B-1241(L07) The Texas A&M University Syst Texas Livestock Enterprise Budgets Projected for 1995 Fisher Jones Shackel ford Nolan Taylor Callahan Ster- Coke \Runnels\coleman\ Q ling Brown Irion Tom Green\c°ncho McCulloch Saba jLampasai Schleicher Menard Mason Llano Burnet Texas Agricultural Extension Service Staff The Texas Agricultural Extension Service • Zerlc L. Carpenter, Director • The Texas A&M University System • College Station, Texas B-1241 (16) Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 Cow-Calf Production West Central Texas (7) 1995 Projected Costs and Returns per Head PRODUCTION Description CULL COWS DEER LEASE HEIFER CALVES STOCKER STEERS Quantity Unit $ 0.10-id 10.000 cwt. 16.000 acre 0.32Hd 4.500 cwt. 0.45Hd 5.000 cwt. / Unit 41.5000 2.5000 77.0000 87.0000 Return 41.50 40.00 110.88 195.75 388.13 Total GROSS Income OPERATING INPUT or CUSTOM OPERATION Description Input Use MISC. EXPENSE COW-CALF 12.000 RANGE CUBES 480.000 SALES COMMISSION 348.130 S A LT AND MINERAL 30.000 V E T. MEDICINE COW-CALF 1.000 Fuel Lube Repair Unit $ lb. $ lb. head J? / Unit 1.000 0.135 0.030 0.350 10.650 Cost 12.,00 64.,80 10.,44 10..50 10..65 5..48 0..27 2,.15 Total OPERATING INPUT and CUSTOM OPERATION Cost s 116,.29 Residual returns to capital, ownership l a b o r, l a n d , m a n a g e m e n t , a n d p r o fi t 271 .84 CAPITAL INVESTMENT Description Quantity Invested 1163.610 101.802 Interest - IT Borrowed Interest - OC Borrowed Unit Dol. Dol. Rate of Return 0.098 0.098 Cost 113.45 9.93 Total CAPITAL INVESTMENT Costs 123.38 R e s i d u a l r e t u r n s t o o w n e r s h i p , l a b o r, land, management, and profit 148.46 OWNERSHIP COST Description (Depreciation, Taxes, and Insurance) Machinery and Equipment Livestock 112.17 R e s i d u a l r e t u r n s t o l a b o r, l a n d , m a n a g e m e n t , a n d p r o fi t COST Description Cost 31.31 4.98 36.29 Total OWNERSHIP Costs LABOR Input Use Unit 3 . 4 5 9 H r. 7 . 2 0 0 H r. Machinery and Equipment Other Average Rate 5.601 5.600 Cost 19.37 40.32 Total LABOR Costs 59.69 Residual returns to land, management, and profit 52.48 LAND COST PASTURE RENT Annual Your Estimate Description Lease Input Use 16.000 Total LAND Costs Residual returns to management and profit Unit Acre Rate of Return 5.000 Cost 80.00 80.00 -27.52 -WARNING- No Management Cost Specified R e s i d u a l r e t u r n s t o p r o fi t -27.52 To t a l P r o j e c t e d C o s t o f P r o d u c t i o n 415.65 90% calf crop, 1 bull to 33 cows, 3% death loss, 13% replacement rate. 230 animals total. Information pnsented is pnpand solely as a general guide and is not intended to ncognize or predict the costs and returns from any one particularfarm or ranch operation. These projections wen collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. L7.21 B-1241 (16) Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 Cow-Calf Production West Central Texas (7) 1995 Projected Costs and Returns per Head GROSS INCOME Description CULL COWS DEER LEASE HEIFER CALVES STOCKER STEERS Quantity —======== 0., lOHd 10.000 16.000 0.,32Hd 4.500 0,. 45Hd 5.000 Unit ==== cwt. acre cwt. cwt. Unit 41.5000 2.5000 77.0000 87.0000 To t a l Yo u r Estimate 41.50 40.00 110.88 195.75 388.13 Total GROSS Income To t a l VARIABLE COST Description 0.04 2.75 9.93 40.32 12.00 24.16 64.80 10.44 10.50 0.02 0.04 0.04 10.65 0.18 0.04 BARN FENCE 1 MILE Interest - OC Borrowed LIVESTOCK LABOR MISC. EXPENSE COW-CALF PICKUP TRUCK 3/4 TON RANGE CUBES SALES COMMISSION SALT AND MINERAL SHED STOCK SPRAYER STOCK TRAILER VET. MEDICINE COW-CALF WATER WORKING PENS Total VARIABLE COST 185.91 GROSS INCOME minus VARIABLE COST 202.22 FIXED COST Description Machinery and Equipment Livestock Land Unit Acre Acre To t a l 70.06 79.68 80.00 Total FIXED Cost 229.74 Total of ALL Cost 415.65 NET PROJECTED RETURNS -27.52 90% calf crop, 1 bull to 33 cows, 3% death loss, 13% replacement rate. 230 animals total L7.22 Information pnsented is pnpand solely as a generalguide andis not intendedto ncognize or predict the costs and nturnsfrim any one particular farm or ranch operation These projections wen collected and developed by staff members of the Texas Agricultural Extension Service and approved far publication. B-1241 (16) Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 Coastal Bermudagrass Establishment, Dryland West Central Texas (7) 1995 Projected Costs and Returns per Acre GROSS INCOME Description Quantity Unit $ / Unit To t a l Unit ==== To t a l Yo u r Estimate -WARNING- No gross receipts VARIABLE COST Description NITROGEN PHOSPHATE SPRIGGING HERBICIDE NITROGEN Fuel & Lube - Machinery Repairs - Machinery Labor - Machinery Interest - OC Borrowed Quantity =========== 16.000 20.000 1.000 1.000 16.000 2.248 41.673 lb. lb. acre lb. lb. Acre Acre Hour Dol. Total FIXED Cost Total of ALL Cost NET PROJECTED RETURNS 5.600 0.097 2.56 4.60 30.00 7.00 2.56 4.74 1.45 12.59 4.06 -69.,56 GROSS INCOME minus VARIABLE COST Machinery and Equipment Land .160 .230 30.000 7.000 .160 69.56 Total VARIABLE COST FIXED COST Description $ / Unit Unit Acre Acre To t a l 20..84 12..00 32..84 102,.40 -102,.40 Information pnsented is pnpand solely as a general guide and is not intended lo ncognize or predict the costs and ntumsfrom any one particular farm or ranch operation. These projectionswen collectedanddevelopedbystaffmembers ofthe Texas Agricultural Extension Service and approved for publication. L7.1 B-1241 (L6) Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 Date Stage of Production Type Product Name of Prod. Number of Units Weight Cash Landlord Break per NonShare Even Head Cash Prod. -WARNING- No valid Receipts records Date Stage of Type of Input Name Number of Units Production Cash NonCash F i x e d L a n d l ord or Share Va r i . Input ======== ================ ===== ========================= ============= ===== ===== ======== 01/10/95 01/20/95 01/30/95 02/10/95 02/10/95 02/10/95 02/15/95 02/15/95 04/15/95 04/15/95 04/30/95 06/15/95 06/15/95 10/31/95 L7.2 M M M E E M M G E M M E M K CHISELING DISCING DISCING NITROGEN PHOSPHATE FERTILIZING DISCING SPRIGGING HERBICIDE SPRAYING PICKUP TRUCK NITROGEN FERTILIZING LAND CHARGE TANDEM TANDEM TANDEM 12 FT 3/4 TON FORAGE 1.0000 1.0000 1.0000 16.0000 20.0000 1.0000 1.0000 1.0000 1.0000 1.0000 21.0000 16.0000 1.0000 1.0000 C C V V c c V V c V c F .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 Information pnsented is pnpand solely as a general guide and is not intended to ncognize or predict the costs and Mums from any one particular farm or ranch operation. These projections wen collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. B-1241 (16) Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 Oats, Dryland West Central Texas (7) 1995 Projected Costs and Returns per Acre GROSS INCOME Description DEFICIENCY PMT. OATS OATS PA S T U R E S M . G R A I N Quantity Unit $ / Unit 40.000 bu. 40.000 bu. 3.000 AUM 0.1500 1.3000 8.0000 PREHARVEST NITROGEN PHOSPHATE SEED NITROGEN Fuel & Lube - Machinery Repairs - Machinery Labor - Machinery Total PREHARVEST HARVEST CUSTOM COMBINING CUSTOM HAUL Quantity Unit $ / Unit 16.000 20.000 2.000 34.000 lb. lb. bu. lb. Acre Acre 2.161 Hour .160 .230 6.000 .160 5.600 6.00 52.00 24.00 To t a l 2.56 4.60 12.00 5.44 4.31 1.42 12.10 42.43 1.000 40.000 acre bu. 10.000 .300 10.00 12.00 22.00 Total HARVEST Interest - OC Borrowed 14.463 Dol, 0.098 1.41 Total VARIABLE COST 65.84 GROSS INCOME minus VARIABLE COST 16.16 FIXED COST Description Machinery and Equipment Land Unit Acre Acre To t a l 18.50 12.00 Total FIXED Cost 30.50 Total of ALL Cost 96.34 NET PROJECTED RETURNS Your Estimate 82.00 Total GROSS Income VARIABLE COST Description To t a l -14.34 Information presented is pnpand solely as a general guide and is not intended to ncognize orpndict the costs and Mums from any one particular farm or ranch operation These projections wen collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. L7.19 B-1241 (16) Projections for Planning Purposes Only Not to be Used without Updating after March 10. 1995 Date Stage of Production Type Of Product Name Prod. Number Weighii t of per Units Head ======== ================ ===== ========================= ============= ====; = 11/15/94 12/15/94 01/15/95 05/15/95 05/15/95 Date GRAZING GRAZING GRAZING HARVEST HARVEST Stage of Production A A A A A Type of PASTURE SM.GRAIN PASTURE SM.GRAIN SM.GRAIN PASTURE OATS DEFICIENCY PMT . OATS Input Name 1.0000 1.0000 1.0000 40.0000 40.0000 Number of Units Input Cash NonCash = = = Cash NonCash Landlord Break Share Even Prod. :==== ===== ======== ===== .(oooo C .00 N .(oooo C .00 N .(oooo C .00 N .(oooo C .00 N .(oooo C .00 N = i Fix< Fixed Landlord or Share Var: ======== ================ ===== ========================= ============= ====:= ===: 06/10/94 06/20/94 08/30/94 08/30/94 08/30/94 09/10/94 09/15/94 09/15/94 12/01/94 02/01/95 02/01/95 05/15/95 05/15/95 05/31/95 L7.20 PREHARVEST PREHARVEST PREHARVEST PREHARVEST PREHARVEST PREHARVEST PREHARVEST PREHARVEST PREHARVEST PREHARVEST PREHARVEST HARVEST HARVEST M M M E E M M E M M E G G K CHISELING DISCING FERTILIZING NITROGEN PHOSPHATE DISCING DRILLING SEED PICKUP TRUCK FERTILIZING NITROGEN CUSTOM COMBINING CUSTOM HAUL LAND CHARGE TANDEM TANDEM 8 FT OATS 3/4 TON OATS CROPS 1.0000 1.0000 1.0000 16.0000 20.0000 1.0000 1.0000 2.0000 21.0000 1.0000 34.0000 1.0000 40.0000 1.0000 c c V c V c c c c V V V F V .00 ,00 ,00 ,00 ,00 ,00 ,00 ,00 .00 .00 .00 .00 .00 .00 Information pnsented is pnpand solely as a general guide end is not intended lo ncognize or predict the costs and Mums from any one particular farm or ranch operation These projections wen collected and developed by staff members of the Texas Agricultural Extension Service aid approved for publication. B-1241 (16) Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 Coastal Bermudagrass Pasture, Dryland West Central Texas (7) 1995 Projected Costs and Returns per Acre GROSS INCOME Description Unit $ / Unit Quantity 5.000 PA S T U R E C O A S TA L AUM 8.0000 Unit $ / Unit Quantity NITROGEN PHOSPHATE NITROGEN NITROGEN Fuel & Lube - Machinery Repairs - Machinery Labor - Machinery Interest - OC Borrowed 60.000 40.000 36.000 24.000 2.328 5.433 lb. lb. lb. lb. Acre Acre Hour Dol. .160 .230 .160 .160 5.600 0.098 B r e a k - E v e n P r i c e , To t a l Va r i a b l e C: oosst t $ Total of ALL Cost NET PROJECTED RETURNS 9.60 9.20 5.76 3.84 3.57 0.84 13.04 0.53 -6.38 Unit Acre Acre Acre To t a l 18.59 12.00 18.75 49.34 Total FIXED Cost Break-Even Price, Total Cost $ To t a l 9 .27 per AUM of PASTURE GROSS INCOME minus VARIABLE COST Machinery and Equipment Land Perennial Crop 40.00 46.38 Total VARIABLE COST FIXED COST Description Your Estimate 40.00 Total GROSS Income VARIABLE COST Description To t a l L9.14 per AUM of PASTURE 95.72 -55.72 Information pnsentedis pnpandsolely as a general guide andisnot intendedto recognize or premct the costs and nturnsfrxm any one particular farm or ranch operation. These projections wen collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. L7.3 Projections•for Planning Pur^ooses Only Not to be Used without Updating after March 10, 1995 Date Stage of Production 05/01/95 06/01/95 07/01/95 08/01/95 09/01/95 10/01/95 Date Stage of L7.4 Product Name of Prod. A A A A A A GRAZING GRAZING GRAZING GRAZING GRAZING GRAZING Production 04/15/95 04/15/95 04/15/95 04/15/95 05/15/95 06/10/95 06/15/95 06/15/95 08/30/95 09/15/95 09/15/95 09/15/95 10/30/95 10/31/95 Type Type of Number Weight of per Units PASTURE PASTURE PASTURE PASTURE PASTURE PASTURE COASTAL COASTAL COASTAL COASTAL COASTAL COASTAL Input Name Number Units NITROGEN PHOSPHATE FERTILIZING PICKUP TRUCK PICKUP TRUCK SHREDDING NITROGEN FERTILIZING SHREDDING NITROGEN FERTILIZING PICKUP TRUCK LAND CHARGE COASTAL BERMUDA 3/4 TON 3/4 TON 3/4 TON FORAGE Head 1.0000 1.0000 .5000 .5000 1.0000 1.0000 of Input E E M M M M E M M E M M K L B-124,I (L6) 60.0000 40.0000 1.0000 7.0000 7.0000 1.0000 36.0000 1.0000 1.0000 24.0000 1.0000 7.0000 1.0000 1.0000 .0000 .0000 .0000 .0000 .0000 .0000 Cash NonCash C a s h L a n d l ord Break NonShare Even Cash Prod. .00 .00 .00 .00 .00 .00 Q c c c c c Fixed Landlord or Share Va r i . C C V V C V C V C F F .00 .00 .00 .00 .00 .00 ,00 .00 .00 .00 .00 .00 .00 .00 Information pnsented is pnpand solely as a general guide and is not intended to recognize or predict the costs and Mums from any one particular farm or ranch operation. These projections wen collected and developed by suffmembers of the Texas Agricultural Extension Service and approved for publication. Y Y Y Y Y Y B-1241 (16) Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 Coastal Bermudagrass Establishment, Irrigated West Central Texas (7) 1995 Projected Costs and Returns per Acre GROSS INCOME Description Quantity Unit $ / Unit To t a l Unit ==== To t a l Yo u r Estimate -WARNING- No gross receipts VARIABLE COST Description NITROGEN PHOSPHATE SPRIGGING NITROGEN Fuel & Lube - Machinery - Irrigation Repairs - Machinery - Irrigation Labor - Machinery - Irrigation Interest - OC Borrowed Quantity :========== 16.000 20.000 1.000 16.000 1.827 0.480 48.874 lb. lb. acre lb. Acre Acre Acre Acre Hour Hour Dol. Total FIXED Cost Total of ALL Cost NET PROJECTED RETURNS 5.600 5.599 0.098 2.56 4.60 30.00 2.56 3.54 24.14 1.00 10.91 10.23 2.69 4.77 -96.99 GROSS INCOME minus VARIABLE COST Machinery and Equipment Irrigation Land .160 .230 30.000 .160 96.99 Total VARIABLE COST FIXED COST Description $ / Unit Unit Acre Acre Acre To t a l 15.17 42.99 12.00 70.16 167.15 -167.15 Information pnsented is prepared solely as a general guide and is not intended to recogmze or predict the costs and ntumsfrom any one particular farm or ranch operation. These projections wen collected and developed by staff members of the Texas Agricultural Extension Service andapprovedfor publication. L7.5 B-1241 (L6) Projections for Planning Purposes Only Not to be Used without Updating after March 10. 1995 Date Stage of Production Type of Prod. Product Name ======== ================= ===== =========================: Number of Units Weight Cash Landlord Break per NonShare Even Head Cash Prod. -WARNING- No valid R e c e i p t s r e c o r d s Date 01/10/95 02/10/95 02/10/95 02/10/95 02/15/95 04/15/95 04/20/95 04/30/95 05/15/95 05/20/95 07/15/95 07/15/95 07/20/95 08/20/95 10/31/95 L7.6 Stage of Production Type of Input M E E M M M 0 M G 0 E M O O K Input Name Number of Units CHISELING NITROGEN PHOSPHATE FERTILIZING DISCING SPRAYING IRRIGATION PICKUP TRUCK SPRIGGING IRRIGATION NITROGEN FERTILIZING IRRIGATION IRRIGATION LAND CHARGE TANDEM 12 FT 3/4 TON FORAGE 1.0000 16.0000 20.0000 1.0000 1.0000 1.0000 3.0000 21.0000 1.0000 3.0000 16.0000 1.0000 3.0000 3.0000 1.0000 Cash NonCash F i x e d L a n d l ord or Share Va r i . C C V V C V C V C F .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 Information pnsented is pnpand solely as a general guide and is not intended to ncognize or predict the costs and returns from any one particular form or ranch operation. These projections wen collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication B-1241 (16) Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 Coastal Bermudagrass Pasture, Irrigated West Central Texas (7) 1995 Projected Costs and Returns per Acre GROSS INCOME Description Quantity Unit 13.000 AUM PA S T U R E C O A S TA L $ / Unit 8.0000 NITROGEN PHOSPHATE NITROGEN NITROGEN Fuel & Lube - Machinery - Irrigation Unit $ / Unit Quantity 100.000 100.000 100.000 125.000 Repairs - Machinery - Irrigation Labor - Machinery - Irrigation Interest - OC Borrowed 1.744 0.600 31.655 lb. lb. lb. lb. Acre Acre Acre Acre Hour Hour Dol. .160 .230 .160 .160 5.600 5.599 0.097 B r e a k - E v e n P r i c e , To t a l Va r i a b l e C: oosst t $ Total of ALL Cost NET PROJECTED RETURNS 16.00 23.00 16.00 20.00 2.77 30.17 0.64 13.63 9.77 3.36 3.09 -34.42 Unit Acre Acre Acre Acre To t a l 12.66 53.74 12.00 30.60 108.99 Total FIXED Cost Break-Even Price, Total Cost $ To t a l 1 0 .64 per AUM of PASTURE GROSS INCOME minus VARIABLE COST Machinery and Equipment Irrigation Land Perennial Crop 104.00 138.42 Total VARIABLE COST FIXED COST Description Yo u r Estimate 104.00 Total GROSS Income VARIABLE COST Description To t a l .9.03 per AUM of PASTURE 247.41 -143.41 Information pnsentedis pnpandsolely asa generalguide andis not intendedto ncognize or predict the costs and nntmsfrom any one particular farm or ranch operation. These projections wen collected and developed by staff members of the Texas Agricultural Extension Service and approved far publication. L7.7 B-1241 (L6; Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 Date Stage of Production 05/01/95 06/01/95 07/01/95 08/01/95 09/01/95 10/01/95 Date Type Stage of Production Name Type of L7.8 per Units PASTURE PASTURE PASTURE PASTURE PASTURE PASTURE COASTAL COASTAL COASTAL COASTAL COASTAL COASTAL Input Name NITROGEN PHOSPHATE FERTILIZING PICKUP TRUCK 3/4 TON IRRIGATION PICKUP TRUCK 3/4 TON IRRIGATION NITROGEN FERTILIZING IRRIGATION IRRIGATION SHREDDING NITROGEN FERTILIZING PICKUP TRUCK 3/4 TON IRRIGATION LAND CHARGE FORAGE COASTAL BERMUDA IRR. Head 2.0000 3.0000 1.5000 1.5000 3.0000 2.0000 Number of Units Input E E M M 0 M 0 E M 0 0 M E M M 0 K L We i g h t of ======== ================ ===== =============== = = = = = = = = = = = 04/15/95 04/15/95 04/15/95 04/15/95 04/20/95 05/15/95 05/20/95 06/15/95 06/15/95 06/20/95 07/20/95 08/10/95 08/15/95 08/15/95 08/15/95 08/20/95 10/31/95 10/31/95 Number Prod. A A A A A A GRAZING GRAZING GRAZING GRAZING GRAZING GRAZING Product of =z .0000 .0000 .0000 .0000 .0000 .0000 Cash NonCash C a s h L a n d l o r d Break NonShare Even Cash Prod. C C C C C C Fixed Landlord or Share Va r i . ============ ===== ===== ========= 100.0000 100.0000 1.0000 7.0000 3.0000 7.0000 3.0000 100.0000 1.0000 3.0000 3.0000 1.0000 125.0000 1.0000 7.0000 3.0000 1.0000 1.0000 C c V V c V c V c F F .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 Information pnsented is pnpand solely as a general guide and is not intended to ncognize or predict the costs and Mums from any one particular farm or ranch operation These projectionswen collected'anddevelopedbystaff'membersof'the Texas Agricultural Extension Service and approved for publication. .00 .00 .00 .00 .00 .00 Y Y Y Y Y Y B-1241 (16) Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 Coastal Bermudagrass Hay, Irrigated West Central Texas (7) 1995 Projected Costs and Returns per Acre GROSS INCOME Description H AY C O A S TA L Unit Quantity 8.000 $ / Unit ton 60.0000 FIRST CUTTING NITROGEN PHOSPHATE CUSTOM BALING HAUL & STACK Fuel & Lube - Machinery Irrigation Machinery Repairs Irrigation Labor Machinery Irrigation Total FIRST CUTTING SECOND CUTTING NITROGEN CUSTOM BALING HAUL & STACK Fuel & Lube - Machinery - Irrigation Repairs - M - aI rcrhi gi na et iroyn Labor - Machinery - Irrigation Total SECOND CUTTING THIRD CUTTING CUSTOM BALING HAUL & STACK Fuel & Lube - Machinery - Irrigation Repairs - M - aI rcrhi gi naet iroyn Labor - Machinery - Irrigation Total THIRD CUTTING FOURTH CUTTING NITROGEN CUSTOM BALING HAUL & STACK Fuel & Lube - Machinery - Irrigation Repairs - M - aI rcrhi gi naet iroyn Labor - Machinery - Irrigation Total FOURTH CUTTING - OC Borrowed Interest Unit $ / Unit Quantity 100.000 100.000 66.000 66.000 0.487 0.240 lb. lb. bale bale Acre Acre Acre Acre Hour Hour 160 230 800 ,400 5.601 5.599 0.320 0.120 lb. bale bale Acre Acre Acre Acre Hour Hour 66.000 66.000 0.167 0.120 bale bale Acre Acre Acre Acre Hour Hour 16.00 23.00 52.80 26.40 0.84 12.07 0.19 5.45 2.72 1.34 .160 .800 .400 5.601 5.599 16.00 52.80 26.40 0.53 6.03 0 . 11 2.73 1.79 0.67 .800 .400 5.601 5.599 52.80 26.40 0.31 6.03 0.07 2.73 0.93 0.67 89.96 125.000 66.000 66.000 0.320 0.120 lb. bale bale Acre Acre Acre Acre Hour Hour 160 800 400 5.601 5.599 20.00 52.80 26.40 0.53 03 11 73 79 67 111 . 0 6 18.541 Dol. 0.097 1.81 450.71 56.33 per ton of HAY GROSS INCOME minus VARIABLE COST 29.29 Unit Acre Acre Acre Acre To t a l 7.48 53.74 12.00 30.60 103.81 Total FIXED Cost Break-Even Price, Total Cost $ To t a l 107.06 B r e a k - E v e n P r i c e , To t a l Va r i a b l e C o s t $ Machinery and Equipment Irrigation Land Perennial Crop 480.00 140.82 100.000 66.000 66.000 Total VARIABLE COST FIXED COST Description Yo u r Estimate 480.00 Total GROSS Income VARIABLE COST Description To t a l 69.31 per ton of HAY Total of ALL Cost 554.52 NET PROJECTED RETURNS -74.52 Irnarmation pnsented is pnpand soUfy as a general guide and is not intended loncogm These projections wen collected ml developed by staff members of the Texas Agricultural Extension Service and approved for publication. L7.9 Projections•for Planning Purtooses Only Not to be Used without Updating after March 10, 1995 Date Stage of Production Product Type Name B-1241 (L6) Number of Weight of Prod. per Units Head C a s h L a n d l o r d Break NonShare Even Casli Prod. ======== ================ ===== ========================= ============== ============= ===:== =.======= ===== 06/10/95 07/10/95 08/10/95 09/10/95 Date FIRST CUTTING SECOND CUTTING THIRD CUTTING FOURTH CUTTING Stage of Production 04/15/95 04/15/95 04/15/95 04/15/95 04/20/95 05/20/95 06/10/95 06/10/95 06/10/95 06/15/95 06/15/95 06/20/95 07/10/95 07/10/95 07/10/95 07/20/95 08/10/95 08/10/95 08/10/95 08/15/95 08/15/95 08/20/95 09/10/95 09/10/95 09/10/95 09/30/95 09/30/95 L7.10 FIRST CUTTING FIRST CUTTING FIRST CUTTING FIRST CUTTING FIRST CUTTING FIRST CUTTING FIRST CUTTING FIRST CUTTING FIRST CUTTING SECOND CUTTING SECOND CUTTING SECOND CUTTING SECOND CUTTING SECOND CUTTING SECOND CUTTING THIRD CUTTING THIRD CUTTING THIRD CUTTING THIRD CUTTING FOURTH CUTTING FOURTH CUTTING FOURTH CUTTING FOURTH CUTTING FOURTH CUTTING FOURTH CUTTING A A A A Type of HAY HAY HAY HAY COASTAL COASTAL COASTAL COASTAL Input Name Number of Units Input E E M M O O G G M E M O G G M O G G M E M 0 G G M K L 2.0000 2.0000 2.0000 2.0000 NITROGEN PHOSPHATE FERTILIZING PICKUP TRUCK IRRIGATION IRRIGATION CUSTOM BALING HAUL & STACK PICKUP TRUCK NITROGEN FERTILIZING IRRIGATION CUSTOM BALING HAUL & STACK PICKUP TRUCK IRRIGATION CUSTOM BALING HAUL & STACK PICKUP TRUCK NITROGEN FERTILIZING IRRIGATION CUSTOM BALING HAUL & STACK PICKUP TRUCK LAND CHARGE COASTAL BERMUDA 3/4 TON 3/4 TON 3/4 TON 3/4 TON 3/4 TON FORAGE IRR. 100.0000 100.0000 1.0000 5.0000 3.0000 3.0000 66.0000 66.0000 5.0000 100.0000 1.0000 3.0000 66.0000 66.0000 5.0000 3.0000 66.0000 66.0000 5.0000 125.0000 1.0000 3.0000 66.0000 66.0000 5.0000 1.0000 1.0000 .0000 .0000 .0000 .0000 Cash NonCash c c c c .00 .00 .00 .00 Fixed Landlord or Share Va r i . C C V V C C V V C V C C V V C C V V C V C C V V C F F .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 Information pnsentedis pnpandsolely as a general guide and is not intendedto ncognize orpncbct the costs and Mums from any one particular farm or ranch operation. These projections wen collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. Y Y Y Y B-1241 (L6) Projections for Planning Purposes Only Not to be Used without Updating after March 10. 1995 Hybrid Sudan-Sorghum Hay and Grazing West Central Texas (7) 1995 Projected Costs and Returns per Acre GROSS INCOME Description H AY Quantity Unit $ / Unit 60.0000 3.500 ton SORGHUM NITROGEN SEED Fuel & Lube - Machinery Repairs - Machinery Labor - Machinery FIRST CUTTING CUSTOM BALING HAUL & STACK Unit Quantity 50.000 35.000 $ / Unit .160 .400 2.174 5.600 100.000 100.000 bale bale .800 .400 80.00 40.00 120.00 50.000 0.153 lb. Acre Acre Hour .160 5.599 8.00 0.21 0.04 0.86 9 . 11 Interest - OC Borrowed SECOND CUTTING CUSTOM BALING HAUL & STACK 18.615 Dol. 0.097 1.81 67.000 67.000 bale bale .800 .400 53.60 26.80 80.40 Total SECOND CUTTING 251.96 Total VARIABLE COST B r e a k - E v e n P r i c e , To t a l Va r i a b l e C: oosst t $ 7 1 .98 per ton of HAY -41.96 GROSS INCOME minus VARIABLE COST Unit Acre Acre To t a l 21.19 12.00 33.19 Total FIXED Cost Break-Even Price, Total Cost $ To t a l 8.00 14.00 4.84 1.62 12.18 Total SECOND CUTTING Machinery and Equipment Land 210.00 lb. lb. Acre Acre Hour Total FIRST CUTTING SECOND CUTTING NITROGEN Fuel & Lube - Machinery Repairs - Machinery Labor - Machinery FIXED COST Description Your Estimate 210.00 Total GROSS Income VARIABLE COST Description To t a l 31.46 per to>n of HAY Total of ALL Cost 285.14 NET PROJECTED RETURNS -75.14 Information pnsented is pnpand solely as a general guide and is not intended lo ncognize or pndict the costs and Mums from any one particular farm or ranch operation. These projections wen collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. L7.ll B-1241 IL6) Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 Date Stage of Production 0 7 / 1 0 / 9 5 FIRST CUTTING 0 9 / 3 0 / 9 5 SECOND CUTTING Date 03/10/95 03/20/95 04/10/95 04/15/95 04/20/95 04/25/95 04/25/95 06/15/95 07/10/95 07/10/95 07/15/95 07/15/95 09/30/95 09/30/95 09/30/95 L7.12 Stage of Production FIRST CUTTING FIRST CUTTING SECOND CUTTING SECOND CUTTING SECOND CUTTING SECOND CUTTING SECOND CUTTING Product Type Of Prod. A A Type Of Input M M M M E E M M G G E M G G K Name SORGHUM SORGHUM HAY HAY Input Name CHISELING DISCING DISCING LISTING/BEDDING NITROGEN SEED DRILLING PICKUP TRUCK CUSTOM BALING HAUL S STACK NITROGEN FERTILIZING CUSTOM BALING HAUL & STACK LAND CHARGE TANDEM TANDEM SORGHUM 8 FT 3/4 TON FORAGE Number of Units Weight per Head 2.0000 1.5000 Number of Units 1.0000 ..OOOO 1.0000 1.0000 50.0000 35.0000 1.0000 21.0000 100.0000 100.0000 50.0000 1.0000 67.0000 67.0000 1.0000 .0000 .0000 Cash NonCash Cash Landlord Break NonShare Even Cash Prod. C C .00 .00 Fixed Landlord o r ' ,Share Va r i . C C V V C C C V V V C C C V V F .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 Information pnsented is pnpand solely as a general guide and is not intended to ncognize orpndicl the costs and Mums from any one particular farm or ranch operation These projections wen collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. Y Y B-1241 (16) Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 Kleingrass Establishment, Dryland West Central Texas (7) 1995 Projected Costs and Returns per Acre GROSS INCOME Description . Quantity Unit $ / Unit To t a l Your Estimate -WARNING- No gross receipts VARIABLE COST Description NITROGEN PHOSPHATE SEED Fuel & Lube - Machinery Repairs - Machinery Labor - Machinery Interest - OC Borrowed Quantity 32.000 40.000 2.000 3.176 29.527 Unit lb. lb. lb. Acre Acre Hour Dol. Total VARIABLE COST Machinery and Equipment Land .160 .230 5.000 5.600 0.098 To t a l 5.12 9.20 10.00 5.71 1.79 17.78 2.88 52.49 -52.49 GROSS INCOME minus VARIABLE COST FIXED COST Description $ / Unit Unit Acre Acre To t a l 29.42 5.00 Total FIXED Cost 34.42 Total of ALL Cost 86.91 NET PROJECTED RETURNS -86.91 Information pnsented is pnpand solely as a general guide and is not intended lo ncognize orpmSct the costs and Mums from any one particular form or ranch operation. These projections wen collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. L7.13 B-1241 (16) Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 Date Stage of Production -Type of Prod. Product Name Number of Units Weight Cash Landlord Break per NonShare Even Head Cash Prod. -WARNING- No valid Receipts records Date 02/10/95 02/15/95 02/20/95 02/20/95 02/20/95 03/01/95 03/05/95 03/10/95 03/10/95 03/30/95 05/30/95 10/31/95 Stage of Production Type of Input Input Name CHISELING DISCING NITROGEN PHOSPHATE FERTILIZING PICKUP TRUCK DISCING DRILLING SEED SHREDDING SHREDDING PASTURE RENT TANDEM 3/4 TON TANDEM 8 FT KLEINGR. Number Cash Fixed Landlord of Nonor Share Units Cash Va r i . 1.0000 1.0000 32.0000 40.0000 1.0000 21.0000 OOOO OOOO OOOO ,0000 .0000 ,0000 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 Information pnsented is pnpand solely as a general guide and is not intended to ncognize orpncBcl the costs and Mums from any one particular farm or ranch operation. 101.\ 4 These projections wen collected and developed by staff members of the Texas Agricultural Extension Service and approved far publication. B-1241 (16) Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 Kleingrass Pasture, Dryland West Central Texas (7) 1995 Projected Costs and Returns per Acre GROSS INCOME Description Unit $ / Unit Quantity 6.000 PA S T U R E K L E I N G R . AUM === 8.0000 48.00 Unit $ / Unit Quantity 30.000 40.000 30.000 NITROGEN PHOSPHATE NITROGEN Fuel & Lube - Machinery Repairs - Machinery Labor - Machinery Interest - OC Borrowed 0.573 10.678 lb. lb. lb. Acre Acre Hour Dol. === .160 .230 .160 5.600 0.098 B r e a k - E v e n P r i c e , To t a l Va r i a b l e C: oosst t $ 23.83 Unit Acre Acre Acre To t a l 3.37 5.00 18.64 27.01 Total FIXED Cost Break-Even Price, Total Cost $ 4.80 9.20 4.80 0.93 0.20 3.21 1.04 4 .03 per AUM of PAST URE GROSS INCOME minus VARIABLE COST Machinery and Equipment Land Perennial Crop To t a l 24.18 Total VARIABLE COST FIXED COST Description Yo u r Estimate 48.00 Total GROSS Income VARIABLE COST Description To t a l 8.53 per AUM of PASTURE Total of ALL Cost 51.18 NET PROJECTED RETURNS -3.18 Information pnsented is pnpand solely as a general guide and is not intended to ncognize orpndict the costs and Mums from any one particular form or ranch operation These projections wen collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication L7.15 B-1241 (L6) Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 Date Stage of Production A A A A A A A 04/15/95 05/15/95 06/15/95 07/15/95 08/15/95 09/15/95 10/15/95 Date 04/15/95 04/15/95 04/15/95 05/15/95 06/15/95 06/15/95 10/31/95 10/31/95 L7.16 Type of Prod. Stage of Production Type of Input Product Name PASTURE PASTURE PASTURE PASTURE PASTURE PASTURE PASTURE KLEINGR. KLEINGR. KLEINGR. KLEINGR. KLEINGR. KLEINGR. KLEINGR. Input Name NITROGEN PHOSPHATE FERTILIZING PICKUP TRUCK NITROGEN FERTILIZING PASTURE RENT KLEINGRASS 3/4 TON Number of Units ,5000 ,2500 OOOO ,7500 ,7500 OOOO ,7500 Weight per Head Cash NonCash L a n d l o r d Break Share Even Prod. :========= ===== ======== ===== .0000 .0000 .0000 .0000 .0000 .0000 .0000 N N N N N N N .00 .00 .00 .00 .00 .00 .00 Number Cash Fixed Landlord of Nonor Share Units Cash Va r i . 30.0000 40.0000 1.0000 8.0000 30.0000 1.0000 1.0000 1.0000 ,00 ,00 ,00 ,00 ,00 .00 .00 .00 Information pnsented is pnpand solely as a general guide and is not intended to ncognize orpndict the costs md Mums from any one particular farm or ranch operation. These projections wen collectedanddevelopedby staff members ofthe Texas Agriculntral Extension Service and approved for publication. Y Y Y Y Y Y Y B-1241 (L6) Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 Small Grain for Grazing West Central Texas (7) 1995 Projected Costs and Returns per Acre GROSS INCOME Description Unit Quantity PA S T U R E S M . G R A I N AUM 6.000 $ / Unit 8.0000 Unit Quantity NITROGEN PHOSPHATE SEED NITROGEN Fuel & Lube - Machinery Repairs - Machinery Labor - Machinery Interest - OC Borrowed 16.000 20.000 2.500 33.000 2.061 23.978 $ / Unit lb. lb. bu. lb. Acre Acre Hour Dol. .160 .230 6.000 .160 5.600 0.097 B r e a k - E v e n P r i c e , To t a l Va r i a b l e C:oosst t $ Total of ALL Cost NET PROJECTED RETURNS 2.56 4.60 15.00 5.28 4.12 1.37 11.54 2.34 1.19 Unit Acre Acre To t a l 17.94 5.00 22.94 Total FIXED Cost Break-Even Price, Total Cost $ To t a l 7 .80 pei: AUM of PASTURE GROSS INCOME minus VARIABLE COST Machinery and Equipment Land 48.00 46.81 Total VARIABLE COST FIXED COST Description Your Estimate 48.00 Total GROSS Income VARIABLE COST Description To t a l .1.62 per AUM of PI^STURE 69.75 -21.75 Information pnsented is pnpand solely as a general guide and is not intended lo ncognize orpmlict the costs and Mums from any one particular farm or ranch operation. These projections wen collected and developed by staff members of the Texas Agricultural Extension Service and approved far publication. L7.17 B-1241 (L6) Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 Date Stage of Production 11/15/94 12/15/94 01/15/95 02/15/95 03/15/95 04/15/95 Date Type of Stage of Name Prod. A A A A A A GRAZING GRAZING GRAZING GRAZING GRAZING GRAZING Product Type Of Input Number We i g h t of per Units PASTURE PASTURE PASTURE PASTURE PASTURE PASTURE SM.GRAIN SM.GRAIN SM.GRAIN SM.GRAIN SM.GRAIN SM.GRAIN Input Name Head 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Number of Units .0000 .0000 .0000 .0000 .0000 .0000 Cash NonCash Cash Landlord Break NonShare Even Cash Prod. N N N N N N Fixed Landlord or Share Va r i . Production ======== ================ ===== ========================= =_.============ ===== ===== ========= 06/10/94 06/20/94 08/30/94 08/30/94 08/30/94 09/10/94 09/15/94 09/15/94 12/01/94 02/01/95 02/01/95 05/31/95 M M M E E M M E M M E K CHISELING DISCING FERTILIZING NITROGEN PHOSPHATE DISCING DRILLING SEED PICKUP TRUCK FERTILIZING NITROGEN PASTURE RENT TANDEM TANDEM 8 FT OATS 3/4 TON 1.0000 1.0000 1.0000 16.0000 20.0000 1.0000 1.0000 2.5000 18.0000 1.0000 33.0000 1.0000 C C V V C V C C V F .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 Information pnsented is pnpand solely as a general guide and is not intended to ncognize orpndicl the costs and Mums from any one particular farm or ranch operation L7.18 These projections wen collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. .00 .00 .00 .00 .00 .00 Y Y Y Y Y Y B-1241 (16) Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 Sheep Production West Central Texas (7) 1995 Projected Costs and Returns per Animal Unit (5 Ewes) PRODUCTION Description CULL EWES DEER LEASE LAMBS WOOL Quantity Unit $ / Unit 0 . 8 5 - H d 11 0 . 0 0 0 l b . 0 . 1 5 0 0 16.000 acre 2.5000 4.00Hd 70.000 lb. 0.7200 64.200 lb. 1.5000 Return 14.03 40.00 201.60 96.30 351.92 Total GROSS Income OPERATING INPUT or CUSTOM OPERATION Description Input Use SHEEP 215.630 MARKETING 64.200 MARKETING WOOL SHEEP 12.000 MISC. EXPENSE RANGE CUBES 375.000 7.500 SHEARING SHEEP VET. MEDICINE SHEEP 1.000 Fuel Lube Repair Unit $ lbs $ lb. head head $ / Unit 0.030 0.070 1.000 0.135 1.500 8.000 Cost 6.47 4.49 12.00 50.63 11.25 8.00 5.48 0.27 2.15 Total OPERATING INPUT and CUSTOM OPERATION Costs 100.74 Residual returns to capital, ownership l a b o r, l a n d , m a n a g e m e n t , a n d p r o fi t 251.19 CAPITAL INVESTMENT Description Interest - IT Borrowed Interest - OC Borrowed Quantity Invested 744.606 97.081 Unit Dol. Dol. Rate of Return 0.098 0.098 Cost 72.60 9.47 82.06 Total CAPITAL INVESTMENT Costs R e s i d u a l r e t u r n s t o o w n e r s h i p , l a b o r, land, management, and profit 169.12 OWNERSHIP COST Description (Depreciation, Taxes, and Insurance) Machinery and Equipment Livestock Cost 31.31 1.65 32.96 Total OWNERSHIP Costs 136.16 R e s i d u a l r e t u r n s t o l a b o r, l a n d , m a n a g e m e n t , a n d p r o fi t LABOR COST Description Input Use 3.459 9.320 Machinery and Equipment Other Unit H r. Hr. Average Rate 5.601 5.600 Cost 19.37 52.19 Total LABOR Costs 71.56 Residual returns to land, management, and profit 64.60 LAND COST Description Your Estimate Input Use PASTURE RENT Annual Lease 16.000 Unit Acre Rate of Return 5.000 Total LAND Costs Residual returns to management and profit Cost 80.00 80.00 -15.40 -WARNING- No Management Cost Specified R e s i d u a l r e t u r n s t o p r o fi t -15.40 To t a l P r o j e c t e d C o s t o f P r o d u c t i o n 367.33 100% lamb crop, 1 ram to 33 ewes, 3% death loss, 20% replacement rate, Information pnsented is pnpand solely as a general guide and is not intended lo ncognize orpncBct the costs and Mums from any one particular farm or ranch operation These projections wen collected end developed by staff members of the Texas Agricultural Extension Service and approved for publication. L7.23 B-1241 (16) Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 Sheep Production West Central Texas (7) 1995 Projected Costs and Returns per Animal Unit (5 Ewes! GROSS INCOME Description CULL EWES DEER LEASE LAMBS WOOL Quantity Unit $ / Unit 0.85Hd 4.00Hd 110.000 16.000 70.000 64.200 lb. acre lb. lb. 0.1500 2.5000 0.7200 1.5000 To t a l 14.03 40.00 201.60 96.30 351.92 Total GROSS Income To t a l VARIABLE COST Description 0.04 2.75 9.47 52.19 6.47 4.49 12.00 24.16 50.63 11.25 0.02 0.04 0.04 8.00 0.18 0.04 BARN 1 MILE FENCE Interest - OC Borrowed LIVESTOCK LABOR MARKETING SHEEP WOOL MARKETING SHEEP MISC. EXPENSE 3/4 TON PICKUP TRUCK RANGE CUBES SHEEP SHEARING SHED STOCK SPRAYER STOCK TRAILER VET. MEDICINE SHEEP WATER WORKING PENS Total VARIABLE COST 181.76 GROSS INCOME minus VARIABLE COST 170.16 FIXED COST Description Machinery and Equipment Livestock Land Yo u r Estimate Unit Acre Acre To t a l 70.06 35.50 80.00 Total FIXED Cost 185.56 Total of ALL Cost 367.33 NET PROJECTED RETURNS -15.40 Information pnsentedis pnpandsolely asa generalguide andisnot intendedto ncognize orpndict the costs and nmmsfrom any one particular farm or ranch operation. L7.24 These projections wen collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. B-1241 (L6) Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 Goat Production West Central Texas (7) 1995 Projected Costs and Returns per Animal Unit (6 Does) PRODUCTION Description ADULT MOHAIR CULL DOES DEER LEASE KID GOATS KID MOHAIR Quantity 70.000 0.13Hd 85.000 16.000 1.800 6.000 Unit lb. lb. acre head lb. $ / Unit 1.7500 0.1500 2.5000 35.0000 4.0000 Return 122.50 1.66 40.00 63.00 24.00 251.16 Total GROSS Income OPERATING INPUT or CUSTOM OPERATION Input Use Description 1.000 MISC. EXPENSE GOATS 420.000 RANGE CUBES 60.000 SALT AND MINERAL 15.000 S H E A R I N G G O AT S 6.000 VET. MEDICINE GOATS Fuel Lube Repair Unit $ lb. lb. head head $ / Unit 10.000 0.135 0.350 1.750 1.000 Cost 10.00 56.70 21.00 26.25 6.00 5.48 0.27 2.15 Total OPERATING INPUT and CUSTOM OPERATION Costs 127.85 Residual returns to capital, ownership l a b o r, l a n d , m a n a g e m e n t , a n d p r o fi t 123.31 CAPITAL INVESTMENT Description Interest - IT Borrowed Interest - OC Borrowed Quantity Invested 838.713 60.627 Unit Dol. Dol. Rate of Return 0.098 0.098 Cost 81.77 5.91 Total CAPITAL INVESTMENT Costs 87.69 R e s i d u a l r e t u r n s t o o w n e r s h i p , l a b o r, land, management, and profit 35.62 OWNERSHIP COST Description (Depreciation, Taxes, and Insurance) Machinery and Equipment Livestock Cost 31.31 1.45 32.76 Total OWNERSHIP Costs 2.86 R e s i d u a l r e t u r n s t o l a b o r, l a n d , m a n a g e m e n t , a n d p r o fi t LABOR COST Description Input Use Unit 3.459 8.350 Machinery and Equipment Other Hr. Hr. Average Rate 5.601 5.600 19.37 46.76 -63.27 Residual returns to land, management, and profit PASTURE RENT Annual Lease Cost 66.13 Total LABOR Costs LAND COST Description Yo u r Estimate Input Use Unit 16.000 Acre Rate of Return 5.000 Total LAND Costs Residual returns to management and profit Cost 80.00 80.00 -143.27 -WARNING- No Management Cost Specified R e s i d u a l r e t u r n s t o p r o fi t To t a l P r o j e c t e d C o s t o f P r o d u c t i o n -143.27 394.43 50% kid crop, 1 buck to 50 does, 3% death loss, 20% replacement rate. Information pnsented is pnpand solely as a general guide and is not intended to ncognize or predict the costs and Mums from any one particular farm or ranch operation. These projections wen collectedanddevelopedby staffmembers ofthe Texas Agricultural Extension Service andapprovedfor publication. L7.25 B-1241 (L6) Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 Goat Production West Central Texas (7) 1995 Projected Costs and Returns per Animal Unit (6 Does) GROSS INCOME Description ADULT MOHAIR CULL DOES DEER LEASE KID GOATS KID MOHAIR Quantity Unit $ / Unit 0.13Hd 70.000 85.000 16.000 1.800 6.000 lb. lb. acre head lb. 1.7500 0.1500 2.5000 35.0000 4.0000 Total GROSS Income 0.04 2.75 5.91 46.76 10.00 24.16 56.70 21.00 26.25 0.02 0.04 0.04 6.00 0.18 0.04 199.89 Total VARIABLE COST B r e a k - E v e n P r i c e , To t a l Va r i a b l e C o s t $ 1.01 per lb. of ADULT MOHAIR 51.27 GROSS INCOME minus VARIABLE COST Unit Acre Acre To t a l 70.06 44.47 80.00 194.54 Total FIXED Cost Break-Even Price, Total Cost $ 122.50 1.66 40.00 63.00 24.00 To t a l BARN FENCE 1 MILE Interest - OC Borrowed LIVESTOCK LABOR MISC. EXPENSE GOATS PICKUP TRUCK 3/4 TON RANGE CUBES SALT AND MINERAL S H E A R I N G G O AT S SHED STOCK SPRAYER STOCK TRAILER VET. MEDICINE GOATS WATER WORKING PENS Machinery and Equipment Livestock Land Yo u r Estimate 251.16 VARIABLE COST Description FIXED COST Description To t a l 3.7 9 per lb. of ADULT MOHAIR Total of ALL Cost NET PROJECTED RETURNS 394.43 -143.27 50% kid crop, 1 buck to 50 does, 3% death loss, 20% replacement rate L7.26 Information pnsented is pnpand solely as a general guide and is not intended to ncognize orpndict the costs and Mums from any one particular farm or ranch operation These projectionswen collectedanddevelopedby staffmembers ofthe Texas Agricultural Extension Service and approved for publication. B-1241 (L6) Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 Ranch Budget West Central Texas (7) 1995 Projected Whole Farm Cash Non-Cash Costs and Returns GROSS INCOME Description CASH Income ADULT MOHAIR CULL COWS CULL DOES CULL EWES DEER LEASE HEIFER CALVES KID GOATS KID MOHAIR LAMBS STOCKER STEERS WOOL Quant.i t y 10,.30Hd 4,.55Hd 78,.20Hd 32..96Hd 368 .OOHd 46 . 35Hd 2450 10 85 110 3680 5 63 210 70 5 5906 Unit Unit lb. cwt. lb. lb. acre cwt. head lb. lb. cwt. lb. 1.750 41.500 0.150 0.150 2.500 77.000 35.000 4.000 0.720 87.000 1.500 Total CASH Cost NON-CASH Cost Owner Operator Labor R & M Owner Labor 4288 4275 58 1290 9200 11421 2205 840 18547 20162 8860 81145 Total GROSS Income CASH Cost MARKETING SHEEP MARKETING WOOL MISC. EXPENSE COW-CALF MISC. EXPENSE GOATS MISC. EXPENSE SHEEP RANGE CUBES SALES COMMISSION SALT AND MINERAL S H E A R I N G G O AT S SHEARING SHEEP VET. MEDICINE COW-CALF VET. MEDICINE GOATS VET. MEDICINE SHEEP Fuel Lube R & M (Off-Farm) Interest - OC Borrowed Hired Other Labor Quantity :========== Unit ==== 19838 5906 1236 35 1104 98640 35857 5190 525 690 103 210 92 $ lbs $ $ $ lb. $ lb. head head head head head 'Unit 0.030 0.070 1.000 10.000 1.000 0.135 0.030 0.350 1.750 1.500 10.650 1.000 8.000 To t a l 595 413 1236 350 1104 13316 1076 1817 919 1035 1097 210 736 1260 63 494 2100 10591 38412 3920 536 4455 Total NON-CASH Cost GROSS INCOME minus VARIABLE COST FIXED COST Description CASH Cost Annual Taxes Annual Lease Interest - IT Borrowed Insurance Total CASH Cost NON-CASH Cost Depreciation Yo u r Estimate 81145 Total CASH Income VARIABLE COST Description To t a l 38278 To t a l 75 18400 21227 1432 41134 6410 Total NON-CASH Cost 6410 NET PROJECTED RETURNS -9266 Information presented is pnpand solely as a general guide and is not intended to ncognize or predict the costs and n turns from any one particular farm or ranch operation. These projections wen collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. L7.27 Projections for Planning Purposes Only B-1241 (L6) Not to be Used without Updating after March 10, 1995 Ranch Budget West Central Texas (7) 1995 Projected Whole Farm Production Cycle Resource Use Yo u r R e s o u r c e N a m e B e g M o U n i t s D e fi n e d U s e C a l c u l a t e d U s e % U s e E s t i m a t e STOCK SPRAYER STOCK TRAILER PICKUP TRUCK 3/4 TON 01/01 01/01 01/01 Hour Hour Mile 1.00 1.00 21000.00 0.92 92.00 0.92 92.00 20999.00 100.00 Information presented is prepared solely as a generalguide andisnot intended to ncognize orpndict the costs and Mums from any one particular farm or ranch operation. L7.28 TheseprajectiomwencolUcteda>iddevetapedbystaffmembersoftteTexasA&^ Projections for Planning Purposes Only Not to be Used without Updating after March 10, 1995 B-1241 (16) Livestock Products Report Livestock Name ADULT MOHAIR CULL BUCKS CULL BULLS CULL COWS CULL DOES CULL EWES CULL RAMS DEER LEASE HEIFER CALVES KID GOATS KID MOHAIR LAMBS STOCKER STEERS WOOL Price per Unit 1.7500 .1700 55.0000 41.5000 .1500 .1500 .1800 2.5000 77.0000 35.0000 4.0000 .7200 87.0000 1.5000 Unit of Mes. lb. lb. cwt. cwt. lb. lb. lb. acre cwt. head lb. lb. cwt. lb. Weight per Unit 1.0000 1.0000 100.0000 100.0000 1.0000 1.0000 1.0000 1.0000 100.0000 1.0000 1.0000 1.0000 100.0000 1.0000 Cash Flow Row 27 26 26 26 26 26 26 24 24 24 27 24 24 27 Information presented is pnpand solely as a general guide and is not intended to ncognize orpnthct the costs and Mums from any one particular farm or ranch operation. These projections wen collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication. L7.29 Educational programs conducted by the Texas Agricultural Extension Service serve people of all ages regardless of socio-economic level, race, color, sex or national origin. C^pe^ive" Extension Wo'rk in A^cult^d Home Emmies, The Texas A&M University System and the United States Department of Agriculture cooperating Distributed in furtherance of the acts of Congress of May 8, 1914, as amended, and June 30, 1914. ^ ^ 150-01-95, New