576

advertisement
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84,
576
jP^a.
B-124KC12)
SUNFLOWERS, IRRIGATED
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
1. GROSS RECEIPTS
SUNFLOWERS
TOTAL PROJECTED RETURNS
PROJECTED
YIELD
UNIT
1600.00
2. VARIABLE COSTS
INPUT USE
PREHARVEST COSTS
♦SUNFLOWER SEED
4.00
♦NITROGEN (DRY)
50.00
♦HERBICIDE
1.00
♦INSECTICIDE
3.00
CUSTOM FERTILIZE
1.00
PESTICIDE APPLI.
3.00
IRRIGATION WATER
12.00
FUEL & LUBE--TRACTOR
EQUIPMENT
IRRIGATION
R E PA I R S T R A C T O R
EQUIPMENT
IRRIGATION
LABOR MACHINERY
0.91
IRRIGATION
1.20
EQUIPMENT
0.21
OPERATING CAPITAL
36.42
SUBTOTAL, PREHARVEST
HARVEST COSTS
HARVEST & HAUL
1.00
CUSTOM HAUL
16.00
SUBTOTAL, HARVEST
TOTAL VARIABLE COSTS
PROJECTED
VALUE
S/UNIT
LB.
0.08
LB.
LB.
ACRE
APPL
ACRE
ACRE
ACIN
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
HOUR
DOL.
ACRE
0.50
0.26
4.00
6.00
2.00
3.50
ACRE
CWT.
ACRE
ACRE
$
5.00
4.00
4.00
0. 145
25.00
0.20
YOUR
ESTIMATE
128.00
128.00 $
2.00
13.00
4.00
18.00
2.00
10.50
$
4.32
0.49
60.00
1.41
1.02
7.20
4.53
4.80
0.84
5.28
139.38 $
$
25.00
3.20
28.20 $
$
167.58 $
BREAK-EVEN PRICE, VARIABLE COSTS $ O.10/LB. SUNFLOWERS
3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ - 3 9 . 5 8 $ .
4. FIXED COSTS
DEPREC..INTEREST.TAXES & INSUR.
TRACTOR
EQUIPMENT
IRRIGATION
LAND-CASH
RENT
1.00
MISC
ADMIN
0/H
0.50
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
30.00
16.00
$
10.91
10.53
24.48
30.00
8.00
83.92 $
5. TOTAL PROJECTED COSTS
ACRE
$
251.50 $
BREAK-EVEN PRICE, TOTAL COSTS
$ 0 . 16/LB. SU NFLOWERS
ACRE
6. NET PROJECTED RETURNS
$ -123.50 $
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
C12.51
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84,
576
B-1241(C12)
SUNFLOWERS, IRRIGATED
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
MACH
MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR
OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS
OFFSET DISC
BEDDER 6R
CULTIVATOR 6R
PLANTER 6R
CULTIVATOR 6R
HERBICIDE SPRAYR
3
3
3
3
3
34 MAR
36 MAR
40 APR
42 MAY
40 MAY
63 MAY
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
TOTALS
IRRIGATION
APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
APR
MAY
JUNE
JULY
TOTALS
3.00
3.00
3.00
3.00
25
21
64
93
64
16
7 99
4 02
4 43
10 91
4 43
6 .24
4.53
6 . 0 0 20.83
38.03
IRRIG
SYSTEM OPER. LABOR
HOURS COSTS COSTS
APPL. IRRIG
INPUT FIXED
COSTS COSTS
TOTAL
IRRIG
COSTS
0.228
0.151
0.151
0.224
0.151
0.0
0 . 173
0 . 115
0 . 115
0 . 170
0 . 115
0 . 264
0.906
0.950 6.67
APPL. ACRE LABOR
MONTH INCHES HOURS
0.300
0.300
0.300
0.300
APPL. MACH TOTAL
INPUT FIXED OPER.
COSTS COSTS COST
0.0
0.0
0.0
0.0
12.00 1.200 0.0
1 .60
1 .05
1 .04
1 .86
1 .04
0 .08
16.80
16.80
16.80
16.80
1
0
0
1
0
0
14
76
76
12
76
0
0.0
0.0
0.0
2.00
0.0
4.00
1 .20
1 .20
1 .20
1 .20
0.0
0.0
0.0
0.0
5
2
2
5
2
2
6
6
6.
6.
12
12
12
12
24
24
24
24.
67.20 4.80 0.0 24.48 96.48
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF SUNFLOWERS
(DOLLARS)
0.06
0.07
0.08
0.09
1280.
-85.02
-74.78
-64.54
-54.30
-44.06 |
1440.
-75.10
-63.58
-52.06
-40.54
-29.02 j
1600.
-65.18
-52.38
-39.58
-26.78
-13.98 j
1760.
-55.26
-41.18
-27.10
-13.02
1.06 j
-45.34
-29.98
-14.62
0.74
16.10 j
LB.
QUANTITY OF
SUNFLOWERS
0.10
i
1920.
j
—
i
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT
STRATEGIES.
C12.52
12
12
12
12
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-1.7-84,
577
ijp!P*\.
B-1241(C12)
WINTER WHEAT, IRRIGATED
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
1. GROSS RECEIPTS
WINTER WHEAT
GRAZING
DEFICIENCY PMT.
TOTAL PROJECTED RETURNS
PROJECTED
YIELD
UNIT
35.00
90.00
35.00
2. VARIABLE COSTS
INPUT USE
PREHARVEST COSTS
♦WHEAT SD TREATED
60.00
♦NITROGEN (ANHY)
120.00
♦PHOSPHATE
40.00
+ FED. CROP INS.
1.00
IRRIGATION WATER
12.00
FUEL & LUBE--TRACTOR
EQUIPMENT
IRRIGATION
R E PA I R S T R A C T O R
EQUIPMENT
IRRIGATION
1 .48
LABOR MACHINERY
IRRIGATION
1.20
EQUIPMENT
0.49
OPERATING CAPITAL
31.65
SUBTOTAL, PREHARVEST
HARVEST COSTS
CUSTOM HARVEST
1.00
HAUL WHEAT
35.00
SUBTOTAL. HARVEST
TOTAL VARIABLE COSTS
PROJECTED
S/UNIT
VALUE
YOUR
ESTIMATE
115.50
45.00
37.80
198.30 $
BU.
DAYS
BU.
3.30
0.50
LB.
LB.
LB.
ACRE
ACIN
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
HOUR
DOL.
ACRE
0.17
0.13
0.22
5.20
5.00
4.00
4.00
0.145
$
7.07
1. 14
60.00
2.30
1.25
7.20
7.41
4.80
1.96
4.59
137.52 $
ACRE
BU.
ACRE
17.50
0.15
$
17.50
5.25
22.75 $
ACRE
$
160.27 $
1.08
$
10.20
15.60
8.80
5.20
BREAK-EVEN PRICE. VARIABLE COSTS $ 2.21/BU. WINTER WHEAT
3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 3 8 . 0 3 $ _
jP*\
4. FIXED COSTS
DEPREC..INTEREST,TAXES & INSUR.
TRACTOR
EQUIPMENT
IRRIGATION
LAND-CASH
RENT
1.00
MISC
ADMIN
0/H
0.50
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
5. TOTAL PROJECTED COSTS
ACRE
BREAK-EVEN PRICE. TOTAL COSTS
$
$
249.88 $
$ 4 . 77/BU. WI NTER WHEAT
ACRE
6. NET PROJECTED RETURNS
30.00
16.00
17.85
9.29
24.48
30.00
8.00
89.62 $
$
-51.58 $
+ RISK INSURANCE: 65% AT $3.75/BUSHEL.
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
/#*"»
C12.53
B-124KC12)
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84,
WINTER WHEAT, IRRIGATED
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
577
MACHINERY
OPERATION
CHISEL PLOW
FIELD CULTIVATOR
LAND PLANE
FIELD CULTIVATOR
BEDDER 6R
ANHYDROUS SPRDER
DRY FERT SPRDER
GRAIN DRILL
ANHYDROUS SPRDER
MACH
ITEM OPER TIMES LABOR MACHINE OPER LABOR
NO. MONTH OVER HOURS HOURS COSTS COSTS
3,33
3,43
3.50
3,43
3,36
3,61
3,60
3.46
3.61
JUNE
JULY
JULY
SEPT
SEPT
SEPT
SEPT
OCT
FEB
1.00
1.00
0.20
1.00
1.00
1.00
1.00
1.00
1.00
TOTALS
IRRIGATION
APPLICATION
NOV
JAN
FEB
MAR
TOTALS
TOTAL
OPER.
COST
0.202
0. 151
0.050
0. 151
0.151
0. 151
0.203
0.270
0. 151
0.153
0 . 11 5
0.038
0 . 11 5
0 . 11 5
0 . 11 5
0. 154
0.205
0 . 11 5
1.49
1.12
0.34
1.12
1.05
0.96
1.44
1.97
0.96
1.01
0.76
0.25
0.76
0.76
0.76
1.02
1.35
0.76
0.0
0.0
0.0
0.0
0.0
7.80
8.80
10.20
7.80
3.06
2.30
1. 15
2.30
2.21
1.82
4.28
6.76
1.82
5.57
4.18
1.74
4.18
4.02
11.33
15.53
20.27
11.33
1.482
1. 122
10.44
7.41
34.60 25.71
78.16
IRRIG
SYSTEM OPER. LABOR
HOURS COSTS COSTS
APPL. IRRIG
INPUT FIXED
COSTS COSTS
TOTAL
IRRIG
COSTS
APPL. ACRE LABOR
MONTH INCHES HOURS
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
APPL. MACH
INPUT FIXED
COSTS COSTS
4.00
2.00
3.00
3.00
0.400
0.200
0.300
0.300
0.0
0.0
0.0
0.0
22.40
11.20
16.80
16.80
1.60
0.80
1.20
1.20
0.0
0.0
0.0
0.0
8. 16
4.08
6. 12
6.12
32. 16
16.08
24. 12
24.12
12.00
1.200
0.0
67.20
4.80
0.0
24.48
96.48
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF WINTER WHEAT
(DOLLARS)
2.64
2.97
28.00
10.06
-0.82
31.50
2.44
12.83
35.00
14.93
26.48
38.50
27.43
42.00
39.92
BU.
QUANTITY OF
WINTER WHEAT
3.30
3.63
3.96
8.42
17 66
26.90
23.23
33 62
44.02
38.03
49 58
61. 13
40. 13
52.84
65 54
78.25
53.78
67.64
81 50
95.36
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT
STRATEGIES.
C12.54
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84
578
fjW>\
B-124KC12)
WINTER WHEAT, DRYLAND
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
PROJECTED
YIELD
UNIT
GROSS RECEIPTS
WINTER WHEAT
GRAZING
DEFICIENCY PMT.
TOTAL PROJECTED RETURNS
20.00
45.00
20.00
VARIABLE COSTS
PREHARVEST COSTS
♦WHEAT SD TREATED
♦NITROGEN (ANHY)
♦PHOSPHATE
+ FED. CROP INS.
FUEL & LUBE--TRACTOR
EQUIPMENT
R E PA I R S T R A C T O R
EQUIPMENT
LABOR MACHINERY
EQUIPMENT
OPERATING CAPITAL
SUBTOTAL, PREHARVEST
HARVEST COSTS
CUSTOM HARVEST
HAUL WHEAT
SUBTOTAL, HARVEST
PROJECTED
S/UNIT VALUE
BU.
DAYS
BU.
3. 30
0.50
1.08
$
LB.
LB.
LB.
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
ACRE
0.17
0.13
0.22
5.20
10.20
7.80
6.60
5.20
6. 11
1. 14
1.99
1. 13
5.00
6.40
4.00
1.96
0.145
1.74
$ 50.27 $
ACRE
BU.
ACRE
17.50 17.50
0.15
3.00
$ 20.50 $
YOUR
ESTIMATE
66.00
22.50
21.60
11 0 . 1 0 $
INPUT USE
60.00
60.00
30.00
1.00
1.28
0.49
12.00
1.00
20.00
ACRE
TOTAL VARIABLE COSTS
BREAK-EVEN PRICE, VARIABLE COSTS
$
70.77 $
$ 1 . 33/BU. WINTER WHE•AT
INCOME ABOVE VARIABLE COS TS
ACRE
FIXED COSTS
DEPREC..INTEREST,TAXES & INSUR.
TRACTOR
EQUIPMENT
LAND-CASH RENT
1.00
0.30
MISC ADMIN 0/H
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
ACRE
15.42
8 35
30.00 30i00
16.00
4.80
$ 58.57 $
TOTAL PROJECTED COSTS
ACRE
$ 129.34 $
BREAK-EVEN PRICE, TOTAL COSTS
39.33 $
$ 4 . 26/BU. WINTER WHEEAT
ACRE
NET PROJECTED RETURNS
$
$ -19.24 $
+ RISK INSURANCE: 65% AT $3.75/BUSHEL,
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
C12.55
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84,
578
B-124KC12)
WINTER WHEAT, DRYLAND
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
MACHINERY
OPERATION
CHISEL PLOW
FIELD CULTIVATOR
FIELD CULTIVATOR
ANHYDROUS SPRDER
DRY FERT SPRDER
GRAIN DRILL
ANHYDROUS SPRDER
MACH
ITEM OPER TIMES LABOR MACHINE OPER LABOR
NO. MONTH OVER HOURS HOURS COSTS COSTS
3,33
3,43
3,43
3,61
3,60
3,46
3,61
JUNE
JUNE
AUG
SEPT
SEPT
OCT
FEB
TOTALS
1.00
1.00
1.00
1.00
1.00
1.00
1.00
APPL. MACH
INPUT FIXED
COSTS COSTS
TOTAL
OPER.
COST
0.202
0. 151
0. 151
0. 151
0.203
0.270
0. 151
0. 153
0. 115
0.115
0 . 11 5
0. 154
0.205
0. 115
1.49
1. 12
1. 12
0.96
1.44
1.97
0.96
1.01
0.76
0.76
0.76
1.02
1.35
0.76
0.0
0.0
0.0
3.90
6.60
10.20
3.90
3.06
2.30
2.30
1.82
4.28
6.76
1.82
5.57
4. 18
4. 18
7.43
13.33
20.27
7.43
1.280
0.970
9.05
6.40
24.60 22.35
62.39
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF WINTER WHEAT
(DOLLARS)
2.64
2.97
3.30
3.63
16.00
11.85
17.13
22.41
27.69
32.97 j
18.00
18.99
24.93
30.87
36.81
42.75 |
20.00
26. 13
32.73
39.33
45.93
52.53 |
22.00
33.27
40.53
47.79
55.05
62.31 j
24.00
40.41
48.33
56.25
64. 17
72.09 |
BU.
QUANTITY OF
WINTER WHEAT
3.96
i
C12.56
^•^ik
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84
579
B-124KC12)
SPRING WHEAT, IRRIGATED
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
GROSS RECEIPTS
SPRING WHEAT
DEFICIENCY PMT.
TOTAL PROJECTED RETURNS
PROJECTED
YIELD
UNIT
35.00
35.00
VARIABLE COSTS
INPUT USE
PREHARVEST COSTS
♦WHEAT SD TREATED
80.00
♦NITROGEN (ANHY)
80.00
♦PHOSPHATE
40.00
+ FED. CROP INS.
1.00
IRRIGATION WATER
13.00
FUEL & LUBE--TRACTOR
EQUIPMENT
IRRIGATION
R E PA I R S T R A C T O R
EQUIPMENT
IRRIGATION
LABOR MACHINERY
1 .33
IRRIGATION
1.30
EQUIPMENT
0.49
OPERATING CAPITAL
40.46
SUBTOTAL. PREHARVEST
HARVEST COSTS
CUSTOM HARVEST
1.00
HAUL WHEAT
35.00
SUBTOTAL, HARVEST
TOTAL VARIABLE COSTS
BREAK-EVEN PRICE, VARIAE5LE COSTS
PROJECTED
S / U N I T VA L U E
BU.
BU.
3 . 3 0 11 5 . 5 0
1.08 37.80
$ 153.30 $
LB.
LB.
LB.
ACRE
ACIN
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
HOUR
DOL.
ACRE
0.17
0.13
0.22
5.20
5.00
4.00
4.00
0.145
$
ACRE
BU.
ACRE
17.50 17.50
0.15
5.25
$ 22.75 $
ACRE
$ 164.03 $
YOUR
ESTIMATE
13.60
10.40
8.80
5.20
6.35
1. 14
65.00
2.07
1.25
7.80
6.65
5.20
1.96
5.87
141.28 $
$ 3 . 61/BU. SPRING WHE:at
INCOME ABOVE VARIABLE COS1 S
ACRE
$ -10.73 $
FIXED COSTS
DEPREC..INTEREST,TAXES it INSUR.
TRACTOR
EQUIPMENT
IRRIGATION
LAND-CASH RENT
1.00
MISC ADMIN 0/H
0.50
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
16.02
9.29
26.52
30.00 30.00
16.00
8.00
$ 89.84 $
TOTAL PROJECTED COSTS
ACRE
$ 253.87 $
BREAK-EVEN PRICE. TOTAL COSTS
NET PROJECTED RETURNS
$ 6 . 17/BU. SPRING WHE•AT
ACRE
$ -100.57 $
+ RISK INSURANCE: 65% AT $3.75/BUSHEL,
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
C12.57
B-124KC12)
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84
579
SPRING WHEAT, IRRIGATED
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
MACHINERY
OPERATION
CHISEL PLOW
FIELD CULTIVATOR
FIELD CULTIVATOR
LAND PLANE
BEDDER 6R
ANHYDROUS SPRDER
DRY FERT SPRDER
GRAIN DRILL
MACH
ITEM OPER TIMES LABOR MACHINE OPER LABOR
NO. MONTH OVER HOURS HOURS COSTS COSTS
3,33
3,43
3,43
3,50
3,36
3.61
3,60
3,46
JUNE
AUG
OCT
OCT
NOV
NOV
NOV
DEC
1.00
1.00
1.00
0.20
1.00
1.00
1.00
1.00
TOTALS
IRRIGATION
APPLICATION
0. 153
0.115
0.115
0.038
0. 115
0. 115
0. 154
0.205
1 .49
1.12
1.12
0.34
1.05
0.96
1.44
1.97
1.01
0.76
0.76
0.25
0.76
0.76
1.02
1.35
10.40
8.80
13.60
3.06
2.30
2.30
1. 15
2.21
1.82
4.28
6.76
5.57
4. 18
4. 18
1.74
4.02
13.93
15.53
23.67
1.330
1.008
9.48
6.65
32.80 23.89
72.82
SYSTEM OPER. LABOR
HOURS COSTS COSTS
APPL. I R R I G
INPUT FIXED
COSTS COSTS
TOTAL
IRRIG
COSTS
IRRIG
DEC
FEB
MAR
APR
TOTALS
0.0
0.0
0.0
0.0
0.0
TOTAL
OPER.
COST
0.202
0. 151
0. 151
0.050
0.151
0. 151
0.203
0.270
APPL. ACRE LABOR
MONTH INCHES HOURS
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
APPL. MACH
INPUT FIXED
COSTS COSTS
4.00
3.00
3.00
3.00
0.400
0.300
0.300
0.300
0.0
0.0
0.0
0.0
22.40
16.80
16.80
16.80
1.60
1.20
1.20
1.20
0.0
0.0
0.0
0.0
13.00
1.300
0.0
72.80
5.20
0.0
8. 16
6. 12
6. 12
6. 12
32. 16
24. 12
24. 12
24'. 12
26.52 1 0 4 . 5 2
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF SPRING WHEAT
(DOLLARS)
2.64
2.97
3.30
3.63
28.00
-58.82
-49.58
-40.34
-31.10
-21.86 !
31.50
-46.33
-35.93
-25.54
-15.14
-4.75 |
35.00
-33.83
-22.28
-10.73
0.82
12.37 j
38.50
-21.34
-8.63
4.07
16.78
29.48 |
42.00
-8.84
5.02
18.88
32.74
46.60 |
BU.
QUANTITY OF
SPRING WHEAT
3.96
I
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT
STRATEGIES.
C12.58
<^%
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84
580
B-1241(C12)
SPRING WHEAT, DRYLAND
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
PROJECTED
YIELD
UNIT
1. GROSS RECEIPTS
SPRING WHEAT
DEFICIENCY PMT.
TOTAL PROJECTED RETURNS
20.00
20.00
2. VARIABLE COSTS
PREHARVEST COSTS
♦WHEAT SD TREATED
♦NITROGEN (ANHY)
♦PHOSPHATE
+ FED. CROP INS.
FUEL & LUBE--TRACTOR
EQUIPMENT
R E PA I R S T R A C T O R
EQUIPMENT
LABOR MACHINERY
EQUIPMENT
OPERATING CAPITAL
SUBTOTAL, PREHARVEST
HARVEST COSTS
CUSTOM HARVEST
HAUL WHEAT
SUBTOTAL, HARVEST
PROJECTED
VALUE
S/UNIT
BU.
BU.
3.30
1.08
LB.
LB.
LB.
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
ACRE
0. 17
0. 13
0.22
5.20
$
66.00
21.60
87.60 $
$
10.20
5.20
6.60
5.20
5.38
1. 14
1.75
1.13
5.64
1.96
2.31
46.53 $
$
17.50
3.00
20.50 $
$
67.03 $
YOUR
ESTIMATE
INPUT USE
60.00
40.00
30.00
1.00
1. 13
0.49
15.96
1.00
20.00
TOTAL VARIABLE COSTS
ACRE
BU.
ACRE
ACRE
5.00
4.00
0.145
17.50
0. 15
BREAK-EVEN PRICE, VARIABLE COSTS $ 2.27/BU. SPRING WHEAT
3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 2 0 . 5 7 $ _
jpte.,
4. FIXED COSTS
DEPREC..INTEREST,TAXES & INSUR.
TRACTOR
EQUIPMENT
LAND-CASH
RENT
1.00
MISC
ADMIN
0/H
0.30
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
ACRE
5. TOTAL PROJECTED COSTS
ACRE
BREAK-EVEN PRICE, TOTAL COSTS
6. NET PROJECTED RETURNS
$
13.60
8.35
30.00
4.80
56.75 $
$
123.78 $
30.00
16.00
$ 5 . 11/BU. SPRING WHEAT
ACRE
$
-36.18 S
+ RISK INSURANCE: 65% AT S3.75/BUSHEL.
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
C12.59
B-124KC12)
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84
580
SPRING WHEAT, DRYLAND
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
MACHINERY
OPERATION
CHISEL PLOW
FIELD CULTIVATOR
FIELD CULTIVATOR
ANHYDROUS SPRDER
DRY FERT SPRDER
GRAIN DRILL
MACH
ITEM OPER TIMES LABOR MACHINE OPER LABOR
NO. MONTH OVER HOURS HOURS COSTS COSTS
3,33
3,43
3.43
3,61
3,60
3,46
JUNE
AUG
OCT
NOV
NOV
DEC
TOTALS
1.00
1.00
1.00
1.00
1.00
1.00
APPL. MACH
INPUT FIXED
COSTS COSTS
0.202
0.151
0. 151
0.151
0.203
0.270
0.153
0 . 11 5
0 . 11 5
0 . 11 5
0.154
0.205
1.49
1. 12
1. 12
0.96
1 .44
1.97
1.01
0.0
0.76
0.0
0.76
0.0
0.76
5.20
1.02 . 6 . 6 0
1.35
10.20
1. 129
0.855
8.09
5.64
TOTAL
OPER.
COST
3.06
2.30
2.30
1.82
4.28
6.76
5.57
4.18
4. 18
8.73
13.33
20.27
22.00 20.52
56.26
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF SPRING WHEAT
(DOLLARS)
2.64
2.97
3.30
3.63
3.96
16.00 j
18.00 |
-6.91
-1.63
3.65
8.93
14.21 |
0.23
6. 17
12. 11
18.05
23.99 |
20.00 ]
22.00 |
7.37
13.97
20.57
27. 17
33.77 j
14.51
21.77
29.03
36.29
43.55 j
24.00 j
21.65
29.57
37.49
45.41
53.33 |
BU.
QUANTITY OF
SPRING WHEAT
i
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT
STRATEGIES.
C12.60
> * ^ L
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84.
581
B-124KC12)
PROCESSED BEETS (IRRIGATED)
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
1. GROSS RECEIPTS
PROC. BEETS Ml
PROC. BEETS M2
PROC. BEETS #3
USABLE CULLS
TOTAL PROJECTED RETURNS
PROJECTED
YIELD
UNIT
2.30
6.25
1.70
2.75
2. VARIABLE COSTS
INPUT USE
PREHARVEST COSTS
♦BEET SEED
18.00
♦NITROGEN (DRY)
24.00
♦NITROGEN (LIQ)
24.00
♦PHOSPHATE
60.00
♦HERBICIDE
1.00
♦BORON
2.00
BORON APPLICAT.
2.00
♦FUNGICIDE
3.00
FUNGICIDE APPLI.
3.00
FERTILIZER APPLI
1.00
IRRIGATION WATER
12.00
FUEL & LUBE--TRACTOR
EQUIPMENT
IRRIGATION
R E PA I R S T R A C T O R
EQUIPMENT
IRRIGATION
LABOR MACHINERY
2.55
IRRIGATION
1 .20
0.42
EQUIPMENT
OTHER
7.00
OPERATING CAPITAL
50. 18
SUBTOTAL, PREHARVEST
HARVEST COSTS
13.00
CUSTOM HARV&HAUL
SUBTOTAL, HARVEST
TOTAL VARIABLE COSTS
PROJECTED YOUR
VA L U E E S T I M AT E
S/UNIT
TON
TON
TON
TON
70.00
60.00
10.00
1.00
LB.
LB.
LB.
LB.
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
ACIN
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
HOUR
HOUR
DOL.
ACRE
3.00
0.26
0.26
0.22
22.00
2.75
3.00
7.00
2.90
1.80
$
17.30
0.98
60.00
5.39
2.77
7.20
12.73
4.80
1 .68
28.00
7.28
292.80 $
TON
ACRE
11.00
$
143.00
143.00 $
ACRE
s
435.80 $
5.00
4.00
4.00
4.00
0. 145
$
161.00
375.00
17.00
2.75
555.75 $
54.00
6.24
6.24
13.20
22.00
5.50
6.00
21.00
8.70
1.80
BREAK-EVEN PRICE, VARIABLE COSTS $ 17.85/TON PROC. BEETS #1
3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 11 9 . 9 4 $
FIXED COSTS
DEPREC..INTEREST,TAXES & INSUR.
TRACTOR
EQUIPMENT
IRRIGATION
MISC ADMIN 0/H
0.50
LAND-CASH RENT
1.00
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
TOTAL PROJECTED COSTS
ACRE
BREAK-EVEN PRICE, TOTAL COSTS
$
$
580.14 $
$ 80.60/TON PROC. BEETS #1
ACRE
NET PROJECTED RETURNS
16.00
50.00
38.62
23.24
24.48
8.00
50.00
144.34 $
YIELD BASED ON A WEIGHTED AVERAGE OF 18% #1;
AND 21% USABLE CULLS.
$
-24.39
$
48% #2; 13% #3;
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
C12.61
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84.
581
B-124KC12)
PROCESSED BEETS (IRRIGATED)
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
APPL. MACH TOTALINPUT FIXED OPER.
COSTS COSTS COST
MACH
MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR
OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS
SHREDDER
OFFSET DISC
MOLDBOARD PLOW
LAND PLANE
OFFSET DISC
HERBICIDE SPRAYR
PLANTER 4R
BED SHAPER 6R
BEDDER 6R
CULTIVATOR 4R
CULTIVATOR 4R
2 .30
2 .34
1 32
1 .50
2 ,34
63
1.41
1.48
1,36
1.39
1,39
SEPT
SEPT
SEPT
SEPT
NOV
JAN
JAN
JAN
FEB
MAR
APR
1.00
1 .20
1.00
0 .20
1.00
1.00
1.00
1.00
1.00
1.00
1.00
IRRIGATION
APPLICATION
WAT E R
WAT E R
WATER
WATER
A P P L I C AT I O N
A P P L I C AT I O N
APPLICATION
APPLICATION
2 . 1 9 3 2 5 . 3 1 12.73
76.00 60.63 174.67
APPL. ACRE LABOR
MONTH INCHES HOURS
IRRIG
SYSTEM OPER. LABOR
HOURS COSTS COSTS
APPL. IRRIG
INPUT FIXED
COSTS COSTS
JAN
FEB
MAR
APR
0.0
0.0
0.0
0.0
TOTALS
0.300
0.300
0.300
0.300
12.00 1.200 0.0
16.80
16.80
16.80
16.80
31
37
85
25
14
0
52
26
76
13
13
92
12
71
11
43
24
29
64
13
04
04
2.545
3.00
3.00
3.00
3.00
1
1
2
0
1
0
1
1
0
1
1
7
10
24
2
8
24
67
8
5
8
8
0. 199
0.207
0.432
0.038
0. 173
0.264
0.230
0.191
0.115
0. 172
0.172
TOTALS
2.36
2.40
6.32
0.49
2.00
0.08
3.30
2.45
1.50
2.22
2.22
4 25
0.0
6 35
0.0
0 . 0 15 54
0.0
1 37
0.0
5 29
22.00 2 16
54.00 8 47
0.0
4 93
0.0
2 88
0.0
4 69
4 69
0.0
0.263
0.273
0.571
0.050
0.228
0.0
0.303
0.252
0. 151
0.227
0.227
1.20
1.20
1.20
1.20
0.0
0.0
6.24
0.0
12
12
12
12
TOTAL
IRRIG
COSTS
24. 12
24. 12
30.36
24. 12
67.20 4.80 6.24 24.48 102.72
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF PROC. BEETS #1
(DOLLARS)
56.00
63.00
70.00
77.00
84 0 0
1 .84
11 .64
24.51
37.40
50.28
63 16 |
2.07
49.69
64. 18
78.67
93. 16
107 65 |
2.30
87.74
103.84
11 9 . 9 4
136.04
152 14 j
2.53
125.80
143.51
161.22
178.93
196 64 |
163.85
183.17
202.49
221.81
241 13 |
TON
i
QUANTITY OF
PROC. BEETS #1
2.76
j
L
C12.62
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84,
582
CABBAGE, IRRIGATED
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
GROSS RECEIPTS
CABBAGE
TOTAL PROJECTED RETURNS
PROJECTED
YIELD
UNIT
550.00
BAG
PROJECTED YOUR
S/UNIT
VALUE ESTIMATE
3.50
VARIABLE COSTS
INPUT USE
PREHARVEST COSTS
♦CABBAGE SEED
1.50
♦NITROGEN (LIQ)
50.00
♦PHOSPHATE
80.00
♦HERBICIDE
1.00
♦NITROGEN (DRY)
50.00
♦INSECTICIDE
10.00
♦FUNGICIDE
5.00
PESTICIDE APPLI.
10.00
IRRIGATION WATER
16.00
FUEL & LUBE--TRACTOR
EQUIPMENT
IRRIGATION
R E PA I R S T R A C T O R
EQUIPMENT
IRRIGATION
LABOR MACHINERY
2.59
IRRIGATION
1.60
EQUIPMENT
0.49
OTHER
24.00
OPERATING CAPITAL
70.69
SUBTOTAL, PREHARVEST
HARVEST COSTS
550.00
HARV, PACK & MKT
SUBTOTAL. HARVEST
LB.
LB.
LB.
ACRE
LB.
APPL
APPL
ACRE
ACIN
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
HOUR
HOUR
DOL.
ACRE
68.00
0.26
0.22
8.50
0.26
13.00
12.00
3.50
BAG
ACRE
2.10
TOTAL VARIABLE COSTS
ACRE
BREAK-EVEN PRICE. VARIABLE COSTS
jl*S
B-124KC12)
ACRE
4. FIXED COSTS
DEPREC..INTEREST.TAXES & INSUR.
TRACTOR
EQUIPMENT
IRRIGATION
LAND-CASH
RENT
1.00
MISC
ADMIN
0/H
0.50
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
5. TOTAL PROJECTED COSTS
ACRE
6. NET PROJECTED RETURNS
$
102.00
13.00
17.60
8.50
13.00
130.00
60.00
35.00
$
17. 19
1. 14
80.00
5.49
2.61
9.60
12.96
6.40
1.96
96.00
10.25
622.70 $
1155.00
$ 1155.00 $
1777.70
$.
$ 3.23/BAG CABBAGE
3. INCOME ABOVE VARIABLE COSTS
BREAK-EVEN PRICE. TOTAL COSTS
5.00
4.00
4.00
4.00
0. 145
1925.00
$ 1925.00 $
$
147.30
50.00
16.00
$
$
37.82
23.62
32.64
50.00
8.00
152.08 $
$ 1929.78 $
$ 3.51/BAG CABBAGE
ACRE
$
-4.78
$
CABBAGE ARE PACKED AND MARKETED IN 50 POUND BAGS.
BUDGET BASED ON A FALL CROP
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
C12.63
B-1241(C12)
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84
582
CABBAGE. IRRIGATED
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
^^$k
MACH
MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR
OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS
SHREDDER
OFFSET DISC
MOLDBOARD PLOW
LAND PLANE
DRY FERT SPRDER
OFFSET DISC
BEDDER 6R
CULTIVATOR 4R
HERBICIDE SPRAYR
STANHAY PLANTER
CULTIVATOR 4R
CULTIVATOR 4R
2
2
1
1
2
2
1
1
JUNE
JUNE
JUNE
JUNE
JUNE
JULY
JULY
JULY
JULY
JULY
SEPT
OCT
30
34
32
50
60
34
36
39
63
2 44
1 .39
1 .39
TOTALS
IRRIGATION
APPLICATION
0 .50
1 .20
1 .00
0 .20
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
0. 131
0.273
0.571
0.050
0.203
0.228
0. 151
0.227
0.0
0.303
0.227
0.227
0.100
0.207
0.432
0.038
0. 154
0.173
0 . 11 5
0. 172
0.264
0.230
0.172
0.172
2.592
2.228
18
40
32
49
80
00
50
22
08
71
22
22
0
1
2
0
1
1
0
1
0
1
1
1
3 96
66
0.0
2 13
37
0.0
6 35 10 12
85
0 . 0 15 54 24 71
25
0.0
1 37
2 11
02 30.60 4 32 37 73
14
0.0
5 29
8 43
76
0.0
2 88
5 13
13
0.0
4 69
8 04
0
8 . 5 0 2 16 10 74
52 102.00 5 9 0 112 12
13
0.0
4 69
8 04
13
4 69
8 04
0.0
25. 11 12.96 141. 10 60.01 239.18
IRRIG
SYSTEM OPER. LABOR
HOURS COSTS COSTS
APPL. ACRE LABOR
MONTH INCHES HOURS
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
1
2
6
0
1
2
1
2
0
2
2
2
APPL. MACH TOTAL
INPUT FIXED OPER.
COSTS COSTS COST
APPL. IRRIG
INPUT FIXED
COSTS COSTS
TOTAL
IRRIG
COSTS
J U LY 6 . 0 0 0 . 6 0 0 0 . 0 3 3 . 6 0 2 . 4 0 0 . 0 1 2 . 2 4 4 8 . 2 4
AUG 6.00 0.600 0.0 33.60 2.40 13.00 12.24 61.24
SEPT 4.00 0.400 0.0 22.40 1.60 0.0 8.16 32.16
TOTALS
16.00 1.600 0.0
89.60 6.40 13.00 32.64 141.64
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF CABBAGE
(DOLLARS)
2 80
3.15
3.50
3 85
440.00
-314 69
-160.69
-6.70
147 30
301 30 j
495.00
-276 19
-102.94
70.30
243 55
416 80 |
550.00
-237 69
-45.19
147.30
339 80
532 30 |
605.00
-199 19
12.56
224.30
436 05
647 80 |
660.00
-160 69
70.31
301.30
532 30
763 30 j
, BAG
QUANTITY OF
CABBAGE
4 20
i
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT. GRAZE-OUT, OR OTHER MANAGEMENT
STRATEGIES.
C12.64
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84.
583
B-1241(C12)
CANTALOUPES, IRRIGATED
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
PROJECTED
YIELD UNIT
GROSS RECEIPTS
CANTALOUPS
TOTAL PROJECTED RETURNS
300.00 CRTN
VARIABLE COSTS
INPUT USE
PREHARVEST COSTS
♦CANTALOUP SEED
2..00
♦NITROGEN (LIQ)
40..00
♦PHOSPHATE
80..00
♦HERBICIDE
1..00
♦INSECTICIDE
5..00
♦FUNGICIDE
4,.00
PESTICIDE APPLI.
5,.00
BEEHIVE RENT
0..50
♦NITROGEN (DRY)
60,.00
IRRIGATION WATER
15,.00
FUEL & LUBE- -TRACTOR
EQUIPMENT
IRRIGATION
EQUIPMENT
IRRIGATION
-MACHINERY
IRRIGATION
EQUIPMENT
OTHER
OPERATING CAPITAL
SUBTOTAL. PREHARVEST
HARVEST COSTS
HARV, PACK & MKT
SUBTOTAL, HARVEST
TO TA L
VA R I A B L E
3 .01
1,.50
0 .59
18,.00
65,.55
300 .00
COSTS
LB.
LB.
LB.
ACRE
APPL
APPL
ACRE
ACRE
LB.
ACIN
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
HOUR
HOUR
DOL.
ACRE
5.50 1650.00
$ 1650.00 $
6,.00
0,.26
0,.22
12,.00
7,.50
7,.00
3,.50
15,.00
0,.26
5,.00
4,.00
4,.00
4,.00
0 . 145
CRTN
ACRE
ACRE
YOUR
ESTIMATE
PROJECTED
S/UNIT VALUE
4 .25
$
12,.00
10,.40
17..60
12..00
37,.50
28,.00
17..50
7,.50
15,.60
$
16,. 10
1,.37
75,.00
5,.09
3,.20
9,.00
15..07
6..00
2 .35
72,.00
9,.50
372,.77 $
1275 .00
$ 1275 .00 $
1647.77
$_
BREAK-EVEN PRICE, VARIABLE COSTS $ 5.49/CRTN CANTALOUPS
3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 2 . 2 3 $ _
4. FIXED COSTS
DEPREC..INTEREST.TAXES & INSUR.
TRACTOR
EQUIPMENT
IRRIGATION
LAND-CASH
RENT
1.00
MISC
ADMIN
0/H
0.50
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
5. TOTAL PROJECTED COSTS
ACRE
BREAK-EVEN PRICE. TOTAL COSTS
6. NET PROJECTED RETURNS
50.00
16.00
$
39.46
30. 10
30.60
50.00
8.00
158.16 $
$ 1805.93 S
$ 6.02/CRTN CANTALOUPS
ACRE
$
-155.93
$
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
C12.65
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84.
583
B-1241(C12)
CANTALOUPES, IRRIGATED
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
MACHINERY
OPERATION
CULTIVATOR 4R
SHREDDER
CULTIVATOR 4R
OFFSET DISC
MOLDBOARD PLOW
LAND PLANE
OFFSET DISC
BEDDER 6R
HERBICIDE SPRAYR
DRY FERT SPRDER
CULTIVATOR 4R
PLANTER 6R
CULTIVATOR 4R
LAND PLANE
ROLLING CULT 4R
MACH
ITEM OPER TIMES LABOR MACHINE OPER LABOR
NO. MONTH OVER HOURS HOURS COSTS COSTS
3,39
3,30
3,39
3,34
1.32
50
3,34
1,36
63
3,60
3,39
3,42
3,39
50
3,37
NOV
DEC
DEC
JAN
JAN
JAN
FEB
FEB
FEB
FEB
MAR
MAR
APR
MAY
MAY
1.00
0.50
1.00
1.20
1.00
0.20
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
TOTALS
IRRIGATION
APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
0.227
0. 131
0.227
0.273
0.571
0.0
0.228
0. 151
0.0
0.203
0.227
0.224
0.227
0.0
0.324
0.172
0.100
0. 172
0.207
0.432
0.038
0.173
0 . 11 5
0.264
0.154
0.172
0.170
0. 172
0. 191
0.246
3.013
2.776
APPL. ACRE LABOR
MONTH INCHES HOURS
FEB
MAR
APR
MAY
TOTALS
1.55
0.95
1.55
1.92
6.32
0.02
1.60
1.50
0.08
1.44
1.55
1.86
1.55
0. 11
2. 19
1.13
0.66
1.13
1.37
2.85
0.0
1. 14
0.76
0.0
1.02
1. 13
1. 12
1. 13
0.0
1.62
APPL. MACH
INPUT FIXED
COSTS COSTS
TOTAL
OPER.
COST
0.0
3.70
2.10
0.0
0.0
3.70
0.0
6.30
0 . 0 15.54
0.0
0.54
0.0
5.25
2.88
0.0
12.00 2.16
33.20 4.28
0.0
3.70
12.00 5.93
0.0
3.70
0.0
2.72
0.0
5.36
6.38
3.70
6.38
9.58
24.71
0.57
7.99
5.13
14.24
39.93
6.38
20.91
6.38
2.83
9.18
24. 17 1 5 . 0 7
57.20 67.85 164.28
IRRIG
APPL. IRRIG
INPUT FIXED
COSTS COSTS
TOTAL
IRRIG
COSTS
6. 12
8.16
8. 16
8. 16
24. 12
32. 16
42.56
32. 16
SYSTEM OPER. LABOR
HOURS COSTS COSTS
3.00
4.00
4.00
4.00
0.300
0.400
0.400
0.400
0.0
0.0
0.0
0.0
16.80
22.40
22.40
22.40
1.20
1 .60
1.60
1.60
0.0
0.0
10.40
0.0
15.00
1.500
0.0
84.00
6.00
10.40 30.60 131.00
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
**^k
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF CANTALOUPS
(DOLLARS)
4 40
4.95
5.50
6 .05
6 60
240.00
- 3 3 6 77
-204.77
-72.77
59 .23
191 23 !
270.00
- 3 3 2 27
-183.77
-35.27
113 .23
261 7 3 !
300.00
- 3 2 7 77
-162.77
2.23
167 23
332 2 3 |
330.00
- 3 2 3 27
-141.77
39.73
221 23
402 7 3 |
360.00
- 3 1 8 77
-120.77
77.23
275 23
473 2 3 |
CRTN
QUANTITY OF
CANTALOUPS
■
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT, GRAZE-OUT. OR OTHER MANAGEMENT
STRATEGIES.
C12.66
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84
584
J^v
B-1241(C12)
CARROTS, IRRIGATED
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
GROSS RECEIPTS
CARROTS
TOTAL PROJECTED RETURNS
PROJECTED
UNIT
YIELD
350.00
BAG
VARIABLE COSTS
INPUT USE
PREHARVEST COSTS
♦CARROT SEED
3.50
♦NITROGEN (LIQ)
60.00
♦PHOSPHATE
75.00
♦HERBICIDE
2.00
2.00
♦INSECTICIDE
♦FUNGICIDE
2.00
PESTICIDE APPLI.
2.00
♦NITROGEN (DRY)
60.00
IRRIGATION WATER
18.00
FUEL & LUBE--TRACTOR
IRRIGATION
R E PA I R S T R A C T O R .
EQUIPMENT
IRRIGATION
LABOR-- MACHINERY
2.46
IRRIGATION
1.80
OPERATING CAPITAL
66.23
SUBTOTAL, PREHARVEST
HARVEST COSTS
HARV, PACK & MKT
350.00
SUBTOTAL. HARVEST
LB.
LB.
LB.
ACRE
APPL
APPL
ACRE
LB.
ACIN
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
ACRE
TOTAL VARIABLE COSTS
ACRE
BAG
ACRE
PROJECTED YOUR
VALUE ESTIMATE
S/UNIT
6 . 5 0 2275.00
$ 2275.00 $
5.50
0.26
0.22
15.00
6.50
7.00
3.50
0.26
5.00
4.00
0. 145
4.50
19.25
15.60
16.50
30.00
13.00
14.00
7.00
15.60
$
13.58
90.00
4.26
2.40
10.80
12.30
7.20
9.60
281.09 $
1575.00
$ 1575.00 $
$ 1856.09 $
BREAK-EVEN PRICE. VARIABLE COSTS $ 5.30/BAG CARROTS
3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 4 1 8 . 9 1 $ _
4. FIXED COSTS
DEPREC..INTEREST.TAXES & INSUR.
TRACTOR
EQUIPMENT
IRRIGATION
LAND-CASH RENT , 1.00
MISC
ADMIN
0/H
0.50
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
33.02
23.84
36.72
50.00 50.00
16.00
8.00
$ 151.58 $
5. TOTAL PROJECTED COSTS
ACRE
$ 2007.68 $
BREAK-EVEN PRICE. TOTAL COSTS
6. NET PROJECTED RETURNS
$ 5 . 74/BAG CARROTS
ACRE
$ 267.32 $
CARROTS ARE PACKED AND MARKETED IN 48 ONE POUND CELLO BAGS
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
jPN
C12.67
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84
584
B-1241(C12)
CARROTS, IRRIGATED
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
MACH
MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR
OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS
OFFSET DISC
MOLDBOARD PLOW
LAND PLANE
HERBICIDE SPRAYR
OFFSET DISC
BEDDER 6R
DRY FERT SPRDER
STANHAY PLANTER
CULTIVATOR 4R
HERBICIDE SPRAYR
CULTIVATOR 4R
CULTIVATOR 4R
3 34 JUNE
1 32 JUNE
1 50 JUNE
63 JUNE
3 34 JULY
1 36 JULY
3 60 JULY
3 44 JULY
3 39 AUG
63 AUG
3 39 SEPT
3 39 OCT
1 .20
1 .00
0 .20
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
TOTALS
IRRIGATION
APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
0.273
0.571
0.050
0.227
0.227
0.207
0.432
0.038
0.264
0.173
0 . 11 5
0. 154
0.230
0.172
0.264
0.172
0. 172
2.461
2.393
0.0
0.228
0.151
0.203
0.303
0.227
0.0
APPL. ACRE LABOR
MONTH INCHES HOURS
JULY
AUG
SEPT
OCT
NOV
TOTALS
1.92
6.32
0.49
0.08
1.60
1.50
1.44
2. 17
1.55
0.08
1.55
1.55
1
2
0
0
1
0
1
1
1
0
1
1
37
85
25
0
14
76
02
52
13
0
13
13
APPL. MACH TOTAL
INPUT FIXED OPER.
COSTS COSTS COST
0.0
0.0
0.0
15.00
0.0
0.0
32. 10
19.25
0.0
15.00
0.0
0.0
6
15
1
2
5
2
4
5
3
2
3
3
30
54
37
16
25
88
28
84
70
16
70
70
9
24
2
17
7
5
38
28
6
17
6
6
58
71
11
24
99
13
83
78
38
24
38
38
2 0 . 2 4 12 30
8 1 . 3 5 56 86 170 75
IRRIG
SYSTEM OPER. LABOR
HOURS COSTS COSTS
APPL. IRRIG TOTAL
INPUT FIXED IRRIG
COSTS COSTS COSTS
6.00
3.00
3.00
3.00
3.00
0.600
0.300
0.300
0.300
0.300
0.0
0.0
0.0
0.0
0.0
33.60
16.80
16.80
16.80
16.80
2 40
1 .20
1 .20
1 .20
1 .20
0 . 0 12 24
15.60 6 12
0.0
6 12
0.0
6 12
0.0
6 12
48
39
24
24
24
24
72
12
12
12
18.00
1.800
0.0
100.80
7 .20
15.60 36 72 160 32
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF CARROTS
(DOLLARS)
5.20
5.85
6.50
7 15
280.00
-85.09
96.91
278.91
460 91
642 . 9 1 j
315.00
-60.59
144. 16
348.91
553 66
758 4 1 |
350.00
-36.09
191.41
418.91
646 41
873 9 1 j
385.00
- 11 . 5 9
238.66
488.91
739 16
989 4 1 j
12.91
285.91
558.91
831 91
1104 . 9 1 |
BAG
QUANTITY OF
CARROTS
7 80
i
420.00
i
j
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT
STRATEGIES.
C12.68
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84
585
B-124KC12)
PROCESSED CARROTS, IRRIGATED
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
GROSS RECEIPTS
PROC. CARROTS #1
PROC. CARROTS #2
PROC. CARROTS #3
CARROT CULLS
TOTAL PROJECTED RETURNS
PROJECTED
YIELD
UNIT
2.40
8.00
1 .20
0.40
PROJECTED YOUR
VALUE ESTIMATE
S/UNIT
TON
TON
TON
TON
64.00
36.00
15.00
1.00
VARIABLE COSTS
INPUT USE
PREHARVEST COSTS
♦CARROT SEED
3.50
♦NITROGEN (LIQ)
60.00
♦PHOSPHATE
75.00
♦HERBICIDE
2.00
♦INSECTICIDE
2.00
♦FUNGICIDE
2.00
PESTICIDE APPLI.
2.00
♦NITROGEN (DRY)
60.00
IRRIGATION WATER
18.00
FUEL & LUBE--TRACTOR
IRRIGATION
R E PA I R S T R A C T O R
EQUIPMENT
IRRIGATION
LABOR MACHINERY
2.46
IRRIGATION
1.80
OPERATING CAPITAL
97.23
SUBTOTAL, PREHARVEST
HARVEST COSTS
HARVEST AND HAUL
12.00
SUBTOTAL, HARVEST
LB.
LB.
LB.
ACRE
APPL
APPL
ACRE
LB.
ACIN
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
ACRE
5.50
0.26
0.22
15.00
6.50
7.00
3.50
0.26
19.25
15.60
16.50
30.00
13.00
14.00
7.00
15.60
5.00
4.00
0. 145
$
13.58
90.00
4.26
2.40
10.80
12.30
7.20
14. 10
285.59 $
TON
ACRE
11.00
. $
132.00
132.00 $
TOTAL VARIABLE COSTS
ACRE
$
417.59 $
BREAK-EVEN PRICE, VARIABLE COSTS
$
153.60
288.00
18.00
0.40
460.00 $
$ 46.33/TON PROC. CARROTS #1
3. INCOME ABOVE VARIABLE COSTS
ACRE
4. FIXED COSTS
DEPREC..INTEREST,TAXES & INSUR.
TRACTOR
EQUIPMENT
IRRIGATION
LAND-CASH
RENT
1.00
MISC
ADMIN
0/H
0.50
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
50.00
16.00
$
33.02
23.84
36.72
50.00
8.00
151.58 $
5. TOTAL PROJECTED COSTS
ACRE
$
569.17 $
BREAK-EVEN PRICE, TOTAL COSTS
6. NET PROJECTED RETURNS
$
42.41
$
S1O9.49/T0N PROC. CARROTS #1
ACRE
$
-109.17
$
YIELD BASED ON 20% #1; 67% #2; 10% #3; AND 3% USABLE CULLS.
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
C12.69
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84,
585
B-1241(C12)
PROCESSED CARROTS, IRRIGATED
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
^ ^ k
MACH
MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR
OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS
OFFSET DISC
MOLDBOARD PLOW
LAND PLANE
HERBICIDE SPRAYR
OFFSET DISC
BEDDER 6R
DRY FERT SPRDER
STANHAY PLANTER
CULTIVATOR 4R
HERBICIDE SPRAYR
CULTIVATOR 4R
CULTIVATOR 4R
3 34 JUNE
1 32 JUNE
1 50 JUNE
63 JUNE
3 34 JULY
1 36 JULY
3 60 JULY
3 44 JULY
3 39 AUG
63 AUG
3 39 SEPT
3 39 OCT
1 .20
1 .00
0 .20
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
TOTALS
IRRIGATION
APPLICATION
0.273
0". 571
0.050
0.207
0.432
0.038
0.264
0.173
0 . 11 5
0.154
0.230
0.172
0.264
0.0
0.228
0.151
0.203
0.303
0.227
0.0
0. 172
0.172
0.227
0.227
1
6
0
0
1
1
1
2
1
0
1
1
92
32
49
08
60
50
44
17
55
08
55
55
1
2
0
0
1
0
1
1
1
0
1
1
37
85
25
0
14
76
02
52
13
0
13
13
APPL. MACH TOTAL
INPUT FIXED OPER.
COSTS COSTS COST
0.0
6 30
0 . 0 15 54
0.0
1 37
15.00 2 16
5 25
0.0
2 88
0.0
32. 10 4 28
19.25 5 84
3 70
0.0
15.00 2 16
3 70
0.0
3 70
0.0
9
24
2
17
7
5
38
28
6
17
6
6
58
71
11
24
99
13
83
78
38
24
38
38
2.461 2.393 20.24 12.30 81.35 56.86 170.75
IRRIG
SYSTEM OPER. LABOR
HOURS COSTS COSTS
APPL. ACRE LABOR
MONTH INCHES HOURS
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
JULY
AUG
SEPT
OCT
NOV
TOTALS
6.00
3.00
3.00
3.00
3.00
0.600
0.300
0.300
0.300
0.300
0.0
0.0
0.0
0.0
0.0
18.00
1.800
0.0
33
16
16
16
16
60
80
80
80
80
2 .40
1 .20
1 .20
1 .20
1 .20
100 80
7 .20
APPL. IRRIG TOTAL
INPUT FIXED IRRIG
COSTS COSTS COSTS
0.0
15.60
0.0
0.0
0.0
12
6
6
6
6
24
12
12
12
12
48
39
24
24
24
24
72
12
12
12
1 5 . 6 0 36 72 160 32
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF PROC. CARROTS #1
(DOLLARS)
51 20
57.60
64.00
70.40
1.92
-47 76
-35.47
-23.19
-10.90
1.39 |
2. 16
-18 03
-4.21
9.61
23.44
37.26 j
2.40
11 69
27.05
42.41
57.77
73.13 !
2.64
41 42
58.32
75.21
92. 11
109.01 |
2.88
71 15
89.58
108.01
126.45
144.88 |
TON
QUANTITY OF
PROC. CARROTS #1
76.80
i
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT
STRATEGIES.
C12.70
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84.
586
B-1241(C12)
CUCUMBERS, IRRIGATED
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
1. GROSS RECEIPTS
CUCUMBERS
TOTAL PROJECTED RETURNS
PROJECTED
YIELD
UNIT
250.00
2. VARIABLE COSTS
INPUT USE
PREHARVEST COSTS
♦CUCUMBER SEED
3.00
♦NITROGEN (LIQ)
40.00
♦PHOSPHATE
80.00
♦HERBICIDE
1.00
♦INSECTICIDE
1.00
♦FUNGICIDE
5.00
PESTICIDE APPLI.
5.00
BEEHIVE RENT
0.50
♦NITROGEN (DRY)
40.00
IRRIGATION WATER
16.00
FUEL & LUBE--TRACTOR
EQUIPMENT
IRRIGATION
R E PA I R S T R A C T O R
EQUIPMENT
IRRIGATION
LABOR-- MACHINERY
2.50
IRRIGATION
1.60
EQUIPMENT
0.49
OTHER
10.00
OPERATING CAPITAL
25.15
SUBTOTAL. PREHARVEST
HARVEST COSTS
250.00
HRV.PKG.MKT
SUBTOTAL, HARVEST
TOTAL VARIABLE COSTS
CRTN
6.50
LB.
LB.
LB.
ACRE
APPL
APPL
ACRE
ACRE
LB.
ACIN
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
HOUR
HOUR
DOL.
ACRE
6.50
0.26
0.22
8.00
10.00
7.00
3.50
15.00
0.26
CRTN
ACRE
ACRE
BREAK-EVEN PRICE. VARIABLE COSTS
PROJECTED YOUR
VALUE ESTIMATE
S/UNIT
5.00
4.00
4.00
4.00
0. 145
4.25
$
1625.00
$ 1625.00 $
19.50
10.40
17.60
8.00
10.00
35.00
17.50
7.50
10.40
13.75
1 . 14
80.00
4.32
2.61
9.60
12.48
6.40
$
1 .96
40.00
3.65
3 11 . 8 1 $
1062.50
$ 1062.50 $
1374.31
$.
$ 5.50/CRTN CUCUMBERS
INCOME ABOVE VARIABLE COSTS
ACRE
FIXED COSTS
DEPREC..INTEREST.TAXES & INSUR.
TRACTOR
EQUIPMENT
IRRIGATION
LAND-CASH
RENT
1.00
MISC
ADMIN
0/H
0.50
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
33.45
23. 18
32.64
50.00 50.00
16.00
8.00
$ 147.27 $
TOTAL PROJECTED COSTS
ACRE
$ 1521.58 $
BREAK-EVEN PRICE. TOTAL COSTS
NET PROJECTED RETURNS
$
250.69
$
$ 6 . 09/CRTN CUCUMBERS
ACRE
$ 103.42 $
CUCUMBERS ARE PACKED AND MARKETED IN 50 POUND CARTONS,
BUDGET BASED ON A FALL CROP
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
C12.71
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84
586
B-124KC12)
CUCUMBERS, IRRIGATED
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
MACHINERY
OPERATION
SHREDDER
OFFSET DISC
MOLDBOARD PLOW
LAND PLANE
HERBICIDE SPRAYR
DRY FERT SPRDER
BEDDER 6R
CULTIVATOR 4R
STANHAY PLANTER
CULTIVATOR 4R
MACH
ITEM OPER TIMES LABOR MACHINE OPER LABOR
NO. MONTH OVER HOURS HOURS COSTS COSTS
3,30
3,34
1,32
1,50
63
3,60
1.36
3.39
3,44
3,39
JUNE
JUNE
JUNE
JUNE
JUNE
JULY
AUG
AUG
AUG
SEPT
1.00
2.20
1.00
0.20
1.00
1.00
1.00
1.00
1.00
1.00
TOTALS
IRRIGATION
APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
0.263
0.501
0.571
0.050
0.0
0.203
0. 151
0.227
0.303
0.227
0.199
0.380
0.432
0.038
0.264
0.154
0. 115
0.172
0.230
0. 172
2.497
2.156
APPL. ACRE LABOR
MONTH INCHES HOURS
NOV
AUG
SEPT
OCT
TOTALS
1.89
3.52
6.32
0.49
0.08
1.44
1.50
1.55
2. 17
1.55
1.31
2.51
2.85
0.25
0.0
1.02
0.76
1. 13
1.52
1. 13
APPL. MACH
INPUT FIXED
COSTS COSTS
TOTAL
OPER.
COST
0.0
4.20
0 . 0 11.54
0 . 0 15.54
0.0
1.37
8.00 2.16
28.00 4 . 2 8
0.0
2.88
0.0
3.70
19.50 5 . 8 4
0.0
3.70
7.41
17.57
24.71
2.11
10.24
34.73
5.13
6.38
29.03
6.38
2 0 . 5 0 12.48
55.50 55.20 143.69
SYSTEM OPER. LABOR
HOURS COSTS COSTS
IRRIG
APPL. IRRIG
INPUT FIXED
COSTS COSTS
TOTAL
IRRIG
COSTS
8. 16
8.16
8. 16
8. 16
32.16
32. 16
42.56
32.16
4.00
4.00
4.00
4.00
0.400
0.400
0.400
0.400
0.0
0.0
0.0
0.0
22.40
22.40
22.40
22.40
1.60
1.60
1.60
1.60
0.0
0.0
10.40
0.0
16.00
1.600
0.0
89.60
6.40
10.40 32.64 139.04
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF CUCUMBERS
(DOLLARS)
5.20
5.85
6.50
7 15
200.00
-121.81
8.19
138.19
268 19
398 19 !
225.00
-98.06
48.19
194.44
340 69
486 9 4 |
250.00
-74.31
88. 19
250.69
413 19
575 6 9 |
275.00
-50.56
128.19
306.94
485 69
664 4 4 |
300.00
-26.81
168.19
363.19
558 19
753 19 j
CRTN
QUANTITY OF
CUCUMBERS
7 80
■
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT
STRATEGIES.
^*%.
C12.72
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84
587
ii^
B-124KC12)
CUCUMBERS (PICKLES) IRRIGATED
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
C AT E G O RY
PROJECTED
YIELD
UNIT
1. GROSS RECEIPTS
CUCUMB. PICKLES 105.00
TOTAL PROJECTED RETURNS
CWT.
2. V A R I A B L E C O S T S I N P U T U S E
PREHARVEST COSTS
♦CUCUMBER-PCKL SD 2.25
♦NITROGEN
(LIQ)
40.00
♦ P H O S P H AT E
80.00
♦HERBICIDE
1.00
♦INSECTICIDE
6.00
PESTICIDE
APPLI.
6.00
BEEHIVE
RENT
0.50
♦NITROGEN
(DRY)
40.00
I R R I G AT I O N WAT E R 1 2 . 0 0
FUEL & LUBE--TRACTOR
EQUIPMENT
IRRIGATION
R E PA I R S T R A C T O R
EQUIPMENT
IRRIGATION
LABOR
MACHINERY 2.72
I R R I G AT I O N 1 . 2 0
EQUIPMENT 0.28
OTHER
10.00
O P E R AT I N G C A P I TA L 3 5 . 9 5
SUBTOTAL. PREHARVEST
HARVEST COSTS
H A R V E S T, P I C K L E S 1 0 5 . 0 0
SUBTOTAL, HARVEST
LB.
LB.
LB.
ACRE
APPL
ACRE
ACRE
LB.
ACIN
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
HOUR
HOUR
DOL.
ACRE
TOTAL VARIABLE COSTS
BREAK-EVEN PRICE. VARIABLE COSTS
YOUR
ESTIMATE
PROJECTED
S / U N I T VA L U E
7.50 787.50
$ 787.50 $
8.00
0.26
0.22
8.00
10.00
3 . 50
15.00
0.26
18.00
10.40
17.60
8.00
60.00
21 .00
7.50
10.40
5.00
4.00
4.00
4.00
0.145
$
14.83
0.65
60.00
4.67
2.65
7.20
13.62
4.80
1.12
40.00
5.21
307.65 $
CWT.
ACRE
4.00 420.00
$ 420.00 $
ACRE
$ 727.65 $
$ 6 . 93/CWT. CUCUMB. PI:ckles
3. INCOME ABOVE VARIABLE COSTS
ACRE
4. FIXED COSTS
DEPREC..INTEREST,TAXES & INSUR.
TRACTOR
EQUIPMENT
IRRIGATION
LAND-CASH
RENT
1.00
MISC
ADMIN
0/H
0.50
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
36.19
23.53
24.48
50.00 50.00
16.00
8.00
$ 142.19 $
5. TOTAL PROJECTED COSTS
ACRE
$ 869.85 $
BREAK-EVEN PRICE. TOTAL COSTS
NET PROJECTED RETURNS
$
59.85 $
$ 8.28/CWT. CUCUMB. PICKLES
ACRE
$
-82.35
$
PRODUCTION VALUE AND HARVESTING EXPENSE BASED ON A WEIGHTED AVERAGE OF 8%#1'S
13%#2'S. 34%03'S, NAD 45%#4'S.
BUDGET BASED ON FALL CROP.
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
jfPv
C12.73
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84
587
B-124KC12)
CUCUMBERS (PICKLES) IRRIGATED
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
MACH
MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR
OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS
SHREDDER
OFFSET DISC
MOLDBOARD PLOW
LAND PLANE
BEDDER 6R
CULTIVATOR 4R
HERBICIDE SPRAYR
DRY FERT SPRDER
STANHAY PLANTER
CULTIVATOR 4R
CULTIVATOR 4R
3
3
1
1
1
3
3
3
3
3
30
34
32
50
36
39
63
60
44
39
39
AUG
AUG
AUG
AUG
AUG
AUG
AUG
AUG
AUG
SEPT
OCT
1 .00
2 .20
1 .00
0 .20
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
TOTALS
IRRIGATION
APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
0.263
0.501
0.571
0.050
0.151
0.227
0.0
0.203
0.303
0.227
0.227
0.199
0.380
0.432
0.038
0.115
0. 172
0.264
0.154
0.230
0.172
0. 172
2.723
2.328
TOTALS
3.00
3.00
3.00
3.00
89
52
32
49
50
55
08
44
17
55
55
1
2
2
0
0
1
0
1
1
1
1
31
51
85
25
76
13
0
02
52
13
13
22 05 13 62
0.0
4
0 . 0 11
0 . 0 15
0.0
1
2
0.0
3
0.0
8.00 2
28.00 4
18.00 5
0.0
3
0.0
3
20
54
54
37
88
70
16
28
84
70
70
7
17
24
2
5
6
10
34
27
6
6
41
57
71
11
13
38
24
73
53
38
38
54.00 58 90 148 57
I R R I G A P P L . I R R I G T O TA L
SYSTEM OPER. LABOR INPUT FIXED IRRIG
HOURS COSTS COSTS COSTS COSTS COSTS
APPL. ACRE LABOR
MONTH INCHES HOURS
AUG
SEPT
OCT
NOV
1
3
6
0
1
1
0
1
2
1
1
APPL. MACH TOTAL
INPUT FIXED OPER.
COSTS COSTS COST
0.300
0.300
0.300
0.300
0.0
0.0
0.0
0.0
12.00 1.200 0.0
16.80
16.80
16.80
16.80
20
20
20
20
0.0
0.0
10.40
0.0
12
12
12
12
24. 12
24. 12
34.52
24. 12
67.20 4.80 10.40 24.48 106.88
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF CUCUMB. PICKLES
(DOLLARS)
6.00
6.75
7.50
8.25
84.00
-139.65
-76.65
-13.65
49.35
112.35 j
94.50
- 11 8 . 6 5
-47.78
23. 10
93.97
164.85 |
105.00
-97.65
-18.90
59.85
138.60
217.35 |
115.50
-76.65
9.97
96.60
183.22
269.85 !
126.00
-55.65
38.85
133.35
227.85
322.35 |
■
CWT.
QUANTITY OF
CUCUMB. PICKLES
9.00
i
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT
STRATEGIES.
""■V
C12.74
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84,
588
B-124KC12)
LETTUCE, IRRIGATED
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
PROJECTED
YIELD
UNIT
1. GROSS RECEIPTS
LETTUCE
TOTAL PROJECTED RETURNS
500.00
2. VARIABLE COSTS
INPUT USE
PREHARVEST COSTS
♦LETTUCE SEED
1.00
♦NITROGEN (LIQ)
150.00
♦PHOSPHATE
80.00
♦HERBICIDE
1.00
♦INSECTICIDE
11.00
♦FUNGICIDE
6.00
PESTICIDE APPLI.
11.00
♦NITROGEN (DRY)
75.00
IRRIGATION WATER
12.00
FUEL & LUBE--TRACTOR
EQUIPMENT
IRRIGATION
R E PA I R S T R A C T O R
EQUIPMENT
IRRIGATION
LABOR MACHINERY
2.55
IRRIGATION
1.20
EQUIPMENT
0.63
OTHER
12.00
OPERATING CAPITAL
17.56
SUBTOTAL, PREHARVEST
HARVEST COSTS
HARV,PKG,HAUL
500.00
SUBTOTAL, HARVEST
TO TA L
VA R I A B L E
COSTS
PROJE■ C T E D Y O U R
VALUE ESTIMATE
S/UNIT
CRTN
5.50
LB.
LB.
LB.
ACRE
APPL
APPL
ACRE
LB.
ACIN
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
HOUR
HOUR
DOL.
ACRE
28.00
0.26
0.22
9.00
8.00
5.40
3.50
0.26
CRTN
ACRE
4.25
ACRE
2750.00
$ 2750.00 $
28.00
39.00
17.60
9.00
88.00
32.40
38.50
19.50
5.00
4.00
4.00
4.00
0. 145
$
$
15. 19
1.47
60.00
4.68
2.66
7.20
12.73
4.80
2.52
48.00
2.55
433.80 $
2125.00
$ 2125.00 $
2558.80
$.
BREAK-EVEN PRICE, VARIABLE COSTS $ 5.12/CRTN LETTUCE
INCOME ABOVE VARIABLE COSTS
ACRE
FIXED COSTS
DEPREC..INTEREST.TAXES & INSUR.
TRACTOR
EQUIPMENT
IRRIGATION
LAND-CASH
RENT
1.00
MISC
ADMIN
0/H
0.50
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
50.00
16.00
$
TOTAL PROJECTED COSTS
ACRE
$
BREAK-EVEN PRICE. TOTAL COSTS
NET PROJECTED RETURNS
$ 191.20 $
36.27
23.23
24.48
50.00
8.00
141.98
2700.78
$.
$ 5.40/CRTN LETTUCE
ACRE
$
49.22
$
LETTUCE IS PACKED AND MARKETED IN 50 POUND CARTONS.
BUDGET BASED ON A FALL CROP
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
#*>
C12.75
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84,
588
B-124KC12)
LETTUCE, IRRIGATED
TEXAS WINTER GARDEN REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
MACHINERY
OPERATION
SHREDDER .
OFFSET DISC v
OFFSET DISC
MOLDBOARD PLOW
LAND PLANE
BEDDER 6R
BED SHAPER 6R
STANHAY PLANTER
BED SHAPER 6R
HERBICIDE SPRAYR
DRY FERT SPRDER
MACH
ITEM OPER TIMES LABOR MACHINE OPER LABOR
NO. MONTI- OVER HOURS HOURS COSTS COSTS
APPL. MACH
INPUT FIXED
COSTS COSTS
TOTAL
OPER.
COST
3,30
3.34
3,34
1,32
1.50
1,36
1,48
3,44
1.48
63
3,60
0.0
4.20
0.0
5.25
0.0
6.30
0 . 0 15.54
0.0
1.37
0.0
2.88
4.93
0.0
28.00 5 . 8 4
0.0
4.93
9.00 2.16
37. 10 4 . 2 8
7.41
7.99
9.58
24.71
2. 11
5.13
8.64
37.53
8.64
11.24
43.83
JULY
JULY
AUG
AUG
AUG
AUG
SEPT
OCT
OCT
OCT
OCT
1.00
1.00
1.20
1.00
0.20
1.00
1.00
1.00
1.00
1.00
1.00
TOTALS
IRRIGATION
APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
0.263
0.228
0.273
0.571
0.050
0. 151
0.252
0.303
0.252
0.0
0.203
0.199
0.173
0.207
0.432
0.038
0 . 11 5
0.191
0.230
0.191
0.264
0. 154
2.547
2.194
APPL. ACRE LABOR
MONTH INCHES HOURS
OCT
NOV
DEC
TOTALS
1.89
1.60
1.92
6.32
0.49
1.50
2.45
2.17
2.45
0.08
1.44
1.31
1. 14
1 .37
2.85
0.25
0.76
1.26
1.52
1.26
0.0
1.02
22.31 1 2 . 7 3
74.10 57.67 166.81
IRRIG
SYSTEM OPER. LABOR
HOURS COSTS COSTS
APPL. IRRIG
INPUT FIXED
COSTS COSTS
TOTAL
IRRIG
COSTS
51.66
32. 16
51.66
4.00
4.00
4.00
0.400
0.400
0.400
0.0
0.0
0.0
22.40
22.40
22.40
1.60
1.60
1.60
19.50
0.0
19.50
8. 16
8. 16
8. 16
12.00
1.200
0.0
67.20
4.80
39.00 24.48 135.48
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF LETTUCE
(DOLLARS)
4 40
4.95
5.50
6 05
400.00
- 3 7 3 80
-153.80
66.20
286 20
506 20 |
450.00
- 3 6 6 30
- 11 8 . 8 0
128.70
376 20
623 70 j
500.00
- 3 5 8 80
-83.80
191.20
466 20
741 20 |
550.00
- 3 5 1 30
-48.80
253.70
556 20
858 70 |
600.00
- 3 4 3 80
-13.80
316.20
646 20
976 20 |
CRTN
QUANTITY OF
LETTUCE
"i
6 60
i
i
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT, GRAZE-OUT. OR OTHER MANAGEMENT
STRATEGIES.
C12.76
Download