Projections for Planning Purposes Only Not to be Used without Updating after December 15, 2002 Table 1.A Estimated costs and returns per Dryland St. Lawrence- Skip Row 2 x 1 (Roundup Ready) 2002 Projected Costs and Returns per Acre _______________________________________________________________________ ITEM UNIT PRICE QUANTITY AMOUNT YOUR FARM _______________________________________________________________________ dollars dollars INCOME cotton lint lb. 0.40 150.0000 60.00 _________ cotton seed lb 0.04 234.0000 9.36 _________ -------TOTAL INCOME 69.36 _________ DIRECT EXPENSES SEED seed (1st planting) seed (replant) CROP INSURANCE crop insurance HERBICIDES RU banded w/ planter RU banded with repla roundup cyclone defoliant INSECTICIDES insecticide HARVEST custom ginning cttn hvst. var. cost OPERATOR LABOR Tractors Self-Propelled Eq. DIESEL FUEL Tractors Self-Propelled Eq. cotton harvester FC REPAIR & MAINTENANCE Implements Tractors Self-Propelled Eq. INTEREST ON OP. CAP. lb. lb. 1.10 0.24 9.0000 2.2000 9.90 0.52 _________ _________ 18.00 1.0000 18.00 _________ pt. pt. pt oz. 1.00 1.00 2.67 0.25 1.5000 0.8000 1.5000 20.0000 1.50 0.80 4.00 5.00 _________ _________ _________ _________ pt. 1.00 1.0000 1.00 _________ lb. lb. 0.09 0.05 150.0000 150.0000 13.50 7.50 _________ _________ hour hour 5.75 5.75 1.5937 0.1500 9.16 0.86 _________ _________ gal gal gal 1.10 1.10 1.10 12.7798 1.5000 8.0000 14.05 1.65 8.80 _________ _________ _________ 9.15 9.85 0.35 4.65 1.0000 1.0000 1.0000 1.0000 9.15 9.85 0.35 4.65 -------120.28 -50.92 _________ _________ _________ _________ 15.51 20.94 7.96 6.75 -------51.17 -------171.45 -102.09 _________ _________ _________ _________ acre TOTAL DIRECT EXPENSES RETURNS ABOVE DIRECT EXPENSES FIXED EXPENSES Implements Tractors Self-Propelled Eq. cotton harvester FC 15.51 20.94 7.96 6.75 TOTAL FIXED EXPENSES TOTAL SPECIFIED EXPENSES RETURNS ABOVE TOTAL SPECIFIED EXPENSES 1.0000 1.0000 1.0000 1.0000 _________ _________ _________ _________ _________ ALLOCATED COST ITEMS Prop. Tax Dry Land acre 15.00 1.0000 15.00 _________ RESIDUAL RETURNS -117.09 _________ _______________________________________________________________________ Universal Parameters for Distict 6 were taken from District 8. Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were collected and developed by staff members of Texas Cooperative Extension and approved for publication. B-1241 (C6) Projections for Planning Purposes Only Not to be Used without Updating after December 15, 2002 B-1241 (C6) Table 1.B Estimated resource use and costs for field operations, per Dryland St. Lawrence- Skip Row 2 x 1 (Roundup Ready) 2002 Projected Costs and Returns per Acre ____________________________________________________________________________________________________________________________________________ _ TRACTOR COST EQUIP COST ALLOC LABOR OPERATING INPUT OPERATION/ SIZE/ TRACTOR PERF TIMES -------------- -------------- ---------------------------------TOTAL OPERATING INPUT UNIT SIZE RATE OVER MTH DIRECT FIXED DIRECT FIXED HOURS COST AMOUNT PRICE COST COST ____________________________________________________________________________________________________________________________________________ _ ------------dollars----------dollars -------dollars-------chisel springtooth harrow lister 8 row row cultivator planter / replanter seed (1st planting) lb. RU banded w/ planter pt. replant row cultivat planter / replanter seed (replant) lb. RU banded with repla pt. springtooth harrow 3-point sprayer roundup pt row cultivator 3-point sprayer cyclone defoliant oz. crop insurance acre 3-point sprayer insecticide pt. cotton harvester cotton harvester FC acre custom ginning lb. cttn hvst. var. cost lb. 180 150 180 180 180 0.133 0.166 0.133 0.103 0.137 1.00 1.00 1.00 1.00 1.00 Jan Jan Feb Feb May 1.94 2.54 1.94 1.50 2.00 1.50 2.38 1.50 1.16 1.55 0.23 0.77 0.69 0.49 2.17 0.50 1.62 1.10 0.77 3.46 0.133 0.166 0.133 0.103 0.137 0.76 0.95 0.76 0.59 0.79 4.95 8.29 6.00 4.52 9.99 9.0000 1.10 9.90 9.90 1.5000 1.00 1.50 1.50 150 0.137 1.00 Jun 2.09 1.96 1.17 1.91 0.137 0.79 7.95 150 0.137 1.00 Jun 2.09 1.96 2.17 3.46 0.137 0.79 10.50 2.2000 0.24 0.52 0.52 0.8000 1.00 0.80 0.80 150 0.166 1.00 Jun 2.54 2.38 0.77 1.62 0.166 0.95 8.29 150 0.125 1.00 Jun 1.90 1.78 0.05 0.08 0.125 0.71 4.54 1.5000 2.67 4.00 4.00 180 0.103 1.00 Jul 1.50 1.16 0.49 0.77 0.103 0.59 4.52 150 0.125 1.00 Oct 1.90 1.78 0.05 0.08 0.125 0.71 4.54 20.0000 0.25 5.00 5.00 1.00 Nov 1.0000 18.00 18.00 18.00 150 0.125 1.00 Nov 1.90 1.78 0.05 0.08 0.125 0.71 4.54 1.0000 1.00 1.00 1.00 0.150 1.00 Nov 2.00 7.96 0.150 0.86 10.83 8.80 6.75 1.0000 15.55 1.00 Nov 150.0000 0.09 13.50 13.50 1.00 Nov 150.0000 0.05 7.50 7.50 ------- ------- ------- ------- ------ ------------- ------TOTALS 23.91 20.94 19.96 30.22 1.743 10.02 61.73 166.80 INTEREST ON OPERATING CAPITAL 4.65 UNALLOCATED LABOR 0.00 TOTAL SPECIFIED COST 171.45 ____________________________________________________________________________________________________________________________________________ _ Universal Parameters for Distict 6 were taken from District 8.