722

advertisement
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-26-84
722
B-124KC15)
OAT HAY, DRYLAND, TEXAS BLACKLAND REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
PROJECTED
YIELD
UNIT
GROSS RECEIPTS
HAY
SM. GR. PASTURE
TOTAL PROJECTED RETURNS
2.00
2.00
VARIABLE COSTS
PREHARVEST COSTS
♦SEED OATS
♦NITROGEN
♦PHOSPHORUS
FERTILIZER APPLI
♦SEVIN
FUEL & LUBE--TRACTOR
EQUIPMENT
R E PA I R S T R A C T O R
EQUIPMENT
LABOR MACHINERY
EQUIPMENT
OPERATING CAPITAL
SUBTOTAL, PREHARVEST
HARVEST COSTS
CUSTOM BALING
CUSTOM BALE HAUL
SUBTOTAL. HARVEST
PROJECTED
S/UNIT
VALUE
YOUR
ESTIMATE
TON
AUM
75.00
0.0
$
150.00
0.0
150.00 $
LB.
LB.
LB.
ACRE
LB.
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
ACRE
0. 13
0.22
0.24
2.75
1.95
4.50
4.00
0.077
$
10.40
19.80
7.20
5.50
0.97
5.01
1 .69
0.90
2.08
4.99
2.80
1.58
62.92 $
INPUT USE
80.00
90.00
30.00
2.00
0.50
1.11
0.70
20.53
67.00
67.00
TOTAL VARIABLE COSTS
BALE
BALE
ACRE
0.65
0.36
ACRE
BREAK-EVEN PRICE, VARIABLE COSTS
$
43.55
24. 12
67.67 $
$
130.59 $
$ 65.29/TON HAY
INCOME ABOVE VARIABLE COSTS
ACRE
FIXED COSTS
DEPREC..INTEREST,TAXES & INSUR.
TRACTOR
EQUIPMENT
LAND NET SHARE-RENT
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
$
7..94
6,.54
16,.44
30 .92 $
TOTAL PROJECTED COSTS
ACRE
$
161 ,.51 $
$ 80. 76/TON
HAY
ACRE
$
BREAK-EVEN PRICE, TOTAL COSTS
NET PROJECTED RETURNS
$
19.41
$
-11 .51 $
LAND RENT BASED ON 33% OF GROSS INCOME LESS 33% OF FERT., BALING AND
HAULING.
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
C15.21
B-1241(C15)
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-26-84
OAT HAY. DRYLAND, TEXAS BLACKLAND REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
722
MACHINERY
OPERATION
CHISEL
DISK
DISK
DRILL
SPRAYER
MACH
ITEM OPER TIMES LABOR MACHINE OPER LABOR
NO. MONTH OVER HOURS HOURS COSTS COSTS
7,30
7,34
7,34
8,36
5,48
AUG
AUG
SEPT
SEPT
OCT
TOTALS
1.00
1.00
1.00
1.00
0.50
APPL. MACH
INPUT FIXED
COSTS COSTS
TOTAL
OPER.
COST
176
0.233 ' 0.0.170
0.224
0.224 0. 170
0.344 0.260
0.084 0.063
1.67
1.68
1.68
2.24
0.40
1.05
1.01
1.01
1.55
0.38
0.0
0.0
0.0
10.40
0.97
2.63
2.64
2.64
4.20
0.52
5.35
5.33
5.33
18.39
2.27
1. 109
7.67
4.99
11.37 1.2.64
36.67
0.840
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF HAY
(DOLLARS)
60.00
67.50
75.00
82.50
90.00
1 .60
24 14
-16.10
-8.06
-0.02
8.02
1.80
20 64
-11.59
-2.55
6.50
15.54
2.00
17 13
-7.08
2.97
13.02
23.07
2.20
13 63
-2.57
8.48
19.54
30.59
2.40
10 12
1.94
14.00
26.06
38. 12
TON
QUANTITY OF
HAY
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT
STRATEGIES.
^
C15.22
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-26-84
724
B-124KC15)
SMALL GRAIN GRAZING, DRYLAND
TEXAS BLACKLAND REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
PROJECTED
YIELD
UNIT
GROSS RECEIPTS
SM. GR. PASTURE
TOTAL PROJECTED RETURNS
7.00
VARIABLE COSTS
PREHARVEST COSTS
♦SEED OATS
♦RYEGRASS SEED
♦NITROGEN
♦PHOSPHORUS
FERTILIZER APPLI
♦SEVIN
FUEL & LUBE--TRACTOR
EQUIPMENT
R E PA I R S T R A C T O R
EOUIPMENT
LABOR MACHINERY
EQUIPMENT
OPERATING CAPITAL
SUBTOTAL, PREHARVEST
HARVEST COSTS
SUBTOTAL, HARVEST
PROJECTED
VALUE
S/UNIT
AUM
0.0
LB.
LB.
LB.
LB.
ACRE
LB.
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
ACRE
0. 13
0.25
0.22
0.24
2.75
1.95
$
0.0
0.0
YOUR
ESTIMATE
$
INPUT USE
90.00
20.00
140.00
80.00
2.00
0.50
0.89
0.56
54.85
TOTAL VARIABLE COSTS
BREAK-EVEN PRICE, VARIA BLE COSTS
$
ACRE
$
0.0
$
92.66 $
$ 13. 24/AUM SM.. GR. P/kSTURE
ACRE
FIXED COSTS
DEPREC.,INTEREST,TAXES & INSUR.
TRACTOR
EQUIPMENT
LAND-CASH RENT
1.00
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
TOTAL PROJECTED COSTS
ACRE
NET PROJECTED RETURNS
$
ACRE
INCOME ABOVE VARIABLE COS TS
BREAK-EVEN PRICE, TOTAL COSTS
4.50
4.00
0.077
11 .70
5.00
30.80
19.20
5.50
0.97
4.50
1.35
1 . 12
2.04
4.02
2.24
4.22
92.66 $
15.00
$
-92.66 $
$
9. 11
6.49
15.00
30.60 $
$
123.26 $
$ 17. 61/AUM SM,. GR. P/»STURE
ACRE
$ ■■123.26 $
LAND RENT BASED ON RENTAL RATES IN REGION.
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
C15.23
B-1241(C15)
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-26-84
SMALL GRAIN GRAZING, DRYLAND
TEXAS BLACKLAND REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
724
MACHINERY
OPERATION
CHISEL
DISK
DISK
DRILL
SPRAYER
MACH
ITEM OPER TIMES LABOR MACHINE OPER LABOR
NO. MONTH OVER HOURS HOURS COSTS COSTS
2.31
2.35
2.35
4,36
5,48
AUG
AUG
SEPT
SEPT
OCT
TOTALS
1.00
1.00
1.00
1.00
0.50
APPL. MACH
INPUT FIXED
COSTS COSTS
TOTAL
OPER.
COST
0. 159
0.153
0.153
0.344
0.084
0. 121
0. 116
0. 116
0.260
0.063
1.47
1.62
1.62
2.29
0.40
0.72
0.69
0.69
1.55
0.38
0.0
0.0
0.0
16.70
0.97
2.79
2.79
2.79
5.24
0.52
4.98
5. 10
5. 10
25.78
2.27
0.894
0.677
7.40
4.02
17.67 14. 12
43.22
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF SM. GR, PASTURE
(DOLLARS)
QUANTITY OF
SM. GR. PASTURE
15.88
10.59
11.91
13.24
14.56
-33.36
-25.95
-18.53
-11. 12
r
-3.71 j
-25.95
-17.61
-9.27
-0.93
7.41 |
7.00 j
-18.53
7.70 | - 1 1 . 1 2
8.40 j
-3.71
-9.27
0.0
9.27
18.53 j
AUM
.,
5.60 |
6.30 j
-0.93
9.27
19.46
29.65 !
7.41
18.53
29.65
40.77 |
|
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT
STRATEGIES.
C15.24
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-26-84
726
# ^
B-124KC15)
SUDAN PASTURE, DRYLAND
TEXAS BLACKLAND REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
PROJECTED
YIELD
UNIT
1. GROSS RECEIPTS
TOTAL PROJECTED RETURNS
PROJECTED
S/UNIT
VALUE
$
2. VARIABLE COSTS
PREHARVEST COSTS
♦FORAGE SORG SEED
♦NITROGEN
♦PHOSPHORUS
FERTILIZER APPLI
FUEL & LUBE--TRACTOR
EQUIPMENT
R E PA I R S T R A C T O R
EQUIPMENT
LABOR MACHINERY
EQUIPMENT
OPERATING CAPITAL
SUBTOTAL. PREHARVEST
HARVEST COSTS
SUBTOTAL. HARVEST
0.0
YOUR
ESTIMATE
$
INPUT USE
50.00
90.00
40.00
2.00
1.09
0.49
28.85
TOTAL VARIABLE COSTS
LB.
LB.
LB.
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
ACRE
0.28
0.22
0.24
2.75
4.50
4.00
0.077
$
14.00
19.80
9.60
5.50
5.78
1. 18
1 .43
2.09
4.92
1 .96
2.22
68.49 $
ACRE
$
ACRE
$
68.49 $
$
-68.49 $
$
12.25
7. 16
15.00
34.42 $
102.91 $
0.0
$
3 . INCOME ABOVE VARIABLE COSTS
ACRE
4 . FIXED COSTS
DEPREC..INTEREST,TAXES & INSUR.
TRACTOR
EQUIPMENT
LAND-CASH RENT
1.00
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
5. TOTAL PROJECTED COSTS
ACRE
$
6 . NET PROJECTED RETURNS
ACRE
$ -102.91 $
15 .00
LAND RENT BASED ON RENTAL RATES IN REGION.
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
C15.25
PROJECTIONS FOR PLANNING PURPOSES ONLY B-1241(C15)
NOT TO BE USED WITHOUT UPDATING AFTER 11-26-84.
726
SUDAN
MACHINERY
OPERATION
CHISEL
DISK
DISK
DRILL
SHREDDER
TOTALS
PA S T U R E ,
DRYLAND
TEXAS BLACKLAND REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
MACH
ITEM OPER TIMES LABOR MACHINE OPER LABOR
NO. MONTH OVER HOURS HOURS COSTS COSTS
2,31
2,35
2,35
4,36
3,44
SEPT
NOV
MAR
MAR
AUG
1.00
1.00
1.00
1.00
1.00
APPL. MACH
INPUT FIXED
COSTS COSTS
TOTAL
OPER.
COST
0. 159
0. 153
0. 153
0.344
0.283
0. 121
0. 116
0. 116
0.260
0.214
1.47
1.62
1.62
2.29
2.09
0.72
0.69
0.69
1.55
1.27
0.0
0.0
0.0
14.00
0.0
2.79
2.79
2.79
5.24
4.52
4.98
5. 10
5. 10
23.08
7.88
1 .093
0.828
9.09
4.92
14.00 18. 13
46. 13
C15.26
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-26-84
728
g^\
B-1241(C15)
SUDAN HAY, DRYLAND
TEXAS BLACKLAND REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
PROJECTED
YIELD
UNIT
GROSS RECEIPTS
SORGHUM HAY
TOTAL PROJECTED RETURNS
5.00
VARIABLE COSTS
PREHARVEST COSTS
♦FORAGE SORG SEED
♦NITROGEN
-PHOSPHORUS
FERTILIZER APPLI
FUEL & LUBE--TRACTOR
EQUIPMENT
R E PA I R S T R A C T O R
EOUIPMENT
LABOR MACHINERY
EQUIPMENT
OPERATING CAPITAL
SUBTOTAL, PREHARVEST
HARVEST COSTS
CUSTOM BALING
CUSTOM BALE HAUL
SUBTOTAL, HARVEST
TON
PROJECTED
S/UNIT VALUE
YOUR
ESTIMATE
80.00 400.00
$ 400.00 $
INPUT USE
50.00
100.00
40.00
2.00
0.81
0.49
-35.82
167.00
167.00
TOTAL VARIABLE COSTS
BREAK-EVEN PRICE, VARIA BLE COSTS
LB.
LB.
LB.
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
ACRE
0.28
0.22
0.24
2.75
14.00
22.00
9.60
5.50
4.33
1. 18
1.08
1.82
4.50
3.64
4.00
1.96
0.077 -2.76
$ 62.35 $
BALE
BALE
ACRE
0.65 108.55
0.36 60.12
$ 168.67 $
ACRE
$ 231.02 $
$ 46. 20/TON SORGHUM H/kY
INCOME ABOVE VARIABLE COS TS
ACRE
$ 168.98 $
FIXED COSTS
DEPREC.,INTEREST.TAXES & INSUR.
TRACTOR •
EQUIPMENT
LAND-CASH RENT
1.00
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
8.70
6 19
15.00 15! 00
$ 29.90 $
TOTAL PROJECTED COSTS
ACRE
$ 260.92 $
BREAK-EVEN PRICE. TOTAL COSTS
NET PROJECTED RETURNS
$ 52. 18/TON SORGHUM H/,Y
ACRE
$ 139.08 $
LAND RENT BASED ON RENTAL RATES IN REGION.
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
C15.27
B-124KC15)
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-26-84
728
SUDAN HAY. DRYLAND
TEXAS BLACKLAND REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
MACHINERY
OPERATION
DISK
DISK
DRILL
CHISEL
MACH
ITEM OPER TIMES LABOR MACHINE OPER LABOR
NO. MONTH OVER HOURS HOURS COSTS COSTS
2.35
2,35
4,36
2,31
NOV
MAR
MAR
SEPT
TOTALS
1.00
1.00
1.00
1.00
APPL. MACH
INPUT FIXED
COSTS COSTS
TOTAL
OPER.
COST
0. 153
0. 153
0.344
0. 159
0. 116
0. 116
0.260
0. 121
1.62
1 .62
2.29
1.47
0.69
0.69
1.55
0.72
0.0
0.0
14.00
0.0
2.79
2.79
5.24
2.79
5. 10
5. 10
23.08
4.98
0.810
0.614
7.00
3.64
14.00 13.61
38.25
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF SORGHUM HAY
(DOLLARS)
64 00
72.00
80.00
88 00
96 00
4.00
58 71
90.71
122.71
154 71
186 71 j
4.50
73 84
109.84
145.84
181 84
217 84 j
5.00
88 98
128.98
168.98
208 98
248 98 |
5.50
104 11
148.11
192.11
236 11
280 11 j
119 24
167.24
215.24
263 24
311 24 j
TON
QUANTITY OF
SORGHUM HAY
6.00
j
^
C15.28
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-26-84,
730
m*s
B-124KC15)
HARD WINTER WHEAT, DRYLAND, TEXAS BLACKLAND REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
PROJECTED
YIELD
UNIT
1. GROSS RECEIPTS
WHEAT
DEFICIENCY PMT.
TOTAL PROJECTED RETURNS
35.00
35.00
2. VARIABLE COSTS
PREHARVEST COSTS
♦SEED
NITROGEN
PHOSPHORUS
FERTILIZER APPLI
RHONOX
HERB. APPLI.
FUEL & LUBE--TRACTOR
R E PA I R S T R A C T O R
EQUIPMENT
LABOR MACHINERY
OPERATING CAPITAL
SUBTOTAL. PREHARVEST
HARVEST COSTS
CUSTOM HARVEST
HAUL WHEAT
SUBTOTAL, HARVEST
PROJECTED
VALUE
S/UNIT
YOUR
ESTIMATE
BU.
BU.
3.40
1.08
$
119.00
37.80
156.80 $
LB.
LB.
LB.
ACRE
PINT
APPL
ACRE
ACRE
ACRE
HOUR
DOL.
ACRE
0.20
0.22
0.24
2.75
2.30
2.75
4.50
0.077
$
20.00
17.60
12.00
5.50
1.54
2.75
5.81
1.64
1.67
4.94
2.20
75.65 $
ACRE
BU.
ACRE
12.00
0. 12
$
12.00
4.20
16.20 $
ACRE
$
91.85 $
$
WHEAT
INPUT USE
100.00
80.00
50.00
2.00
0.67
1.00
1. 10
28.54
1.00
35.00
TOTAL VARIABLE COSTS
BREAK-EVEN PRICE. VARIABLE COSTS
1 . 54/BU,
3. INCOME ABOVE VARIABLE COSTS
ACRE
4. FIXED COSTS
DEPREC..INTEREST.TAXES & INSUR.
TRACTOR
EOUIPMENT
LAND---NET SHARE-RENT
TOTAL FIXED COSTS
5. TOTAL PROJECTED COSTS
BREAK-EVEN PRICE. TOTAL COSTS
6. NET PROJECTED RETURNS
$
64.95 $
ACRE
ACRE
ACRE
ACRE
$
9.91
5.80
34.81
50.53 $
ACRE
$
142.38 $
$ 2 . 99/BU
WHEAT
ACRE
$
14.42 $
LAND RENT IS BASED ON 33% OF GROSS INCOME LESS 33% OF FERTILIZER,
HARVEST & HAUL. MARKET PRICE BASED ON LOAN RATE. DEFICIENCY
PAYMENT BASED ON COMPLIANCE WITH FARM SET ASIDE PROGRAM.
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
C15.29
P R O J E C T I O N S F O R P L A N N I N G P U R P O S E S O N LY B - 1 2 4 1 ( C 1 5 )
NOT TO BE USED WITHOUT UPDATING AFTER 11-26-84.
730
HARD WINTER WHEAT, DRYLAND, TEXAS BLACKLAND REGION
1985 PROJECTED COSTS AND RETURNS PER ACRE
MACHINERY
OPERATION
SHREDDER
DISK
CHISEL
CHISEL
DRILL
MACH
ITEM OPER
TIMES LABOR MACHINE OPER
LABOR
NO. MONTH OVER HOURS HOURS COSTS COSTS
3,44
1,35
1.31
1 ,31
5,36
AUG
AUG
AUG
SEPT
OCT
1.00
1.00
1.00
1.00
1.00
TOTALS
0.283
0. 153
0. 159
0. 159
0.344
0.214
1 .099
APPL. MACH
INPUT FIXED
COSTS COSTS
0.0
0.0
0.0
0.0
TOTAL
OPER.
COST
0. 121
0. 121
0.260
2.09
1 .93
1.79
1.79
1.54
1.27
0.69
0.72
0.72
1.55
20.00
4.52
2.26
2.25
2.25
4.43
7.88
4.88
4.75
4.75
27.52
0.832
9. 12
4.94
2 0 . 0 0 15.71
49.78
0. 116
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF WHEAT
(DOLLARS)
BU.
28.00
QUANTITY OF
WHEAT
2.72
|
-3.07
j
5.56
35.00 |
14.19
38.50 |
42.00 |
22.82
31.50
3.06
3.40
3.74
3.31
9.69
16.07
r
22.44 |
12.74
19.91
27.09
34.26 j
22. 16
30.14
38. 11
46.08 |
31.59
40.36
49. 13
57.90 !
41.02
50.58
60. 15
69.72 !
1
i
,.
31.45
,.
4.08
_
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT
STRATEGIES.
^ \
C15.30
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-26-84
731
B-1241(C15)
CORN FOLLOWING COTTON.TEXAS BLACKLAND REGION
CONSERVATION TILLAGE
1985 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
1. GROSS RECEIPTS
CORN
DEFICIENCY PMT.
TOTAL PROJECTED RETURNS
2. VARIABLE COSTS
PREHARVEST COSTS
♦SEED
♦NITROGEN
♦PHOSPHORUS
♦NITROGEN (LIQ)
FERTILIZER APPLI
♦BICEP
♦POTASSIUM
♦FURADAN
FUEL & LUBE--TRACTOR
R E PA I R S T R A C T O R
EQUIPMENT
LABOR - -MACHINERY
OPERATING CAPITAL
SUBTOTAL, PREHARVEST
HARVEST COSTS
CUSTOM HARVEST
HAUL CORN
SUBTOTAL, HARVEST
PROJECTED
YIELD
UNIT
70.00
70.00
BU.
BU.
PROJECTED
VALUE
S/UNIT
2.80
0.47
YOUR
ESTIMATE
$
196.00
32.90
228.90 $
$
22.08
6.60
14.40
24.96
8.25
8.32
7.20
10.50
4.86
1.23
2.38
3.65
3.64
1 18.07 $
$
15.00
9.80
24.80 $
$
142.87 $
INPUT USE
16.00
30.00
60.00
96.00
3.00
0.40
30.00
7.00
0.81
47.28
1.00
70.00
TOTAL VARIABLE COSTS
LB.
LB.
LB.
LB.
ACRE
GAL.
LB.
LB.
ACRE
ACRE
ACRE
HOUR
DOL.
ACRE
ACRE
BU.
ACRE
ACRE
BREAK-EVEN PRICE, VARIABLE COSTS
ACRE
4. FIXED COSTS
DEPREC..INTEREST.TAXES & INSUR.
TRACTOR
EQUIPMENT
LAND NET SHARE-RENT
TOTAL FIXED COSTS
5. TOTAL PROJECTED COSTS
6. NET PROJECTED RETURNS
4.50
0.077
15.00
0. 14
$ 1 . 57/BU. CORN
3. INCOME ABOVE VARIABLE COSTS
BREAK-EVEN PRICE. TOTAL COSTS
1.38
0.22
0.24
0.26
2.75
20.80
0.24
1.50
$
86.03 $
ACRE
ACRE
ACRE
ACRE
$
10.63
4. 16
43.62
58.41 $
ACRE
$
201.28 $
$ 2 . 41/BU. CORN
ACRE
$
27.62 $
LAND RENT BASED ON 33% OF GROSS INCOME LESS 33% OF FERT..INSECT..HARVEST/HAUL.
GOVERNMENT PAYMENT NOT INCLUDED.
ONE 50 LB. BAG OF SEED CORN CONTAINS 80000 KERNALS.
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
C15.31
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-26-84.
731
B-124KC15)
CORN FOLLOWING COTTON,TEXAS BLACKLAND REGION
CONSERVATION TILLAGE
1985 PROJECTED COSTS AND RETURNS PER ACRE
MACHINERY
OPERATION
SHREDDER
DISK
SWEEP CULTIVATOR
ROLLING CULTIV.
PLANTER
SWEEP CULTIVATOR
MACH
ITEM OPER TIMES LABOR MACHINE OPER LABOR
NO. MONTH OVER HOURS HOURS COSTS COSTS
3,44
34
2,32
2,47
2,42
2.32
OCT
OCT
NOV
DEC
FEB
MAR
TOTALS
1.00
1.00
1.00
1.00
1.00
1.00
0.283
0.0
0. 131
0.085
0. 181
0. 131
0.214
0. 170
0.099
0.064
0. 137
0.099
2.09
0.33
1.32
0.85
2.57
1.32
0.811
0.785
8.47
1 .27
0.0
0.59
0.38
0.82
0.59
3.65
APPL. MACH
INPUT FIXED
COSTS COSTS
0.0
0.0
0.0
0.0
TOTAL
OPER.
COST
4.52
0.63
2.08
1.33
4. 16
2.08
7.88
0.96
3.98
2.56
48.44
3.98
4 0 . 9 0 14.79
67.81
40.90
0.0
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF CORN
(DOLLARS)
BU.
QUANTITY OF
CORN
2.24
2.52
2.80
3.08
13.05
23.56
r
34.06 j
T
3.36
56.00
|
-7.96
2.55
63.00
|
4.09
15.91
27.73
39.55
51.37 j
70.00 |
77.00 j
16.15
29.28
42.41
55.54
68.67 J
28.20
42.64
57.09
71.53
85.98 j
84.00 j
40.25
56.01
71 .77
87.53
103.29 j
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT. GRAZE-OUT. OR OTHER MANAGEMENT
STRATEGIES.
s*S\
C15.32
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-26-84.
732
B-124KC15)
COTTON FOLLOWING CORN,TEXAS BLACKLAND REGION
CONSERVATION TILLAGE
1985 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
PROJECTED
YIELD
UNIT
1. GROSS RECEIPTS
COTTON LINT
COTTONSEED
DEFICIENCY PMT.
TOTAL PROJECTED RETURNS
400.00
0.33
400.00
2. VARIABLE COSTS
PREHARVEST COSTS
♦SEED
♦NITROGEN
♦PHOSPHORUS
♦TREFLAN
♦CAPAROL
♦BIDRIN
♦CYGON
♦GALECRON
INSECT. APPLI.
♦NITROGEN (LIQ)
♦POTASSIUM
♦ROUNDUP
♦DUAL
FERTILIZER APPLI
FUEL & LUBE--TRACTOR
R E PA I R S T R A C T O R
EQUIPMENT
LABOR -MACHINERY
OPERATING CAPITAL
SUBTOTAL, PREHARVEST
HARVEST COSTS
♦DESICCANT
STRIP & HAUL
GIN. BAG, TIES
♦ARSENIC ACID
FUEL & LUBE--TRACTOR
R E PA I R S T R A C T O R
EQUIPMENT
LABOR MACHINERY
SUBTOTAL, HARVEST
PROJECTED
S/UNIT VALUE
LB.
TON
LB.
0.55 220.00
100.00 33.00
0.19 76.00
$ 329.00 $
LB.
LB.
LB.
QT.
LB.
LB.
OZ.
APPL
APPL
LB.
LB.
GAL.
PINT
ACRE
ACRE
ACRE
ACRE
HOUR
DOL.
ACRE
0.51
9.18
0.22
5.28
0 . 2 4 11 . 5 2
6.00
6.00
7.20
7.20
7.20
2.70
0.22
0.88
1.67
5.01
2.75
8.25
0.26
8.32
0.24
5.76
100.00 3.00
5.71
5.71
2.75
5.50
10.09
2.54
4.58
4.50
7.81
0.077
2.95
$ 11 2 . 2 8 $
GAL.
CWT.
CWT.
GAL.
ACRE
ACRE
ACRE
HOUR
ACRE
9.50
4.75
1.55 27.90
2.25 40.50
10.50
5.25
1.72
0.42
0.75
4.50
1.51
$ 82.80 $
ACRE
$ 195.08 $
YOUR
ESTIMATE
INPUT USE
18.00
24.00
48.00
1.00
1.00
0.38
4.00
3.00
3.00
32.00
24.00
0.03
1.00
2.00
1 .74
38.38
0.50
18.00
18.00
0.50
0.34
TOTAL VARIABLE COSTS
BREAK-EVEN PRICE, VARIA BLE COSTS
$ 0 . 22/LB. COTTON LINJT
3. INCOME ABOVE VARIABLE COS TS
ACRE
$ 133.92 $
4. FIXED COSTS
DEPREC..INTEREST.TAXES & INSUR.
TRACTOR
EQUIPMENT
LAND NET SHARE-RENT
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
$
26.74
5.50
58.82
91.06 $
5. TOTAL PROJECTED COSTS
ACRE
$ 286.14 $
BREAK-EVEN PRICE, TOTAL COSTS
6. NET PROJECTED RETURNS
$ 0 . 44/LB. COTTON LINJT
ACRE
$
42.86 $
LAND RENT IS BASED ON 25% OF GROSS INCOME LESS 25% OF
FERTILIZER.INSECTICIDE,GIN-BAG-TIES
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
C15.33
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-26-84.
732
B-1241(C15)
COTTON FOLLOWING CORN,TEXAS BLACKLAND REGION
CONSERVATION TILLAGE
1985 PROJECTED COSTS AND RETURNS PER ACRE
/■■^i
MACHINERY
OPERATION
ROLLING CULTIV.
SPRAYER
ROLLING CULTIV.
PLANTER
SPRAYER
SWEEP CULTIVATOR
ROPE WICK
SPRAYER
SWEEP CULTIVATOR
ROPE WICK
DISK
SPRAYER
MACH
ITEM OPER TIMES LABOR MACHINE OPER LABOR
NO. MONTH OVER HOURS HOURS COSTS COSTS
2.47
3,48
2,47
2,42
3,48
2,32
51
3,48
2,32
51
2,35
3,48
NOV
NOV
FEB
APR
APR
MAY
MAY
MAY
JUNE
JUNE
SEPT
SEPT
TOTALS
1.00
1.00
1.00
1.00
1.00
2.00
1.00
3.00
1.00
1.00
1.00
2.00
APPL. MACH
INPUT FIXED
COSTS COSTS
TOTAL
OPER.
COST
1.33
2.33
1.33
4. 16
2.33
4. 16
0.05
6.99
2.08
0.05
2.79
4.66
2.56
10.53
2.56
16.72
17.44
7.97
2. 11
17. 17
3.98
1.11
5. 10
19.06
0.085
0. 168
0.085
0. 181
0.168
0.262
0.0
0.503
0. 131
0.0
0. 153
0.335
0.064
0. 127
0.064
0.137
0. 127
0. 198
0.064
0.381
0.099
0.064
0. 116
0.254
0.85
1 .45
0.85
2.57
1.45
2.63
0.06
4.34
1.32
0.06
1.62
2.89
0.38
0.75
0.38
0.82
0.75
1. 18
0.0
2.26
0.59
0.0
0.69
1.51
0.0
6.00
0.0
9. 18
12.91
0.0
2.00
3.58
0.0
1.00
0.0
10.00
2.071
1.698
20. 10
9.32
44.67 32.24 106.32
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF COTTON LINT
(DOLLARS)
0.44
0.49
0.55
0.60
0.66
320.00
13 01
26 21
39 41
52 61
65 81
360.00
27 55
42 40
57 25
72 10
86 95
400.00
42 10
58 60
75 10
91 60
108 10
440.00
56 65
74 .80
92 95
111 10
129 25
480.00
71 2 0
91 00
110 80
130 60
150 4 0
LB.
QUANTITY OF
COTTON LINT
C15.34
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-26-84.
733
B-1241(C15)
SORGHUM FOLLOWING COTTON,TEXAS BLACKLAND REGION
CONSERVATION TILLAGE
1985 PROJECTED COSTS AND RETURNS PER ACRE
C AT E G O RY
PROJECTED
YIELD
UNIT
1. GROSS RECEIPTS
SORGHUM
DEFICIENCY
P M T.
TOTAL PROJECTED RETURNS
38.00
38.00
2. V A R I A B L E C O S T S I N P U T U S E
PREHARVEST COSTS
♦SEED
6.00
♦NITROGEN
24.00
♦PHOSPHORUS
48.00
♦NITROGEN
(LIQ)
64.00
FERTILIZER
APPLI
2.00
♦MILOGUARD
0.80
♦ P O TA S S I U M
24.00
♦FURADAN
6.00
♦ROUNDUP
0.02
♦ E T H Y L PA R AT H I O N 1 . 0 0
FUEL & LUBE--TRACTOR
R E PA I R S T R A C T O R
EQUIPMENT
LABOR
MACHINERY 1.06
O P E R AT I N G C A P I TA L 2 3 . 9 5
SUBTOTAL, PREHARVEST
HARVEST COSTS
CUSTOM HARVEST 38.00
HAULING
38.00
SUBTOTAL, HARVEST
TOTAL VARIABLE COSTS
PROJECTED
S/UNIT VALUE
CWT.
CWT.
4.40 167.20
0.82 31.16
$ 198.36 $
LB.
LB.
LB.
LB.
ACRE
LB.
LB.
LB.
GAL.
LB.
ACRE
ACRE
ACRE
HOUR
DOL.
ACRE
0.75
4.50
0.22
5.28
0 . 2 4 11 . 5 2
0.26 16.64
2.75
5.50
3.50
2.80
0.24
5.76
1.50
9.00
100.00 2.00
2.05 2 .05
6. 15
1 .55
3.01
4.50
4.78
0.077
1.84
$ 82.38 $
CWT.
CWT.
ACRE
0.45
0.20
$
ACRE
BREAK-EVEN PRICE, VARIABLE COSTS
ACRE
4. FIXED COSTS
DEPREC..INTEREST,TAXES & INSUR.
TRACTOR
EOUIPMENT
LAND NET SHARE-RENT
TOTAL FIXED COSTS
5 . TOTAL PROJECTED COSTS
NET PROJECTED RETURNS
17.10
7.60
24.70 $
$ 107.08 $
$ 2 . 00/CWT. SORGHUM
3. INCOME ABOVE VARIABLE COSTS
BREAK-EVEN PRICE. TOTAL COSTS
YOUR
ESTIMATE
$
91.28 $
ACRE
ACRE
ACRE
ACRE
$
13.78
4.55
38.91
57.24 $
ACRE
$ 164.32 $
$ 3.50/CWT. SORGHUM
ACRE
$
34.04
$
LAND RENT IS BASED ON 33% OF GROSS INCOME LESS 33% OF
FERTILIZER.INSECTICIDE,HARVEST AND HAUL.
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
C15.35
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-26-84.
733
B-124KC15)
SORGHUM FOLLOWING COTTON,TEXAS BLACKLAND REGION
CONSERVATION TILLAGE
1985 PROJECTED COSTS AND RETURNS PER ACRE
MACHINERY
OPERATION
SHREDDER
DISK
SWEEP CULTIVATOR
ROLLING CULTIV.
PLANTER
SPRAYER
SWEEP CULTIVATOR
ROPE WICK
SPRAYER
MACH
ITEM OPER TIMES LABOR MACHINE OPER LABOR
NO. MONTH OVER HOURS HOURS COSTS COSTS
3,44
34
2,32
2,47
2,42
3,48
2,32
51
3,48
OCT
OCT
NOV
DEC
MAR
MAR
APR
APR
JUNE
TOTALS
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
APPL. MACH
INPUT FIXED
COSTS COSTS
TOTAL
OPER.
COST
0.283
0.0
0. 131
0.085
0. 181
0. 168
0. 131
0.0
0.084
0.214
0. 170
0.099
0.064
0. 137
0. 127
0.099
0.064
0.063
2.09
0.33
1.32
0.85
2.57
1.45
1.32
0.06
0.72
1.27
0.0
0.59
0.38
0.82
0.75
0.59
0.0
0.38
0.0
0.0
0.0
0.0
13.50
2.80
0.0
2.00
2.05
4.52
0.63
2.08
1.33
4. 16
2.33
2.08
0.05
1.16
7.88
0.96
3.98
2.56
21.04
7.33
3.98
2. 11
4.31
1.063
1.039
10.70
4.78
20.35 18.33
54. 17
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF SORGHUM
(DOLLARS)
3.52
3.96
4.40
4.84
5.28
30.40
11 18
20 14
29 10
38.06
47.03
34.20
20 57
30 65
4 0 74
50.82
60.90
38.00
29 97
41
17
52 37
63.57
74.78
41.80
39 36
51 68
64 01
76.33
88.65
45.60
48 76
62 20
75 64
89.09
102.53
CWT.
QUANTITY OF
SORGHUM
^ \
C15.36
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-26-84
734
B-124KC15)
HARD WINTER WHEAT FOLLOWING CORN,TEXAS BLACKLAND REGION
CONSERVATION TILLAGE
1985 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
PROJECTED
YIELD
UNIT
1. GROSS RECEIPTS
WHEAT
DEFICIENCY PMT.
TOTAL PROJECTED RETURNS
35.00
35.00
2. VARIABLE COSTS
PREHARVEST COSTS
♦SEED
♦NITROGEN
♦PHOSPHORUS
FERTILIZER APPLI
♦RHONOX
♦POTASSIUM
♦CYGON
♦NITROGEN (LIQ)
FUEL & LUBE--TRACTOR
R E PA I R S T R A C T O R
EOUIPMENT
LABOR-- MACHINERY
OPERATING CAPITAL
SUBTOTAL, PREHARVEST
HARVEST COSTS
CUSTOM HARVEST
HAUL WHEAT
SUBTOTAL, HARVEST
PROJECTED
VALUE
S/UNIT
BU.
BU.
3.40
1.08
LB."
LB.
LB.
ACRE
PINT
LB.
OZ.
LB.
ACRE
ACRE
ACRE
HOUR
DOL.
ACRE
0.20
0.22
0.24
2.75
2.30
0.24
0.22
0.26
YOUR
ESTIMATE
$
119.00
37.80
156.80 $
$
16.00
5.28
11.52
5.50
1 .54
5.76
2.42
16.64
3.30
0.83
1.05
2.62
1.66
74. 12 $
$
12.00
4.20
16.20 $
$
90.32 $
INPUT USE
80.00
24.00
48.00
2.00
0.67
24.00
11.00
64.00
0.58
21.60
1.00
35.00
TOTAL VARIABLE COSTS
ACRE
BU.
ACRE
ACRE
BREAK-EVEN PRICE, VARIABLE COSTS
$
66.48 $
ACRE
ACRE
ACRE
ACRE
$
7.51
3.71
30.85
42.06 $
ACRE
$
132.39 $
ACRE
4. FIXED COSTS
DEPREC..INTEREST,TAXES & INSUR.
TRACTOR
EQUIPMENT
LAND---NET SHARE-RENT
TOTAL FIXED COSTS
5. TOTAL PROJECTED COSTS •
$
2 . 70/BU. WHEAT
ACRE
6. NET PROJECTED RETURNS
12.00
0. 12
$ 1 . 50/BU. WHEAT
3. INCOME ABOVE VARIABLE COSTS
BREAK-EVEN PRICE, TOTAL dOSTS
4.50
0.077
$
24.41 $
LAND RENT IS BASED ON 33% OF GROSS INCOME LESS 33% OF
FERTILIZER,INSECTICIDE.HARVEST AND HAUL.
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
C15.37
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 11-26-84
B-124KC15)
734 HARD WINTER WHEAT FOLLOWING CORN,TEXAS BLACKLAND REGION
CONSERVATION TILLAGE
1985 PROJECTED COSTS AND RETURNS PER ACRE
MACH
MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR
OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS
APPL. MACH TOTAL
INPUT FIXED OPER.
COSTS COSTS COST
CHISEL 2,31 SEPT 1.00 0.159 0.121 1.47 0.72
F I E L D C U LT I VAT O R 2 , 5 2 O C T 1 . 0 0 0 . 0 7 9 0 . 0 6 0 0 . 8 5 0 . 3 6
DRILL 3,36 OCT 1.00 0.344 0.260 2.86 1.55
0.0 2.79 4.98
0.0 1.33 2.53
16.00 7.09 27.50
0.582 0.441
TOTALS
5 . 1 8 2 . 6 2 1 6 . 0 0 11 . 2 1 3 5 . 0 2
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF WHEAT
(DOLLARS)
2.72
3.06
3.40
3.74
4.08
28.00
2.42
8.80
15. 18
21 56
27 94
31.50
11.05
18.23
25.40
32 58
39 75
35.00
19.68
27.65
35.63
43 60
51 57
38.50
28.31
37.08
45.85
54 62
63 39
42.00
36.94
46.51
56.08
65 64
75 .21
BU.
QUANTITY OF
WHEAT
C15.38
L I S T I N G O F T H E N A M E S E T A N D P R I C E V E C TO R R E G I O N N U M B E R : 1 5 D AT E : 111 5 8 4
CODE ITEM NAME
#^=s
1 MILK
2 EGGS
4 EGGS
10 FEEDER CALVES
13 STEER CALVES
14 HEIFER CALVES
15 CULL HEIFERS
16 DEATH LOSS 2%
17 CULL COWS
20 STOCKER CALVES
22 DAIRY BULL CALVE
27 PULLETTS
34 BROILERS
43 MARKET HOGS
48 DEATH LOSS 2%
49 FEEDER PIGS
70 DEFICIENCY PMT.
71 DEFICIENCY PMT.
72 CORN
73 SORGHUM
74 OATS
76 WHEAT
90 DEFICIENCY PMT.
91 DEFICIENCY PMT.
93 COTTON LINT
94 COTTONSEED
103 SALT & MIN.
105 CREEP FEED
110 RANGE CUBES
111 CONCENTRATES
112 PROT. SUPPLEMENT
122 MILK REPLACER
123 GRAIN MIX
129 FINISHING RATION
135 SOW FEED GEST.
136 SOW FEED LACT.
137 BOAR FEED
138 PIG STARTER
149 BREEDING
150 COASTAL PASTURE
151 PASTURE
152 SM. GR. PASTURE
154 PASTURE, NATIVE
170 HAY
175 SORGHUM HAY
184 SEED
186 SEED
187 FORAGE SORG SEED
190 RYEGRASS SEED
196 COASTAL HAY
1
2
3
4
5
=
=
=
=
=
HEAD 6 = BALE
BU. 7 = ACRE
TON 8 = HOUR
DOZ. 9 = DAYS
GAL. 10 <= AUM
NMOD
BROI
DAIR
STOC
BEEF
WHET
SORG
COTT
CORN
DAIR
DAIR
LIVE
CORN
SORG
11
12
13
14
UNIT
PRICE
CWT.
EACH
C.DZ
CWT.
CWT.
CWT.
HEAD
DOL.
CWT.
CWT.
HEAD
C.HD
C.HD
CWT.
DOL.
LB.
BU.
CWT.
BU.
CWT.
BU.
BU.
LB.
BU.
LB.
TON
CWT.
CWT.
CWT.
CWT.
CWT.
LB.
CWT.
CWT.
CWT.
CWT.
CWT.
CWT.
HEAD
ACRE
ACRE
ACRE
ACRE
CWT.
TON
LB.
LB.
LB.
LB.
TON
13.75
3.40
6.25
66.00
72.00
65.00
280.00
325.00
38.75
70.00
30.00
100.00
12.50
49.75
60.00
1.20
1. 15
0.82
2.95
4.80
1.70
3.30
0. 18
0.48
0.55
110.00
10.50
8.50
9.70
9.20
10.00
0.46
8.00
9.00
10.60
10.80
8.80
10.60
24.50
67.00
12.00
120.00
1.50
4.00
80.00
1.38
0.75
0.28
0.25
75.00
=
=
=
=
ACIN
LB.
PINT
OT.
15
16
17
18
=
=
=
=
CODE ITEM NAME
NMOD
UNIT
198 SEED
202 SM. GR. PASTURE
203 HAY
211 NITROGEN
214 NITROGEN (LIQ)
216 PHOSPHORUS
221 POTASSIUM
222 FURADAN
223 ATRAZINE
224 LASSO
225 HAND HOEING
226 HAND HOEING
227 TREFLAN
228 CAPAROL
229 BIDRIN
233 GUTHION
234 PYDRIN
235 GALECRON
240 CYGON
241 IMIDAN
247 MILOGARD
249 DUAL
250 FURADAN
251 2-4-D
252 ROUNDUP
265 DESICCANT
266 ARSENIC ACID
269 CUSTOM HARVEST
270 CUSTOM HARVEST
272 CUSTOM HARVEST
276 STRIP & HAUL
282 GIN, BAG, TIES
283 HAULING
284 HAUL WHEAT
285 HAUL CORN
291 SEED
296 DIMETHIOATE
297 ETHYL PARATHION
298 RHONOX
320 CUSTOM COMBINING
322 CUSTOM HAULING
330 FERTILIZER APPLI
333 INSECT. APPLI.
334 HERB. APPLI.
340 CUSTOM BALING
341 CUSTOM BALE HAUL
383 MARKETING
399 MGMT RECORDS
400 MISC EXPENSE
410 VET MEDICINE
WHET
LB.
CROP
TON
LB.
LB.
LB.
LB.
LB.
LB.
QT.
ACRE
ACRE
QT.
LB.
LB.
PINT
PINT
APPL
OZ.
LB.
LB.
PINT
LB.
QT.
GAL.
GAL.
GAL.
ACRE
CWT.
ACRE
CWT.
CWT.
CWT.
BU.
BU.
LB.
PINT
LB.
PINT
ACRE
BU.
ACRE
APPL
APPL
BALE
BALE
HEAD
HEAD
HEAD
DOL.
DOL.
CWT.
OZ.
MILE
C15.39
19
20
21
22
=
=
=
=
FEET
APPL
SQFT
C.HD
23
24
25
26
2800
INSC
HERB
HERB
GRAN
COTT
HERB
HERB
INSC
INSC
INSC
HERB
WHET
SORG
CORN
SORG
COTN
INSC
HERB
OATS
OATS
CALF
DAIR
CALF
HEAD
=
=
=
=
LOAD
C.DZ
BAGS
TREE
PRICE
0.20
27
28
29
30
75.00
0.22
0.26
0.24
0.24
1.38
2.35
4.88
5.00
10.00
6.00
7.20
7.20
2.45
14.00
1.67
0.22
2.60
3.20
5.71
1.50
2.25
100.00
9.50
10.50
12.00
0.45
15.00
1.55
2.25
0.20
0. 12
0. 14
0.51
2.06
2.05
2.30
12.00
0. 10
2.75
2.75
2.75
0.65
0.36
9.75
15.50
7.48
4.00
= EACH
= GPM
= KWH
= MCF
LISTING OF THE NAME SET AND PRICE VECTOR REGION NUMBER: 15 DATE: 111584
CODE ITEM NAME NMOD UNIT PRICE CODE ITEM NAME NMOD UNIT PRICE
414 VET MED (SOWS)
415 VET MED (PIGS)
422 LP GAS
442 CLEANING
450 INSUR. PREMIUMS
452 INSURANCE
459 GEN FM OVERHEAD
460 UTILITIES
464 ELECTRICITY
484 HAULING
486 SALES COMM
489 SUPPLIES
490 SUPPLIES
491 SUPPLIES
492 WATER
493 SUPPLIES
494 SUPPLIES
495 SUPPLIES
501 SEVIN
509 MILOGUARD
516 KLEINGRASS SEED
517 SEED OATS
522 CUSTOM SPRIGGING
523 VET. MEDICINE
524 SALT & MINERALS
525 VET. MEDICINE
526 MISC. EXPENSE
527 SALES COMMISSION
528 SALES COMMISSION
529 MISC. EXPENSE
530 VET. MEDICINE
531 SALES COMMISSION
532 MISC. EXPENSE
533 CALF STARTER
534 BICEP
585 BROILERS
586 HEAT ALLOWANCE
587 HEAT ALLOWANCE
1
2
3
4
5
=
=
=
=
=
HEAD 6 = BALE
BU. 7 = ACRE
TON 8 = HOUR
DOZ. 9 = DAYS
GAL. 10 = AUM
POUL
POUL
MILK
STOC
DAIR
PULL
EGGS
POUL
BROI
STOC
STOC
DAIR
DAIR
DAIR
FEDR
FEDR
HOGS
HOGS
HOGS
DAIR
POUL
POUL
11
12
13
14
s^&km
HEAD
2.00
HEAD
1.00
GAL.
0.78
DOL.
1.00
DOL.
1.00
C.HD
0.47
DOL.
1.00
HEAD
40.00
KWH
0.06
CWT.
0.67
9.55
HEAD
34.75
HEAD
DOL. 1050.00
DOL. 500.00
DOL.
1.00
DOL. 600.00
DOL.
100.00
C.HD
0.56
LB.
1.95
LB.
3.50
LB.
5.50
LB.
0. 13
ACRE
40.00
HEAD
5.50
CWT.
10.80
DOL.
30.00
DOL.
15.00
DOL.
8.50
HEAD
1.50
HEAD
2.00
DOL.
1.00
HEAD
2.50
HEAD
2.00
CWT.
13.90
GAL.
20.80
C.HD
40.00
C.HD
2.00
C.HD
2.50
=
=
=
=
ACIN
LB.
PINT
QT.
15
16
17
18
=
=
s
=
DOL.
CWT.
OZ.
MILE
C15.40
19 =
20 =
21 .=
22 =
FEET
APPL
SQFT
C.HD
23
24
25
26
= LOAD
<= C.DZ
= BAGS
= TREE
27
28
29
30
= EACH
= GPM
= KWH
= MCF
DEFAULT PARAMETER VALUES AND DEFINITIONS
R E G I O N : 1 5 D AT E : 11 0 7 8 4
ROW
PA R A M E T E R
DEFINITION
1. P R I C E
PER
GALLON
2. P R I C E
PER
GALLON
3. P R I C E
PER
OF
GASOLINE
OF
GALLON
D E FA U LT
L . P.
OF
VA L U E
1.1500
GAS
0.5100
DIESEL
1.1000
4 . PRICE PER KILOWATT HOUR OF ELECTRICITY 0.0500
5. P R I C E P E R 1 0 0 0 C U . F T. O F N AT U R A L G A S 0 . 0
6. N O M I N A L
INTEREST
R AT E
0.1200
7. MACHINERY INSUR. RATE (AVERAGE INVESTMENT) 0.0100
8. M A C H I N E R Y TA X R AT E ( P U R C H A S E VA L U E ) 0 . 0
9. I R R I G A T I O N
10. H O U R L Y
11. H O U R L Y
SYSTEM
MACHINERY
OTHER
NUMBER
WAGE
LABOR
R AT E
WAGE
R AT E
1.
4.50
4.00
12. H O U R L Y I R R I G . / L I V E S T O C K W A G E R A T E 3 . 5 0
13. DEATH LOSS (PERCENT OF TOTAL RECEIPTS) 0.0
14. LIVESTOCK INSUR. RATE (AVERAGE INVESTMENT) 0.0100
15. EOUIPMENT INSUR. RATE (AVERAGE INVESTMENT) 0.0100
16. L I V E S T O C K TA X R AT E ( AV E R A G E VA L U E ) 0 . 0 0 5 0
17. E Q U I P M E N T TA X R AT E ( AV E R A G E VA L U E ) 0 . 0
18. I R R I G AT I O N L A B O R M U LT I P L I E R ( H R S / A C I N ) 0 . 2 5 0 0
19. FACTOR TO CONVERT MACHINE HRS TO TRACTOR HRS 1.1000
20. FACTOR TO CONVERT TRACTOR HRS TO LABOR HRS 1.2000
21. FACTOR TO CONVERT SELF-POWERED MACHINERY HRS
TO
LABOR
HRS
1.2500
22. LUBRICATION COST MULTIPLE OF MACHINERY
FUEL
COSTS
0.1500
23. I N F L A T I O N
0.0400
R AT E
24. LUBRICATION COST MULTIPLE OF EQUIPMENT
FUEL
COSTS
C15.41
0.0500
LISTING OF ECONOMIC AND ENGINEERING DATA FOR MACHINERY IN REGION 15
12
3
4
5
6
MACHINE CODE HIDTH LIST SPEED FIELD RC1
N O . ( F T ) P R I C E ( M P H ) E F F.
TRACTOR
TRACTOR
TRACTOR
TRACTOR
TRACTOR
TRACTOR 4 HH DR
TRACTOR 3T
TRACTOR 4T
PICKUP
CHISEL
CHISEL
SHEEP CULTIVATOR
CULTIVATOR
DISK
DISK
DRILL
FERT. APPL.
HERBICIDE APPL.
HERBICIDE APPL.
LISTER/BEDDER
PLANTER
PLANTER
SHREDDER
ROLLING CULTIV.
SPRAYER
ROPE HICK
FIELD CULTIVATOR
ROLLER
1.
2.
3.
4.
5.
6.
7.
8.
12.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
41.
42.
43.
44.
47.
48.
51.
52.
55.
150.0
125.0
100.0
75.0
40.0
225.0
100.0
75.0
1.0
13.0
19.0
13.0
19.0
13.0
19.0
11 . 0
19.0
13.0
19.0
19.0
20.0
19.0
13.0
20.0
25.0
20.0
21.5
19.0
53250.
47650.
39050.
25450.
14975.
92725.
27940.
18370.
15000.
3700.
4800.
5200.
5500.
5900.
10000.
5100.
3200.
2500.
2800.
4000.
12000.
6300.
5400.
5100.
2700.
500.
7040.
1250.
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
30.0
4.5
4.5
8.0
5.0
4.5
4.5
4.0
4.5
4.0
4.0
4.5
5.0
4.5
3.7
8.0
4.0
8.0
8.0
6.0
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.80
0.80
0.80
0.80
0.83
0.83
0.72
0.70
0.67
0.67
0.80
0.60
0.60
0.80
0.80
0.65
0.80
0.80
0.80
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
0.88
1.00
1.00
1.00
1.00
0.65
0.65
0.75
1.20
1.20
1.20
1.00
0.80
0.80
0.60
1.00
1.00
1.00
1.00
0.80
D AT E : 11 0 7 8 4
7
8
9
10
11
12
13
14
15
16
AGE RC3 ANNUAL YEARS RFV1 RFV2 PURCH FUEL LIFE HP
(HRS)
HRS
OWNED
PRICE
TYPE
(HRS)
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.60
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
600.
400.
350.
400.
350.
600.
350.
500.
900.
150.
110.
200.
65.
200.
200.
60.
80.
100.
150.
80.
120.
100.
150.
200.
210.
100.
200.
50.
7.
7.
7.
7.
7.
7.
7.
7,
5.
10.
10.
10.
10.
10.
10.
10.
10.
10.
8.
10.
10.
10.
10.
10.
8.
5.
10.
10.
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.68
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
47925.
42900.
35150.
22900.
13475.
83450.
25150.
16530.
13000.
3330.
4320.
4680.
4950.
5310.
9000.
4590.
3000.
2250.
2520.
3600.
10800.
5670.
4860.
4200.
2430.
400.
6340.
1125.
3.
3.
3.
3.
3.
3.
3.
3.
1.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
12000.
12000.
12000.
12000.
12000.
12000.
12000.
12000.
4000.
2000.
2000.
2000.
2000.
2000.
2000.
1000.
1200.
1200.
1200.
2000.
1200.
1200.
2000.
2000.
1200.
500.
2000.
2000.
150.
125.
100.
75.
40.
225.
100.
75.
1.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
'/4*%
^
C15.42
\
Download