PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, 563 B-1241(C12) FORAGE SORGHUM HAY, IRRIGATED TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS SORGHUM HAY TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 10.00 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦FORAGE SORG SEED 40.00 ♦NITROGEN (ANHY) 240.00 ♦PHOSPHATE 60.00 IRRIGATION WATER 20.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 1.87 IRRIGATION 2.00 0.63 EQUIPMENT OPERATING CAPITAL 7.28 SUBTOTAL, PREHARVEST HARVEST COSTS 330.00 MOW,RAKE,BALE CUSTOM HAUL 330.00 SUBTOTAL, HARVEST TOTAL VARIABLE COSTS TON PROJECTED VALUE S/UNIT 65.00 $ YOUR ESTIMATE 650.00 650.00 S LB. LB. LB. ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. ACRE 0.32 0. 13 0.22 12.80 31.20 13.20 5.00 4.00 4.00 0. 145 $ 8.90 1.47 100.00 2.90 1.30 12.00 9.33 8.00 2.51 1.06 204.67 $ BALE BALE ACRE 0.90 0. 15 $ 297.00 49.50 346.50 $ ACRE $ 551.17 $ BREAK-EVEN PRICE, VARIABLE COSTS $ 55.12/TON SORGHUM HAY 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 9 8 . 8 3 $ _ 4. FIXED COSTS DEPREC..INTEREST.TAXES & INSUR. TRACTOR EQUIPMENT IRRIGATION LAND-CASH RENT 1.00 MISC ADMIN 0/H 0.50 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE ACRE 5. TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE, TOTAL COSTS 6. NET PROJECTED RETURNS 40.00 16.00 $ 22.48 12.38 40.80 40.00 8.00 123.66 $ $ 674.84 $ $ 67.48/TON SORGHUM HAY ACRE $ -24.84 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C12.25 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 563 B-124KC12) FORAGE SORGHUM HAY. IRRIGATED TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE ^ ^ ! k M A C H A P P L . M A C H TO TA L MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR INPUT FIXED OPER. OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS COSTS COSTS COST SHREDDER CHISEL PLOW OFFSET DISC LAND PLANE ANHYDROUS SPRDER DRY FERT SPRDER GRAIN DRILL ANHYDROUS SPRDER ANHYDROUS SPRDER ANHYDROUS SPRDER 3 3 3 3 3 3 3 3 3 3 30 33 34 50 61 60 46 61 61 61 NOV NOV NOV NOV FEB FEB FEB MAY JUNE JULY 1.00 1.00 1.20 0 .20 1.00 1.00 1.00 1.00 1.00 1.00 TOTALS IRRIGATION APPLICATION 0 0 0 0 0 0 0 0 0 0 263 202 273 050 151 203 270 151 151 151 0. 199 0. 153 0. 207 0. 038 0. 115 0. 154 0. 205 0. 115 0. 115 0. 115 1 1 1 0 0 1 1 0 0 0 89 49 92 34 96 44 97 96 96 96 1 1 1 0 0 1 1 0 0 0 31 61 37 25 76 02 35 76 76 76 0 0 0 0 7 13 12 7 7 7 0 0 0 0 80 20 80 80 80 80 4 20 3 06 6 30 1 15 1 82 4 28 6 76 1 82 1 .82 1 .82 7 5 9 1 11 19 22 11 11 11 1 . 8 6 6 1 . 4 1 4 1 2 . 8 8 9 . 3 3 5 7 . 2 0 3 3 . 0 3 11 2 . 4 5 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. ACRE LABOR MONTH INCHES HOURS WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION FEB APR JUNE JULY AUG TOTALS APPL. IRRIG TOTAL INPUT FIXED IRRIG COSTS COSTS COSTS 4.00 4.00 4.00 4.00 4.00 0.400 0.400 0.400 0.400 0.400 0.0 0.0 0.0 0.0 0.0 22.40 22.40 22.40 22.40 22.40 1 .60 1 .60 1 .60 1 .60 1 .60 0.0 0.0 0.0 0.0 0.0 20.00 2.000 0.0 112.00 8 .00 0.0 8. 8. 8 8 8 16 16 16 16 16 32. 32. 32. 32. 32. INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF SORGHUM HAY (DOLLARS) 52.00 58.50 65.00 71.50 78 00 -65.87 • -48.52 -13.87 38.13 90. 13 142 13 | 9.98 68.48 126.98 185 48 | 10.00 -31.17 33.83 98.83 163.83 228 83 ! 11.00 -13.82 57.68 129.18 200.68 272 18 ! 12.00 3.53 81.53 159.53 237.53 315 53 ! TON 8.00 9.00 L NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. C12.26 16 16 16 16 16 40 80 160. 80 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT QUANTITY OF SORGHUM HAY 41 57 58 74 33 93 87 33 33 33 PROJECTIONS FOR PLANNING PURPOSES ONLY B-1241(C12) NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 564 CORN FOR SILAGE, IRRIGATED TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS CORN SILAGE TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 15.00 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦SEED CORN/SILAGE 20.00 ♦NITROGEN (ANHY) 160.00 ♦PHOSPHATE 80.00 ♦HERBICIDE 1.00 HERBICIDE APPLI. 1.00 ♦INSECTICIDE 1.00 IRRIGATION WATER 16.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 2. 13 IRRIGATION 1.60 EQUIPMENT 0.98 OPERATING CAPITAL 63.02 SUBTOTAL, PREHARVEST HARVEST COSTS SUBTOTAL. HARVEST TOTAL VARIABLE COSTS PROJE CTED S/UNIT VALUE TON 23.00 LB. LB. LB. ACRE ACRE APPL ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. ACRE 1.00 0. 13 0.22 20.00 3.00 8.00 5.00 4.00 4.00 0.145 $ YOUR ESTIMATE 345.00 345.00 $ 20.00 20.80 17.60 20.00 3.00 8.00 $ ACRE $ ACRE $ 11 . 9 0 2.28 80.00 3.74 2.04 9.60 10.66 6.40 3.92 9. 14 229.08 $ 0.0 S 229.08 $ BREAK-EVEN PRICE. VARIABLE COSTS $ 15.27/TON CORN SILAGE 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 11 5 . 9 2 $ . 4. FIXED COSTS DEPREC..INTEREST.TAXES & INSUR. TRACTOR EQUIPMENT IRRIGATION LAND-CASH RENT 1.00 MISC ADMIN 0/H 0.50 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE ACRE 40.00 16.00 $ 28.76 19.08 32.64 40.00 8.00 128.48 $ 5. TOTAL PROJECTED COSTS ACRE $ 357.55 $ BREAK-EVEN PRICE. TOTAL COSTS $ 23. 84/TON CO RN SILAGE ACRE 6. NET PROJECTED RETURNS $ -12.55 $ SOLD STANDING IN FIELD. A FALL APPLICATION OF A HERBICIDE MAY BE NECESSARY IF WEEDS BECOME A PROBLEM INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. A***. C12.27 B-1241(C12) PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 CORN FOR SILAGE. IRRIGATED TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE 564 MACH MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS CHISEL PLOW OFFSET DISC LAND PLANE OFFSET DISC BEDDER 6R ROLLING CULT 6R ANHYDROUS SPRDER DRY FERT SPRDER PLANTER 6R ROLLING CULT 6R ROLLING CULT 6R 1 33 1 34 2 50 1 34 3 36 3 38 3 61 3 60 3 42 3 .38 3 38 AUG AUG AUG OCT NOV DEC FEB FEB FEB MAR APR 1 .00 1 .20 0 .20 1 .00 1 .00 1 .00 1 .00 1 .00 1 .00 1 .00 1 .00 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION 0.202 0.273 0.050 0.228 0. 151 0.216 0.151 0.203 0.224 0.216 0.216 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 153 207 038 173 115 164 115 154 170 164 164 2 09 2 73 0 43 2 27 1 05 1 50 0 96 1 44 1 .86 1 .50 1 .50 1 01 1 37 0 25 1 14 0 76 1 08 0 .76 1 .02 1 .12 1 .08 1 .08 APPL. MACH TOTAL INPUT FIXED OPER. COSTS COSTS COST 0.0 0.0 0.0 0.0 0.0 0.0 20.80 17.60 28.00 0.0 0.0 3 7 1 6 2 3 1 4 5 3 3 95 49 16 24 21 96 82 28 93 96 96 7 04 11 b9 1 84 9 66 4 02 6 55 24 33 24 33 36 91 6 .55 6 55 2.131 1.615 17.32 10.66 66.40 44.98 139.36 I R R I G A P P L . I R R I G T O TA L SYSTEM OPER. LABOR INPUT FIXED IRRIG HOURS COSTS COSTS COSTS COSTS COSTS APPL. ACRE LABOR MONTH INCHES HOURS FEB MAR APR MAY TOTALS 4.00 4.00 4.00 4.00 0.400 0.400 0.400 0.400 0.0 0.0 0.0 0.0 16.00 1.600 0.0 22.40 22.40 22.40 22.40 1 .60 1 .60 1 .60 1 .60 0.0 0.0 0.0 0.0 8. 8. 8. 8. 16 16 16 16 32. 32. 32. 32. 89.60 6.40 0.0 32.64 128.64 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF CORN SILAGE (DOLLARS) 18 4 0 20.70 23.00 25.30 27 60 12.00 - 8 27 19.32 46.92 74.52 102 12 | 13.50 19 33 50.37 81.42 112.47 143 52 ] 15.00 46 92 81.42 115.92 150.42 184 92 ] 16.50 74 52 112.47 150.42 188.37 226 32 | 18.00 102 12 143.52 184.92 226.32 267 72 j TON QUANTITY OF CORN SILAGE i NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. C12.28 16 16 16 16 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 565 B-124KC12) FOOD CORN, IRRIGATED TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS CORN DEFICIENCY PMT. TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 100.00 100.00 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦SEED CORN/GRAIN 15.00 ♦NITROGEN (ANHY) 200.00 ♦PHOSPHATE 90.00 ♦NITROGEN (DRY) 40.00 ♦HERBICIDE 1.00 HERBICIDE APPLI. 1.00 ♦INSECTICIDE 1.00 HAIL INSURANCE 1.00 IRRIGATION WATER 16.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 2.39 IRRIGATION 1.60 EQUIPMENT 0.63 OPERATING CAPITAL 84.40 SUBTOTAL, PREHARVEST HARVEST COSTS CUSTOM HARVEST 1.00 HAUL CORN 100.00 SUBTOTAL, HARVEST TOTAL VARIABLE COSTS BU. BU. PROJECTED YOUR S/UNIT VALUE ESTIMATE 3.95 0.47 $ 395.00 47.00 442.00 $ LB. LB. LB. LB. ACRE ACRE APPL ACRE ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. ACRE 1.40 0. 13 0.22 0.26 20.00 3.00 8.00 17.00 21.00 26.00 19.80 10.40 20.00 3.00 8.00 17.00 5.00 4.00 4.00 0. 145 $ 13.65 1.47 80.00 4.38 2. 14 9.60 11.97 6.40 2.52 12.24 269.57 $ ACRE BU. ACRE 24.00 0. 17 $ 24.00 17.00 41.00 $ ACRE $ 310.57 $ BREAK-EVEN PRICE, VARIABLE COSTS $ 2.64/BU. CORN 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 1 3 1 . 4 3 $ _ 44$P*S 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT IRRIGATION LAND-CASH RENT 1.00 MISC ADMIN 0/H 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE ACRE 5. TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE. TOTAL COSTS 6. NET PROJECTED RETURNS 65.00 16.00 $ 32.01 19.09 32.64 65.00 16.00 164.74 $ $ 475.31 $ $ 4 . 28/BU. CO RN • $ -33.31 $ ACRE A FALL APPLICATION OF A HERBICIDE MAY BE NECESSARY IF WEEDS BECOME A PROBLEM INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C12.29 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. B-124KC12) FOOD CORN, IRRIGATED TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE 565 MACHINERY OPERATION OFFSET DISC BEDDER 6R ROLLING CULT 6R DRY FERT SPRDER PLANTER 6R ANHYDROUS SPRDER ROLLING CULT 6R ROLLING CULT 6R SHREDDER CHISEL PLOW OFFSET DISC LAND PLANE MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 1.34 2,36 3,38 3,60 3,42 3,61 3,38 3,38 2.30 1.33 1.34 2.50 OCT NOV DEC FEB FEB FEB MAR APR AUG AUG AUG AUG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.20 0.20 TOTALS IRRIGATION APPLICATION 0.228 0. 151 0.216 0.203 0.224 0. 151 0.216 0.216 0.263 0.202 0.273 0.050 0.173 0 . 11 5 0. 164 0. 154 0. 170 0 . 11 5 0.164 0. 164 0.199 0. 153 0.207 0.038 2.394 1.814 JAN APR MAY JUNE TOTALS 1.14 0.76 1.08 1.02 1. 12 0.76 1.08 1.08 1.31 1.01 1 .37 0.25 19.94 1 1 . 9 7 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. ACRE LABOR MONTH INCHES HOURS WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION 2.27 1.32 1.50 1.44 1.86 0.96 1.50 1.50 2.36 2.09 2.73 0.43 APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 6.24 2.25 3.96 4.28 5.93 1.82 3.96 3.96 4.25 3.95 7.49 1 . 16 9.66 4.32 6.55 36.93 37.91 29.53 6.55 6.55 7.92 7.04 11.59 1.84 0.0 0.0 0.0 30.20 29.00 26.00 0.0 0.0 0.0 0.0 0.0 0.0 8 5 . 2 0 49.27 166.38 APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 3.00 3.00 6.00 4.00 0.300 0.300 0.600 0.400 0.0 0.0 0.0 0.0 16.80 16.80 33.60 22.40 1.20 1.20 2.40 1.60 0.0 0.0 0.0 0.0 6.12 6.12 12.24 8.16 24. 12 24. 12 48.24 32. 16 16.00 1.600 0.0 89.60 6.40 0.0 32.64 128.64 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF CORN (DOLLARS) 3 16 3.55 3.95 4.34 4.74 80.00 -16 77 14.83 46.43 78.03 109.63 j 90.00 17 83 53.38 88.93 124.48 160.03 | 100.00 52 43 91.93 131.43 170.93 210.43 ! 11 0 . 0 0 87 03 130.48 173.93 217.38 260.83 | 120.00 121 63 169.03 216.43 263.83 3 11 . 2 3 ! BU. QUANTITY OF CORN i NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. ***% C12.30 PROJECTIONS FOR PLANNING PURPOSES ONLY B-1241(C12) NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 566 COTTON IRRIGATED, LONG SEASON VARITIES TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY GROSS RECEIPTS COTTON LINT COTTONSEED DEFICIENCY PMT. TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 900.00 0.73 900.00 VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦SD COTTON-UPLAND 16.00 ♦NITROGEN (ANHY) 80.00 ♦PHOSPHATE 50.00 ♦HERBICIDE 1.00 HAIL INSURANCE 1.00 ♦INSECTICIDE 10.00 PESTICIDE APPLI. 10.00 ♦DEFOLIANT 1.00 DEFOLIANT APPLI. 1.00 ♦GROWTH RETARDANT 1.00 CUST RETARD APPL 1.00 IRRIGATION WATER 16.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 2.82 IRRIGATION 1.60 EQUIPMENT 0.63 OTHER 4.00 OPERATING CAPITAL 80.84 SUBTOTAL. PREHARVEST HARVEST COSTS CUST COTTON PICK 900.00 1.90 GIN. BAG. TIES SUBTOTAL. HARVEST JpN TOTAL VARIABLE COSTS BREAK-EVEN PRICE. VARIAEJLE COSTS LB. TON LB. PROJECTED S / U N I T VA L U E 0.65 585.00 130.00 94.90 0.19 171.00 $ 850.90 $ LB. LB. LB. ACRE ACRE APPL ACRE ACRE ACRE APPL APPL ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 0.55 0.13 0.22 8.50 19.00 8 .50 3.50 8.00 3.00 12.00 3.50 8.80 10.40 11 . 0 0 8.50 19.00 85 .00 35.00 8.00 3.00 12.00 3.50 5.00 4.00 4.00 4.00 0.145 $ 17.23 1 .47 80.00 5.53 2.60 9.60 14.12 6.40 2.52 16.00 11 . 7 2 371.39 $ LB. BALE ACRE 0 . 11 9 9 . 0 0 43.60 82.84 $ 181.84 $ ACRE $ 553.23 $ $ 0 . 32/LB. COTTON LIiNIT INCOME ABOVE VARIABLE COS1"S ACRE $ 297.67 $ FIXED COSTS DEPREC..INTEREST,TAXES fiI INSUR. TRACTOR EQUIPMENT IRRIGATION LAND-CASH RENT 1.00 MISC ADMIN 0/H 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE ACRE 39. 15 24.39 32.64 65.00 65.00 16.00 16.00 $ 177.18 $ TOTAL PROJECTED COSTS ACRE $ 730.41 $ BREAK-EVEN PRICE. TOTAL COSTS NET PROJECTED RETURNS YOUR ESTIMATE $ 0 . 52/LB. COTTON LIhJT ACRE $ 120.49 $ A FALL APPLICATION OF A HERBICIDE MAY BE NECESSARY IF WEEDS BECOME A PROBLEM INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C12.31 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 566 B-124KC12) COTTON IRRIGATED, LONG SEASON VARITIES TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE ^%F^ MACHINERY OPERATION SHREDDER CHISEL PLOW OFFSET DISC LAND PLANE CHISEL PLOW OFFSET DISC OFFSET DISC BEDDER 6R HERBICIDE SPRAYR DRY FERT SPRDER ANHYDROUS SPRDER PLANTER 6R ROLLING CULT 6R ROLLING CULT 6R ROLLING CULT 6R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS OCT OCT OCT OCT NOV DEC JAN JAN JAN FEB FEB MAR APR MAY JUNE 2,30 1,33 1.34 2,50 1,33 1,34 1,34 2,36 63 2,60 3,61 2,42 3,38 3,38 3,38 1.00 1.00 1.20 0.20 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 TOTALS IRRIGATION APPLICATION 0.263 0.202 0.273 0.050 0.202 0.228 0.228 0. 151 0.0 0.203 0. 151 0.224 0.216 0.216 0.216 0. 199 0.153 0.207 0.038 0.153 0.173 0.173 0. 115 0.264 0.154 0 . 11 5 0.170 0.164 0. 164 0. 164 2.823 2.403 APPL. ACRE LABOR MONTH INCHES HOURS WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION FEB APR JUNE AUG TOTALS 2.36 2.09 2.73 0.43 2.09 2.27 2.27 1 .32 0.08 1.80 0.96 2.26 1.50 1.50 1.50 1.31 1.01 1.37 0.25 1.01 1.14 1.14 0.76 0.0 1.02 0.76 1. 12 1.08 1.08 1.08 APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.50 11.00 10.40 8.80 0.0 0.0 0.0 7.92 7.04 11 .59 1.84 7.04 9.66 9.66 4.32 10.74 18.13 13.93 18.15 6.55 6.55 6.55 4.25 3.95 7.49 1. 16 3.95 6.24 6.24 2.25 2. 16 4.32 1.82 5.97 3.96 3.96 3.96 25. 13 1 4 . 1 2 38.70 61 .71 139.66 IRRIG APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 8.16 8. 16 8. 16 8. 16 32.16 32. 16 32. 16 32.16 SYSTEM OPER. LABOR HOURS COSTS COSTS 4.00 4.00 4.00 4.00 0.400 0.400 0.400 0.400 0.0 0.0 0.0 0.0 22.40 22.40 22.40 22.40 1.60 1.60 1.60 1.60 0.0 0.0 0.0 0.0 16.00 1.600 0.0 89.60 6.40 0.0 32.64 128.64 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF COTTON LINT (DOLLARS) 0.52 0.58 0.65 0 71 720. 70.26 117.06 163.86 210 66 257 46 | 810. 125.47 178.12 230.77 283 42 336 07 j 900. 180.67 239.17 297.67 356 17 414 67 ! 990. 235.88 300.23 364.58 428 93 493 28 | 1080. 291.08 361.28 431.48 501 68 571 88 | LB. QUANTITY OF COTTON LINT 0 78 i C12.32 • PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 567 B-124KC12) COTTON IRRIGATED, SHORT SEASON VARIETIES TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS COTTON LINT COTTONSEED DEFICIENCY PMT. TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 750.00 0.61 750.00 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦SD COTTON-UPLAND 16.00 ♦NITROGEN (ANHY) 25.00 ♦PHOSPHATE 40.00 ♦HERBICIDE 1.00 HAIL INSURANCE 1.00 ♦INSECTICIDE 5.00 PESTICIDE APPLI. 5.00 ♦DEFOLIANT 1.00 DEFOLIANT APPLI. 1.00 IRRIGATION WATER 12.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 2.62 IRRIGATION 1.20 EQUIPMENT 0.63 OTHER 4.00 OPERATING CAPITAL 41.09 SUBTOTAL, PREHARVEST HARVEST COSTS CUST COTTON PICK 750.00 GIN. BAG, TIES 1.56 SUBTOTAL, HARVEST TOTAL VARIABLE COSTS BREAK-EVEN PRICE, VARIAE5LE COSTS PROJECTED S/UNIT VALUE LB. TON LB. 0.65 487.50 130.00 79.30 0.19 142.50 $ 709.30 $ LB. LB. LB. ACRE ACRE APPL ACRE ACRE ACRE ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 0.55 8.80 0.13 3.25 0.22 8.80 8.50 8.50 19.00 19.00 8.50 42.50 3.50 17.50 8.00 8.00 3.00 3.00 15.79 1.47 60.00 5. 10 2.38 7.20 5 . 0 0 1 3 . 11 4.00 4.80 4.00 2.52 4.00 16.00 0.145 5.96 $ 253.68 $ LB. BALE ACRE 0 . 11 8 2 . 5 0 43.60 68.02 $ 150.52 $ ACRE $ 404.19 $ $ 0 . 24/LB. COTTON LINIT 3. INCOME ABOVE VARIABLE COS1 S ACRE $ 3 0 5 . 11 $ 4. FIXED COSTS DEPREC..INTEREST,TAXES 8• INSUR. TRACTOR EQUIPMENT IRRIGATION LAND-CASH RENT 1.00 MISC ADMIN 0/H 0.75 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE ACRE 35.84 23.76 24.48 50.00 50.00 16.00 12.00 $ 146.08 $ 5. TOTAL PROJECTED COSTS ACRE $ 550.27 $ BREAK-EVEN PRICE, TOTAL COSTS 6. NET PROJECTED RETURNS YOUR ESTIMATE • $ 0 . 44/LB. COTTON LINIT ACRE $ 159.03 $ A FALL APPLICATION OF A HERBICIDE MAY BE NECESSARY IF WEEDS BECOME A PROBLEM INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C12.33 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 567 B-1241(C12) COTTON IRRIGATED, SHORT SEASON VARIETIES TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACH MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS SHREDDER CHISEL PLOW OFFSET DISC OFFSET DISC LAND PLANE OFFSET DISC BEDDER 6R HERBICIDE SPRAYR DRY FERT SPRDER ANHYDROUS SPRDER PLANTER 6R ROLLING CULT 6R ROLLING CULT 6R ROLLING CULT 6R 2 1 1 1 2 1 2 2 3 2 3 3 3 30 33 34 34 50 34 36 63 60 61 42 38 38 38 SEPT SEPT SEPT NOV NOV JAN JAN JAN JAN JAN MAR APR MAY JUNE 1.00 1.00 1.00 1.20 0 .20 1.00 1.00 1.00 1.00 1.00 1.00 1 .00 1 .00 1 .00 TOTALS IRRIGATION APPLICATION 0.263 0.202 0.228 0.273 0.050 0.228 0.151 0.0 0.203 0.151 0.224 0.216 0.216 0.216 0.199 0.153 0. 173 0.207 0.038 0.173 0 . 11 5 0.264 0.154 0.115 0.170 0.164 0. 164 0. 164 2.622 2.251 2.36 2.09 2.27 2.73 0.43 2.27 1.32 0.08 1.80 0.96 2.26 1.50 1.50 1.50 APPL. MACH TOTAL INPUT FIXED OPER. COSTS COSTS COST 1.31 1.01 1. 14 1.37 0.25 1. 14 0.76 0.0 1.02 0.76 1.12 1.08 1.08 1.08 23.05 13. 11 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.50 8.80 3.25 8.80 0.0 0.0 0.0 4.25 3.95 6.24 7.49 1. 16 6.24 2.25 2.16 4.32 1.82 5.97 3.96 3.96 3.96 7 7 9 11 1 9 4 10 15 6 18 6 6 6 29.35 57.76 123 27 I R R I G A P P L . I R R I G T O TA L APPL. ACRE LABOR SYSTEM OPER. LABOR INPUT FIXED IRRIG MONTH INCHES HOURS HOURS COSTS COSTS COSTS COSTS COSTS WATER APPLICATION WATER APPLICATION WATER APPLICATION FEB MAY JUNE TOTALS 4 00 4 .00 4 00 0 400 0 400 0 400 0 0 0 0 0 0 12.00 1.200 0.0 22 4 0 22 4 0 22 4 0 1 .60 1 .60 1 .60 0 0 0 0 0 0 8. 16 8. 16 8. 16 32. 16 32. 16 32. 16 67.20 4.80 0.0 24.48 96.48 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF COTTON LINT (DOLLARS) 0 52 0.58 0.65 0 71 600.00 115 35 154.35 193.35 232 35 271 35 | 675.00 161 48 205.35 249.23 293 10 336 98 | 750.00 207 61 256.36 305.11 353 86 402 61 | 825.00 253 73 307.36 360.98 414 61 468 23 | 299 86 358.36 416.86 475 36 533 86 | LB. QUANTITY OF COTTON LINT 92 04 66 59 84 66 32 74 93 78 15 55 55 55 900.00 0 78 L j C12.34 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 568 B-1241(C12) COTTON, DRYLAND, SHORT SEASON VARIETIES TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY GROSS RECEIPTS COTTON LINT COTTONSEED DEFICIENCY PMT. TOTAL PROJECTED RETURNS VARIABLE COSTS PREHARVEST COSTS ♦SD COTTON-UPLAND ♦NITROGEN (ANHY) ♦PHOSPHATE ♦HERBICIDE ♦INSECTICIDE PESTICIDE APPLI. ♦DEFOLIANT DEFOLIANT APPLI. + FED. CROP INS. FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR- MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS CUST HARV, STRIP GIN STRPR COTTON BL.BG.TIE-ST CTN SUBTOTAL, HARVEST PROJECTED YIELD UNIT 350.00 0.28 350.00 PROJECTED YOUR S/UNIT VALUE ESTIMATE LB. TON LB. 0.57 130.00 0. 19 $ 199.50 36.40 66.50 302.40 $ LB. LB. LB. ACRE APPL ACRE ACRE ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 0.55 0.13 0.22 8.50 8.50 3.50 8.00 3.00 15.73 $ 6.60 3.25 4.40 8.50 25.50 10.50 8.00 3.00 15.73 9.93 1.47 3.23 2.04 10.41 2.52 2.42 117.50 $ $ 24.50 24.50 9. 10 58.10 $ $ 175.60 $ INPUT USE 12.00 25.00 20.00 1.00 3.00 3.00 1.00 1.00 1.00 2.08 0.63 16.68 14.00 14.00 0.70 TOTAL VARIABLE COSTS CWT. CWT. BALE ACRE 5.00 4.00 0. 145 1 .75 1.75 13.00 ACRE BREAK-EVEN PRICE. VARIABLE COSTS $ 0.21/LB. COTTON LINT INCOME ABOVE VARIABLE COSTS ACRE FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT MISC ADMIN 0/H 0.50 LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE, TOTAL COSTS NET PROJECTED RETURNS $ 126.80 $. 25.08 18.85 16.00 8.00 20.00 20.00 $ 71 .92 $^ $ 247.53 $. $ 0.41/LB. COTTON LINT ACRE $ 54.87 $ + RISK INSURANCE: 65% AT S.70/LB OF LINT, INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. # ^ C12.35 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, 568 B-124KC12) COTTON, DRYLAND. SHORT SEASON VARIETIES TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE j<3B^" MACHINERY OPERATION SHREDDER CHISEL PLOW OFFSET DISC OFFSET DISC BEDDER 6R HERBICIDE SPRAYR DRY FERT SPRDER ANHYDROUS SPRDER PLANTER 6R ROLLING CULT 6R ROLLING CULT 6R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 3.30 3.33 3,34 3,34 3,36 63 3,60 3,61 3,42 3,38 3,38 SEPT SEPT SEPT DEC JAN JAN JAN JAN MAR APR MAY TOTALS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.263 0.202 0.228 0.228 0. 151 0.0 0.203 0. 151 0.224 0.216 0.216 0. 199 0.153 0. 173 0.173 0 . 11 5 0.264 0. 154 0 . 11 5 0.170 0.164 0. 164 2.082 1.842 1.89 1.49 1.60 1.60 1.05 0.08 1.44 0.96 1.86 1.50 1.50 APPL. MACH INPUT FIXED COSTS COSTS 4.20 3.06 5.25 5.25 2.21 2. 16 4.28 1.82 5.93 3.96 3.96 7.41 5.57 7.99 7.99 4.02 10.74 11.13 6.78 15.51 6.55 6.55 22.75 42.09 90.23 1.31 1.01 1. 14 1 . 14 0.76 0.0 1.02 0.76 1. 12 1.08 1.08 14.98 10.41 TOTAL OPER. COST 0.0 0.0 0.0 0.0 0.0 8.50 4.40 3.25 6.60 0.0 0.0 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF COTTON LINT (DOLLARS) 0.46 0.51 0.57 0 63 0 68 280.00 46.02 61.98 77.94 93 90 109 86 ! 315.00 66.46 84.41 102.37 120 32 138 28 | 350.00 86.90 106.85 126.80 146 75 166 70 j 385.00 107.34 129.28 151.23 173 17 195 12 | 420.00 127.78 151.72 175.66 199 60 223 54 | LB. i QUANTITY OF COTTON LINT i ••"s%. C12.36 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 569 B-124KC12) GRAIN SORGHUM, DRYLAND TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE /JsW&j^y CATEGORY PROJECTED YIELD UNIT 1. GROSS RECEIPTS GRAIN SORGHUM DEFICIENCY PMT. TOTAL PROJECTED RETURNS 25.00 25.00 2. VARIABLE COSTS PREHARVEST COSTS ♦GRAIN SORG. SEED ♦NITROGEN (ANHY) ♦PHOSPHATE ♦HERBICIDE HERBICIDE APPLI. ♦INSECTICIDE I N S E C T. A P P L I . + FED. CROP INS. FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL. PREHARVEST HARVEST COSTS CUSTOM HARVEST D HAUL GRAIN SORG SUBTOTAL. HARVEST PROJECTED VALUE S/UNIT CWT. CWT. 4.44 0.82 YOUR ESTIMATE $ 111.00 20.50 131.50 $ $ 3.04 7.80 8.80 10.00 3.00 16.00 6.00 5.19 10.24 1.47 3.34 2.00 10.73 2.52 3. 19 93.31 $ $ 18.00 7.50 25.50 $ $ 118.81 $ INPUT USE 4.00 60.00 40.00 1.00 1.00 2.00 2.00 1.00 2. 15 0.63 21 .98 1.00 25.00 LB. LB. LB. ACRE ACRE APPL APPL ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 0.76 0. 13 0.22 10.00 3.00 8.00 3.00 5. 19 5.00 4.00 0. 145 18.00 0.30 ACRE CWT. ACRE ACRE TOTAL VARIABLE COSTS BREAK-EVEN PRICE. VARIABLE COSTS $ 3.93/CWT. GRAIN SORGHUM 3. INCOME ABOVE VA R I A B L E COSTS 4. FIXED COSTS DEPREC..INTEREST.TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 MISC ADMIN 0/H 0.30 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE 5. TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE. TOTAL COSTS ACRE 12.69 $. $ 25.86 17.65 15.00 4.80 63.31 $ $ 182.12 $ 15.00 16.00 $ 6.46/CWT. GRAIN SORGHUM ACRE 6. NET PROJECTED RETURNS $ $ -50.62 $ A FALL APPLICATION OF A HERBICIDE MAY BE NECESSARY IF WEEDS BECOME A PROBLEM + R I S K I N S U R A N C E : 6 5 % AT S 4 . 9 1 / C W T. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C12.37 B-124KC12) PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 GRAIN SORGHUM, DRYLAND TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE 569 MACHINERY OPERATION SHREDDER CHISEL PLOW OFFSET DISC OFFSET DISC ANHYDROUS SPRDER DRY FERT SPRDER PLANTER 6R ROLLING CULT 6R ROLLING CULT 6R ROLLING CULT 6R MACH ' LABOR ITEM OPER TIMES LABOR MACHINE OPER NO. MONTH OVER HOURS HOURS COSTS COSTS 3.30 3.33 3.34 3,34 3,61 3,60 3,42 3,38 3,38 3,38 AUG AUG SEPT DEC FEB FEB FEB MAR APR MAY TOTALS 1.00 1 .00 1 .00 1 .00 1.00 1 .00 1.00 1 .00 1 .00 1.00 0.263 0.202 0.228 0.228 0. 151 0.203 0.224 0.216 0.216 0.216 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 199 153 173 173 115 154 170 164 164 164 1 .89 1 .31 1 .49 1.01 1 .60 1 . 14 1 .60 1 . 14 0.96' 0.76 1 .44 1 .02 1 .86 1 . 12 1 .50 1 .08 1 .50 1 .08 1 .50 1 .08 2. 147 1.626 15.35 10.73 APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 4.20 3.06 5.25 5.25 1 .82 4.28 5.93 3.96 3.96 3.96 7.41 5.57 7.99 7.99 1 1 .33 15.53 1 1 .95 6.55 6.55 6.55 1 9 . 6 4 41 .68 87.40 0.0 0.0 0.0 0.0 7.80 8.80 3.04 0.0 0.0 0.0 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF GRAIN SORGHUM (DOLLARS) 3.55 4.00 4.44 4.88 20.00 -29.87 -20.99 - 1 2 . 11 -3.23 5 65 j 22.50 -19.69 -9.70 0.29 10.28 20 27 j 25.00 -9.51 1.59 12.69 23.79 34 89 j 27.50 0.67 12.88 25.09 37.30 49 51 j 30.00 10.85 24. 17 37.49 50.81 64 CWT. QUANTITY OF GRAIN SORGHUM 5 33 13 j NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. C12.38 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 570 0$\ B-1241(C12) GRAIN SORGHUM, IRRIGATED TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS GRAIN SORGHUM DEFICIENCY PMT. TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 50.00 50.00 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦GRAIN SORG. SEED 6.00 ♦NITROGEN (ANHY) 120.00 ♦PHOSPHATE 60.00 ♦HERBICIDE 1.00 HERBICIDE APPLI. 1.00 ♦INSECTICIDE 2.00 INSECT. APPLI. 2.00 HAIL INSURANCE 1.00 IRRIGATION WATER 12.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 2.39 IRRIGATION 1.20 0.28 EQUIPMENT 49.89 OPERATING CAPITAL SUBTOTAL. PREHARVEST HARVEST COSTS 50.00 CUSTOM HARVEST I HAUL GRAIN SORG 50.00 SUBTOTAL, HARVEST PROJECTED YOUR VALUE ESTIMATE S/UNIT CWT. CWT. 4.44 0.82 LB. LB. LB. ACRE ACRE APPL APPL ACRE ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. ACRE 0.76 0. 13 0.22 10.00 3.00 8.00 3.00 12.00 CWT. CWT. ACRE 5.00 4.00 4.00 0. 145 0.45 0.30 ACRE TOTAL VARIABLE COSTS $ 222.00 41 .00 263.00 $ 4.56 15.60 13.20 10.00 3.00 16.00 6.00 12.00 $ 11.42 0.65 60.00 3.72 2.02 7.20 11.97 4.80 1. 12 7.23 190.49 $ $ 22.50 15.00 37.50 $ $ 227.99 $ BREAK-EVEN PRICE, VARIABLE COSTS $ 3.74/CWT. GRAIN SORGHUM 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 3 5 . 0 1 $ _ 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT IRRIGATION LAND-CASH RENT 1.00 MISC ADMIN 0/H 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE ACRE 5. TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE, TOTAL COSTS $ $ 355.38 $ $ 6.29/CWT. GRAIN SORGHUM ACRE 6. NET PROJECTED RETURNS 40.00 16.00 28.84 18.07 24.48 40.00 16.00 127.39 $ $ -92.38 $ A FALL APPLICATION OF A HERBICIDE MAY BE NECESSARY IF WEEDS BECOME A PROBLEM INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. ifP\ C12.39 B-1241(C12) PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 570 GRAIN SORGHUM. IRRIGATED TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION CHISEL PLOW OFFSET DISC OFFSET DISC LAND PLANE BEDDER 6R DRY FERT SPRDER ANHYDROUS SPRDER PLANTER 6R ROLLING CULT 6R ROLLING CULT 6R ROLLING CULT 6R SHREDDER MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 3,33 3,34 3,34 3,50 3,36 3,60 3,61 3,42 3,38 3,38 3,38 3,30 AUG AUG DEC DEC JAN FEB FEB MAR MAR APR MAY JULY 1.00 1.00 1.20 0.20 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION 0.202 0.228 0.273 0.050 0. 151 0.203 0. 151 0.224 0.216 0.216 0.216 0.263 0. 153 0. 173 0.207 0.038 0. 115 0. 154 0. 115 0. 170 0. 164 0. 164 0. 164 0. 199 2.394 1.814 TOTALS 1.01 1.14 1.37 0.25 0.76 1.02 0.76 1. 12 1.08 1.08 1.08 1.31 17.06 11.97 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. ACRE LABOR MONTH INCHES HOURS JAN MAR MAY 1.49 1.60 1.92 0.34 1.05 1.44 0.96 1.86 1.50 1.50 1.50 1.89 APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 0.0 0.0 0.0 0.0 0.0 13.20 15.60 4.56 0.0 0.0 0.0 0.0 5.57 7.99 9.58 1.74 4.02 19.93 19. 13 13.47 6.55 6.55 6.55 7.41 3.06 5.25 6.30 1.15 2.21 4.28 1.82 5.93 3.96 3.96 3.96 4.20 33.36 46.09 108.48 APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 4.00 4.00 4.00 0.400 0.400 0.400 0.0 0.0 0.0 22.40 22.40 22.40 1.60 1.60 1.60 0.0 0.0 0.0 8. 16 8. 16 8. 16 32. 16 32. 16 32. 16 12.00 1.200 0.0 67.20 4.80 0.0 24.48 96.48 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF GRAIN SORGHUM (DOLLARS) 3.55 4.00 40.00 -45.61 -27.85 -10.09 7.67 25.43 | 45.00 -27.50 -7.52 12.46 32.44 52.42 ] 50.00 -9.39 12.81 35.01 57.21 79.41 | 55.00 8.72 33.14 57.56 81.98 106.40 | 60.00 26.83 53.47 80.11 106.75 133.39 | CWT. QUANTITY OF GRAIN SORGHUM 4.44 4.88 5.33 - i i NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. C12.40 PROJECTIONS FOR PLANNING PURPOSES ONLY B-1241(C12) NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 571 GUAR, IRRIGATED, TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS GUAR TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 17.50 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦INSECTICIDE 1.00 ♦GUAR SEED 8.00 ♦INNOCULANT 1.00 ♦NITROGEN (ANHY) 100.00 ♦PHOSPHATE 45.00 ♦HERBICIDE 1.00 HERBICIDE APPLI. 1.00 INSECT. APPLI. 1.00 IRRIGATION WATER 13.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 1.97 IRRIGATION 1.30 EQUIPMENT 0.63 OTHER 2.00 OPERATING CAPITAL 57.79 SUBTOTAL, PREHARVEST HARVEST COSTS CUS HARV GUAR 1.00 HAUL GUAR 17.50 SUBTOTAL. HARVEST TOTAL VARIABLE COSTS PROJECTED YOUR VALUE ESTIMATE S/UNIT CWT. 12.00 APPL LB. ACRE LB. LB. ACRE ACRE APPL ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 8.00 0.65 0.50 0. 13 0.22 4.00 3.00 3.00 ACRE CWT. ACRE 5.00 4.00 4.00 4.00 0. 145 25.00 0.25 ACRE $ 210.00 210.00 $ 8.00 5.20 0.50 13.00 9.90 4.00 3.00 3.00 $ 8. 19 1.47 65.00 2.24 2.04 7.80 9.86 5.20 2.51 8.00 8.38 167.28 $ $ 25.00 4.38 29.38 $ $ 196.66 $ BREAK-EVEN PRICE, VARIABLE COSTS $ 11.24/CWT. GUAR 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 1 3 . 3 4 $ 5 FIXED COSTS DEPREC..INTEREST.TAXES & INSUR. TRACTOR EQUIPMENT IRRIGATION LAND-CASH RENT 1.00 MISC ADMIN 0/H 0.50 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE ACRE TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE. TOTAL COSTS $ $ 302.27 $ $ 17.27/CWT. GUAR ACRE 6. NET PROJECTED RETURNS 30.00 16.00 24.82 16.27 26.52 30.00 8.00 105.61 $ $ -92.27 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C12.41 B-124KC12) PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 571 GUAR, IRRIGATED, TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION MOLDBOARD PLOW CHISEL PLOW TANDEM DISK BEDDER 6R ROLLING CULT 6R PLANTER 6R DRY FERT SPRDER ANHYDROUS SPRDER ROLLING CULT 6R ROLLING CULT 6R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 3,32 3,33 3,58 4,36 4,38 4,42 3,60 3,61 4,38 4,38 DEC DEC JAN JAN FEB APR APR APR MAY JUNE 0.50 0.50 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION TOTALS TOTAL OPER. COST 6.52 1 .53 4.01 2.37 4.19 6.16 4.28 1.82 4. 19 4. 19 10.26 2.78 6.46 3.87 6.34 14.40 16.63 16.53 6.34 6.34 0.285 0. 101 0.208 0.151 0.216 0.224 0.203 0.151 0.216 0.216 0.216 0.076 0. 158 0.115 0. 164 0. 170 0. 154 0.115 0. 164 0. 164 2.32 0.75 1.41 0.75 1.07 1.42 1 .44 0.96 1.07 1.07 1.43 0.50 1.04 0.76 1.08 1. 12 1.02 0.76 1.08 1.08 1.972 1.494 12.24 9.86 28.60 39.26 89.96 SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS IRRIG APPL. ACRE LABOR MONTH INCHES HOURS MAR MAY JUNE JULY APPL. MACH INPUT FIXED COSTS COSTS 0.0 0.0 0.0 0.0 0.0 5.70 9.90 13.00 0.0 0.0 4.00 3.00 3.00 3.00 0.400 0.300 0.300 0.300 0.0 0.0 0.0 0.0 22.40 16.80 16.80 16.80 1.60 1.20 1.20 1.20 0.0 0.0 0.0 0.0 13.00 1.300 0.0 72.80 5.20 0.0 8. 6. 6. 6. 16 12 12 12 32. 24. 24. 24. 16 12 12 12 2 6 . 5 2 104.52 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF GUAR (DOLLARS) 9.60 10.80 12.00 13.20 j -61.38 -44.58 -27.78 -10.98 5.82 | j -45.02 -26.12 -7.22 11 . 6 8 30.58 | 17.50 ] 19.25 | -28.66 -7.66 13.34 34.34 55.34 | -12.30 10.80 33.90 57.00 80.10 ! 21.00 j i 4.07 29.27 54.47 79.67 CWT. 14.00 QUANTITY OF GUAR 15.75 14.40 T i 104.87 j __ ... . i NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. '—a%. C12.42 PROJECTIONS FOR PLANNING PURPOSES ONLY B-1241(C12) NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 572 GUAR, DRYLAND, TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY ^ N PROJECTED YIELD UNIT 1. GROSS RECEIPTS GUAR TOTAL PROJECTED RETURNS 8.00 2. VARIABLE COSTS PREHARVEST COSTS ♦GUAR SEED ♦INNOCULANT ♦NITROGEN (ANHY) ♦PHOSPHATE ♦HERBICIDE ♦INSECTICIDE INSECT. APPLI. HERBICIDE APPLI. FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS CUS HARV GUAR HAUL GUAR SUBTOTAL. HARVEST TO TA L VA R I A B L E PROJECTED YOUR VALUE ESTIMATE S/UNIT CWT. 12.00 96.00 96.00 $ LB. ACRE LB. LB. ACRE APPL APPL ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 0.65 0.50 0. 13 0.22 4.00 8.00 3.00 3.00 5.00 4.00 0. 145 $ 5.20 0.50 6.50 3.30 4.00 8.00 3.00 3.00 7.38 1. 14 2.07 1.64 8.75 1.96 2.16 58.59 $ ACRE CWT. ACRE 25.00 0.25 $ 25.00 2.00 27.00 $ $ INPUT USE 8.00 1.00 50.00 15.00 1.00 1.00 1.00 1.00 1.75 0.49 14.87 1.00 8.00 COSTS ACRE $ 85.59 $. BREAK-EVEN PRICE. VARIABLE COSTS $ 10.70/CWT. GUAR INCOME ABOVE VARIABLE COSTS JP&N 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 MISC ADMIN 0/H 0.50 TO TA L FIXED COSTS TOTAL PROJECTED COSTS ACRE ACRE ACRE ACRE ACRE ACRE BREAK-EVEN PRICE, TOTAL COSTS NET PROJECTED RETURNS $ ACRE 10.41 $ 21.91 14.45 20.00 20.00 16.00 8.00 64.36 $_ $" $ 149.95 $. $ 18.74/CWT. GUAR ACRE $ -53.95 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. JP^N C12.43 B-124KC12) PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 572 GUAR, DRYLAND, TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION MOLDBOARD PLOW TANDEM DISK TANDEM DISK BEDDER 6R DRY FERT SPRDER ANHYDROUS SPRDER PLANTER 6R ROLLING CULT 6R ROLLING CULT 6R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 3,32 3,58 3,58 4,36 3,60 3,61 4,42 4,38 4,38 NOV JAN MAY MAY MAY MAY JUNE JULY AUG 0.30 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 TOTALS 0. 171 0.208 0.208 0. 151 0.203 0. 151 0.224 0.216 0.216 0.130 0.158 0.158 0.115 0.154 0 . 11 5 0.170 0.164 0.164 1.39 1.41 1 .41 0.75 1.44 0.96 1.42 1.07 1.07 0.86 1.04 1.04 0.76 1.02 0.76 1. 12 1.08 1.08 1.750 1.325 10.91 8.75 APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 3.91 4.01 4.01 2.37 4.28 1.82 6. 16 4. 19 4. 19 6. 16 6.46 6.46 3.87 10.03 10.03 14.40 6.34 6.34 15.50 34.94 70.09 0.0 0.0 0.0 0.0 3.30 6.50 5.70 0.0 0.0 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF GUAR (DOLLARS) 9.60 10.80 12.00 13.20 6.40 j 7.20 j -23.75 -16.07 -8.39 -0.71 6.97 | -16.27 -7.63 1.01 9.65 18.29 | 8.00 j 8.80 j -8.79 0.81 10.41 20.01 29.61 | -1.31 9.25 19.81 30.37 40.93 j 17.69 29.21 40.73 52.25 | CWT. QUANTITY OF GUAR 9.60 | NOTE 14.40 T 6. 17 NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. C12.44 PROJECTIONS FOR PLANNING PURPOSES ONLY B-1241(C12) NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 573 PEANUTS, FLORUNNER, IRRIGATED TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS FLORUNNER PEANUT TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 29.00 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦PEANUT SEED 100.00 ♦PHOSPHATE 50.00 ♦HERB., PREMERGE 1.00 CUSTOM FERTILIZE 1.00 ♦HERB, POSTEMERGE 1.00 ♦INSECTICIDE 2.00 CUST INSECT. 1.00 ♦FUNGICIDE 5.00 PESTICIDE APPLI. 5.00 CUST. PCNB FUNG. 1.00 VITAVAX APPL. 0. 10 IRRIGATION WATER 14.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 2.56 IRRIGATION 3.50 EQUIPMENT 0.60 OTHER 3.00 38.79 OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS ♦CUSTOM HAUL 1.67 ♦CUSTOM DRYING 1.67 FUEL & LUBE--TRACTOR R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY 1.63 SUBTOTAL, HARVEST PROJECTED YOUR S/UNIT VA L U E E S T I M AT E CWT. 26.50 LB. LB. ACRE ACRE ACRE APPL APPL APPL ACRE APPL APPL ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 0.62 0.22 3. 12 2.00 9.00 TON TON ACRE ACRE ACRE HOUR ACRE 5.00 4.00 4.00 4.00 0. 145 $ 16.72 1 .40 70.00 5.43 3. 14 18.20 12.82 14.00 2.40 12.00 5.62 367.05 $ $ 13.36 30.06 9.72 3.45 2.00 8. 15 66.73 $ $ 433.78 $ 8.00 18.00 5.00 768.50 768.50 $ 62.00 11 . 0 0 3. 12 2.00 9.00 8.20 5.00 38.50 17.50 46.00 3.00 4. 10 5.00 7.70 3.50 46.00 30.00 ACRE TOTAL VARIABLE COSTS $ BREAK-EVEN PRICE. VARIABLE COSTS $ 14.96/CWT. FLORUNNER PEANUT 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 3 3 4 . 7 2 $ _ 4. FIXED COSTS DEPREC..INTEREST.TAXES & INSUR. TRACTOR EQUIPMENT IRRIGATION MISC ADMIN 0/H 1.00 LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE ACRE 5. TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE. TOTAL COSTS $ $ 750.17 $ $ 25.87/CWT. FLORUNNER PEANUT ACRE 6. NET PROJECTED RETURNS 16.00 150.00 56.41 30.98 63.00 16.00 150.00 316.39 $ $ 18.33 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C12.45 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 573 B-1241(C12) PEANUTS. FLORUNNER, IRRIGATED TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION OFFSET DISC TANDEM DISk CHISEL PLOW MOLDBOARD PLOW BEDDER 6R PEANUT PLANTER ROLLING CULT 6R HERBICIDE SPRAYR CULTIVATOR 6R HERBICIDE SPRAYR CULTIVATOR 6R PEANUT DIG SHK2R PEANUT COMB. 4R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 1 .34 1 .58 1 ,33 1 .32 2 .36 2 ,68 2 ,38 63 2 .40 63 2 .40 2 .66 2 .67 SEPT OCT DEC JAN FEB APR APR APR APR MAY MAY AUG AUG 1.00 1.00 1.00 1.00 2.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION 0.228 0.208 0.202 0.571 0.302 0.318 0.432 0.0 0.151 0.0 0. 151 1.084 0.546 0.173 0. 158 0.153 0.432 0.229 0.241 0.327 0.264 0.115 0.264 0. 115 0.821 0.414 4. 193 3.705 TOTALS 1 . 14 1 .04 1.01 2.85 1.51 1.59 2.16 0.0 0.76 0.0 0.76 5.42 2.73 0.0 0.0 0.0 0.0 0.0 6.24 4.92 3.95 15.54 4.49 62.00 7.23 0.0 8.02 3. 12 2. 16 0.0 2.67 9 . 0 0 2. 16 2.67 14.02 4 3 . 4 2 11.56 0.0 0.0 TOTAL OPER. COST 9.66 7.99 7.04 24.71 8.63 74.04 13.94 5.36 4.73 11.24 4.73 29.08 63.23 40.24 2 0 . 9 6 11 7 . 5 4 85- 64 264.38 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. ACRE LABOR MONTH INCHES HOURS MAY JUNE JULY AUG 2.27 2.03 2.09 6.32 2.63 3.22 3.76 0.08 1.30 0.08 1.30 9.64 5.53 APPL. MACH INPUT FIXED COSTS COSTS APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 2.00 5.00 5.00 2.00 0.500 1.250 1.250 0.500 0.0 0.0 0.0 0.0 12.60 31 .50 31.50 12.60 2.00 5.00 5.00 2.00 0.0 0.0 0.0 0.0 9.00 22.50 22.50 9.00 23.60 59.00 59.00 23.60 14.00 3.500 0.0 88.20 1 4 . 0 0 0.0 6 3 . 0 0 165.20 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF FLORUNNER PEANUT (DOLLARS) CWT. QUANTITY OF FLORUNNER PEANUT 21.20 23.85 26.50 29. 15 6 6 75 1 2 3 88 128 .23 189 71 251 . 19 r 312 67 j 193 05 262 21 331 .38 400 54 j 1 8 1 02 16 238 2 9 5 30 257 87 334 72 411 .57 488 42 | 322 69 407 23 491 76 576 30 j 387 52 479 74 571 96 664 18 | T 23.20 | 26. 10 | 29.00 | 31.90 | 34.80 |i C12.46 31.80 • PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, 574 0^\ B-124KC12) PEANUTS, SPANISH, DRYLAND, TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY PROJECTED YIELD UNIT 1. GROSS RECEIPTS SPANISH PEANUTS TOTAL PROJECTED RETURNS 12.50 2. VARIABLE COSTS PREHARVEST COSTS ♦PEANUT SEED ♦NEMATICIDE ♦HERB., PREMERGE ♦INSECTICIDE ♦FUNGICIDE PESTICIDE APPLI. ♦CUST. PCNB FUNG. VITAVAX APPL. FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OTHER OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS ♦CUSTOM HAUL ♦CUSTOM DRYING CUSTOM COMBINE FUEL & LUBE--TRACTOR R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY SUBTOTAL. HARVEST PROJECTED YOUR VALUE ESTIMATE S/UNIT CWT. 26.50 331.25 331.25 $ LB. APPL ACRE APPL APPL ACRE LB. APPL ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. ACRE 0.62 28.00 3. 12 4. 10 7.70 3.50 0.45 30.00 $ 31.00 20.00 3. 12 8.20 23.10 10.50 22.50 15.00 14. 12 1. 14 4.68 2.80 11.07 1.96 10.00 4.29 183.49 $ TON TON CWT. ACRE ACRE ACRE HOUR ACRE 8.00 18.00 1.50 $ 5.44 12.24 18.75 6.46 2.29 0.89 5.42 51.49 $ $ 234.98 S $ INPUT USE 50.00 0.71 1.00 2.00 3.00 3.00 50.00 0.50 2.21 0.49 2.50 29.59 0.68 0.68 12.50 1.08 TOTAL VARIABLE COSTS 5.00 4.00 4.00 0. 145 5.00 ACRE BREAK-EVEN PRICE, VARIABLE COSTS $ 18.80/CWT. SPANISH PEANUTS 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 9 6 . 2 7 $ . 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT MISC ADMIN O/H 0.50 LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE 5. TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE. TOTAL COSTS $ $ 336.07 $ $ 26.89/CWT. SPANISH PEANUTS ACRE 6. NET PROJECTED RETURNS 16.00 30.00 43.62 19.47 8.00 30.00 101.09 $ $ -4.82 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C12.47 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, 574 B-124KC12) PEANUTS, SPANISH, DRYLAND, TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION CHISEL PLOW MOLDBOARD PLOW BEDDER 6R BEDDER 6R BEDDER 6R PEANUT PLANTER ROLLING CULT 6R HERBICIDE SPRAYR CULTIVATOR 6R CULTIVATOR 6R CULTIVATOR 6R PEANUT DIG SHK2R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 1,33 1,32 2,36 2,36 2,36 2.68 2,38 63 2,40 2,40 2,40 2,66 3.95 0.0 0 . 0 15.54 0.0 2.25 0.0 2.25 0.0 2.25 51.00 7 . 2 3 0.0 4.01 7.04 24.71 4.32 4.32 4.32 63.04 6.97 5.36 4.73 4.73 4.73 29.08 OCT NOV JAN FEB MAR MAR MAR MAR MAR APR MAY JULY TOTALS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.202 0.571 0.151 0. 151 0.151 0.318 0.216 0.0 0. 151 0. 151 0.151 1.084 0.153 0.432 0.115 0.115 0. 115 0.241 0.164 0.264 0 . 11 5 0 . 11 5 0 . 11 5 0.821 3.297 2.762 2.09 6.32 1.32 1.32 1.32 3.22 1.88 0.08 1.30 1.30 1.30 9.64 1.01 2.85 0.76 0.76 0.76 1.59 1.08 0.0 0.76 0.76 0.76 5.42 31.07 16.49 3. 12 0.0 0.0 0.0 0.0 2. 16 2.67 2.67 2.67 14.02 54. 12 6 1 . 6 6 1 6 3 . 3 4 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF SPANISH PEANUTS (DOLLARS) 21.20 23.85 26.50 29.15 31.80 10.00 -15.69 10.81 37.31 63.81 90.31 j 11 . 2 5 7. 17 36.98 66.79 96.60 126.42 | 12.50 30.02 63. 15 96.27 129.40 162.52 | 13.75 52.88 89.32 125.76 162. 19 198.63 | 15.00 75.74 11 5 . 4 9 155.24 194.99 234.74 | CWT. QUANTITY OF SPANISH PEANUTS i . . i NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. C12.48 PROJECTIONS FOR PLANNING PURPOSES ONLY B-1241(C12) NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 575 jJPN, SOYBEANS, IRRIGATED TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS SOYBEANS TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 42.00 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦SOYBEAN SEED 42.00 ♦PHOSPHATE 50.00 ♦HERBICIDE 1.00 ♦INSECTICIDE 1.00 CUSTOM FERTILIZE 1.00 PESTICIDE APPLI. 1.00 IRRIGATION WATER 12.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 1.77 IRRIGATION 1.20 EQUIPMENT 0.42 OTHER 3.00 OPERATING CAPITAL 39.31 SUBTOTAL, PREHARVEST HARVEST COSTS CUSTOM HARVEST 42.00 CUSTOM HAUL 42.00 SUBTOTAL, HARVEST TOTAL VARIABLE COSTS PROJECTED YOUR VALUE ESTIMATE S/UNIT BU. 6.25 LB. LB. ACRE APPL ACRE ACRE ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 0.32 0.22 4.00 7.00 2.00 3.50 BU. BU. ACRE ACRE $ 262.50 262.50 $ 13.44 11.00 4.00 7.00 2.00 3.50 12.66 0.98 60.00 3.75 5.00 4.00 4.00 4.00 0. 145 $ 0.75 0. 15 1 .78 7.20 8.85 4.80 1.68 12.00 5.70 160.34 S $ 31.50 6.30 37.80 $ $ 198.14 $ BREAK-EVEN PRICE, VARIABLE COSTS $ 4.72/BU. SOYBEANS 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 6 4 . 3 6 $ _ J^N 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT IRRIGATION MISC ADMIN 0/H 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE 5. TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE, TOTAL COSTS $ $ $ 284.32 $ 6 . 77/BU. SOYBEANS ACRE 6. NET PROJECTED RETURNS 16.00 29.06 16.64 24.48 16.00 86.18 $ $ -21.82 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C12.49 B-1241(C12) PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, 575 SOYBEANS, IRRIGATED TEXAS WINTER GARDEN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE M A C H A P P L . M A C H TO TA L MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR INPUT FIXED OPER. OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS COSTS COSTS COST OFFSET DISC CHISEL PLOW HARROW SPIKE LAND PLANE HERBICIDE SPRAYR ROLLING CULT 6R ROD WEEDER PLANTER 6R ROLLING CULT 6R ROLLING CULT 6R OFFSET DISC CHISEL PLOW 1 ,34 DEC 1 .33 DEC 73 DEC 1,50 DEC 63 1,38 1.65 1,42 1,38 1,38 1,34 1,33 MAR MAR MAY MAY JUNE JULY NOV NOV 0 20 1 00 1 00 0 .20 1 .00 1 .00 1 .00 1 .00 1 .00 1 .00 1 .00 1 .00 TOTALS IRRIGATION APPLICATION 0.046 0.202 0.035 0. 153 0.095 0.038 0.264 0.164 0. 129 0.170 0. 164 0. 164 0. 173 0. 153 0.0 0.050 0.0 0.216 0. 170 0.224 0.216 0.216 0.228 0.202 0.45 2.09 0.01 0.49 0.08 2. 14 1.62 2.52 2. 14 2. 14 2.27 2.09 0.23 1.01 0.0 0.25 0.0 1.08 0.85 1. 12 1.08 1.08 1. 14 1.01 0.0 0.0 0.0 0.0 4.00 0.0 0.0 13.44 0.0 0.0 0.0 0.0 1 25 3 95 0 85 1 37 2 16 4 91 3 06 6 .91 4 91 4 .91 6 .24 3 .95 1 7 0 2 6 8 5 23 8 8 9 7 1.770 1.700 18.04 8.85 17.44 44.48 88.81 I R R I G A P P L . I R R I G T O TA L APPL. ACRE LABOR SYSTEM OPER. LABOR INPUT FIXED IRRIG MONTH INCHES HOURS HOURS COSTS COSTS COSTS COSTS COSTS WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION JUNE JULY AUG SEPT TOTALS 3.00 3.00 3.00 3.00 0.300 0.300 0.300 0.300 0.0 0.0 0.0 0.0 12.00 1.200 0.0 16.80 16.80 16.80 16.80 1 .20 1 .20 1 .20 1 .20 0.0 0.0 0.0 0.0 6. 6. 6. 6. 12 12 12 12 24. 24. 24 24 INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF SOYBEANS (DOLLARS) 5.00 5.63 6.25 6.88 7.50 33.60 22.58 -1.58 19.42 40.42 61.42 37.80 -5.36 18.27 41 .89 65.52 89. 14 42.00 11 . 8 6 38. 11 64.36 90.61 11 6 . 8 6 46.20 29.08 57.96 86.83 11 5 . 7 1 144.58 50.40 46.30 77.80 109.30 140.80 172.30 BU. NOTE NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. C12.50 12 12 12 12 67.20 4.80 0.0 24.48 96.48 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT QUANTITY OF SOYBEANS 93 04 86 11 24 13 53 99 13 13 66 04