TEXAS EDWARDS PLATEAU EASTERN SOIL RESOURCE AREA 10 r B-124KC10) TEXAS AGRICULTURAL EXTENSION SERVICE . THE TEXAS A&M UNIVERSITY SYSTEM Z e r l e L . C a r p e n t e r , D i r e c t o r . C o l l e g e S t a t i o n , Te x a s JS*\ TEXAS CROP ENTERPRISE BUDGETS EDWARDS PLATEAU EASTERN REGION Projected for 1985 E d u c a t i o n a l p r o g r a m s c o n d u c t e d b y t h e Te x a s A g r i c u l t u r a l E x t e n s i o n S e r v i c e s e r v e p e o p l e o f a l l a g e s r e g a r d l e s s o f socio-economic level, race, color, sex, religion or national origin. C o o p e r a t i v e E x t e n s i o n W o r k i n A g r i c u l t u r e a n d H o m e E c o n o m i c s , T h e Te x a s A S M U n i v e r s i t y S y s t e m a n d t h e U n i t e d S t a t e s Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914. 150 • 12-S4, New ECO 7-2 PROJECTIONS FOR PLANNING PURPOSES ONLY B-1241(C10) NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 451 GRAIN SORGHUM, DRYLAND, TEXAS EDWARDS PLATEAU EASTERN 1985 PROJECTED COSTS AND RETURNS PER ACRE PROJECTED YIELD UNIT CATEGORY 1. GROSS RECEIPTS GRAIN SORGHUM DEFICIENCY PMT. TOTAL PROJECTED RETURNS 20.00 20.00 2. VARIABLE COSTS PREHARVEST COSTS ♦GRAIN SORG. SEED ♦NITROGEN FUEL & LUBE--TRACTOR EOUIPMENT R E PA I R S T R A C T O R EOUIPMENT LABOR MACHINERY EOUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS CUST HARV SORG D CUSTOM HAUL SUBTOTAL, HARVEST YOUR ESTIMATE PROJECTED VALUE $/UNIT CWT. CWT. 4.38 0.82 $ 87.60 16.40 104.00 $ LB. LB. ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 0.40 0.28 4.50 3.35 0. 120 $ 2.40 5.60 9. 18 1.76 1.67 2.59 12.61 2.34 0.03 38.17 $ ACRE CWT. ACRE 10.00 0.30 $ 10.00 6.00 16.00 $ ACRE $ 54. 17 $ INPUT USE 6.00 20.00 2.80 0.70 0.27 1.00 20.00 TOTAL VARIABLE COSTS BREAK-EVEN PRICE, VARIABLE COSTS $ 1.89/CWT. GRAIN SORGHUM 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 4 9 . 8 3 $ . 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EOUIPMENT LAND-CASH RENT 1.00 TO TA L FIXED COSTS TOTAL PROJECTED COSTS ACRE ACRE ACRE ACRE 12.00 ACRE BREAK-EVEN PRICE, TOTAL COSTS NET PROJECTED RETURNS ; 26..38 12..92 12,.00 5 1 ..29 $ i 1 0 5 ,.47 $ $ 4.45/CWT. GRAIN SORGHUM ACRE $ -1.47 $ LAND CHARGE BASED ON CASH RENT. MARKET PRICE BASED ON LOAN RATE. DEFICIENCY PAYMENT BASED ON COMPLIANCE WITH FARM SET ASIDE PROGRAM. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. ifjW^N C10.1 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. B-124KC10) 451 GRAIN SORGHUM, DRYLAND, TEXAS EDWARDS PLATEAU EASTERN 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION CHISEL DISK-TANDEM LISTER/BEDDER FERT. APPLI. PLANTER 4-R CULT SHREDDER MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 4,44 4,30 4,49 5,86 5,42 4,64 5,61 MAR MAR APR MAY MAY JUNE AUG TOTALS 1.00 1.00 1.00 1.00 1.20 2.00 1.00 0.261 0.210 0.320 0. 153 0.619 0.653 0.584 0. 198 0. 159 0.242 0. 116 0.469 0.495 0.442 2.801 2. 122 1.59 1.36 2.00 0.54 2.56 3.52 1.63 1.18 0.95 1.44 0.69 2.79 2.94 2.63 13. 18 12.61 APPL. MACH INPUT FIXED COSTS COSTS 0.0 0.0 0.0 5.60 2.40 0.0 0.0 TOTAL OPER. COST 4.09 2.86 4.73 1.96 7.04 9.89 6.85 6.85 5. 16 8. 17 8.79 14.78 16.34 11. 10 8 . 0 0 37.42 71.20 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF GRAIN SORGHUM (DOLLARS) 3.50 3.94 4.38 4.82 5.26 16.00 16.21 23.22 30.23 37.24 44.24 | 18.00 24.26 32. 14 40.03 47.91 55.80 | 20.00 32.31 41.07 49.83 58.59 67.35 j 22.00 40.36 49.99 59.63 69.26 78.90 | 48.40 58.92 69.43 79.94 90.45 j CWT. QUANTITY OF GRAIN SORGHUM i 24.00 i Jl CIO.2 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 452 B-124KC10) COASTAL BERMUDAGRASS ESTAB., DRYLAND, TEXAS EDWARDS PLATEAU EASTERN 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY PROJECTED YIELD UNIT 1. GROSS RECEIPTS TOTAL PROJECTED RETURNS PROJECTED VALUE $/UNIT $ 2. VARIABLE COSTS PREHARVEST COSTS CUSTOM SPRIGGING ♦NITROGEN ♦PHOSPHATE ♦HERBICIDE FUEL & LUBE--TRACTOR EOUIPMENT R E PA I R S T R A C T O R EOUIPMENT L A B O R - - - M A C H I N E RY EOUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS SUBTOTAL, HARVEST 0.0 YOUR ESTIMATE $ INPUT USE 1.00 32.00 40.00 1.00 1 .55 0.70 45.44 ACRE LB. LB. LB. ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 30 .00 0 .28 0 .28 7..00 4 .50 3 .35 0. 120 $ 30.00 8.96 11.20 7.00 5.26 1.76 0.95 1.82 6.97 2.34 5.45 81 .71 $ ACRE $ ACRE $ 81.71 $ 3. INCOME ABOVE VARIABLE COSTS ACRE $ -81.71 $ 4 . FIXED COSTS DEPREC..INTEREST.TAXES & INSUR. TRACTOR EOUIPMENT LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE $ 15.03 7.26 8.00 30.29 $ 5. TOTAL PROJECTED COSTS ACRE $ 111.99 $ 6. NET PROJECTED RETURNS ACRE $ - 111 . 9 9 $ TOTAL VARIABLE COSTS 8 .00 0.0 $ LA,ND CHARGE BASED ON PREVAILING RATES IN REGION. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. CIO.3 PROJECTIONS FOR PLANNING PURPOSES ONLY B-1241(C10) NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 452 COASTAL BERMUDAGRASS ESTAB., DRYLAND, TEXAS EDWARDS PLATEAU EASTERN 1985 PROJECTED COSTS AND RETURNS PER ACRE M A C H A P P L . M A C H TO TA L MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR INPUT FIXED OPER. OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS COSTS COSTS COST CHISEL 4,44 DISK-TANDEM FERT. APPLI. DISK-TANDEM HERBICID SPRAYER FERT. APPLI. TO TA L S JAN 4,,30 5,,86 4,,30 5,,73 5,,86 1.00 0.261 0.198 1.59 1.18 JAN 2 .00 0. 421 0. 319 2..72 1..89 FEB 1 .00 0. 153 0. 116 0..54 0,.69 FEB 1 .00 0..210 0. 159 1..36 0,.95 APR 1 .00 0. 349 0. 264 1..04 1,.57 JUNE 1 .00 0. 153 0. 116 0..54 0,.69 1.548 1.173 7.78 CIO.4 6.97 27.16 0.0 4.09 0..0 5..72 10..08 1,.96 0.. 0 2..86 7..00 3..82 10..08 1,.96 20.41 6.85 10..32 13..27 5.. 16 13..43 13..27 62.31 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 453 B-124KC10) COASTAL BERMUDAGRASS PASTURE, DRYLAND, TEXAS EDWARDS PLATEAU EASTERN 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY PROJECTED YIELD UNIT GROSS RECEIPTS COASTAL PASTURE TOTAL PROJECTED RETURNS 5.00 VARIABLE COSTS PREHARVEST COSTS ♦NITROGEN ♦PHOSPHATE FUEL & LUBE--TRACTOR EOUIPMENT YOUR ESTIMATE PROJECTED VALUE $/UNIT AUM 6.00 LB. LB. ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 0.28 $ 30.00 30.00 $ INPUT USE 120.00 40.00 R E PA I R S T R A C T O R EOUIPMENT MACHINERY EOUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS SUBTOTAL. HARVEST LABOR 1.63 0.35 13.54 TOTAL VARIABLE COSTS BREAK-EVEN PRICE. VARIABLE COSTS $ $ ACRE $ 33.60 11 .20 3.67 0.88 0.71 0.61 7.33 1.17 1 .63 60.80 $ 0.0 $ 60.80 $ $ 1 2 . 16/AUM COASTAL PASTURE ACRE FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EOUIPMENT LAND-CASH RENT 1.00 PRORATED ESTAB 111 . 9 9 TOTAL FIXED COSTS ACRE ACRE ACRE DOL. ACRE TOTAL PROJECTED COSTS ACRE NET PROJECTED RETURNS 4.50 3.35 0. 120 ACRE INCOME ABOVE VARIABLE COSTS BREAK-EVEN PRICE. TOTAL COSTS 0.28 8.00 0.07 $ -30.80 $ $ 11.26 9.27 8.00 7.84 36.37 $ $ 97. 17 $ $ 1 9 . 43/AUM COASTAL PASTURE ACRE $ -67.17 $ ESTABLISHMENT COST PRORATED OVER 15 YEARS. LAND CHARGE BASED ON PREVAILING RATE IN REGION. INCOME FROM CROP REFLECTED IN THE LIVESTOCK BUDGETS. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. yrffcs. CIO.5 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, B-1241(C10) 453 COASTAL BERMUDAGRASS PASTURE, DRYLAND, TEXAS EDWARDS PLATEAU EASTERN 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION FERT. APPLI. SHREDDER FERT. APPLI. SHREDDER FERT. APPLI. MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 5,86 5,61 5,86 5,61 5.86 APR JUNE JUNE AUG SEPT TOTALS 1.00 1.00 1.00 1.00 1.00 APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 0. 153 0.584 0. 153 0.584 0. 153 0.116 0.442 0. 116 0.442 0.116 0.54 1.63 0.54 1.63 0.54 0.69 2.63 0.69 2.63 0.69 22.40 0.0 13.44 0.0 8.96 1.96 6.85 1.96 6.85 1.96 25.59 11. 10 16.63 11. 10 12.15 1.628 1.233 4.87 7.33 44.80 19.59 76.58 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF COASTAL- PASTURE (DOLLARS) 4.80 5.40 6.00 6.60 4.00 -41.60 -39.20 -36.80 -34.40 -32.00 | 4.50 -39.20 -36.50 -33.80 -31.10 -28.40 j 5.00 -36.80 -33.80 -30.80 -27.80 -24.80 ! 5.50 -34.40 -31.10 -27.80 -24.50 -21.20 | 6.00 -32.00 -28.40 -24.80 -21.20 -17.60 j AUM QUANTITY OF COASTAL PASTURE 7.20 I i NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT. GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. CIO.6 s ^ k PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 454 B-1241(C10) COASTAL BERMUDAGRASS ESTAB., IRRIGATED, TEXAS EDWARDS PLATEAU EASTERN 1985 PROJECTED COSTS AND RETURNS PER ACRE C AT E G O RY PROJECTED YIELD UNIT 1. GROSS RECEIPTS TOTAL PROJECTED RETURNS PROJECTED VALUE $/UNIT $ 2. V A R I A B L E C O S T S I N P U T U S E PREHARVEST COSTS CUSTOM SPRIGGING 1.00 ♦NITROGEN 32.00 ♦ P H O S P H AT E 40.00 I R R I G AT I O N WAT E R 1 2 . 0 0 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 0.78 I R R I G AT I O N 1 . 2 0 EQUIPMENT 0.35 O P E R AT I N G C A P I TA L 4 5 . 5 5 SUBTOTAL. PREHARVEST HARVEST COSTS SUBTOTAL. HARVEST ACRE LB. LB. ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. ACRE 30.00 0.28 0.28 0.0 YOUR ESTIMATE $ 30.00 8.96 11.20 4.50 3.50 3.35 0. 120 $ 2.69 0.88 27.84 0.49 0.97 10.92 3.50 4.20 1. 17 5.47 108.29 $ ACRE $ ACRE $ 3. INCOME ABOVE VARIABLE COSTS ACRE $ -108.29 $ 4 . FIXED COSTS DEPREC..INTEREST.TAXES & INSUR. TRACTOR EOUIPMENT IRRIGATION LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE 12.00 $ 7.67 4. 15 23.88 12.00 47.69 $ 5. TOTAL PROJECTED COSTS ACRE $ 155.98 $ 6. NET PROJECTED RETURNS ACRE $ -155.98 $ TOTAL VARIABLE COSTS 0.0 $ 108.29 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. CIO.7 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, B-124KC10) 454 COASTAL BERMUDAGRASS ESTAB.. IRRIGATED, TEXAS EDWARDS PLATEAU EASTERN 1985 PROJECTED COSTS AND RETURNS PER ACRE M A C H A P P L . M A C H TO TA L MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR INPUT FIXED OPER. OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS COSTS COSTS COST CHISEL DISK-TANDEM FERT. APPLI. FERT. APPLI. 4,,44 4,,30 5,,86 5,,86 JAN FEB FEB JULY 1 .00 1 .00 1 .00 1 .00 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION TOTALS 0.,261 0. 210 0. 153 0. 153 0. 0. 0. 0. 1,.59 1..36 0,.54 0..54 1. 18 0.95 0.69 0.69 0.0 0.0 10.08 10.08 A .09 2 .86 1 .96 1,.96 6..85 5,, 16 13..27 13..27 0.778 0.590 4.02 3.50 20. 16 10.87 38.56 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS APPL. ACRE LABOR MONTH INCHES HOURS APR MAY JULY AUG 3.00 3.00 3.00 3.00 0.300 0.300 0.300 0.300 198 159 116 116 0.0 0.0 0.0 0.0 12.00 1.200 0.0 CIO.8 9.69 9.69 9.69 9.69 1.05 1.05 1.05 1.05 0.0 0.0 0.0 0.0 5.97 5.97 5.97 5.97 16..71 16..71 16..71 16..71 38.76 4.20 0.0 23.88 66.84 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 455 B-124KC10) COASTAL BERMUDAGRASS PASTURE, IRRIGATED TEXAS EDWARDS PLATEAU EASTERN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY PROJECTED YIELD UNIT GROSS RECEIPTS COASTAL PASTURE TOTAL PROJECTED RETURNS 2. VARIABLE COSTS 13.00 PREHARVEST COSTS ♦NITROGEN ♦PHOSPHATE IRRIGATION WATER FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S - T R A C TO R EQUIPMENT IRRIGATION LABOR --MACHINERY IRRIGATION EQUIPMENT OPERATING CAPITAL SUBTOTAL. PREHARVEST HARVEST COSTS SUBTOTAL. HARVEST PROJECTED VALUE $/UNIT YOUR ESTIMATE AUM 6.00 $ 78.00 78.00 $ LB. LB. ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. ACRE 0.28 0.28 91.00 28.00 INPUT USE 325.00 100.00 15.00 1.04 1.50 0.35 52.02 TOTAL VARIABLE COSTS BREAK-EVEN PRICE, VARIABLE COSTS $ ACRE $ 0.0 $ 189.06 $ $ 14.54/AUM COASTAL PASTURE ACRE FIXED COSTS DEPREC..INTEREST.TAXES & INSUR. TRACTOR EQUIPMENT IRRIGATION LAND-CASH RENT 1.00 P R O R AT E D E S TA B 1 5 5 . 9 8 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE DOL. ACRE TOTAL PROJECTED COSTS ACRE NET PROJECTED RETURNS $ ACRE INCOME ABOVE VARIABLE COSTS BREAK-EVEN PRICE. TOTAL COSTS 4.50 3.50 3.35 0. 120 2.36 0.88 34.80 0.46 0.55 13.65 4.70 5.25 1. 17 6.24 189.06 $ $ - 111 . 0 6 12.00 0.07 $ $ 7.22 6.46 29.85 12.00 10.92 66.45 $ $ 255.51 $ $ 19.65/AUM COASTAL PASTURE ACRE $ -177.51 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. CIO.9 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 B-124KC10) 455 COASTAL BERMUDAGRASS PASTURE. IRRIGATED TEXAS EDWARDS PLATEAU EASTERN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACH MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS FERT. APPLI. FERT. APPLI. FERT. APPLI. SHREDDER 5 5 5 5 86 86 86 61 APR JUNE AUG AUG 1.00 1.00 1.00 1.00 TOTALS IRRIGATION APPLICATION 0. 0. 0. 0. 153 153 153 584 1.044 APPL. ACRE LABOR MONTH INCHES HOURS WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION APR MAY JUNE JULY AUG TOTALS 3.00 3.00 3.00 3.00 3.00 0 0 0 0 0 300 300 300 300 300 0. 116 0. 116 0. 116 0. 442 0 0 0 1 54 54 54 63 0 0 0 2 0.791 3.24 69 69 69 63 15.00 1.500 0.0 9 9 9 9 9 69 69 69 69 69 56 28 35 0 00 00 00 0 1 96 1 .96 1 .96 6 .85 59 31 38. 11. 1.05 1.05 1.05 1.05 1.05 APPL. IRRIG INPUT FIXED COSTS COSTS 0.0 0.0 0.0 0.0 0.0 5 5 5 5 5 97 97 97 97 97 TOTAL IRRIG COSTS 16 16 16 16 16 71 71 71 71 71 48.45 5.25 0.0 29.85 83.55 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF COAST* L PASTURE (DOLLARS) 4 80 5.40 6.00 6.60 10.40 -139 14 -132.90 -126.66 -120.42 -114 18 | 11 .70 -132 90 -125.88 - 11 8 . 8 6 - 111 . 8 4 -104 82 | 13.00 -126 66 -118.86 - 111 . 0 6 -103.26 - 9 5 46 | 14.30 -120 42 - 111 . 8 4 -103.26 -94.68 - 8 6 10 j 15.60 -114 18 -104.82 -95.46 -86.10 - 7 6 74 j AUM QUANTITY OF COASTAL PASTURE 7 20 i NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. CIO.10 19 19 19 10 4 . 7 0 119.00 12.74 139.68 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS 0.0 0.0 0.0 0.0 0.0 APPL. MACH TOTAL INPUT FIXED OPER. COSTS COSTS COST PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 B-1241(C10) 456 COASTAL BERMUDAGRASS HAY, IRRIGATED, TEXAS EDWARDS PLATEAU EASTERN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE A^\ CATEGORY 1. GROSS RECEIPTS COASTAL HAY TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 8.00 INPUT USE 2. VARIABLE COSTS PREHARVEST COSTS ♦NITROGEN 325.00 ♦PHOSPHATE 100.00 IRRIGATION WATER 15.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 0.46 IRRIGATION 1.50 0.49 EQUIPMENT OPERATING CAPITAL -7.10 SUBTOTAL, PREHARVEST HARVEST COSTS CUSTOM BALING 264.00 HAUL & STACK 264.00 SUBTOTAL. HARVEST TOTAL VARIABLE COSTS TON LB. LB. ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. ACRE PROJECTED VALUE $/UNIT 80.00 $ 0.28 0.28 YOUR ESTIMATE 640.00 640.00 $ 91.00 28.00 $ 1.04 1.23 34.80 0.20 0.55 13.65 2.07 5.25 1 .64 -0.85 178.59 $ BALE BALE ACRE 0.80 0.40 $ 2 11 . 2 0 105.60 316.80 $ ACRE $ 495.39 $ 4.50 3.50 3.35 0.120 BREAK-EVEN PRICE, VARIABLE COSTS $ 61.92/TON COASTAL HAY 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 1 4 4 . 6 1 $ _ 4. FIXED COSTS DEPREC..INTEREST.TAXES & INSUR. TRACTOR EQUIPMENT IRRIGATION LAND-CASH RENT 1.00 P R O R AT E D E S TA B 1 5 5 . 9 8 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE DOL. ACRE 12.00 0.07 $ 3. 18 4.03 29.85 12.00 10.92 59.98 $ 5. TOTAL PROJECTED COSTS ACRE $ 555.36 $ BREAK-EVEN PRICE. TOTAL COSTS 6. NET PROJECTED RETURNS $ 69. 42/TON COASTAL HAY ACRE $ 84.64 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. CIO.11 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, B-124KC10) 456 COASTAL BERMUDAGRASS HAY, IRRIGATED, TEXAS EDWARDS PLATEAU EASTERN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACH MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS FERT. APPLI. FERT. APPLI. FERT. APPLI. 5 86 APR 5 86 JUNE 5 86 AUG 1. 0 0 1. 0 0 1.00 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION 0. 153 0. 153 0. 153 0. 116 0. 116 0. 116 0.460 0.348 1.62 TOTALS 3.00 3.00 3.00 3.00 3.00 0 69 0 69 0 69 0.300 0.300 0.300 0.300 0.300 0.0 0.0 0.0 0.0 0.0 15.00 1.500 0.0 9.69 9.69 9.69 9.69 9.69 56 00 28 00 35 00 2.07 119.00 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. ACRE LABOR MONTH INCHES HOURS APR MAY JUNE JULY AUG 0 54 0 54 0 54 APPL. MACH TOTAL INPUT FIXED OPER. COSTS COSTS COST 1.96 1. 9 6 ' 1.96 5.89 128.58 APPL. IRRIG INPUT FIXED COSTS COSTS 1.05 1.05 1.05 1.05 1.05 0.0 0.0 0.0 0.0 0.0 48.45 5.25 59 19 31 19 38 19 5.97 5.97 5.97 5.97 5.97 TOTAL IRRIG COSTS 16.71 16.71 16.71 16.71 16.71 0.0 29.85 83.55 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF COASTAL HAY (DOLLARS) 64.00 72.00 80.00 88.00 96.00 6.40 -22.43 28.77 79.97 131.17 182.37 | 7.20 -2.91 54.69 112.29 169.89 227.49 j 8.00 16.61 80.61 144.61 208.61 272.61 j 8.80 36. 13 106.53 176.93 247.33 317.73 j 9.60 55.65 132.45 209.25 286.05 362.85 | TON QUANTITY OF COASTAL HAY i NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. ^SUsl CIO.12 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING-AFTER 11-17-84 457 B-124KC10) HYBRID SUDAN-SORGHUM HAY & GRAZING, DRYLAND, TEXAS EDWARDS PLATEAU EASTERN 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY PROJECTED YIELD UNIT GROSS RECEIPTS SORGHUM HAY TOTAL PROJECTED RETURNS 3.50 VARIABLE COSTS PREHARVEST COSTS ♦FORAGE SORG SEED ♦NITROGEN FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS CUSTOM BALING HAUL & STACK SUBTOTAL. HARVEST TON PROJECTED $/UNIT VALUE 80.00 YOUR ESTIMATE $ 280.00 280.00 $ LB. LB. ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 4.50 3.35 0. 120 $ 14.00 28.00 6.00 1.76 1.09 2. 12 8.02 2.34 1. 16 64.49 $ BALE BALE ACRE 0.80 0.40 $ ACRE $ INPUT USE 35.00 100.00 1 .78 0.70 9.63 167.00 167.00 TOTAL VARIABLE COSTS BREAK-EVEN PRICE, VARIABLE COSTS ACRE 4. FIXED COSTS DEPREC..INTEREST.TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 5. TOTAL PROJECTED COSTS ACRE 6. NET PROJECTED RETURNS 133.60 66.80 200.40 $ 264.89 $_ $ 75.68/TON SORGHUM HAY 3. INCOME ABOVE VARIABLE COSTS BREAK-EVEN PRICE, TOTAL COSTS 0.40 0.28 $ 15. 11 $_ $ 17. 17 7.55 8.00 32.73 $ $ 297.62 $ 8.00 $ 85.03/TON SORGHUM HAY ACRE $ -17.62 $. LAND CHARGE BASED ON PREVAILING RATES IN REGION. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. CIO.13 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 B-124KC10) 457 HYBRID SUDAN-SORGHUM HAY & GRAZING, DRYLAND, TEXAS EDWARDS PLATEAU EASTERN 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION CHISEL DISK-TANDEM FERT. APPLI. DISK-TANDEM LISTER/BEDDER DRILL GRAIN FERT. APPLI. MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 4,44 4,30 5.86 4.30 4,49 5,52 5,86 MAR MAR APR APR APR APR JULY TOTALS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.261 0.210 0. 153 0.210 0.320 0.473 0.153 0. 198 0.159 0. 116 0.159 0.242 0.358 0.116 1.59 1.36 0.54 1.36 2.00 1.59 0.54 1. 18 0.95 0.69 0.95 1.781 1.349 8.96 APPL. MACH INPUT FIXED COSTS COSTS 0.0 0.0 TOTAL OPER. COST 1 .44 2.13 0.69 14.00 14.00 4.09 2.86 1.96 2.86 4.73 4.38 1.96 17. 19 5. 16 8. 17 22.09 17. 19 8.02 42.00 22.85 81.82 14.00 0.0 0.0 ■/fll% 6.85 5. 16 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF SORGHUM HAY (DOLLARS) 64.00 72.00 80.00 88.00 96.00 2.80 45.61 -23.21 -0.81 21 59 43 99 3. 15 43.25 -18.05 7.15 32 35 57 55 3.50 40.89 -12.89 15. 11 43 11 71 3.85 38.53 -7.73 23.07 53 87 84 67 4.20 36.17 -2.57 31.03 64 63 98 23 TON QUANTITY OF SORGHUM HAY 11 NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. •*«% >-^% CIO.14 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 458 B-1241(C10) KLEINGRASS ESTABLISHMENT, DRYLAND, TEXAS EDWARDS PLATEAU EASTERN 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY PROJECTED YIELD UNIT 1. GROSS RECEIPTS TOTAL PROJECTED RETURNS PROJECTED VALUE %/UlsJIT $ 2. VARIABLE COSTS PREHARVEST COSTS ♦KLEINGRASS SEED ♦NITROGEN ♦PHOSPHATE FUEL & LUBE--TRACTOR EOUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS SUBTOTAL. HARVEST 0.0 YOUR ESTIMATE $ INPUT USE 2.00 32.00 40.00 2.48 0.42 29.01 LB. LB. LB. ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 5 .00 0 .28 0 .28 4 .50 3 .35 0 . 120 $ 10.00 8.96 11.20 6.93 1 .06 1.29 1 .60 11. 14 1 .41 3.48 57.08 $ $ ACRE $ 57.08 $ 3. INCOME ABOVE VARIABLE COSTS ACRE $ -57.08 $ 4. FIXED COSTS DEPREC.,INTEREST.TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE $ 20.43 10.54 8.00 38.97 $ 5. TOTAL PROJECTED COSTS ACRE 6 . NET PROJECTED RETURNS ACRE TOTAL VARIABLE COSTS 8.00 $ $ 0.0 $ ACRE 96.05 $ -96.05 $ LAND CHARGE BASED ON PREVAILING RATES IN REGION. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. CIO.15 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. B-1241(C10) 458 KLEINGRASS ESTABLISHMENT. DRYLAND, TEXAS EDWARDS PLATEAU EASTERN 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION CHISEL DISK-TANDEM F E RT. A P P L I . DISK-TANDEM DRILL GRAIN SHREDDER SHREDDER TOTALS MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 4,44 4,30 5,86 4,30 5,52 5,61 5,61 FEB FEB FEB MAR MAR MAR MAY 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.261 0.210 0.153 0.210 0.473 0.584 0.584 0.198 0.159 0 . 11 6 0. 159 0.358 0.442 0.442 1.59 1.36 0.54 1.36 1.59 1.63 1.63 2.476 1.876 9 . 6 8 11. 14 CIO.16 1. 18 0.95 0.69 0.95 2. 13 2.63 2.63 APPL. MACH INPUT FIXED COSTS COSTS 0.0 0.0 TOTAL OPER. COST 4.09 2.86 1.96 2.86 4.38 6.85 6.85 6.85 5. 16 23.35 5. 16 18.09 11. 10 11. 10 30. 16 2 9 . 8 4 80.82 20. 16 0.0 10.00 0.0 0.0 /**% PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 459 KLEINGRASS PASTURE, DRYLAND, TEXAS EDWARDS PLATEAU EASTERN 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY PROJECTED YIELD UNIT GROSS RECEIPTS KLINEGRASS PAST TOTAL PROJECTED RETURNS 6.00 VARIABLE COSTS PREHARVEST COSTS ♦NITROGEN ♦PHOSPHATE FUEL & LUBE--TRACTOR EOUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL. PREHARVEST HARVEST COSTS SUBTOTAL. HARVEST YOUR ESTIMATE PROJECTED VALUE $/UNIT AUM 6.00 $ 36.00 36.00 $" LB. LB. ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 0.28 0.28 16.80 14.00 0.69 0.71 O. 13 0.35 1.38 0.94 0.49 35.49 $. INPUT USE 60.00 50.00 0.31 0.28 4.04 TOTAL VARIABLE COSTS 4.50 3.35 0. 120 ACRE 0.0 ACRE BREAK-EVEN PRICE, VARIABLE COSTS $ 35.49 $ $ 5.91/AUM KLINEGRASS PAST INCOME ABOVE VARIABLE COSTS ACRE $ FIXED COSTS DEPREC..INTEREST.TAXES & INSUR. TRACTOR EQUIPMENT P R O R AT E D E S TA B 96.05 LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE DOL. ACRE ACRE TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE, TOTAL COSTS /fP^N B-1241(C10) NET PROJECTED RETURNS 0. 10 8.00 0.51 $ 2. 12 2.56 9.61 8.00 22.29 $. 57.77 $ $ 9.63/AUM KLINEGRASS PAST ACRE $ -21.77 $ ESTABLISHMENT COST PRORATED OVER 10 YEARS. LAND CHARGE BASED ON PREVAILING RATES IN REGION. INCOME FROM CROP REFLECTED IN THE LIVESTOCK BUDGETS. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. CIO.17 PROJECTIONS FOR PLANNING PURPOSES ONLY B-1241(C10) NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 459 KLEINGRASS PASTURE. DRYLAND, TEXAS EDWARDS PLATEAU EASTERN 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION FERT. APPLI. FERT. APPLI. MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 5,86 APR 5,86 JUNE TOTALS 1.00 1.00 0. 153 0. 153 0. 116 0. 116 0.54 0.54 0.69 0.69 14.00 16.80 1.96 1 .96 17.19 19.99 0.307 0.232 1.08 1.38 30.80 3.93 37. 19 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF KLINEGRASS PAST (DOLLARS) 4.80 5.40 6.00 6.60 4.80 j 5.40 j -12.45 -9.57 -6.69 -3.81 r -0.93 ! -9.57 -6.33 -3.09 0. 15 3.39 | 6.00 j 6.60 | -6.69 -3.09 0.51 4. 11 7.71 j -3.81 0.15 4. 11 8.07 12.03 | 7.20 ] i -0.93 3.39 7.71 12.03 16.35 | AUM QUANTITY OF KLINEGRASS PAST T 7.20 NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. < ^ % i CIO.18 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, 460 OATS, DRYLAND, TEXAS EDWARDS PLATEAU EASTERN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY PROJECTED YIELD UNIT GROSS RECEIPTS OATS SM. GR. PASTURE TOTAL PROJECTED RETURNS 40.00 3.00 VARIABLE COSTS PREHARVEST COSTS ♦OAT SEED ♦NITROGEN ♦PHOSPHATE FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EOUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL. PREHARVEST HARVEST COSTS CUSTOM HAUL OATS CUSTOM COMBINING SUBTOTAL. HARVEST PROJECTED VALUE $/UNIT BU. AUM 1.80 6.00 BU. LB. LB. ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 6.00 0.28 0.28 YOUR ESTIMATE $ 72.00 18.00 90.00 $ $ 12.00 14.00 5.60 4.64 1.06 0.85 1.62 6.58 1.41 1.69 49.44 $ $ 12.00 10.00 22.00 $ $ 71.44 $ INPUT USE 2.00 50.00 20.00 1.46 0.42 14.07 40.00 1.00 TOTAL VARIABLE COSTS BU. ACRE ACRE ACRE BREAK-EVEN PRICE. VARIABLE COSTS /0^\ B-124KC10) ACRE FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 TOTAL FIXED COSTS TOTAL PROJECTED COSTS NET PROJECTED RETURNS 0.30 10.00 $ 1 . 34/BU. OATS INCOME ABOVE VARIABLE COSTS BREAK-EVEN PRICE, TOTAL COSTS 4.50 3.35 0. 120 $ 18.56 $ ACRE ACRE ACRE ACRE 8.00 $ 13.41 5.83 8.00 27.24 $ ACRE $ 98.68 $ $ 2 . 02/BU. OATS ACRE $ -8.68 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. CIO.19 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 460 B-124KC10) OATS. DRYLAND, TEXAS EDWARDS PLATEAU EASTERN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION CHISEL DISK-TANDEM FERT. APPLI. DISK-TANDEM DRILL GRAIN FERT. APPLI. MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 4,44 4,30 5,86 4,30 5.52 5,86 JUNE JUNE AUG SEPT SEPT FEB 1.00 1.00 1.00 1.00 1.00 1.00 TOTALS 0.261 0.210 0.153 0.210 0.473 0.153 0.198 0.159 0.116 0. 159 0.358 0. 116 1.59 1.36 0.54 1.36 1.59 0.54 1.18 0.95 0.69 0.95 1.461 1.107 6.96 APPL. MACH INPUT FIXED COSTS COSTS 0.0 0.0 TOTAL OPER. COST 2. 13 0.69 12.00 9.52 4.09 2.86 1.96 2.86 4.38 1.96 6.85 5. 16 13.27 5. 16 20.09 12.71 6.58 3 1 . 6 0 1 8 . 11 63.25 10.08 0.0 /^k RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF OATS (DOLLARS) BU. QUANTITY OF OATS 1.44 1.62 1.80 1.98 -4.96 0.80 6.56 12.32 r 18.08 | -0.40 6.08 12.56 19.04 25.52 j 16 11 . 3 6 18.56 25.76 32.96 | 16.64 24.56 32.48 40.40 | 21.92 30.56 39.20 47.84 j T 32.00 j 36.00 j 40.00 j 44.00 | 48.00 | 4. 8.72 13.28 2. 16 NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. CIO.20 «"=% PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 461 B-124KC10) SMALL GRAIN FOR GRAZING, TEXAS EDWARDS PLATEAU EASTERN 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY GROSS RECEIPTS SM. GR. PASTURE TOTAL PROJECTED RETURNS VARIABLE COSTS PREHARVEST COSTS ♦OAT SEED ♦NITROGEN ♦PHOSPHATE FUEL & LUBE--TRACTOR EOUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EOUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS SUBTOTAL, HARVEST PROJECTED YIELD UNIT 6.00 PROJECTED VALUE $/UNIT AUM 6.00 6.00 0.28 0.28 YOUR ESTIMATE $ 36.00 36.00 $ BU. LB. LB. ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 4.50 3.35 0. 120 $ 15.00 13.72 5.60 4.64 1.06 0.85 1.62 6.58 1 .41 1 .84 52.32 $ ACRE $ ACRE $ INPUT USE 2.50 49.00 20.00 1.46 0.42 15.35 TOTAL VARIABLE COSTS BREAK-EVEN PRICE, VARIABLE COSTS ACRE FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 TOTAL FIXED COSTS TOTAL PROJECTED COSTS NET PROJECTED RETURNS $ 52.32 $ $ 8 . 72/AUM SM., GR. PASTURE INCOME ABOVE VARIABLE COSTS BREAK-EVEN PRICE, TOTAL COSTS 0.0 $ -16.32 $ ACRE ACRE ACRE ACRE 8.00 $ 13.41 5.83 8.00 27.24 $ ACRE $ 79.56 $ $ 13. 26/AUM SM.. GR. PASTURE ACRE $ -43.56 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. CIO.21 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, 461 B-1241(C10) SMALL GRAIN FOR GRAZING, TEXAS EDWARDS PLATEAU EASTERN 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION CHISEL DISK-TANDEM FERT. APPLI. DISK-TANDEM DRILL GRAIN FERT. APPLI. MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 4,44 4.30 5,86 4,30 5,52 5,86 JUNE JUNE AUG SEPT SEPT FEB TOTALS 1.00 1.00 1.00 1.00 1.00 1.00 0.261 0.210 0. 153 0.210 0.473 0. 153 0.198 0.159 1.461 APPL. MACH INPUT FIXED COSTS COSTS 0.0 0.0 TOTAL OPER. COST 0. 116 0.159 0.358 0 . 11 6 1.59 1.36 0.54 1.36 1.59 0.54 1. 18 0.95 0.69 0.95 2. 13 0.69 10.08 4.09 2.86 1 .96 2.86 4.38 1.96 6.85 5. 16 13.27 5.16 23.09 12.43 1. 107 6.96 6.58 3 4 . 3 2 18. 11 65.97 0.0 15.00 9.24 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF SM. GR. (DOLLARS) 4.80 5.40 6.00 6.60 4.80 -29.28 -26.40 -23.52 -20.64 -17.76 j 5.40 -26.40 -23.16 -19.92 -16.68 -13.44 j 6.00 -23.52 -19.92 -16.32 -12.72 -9.12 | 6.60 -20.64 -16.68 -12.72 -8.76 -4.80 | 7.20 -17.76 -13.44 -9. 12 -4.80 -0.48 j AUM QUANTITY OF SM. GR. PASTURE PASTURE i 7.20 i NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. CIO.22 /■*^\ PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 464 B-124KC10) SPANISH PEANUTS, IRRIGATED, TEXAS EDWARDS PLATEAU EAST. REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE SOLID PLANT CATEGORY GROSS RECEIPTS PEANUTS PEANUTS, ADD. TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 1575.00 675.00 VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦PEANUT SEED 80.00 ♦NITROGEN 25.00 ♦PHOSPHATE 50.00 ♦POTASH 25.00 ♦FERTILIZER APPLI 1.00 1.00 ♦HERB, PREMERGE ♦FOLIAR FUNGICIDE 5.00 ♦INSECTICIDE 1.00 ♦SOIL FUNGICIDE 3.00 ALLOTMENT LEASE 2250.00 ♦RYE SEED 40.00 IRRIGATION WATER 12.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 3.25 IRRIGATION 1 .20 EQUIPMENT 2. 10 OPERATING CAPITAL 68.82 SUBTOTAL, PREHARVEST HARVEST COSTS CUST. DRY PNUTS 1. 13 FUEL & LUBE--TRACTOR R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY 1.24 EQUIPMENT 0.00 SUBTOTAL, HARVEST TOTAL VARIABLE COSTS BREAK-EVEN PRICE, VARIAEJLE COSTS LB. LB. PROJECTED $ / U N I T VA L U E YOUR ESTIMATE 0.21 330.75 0.12 81.00 $ 4 11 . 7 5 $ LB. LB. LB. LB. ACRE ACRE APPL APPL APPL LB. LB. ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. ACRE 0.55 0.28 0.28 0.15 1.75 3.40 4.15 11 . 5 0 7.00 0.02 0.14 44.00 7.00 14.00 3.75 1.75 3.40 20.75 11 . 5 0 21.00 45.00 5.60 4.50 3.50 3.35 0.120 $ 10.53 5.29 27.84 1.92 4. 19 10.92 14.62 4.20 7.03 8.26 272.56 $ TON ACRE ACRE ACRE HOUR HOUR ACRE 22.50 25.31 5.25 0.92 6.50 4.50 5.58 3.35 0.01 $ 43.58 $ ACRE $ 316.15 $ $ 0 . 15/LB. PEANUTS INCOME ABOVE VARIABLE COS!rs ACRE FIXED COSTS DEPREC..INTEREST,TAXES cV INSUR. TRACTOR EQUIPMENT IRRIGATION LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE 44.91 32.53 23.88 25.00 25.00 $ 126.31 $ TOTAL PROJECTED COSTS ACRE $ 442.46 $ BREAK-EVEN PRICE. TOTAL COSTS NET PROJECTED RETURNS $ 95.60 $ $ 0 . 23/LB. PEANUTS ACRE $ -30.71 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. CIO.23 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, B-124KC10) 464 SPANISH PEANUTS, IRRIGATED, TEXAS EDWARDS PLATEAU EAST. REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE SOLID PLANT MACHINERY OPERATION MB PLOW 4 BOTTOM SPRAYER CULTIVATOR 6R DISK/BEDDER PLANTR PEANUT 6R CULTIVATOR ROLLG SPRAYER CULTIVATOR ROLLG SPRAYER SPRAYER CULTIVATOR 6R DRILL GRAIN DIGGER PEANUT COMBINE PEANUT MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 4,37 74 4,33 4,50 4.41 5,65 5,74 5,65 5,74 5,74 4,33 5,53 4,69 4,95 MAR APR APR APR MAY JUNE JUNE JULY JULY AUG NOV NOV NOV NOV 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 1.00 1.00 1.00 1.00 TOTALS IRRIGATION APPLICATION 0.626 0.0 0.415 0. 168 0.202 0.212 0.178 0.212 0.357 0.357 0.207 0.315 0.451 0.789 0.475 0.135 0.314 0.127 0. 153 0.161 0. 135 0.161 0.270 0.270 0.157 0.239 0.342 0.598 4.491 3.537 JUNE JULY AUG TOTALS 2.82 0.0 1.87 0.76 0.91 0.96 0.80 0.96 1.61 1.61 0.93 1 .42 2.03 3.55 TOTAL OPER. COST 0.0 9.24 3.40 0.82 0.0 7. 12 0.0 2.63 4 4 . 0 0 2.79 0.0 2.02 25.15 2.05 0.0 2.02 19.80 4. 10 8.30 4. 10 0.0 3.56 5.60 3.62 0.0 7.62 0 . 0 18.75 15.69 4.42 11.32 4.29 49.20 3.71 28.69 3.71 26.88 15.38 5.66 11 .90 12.57 32.06 /^3% 28.56 2 0 . 2 1 106.25 70.46 225.48 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. ACRE LABOR MONTH INCHES HOURS WATER APPLICATION WATER APPLICATION WATER APPLICATION 3.63 0.20 2.34 0.90 1.50 0.73 0.69 0.73 1.37 1.37 1.17 1.26 2.91 9.76 APPL. MACH INPUT FIXED COSTS COSTS APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 2.00 6.00 4.00 0.200 0.600 0.400 0.0 0.0 0.0 6.46 19.38 12.92 0.70 2. 10 1.40 0.0 0.0 0.0 3.98 11.94 7.96 11. 14 33.42 22.28 12.00 1.200 0.0 38.76 4.20 0.0 23.88 66.84 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF PEANUTS (DOLLARS) O. 17 0. 19 0.21 0.23 j -34.61 -8.15 18.31 44.77 r 71.23 j j -2.58 27.19 56.96 86.73 11 6 . 4 9 j 1575. | 29.45 62.53 95.60 128.68 161.75 ] 1733. | 61.48 97.86 134.25 170.63 207.01 | 1890. j 93.51 133.20 172.89 212.58 252.27 | LB. 1260. QUANTITY OF PEANUTS 1418. 0.25 • NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. **% CIO.24 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, 465 B-124KC10) COTTON, DRYLAND, TEXAS EDWARDS PLATEAU EASTERN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY PROJECTED YIELD UNIT GROSS RECEIPTS COTTON LINT COTTONSEED DEFICIENCY PMT. TOTAL PROJECTED RETURNS 250.00 0.20 250.00 VARIABLE COSTS PREHARVEST COSTS ♦SEED COTTON INSECTICIDE MISC. EXPENSE ♦HERBICIDE FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS ♦GIN,BAG & TIES CONTRACT BROKER FUEL & LUBE--TRACTOR R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EOUIPMENT SUBTOTAL. HARVEST LB. TON LB. PROJECTED YOUR VALUE ESTIMATE $/UNIT 0.53 90.00 0. 19 132.50 18.00 47.50 198.00 $ 0.40 6.00 5.00 6.00 3.20 3.00 5.00 6.00 11.32 2. 10 3.65 2.01 11.87 4.55 1.61 54.31 $ $ INPUT USE 8.00 0.50 1.00 1.00 2.37 0.91 11.49 250.00 0.52 0.88 0-01 TOTAL VARIABLE COSTS LB. APPL ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE LB. BALE ACRE ACRE ACRE HOUR HOUR ACRE ACRE 5.00 5.00 0.140 $ 0.08 1.25 21 .25 0.65 4.33 5.00 5.00 $ 1 .37 3.27 4.40 0.05 35.32 $ $ 89.63 $ BREAK-EVEN PRICE, VARIABLE COSTS $ 0.10/LB. COTTON LINT 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 1 0 8 . 3 7 $ . 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND NET SHARE-RENT CROP INSURANCE 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE 4.50 $ 36.23 20.74 42.15 4.50 103.63 $ 5. TOTAL PROJECTED COSTS ACRE $ 193.26 $ BREAK-EVEN PRICE. TOTAL COSTS 6. NET PROJECTED RETURNS $ 0 . 51/LB. CO TTON LINT ACRE $ 4.74 $ LAND (NET RENT) BASED ON 1/4 OF GROSS LESS 1/4 OF INSECT, GINNING. BAGS, TIES. AND CROP INSURANCE. PRICE BASED ON LOAN RATE ADJUSTED FOR QUALITY, DEFICIENCY PAYMENT BASED ON COMPLIANCE WITH GOVT SET ASIDE PROGRAM. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. CIO.25 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, 465 B-124KC10) COTTON, DRYLAND, TEXAS EDWARDS PLATEAU EASTERN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE ^ ^ k MACHINERY OPERATION SHREDDER 2R TANDEM DISC MOLDBOARD 6B CHISEL TANDEM DISC HERB SPR/DISC LISTER 6R LISTER-PLNT6R SAND FIGHTER ROLLING CULT CULTIVATOR 6R CULTIVATOR 6R CULTIVATOR 6R COTTON STR/BSK MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS DEC DEC JAN JAN MAR 61 MAR 3 , 5 4 APR 3 , 3 6 MAY 5,56 3.40 2,47 2,44 2,40 3,51 3,30 2,33 2,33 2,33 3,64 JUNE JUNE JUNE JULY AUG NOV TOTALS 1.00 1.00 0.30 0.70 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.557 0.208 0 . 11 3 0.092 0.208 0.151 0.151 0.076 0. 194 0.207 0.207 0.207 0.880 0.422 0.158 0.086 0.070 0. 158 0. 158 0 . 11 5 0 . 11 5 0.057 0. 147 0. 157 0. 157 0. 157 0.666 3.254 2.623 0.0 1.42 1.52 1.09 0.92 1.90 0.01 1.03 1.13 0.56 1.45 1.85 1.85 1.85 8.91 2.79 1.04 0.57 0.46 1.04 0.0 0.76 0.76 0.38 0.97 1.04 1.04 1.04 4.40 25.52 16.27 APPL. MACH INPUT FIXED COSTS COSTS 0.0 0.0 0.0 0.0 0.0 5.00 3. 18 2.19 1.53 3.22 0. 17 2.01 3 . 2 0 2.47 0.0 1.00 0.0 2.80 0.0 3.70 0.0 3.70 0.0 3.70 2 1 . 2 5 16.26 6.00 0.0 TOTAL OPER. COST 9.21 5.74 3.85 2.92 6.16 6.18 3.80 7.56 1.94 5.23 6.59 6.59 6.59 50.82 3 0 . 4 5 50.92 123.16 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF COTTON L I N T (DOLLARS) 0.42 0.48 0.53 0.58 200.00 23.90 31.85 39.80 47.75 55.70 ! 225.00 35. 12 44.07 53.01 61.96 70.90 ! 250.00 46.34 56.28 66.22 76. 16 86.09 ] 275.00 57.56 68.50 79.43 90.36 101.29 j 300.00 68.78 80.71 92.63 104.56 11 6 . 4 8 j LB. QUANTITY OF COTTON LINT i 0.64 i ^s^,. CIO.26 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 466 J0Pfe«y B-124KC10) COTTON, IRRIGATED, TEXAS EDWARDS PLATEAU EASTERN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS COTTON LINT COTTONSEED DEFICIENCY PMT. TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 525.00 0.42 525.00 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS 20.00 ♦SEED COTTON FERT (N) APPL'D 20.00 FERT (P) APPL'D 20.00 MISC. EXPENSE 1.00 ♦HERBICIDE 1.00 GLEAN 4.00 IRRIGATION WATER 14.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 2.47 IRRIGATION 1.40 EOUIPMENT 0.98 OTHER 2.00 44.31 OPERATING CAPITAL SUBTOTAL. PREHARVEST HARVEST COSTS ♦GIN,BAG & TIES 525.00 CONTRACT BROKER 1 .09 FUEL & LUBE--TRACTOR R E PA I R S T R A C T O R EOUIPMENT LABOR MACHINERY 0.88 EQUIPMENT 0.01 SUBTOTAL, HARVEST TOTAL VARIABLE COSTS LB. TON LB. 0.53 278.25 90.00 37.80 0.19 99.75 $ 415.80 LB. LB. LB. ACRE ACRE OZ. ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 0.40 8.00 0.29 5.80 0.23 4.60 5 .00 5.00 6 .00 6.00 14.50 58.00 LB. BALE ACRE ACRE ACRE HOUR HOUR ACRE ACRE BREAK-EVEN PRICE. VARIAEJLE COSTS $ YOUR ESTIMATE PROJE CTED $ / U N I T VA L U E 11 . 6 0 2.26 40.25 3.71 2. 18 3.34 5.00 12!35 5.00 7.00 5.00 4.90 5.00 10.00 0.140 6.20 $ 191.20 0.08 1.25 $ $ 44.62 1.36 4.33 1.37 3.27 4.40 0.05 59.40 $ $ 250.60 $ 5.00 5.00 $ 0 . 2 2 / L B . C O T T O N L I hJT 3. INCOME ABOVE VARIABLE COS1rs ACRE $ 165.20 $ 4. FIXED COSTS DEPREC..INTEREST,TAXES cI INSUR. TRACTOR EQUIPMENT IRRIGATION LAND---NET SHARE-RENT 1 .00 CROP INSURANCE TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE ACRE 37.33 21.46 32. 19 74.23 4.50 4.50 $ 169.71 $ 5. TOTAL PROJECTED COSTS ACRE $ 420.31 $ BREAK-EVEN PRICE. TOTAL COSTS 6. NET PROJECTED RETURNS $ 0 . 5 4 / L B . C O T T O N L UJT ACRE $ -4.51 $ LAND (NET RT) BASED ON 1/4 OF GROSS LESS 1/4 OF FERT. INSECT, GINNING, BAGS. TIES AND CROP INSURANCE. PRICE BASED ON LOAN RATE ADJUSTED FOR QUALITY. DEFICIENCY PAYMENT BASED ON COMPLIANCE W/ GOVT SET ASIDE PROGRAM. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. CIO.27 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, 466 B-124KC10) COTTON. IRRIGATED. TEXAS EDWARDS PLATEAU EASTERN REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER 2R MOLDBOARD 6B CHISEL TANDEM DISC HERB SPR/DISC LISTER 6R ROLLING CULT LISTER-PLNT6R SAND FIGHTER ROLLING CULT CULTIVATOR 6R CULTIVATOR 6R COTTON STR/BSK MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 5.56 2,47 2,44 3,40 61 3,54 3,30 3,36 3,51 3,30 2,33 2,33 3,64 JAN JAN JAN FEB FEB APR APR MAY JUNE JUNE JULY AUG NOV 1.00 0.50 0.50 1.00 1.00 1.00 1.00 1.40 1.00 1.00 1.00 2.00 1.00 TOTALS IRRIGATION APPLICATION 0.557 0.189 0.066 0.208 0.0 0. 151 0. 194 0.212 0.076 0. 194 0.207 0.415 0.880 0.422 0.143 0.050 0.158 0. 158 0. 115 0. 147 0.160 0.057 0. 147 0.157 0.314 0.666 3.350 2.696 APPL. ACRE LABOR MONTH INCHES HOURS WATER APPLICATION WATER APPLICATION WATER APPLICATION APR JULY AUG TOTALS 1.42 1.82 0.66 1.52 0.01 1.03 1 .45 1.59 0.56 1.45 1.85 3.70 8.91 2.79 0.95 0.33 1.04 0.0 0.76 0.97 1.06 0.38 0.97 1.04 2.07 4.40 APPL. MACH INPUT FIXED COSTS COSTS 0.0 0.0 0.0 0.0 5.00 3.65 1.09 3. 18 0. 17 2.01 2.80 8 . 0 0 3.46 0.0 1.00 0.0 2.80 0.0 3.70 0.0 7.40 4 4 . 6 2 16.26 6.00 0.0 0.0 TOTAL OPER. COST 9.21 6.42 2.08 5.74 6. 18 3.80 5.23 14. 11 1.94 5.23 6.59 13.17 74. 19 25.99 16.75 5 8 . 6 2 52.51 153.88 IRRIG APPL. IRRIG INPUT FIXED COSTS COSTS SYSTEM OPER. LABOR HOURS COSTS COSTS TOTAL IRRIG COSTS 6.00 4.00 4.00 0.600 0.400 0.400 4.023 2.682 2.682 18.68 12.45 12.45 3.00 2.00 2.00 0.0 0.0 0.0 13.80 9.20 9.20 35.48 23.65 23.65 14.00 1.400 9.387 43.59 7.00 0.0 32. 19 82.78 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF COTTON LINT (DOLLARS) 0.42 0.48 0.53 0.58 0.64 420.00 2 11 18 81 35 50 52 2 0 68 89 472.50 25 67 44 45 63 24 82 02 100 80 525.00 49 23 70 10 90 97 111 84 132 71 577.50 72 80 95 75 118 71 141 66 164 62 630.00 96 36 121 40 146 44 171 49 196 53 LB. QUANTITY OF COTTON LINT CIO.28 LISTING OF THE NAME SET AND PRICE VECTOR REGION NUMBER: 10 DATE: 110784 CODE ITEM NAME NMOD UNIT PRICE CODE ITEM NAME NMOD UNIT PRICE 3 WOOL 13 STOCKER STEERS 14 HEIFER CALVES 17 CULL COWS 23 KID MOHAIR 24 ADULT MOHAIR 25 KID GOATS 26 DOES-CULL 28 DEER LEASE 31 LAMBS 36 CULL EWES 60 SALES COMM. 71 DEFICIENCY PMT. SORG 73 GRAIN SORGHUM 74 OATS 93 COTTON LINT 95 PEANUTS 100 PEANUTS, ADD. 103 SALT & MIN. 110 RANGE CUBES 134 LAMB FEED 150 COASTAL PASTURE 152 SM. GR. PASTURE 153 PASTURE RENT FIXD 175 SORGHUM HAY 186 GRAIN SORG. SEED 187 FORAGE SORG SEED 193 COTTONSEED 196 COASTAL HAY 201 OAT SEED 205 FERT (N) APPL'D 206 FERT (P) APPL'D 211 NITROGEN 215 PHOSPHATE 218 INSECTICIDE 219 HERBICIDE 220 POTASH 236 SOIL FUNGICIDE 237 FOLIAR FUNGICIDE 248 HERB, PREMERGE 270 CUST HARV SORG D 274 CUSTOM HAUL 291 SD COTTON-UPLAND 320 CUSTOM COMBINING 322 CUSTOM HAUL OATS 330 FERTILIZER APPLI 337 CUSTOM SPRIGGING 340 CUSTOM BALING 345 HAUL & STACK 392 MARKETING LIVE 1 2 3 4 5 = = = = = HEAD 6 = BALE BU. 7 = ACRE TON 8 = HOUR DOZ. 9 = DAYS GAL. 10 = AUM 11 12 13 14 LB. CWT. CWT. CWT. LB. LB. HEAD LB. ACRE LB. LB. DOL. CWT. CWT. BU. LB. LB. LB. LB. LB. LB. AUM AUM ACRE TON LB. LB. TON TON BU. LB. LB. LB. LB. APPL LB. LB. APPL APPL ACRE ACRE CWT. LB. ACRE BU. ACRE ACRE BALE BALE DOL. = = = = ACIN LB. PINT OT. 1 .30 72.00 67.00 38.75 6.00 4.50 40.00 0.25 2.00 0.64 0.24 0\82 4.38 1.80 0.53 0.21 0. 12 0.35 0.10 0.09 6.00 6.00 5.00 80.00 0.40 0.40 140.00 80.00 6.00 0.30 0.30 0.28 0.28 11.50 7.00 0. 15 7.00 4. 15 3.40 10.00 0.30 0.40 10.00 0.30 1 .75 30.00 0.80 0.40 1.00 15 16 17 18 = = = = 393 400 410 413 414 441 469 501 502 503 508 509 510 520 DOL. CWT. OZ. MILE /^P\ CIO.29 MISC EXPENSE MISC EXPENSE VET MEDICINE SHEARING SHEARING GIN,BAG, TIES ALLOTMENT LEASE KLINEGRASS PAST RYE SEED KLEINGRASS SEED INSECTICIDE HERBICIDE CUST. DRY PNUTS PEANUT SEED 19 20 21 22 = = = = FEET APPL SQFT LBGN 23 24 25 26 LIVE SHEP GOAT COTT COTT = = = = DOL. DOL. DOL. HEAD HEAD BALE LB. AUM LB. LB. APPL ACRE TON LB. CRTN CRAT BAGS TREE 27 28 29 30 1.00 10. 00 1. 00 1. 50 2. 50 52. 00 0. 02 6. 0 0 0. 14 5 00 4. 50 6 00 22 50 0 55 = EACH = GPM = KWH = MCF DEFAULT PARAMETER VALUES AND DEFINITIONS R E G I O N : 1 0 D AT E : 11 0 7 8 4 ROW PA R A M E T E R DEFINITION 1. P R I C E PER GALLON 2. P R I C E PER GALLON 3. P R I C E PER OF GASOLINE OF GALLON D E FA U LT L . P. OF VA L U E 1.2000 GAS 0.6000 DIESEL 1.1000 4. PRICE PER KILOWATT HOUR OF ELECTRICITY 0.0500 5. P R I C E P E R 1 0 0 0 C U . F T. O F N AT U R A L G A S 0 . 0 6. N O M I N A L INTEREST R AT E 0.1200 7. MACHINERY INSUR. RATE (AVERAGE INVESTMENT) 0.0100 8. M A C H I N E R Y TA X R AT E ( P U R C H A S E VA L U E ) 0 . 0 9. I R R I G A T I O N 10. H O U R L Y SYSTEM MACHINERY 11. H O U R L Y O T H E R NUMBER WAGE LABOR R AT E WAGE R AT E 1. 4.50 3.35 12. H O U R L Y I R R I G . / L I V E S T O C K W A G E R A T E 3 . 5 0 13. DEATH LOSS (PERCENT OF TOTAL RECEIPTS) 0.0 14. LIVESTOCK INSUR. RATE (AVERAGE INVESTMENT) 0.0100 15. EOUIPMENT INSUR. RATE (AVERAGE INVESTMENT) 0.0100 16. L I V E S T O C K T A X R A T E ( A V E R A G E V A L U E ) 0 . 0 17. E Q U I P M E N T TA X R AT E ( AV E R A G E VA L U E ) 0 . 0 18. I R R I G AT I O N L A B O R M U LT I P L I E R ( H R S / A C I N ) 0 . 1 0 0 0 19. FACTOR TO CONVERT MACHINE HRS TO TRACTOR HRS 1.1000 20. FACTOR TO CONVERT TRACTOR HRS TO LABOR HRS 1.2000 21. FACTOR TO CONVERT SELF-POWERED MACHINERY HRS TO LABOR HRS 1.2500 22. LUBRICATION COST MULTIPLE OF MACHINERY FUEL COSTS 23. I N F L A T I O N R AT E 24. LUBRICATION COST MULTIPLE OF EQUIPMENT FUEL COSTS CIO.30 0.1000 0.0 0.0500 D AT E : 111 2 8 4 LISTING OF ECONOMIC AND ENGINEERING DATA FOR MACHINERY IN REGION 10 r 1 MACHINE TRACTOR TRACTOR TRACTOR TRACTOR TRACTOR TRACTOR A HH DR PICKUP TRUCK DISK-TANDEM CULTIVATOR ROLLG CULTIVATOR 6R LISTER-PLNT 6R MB PLOH A BOTTOM TANDEM DISC PLANTR PEANUT 6R PLANTER A-R CHISEL CHISEL MOLDBOARD 6B LISTER/BEDDER DISK/BEDDER SAND FIGHTER DRILL GRAIN DRILL GRAIN LISTER 6R SHREDDER 2R SHREDDER COTTON TR 3BL COTTON STR/BSK CULT CULTIVATOR ROLLG DIGGER PEANUT HERBICID SPRAYER SPRAYER FERT. APPLI. COMBINE PEANUT 2 CODE HIDTH NO. (FT) 1. 2. 3. A. 5. 6. 10. 30. 31. 33. 36. 37. AO. 41. 42. 44. 45. 47. 49. 50. 51. 52. 53. 54. 56. 61. 62. 63. 64. 65. 69. 73. 74. 86. 95. 150.0 125.0 100.0 75.0 40.0 225.0 0.5 13.0 20.0 20.0 20.0 5.3 14.0 18.0 6.3 12.7 23.0 8.0 12.7 18.0 22.5 8.0 12.0 20.0 6.6 6.3 6.6 6.6 12.7 18.0 12.0 12.0 2A.0 20.0 12.0 3 LIST PRICE 53250. A7650. 39050. 25A50. 1A975. 92725. 10500. A500. 3500. AOOO. A500. A250. A500. 9350. 1695. 3300. 6200. 5000. 2850. 3050. 1000. 2000. 3850. 1590. 1200. 1200. 2A00. 12500. 2500. 3300. 6050. 1200. 2750. 2500. 1A850. A 5 6 SPEED FIELD RC1 (MPH) EFF. A.5 A.5 A.5 A.5 4.5 4.5 30.0 4.8 3.5 3.5 4.5 A.l 4.5 5.0 5.0 4.1 4.5 4.5 4.0 4.5 8.0 4.0 4.0 4.5 3.7 3.7 10.0 2.8 3.5 3.8 3.0 4.0 4.8 5.3 2.3 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.83 0.80 0.75 0.80 0.80 0.83 0.60 0.67 0.80 0.80 0.80 0.67 0.80 0.80 0.72 0.72 0.80 0.80 0.80 0.82 0.67 0.75 0.75 0.67 0.65 0.53 0.67 0.50 1.20 1.20 1.20 1.20 1.20 1.20 0.80 0.65 1.00 1.00 1.00 0.60 0.65 0.60 0.80 0.65 1.00 1.00 0.80 0.65 1.00 0.65 0.60 1.00 0.60 0.60 1.00 0.60 1.00 0.60 0.60 1.00 0.60 0.75 1.20 CIO.31 7 8 9 10 11 12 13 14 15 16 AGE RC3 ANNUAL YEARS RFV1 RFV2 PURCH FUEL LIFE HP (HRS) HRS OHNED PRICE TYPE (HRS) 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.80 1.80 1.80 1.80 1.30 1.80 0.30 1.60 1.80 1.80 1.30 1.60 1.80 1.80 1.80 1.30 1.80 1.80 1.80 1.80 1.60 1.80 1.30 1.30 1.80 1.30 1.80 1.60 500. 600. 500. 300. 300. 600. 700. 100. 200. 100. 150. 175. 200. 200. 50. 100. 200. 100. 120. 100. 100. 100. 100. 150. 125. 50. 150. 300. 100. 150. 140. 35. 75. 50. 180. 7. 7. 7. 7. 7. 7. 3. 10. 7. 7. 7. 10. 7. 10. 10. 10. 7. 7. 8. 8. 7. 10. 10. 7. 7. 10. 7. 5. 7. 10. 10. 10. 10. 10. 6. 0.68 0.68 0.68 0.68 0.68 0.68 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.06 0.56 0.60 0.92 0.92 0.92 0.92 0.92 0.92 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 A7925. A2900. 35150. 22900. 13A75. 83A50. 9500. 1555. 3200. 3600. A200. AOOO. A250. 3500. 1695. 2970. 5700. A500. 2565. 2750. 900. 1800. 3500. 1A00. 1100. 1800. 1600. 12000. 2250. 3000. 5500. 1080. 2500. 2250. 13500. 3. 3. 3. 3. 3. 3. 1. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 12000. 12000. 12000. 12000. 12000. 12000. 2800. 1250. 2000. 2000. 2000. 2200. 2000. 1200. 625. 1250. 2000. 2000. 1200. 2000. 750. 1250. 1250. 2000. 2000. 2000. 2000. 1500. 2000. 1875. 1750. 1200. 1000. 1000. 1500. 150. 125. 100. 75. AO. 225. 30. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. B-124KL10) TEXAS AGRICULTURAL EXTENSION SERVICE . THE TEXAS A&M UNIVERSITY SYSTEM Z e r l o L . C a r p o n t o r , D i r e c t o r . C o l l a g e S t a t i o n , Te x a s r TEXAS LIVESTOCK ENTERPRISE BUDGETS EDWARDS PLATEAU EASTERN REGION Projected for 1985 4Ps E d u c a t i o n a l p r o g r a m s c o n d u c t e d b y t h e Te x a s A g r i c u l t u r a l E x t e n s i o n S e r v i c e s e r v e p e o p l e o f a l l a g e s r e g a r d l e s s o f socio-economic level, race, color, sax, religion or national origin. C o o p e r a t i v e E x t e n s i o n W o r k i n A g r i c u l t u r e a n d H o m e E c o n o m i c s , T h e Te x a s A S M U n i v e r s i t y S y s t e m a n d t h e U n i t e d S t a t e s Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of Hay a, 1914, as amended, and June 30, 19 14. 150 • 12-84, New ECO 7.2 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 491 B-1241(L10) COW-CALF PRODUCTION TEXAS EDWARDS PLATEAU EASTERN REGION 1985 PROJECTED COSTS AND RETURNS PER COW INVESTMENT REOUIREME•NTS NUMBER UNIT COW RAISED 1.. 0 0 H E A D BULL PURCHASED 0.. 0 3 H E A D HEIFER RAISED 0.. 1 3 H E A D 0.. 0 0 H E A D HORSE(2) TOTAL LIVESTOCK INVESTMENT SIZE 1 .00 1 .00 1 .00 1 .00 PRODUCTION WGT. TOTAL EACH UNITS NUMBER STOCKER STEERS 0.45 5.00 2.2 HEIFER CALVES 0.32 4.50 1.4 CULL COWS 0. 10 1 0 . 0 0 1 . 0 DEER LEASE 13.90 1.00 13.9 TOTAL PROJECTED RETURNS OPERATING INPUTS RANGE CUBES SALT & MIN. VET MEDICINE SALES COMM. MISC EXPENSE EOUIPMENT FUEL AND LUBE EOUIPMENT REPAIR TOTAL OPERATING COST INPUT USE 480.00 30.00 10.65 8.00 12.00 UNIT CWT. CWT. CWT. ACRE UNIT LB. LB. DOL. DOL. DOL. PROJECTED YOUR VALUE ESTIMATE $/UNIT 550.00 550.00 36.01 1050.00 540.00 70.20 3.36 781.25 $ 659.57 $ PROJECTED RETURN $/UNIT 72.00 162.00 67.00 96.48 38.75 38.75 2.00 27.80 $ 325.03 $ PROJECTED COST $/UNIT 0.10 48.00 0.35 10.50 1.00 10.65 1.00 8.00 1.00 12.00 3.53 0.74 $ 93.42 $ RESIDUAL RETURNS TO LAND, LABOR, CAPITAL, OWNERSHIP, MANAGEMENT, AND PROFIT CAPITAL INVESTMENT ANNUAL OPERATING CAPITAL EOUIPMENT INVESTMENT LIVESTOCK INVESTMENT TOTAL CAPITAL COST UNIT QUANTITY INVESTED 0.25 218.41 659.57 DOL. DOL. DOL. RATE OF RETURN 0. 120 0.120 0. 120 RESIDUAL RETURNS TO LAND, LABOR, OWNERSHIP, MANAGEMENT, AND PROFIT OWNERSHIP COSTS (DEPRECIATION. TAXES, AND INSURANCE) EOUIPMENT LIVESTOCK TOTAL OWNERSHIP COST RESIDUAL RETURNS TO LAND, OPERATOR LABOR COSTS EOUIPMENT LIVESTOCK TOTAL LABOR COST LABOR, MANAGEMENT, AND PROFIT LABOR USE UNIT 1..88 7 .00 HOUR HOUR RATE OF RETURN 3.35 3.35 RESIDUAL RETURNS TO LAND, MANAGEMENT, AND PROFIT LAND COSTS PA S T U R E RENT TOTAL LAND COST INPUT USE UNIT 13.90 ACRE $ PROJECTED COST 0.03 26.21 79. 15 $ 105.39 $ $ 126.22 $ PROJECTED COST 20.21 6.86 $ 27.07 $ $ 99.15 $ PROJECTED COST 6.30 23.45 29.75 $ $ $ RATE OF RETURN 5.00 231.61 $ 69.39 $ PROJECTED COST 69..50 $ 69.,50 $ RESIDUAL RETURNS TO MANAGEMENT AND PROFIT $ - 0 .. 11 $ TOTAL PROJECTED COST OF PRODUCTION $ 325..13 $ 90% CALF CROP, 1 BULL TO 30 COWS, 3% COW DEATH LOSS, 13% REPLACEMENT. 230 ANIMAL UNITS TOTAL. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. L10.1 491 PROJECTIONS FOR PLANNING PURPOSES ONLY ... NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. COH-CALF PRODUCTION TEXAS EDHARDS PLATEAU EASTERN REGION 1985 PROJECTED COSTS AND RETURNS PER COH 1 JAN 2 FEB 3 MAR 4 APR 5 HAY 6 JUN AVER. ANNUAL CAPITAL 2.26 3.46 4.86 5.04 5.22 -13.51 LABOR REQUIREMENTS MACHINERY LABOR EQUIPMENT LABOR LIVESTOCK LABOR TOTAL LABOR 0.0 0.0 0.0 0.0 0.0 0.0 0.22 0.88 0.22 0.88 0.14 0.86 0.14 0.29 0.14 0.88 0.14 0.88 7 JUL 8 AUG 9 SEP 11 NOV (DOLLARS) 0.18 0.36 -2.69 -2.51 -3.26 (HOURS) 0.0 0.0 0.14 0.14 0.29 0.29 12 DEC 0.83 TOTAL 0.25 TOTAL 0.0 0.0 0.0 0.0 0.0 0.12 0.29 0.12 0.29 0.14 0.29 0.22 0.88 1.88 7.00 1.10 1.10 1.00 0.43 1.02 1.02 0.43 0.43 0.41 0.41 0.43 1.10 8.88 EQUIPMENT FIXED AND VARIABLE COSTS PER YEAR EQUIPMENT 10 OCT CODE TOTAL TOTAL HOURS OHN. OPER. LABOR D E P R I N T. I N S . T A X R E P A I R F U E L L U B . ALLOC (.%) FENCE (13) 1 180.00 280.80 23.40 0.0 1.80 0.0 0.0 484.20 1.80 8.00 0.004 H AT E R O ) 2 1 8 0 . 0 0 3 4 0 . 8 0 2 8 . 4 0 0 . 0 6 . 0 0 0 . 0 0 . 0 5 4 9 . 2 0 6 . 0 0 0 . 0 0 . 0 0 4 BARN 3 240.00 446.40 37.20 0.0 2.40 0.0 0.0 723.60 2.40 0.0 0.004 SHED 4 100.00 186.00 15.50 0.0 1.00 0.0 0.0 301.50 1.00 0.0 0.004 KORKING PENS 5 150.00 189.00 15.75 0.0 3.00 0.0 0.0 354.75 3.00 8.00 0.004 STOCK TRAILER 6 250.00 195.00 16.25 0.0 3.75 0.0 0.0 461.25 3.75 0.0 0.004 S TO C K S P R AY E R 7 8 0 . 0 0 5 2 . 8 0 4 . 4 0 0 . 0 4 . 0 0 0 . 0 0 . 0 1 3 7 . 2 0 4 . 0 0 0 . 0 0 . 0 0 4 PICKUP TRUCK 10 1057.14 759.43 63.29 0.0 252.00 1680.00 84.00 1879.86 2016.00 700.00 0.002 COH RAISED 51 0.0 66.00 5.50 0.0 0.0 0.0 0.0 71.50 0.0 0.0 1.000 BULL PURCHASED 54 0.0 126.00 10.50 0.0 0.0 0.0 0.0 136.50 0.0 0.0 0.034 HEIFER RAISED 55 0.0 64.80 5.40 0.0 0.0 0.0 0.0 70.20 0.0 0.0 0.130 K0RSE(2) 95 62.50 93.75 7.81 0.0 0.0 0.0 0.0 164.06 0.0 0.0 0.004 SELECTED EQUIPMENT COMPLEMENT INFORMATION 1 EQUIPMENT FENCE(13) HATERO) BARN SHED KORKING PENS STOCK TRAILER STOCK SPRAYER PICKUP TRUCK COH RAISED BULL PURCHASED HEIFER RAISED K0RSE(2) 2 3 4 5 6 SIZE UNIT TYPE■ LIST PRICE PURCH PRICE 1. 1. MILE 2. 4500. 2. 1. DOL. 2. 5000. 3. 1200. SQFT 2. 7200. 4. 1000. SQFT 2. 3000. 1. DOL. 2. 3000. 5. 6. 1. DOL. 2. 3000. 7. 1. DOL. 2. 800. 10. 1. 2. 10500. 1. HEAD 1. 51. 550. 1. HEAD 1. 1050. 54. 55. 1. HEAD 1. 540. 95. 1. HEAD 1 . ' 1000. 4500. 5000. 7200. 3000. 3000. 3000. 800. 9500. 550. 1050. 540. 1000. CODE NO. L10.2 7 8 9 10 LIFE SALV. REPAIR FUEL (YRS) (XLP) (%LP) USE 25. 25. 30. 30. 20. 12. 10. 7. 8. 4. 10. 8. 0.0 0.10 0.0 0.0 0.0 0.0 0.0 0.20 1.00 1.00 1.00 0.50 0.01 0.0 0.03 0.0 0.01 0.0 0.01 0.0 0.02 0.0 0.01 0.0 0.0 0.05 0.17 :1400.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11 12 13 14 ANNUAL ANNUAL XXXXXX XXXXXX LABOR USE 8.0 0.0 0.0 0.0 8.0 0.0 0.0 700.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.0 0.0 0.0 15 EFF. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 492 B-124KL10) SHEEP PRODUCTION TEXAS EDWARDS PLATEAU EASTERN REGION 1985 PROJECTED COSTS AND RETURNS PER ANIMAL UNIT* INVESTMENT REQUIREME:nts NUMBER EWE RAISED 5.00 RAMS PURCHASED 0.03 YEARLING EWE 1.00 H0RSE(2) 0.00 TOTAL LIVESTOCK INVESTMENT PRODUCTION UNIT HEAD HEAD HEAD HEAD WGT. NUMBER EACH WOOL 4 2 . 5 0 1 .. 0 0 LAMBS 4 . 0 0 7 0 ..00 CULL EWES 0.85 100.. 0 0 DEER LEASE 1 3 . 9 0 1 ..00 TOTAL PROJECTED RETURNS OPERATING INPUTS RANGE CUBES LAMB FEED VET MEDICINE SHEARING MARKETING MISC EXPENSE EOUIPMENT FUEL AND LUBE EOUIPMENT REPAIR TOTAL OPERATING COST SIZE 1.00 1.00 1.00 1.00 TOTAL UNITS UNIT 42.5 LB. 280.0 LB. 85.0 LB. 13.9 ACRE INPUT USE UNIT 375.00 LB. 60.00 LB. 7.99 DOL. 7.50 HEAD 2.75 DOL. 12.00 DOL. PROJECTED YOUR VALUE ESTIMATE S/UNIT 45.00 225.00 141.83 4.25 45.00 45.00 781.25 3.36 $ 277.61 $ PROJECTED S/UNIT RETURN 1.30 55.25 0.64 179.20 0.24 20.40 2.00 27.80 $ 282.65 S PROJECTED COST S/UNIT 0. 10 37.50 0.09 5.40 1.00 7.99 1.50 11.25 1.00 2.75 1.00 12.00 3.53 0.74 81.16 $ $ RESIDUAL RETURNS TO LAND, LABOR, CAPITAL, OWNERSHIP, MANAGEMENT, AND PROFIT CAPITAL INVESTMENT ANNUAL OPERATING CAPITAL EOUIPMENT INVESTMENT LIVESTOCK INVESTMENT TOTAL CAPITAL COST $ 201.49 $ QUANTITY UNIT RATE OF PROJECTED INVESTED RETURN COST 53.45 DOL. 0. 120 6.41 218.41 DOL. 0. 120 26.21 277.61 DOL. 0. 120 33.31 65.94 $ RESIDUAL RETURNS TO LAND, LABOR, OWNERSHIP, MANAGEMENT, AND PROFIT OWNERSHIP COSTS (DEPRECIATION, TAXES. AND INSURANCE) EQUIPMENT LIVESTOCK TOTAL OWNERSHIP COST $ 135.55 $ PROJECTED COST 20.21 4.34 $ 24.55 $ RESIDUAL RETURNS TO LAND, LABOR. MANAGEMENT, AND PROFIT $ 111.00 $ OPERATOR LABOR COSTS EOUIPMENT LIVESTOCK TOTAL LABOR COST LABOR USE 1,.88 9..32 UNIT HOUR HOUR RATE OF RETURN 3.35 3.35 RESIDUAL RETURNS TO LAND, MANAGEMENT, AND PROFIT LAND COSTS PASTURE RENT TOTAL LAND COST INPUT USE 13.90 UNIT ACRE PROJECTED COST 6.30 31.22 $ 37.53 §_ $ RATE OF RETURN 5.00 73.48 $ PROJECTED COST 69.50 69.50 $ $ RESIDUAL RETURNS TO MANAGEMENT AND PROFIT $ 3.98 $ TO TA L P R O J E C T E D C O S T O F P R O D U C T I O N $ 2 7 8 . 6 7 $ _ _ 100% LAMB CROP. 1 RAM TO 33 EWES. 3% DEATH LOSS. 20% REPLACEMENT RATE INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. L10.3 492 PROJECTIONS FOR PLANNING PURPOSES ONLY ... NOT TO BE USED HITHOUT UPDATING AFTER 11-17-84. SHEEP PRODUCTION TEXAS EDHARDS PLATEAU EASTERN REGION 1985 PROJECTED COSTS AND RETURNS PER ANIMAL UNIT* 1 JAN 2 FEB 3 MAR 4 APR 5 MAY 6 JUN AVER. ANNUAL CAPITAL 6.43 7.43 8.41 8.93 -11.00 3.85 LABOR REQUIREMENTS MACHINERY LABOR EQUIPHENT LABOR LIVESTOCK LABOR TOTAL LABOR 0.0 0.0 0.22 0.22 1.10 1.10 0.0 0.14 1.10 0.0 0.14 1.10 0.0 0.14 1.10 0.0 0.14 1.10 1.32 1.24 1.24 1.24 1.24 1.32 7 JUL 8 AUG 9 SEP 11 NOV 12 DEC TOTAL 4 . 9 8 5 . 1 2 5 . 2 7 5 . 4 3 53.45 (DOLLARS) 4.22 4.36 (HOURS) 10 OCT 0.0 0.14 1.10 0.0 0.14 0.13 0.0 0.12 1.10 0.0 0.12 0.13 0.0 0.14 0.13 1.24 0.27 1.22 0.25 0.27 TOTAL 0.0 0.0 0.22 1.88 0.13 9.32 0.35 11 . 2 0 EQUIPMENT FIXED AND VARIABLE COSTS PER YEAR EQUIPMENT TOTAL TOTAL HOURS C O D E D E P R I N T. I N S . TA X R E PA I R F U E L L U B . O W N . O P E R . L A B O R 1 180.00 280.80 2 180.00 340.80 3 240.00 446.40 4 100.00 186.00 5 150.00 189.00 6 250.00 195.00 7 80.00 52.80 10 1057.14 759.43 0.0 81 5.40 84 43.17 17.02 0.0 85 5.40 95 62.50 93.75 FENCE(13) H AT E R O ) BARN SHED KORKING PENS STOCK TRAILER STOCK SPRAYER PICKUP TRUCK EKE RAISED RAMS PURCHASED YEARLING EHE KORSEO) 23.40 28.40 37.20 15.50 15.75 16.25 4.40 63.29 0.45 1.42 0.45 7.81 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.80 6.00 252.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1680.00 0.0 0.0 0.0 0.0 0.0 484. 1.80 0.0 549. 6.00 0.0 723. 2.40 0.0 301. 1.00 0.0 354. 3.00 0.0 461. 3.75 0.0 137. 4.00 84.00 1879. 86 2016.00 0.0 5.85 0.0 0.0 61.60 0.0 0.0 5.85 0.0 0.0 164. 0 6 0 . 0 B.OO 0.0 0.0 0.0 8.00 0.0 0.0 700.00 0.0 0.0 0.0 0.0 ALLOC (.X) 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.002 1.000 0.030 0.200 0.004 SELECTED EQUIPMENT COMPLEMENT INFORMATION 1 EQUIPHENT FENCE(13) HATERO) BARN SHED KORKING PENS STOCK TRAILER STOCK SPRAYER PICKUP TRUCK EHE RAISED RAMS PURCHASED YEARLING EHE H0RSE(2) CODE NO. 2 3 4 5 SIZE UNIT TYPE1 LIST PRICE 1. 1. MILE 2. 1. DOL. 3. 1200. SQFT 4. 1000. SQFT 1. DOL. 5. 6. 1. DOL. 7. 1. DOL. 10. 1. 81. 1. HEAD 84. 1. HEAD 85. 1. HEAD 95. 1. HEAD 2. 4500. 2. 5000. 2. 7200. 2. 3000. 2. 3000. 2. 3000. 2. 800. 2. 10500. 1. 45. 1. 185. 1. 45. 1. 1000. 6 PURCH PRICE 4500. 5000. 7200. 3000. 3000. 3000. 800. 9500. 45. 185. 45. 1000. 7 8 9 10 LIFE SALV. REPAIR FUEL (YRS) (XLP) (XLP) USE 25. 25. 30. 30. 20. 12. 10. 7. 5. 3. 6. 8. 0.0 0.10 0.0 0.0 0.0 0.0 0.0 0.20 1.00 0.30 1.00 0.50 0.01 0.0 0.03 0.0 0.01 0.0 0.01 0.0 0.02 0.0 0.01 0.0 0.05 0.0 0.17 :1400.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11 12 13 14 ANNUAL ANNUAL XXXXXX XXXXXX LABOR USE 8.0 0.0 0.0 0.0 8.0 0.0 0.0 700.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 • 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.0 0.0 0.0 15 EFF. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 '"*=%. L10.4 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 493 0^1%*, B-1241(L10) GOAT PRODUCTION TEXAS EDWARDS PLATEAU EASTERN REGION 1985 PROJECTED COSTS AND RETURNS PER ANIMAL UNIT (6 DOES) INVESTMENT REQUIREMENTS NUMBER UNIT DOE RAISED 6.00 HEAD BUCK PURCHASED 0.02 HEAD YEARLING DOE 1.20 HEAD H0RSE(2) 0.00 HEAD TOTAL LIVESTOCK INVESTMENT PRODUCTION WGT. NUMBER EACH KID MOHAIR 9.00 1.00 ADULT MOHAIR 48.00 1.00 KID GOATS 1.80 1.00 DOES-CULL 0.13 85.00 DEER LEASE 13.90 1.00 TOTAL PROJECTED RETURNS OPERATING INPUTS RANGE CUBES SALT & MIN. VET MEDICINE SHEARING MISC EXPENSE EQUIPMENT FUEL AND LUBE EQUIPMENT REPAIR TOTAL OPERATING COST SIZE 1.00 1.00 1.00 1.00 TOTAL UNITS UNIT 9.0 LB. 48.0 LB. 1.8 HEAD 11.0 LB. 13. 9 ACRE INPUT USE 300.00 60.00 6..00 6..00 10.00 UNIT LB. LB. DOL. HEAD DOL. YOUR PROJECTED S/UNIT VALUE ESTIMATE 60.00 360.00 210.00 4.20 60.00 72.00 781.25 3.36 $ 439.56 $ PROJECTED RETURN S/UNIT 6.00 54.00 4.50 216.00 40.00 72.00 0.25 2.76 2.00 27.80 $ 372.56 $ PROJECTED COST S/UNIT 0. 10 30.00 0.35 21.00 6.00 1.00 2.50 15.00 1.00 10.00 3.53 0.74 86.27 $ $ RESIDUAL RETURNS TO LAND, LABOR,, CAPITAL, OWNERSHIP, MANAGEMENT, AND PROFIT CAPITAL INVESTMENT ANNUAL OPERATING CAPITAL EQUIPMENT INVESTMENT LIVESTOCK INVESTMENT TOTAL CAPITAL COST QUANTITY INVESTED -101.78 218.41 439.56 UNIT DOL. DOL. DOL. RATE OF RETURN 0.120 0. 120 0. 120 RESIDUAL RETURNS TO LAND, LABOR, OWNERSHIP, MANAGEMENT, AND PROFIT OWNERSHIP COSTS (DEPRECIATION, TAXES, AND INSURANCE) EQUIPMENT LIVESTOCK TOTAL OWNERSHIP COST $ 286.29 $ PROJECTED COST -12.21 26.21 52.75 $ 66.74 $ $ 219.55 $ PROJECTED COST 20.21 5.86 $ 26.07 $ RESIDUAL RETURNS TO LAND. LABOR. MANAGEMENT. AND PROFIT $ OPERATOR LABOR COSTS PROJECTED COST 6.30 26.80 33.10 $ $ LABOR USE 1..88 8 .00 EQUIPMENT LIVESTOCK TOTAL LABOR COST UNIT HOUR HOUR RATE OF RETURN 3.35 3.35 193.48 $ RESIDUAL RETURNS TO LAND. MANAGEMENT. AND PROFIT $ LAND COSTS PROJECTED COST 69.50 $ 69.50 £ PASTURE RENT TOTAL LAND COST INPUT USE UNIT RATE OF RETURN 13.90 ACRE 5.00 160.37 $ RESIDUAL RETURNS TO MANAGEMENT AND PROFIT $ 90.87 $ TOTAL PROJECTED COST OF PRODUCTION $ 281.69 $ 50% KID CROP, 1 BUCK TO 50 DOES. 5% DEATH LOSS. 20% REPLACEMENT RATE INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. L10.5 493 PROJECTIONS FOR PLANNING PURPOSES ONLY ... NOT TO BE USED HITHOUT UPDATING AFTER 11-17-84. GOAT PRODUCTION TEXAS EDHARDS PLATEAU EASTERN REGION 1985 PROJECTED COSTS AND RETURNS PER ANIMAL UNIT (6 DOES) 1 JAN 2 FEB 3 MAR 4 APR 5 MAY 6 JUN AVER. ANNUAL CAPITAL -9.91 -13.10 -12.43 -12.26 -18.07 3.65 LABOR REQUIREMENTS MACHINERY LABOR EQUIPMENT LABOR LIVESTOCK LABOR 7 JUL 8 AUG 9 SEP 10 OCT 11 NOV 12 DEC (DOLLARS) TO TA L 3.82 4.86 -12.72 -12.30 -11.88 -11.44-101.78 (HOURS) TOTAL LABOR TOTAL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.22 0.75 0.22 0.75 0.14 0.75 0.14 0.75 0.14 0.75 0.14 0.50 0.14 0.60 0.14 0.60 0.12 0.60 0.12 0.60 0.14 0.60 0.22 0.75 1.88 8.00 0.97 0.97 0.89 0.89 0.89 0.64 0.74 0.74 0.72 0.72 0.74 0.97 9.88 EQUIPMENT FIXED AND VARIABLE COSTS PER YEAR EQUIPMENT CODE DEPR I N T. I N S . TA X R E PA I R FUEL LUB. TOTAL TOTAL HOURS OHN. OPER. LABOR ALLOC (.X) FENCE (13) 1 180.00 280.80 23.40 0.0 1.80 0.0 0.0 484.20 1.80 8.00 0.004 H AT E R O ) 2 1 8 0 . 0 0 3 4 0 . 8 0 2 8 . 4 0 0 . 0 6 . 0 0 0 . 0 0 . 0 5 4 9 . 2 0 6 . 0 0 0 . 0 0 . 0 0 4 BARN 3 240.00 446.40 37.20 0.0 2.40 0.0 0.0 723.60 2.40 0.0 0.004 SHED 4 100.00 186.00 15.50 0.0 1.00 0.0 0.0 301.50 1.00 0.0 0.004 KORKING PENS 5 150.00 189.00 15.75 0.0 3.00 0.0 0.0 354.75 3.00 8.00 0.004 STOCK TRAILER 6 250.00 195.00 16.25 0.0 3.75 0.0 0.0 461.25 3.75 0.0 0.004 S TO C K S P R AY E R 7 8 0 . 0 0 5 2 . 8 0 4 . 4 0 0 . 0 4 . 0 0 0 . 0 0 . 0 1 3 7 . 2 0 4 . 0 0 0 . 0 0 . 0 0 4 PICKUP TRUCK ' 10 1057.14 759.43 63.29 0.0 252.00 1680.00 84.00 1879.86 2016.00 700.00 0.002 DOE RAISED 87 0.0 7.20 0.60 0.0 0.0 0.0 0.0 7.80 0.0 0.0 1.000 BUCK PURCHASED 90 60.00 25.20 2.10 0.0 0.0 0.0 0.0 87.30 0.0 0.0 0.020 YEARLING DOE 91 0.0 7.20 0.60 0.0 0.0 0.0 0.0 7.80 0.0 0.0 0.200 HORSE (2) 95 62.50 93.75 7.81 0.0 0.0 0.0 0.0 164.06 0.0 0.0 0.004 SELECTED EQUIPMENT COMPLEMENT INFORMATION 1 EQUIPHENT FENCE(13) HATERO) BARN SHED WORKING PENS STOCK TRAILER STOCK SPRAYER PICKUP TRUCK DOE RAISED BUCK PURCHASED YEARLING DOE HORSE(2) CODE 2 3 4 5 6 SIZE UNIT TYPE LIST PRICE PURCH PRICE 1. 1. MILE 2. 4500. 2. 1. DOL. 2. 5000. 3. 1200. SQFT 2. 7200. 4. 1000. SQFT 2. 3000. 5. 1. DOL. 2. 3000. 6. 1. DOL. 2. 3000. 7. 1. DOL. 2 . 800. 10. 1. 2. 10500. 87. 1. HEAD 1. 60. 90. 1. HEAD 1. 300. 91. 1. HEAD 1. 60. 95. 1. HEAD 1. 1000. 4500. 5000. 7200. 3000. 3000. 3000. 800. 9500. NO. 60. 300. 60. 1000. L10.6 7 8 9 10 LIFE SALV. REPAIR FUEL (YRS) (XLP) (XLP) USE 25. 25. 30. 30. 20. 12. 10. 7. 5. 4. 6. 8. 0.0 0.10 0.0 0.0 0.0 0.0 0.0 0.20 1.00 0.20 1.00 0.50 0.01 0.0 0.03 0.0 0.01 0.0 0.01 0.0 0.02 0.0 0.01 0.0 0.05 0.0 0 . 1 7 1400.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11 12 13 14 ANNUAL ANNUAL XXXXXX XXXXXX LABOR USE 8.0 0.0 0.0 0.0 8.0 0.0 0.0 700.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.0 0.0 0.0 15 EFF. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 PROJECTIONS FOR PLANNING PURPOSES ONLY B-1241(L10) NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 494 RANCH BUDGET TEXAS EDWARDS PLATEAU REGION EASTERN 1985 PROJECTED COSTS AND RETURNS PER ANIMAL UNIT* INVESTMENT REOUIREME[NTS PROJECTED YOUR NUMBER U N I T S I Z E VALUE ESTIMATE S/UNIT COW RAISED 0..45 H E A D 1 . 0 0 550.00 247.50 BULL PURCHASED 0,.01 H E A D 1 . 0 0 1050.00 14. 17 HEIFER RAISED 0..06 H E A D 1 . 0 0 540.00 31.59 EWE RAISED 2..00 H E A D 1 . 0 0 45.00 90.00 RAMS PURCHASED 0..01 H E A D 1 . 0 0 141.83 1.70 YEARLING EWE 0..40 H E A D 1 . 0 0 45.00 18.00 DOE RAISED 0..90 H E A D 1 . 0 0 60.00 54.00 BUCK PURCHASED 0..00 H E A D 1 . 0 0 210.00 0.63 YEARLING DOE 10.80 0,.18 H E A D 1 . 0 0 60.00 781.25 3.36 HORSE(2) 0 .00 H E A D 1 . 0 0 TOTAL LIVESTOCK INVESTMENT $ 471.75 $ PRODUCTION NUMBER STOCKER STEERS 0.,20 HEIFER CALVES 0.. 14 CULL COWS 0.,04 WOOL 17.,00 LAMBS 1.,60 CULL EWES 0..34 KID GOATS 0..27 DOES-CULL 0..02 KID MOHAIR 1..08 ADULT MOHAIR 7,.20 DEER LEASE 13..90 TOTAL PROJECTED RETURNS OPERATING INPUTS RANGE CUBES LAMB FEED SALT & MIN. VET MEDICINE SHEARING MARKETING MISC EXPENSE EQUIPMENT FUEL AND LUBE EQUIPMENT REPAIR TOTAL OPERATING COST WGT. TOTAL EACH UNITS UNIT 5.. 0 0 1 . 0 C W T. 4.. 5 0 0 . 6 C W T. 10., 0 0 0 . 4 C W T. 1.. 0 0 1 7 . 0 L B . 70..00 1 12.0 LB. 100.. 0 0 3 4 . 0 L B . 1,. 0 0 0 . 3 H E A D 85.. 0 0 1 . 7 L B . 1.. 0 0 1 . 1 L B . 1.. 0 0 7 . 2 L B . 1..00 13.9 ACRE PROJECTED S/UNIT RETURN 72.00 72.90 67.00 43.42 38.75 17.44 1.30 22.10 0.64 71.68 0.24 8.16 40.00 10.80 0.25 0.41 6.00 6.48 4.50 32.40 2.00 27.80 $ 313.59 $ PROJECTED COST S/UNIT 0. 10 30.20 0.09 2. 16 0.35 16.72 1.00 7.98 1.50 5.70 1.00 6.68 1.00 10.00 3.53 0.56 83.52 S $ INPUT USE UNIT 302.00 LB. 24.00 LB. 47.76 LB. 7.98 DOL. 3.80 HEAD 6.68 DOL. 10.00 DOL. RESIDUAL RETURNS TO LAND. LABOR, CAPITAL, OWNERSHIP, MANAGEMENT, AND PROFIT CAPITAL INVESTMENT ANNUAL OPERATING CAPITAL EQUIPMENT INVESTMENT LIVESTOCK INVESTMENT TOTAL CAPITAL COST QUANTITY INVESTED -54.98 60.51 471.76 UNIT DOL. DOL. DOL. RATE OF RETURN 0.120 0.120 0. 120 RESIDUAL RETURNS TO LAND, LABOR, OWNERSHIP. MANAGEMENT, AND PROFIT OWNERSHIP COSTS (DEPRECIATION, TAXES, AND INSURANCE) EQUIPMENT LIVESTOCK TOTAL OWNERSHIP COST $ 230.06 $ PROJECTED COST -6.60 7.26 56.61 $ 57.27 $ $ 172.79 $ PROJECTED COST 6.42 5.68 $ 12.10 $ RESIDUAL RETURNS TO LAND. LABOR. MANAGEMENT, AND PROFIT $ OPERATOR LABOR COSTS PROJECTED COST 5.07 24.12 29.19 $ $ EQUIPMENT LIVESTOCK TOTAL LABOR COST LABOR USE 1..51 7..20 UNIT HOUR HOUR RATE OF RETURN 3.35 3.35 RESIDUAL RETURNS TO LAND, MANAGEMENT, AND PROFIT LAND COSTS INPUT USE UNIT 160.69 $ $ 131.50 $ RATE OF RETURN 5.00 PROJECTED COST PASTURE RENT 13.90 ACRE 69.50 TOTAL LAND COST $ 69.50 RESIDUAL RETURNS TO MANAGEMENT AND PROFIT $ 62.00 TO TA L P R O J E C T E D C O S T O F P R O D U C T I O N $ 2 5 1 . 5 9 103 COWS, 460 SHEEP. 210 GOATS. 90% CALF CROP. 100% LAMB CROP. 50% $ $ $ KID CROP, INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. L10.7 494 PROJECTIONS FOR PLANNING PURPOSES ONLY ... NOT TO BE USED HITHOUT UPDATING AFTER 11-17-84. RANCH BUDGET TEXAS EDHARDS PLATEAU REGION EASTERN 1965 PROJECTED COSTS AND RETURNS PER ANIMAL UNIT* 1 JAN 2 FEB 3 MAR 4 APR 5 MAY 6 JUN AV E R . A N N U A L C A P I TA L - 7 . 8 8 - 6 . 8 3 - 5 . 7 9 - 5 . 3 6 - 1 3 . 3 8 3 . 8 5 LABOR REQUIREMENTS MACHINERY LABOR EQUIPMENT LABOR LIVESTOCK LABOR TOTAL LABOR 7 JUL 8 AUG 9 SEP (DOLLARS) 4.05 4.48 0.0 0.0 0.0 0.0 0.0 0.0 0.19 0.60 0.19 0.60 0 . 11 0.60 0 . 11 0.60 0.11 0.60 0 . 11 0.60 (HOURS) 0.0 0.0 0 . 11 0 . 11 0.60 0.60 0.79 0.79 0.71 0.71 0.71 0.71 0.71 10 OCT 1.78 -10.14 11 NOV 12 DEC TOTAL -9.98 -9.77 -54.98 TOTAL 0.0 0.71 0.0 0.09 0.60 0.09 0.60 0.69 0.69 0.0 0.0 0.0 0 . 11 0.60 0.19 0.60 1.51 7.20 0.71 0.79 8.71 EQUIPMENT FIXED AND VARIABLE COSTS PER YEAR EQUIPMENT TOTAL TOTAL HOURS C O D E D E P R I N T. I N S . TA X R E PA I R F U E L L U B . O H N . O P E R . L A B O R 1 2 3 4 5 6 7 10 51 54 55 81 84 85 87 90 91 95 FENCE(13) HATERO) BARN SHED KORKING PENS STOCK TRAILER STOCK SPRAYER PICKUP TRUCK COH RAISED BULL PURCHASED HEIFER RAISED EHE RAISED RAMS PURCHASED YEARLING EHE DOE RAISED BUCK PURCHASED YEARLING DOE HORSEO) 180.00 180.00 240.00 100.00 150.00 250.00 80.00 1057.14 0.0 0.0 0.0 0.0 43.17 0.0 0.0 60.00 0.0 62.50 280.80 340.80 446.40 186.00 189.00 195.00 52.80 759.43 66.00 126.00 64.80 5.40 17.02 5.40 7.20 25.20 7.20 93.75 23.40 28.40 37.20 15.50 15.75 16.25 4.40 63.29 5.50 10.50 5.40 0.45 1.42 0.45 0.60 2.10 0.60 7.81 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.80 0.0 6.00 0.0 2.40 0.0 1.00 0.0 3.00 0.0 3.75 0.0 4.00 0.0 252.00 1680.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 484.20 1.80 0.0 549.20 6.00 0.0 723.60 2.40 0.0 301.50 1.00 0.0 354.75 3.00 0.0 461.25 3.75 0.0 137.20 4.00 8 4 . 0 0 1879.86 2016.00 0.0 71.50 0.0 0.0 136.50 0.0 0.0 70.20 0.0 0.0 5.85 0.0 0.0 61.60 0.0 0.0 5.85 0.0 0.0 7.80 0.0 0.0 87.30 0.0 0.0 7.80 0.0 0.0 164.06 0.0 8.00 0.0 0.0 0.0 8.00 0.0 0.0 700.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ALLOC (.X) 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.002 1.000 0.030 0.130 1.000 0.030 0.200 1.000 0.020 0.200 0.004 SELECTED EQUIPMENT COMPLEHENT INFORMATION 1 EQUIPHENT FENCE(13) HATERO) BARN SHED KORKING PENS STOCK TRAILER STOCK SPRAYER PICKUP TRUCK COH RAISED BULL PURCHASED HEIFER RAISED EHE RAISED RAMS PURCHASED YEARLING EHE DOE RAISED BUCK PURCHASED YEARLING DOE HORSEO) CODE NO. 2 3 4 5 SIZE UNIT TYPE! LIST PRICE 1. 1. MILE 2. 1. DOL. 3. 1200. SQFT 4. 1000. SQFT 1. DOL. 5. 6. 1. DOL. 7. 1. DOL. 10. 1. 51. 1. HEAD 54. 1. HEAD 1. HEAD 55. 81. 1. HEAD 84. 1. HEAD 1. HEAD 85. 87. 1. HEAD 90. 1. HEAD 91. 1. HEAD 95. 1. HEAD 2. 4500. 2. 5000. 2. 7200. 2. 3000. 2. 3000. 2. 3000. 800. 2. 2. 10500. 1. 550. 1. 1050. 1. 540. 1. 45. 1. 185. 1. 45. 1. 60. 1. 300. 1. 60. 1. 1000. 6 PURCH PRICE 4500. 5000. 7200. 3000. 3000. 3000. 800. 9500. 550. 1050. 540. 45. 185. 45. 60. 300. 60. 1000. 7 8 9 10 LIFE SALV. REPAIR FUEL (YRS) (XLP) (XLP) USE 25. 25. 30. 30. 20. 12. 10. 7. 8. 4. 10. 5. 3. 6. 5. 4. 6. 8. 0.0 0.10 0.0 0.0 0.0 0.0 0.0 0.20 1.00 1.00 1.00 1.00 0.30 1.00 1.00 0.20 1.00 0.50 L10.8 0.01 0.0 0.03 0.0 0.01 0.0 0.01 0.0 0.02 0.0 0.01 0.0 0.05 0.0 0 . 1 7 1400.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11 12 13 14 ANNUAL ANNUAL XXXXXX XXXXXX LABOR USE 8.0 0.0 0.0 0.0 8.0 0.0 0.0 700.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15 EFF. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 DATE:110784 LISTING OF ECONOMIC AND ENGINEERING DATA FOR EQUIPMENT IN REGION 10 EQUIPMENT NAME CODE SIZE UNIT TYPE FENCE(13) H AT E R O ) BARN SHED KORKING PENS STOCK TRAILER STOCK SPRAYER PICKUP TRUCK PEANUT TRAILER COH RAISED BULL PURCHASED HEIFER RAISED EHE RAISED RAMS PURCHASED YEARLING EHE DOE RAISED BUCK PURCHASED YEARLING DOE HORSEO) 1. 2. 1 1 3. 1200 4. 1000 5. 1 6. 1 7. 1 10. 1 50. 1 51. 1 54. 1 55. 1 81. 1 84. 1 85. 1 87. 1 90. 1 91. 1 95. 1 18. 15. 21. 21. 15. 15. 15. 0. 0. 1. 1. 1. 1. 1, 1. 1. 1. 1, !• 2 2 2 2 2 2 2 2 2 5 6 7 8 9 10 11 12 13 14 15 L I S T P U R C H . L I F E S A LV. R E PA I R F U E L A N N U A L A N N U A L E F F. PRICE PRICE (YRS) (XLP) (XLP) USE LABOR USE XXXXXX XXXXXX 4500. 5000. 7200. 3000. 3000. 3000. 800. 10500. 8800. 550. 1050. 540. 45. 185. 45. 60. 300. 60. 1000. 4500. 5000. 7200. 3000. 3000. 3000. 800. 9500. 8000. 550. 1050. 540. 45. 185. 45. 60. 300. 60. 1000. 25. 25. 30. 30. 20. 12. 10. 7. 10. 8. 4. 10. 5. 3. 6. 5. 4. 6. 8. 0.0 0.10 0.0 0.0 0.0 0.0 0.0 0.20 0.10 1.00 1.00 1.00 1.00 0.30 1.00 1.00 0.20 1.00 0.50 iffP16^ L10.9 0.01 0.0 0.03 0.0 0.01 0.0 0.0 0.01 0.0 0.02 0.01 0.0 0.05 0.0 0 . 1 7 1400.0 0.01 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 •0.0 0.0 0.0 8.0 0.0 0.0 0.0 8.0 0.0 0.0 700.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0