/ TexasAgricultural Extension Service The Texas A&M University System Texas Crop Enterprise Budgets South Texas District Projected for 1996 Merritt J. Taylor, District 12 Extension Economist-Management Extension programs serve people of all ages regardless of socioeconomic level, race, color, sex, religion, disability or national origin. The Texas A&M University System, U.S. Department of Agriculture, and the County Commissioners Courts of Texas Cooperating 1996 CROP & LIVESTOCK BUDGETS TABLE OF CONTENTS I AJWUALS A. FIELD CROPS 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. CORN. IRRIGATED COTTON. DRYLAND COTTON. IRRIGATED FORAGE SORGHUM KAY. ORYLAND SORGHUM. DRYLAND .... SORGHUM. IRRIGATED SORGHUM DRYLAND. CONSERVATIVE TILLAGE SOYBEANS. IRRIGATED PEANUTS. SPANISH. DRYLAND PEANUTS. SPANISH. IRRIGATED C12.1 C12.2 C12 3 C12 4 C12 5 C126 C12 7 C12 8 C129 C12.10 B. VEGETABLES 1. 2. 3. 4. 5. 6. 7 8. 9. 10. 11. 12. 13. 14. BROCCOLI. IRRIGATED CABBAGE. IRRIGATE CANTALOUPES. IRRIGATED CARROTS. IRRIGATE CUCUMBERS. IRRIGATED HONEYDEWS. IRRIGATED LETTUCE, IRRIGATED YELLOW ONIONS. IRRIGATED YELLOW ONIONS. DRYLAND PEPPERS. (BELL). IRRIGATED PEPPERS. (JALAPENO) IRRIGATE TOMATOS. FRESH SPRING. IRRIGATED WATERMELONS. DRYLAND WATERMELONS. IRRIGATED ... C12.11 C12.12 C12.13 C12.14 C12.15 C12.16 C12.17 Ctt 18 Ctt. 19 C12.20 C1221 C12.22 C1223 C12.24 II. PERENNIALS A. CITRUS 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. GRAPEFRUIT E S TA B L I S H M E N T YEAR GRAPEFRUIT E S TA B L I S H M E N T YEAR GRAPEFRUIT E S TA B L I S H M E N T- Y E A R GRAPEFRUIT E S TA B L I S H M E N T- Y E A R GRAPEFRUIT-MATURE GROVE ORANGES ESTABLISHMENT - YEAR 1 ORANGES ESTABLISHMENT - YEAR 2 ORANGES ESTABLISHMENT - YEAR 3 ORANGES ESTABLISHMENT - YEAR 4 ORANGES-MATURE GROVE ... 1 2 3 4 _., 2, ^ ~ 2J_5 2H3. C12.28 C12.29 C12.30 C12.31 C12.32 C1233 C12.34 B SUGARCANE 1. 2. PLANT CANE RATOON CANE. IRRIGATED Ctt. 35 C12.36 C PASTURE GRASS BERMUDA TYPE GRASSES. ESTABLISHMENT. IRRIGATED BERMUDA GRASS HAY. IRRIGATED BERMUDA PASTURE. IRRIGATED .. BUFFLE GRASS ESTABLISHMENT. DRYLAND BUFFLEGRASS. DRYLAND ... KLINEGRASS ESTABLISHMENT. DRYLAND KLINEGRASS PASTURE. DRYLAND C12.37 C12.38 C12.39 C12 40 C12.41 C12.42 C12.43 III LIVESTOCK A. COW-CALF PRODUCTION & LIVESTOCK PROOUCTS REPORT COW-CALF PRODUCTION. UNIMPROVED BRUSH COUNTRY COW-CALF PRODUCTION. 1/3 IMPROVED PASTURE COW-CALF PROOUCTION. IMPROVED PASTURE LIVESTOCK PRODUCTS REPORT L12.1 L12.2 L12.4 L12.5 IV. STANDARDIZED DATA A. REPORTS. COSTS. AND RESOURCES 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11 . 12. 13. CROP PROOUCTS REPORT c.~ TRACTORS. IMPLEMENTS ANO EQUIPMENT O P E R AT I N G INPUT RESOURCES AUTO OR TRUCK RESOURCES CUSTOM O P E R AT I O N RESOURCES LABOR RESOURCES LIVESTOCK RESOURCES LAND RESOURCES PERENNIAL CROP RESOURCES BUILDING OR IMPROVEMENTS RESOURCES I R R I G AT I O N EQUIPMENT MACHINERY COST REPORT BUOGETS PA R A M E T E R S REPORT „ ei?.*Lc ro'SS cmsj Ci?£«_« C15S7 c\i% C13M Cl2«r Cl_sf C t t fi ? C t t fi L * C12e5 H TexasAgricultural Extension Service vM The Texas A&M University System MEMO TO. Users of the 1996 Crop and Livestock Budgets for South Texas FROM: foferritt J. Taylor, Extension Economist-Management Enrique Alonzo Jr., Student Assistant SUBJECT: Use of These Budgets Attached are the Texas Crop and Livestock Enterprise Budgets for 1996. They were developed through cooperation of many producers throughout the TAEX district 12 of South Texas and Merritt J. Taylor at the Department of Agricultural Economics at Texas A&M University. They are a composite of several producers' activities and production costs so many not reflect your individual practices or costs of production. They are averages and should be used as a guide only. The budgets were organized using the Lotus 123 Spreadsheet Software with fixed costs estimated using the MBMS Budget Generator. The templates can be obtained for your use and personalization by sending formatted diskettes to me. l3_i_itKM As with any new technique and with all works of this size errors may have gotten by me in the reviewing process. If you find any error whether it be in cultural practice, logic, costs, prices or calculations--I would greatly appreciate you calling me so that I can make the correction. Since I am using spreadsheet templates the future editions should have less errors. If you would like to be an annual reviewer of these budgets and thus enable the output to more readily reflect real costs, yields, revenues and practices please cut out the form below and return to Merritt J. Taylor, 2401 East Highway 83, Weslaco, TX 78596. Telephone (210) 968-5581. I agree to be a contributing member of the South Texas Crop and Livestock Budget reviewers group. Name Address Telephone Company Extension programs serve people of all ages regardless of socioeconomic level, race, color, sex, religion, disability or national origin. The Texas A&M University System, U.S. Department of Agriculture, and the County Commissioners Courts of Texas Cooperating P r o j e c ti o n s fo r P l a n n i n g Pu rp o se s On l y B-1 2 4 1 (C 1 2 ) Not to be Used without Updating after March 1,1996. CORN. IRRIGATED South Texas District (12) 1996 Projected Costs and Returns per Acre GROSS INCOMf_D;^on_ Quantity Unit D B R O E N C T P M T. G O R N To t a l GROSS $/Unit To t a l HS£ Income V/v tr Estimate ^^^ $3.38 ^ ==$253.50= VA R I A B L E C O S T D e s c r i p t i o n Q u a n t i t y U n i t $ / U n i t To t a l PREHARVEST ======================= PHn^Sri:DRY) ™£J 500° ?EED 10.00 15°°0,btolb. HERBICIDE *043 °-29 130 100 564 14 13 ^ 50 50 00 IJ; ™™ INSECTICIDE 100 acre 11 . 0 0 11 0 0 ANNUAL I R R I G AT I O N FEE 10 oo io 00 I R R I G AT I O N 3.00 appl 10.50 31.50 Fuel & Lube Machinery 1.00 acre 12 07 12 07 Repairs -Machinery 1.00 acre 3 86 386 Labor -Machinery 3.60 hour 6 81 2454 lrri9atJ°n 4.50 hour 5J0 25.64 To t a l HARVEST CUSTOM CUSTOM PREHARVEST HARVEST HAULING loo acre 44.8O To t a l -OC To t a l Borrowed INCOME FIXED COST Machinery Land minus PROJECTED COST unit 0^* Cost ALL RETURNS 11 . 5 5 63 "$657l" 90.00 ""JSjT Cost PER _4 Total Equipment acre FIXED 0.120 S======$258=1=3 VA R I A B L E Description of dol. COST and To t a l — 96.26 VA R I A B L E GROSS NET 20 cwt HARVEST Interest To t a l co17co 5217.62 00 20 00 0.20 1*6 ACRE $41384 ($160.34)- Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. C12.1 Projections for Planning Purposes Only Not to be Used without Updating after March 1,1995. B-1241 (C12) COTTON. DRYLAND South Texas District (12) 1995 Projected Costs and Returns per Acre GROSS INCOME Description COTTON UNT COTTONSEED DEFICIENCY PMT. COTTON Quantity 500 0.405 500 Unit lb. ton lb. Total GROSS Income VARIABLE COST Description PREHARVEST BOLL WEEVIL ERADICATION NITROGEN (DRY) PHOSPHATE SEED HERBICIDE INSECTICIDE PESTICIDE APPL. CAT + @ 65% INSURANCE Fuel & Lube - Machinery Repairs - Machinery Labor - Machinery Total PREHARVEST HARVEST DEFOLIANT DEFOLIANT APPL GIN. BAG, TIES CUSTOM STRIPPING Fuel & Lube - Machinery Repairs - Machinery Labor - Machinery -Other Quantity Unit 30.00 30.0 18.0 1.0 4.0 4.0 lb. lb. lb. acre appl acre 1.0 1.0 6.5 acre acre hour $/Unit Your To t a l E s t i m a t e $0.64 110.00 0.150 $320.00 44.55 75.X $0.79 $439.55 $/Unit $10.00 $0.31 0.29 0.60 12.95 7.53 3.00 10.00 12.25 3.93 6.81 Total $10.00 $9.30 8.70 10.80 1295 30.12 1200 10.X 12.25 3.93 44.27 $164.32 1.0 1.0 1.041 500.0 1.0 1.0 0.1 1.0 acre acre acre lb. acre acre hour hour 5.50 3.50 30.00 0.08 0.20 0.06 5.00 5.X Total HARVEST 5.50 3.50 31.23 40.X 0.20 0.06 0.52 5.X $86.01 Interest - OC Borrowed 100.63 dol. 0.12 12.X Total VARIABLE COST $262.40 VARIABLE INCOME minus VARIABLE COST $177.15 FIXED COST Description Unit Machinery and Equipment Land acre acre Total $67.39 40.X Total FIXED Cost $107.39 Total of ALL Cost $369.79 NET PROJECTED RETURNS PER ACRE $69.76 Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. C12.2 Projections for Planning Purposes Only B-1241 (C12) Not to be Used without Updating after March 1.1996. COTTON. IRRIGATED South Texas District (12) 1996 Projected Costs and Returns per Acre GROSS INCOME Description COTTON UNT COTTONSEED DEFICIENCY PMT. COTTON mtity Unit 7X to. 0.608 ton 750 lb. Total GROSS Income VARIABLE COST Description PREHARVEST BOLL WEEVIL ERADICATION HERBICIDE NITROGEN (DRY) PHOSPHATE SEED INSECTICIDE PESTICIDE APPL. ANNUAL IRRIGATION FEE IRRIGATION CAT + @ 65% INSURANCE Fuel & Lube - Machinery Repairs - Machinery Labor -Machinery -Irrigation Total PREHARVEST HARVEST DEFOLIANT DEFOLIANT APPL GIN, BAG, TIES CUSTOM PICKING Fuel & Lube - Machinery Repairs - Machinery Labor - Machinery -Other ntity Unit 1.0 acre X.O lb. X.O lb. 18.0 lb. 10.0 appl 10.0 appl 3.0 appl 1.0 1.0 3.9 4.5 acre acre hour hour $/Unrt Your To t a l E s t i m a t e $0.75 110.X O.X $562.50 66.83 $0.00 $0.75 $629.33 $/Unit Total $18.00 $12.95 0.43 0.29 O.X 7.53 3.X 10.X 10.X 8.00 12.76 4.59 6.81 5.70 $18.X $12.95 2S.X 17.40 10.X 75.X X.X 10.X 31.X 8.X 12.76 4.59 26.49 25.64 $291.23 1.0 acre 1.0 acre 1.562 bale 750.0 lb. 1.0 acre 1.0 acre 0.1 hour 1.0 hour 5.X 3.X X.X 0.12 0.20 O.X 5.X 5.X Total HARVEST $5.X 3.X 46.X X.X 0.20 O.X 0.52 5.X $151 .X Interest - OC Borrowed 130.7 dol. Total VARIABLE COST Machinery and Equipment Land $15.69 $458.55 GROSS INCOME minus VARIABLE COST FIXED COST Description 0.12 $170.78 Unit acre acre Total FIXED Cost Total $72.61 70.X $142.61 Total of ALL Cost $X1.16 NET PROJECTED RETURNS PER ACRE $28.17 Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. C12.3 Projections for Planning Purposes Not to be Used without Updating after March 1,1996. Only B-1241 (C12) FORAGE SORGHUM HAY, DRYLAND South Texas District (12) 1996 Projected Costs and Returns per Acre GROSS H AY INCOME Description SORGHUM Quantity 100 Unit bales $/Unit $1.50 Total GROSS Income Your Estimate To t a l $150.00 150.00 VARIABLE COST Description PREHARVEST NITROGEN (DRY) PHOSPHATE SEED Fuel & Lube - Machinery Repairs - Machinery Labor - Machinery Total PREHARVEST HARVEST CUSTOM BAILING CUSTOM HAULING intity Unit 60.00 30.00 20.00 1.0 .1.0 1.47 $/Unit lb. lb. tb. acre acre hour $0.31 0.29 0.16 4.75 1.82 6.81 Total $18.60 8.70 3.20 4.75 1.82 9.99 $47.06 100.00 bales 100.00 bales 0.65 0.40 Total HARVEST 65.00 40.00 $105.00 Interest - OC Borrowed 24.79 dol. Total VARIABLE COST 0.12 2.97 $155.04 Break-Even Price, Total Variable Cost $1.55 p>er bale of HAY GROSS INCOME minus VARIABLE COST ($5.04) FIXED COST Description Unit Machinery and Equipment Land acre acre Total $26.71 40.00 Total FIXED Cost $66.71 Total of ALL Cost $221.75 NET PROJECTED RETURNS PER ACRE ($71.75) B r e a k - E v e n P r i c e , To t a l C o s t & 2 . 2 2 p e r b a l e o f H AY Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. C12.4 Projections for Planning Purposes Only Not to be Used without Updating after March 1.1996. B-1241 (C12) SORGHUM. DRYLAND South Texas District (12) 1996 Projected Costs and Returns per Acre GROSS INCOME Description SORGHUM DEFICIENCY PMT. SORGHUM Unit Quantity Your Total" Estimate : s = s s = = s s sI S S S S S S :: : : = : s s s 3 3 = = = = = = = = = = = = = s s s s s s s s : 28 <7 m . 28 < Total GROSS Income VARIABLE COST Description $/Ur* Quantity Unit :========= s PREHARVEST NITROGEN (DRY) SEED INSECTICIDE PESTICIDE APPL. Fuel & Lube • Machinery Repairs - Machinery Labor • Machinery X.0 5.0 20 2.0 1.0 1.0 3.8 Total PREHARVEST HARVEST CUSTOM HARVEST CUSTOM HAULING $4.66 1.01 $130.48 28.28 $5.67 $158.76 $/Unit Total :=====:============= ========== lb. lb. appl acre acre acre hour $0.31 0.70 1.80 4.X 12.96 4.48 6.81 9.X 3.X 3.X 9.X 12.96 4.48 26.04 $68.88 28.0 28.0 cwt cwt 0.40 0.20 Total HARVEST 11.20 5.X $16.80 Interest - OC Borrowed $57.X dol Total VARIABLE COST $6.85 ========== $92.53 GROSS INCOME minus VARIABLE COST Breakeven Price For Variable Costs 0.120 $66.23 $3.30 per cwt FIXED COST Description Unit Machinery and Equipment Land acre acre Total FIXED Cost Total $72^0 40.X $112.20 Total of ALL Cost $204.73 NET PROJECTED RETURNS PER YEAR ($45.97) Breakeven Price to Cover All Costs $7.31 Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. C12.5 P r o j e c ti o n s fo r P l a n n i n g P u rp o se s On l y B-1 2 4 1 (C 1 2 ) Not to be Used without Updating after March 1,1996. IRRIGATED SORGHUM South Texas District (12) 1996 Projected Costs and Returns per Acre GROSS INCOME Description Quantity Unit SORGHUM DEFICIENCY PMT. SORGHUM X cwt X cwt Total GROSS Income VARIABLE COST Description PREHARVEST NITROGEN (DRY) PHOSPHATE SEED HERBICIDE INSECTICIDE PESTICIDE APPL. ANNUAL IRRIGATION FEE IRRIGATION Fuel & Lube • Machinery Repairs - Machinery Labor - Machinery - Irrigation Quantity Unit 120.0 60.0 8.0 1.0 7.0 7.0 lb. lb. lb. acre appl acre 3.0 1.0 1.0 4.0 4.5 appl acre acre hour hour Total PREHARVEST HARVEST CUSTOM HARVEST CUSTOM HAULING Your To t a l E s t i m a t e $4.66 1.01 $233.X X . X $5.67 $283.50 $/Unrt 0.43 0.29 0.70 4.00 1.80 4.50 10.X 10.50 14.10 5.01 6.81 5.70 Total $51.60 17.40 5.X 4.X 12.X 31.X 10.X 31.X 14.10 5.01 27.35 25.64 $236.30 50 cwt 50 cwt Total HARVEST Interest - OC Borrowed $/Unit $121.81 dol. Total VARIABLE COST 0.40 0.20 $20.00 10.X $0.60 $30.00 0.120 14.62 $280.92 GROSS INCOME minus VARIABLE COST 2.58 FIXED COST Description Unit Machinery and Equipment Land acre acre Total $75.59 70.00 Total FIXED Cost $145.59 Total of ALL Cost $426.51 NET PROJECTED RETURNS PER ACRE ($143.01) Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. C12.6 Projections for Planning Purposes Only B-1241 (C12) Not to be Used without Updating after March 1,1996. SORGHUM, DRYLAND, CONSERVATION TILLAGE South Texas District (12) 1996 Projected Costs and Returns per Acre GROSS INCOME Description Quantity Unit SORGHUM DEFICIENCY PMT. SORGHUM 28 cwt 28 cwt $/Untt Your To t a l E s t i m a t e $4.66 1.01 $130.48 28.28 Total GROSS Income $158.76 VARIABLE COST Description PREHARVEST ROUNDUP HERBICIDE APPL SEED MILOGUARD LORSBAN MALATHION PESTICIDE APPL Fuel & Lube - Machinery Repairs - Machinery Labor -Machinery Total PREHARVEST HARVEST CUSTOM HARVEST CUSTOM HAULING Quantity Unit 0.25 pint 1.X acre 6.X lb. 1.25 lb. 1.25 qt 0.20 gal. 3.X acre 1.X acre 1.X acre 2.19 Hour $/Unit Total $9.38 3.X 0.70 2.95 9.68 12.40 4.X 6.34 1.94 6.81 $2.35 3.X 4.20 3.X 12.10 2.48 13.X 6.34 1.94 14.91 $65.00 28.X cwt 28.X cwt 0.40 0.20 $11.20 5.X Total HARVEST $16.80 Interest • OC Borrowed 38.61 Dol. 0.120 4.X Total VARIABLE COST $86.44 GROSS INCOME minus VARIABLE COST $72.32 FIXED COST Description Unit Machinery and Equipment Land Acre Acre Total $33.26 40.X Total FIXED Cost $73.26 Total of ALL Cost $1X.70 NET PROJECTED RETURNS PER ACRE ($0.94) Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. C127 B-1241 (C12) Projections for Planning Purposes Only Not to be Used without Updating after March 1,1996. SOYBEANS, IRRIGATED South Texas District (12) 1996 Projected Costs and Returns per Acre GROSS INCOME Description Unit Quantity SOYBEANS X bu. $/Unit Your To t a l E s t i m a t e $5.00 $150.00 Total GROSS Income VARIABLE COST Description PREHARVEST HERB, PREMERGE SEED INOCULANT PHOSPHATE ANNUAL IRRIGATION FEE IRRIGATION INSECTICIDE PESTICIDE APPL FUNGICIDE Fuel & Lube - Machinery Repairs • Machinery Labor • Machinery - Irrigation Total PREHARVEST HARVEST HARVEST & HAUL Fuel & Lube - Machinery Repairs - Machinery Labor - Machinery $150.00 Quantity Unit 1.0 60.0 1.0 30.0 appl fc. appl lb. 3.0 3.0 3.0 1.0 1.0 1.0 1.1 4.5 appl appl acre appl acre acre hour hour $9.00 0.28 1.10 0.29 10.00 10.50 2.60 4.50 9.80 4.43 1.X 6.81 5.70 Total $9.00 16.80 1.10 8.70 10.00 31.50 7.80 13.50 9.80 4.43 1.X 7.28 25.64325 $147.21 30.0 1.0 1.0 0.3 bu. acre acre hour Total HARVEST Interest - OC Borrowed $/Unrt $36.73 dol. 0.70 1.79 4.46 5.00 21.00 1.79 4.46 1.64 $11.95 $28.89 0.12 $4.41 Total VARIABLE COST $180.51 Break-Even Price - Total Variable Cost $6.02 per bu. of SOYBEANS GROSS INCOME minus VARIABLE COST ($30.51) FIXED COST Description Unit acre acre Machinery and Equipment Land Total $37.10 70.00 Total FIXED Cost $107.10 Total of ALL Cost $287.61 NET PROJECTED RETURNS PER ACRE Break-Even Price , Total Cost ($137.61) $9.59 per bu. of SOYBEANS Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. C12.8 Projections for Planning Purposes Only Not to be Used without Updating after March 1,1996 B-1241 (C12) PEANUTS , SPANISH. DRYLAND South Texas District (12) 1996 Projected Costs and Returns per Acre GROSS INCOME Description Unit $ / Unit Quantity PEANUTS 1.X ton Your Estimate Total $610 00 Total GROSS Income VARIABLE COST Description PREHARVEST NITROGEN (DRY) PHOSPHATE POTASH SEED HERBICIDE FUNGICIDE INSECTICIDE Fuel & Lube - Machinery Repairs • Machinery Labor • Machinery Total PREHARVEST HARVEST CUSTOM HARVEST CUSTOM DRYING Fuel & Lube - Machinery Repairs -Machinery Labor -Machinery Unit $ / Unit Quantity 16.X 24.X 12.X 70.X 1.X 3.X 4.X 1.0 1.0 3.31 to. to. to. to. acre appl appl acre acre Hour $0 31 0.29 0.13 0.61 8.56 5.61 5.X 12.94 4.87 6.81 $141.92 1.X 1.X 1.0 1.0 0.08 ton ton acre acre Hour 8.X 20.X 0.11 0.79 5.X Total HARVEST Interest - OC Borrowed $81.16 Dol. 0.12 Machinery and Equipment Land Peanut Quota Rent 9.74 $180.97 $1X.97 per ton of PEANUTS GROSS INCOME minus VARIABLE COST FIXED COST Description $8.00 20.X 0.11 0.79 0.41 $29.31 Total VARIABLE COST Break-Even Price Total Variable Cost $4.96 6.X 1.X 42.7 8.X 16.X 20.X 12.94 4.87 22.54 $429.03 Unit Acre Acre 1.X ton Total $66.67 $67 96 40.X X.67 Total FIXED Cost $174.63 Total of ALL Cost $355.60 NET PROJECTED RETURNS PER ACRE $254.40 Break-Even Price. Total Cost & $355.X per ton of PEANUTS Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. C12.9 Projections for Planning Purposes Only Not to be Used without Updating alter March 1,1996 B-1241 (C12) PEANUTS . SPANISH. IRRIGATED South Texas District (12) 1996 Projected Costs and Returns per Acre GROSS INCOME Description S===S=SS3SS3SSSS3S PEANUTS Unit $ / Unit Quantity 1.X ton $610.00 Total GROSS Income VARIABLE COST Description PREHARVEST NITROGEN (DRY) PHOSPHATE POTASH SEED HERBICIDE FUNGICIDE ANNUAL IRRIGATION FEE IRRIGATION INSECTICIDE FUNGICIDE HOEING Fuel & Lube • Machinery Repairs • Machinery Labor - Machinery • Irrigation Total PREHARVEST HARVEST CUSTOM HARVEST CUSTOM DRYING Fuel & Lube • Machinery Repairs • Machinery Labor - Machinery $915.00 $915.X Quantity Unit $/Unrt Total 16.X 24.X 12.X X.X 1.00 1.00 lb. lb. lb. lb. acre appl 4.X 3.X 6.X 1.X appl appl appl acre 0.13 0.61 6.X 19.88 10.X 10.X 5.X 5.61 6 00 1.00 1.X 3.47 6.X acre acre hour hour 13.97 4.80 6.81 5.70 4.X 6.X $1.56 54.X $0.31 0.29 8.56 19 88 10.X 42.X 15.X 33.X 6.X 13.97 4.X 23.64 34.19 $280.08 1.X 1.X 1.X 1.X O.X ton ton acre acre hour 8.X 20.X 0.11 0.79 5.X Total HARVEST Interest • OC Borrowed Your Estimate Total $12.X 30.X 0.11 0.79 0.42 $43.32 125.74 Dol. 0.12 Total VARIABLE COST 15.X $338.48 Break-Even Price. Total Variable Cost $225.65 per ton of PEANUTS GROSS INCOME minus VARIABLE COST $576.52 FIXED COST Description Unit 1 Acre 1 Acre 1.5 ton Machinery and Equipment Land Peanut Quato Rent Total $70.41 X . X 66.67 $70.41 $90.00 $1X.01 Total FIXED Cost $260.42 Total of ALL Cost $598.90 NET PROJECTED RETURNS PER ACRE $316.10 Break-Even Price . Total Cost 399.26 per ton of PEANUTS Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. C12.10 B-1241 (C12) Projections for Planning Purposes Only Not to be Used without Updating after March 1.19X. BROCCOLI. IRRIGATED South Texas District (12) 19X Projected Costs and Returns per Acre GROSS INCOME Description BROCCOLI Quantity Unit 6 X . X crtn Total GROSS Income VARIABLE COST Description PREHARVEST PHOSPHATE HERBICIDE SEED ANNUAL IRRIGATION FEE IRRIGATION NITROGEN (LIQ) INSECTICIDE PESTICIDE APPL FUNGICIDE Fuel & Lube • Machinery Repairs -Machinery Labor - Machinery -Other -Irrigation Total PREHARVEST HARVEST HARVEST PACK & COUNT MARKETING Labor -Other Quantity Unit X . X to. 1 . X acre 1 . X to. 7.X 2X.X 7.X 7.X 6.00 1.00 1.X 5.22 24.X 10.X appl lb. appl acre appl acre acre hour hour hour $/Unit Your To t a l E s t i m a t e $7.X $4,500.00 (size 18's) === $4,500.00 $/Unit Total $0.29 41.55 96.00 10.X 10.X 0.70 8.00 4.X 6.X 15.04 5.92 6.81 5.70 5.70 $23.20 41.X X.X 10.X 73.X 140.X X.X 31.X 36.00 15.04 5.92 35.57 136.76 X.X $758.03 600.00 600.00 6X.X 6.X crtn crtn bag hour Total HARVEST Interest - OC Borrowed $179.32 dol. $1.60 2.70 0.40 5.X $960.00 1.620.X 240.X 30.00 $4.70 $2,850.00 0.12 21.52 Total VARIABLE COST $3,629.55 Break-Even Price - Total Variable Cost $6.05 per crtn of BROCC<DU GROSS INCOME minus VARIABLE COST $870.45 FIXED COST Description Unit Machinery and Equipment Land Acre Acre Total $153.08 X.X Total FIXED Cost $243.08 Total of ALL Cost $3,872.63 NET PROJECTED RETURNS PER ACRE Break-Even Price - Total Cost $627.37 $6.45 per crtn of BROCCOLI Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. C12.11 Projections for Planning Purposes Only Notto be Used without Updating after March 1, 19X. B-1241 (C12) CABBAGE, IRRIGATED South Texas District (12) 19X Projected Costs and Returns per Acre GROSS INCOME Description CABBAGE antity Unit 6X.X bags X.X lb. Total GROSS Income VARIABLE COST Description PREHARVEST PHOSPHATE HERBICIDE SEED NITROGEN (LIQ) ANNUAL IRRIGATION FEE IRRIGATION INSECTICIDE PESTICIDE APPL FUNGICIDE Fuel & Lube - Machinery Repairs - Machinery Labor - Machinery -Other •Irrigation Total PREHARVEST HARVEST HARVESTING MARKETING PACK & COUNT antity Unit X.X lb. 1.X acre 1.X lb. 200.00 B>. 7.X 7.X 7.X 6.X 1.X 1.X 4.X 24.X 10.X appl appl acre appl Acre Acre Hour Hour Hour $/Unit Your To t a l E s t i m a t e $5.90 $3,540.X (18-24 ct) ==$3.540.X $/Unrt Total $0.29 41.X 75.X O.X 10.X 10.X 8.X 4.X 6.X 13.22 4.71 6.81 5.70 5.70 $23.20 41.X 75.X 126.X 10.X 73.X X.X 31.X X.X 13.22 4.71 33.28 1X.76 59.83 $720.55 600.00 bag 600 00 bag 6X.X bag 1.00 0.40 1.75 $600.00 240.X 10X.X $3.15 Labor -Other 6.X Hour 4.X 27.X Total HARVEST $1.917.X Interest • OC Sorrowed 179.41 Dol. 0.12 21.X Total VARIABLE COST $2,659.08 Break-Even Price - Total Variable Cost $4.43 per bag of CABBAGIE GROSS INCOME minus VARIABLE COST $880.92 FIXED COST Description Unit Machinery and Equipment Land Acre Acre Total $114.X 75.X Total FIXED Cost $189.36 Total of ALL Cost $2,848.44 NET PROJECTED RETURNS $691.56 Break-Even Price , Total Cost $4.75 perbtag of CABBAGE Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. C12.12 Projections for Planning Purposes Only Not to be Used without Updating after March 1.19X. CANTALOUPES. IRRIGATED South Texas District (12) 19X Projected Costs and Returns per Acre GROSS INCOME Description CANTALOUPES Total GROSS Income VARIABLE COST Description PREHARVEST PHOSPHATE HERBICIDE NEMATICIDE SEED NITROGEN ANNUAL IRRIGATION FEE IRRIGATION INSECTICIDE FUNGICIDE PESTICIDE APPL BEE RENT Fuel & Lube • Machinery Repairs -Machinery Labor -Machinery -Other -Irrigation Total PREHARVEST HARVEST HARVESTING PACK & COUNT MARKETING Quantity Unit 395.X crtn (40 lb) $10.42 Your To t a l E s t i m a t e $4.115.X $4.115.X Quantity Unit X.X 200 1.X 1.X 120.X lb. acre acre lb. lb. 3.X 5.X 9.X 6.X 1.X 1.X 1.X 6.X 10.X 7.X appl appl appl acre hive acre acre hour hour hour $/Unrt X.29 9.X 40.X 125.X O.X 10.X 10.X 8.X 11.20 4.X X.X 16.13 6.03 7.X 5.70 5.70 Total $23.20 19.X 40.X 125.X 75.X 10.X 31.X 40.X 1X.X 27.X 75.X 16.13 6.X 45.X X.X 42.74 $734.48 395.X crtn 395.X crtn 395.X crtn Total HARVEST Interest - OC Borrowed $/Unit 191.X Dol. 1.25 2.X O.X 4X.75 X8.X 197.X $4.05 $1.5X75 0.12 23.X Total VARIABLE COST $2,357.26 Break-Even Price - Total Variable Cost $5.97 per crtn of CAN TALOUPES GROSS INCOME minus VARIABLE COST $1.7X64 FIXED COST Description Unit Machinery and Equipment Land Acre Acre Total FIXED Cost Total $87.X X.X $177.X Total of ALL Cost $2,534.64 NET PROJECTED RETURNS PER ACRE Break-Even Price - Total Cost $1,581.26 $6.42 per crtn of CANTALOUPES Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. C12.13 Projections for Planning Purposes Only. Not to be Used without Updating after March 1. 19X. B-1241 (C12) CARROTS, IRRIGATED South Texas District (12) 19X Projected Costs and Returns per Acre GROSS INCOME Description CARROTS _ntity Unit $/Unit 380.00 crtn PREHARVEST PHOSPHATE HERBICIDE NEMATICIDE SEED NITROGEN (LIQ) ANNUAL IRRIGATION FEE IRRIGATION INSECTICIDE FUNGICIDE PESTICIDE APPL Fuel & Lube - Machinery Repairs • Machinery Labor - Machinery • Irrigation Total PREHARVEST HARVEST HARVEST PACK & COUNT MARKETING $2.337.X antity Unit X.OO b. 2.00 acre 1.00 acre 3.00 lb. 120.00 to. 4.00 3.00 4.00 4.00 1.00 1.00 4.78 6.00 appl appl appl acre Acre Acre Hour Hour $/Unit Total $0.29 13.00 40.00 6.50 0.70 10.00 10.50 8.67 4.00 4.50 18.67 6.76 6.81 5.70 $23.20 26.X 40.00 19.X 84.X 10.00 42.00 26.01 16.00 18.00 18.67 6.76 32.59 34.19 $396.92 380.00 crtn 380.00 crtn 380.00 crtn Total HARVEST Interest - OC Borrowed $2,337.00 (50 lb.) Total GROSS Income VARIABLE COST Description $6.15 Your To t a l E s t i m a t e 127.39 Dol 1.10 2.40 0.40 $418.00 912.00 152.00 $3.90 $1,482.00 0.12 15.29 Total VARIABLE COST $1,894.21 Break-Even Price - Total Variable Cost $4.98 |jer carton of CAR ROTS GROSS INCOME minus VARIABLE COST $442.79 FIXED COST Description Unit Machinery and Equipment Land Acre Acre Total $97.20 75.X Total FIXED Cost $172.20 Total of ALL Cost $2.0X.41 NET PROJECTED RETURNS Break-Even Price - Total Cost $270.59 $5.44 per carton of CARROTS Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch. operation. These projections were collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. C12.14 Projections for Planning Purposes Only Not to be Used without Updating after March 1.19X. B-1241 (C12) CUCUMBERS. IRRIGATED South Texas District (12) 19X Projected Costs and Returns per Acre GROSS INCOME Description CUCUMBERS Quantity Unit 275.X crtn $/Urut $5.75 Total GROSS Income Your To t a l E s t i m a t e $1.X1.25 $1.X1.25 VARIABLE COST Description PREHARVEST PHOSPHATE HERBICIDE SEED NITROGEN (UQ) ANNUAL IRRIGATION FEE IRRIGATION INSECTICIDE PESTICIDE APPL FUNGICIDE BEE RENT Fuel & Lube - Machinery Repairs - Machinery Labor • Machinery -Other -Irrigation Total PREHARVEST HARVEST HARVEST PACK & COUNT MARKETING Quantity Unit X.X 200 2.X 1X.X to. acre lb. lb. 4.X 3.X 6.X 3.X 1.X 1.X 1.X 2.X 15.X 6.X appl appl acre appl hive acre acre hour hour hour $/Unrt $0.29 8.X 8.00 0.70 10.X 10.X 6 00 4.X 4.00 40.X 9.20 3.X 6.81 5.70 5.70 Total $17.40 16.X 20.X 70.X 10.X 42.X 18.X 27.X 12.X 60.00 9.20 3.X 19.X 85.48 34.19 $444.24 275.X crtn 275.X crtn 275.X crtn Total HARVEST Interest • OC Borrowed X.12 dol. 1.X 1.80 0.45 412.X 4X.X 123.75 $3.75 $1.X1.25 0.12 7.57 Total VARIABLE COST $1.483.X Break-Even Price - Total Variable Cost $5.39 per crtn of CUC UMBERS GROSS INCOME minus VARIABLE COST $98.19 FIXED COST Description Unit Machinery and Equipment Land Acre Acre Total FIXED Cost Total $5246 75.X $127.46 Total of ALL Cost $1,610.52 NET PROJECTED RETURNS PER ACRE Break-Even Price - Total Cost ($29.27) $5.X per crtn of CUCUMBERS Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. C12.15 Projections for Planning Purposes Only Not to be Used without Updating after March 1,19X. B-1241 (C12) HONEYDEWS, IRRIGATED South Texas District (12) 19X Projected Costs and Returns per Acre GROSS INCOME Description HONEYDEWS Total GROSS Income VARIABLE COST Description PREHARVEST PHOSPHATE HERBICIDE SEED NEMATOC.DE NITROGEN (LIQ) ANNUAL IRRIGATION FEE IRRIGATION FUNGICIDE PESTICIDE APPL BEE RENT INSECTICIDE Fuel & Lube - Machinery Repairs • Machinery Labor -Machinery -Other -Irrigation Total PREHARVEST HARVEST HARVESTING PACK & COUNT MARKETING jar&ty Unit:$/Unit 6 X . X crtn (28.5 b) To t a l E s t i m a t e $7.48 $4,4X.X $4,488.00 Quantity Unit X.X 200 1.X 1.00 120.X b. acre b. acre b. 3.X 6.X 6.X 1.50 5.X 1.X 1.X 6.X 10.X 7.X appl appl acre hive appl acre acre hour hour hour $/Unft X.29 9.X 2X.X 40.X O.X 10.X 10.X 11.20 4.X X.X 8.X 16.13 6.X 7.X 5.70 4.X Total $23.20 19.X 293.X 40.00 75.X 10.X 31.X 67.20 27.X 75.X 40.X 16.13 6.X 45.X 57.X 33.75 $859.91 600.00 crtn 600.00 crtn 600.00 crtn Total HARVEST Interest • OC Borrowed $116.00 Dd. 1.00 2.X 0.40 6X.X 12X.X 240.X $3.40 $2,040.00 0.12 13.92 Total VARIABLE COST $2.913.X Break-Even Price - Total Variable Cost $4.86 per crtn of HONIEYDEWS' GROSS INCOME minus VARIABLE COST $1,574.17 FIXED COST Description Unit Machinery and Equipment Land Acre Acre Total $121.00 1X.X Total FIXED Cost $221 .X Total of ALL Cost $3.134.X NET PROJECTED RETURNS PER ACRE $1,353.17 Break-Even Price - Total Cost $5.22 per crtn of HONEYDEWS Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. C1216 Projections for Planning Purposes Only Not to be Used without Updating after March 1,1996. B-1241 (C12) LETTUCE, IRRIGATED South Texas District (12) 19X Projected Costs and Returns per Acre GROSS INCOME Description LETTUCE uantity Unit 400.00 crtn $/Unit $4.70 Total GROSS Income VARIABLE COST Description PREHARVEST HERBICIDE NITROGEN (DRY) PHOSPHATE SEED INSECTICIDE PESTICIDE APPL 4-29-2 ANNUAL IRRIGATION FEE IRRIGATION 32-0-0 CALCIUM NITRATE FUNGICIDE NEMATICIDE Fuel & Lube - Machinery Repairs • Machinery Labor - Machinery -Other - Irrigation Total PREHARVEST HARVEST HARVESTING PACK & COUNT MARKETING $1,880.00 $1.880.X uantity Unit 1.00 180.00 80.00 1.00 16.00 16.00 30.00 acre b. b. to. appl acre gal 8.00 30.00 10.00 10.00 1.00 1.00 1.00 4.55 35.00 12.00 appl gal gal appl acre acre acre hour hour hour $/Unrt $17.60 0.31 0.29 70.00 6.12 4.50 1.10 10.00 10.50 0.63 1.10 4.63 40.00 13.35 4.92 6.81 5.70 5.70 Total $17.X 55.X 23.20 70.X 97.92 72.X 33.00 10.X 84.X 18.90 11.X 46.X 40.00 13.35 4.92 30.X 199.45 68.38 $896.78 400.00 crtn 400.00 crtn 400.00 bag Total HARVEST Interest - OC Borrowed Your To t a l E s t i m a t e $215.31 dol. 1.00 1.00 0.40 $400.00 400.X 160.00 $2.40 $960.00 0.12 25.84 Total VARIABLE COST $1,882.62 Break-Even Price - Total Variable Cost $4.71 per crtn of LEUrucE GROSS INCOME minus VARIABLE COST FIXED COST Description Unit Machinery and Equipment Land Acre Acre Total FIXED Cost ($2.62) Total $83.18 75.00 $158.18 Total of ALL Cost $2,040.80 NET PROJECTED RETURNS PER ACRE Break-Even Price - Total Cost ($160.80) $5.10 per crtn of LETTUCE Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. C12.17 Projections for Planning Purposes Only Notto be Used without Updating after March 1,19X. B-1241 (C12) YELLOW ONIONS. IRRIGATED South Texas District (12) 19X Projected Costs and Returns per Acre GROSS INCOME Description Quantity ONIONS Unit 550 bags $/Unrt $5.50 Total GROSS Income VARIABLE COST Description PREHARVEST PHOSPHATE HERBICIDE SEED NITROGEN (LIQ) ANNUAL IRRIGATION FEE IRRIGATION FUNGICIDE PESTICIDE APPL INSECTICIDE FOLFEED Fuel & Lube - Machinery Repairs • Machinery Labor -Machinery -Other -Irrigation Total PREHARVEST HARVEST HARVESTING PACK 4 COUNT MARKETING DRYING ONIONS Your To t a l E s t i m a t e $3.02S.X $3.02S.X Quantity Unit X . O b. 1.0 acre 2 5 b. 1 X . 0 b. 7.0 appl 10.0 appl 10.0 appl 5.0 appl 9.0 appl 1.0 Acre 1.0 Acre 3.9 Hour 20.0 Hour 10.5 Hour $/Unit X.29 X.X X.X 0.70 10.X 10.X 10.X 4.X 9.32 1.X 12.91 5.17 6.81 5.70 5.70 Total $23.20 X.X X.X 126.X 10.X 73.X 1X.X 45.X 46.X 9.X 1291 5.17 26.81 113.97 X.X $807.00 550 550 550 5X bag bag bag bags Total HARVEST Interest • OC Borrowed 420.X Dd. $1.40 1.X O.X 0.25 $770.X 742.X 275.X 137.X $3.50 $1,925.00 0.12 X.X Total VARIABLE COST $2.782.X Break-Even Price - Total Variable Cost $5.06 per bags of ONIONS GROSS INCOME minus VARIABLE COST $242.50 FIXED COST Description Unit Machinery and Equipment Land Acre Acre Total $74.79 75.X Total FIXED Cost $149.79 Total of ALL Cost $2X2.29 NET PROJECTED RETURNS $92.71 Break-Even Price - Total Cost $5.33 per bag of Onions Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were cdlected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. C12.18 Projections for Planning Purposes Only Nd to be Used without Updating after March 1. 1996. B-1241 (C12) YELLOW ONIONS. -DrylandSouth Texas District (12) (Coastal Bend Area) 1996 Projected Costs and Returns per Acre GROSS INCOME Description 33SSSSSSSSSSSSSSS23SS33S3SSSSSS s: Quantity Unit ONIONS 250 bags $/Unit $5.50 Total GROSS Income VARIABLE COST Description PREHARVEST Machinery Operations disc chisel plow plant cultivate Hy-cycle spray Pesticide Appfication fertilizing (liquid) fertilizing (dry) Chemicals Fertilizer 4-10-10 Fertilizer 15-15-15 HERBICIDE (Goal) HERBICIDE (Prowl) SEED (colossal) INSECTICIDE (Ridoma - Bravo 81) Other Resources Used Fuel & Lube - Machinery Repairs - Machinery Labor Quantity Unit 2.00 appl 200 appl 1.X appl 2.X appl 4.00 appl 1.X appl 1.X appl $/Unit Total $5.00 5.X 6.X 5.X 2.X 2.75 2.X $10.00 10.00 6.X 10.X 10.X 2.75 2.00 b b oz pt b appl 0.07 O.X O.X 3.X 21.92 13.75 11.83 22X 3.30 5.09 16.44 27.X 1.00 acre 1.X acre 1.00 hour 6.X 5.17 5.70 6.X 5.17 5.70 169.X 250.00 6.00 1.X 0.75 2.X $154.28 250.00 bag 250.00 bag Total HARVEST Interest - OC Borrowed $1.37500 $1.37S.X Total PREHARVEST HARVEST HARVESTING & haul PACK & COUNT & market Your To t a J E s t i m a t e 175.89 dd 1.70 2.25 $425 00 562.X 3.X $987.50 O.X 15.83 Total VARIABLE COST $1,157.61 Break-Even Price - Total Variable Cost $4.63 |per bag of ONIONS GROSS INCOME minus VARIABLE COST $217.39 FIXED COST Description Unit Machinery and Equipment Land Acre Acre Total FIXED Cost Total $14.79 35.00 $49.79 Total of ALL Cost $1,207.40 NET PROJECTED RETURNS $167.60 Break-Even Price - Total Cost $4.83 per bag of ONIONS Information presented is prepared solely as a general guide and is not intended to recognize or predid the costs and returns from any one particular farm or ranch operation. These projections were cdleded and developed by staff members of the Texas Agricultural Extension Service and approved for publication C1219 Projections for Planning Purposes Only Not to be Used without Updating after March 1,19X. B-1241 (C12) BELL PEPPERS. IRRIGATED South Texas District (12) 19X Projected Costs and Returns per Acre GROSS INCOME Description BELL PEPPERS Your Unit Total $/Unit Estimate - S S S S S S S S ====== =========== :============= s s s s s s s s : 400.00 crtn X.X $2,600.00 Quantity Total GROSS Income VARIABLE COST Description PREHARVEST HERBICIDE PHOSPHATE SEED INSECTICIDE ANNUAL IRRIGATION FEE IRRIGATION FUNGICIDE PESTICIDE APPL NITROGEN (LIQ) Fuel & Lube - Machinery Repairs - Machinery Labor -Machinery -Other -Irrigation Total PREHARVEST HARVEST PACK & COUNT HARVEST MARKETING $2,600.00 Quantity Unit 1.X 1X.X 3.X 14.X acre b. b. appl 7.X 8.X 11.X 1X.X 1.X 1.00 3.29 X.X 10.X appl appl acre b. acre acre Hour Hour Hour $45.00 0.29 25.X 14.X 10.X 10.X 3.X 4.X O.X 11.83 4.X 6.81 5.70 5.70 Total $45.00 29.X 75.X 1X.X 10.X 73.X 24.X 49.X 113.40 11.83 4.X 2242 170.X X.X $885.10 4 X . X crtn 4 X . X crtn 4 X . X crtn Total HARVEST Interest - OC Borrowed $/Urat $224.51 Dd. 1.65 1.25 O.X 6X.X 500.00 2X.X $3.40 $1.360.X 0.12 26.94 Total VARIABLE COST $2.27204 Break-Even Price - Total Variable Cost $5.68 per crtn of BELl.PEPPERS GROSS INCOME minus VARIABLE COST $327.X FIXED COST Description Unit Acre Acre Machinery and Equipment Land Total $67.47 75.X Total FIXED Cost $14247 Total of ALL Cost $2414.51 NET PROJECTED RETURNS PER ACRE Break-Even Price - Total Cost $185.49 $6.04 per crtn of BELL PEPPERS Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm cr ranch operation. These projections were collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. C12.20