PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 857 B-1241(C18) PEANUTS. IRRIGATED, COASTAL BEND REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION DISC-TANDEM GRAIN DRILL MB PLOW 4 BOTTOM BEDDER 4R PLANTER PEANUT 4 SPRAYER HERBICID PICKER WHEELS SPRAYER HERBICID CULTIVATOR ROLL SPRAYER HERBICID CULTIVATOR ROLL CULTIVATOR ROLL DIGGER PEANUT COMBINE PEANUT MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 4 81 5 82 4 83 4 67 4 85 5 86 5 ,87 5 86 4 88 5 86 4 88 4 88 4 90 4 80 4.25 0.0 9.68 7.81 0 . 0 10.77 4.91 0.0 48.00 7.92 2.75 1.63 0.0 2.42 5.37 6.51 4.45 0.0 0.0 3.26 0.0 4.45 4.45 0.0 0 . 0 17.39 0 . 0 34.80 6.60 21. 14 18.81 9.94 59.53 5.76 3.40 17.42 7.81 6.03 7.81 7.81 30.47 47.76 NOV NOV MAR APR APR APR APR MAY MAY JUNE JUNE JULY OCT OCT 1.00 1.00 1.00 2.00 1.00 0.50 0.50 2.00 1.00 1.00 1.00 1.00 1.00 1.00 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION 0.216 0.378 0.644 0.448 0.318 0.161 0.119 0.644 0.306 0.322 0.306 0.306 1.152 1.152 0. 164 0.286 0.488 0.340 0.241 0.122 0.090 0.488 0.232 0.244 0.232 0.232 0.873 0.873 6.474 4.905 TOTALS 1. 13 1.99 3.38 2.35 1.67 0.85 0.63 3.38 1.61 1.69 1.61 1.61 6.05 6.05 35.49 33.99 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. ACRE LABOR MONTH INCHES HOURS MAY JUNE JULY AUG SEPT 1.22 1.67 4.66 2.67 1.95 0.54 0.36 2.16 1.75 1.08 1.75 1.75 7.03 6.91 3.00 3.00 3.00 3.00 3.00 0.900 0.900 0.900 0.900 0.900 0.0 0.0 0.0 0.0 0.0 15.00 4.500 0.0 9.00 9.00 9.00 9.00 9.00 65.80115.00 250.28 APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 4.72 4.72 4.72 4.72 4.72 0.0 0.0 0.0 0.0 0.0 12.00 12.00 12.00 12.00 12.00 25.72 25.72 25.72 25.72 25.72 45.00 23.62 0.0 60.00 128.62 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF PEANUTS (DOLLARS) 16.00 18.00 20.00 22.00 24.00 -107.59 -71.59 -35.59 0.41 36.41 [ 27.00 -86.29 -45.79 -5.29 35.21 75.71 | 30.00 -64.99 -19.99 25.01 70.01 115.01 j 33.00 -43.69 5.81 55.31 104.81 154.31 ] -22.39 31.61 85.61 139.61 193.61 j CWT. QUANTITY OF PEANUTS 24.00 i 36.00 j NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. •""% C18.14 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 858 rf^v B-124KC18) SOYBEANS, COASTAL BEND REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY PROJECTED YIELD UNIT 1. GROSS RECEIPTS SOYBEANS TOTAL PROJECTED RETURNS 22.00 2. VARIABLE COSTS PREHARVEST COSTS ♦SOYBEAN SEED ♦NITROGEN ♦PHOSPHOROUS ♦TREFLAN ♦MALATHION INSECT. APPLI. ♦BENLATE FUNGICIDE APPL. FERTILIZER APPL FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S - T R A C TO R EOUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS CUS HARV SOYBEAN HAUL SUBTOTAL. HARVEST BU. PROJECTED VALUE S/UNIT YOUR • ESTIMATE 7.00 154.00 154.00 $ 0.32 0.20 0.25 5.50 0. 16 2.75 13.38 2.75 2.75 $ 16.00 4.00 10.00 8.25 1.28 2.75 13.38 2.75 2.75 15.23 1.49 4.28 1.81 10.61 2.94 4. 17 101.69 $ $ 11.00 4.40 15.40 $ $ 117.09 $ $ INPUT USE 50.00 20.00 40.00 1.50 8.00 1.00 1.00 1.00 1.00 2.02 0.56 29.78 22.00 22.00 TOTAL VARIABLE COSTS LB. LB. LB. OT. OZ. APPL LB. APPL APPL ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE BU. BU. ACRE ACRE BREAK-EVEN PRICE. VARIABLE COSTS $ 36.91 $ ACRE ACRE ACRE ACRE $ 24.27 18.32 32. 17 74.75 $ ACRE $ 191.85 $ ACRE 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND---NET SHARE-RENT TOTAL FIXED COSTS 5. TOTAL PROJECTED COSTS 6. NET PROJECTED RETURNS 0.50 0.20 $ 5 . 32/BU. SOYBEANS 3. INCOME ABOVE VARIABLE COSTS BREAK-EVEN PRICE. TOTAL COSTS 5.25 5.25 0. 140 $ 8 . 72/BU. SOYBEANS ACRE $ -37.85 $ LAND RENT EQUALS 1/3 OF GROSS LESS 1/3 OF FERTILIZER, HERBICIDE, FUNGICIDE, HARVEST, AND HAUL. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C18.15 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 858 B-1241(C18) SOYBEANS, COASTAL BEND REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER 4R CHISEL PLOW TANDEM DISC 6R TANDEM DISC 6R FIELD CULT. 6R HERB. APPLI. BEDDER 6R ROW DISC 6R ROW DISC 6R PLANTER 6R CULTIVATOR 6R ROLLER 6R CULTIVATOR 6R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 2,31 2,45 2,36 2,36 2.43 2.49 2,35 2,41 2,41 2.40 2,42 2,38 2,42 SEPT SEPT SEPT OCT OCT OCT NOV JAN MAR APR APR APR MAY TOTALS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.209 0. 151 0. 146 0. 146 0.136 0.203 0. 151 0. 146 0. 146 0.202 0.136 0. 113 0. 136 0. 159 0. 115 0. 153 0. 103 0.086 0. 103 2. 17 1 .54 1.56 1.56 1 .40 2.12 1.55 1 .48 1 .48 2.22 1.47 1 . 11 1.47 1. 10 0.79 0.77 0.77 0.71 1.07 0.79 0.77 0.77 1.06 0.71 0.60 0.71 2.022 1.532 2 1 . 11 10.61 0. 110 0 . 11 0 0. 103 0. 154 0. 115 0. 110 0. 110 APPL. MACH INPUT FIXED COSTS COSTS 0.0 0.0 0.0 0.0 0.0 TOTAL OPER. COST 3.73 4.06 3.48 3.48 3.80 3.50 2.50 2.86 2.86 4.80 2.24 1.61 2.24 6.99 6.40 5.80 5.80 5.91 14.94 4.84 5 . 11 5 . 11 34.08 4.42 3.31 4.42 3 4 . 2 5 41. 17 107.14 8.25 0.0 0.0 0.0 26.00 0.0 0.0 0.0 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF SOYBEANS (DOLLARS) 5.60 6.30 7.00 7.70 8.40 17.60 30.34 -22.08 -13.83 -5.58 2.68 19.80 23. 12 -13.83 -4.54 4.74 14.03 22.00 15.89 -5.58 4.74 15.06 25.38 24.20 -8.67 2.68 14.03 25.38 36.73 26.40 -1.45 10.93 23.31 35.70 48.08 BU. QUANTITY OF SOYBEANS NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT. OR OTHER MANAGEMENT STRATEGIES. >s% C18.16 PROJECTIONS FOR PLANNING PURPOSES ONLY B-1241(C18) NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 859 WATERMELONS, COASTAL BEND REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY PROJECTED YIELD UNIT GROSS RECEIPTS WATERMELONS TOTAL PROJECTED RETURNS 160.00 CWT. VARIABLE COSTS PREHARVEST COSTS ♦WATERMELON SEED ♦NITROGEN ♦PHOSPHOROUS ♦POTASSIUM ♦SEVIN ♦METHYLATE ♦METHYL PARATHION ♦DIFOLATAN INSECT/FUNG APPL HOEING FERTILIZER APPL . FUEL & LUBE--TRACTOR EQUIPMENT REPAI RS TRACTOR EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL. PREHARVEST HARVEST COSTS BROKERAGE WATERMELON HAUL HAND HARVEST SUBTOTAL. HARVEST PROJECTED VALUE S/UNIT YOUR ESTIMATE 6.50 1040.00 $ 1040.00 $* INPUT USE 0.75 30.00 60.00 30.00 1.50 0.10 2.00 2.00 2.00 1.00 1.00 2.89 2.66 9.58 160.00 160.00 1.00 TOTAL VARIABLE COSTS LB. LB. LB. LB. LB. GAL. QT. QT. APPL ACRE APPL ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE CWT. CWT. ACRE ACRE ACRE BREAK-EVEN PRICE. VARIABLE COSTS 4.00 0.20 0.25 0. 18 3. 14 17.80 3.25 6.20 2.75 12.00 2.75 5.25 5.25 0.140 0.50 3.50 62.00 $ $ 3.00 6.00 15.00 5.40 4.71 1.78 6.50 12.40 5.50 12.00 2.75 9.56 7.09 2.09 2. 14 15. 15 13.96 1.34 126.38 $ $ 80.00 560.00 62.00 702.00 $ 828.38 $_ $ 5.18/CWT. WATERMELONS 3. INCOME ABOVE VARIABLE COSTS ACRE 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE 24.24 ACRE 16.49 ACRE 18.00 18.00 ACRE $ 58.73 $^ 5. TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE, TOTAL COSTS 6. NET PROJECTED RETURNS $ $ 2 11 . 6 2 8 8 7 . 11 $_ $_ $ 5.54/CWT. WATERMELONS ACRE $ 152.89 $ RENT EQUALS S18/ACRE INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C18.17 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 859 B-1241(C18) WATERMELONS, COASTAL BEND REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION CHISEL PLOW TANDEM DISC 4R BEDDER 3R BEDDER 3R TANDEM DISC 2R TANDEM DISC 2R PLANTER 1R TANDEM DISC 2R CULTIVATOR 1R CULTIVATOR 4R CHISEL PLOW SPRAYER 6R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 3,69 4,62 4,78 4,78 5,61 5,61 5.75 5.61 5,76 4,68 3,69 5.46 OCT OCT NOV FEB FEB MAR MAR APR APR APR MAY MAY TOTALS 1.00 1.00 1.00 1.00 0.67 0.67 1.00 0.67 1.00 0.70 0.67 2.00 0. 191 0.252 0.216 0. 168 0. 168 0.326 0.326 0.224 0.326 0. 151 0. 141 0. 169 0.419 0. 164 0. 127 0.127 0.247 0.247 0. 170 0.247 0. 115 0. 107 0. 128 0.317 2.885 2. 186 1.93 1.23 0.94 0.94 0.96 0.96 0.67 0.96 0.43 0.87 1.29 1.63 1.32 1. 13 0.88 0.88 1.71 1.71 1. 18 1.71 0.79 0.74 0.89 2.20 1 2 . 8 2 15. 15 APPL. MACH INPUT FIXED COSTS COSTS 0.0 0.0 0.0 0.0 0.0 0.0 TOTAL OPER. COST 4.94 3.58 1.79 1.79 3. 17 3. 17 1.94 3. 17 1.22 1.58 3.31 4.33 8. 19 5.95 3.61 3.61 5.84 5.84 6.78 5.84 2.44 3. 19 5.49 20.55 15.40 33.97 77.34 3.00 0.0 0.0 0.0 0.0 12.40 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF WATERMELONS (DOLLARS) 5.20 5.85 6.50 7. 15 7.80 128.00 34 78 48 42 131 .62 214 82 298 02 144.00 15 58 78 02 171 .62 265 22 358 82 160.00 3 62 107 62 211 .62 315 62 419 62 176.00 22 82 137 22 251 .62 366 02 480 42 192.00 42 02 166 82 291 .62 416 42 541 22 CWT. QUANTITY OF WATERMELONS NOTE NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT. GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. C18.18 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 861 B-124KC18) COASTAL BERMUDAGRASS ESTAB., DRYLAND, TEXAS COASTAL BEND REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY PROJECTED YIELD UNIT 1. GROSS RECEIPTS COASTAL HAY TOTAL PROJECTED RETURNS 1.00 2. VARIABLE COSTS PREHARVEST COSTS CUSTOM SPRIGGING ♦NITROGEN ♦PHOSPHOROUS FERTILIZER APPL FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS MOW,RAKE.BALE CUSTOM BALE HAUL SUBTOTAL. HARVEST PROJECTED YOUR VALUE ESTIMATE S/UNIT TON 60.00 ACRE LB. LB. APPL ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 36.00 0.20 0.25 2.75 BALE BALE ACRE 0.69 0.40 ACRE $ $ 60.00 60.00 $ INPUT USE 1.00 40.00 40.00 1.00 1.49 0.28 30. 17 33.00 33.00 TOTAL VARIABLE COSTS BREAK-EVEN PRICE, VARIABLE COSTS ACRE 4. FIXED COSTS DEPREC..INTEREST.TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1 .00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 5. TOTAL PROJECTED COSTS ACRE 6. NET PROJECTED RETURNS $ 3. 15 1.98 7.81 1 .47 4.22 87.34 $ $ 22.77 13.20 35.97 $ 123.31 $_ S123.31/T0N COASTAL HAY 3. INCOME ABOVE VARIABLE COSTS BREAK-EVEN PRICE, TOTAL COSTS 5.25 5.25 0. 140 36.00 8.00 10.00 2.75 11.21 0.75 $ -63.31 $_ 17.86 12.84 15.00 15.00 $ 45.70 $" $ 169.00 $. S169.00/T0N COASTAL HAY ACRE $ -109.00 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C18.19 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, 861 B-124KC18) COASTAL BERMUDAGRASS ESTAB., DRYLAND, TEXAS COASTAL BEND REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER 4R SHREDDER 4R ' SHREDDER 4R SHREDDER 4R MOLDBOARD PLOW TANDEM DISC 6R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 2.31 2,31 2,31 2,31 2.33 2,36 APR JUNE JULY AUG AUG AUG TOTALS 1.00 1 .00 1.00 1.00 1.00 1.00 APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 0. 110 2. 17 2. 17 2. 17 2. 17 6.02 1.56 1.10 1.10 1. 10 1.10 2.65 0.77 0.0 0.0 0.0 0.0 0.0 0.0 3.73 3.73 3.73 3.73 11 . 5 9 3.48 6.99 6.99 6.99 6.99 20.25 5.80 1. 127 16.23 7.81 0.0 29.98 54.03 0.209 0.209 0.209 0.209 0.504 0. 146 0. 159 0. 159 0. 159 0. 159 0.382 1.488 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF COASTAL HAY (DOLLARS) 48.00 54.00 60.00 66.00 0.80 -77.71 -72.91 - 6 8 . 11 -63.31 -58.51 j 0.90 -76.51 - 7 1 . 11 -65.71 -60.31 -54.91 j 1.00 -75.31 -69.31 -63.31 -57.31 -51.31 j 1.10 -74. 10 -67.50 -60.90 -54.30 -47.70 | -72.90 -65.70 -58.50 -51.30 -44.10 | TON QUANTITY OF COASTAL HAY 72.00 i 1 .20 i j NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. C18.20 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 863 KLEINGRASS ESTABLISHMENT, DRYLAND, COASTAL BEND REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE C AT E G O RY 1. GROSS RECEIPTS PROJECTED YIELD UNIT $ 2. V A R I A B L E C O S T S I N P U T U S E PREHARVEST COSTS ♦KLEINGRASS SEED 0.80 CUSTOM PLANT 1.00 ♦NITROGEN 30.00 ♦PHOSPHOROUS 30.00 FERTILIZER APPL 1.00 ♦BANVEL 4.00 HERBICIDE APPL 1.00 FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY 1.04 EQUIPMENT 0.42 O P E R AT I N G C A P I TA L 3 8 . 3 0 SUBTOTAL, PREHARVEST HARVEST COSTS SUBTOTAL, HARVEST YOUR ESTIMATE PROJECTED VALUE S/UNIT TOTAL PROJECTED RETURNS 5.75 5.08 0.20 0.25 2.75 0.41 2.75 0.0 $ LB. ACRE LB. LB. APPL OZ. APPL ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 5.25 5.25 0. 140 $ ACRE $ ACRE $ 56.41 $ 3. INCOME ABOVE VARIABLE COSTS ACRE $ -56.41 $ 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 5. TOTAL PROJECTED COSTS 6. NET PROJECTED RETURNS TOTAL VARIABLE COSTS /jP^S B-1241(C18) 4.60 5.08 6.00 7.50 2.75 1.64 2.75 7.84 1. 12 2.20 1.90 5.46 2.20 5.36 56.41 $ 0.0 $ $ 12.49 13.52 15.00 41 .01 $ ACRE $ 97.41 $ ACRE $ -97.41 $ 15.00 LAND CHARGE BASED ON FULL YEAR BASIS, INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C18.21 PROJECTIONS FOR PLANNING PURPOSES ONLY B-1241(C18) NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 863 KLEINGRASS ESTABLISHMENT, DRYLAND, COASTAL BEND REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION MOLDBOARD PLOW OFFSET DISC TANDEM DISC 6R TOTALS MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 2,33 FEB 2,37 FEB 2,36 FEB 1.00 2.00 1.00 APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 0.504 0.390 0. 146 0.382 0.296 0 . 11 0 6.02 4.21 1.56 2.65 2.05 0.77 0.0 0.0 0.0 11.59 9.87 3.48 20.25 16. 14 5.80 1.040 0.788 11.79 5.46 0.0 24.94 42. 19 >*\ C18.22 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, 862 B-124KC18) KLEINGRASS PASTURE, DRYLAND, COASTAL BEND REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY PROJECTED YIELD UNIT GROSS RECEIPTS KLEINGRASS SEED TOTAL PROJECTED RETURNS 30.00 VARIABLE COSTS ' PREHARVEST COSTS ♦NITROGEN ♦PHOSPHOROUS FERTILIZER APPL FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S - T R A C TO R EQUIPMENT LABOR MACHINERY EOUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS GRASS COMBINING SUBTOTAL, HARVEST PROJECTED VALUE S/UNIT LB. 5.75 LB. LB. APPL ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 0.20 0.25 2.75 $ YOUR ESTIMATE 172.50 172.50 $ INPUT USE 60.00 30.00 1.00 0.10 0.42 -0.29 1.00 TOTAL VARIABLE COSTS ACRE ACRE 5.25 5.25 0. 140 22.75 ACRE BREAK-EVEN PRICE. VARIABLE COSTS ACRE FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 PRORATED ESTABL 97.41 TOTAL FIXED COSTS ACRE ACRE ACRE DOL. ACRE TOTAL PROJECTED COSTS ACRE NET PROJECTED RETURNS $ 22.75 22.75 $ $ 50.07 $ $ 1 . 67/LB. KLEINGRASSi SEED INCOME ABOVE VARIABLE COSTS BREAK-EVEN PRICE, TOTAL COSTS $ 12.00 7.50 2.75 0.79 1. 12 0.22 0.23 0.55 2.20 -0.04 27.32 $ 15.00 0. 10 $ 122.43 $ $ 1 .26 1 .67 15.00 9.74 27.67 $ $ 77.74 $ $ 2 . 59/LB. KLEINGRASS SEED ACRE $ 94.76 $ ESTABLISHMENT COSTS PRORATED OVER 10 YEARS, INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C18.23 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 862 B-1241(C18) KLEINGRASS PASTURE, DRYLAND, COASTAL BEND REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER 4R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 2 , 3 1 J U LY 0 . 5 0 TOTALS APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 0. 105 0.079 1.08 0.55 0.0 1.86 3.50 0.105 0.079 1.08 0.55 0.0 1 .86 3.50 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF KLEINGRASS SEED (DOLLARS) LB. QUANTITY OF KLEINGRASS SEED 24.00 j 27.00 | 6.90 4.60 5.18 5.75 6.32 61.83 75.63 89.43 103 23 r 11 7 . 0 3 | 74.88 90.40 105.93 121 45 136.98 | T 30.00 j 33.00 | 87.93 105.18 122.43 139 68 156.93 | 100.98 11 9 . 9 5 138.93 157 90 176.88 ! 36.00 | 11 4 . 0 3 134.73 155.43 176 13 196.83 | i C18.24 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, 864 COASTAL BERMUDAGRASS PASTURE, DRYLAND, TEXAS COASTAL BEND REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY PROJECTED YIELD UNIT GROSS RECEIPTS GRAZING TOTAL PROJECTED RETURNS 4.00 VARIABLE COSTS PREHARVEST COSTS ♦NITROGEN ♦PHOSPHOROUS FERTILIZER APPL FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS SUBTOTAL. HARVEST YOUR ESTIMATE PROJECTED S/UNIT VALUE AUM 6.00 LB. LB. APPL ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 0.20 0.25 2.75 $ 24.00 24.00 $ $ 12.00 7.50 2.75 0.0 0.75 0.0 0. 10 0.0 1.47 2.40 26.96 $ INPUT USE 60.00 30.00 1.00 0.0 0.28 17. 11 TOTAL VARIABLE COSTS BREAK-EVEN PRICE. VARIABLE COSTS JfP^ B-124KC18) ACRE $ ACRE $ $ ACRE FIXED COSTS DEPREC..INTEREST.TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 PRORATED ESTABL 109.00 TOTAL FIXED COSTS ACRE ACRE ACRE DOL. ACRE TOTAL PROJECTED COSTS ACRE NET PROJECTED RETURNS 0.0 $ 26.96 $ 6 . 74/AUM GRAZING INCOME ABOVE VARIABLE COSTS BREAK-EVEN PRICE. TOTAL COSTS 5.25 5.25 0. 140 15.00 0.10 $ -2.96 $ $ 0.0 0.71 15.00 10.90 26.61 S $ 53.58 $ $ 1 3 . 39/AUM GRAZING ACRE $ -29.58 $ ESTABLISHMENT COSTS PRORATED OVER TEN YEARS INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. Afy\ C18.25 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 864 B-124KC18) COASTAL BERMUDAGRASS PASTURE. DRYLAND. TEXAS COASTAL BEND REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACH MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS TOTALS 0.0 0.0 0.0 0.0 APPL. MACH TOTAL INPUT FIXED OPER. COSTS COSTS COST 0.0 0.0 0.0 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF GRAZING (DOLLARS) 4.80 5.40 6.00 6.60 7.20 3.20 11 . 6 0 9.68 -7.76 -5.84 ■3 . 9 2 3.60 -9.68 7.52 -5.36 -3.20 •1 .04 4.00 -7.76 5.36 -2.96 -0.56 1.84 4.40 -5.84 3.20 -0.56 2.08 4.72 4.80 -3.92 1.04 1.84 4.72 7.60 AUM QUANTITY OF GRAZING NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT. GRAZE-OUT. OR OTHER MANAGEMENT STRATEGIES. C18.26 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 866 j0&*\ B-124KC18) BUFFEL GRASS ESTAB., DRYLAND, TEXAS COASTAL BEND REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY PROJECTED YIELD UNIT 1. GROSS RECEIPTS TOTAL PROJECTED RETURNS IPROJECTED VALUE S/UNIT $ 2. VARIABLE COSTS PREHARVEST COSTS ♦BUFFEL GRASS SD BRUSH CLEARING FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR-- MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS SUBTOTAL, HARVEST 0.0 YOUR ESTIMATE $ INPUT USE 4.00 1.00 0.65 0.21 90.61 LB. ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 3 .25 75 .00 5 .25 5 .25 0. 140 $ 13.00 75.00 4.93 0.56 1.38 0.53 3.43 1.10 12.69 112.62 $ ACRE $ ACRE $ 3. INCOME ABOVE VARIABLE COSTS ACRE $ - 11 2 . 6 2 $ 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1 .00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE $ 7.85 5.37 15.00 28.22 $ 5. TOTAL PROJECTED COSTS ACRE $ 140.84 $ 6. NET PROJECTED RETURNS ACRE $ -140.84 $ TOTAL VARIABLE COSTS 15 .00 0.0 $ 112.62 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C18.27 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 866 B-124KC18) BUFFEL GRASS ESTAB.. DRYLAND, TEXAS COASTAL BEND REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION TANDEM DISC 6R BROADCAST SEEDER CULTIPACKER TOTALS MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 2.36 MAR 2.34 APR 2.39 APR 2.00 1.00 1.00 0.292 0.135 0.227 0.221 0.103 0. 172 3. 11 1.39 2.27 1.53 0.71 1. 19 0.0 13.00 0.0 6.96 2.43 3.30 11.60 17.53 6.76 0.654 0.495 6.76 3.43 13.00 12.69 35.89 '"388\ ^OV C18.28