r r TEXAS RIO GRANDE VALLEY SOIL RESOURCE AREA 19 B-124KC19) TEXAS AGRICULTURAL EXTENSION SERVICE . THE TEXAS A&M UNIVERSITY SYSTEM Zerle L. Carpenter, Director College Station, Te x a s TEXAS CROP ENTERPRISE BUDGETS TEXAS RIO GRANDE VALLEY REGION Projected for 1984 Educational programs conducted by regardless of socio-economic level, t h e Ta x e s A g r i c u l t u r a l E x t e n s i o n S e r v i c e s e r v e race, color, sex, religion or national origin. people of all ages C o o p e r a t i v e E x t e n s i o n W o r k i n A g r i c u l t u r e a n d H o m e E c o n o m i c s , T h e Te x a s A S M U n i v e r s i t y S y s t e m a n d t h e United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May e. 1914, as amended, and June 30, 1914. 150 • 1-84, New ECO 7-2 901 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/23/84. B-1241(C19) COTTON, DRYLAND, TEXAS RIO GRANDE VALLEY REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY GROSS RECEIPTS COTTON LINT COTTONSEED DEFICIENCY PMT. TOTAL PROJECTED RETURNS VARIABLE COSTS PREHARVEST COSTS *SEED COTTON ♦NITROGEN (DRY) ♦PHOSPHATE ♦HERBICIDE ♦INSECTICIDE PESTICIDE APPL. FUEL & LUBE--TRACTOR EOUIPMENT R E PA I R S T R A C T O R EOUIPMENT LABOR MACHINERY EOUIPMENT OTHER OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS ♦DEFOLIANT DEFOLIANT APPLI. ♦GIN, BAG, TIES FUEL & LUBE—TRACTOR EOUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EOUIPMENT SUBTOTAL, HARVEST PROJECTED YIELD UNIT 400.00 0.32 400.00 PROJECTED YOUR VALUE ESTIMATE $/UNIT LB. TON LB. 0.65 115.00 0.18 $ 260.00 36.80 72.00 368.80 $ LB. LB. LB. ACRE APPL APPL ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. ACRE 0.48 0.27 0.25 21.72 4.50 4.50 $ 8.64 8.10 7.50 21.72 18.00 18.00 12.65 2.75 4. 13 3. 10 10.38 5.35 4.50 4.91 129.73 $ ACRE ACRE BALE ACRE ACRE ACRE ACRE HOUR HOUR ACRE 4.60 4.50 48.00 4.50 4.50 $ 4.60 4.50 39.84 0.0 6.21 0.0 22.25 6.00 0. 13 83.54 $ INPUT USE 18.00 30.00 30.00 1.00 4.00 4.00 2.31 1.19 1.00 37.75 1.00 1.00 0.83 1.33 0.03 TOTAL VARIABLE COSTS BREAK-EVEN PRICE, VARIABLE COSTS ACRE 4.50 4.50 4.50 0.130 $ 213.27 $_ $ O.26/LB. COTTON LINT 3. INCOME ABOVE VARIABLE COSTS ACRE 4. FIXED COSTS DEPREC, INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 5. TOTAL PROJECTED COSTS ACRE $ 357.82 $. $ 0.62/LB COTTON LINT ACRE $ 10.98 $ BREAK-EVEN PRICE. TOTAL COSTS 6. NET PROJECTED RETURNS $ 155.53 $ 24.72 64.83 55.00 55.00 $ 144.56 $_ PRICE BASED ON LOAN RATE ADJUSTED FOR QUALITY. DEFICIENCY PAYMENT BASED ON COMPLIANCE WITH GOVT SET ASIDE PROGRAM. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 901 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/23/84. B-1241(C19) COTTON, DRYLAND, TEXAS RIO GRANDE VALLEY REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER 4R MOLDBOARD PLOW CHISEL PLOW OFFSET DISC OFFSET DISC BEDDER 6R FERT.APPL,RNTD HERB SPRAYR 6R RLNG CULT 6R PLANTER 6R CULTIVATOR 6R CULTIVATOR 6R CTTN PICKR 2R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 4,46 2,30 2,32 2,38 2.38 2,35 2,59 47 2,34 2,36 2,44 2,44 17 SEPT SEPT SEPT SEPT OCT NOV JAN JAN FEB FEB MAR MAY AUG TOTALS 1.00 0.50 0.50 1.00 1.00 1.00 1.00 1.25 1.00 1.25 1.00 1.00 1.25 APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 0.283 0.285 0.101 0.210 0.210 0.151 0.203 0.0 0.194 0.252 0.207 0.207 1.334 0.214 0.216 0.076 0.159 0.159 0 . 11 5 0.154 0.198 0.147 0.191 0.157 0.157 1.068 1.34 2.66 0.89 1.87 1.87 1.27 1.57 0.14 1.80 2.44 1.80 1.80 31.39 1.27 1.28 0.45 0.95 0.95 0.68 0.91 0.0 0.88 1.13 0.93 0.93 6.00 0.0 4.41 7.03 0.0 5.37 9.31 0.0 1.52 2.86 0.0 3.82 6.63 0.0 3.82 6.63 0.0 2.02 3.97 15.60 2 . 1 6 20.24 21.72 0 . 4 9 22.36 2.78 5.45 0.0 8 . 6 4 4.61 16.83 0.0 3.00 5.73 5.73 0.0 3.00 39.84 44.06 121.30 3.640 3.013 50.84 16.38 8 5 . 8 0 81.05 234.08 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF COTTON LINT (DOLLARS) 0 52 0.58 0.65 0.71 0.78 320.00 48 14 68.94 89.74 110.54 131.34 360.00 75 84 99.24 122.64 146.04 169.44 400.00 103 53 129.53 155.53 181.53 207.53 440.00 131 23 159.83 188.43 217.03 245.63 480.00 158 92 190.12 221.32 252.52 283.72 LB. QUANTITY OF COTTON LINT 902 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/23/84. B-124KC19) COTTON, IRRIGATED, TEXAS RIO GRANDE VALLEY REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY GROSS RECEIPTS COTTON LINT COTTONSEED DEFICIENCY PMT. TOTAL PROJECTED RETURNS J^*"1 PROJECTED YIELD UNIT 650.00 0.52 650.00 VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦SEED COTTON 18.00 ♦NITROGEN (DRY) 60.00 ♦PHOSPHATE 60.00 ♦HERBICIDE 1.00 ♦INSECTICIDE 6.00 PESTICIDE APPL. 6.00 ♦IRRIG. WATER 3.00 IRRIGATION WATER 18.00 FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY 2.67 IRRIGATION 4.50 EQUIPMENT 1.19 OTHER 1.00 OPERATING CAPITAL 58.18 SUBTOTAL, PREHARVEST HARVEST COSTS 1.35 ♦GIN, BAG, TIES FUEL & LUBE—TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY 1.60 EQUIPMENT 0.03 SUBTOTAL, HARVEST TOTAL VARIABLE COSTS PROJECTED YOUR VALUE ESTIMATE $/UNIT LB. TON LB. 0.65 115.00 0.18 LB. LB. LB. ACRE APPL APPL APPL ACIN ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 0.48 0.27 0.25 21.72 4.50 4.50 15.00 BALE ACRE ACRE ACRE ACRE HOUR HOUR ACRE 48.00 $ 422.50 59.80 117.00 599.30 $ 8.64 16.20 15.00 21.72 27.00 27.00 45.00 4.50 4.50 4.50 4.50 0.130 $ 14.86 2.75 4.90 3. 11 11.99 20.25 5.35 4.50 7.56 235.84 $ 4.50 4.50 $ 64.80 0.0 7.45 0.0 26.70 7.21 0.13 106.29 $ $ 342.13 $ ACRE BREAK-EVEN PRICE, VARIABLE COSTS $ 0.25/LB. COTTON LINT 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 2 5 7 . 1 7 $ _ 4. FIXED COSTS DEPREC,INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 TO TA L FIXED COSTS 5. TOTAL PROJECTED COSTS BREAK-EVEN PRICE, TOTAL COSTS 6. NET PROJECTED RETURNS ACRE ACRE ACRE ACRE 7 0 . 0 0I $ 28.45 74.47 70.00 172.92 $ ACRE $ 515.05 $ $ 0.52/LB. COTTON LINT ACRE $ 84.25 $ PRICE BASED ON LOAN RATE ADJUSTED FOR STORAGE. DEFICIENCY PAYMENT BASED ON COMPLIANCE WITH GOVT SET ASIDE PROGRAM. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 902 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/23/84 B-1241(C19) COTTON, IRRIGATED, TEXAS RIO GRANDE VALLEY REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE MACH MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS SHREDDER 4R CHISEL PLOW OFFSET DISC OFFSET DISC OFFSET DISC OFFSET DISC BEDDER 6R HERB SPRAYR 6R FERT.APPL,RNTD RLNG CULT 6R PLANTER 6R CULTIVATOR 6R DITCHER BLADE DITCHER BLADE CULTIVATOR 6R DITCHER BLADE CTTN PICKR 2R 2 2 2 2 2 2 2 4 2 2 2 2 4 4 2 4 46 32 38 38 38 38 35 47 59 34 36 44 48 48 44 48 17 SEPT SEPT SEPT OCT NOV NOV DEC JAN JAN FEB FEB MAR MAR APR MAY MAY AUG 1.00 0 .50 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.25 1.00 0 .01 0 .01 1.00 0 .01 1.50 TOTALS IRRIGATION APPLICATION 0.283 0.101 0.210 0.210 0.210 0.210 0.151 0.209 0.203 0.194 0.252 0.207 0.005 0.005 0.207 0.005 1.601 0.214 0.076 0.159 0.159 0.159 0.159 0 . 11 5 0.159 0.154 0.147 0.191 0.157 0.004 0.004 0.157 0.004 1.281 4.267 3 . 3 0 0 6 0 . 1 2 19.20 126.36 94.42 300.09 MAR APR MAY TOTALS 6.00 6.00 6.00 1.27 0.45 0.95 0.95 0.95 0.95 0.68 0.94 0.91 0.88 1. 13 0.93 0.02 0.02 0.93 0.02 7.21 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. ACRE LABOR MONTH INCHES HOURS WATER APPLICATION WATER APPLICATION WATER APPLICATION 2.34 0.89 1.87 1.87 1.87 1.87 1.27 0.99 1.57 1.80 2.44 1.80 0.02 0.02 1.80 0.02 37.67 APPL. MACH TOTAL INPUT FIXED OPER. COSTS COSTS COST 1.500 1.500 1.500 0.0 0.0 0.0 18.00 4.500 0.0 0.0 0.0 0.0 6 75 6 75 6 75 4.06 7 0.0 0.0 1.52 2 0.0 3.82 6 0.0 3.82 6 0.0 3.82 6 0.0 3.82 6 3 0.0 2.02 21.72 2 . 8 7 26 3 1 . 2 0 2 . 1 6 35 2.78 5 0.0 8 . 6 4 4.61 16 5 0.0 3.00 0.0 0.09 0 0.0 0.09 0 5 0.0 3.00 0.0 0.09 0 6 4 . 8 0 52.87 162 APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 15.00 15.00 15.00 21 .75 21 .75 21 .75 0.0 0.0 0.0 0.0 20.25 45.00 0.0 65.25 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF COTTON LINT (DOLLARS) 0 52 0.58 0.65 0.71 0 78 520.00 82 67 116.47 150.27 184.07 217 87 585.00 127 67 165.69 203.72 241.74 279 77 650.00 172 67 214.92 257. 17 299.42 341 67 715.00 217 67 264.14 310.62 357.09 403 57 780.00 262 67 313.37 364.07 414.77 465 47 LB. QUANTITY OF COTTON LINT 67 86 63 63 63 63 97 53 84 45 83 73 13 13 73 13 55 903 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/23/84. B-1241(C19) GRAIN SORGHUM, DRYLAND, TEXAS RIO GRANDE VALLEY REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS GRAIN SORGHUM DEFICIENCY PMT. TOTAL PROJECTED RETURNS 2. VARIABLE COSTS PREHARVEST COSTS ♦GRAIN SORG.SEED ♦NITROGEN (DRY) ♦INSECTICIDE PESTICIDE APPL. FUEL & LUBE—TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS CUS HARV SORG D HAUL GRAIN SORG SUBTOTAL, HARVEST PROJECTED YIELD UNIT 28.00 28.00 PROJECTED VALUE $/UNIT YOUR ESTIMATE CWT. CWT. 4.80 0.82 $ 134.40 22.96 157.36 $ LB. LB. APPL APPL ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 0.77 0.27 1.72 4.50 4.62 8.10 3.44 9.00 11.11 2.75 3.43 2.84 9.92 5.35 1.82 62.38 $ INPUT USE 6.00 30.00 2.00 2.00 2.20 1.19 13.96 28.00 28.00 TOTAL VARIABLE COSTS CWT. CWT. ACRE 4.50 4.50 0.130 $ 0.35 0.35 ACRE $ 9.80 9.80 19.60 $ $ 81.98 $ BREAK-EVEN PRICE, VARIABLE COSTS $ 2.11/CWT. GRAIN SORGHUM 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 7 5 . 3 8 $ _ 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR ACRE EQUIPMENT ACRE LAND-CASH RENT 1.00 ACRE TOTAL FIXED COSTS ACRE TOTAL PROJECTED COSTS BREAK-EVEN PRICE, TOTAL COSTS NET PROJECTED RETURNS 40.00 $; ACRE 24..18 14..62 40,.00 7 8 ,.80 $ $I 1 6 0 ,.79 $ $ 4.92/CWT. GRAIN SORGHUM ACRE $ -3.43 $ PRICE BASED ON LOAN RATE ADJUSTED FOR STORAGE. DEFICIENCY PAYMENT BASED ON COMPLIANCE WITH GOVT SET ASIDE PROGRAM. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 903 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/23/84. B-1241(C19) GRAIN SORGHUM, DRYLAND. TEXAS RIO GRANDE VALLEY REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER 4R MOLDBOARD PLOW OFFSET DISC OFFSET DISC BEDDER 6R FERT.APPL,RNTD RLNG CULT 6R PLANTER 6R CULTIVATOR 6R CULTIVATOR 6R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 4,46 2,30 2,38 2,38 2,35 2,59 2,34 2.36 4,44 4,44 AUG AUG AUG OCT DEC JAN FEB FEB MAR MAY TOTALS 1.00 0.50 1.00 1.00 1.00 1.00 1.00 1.25 1.00 1.00 0.283 0.285 0.210 0.210 0.151 0.203 0.194 0.252 0.207 0.207 0.214 0.216 0.159 0.159 0 . 11 5 0.154 0.147 0.191 0.157 0.157 1.34 2.66 1.87 1.87 1.27 1.57 1.80 2.44 1.07 1.07 1.27 1.28 0.95 0.95 0.68 0.91 0.88 1.13 0.93 0.93 2.205 1.670 16.95 9.92 APPL. MACH INPUT FIXED COSTS COSTS 0.0 0.0 0.0 0.0 0.0 8.10 0.0 4.62 0.0 0.0 TOTAL OPER. COST 4.41 5.37 3.82 3.82 2.02 2.16 2.78 4.61 3.26 3.26 7.03 9.31 6.63 6.63 3.97 12.74 5.45 12.81 5.26 5.26 12.72 35.50 75.10 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF GRAIN SORGHUM (DOLLARS) 3.84 4.32 4.80 5.28 5.76 22.40 26.32 37.07 47.82 58.58 69.33 25.20 37.41 49.50 61 .60 73.70 85.79 28.00 48.50 61.94 75.38 88.82 102.26 30.80 59.58 74.37 89.15 103*94 118.72 33.60 70.67 86.80 102.93 119.06 135.18 CWT. QUANTITY OF GRAIN SORGHUM 904 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/23/84. B-1241(C19) GRAIN SORGHUM, IRRIGATED, TEXAS RIO GRANDE VALLEY REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS GRAIN SORGHUM DEFICIENCY PMT. TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 50.00 50.00 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦GRAIN SORG.SEED 8.00 120.00 ♦NITROGEN (DRY) 60.00 ♦PHOSPHATE 1 .00 HERBICIDE 7.00 ♦INSECTICIDE 7.00 PESTICIDE APPL. 3.00 ♦IRRIG. WATER IRRIGATION WATER 18.00 FUEL & LUBE--TRACTOR EOUIPMENT R E PA I R S T R A C T O R EOUIPMENT LABOR MACHINERY 2.73 IRRIGATION 4.50 EOUIPMENT 1 . 19 OPERATING CAPITAL 62.31 SUBTOTAL, PREHARVEST HARVEST COSTS CUS HARV SORG D 50.00 HAUL GRAIN SORG 50.00 SUBTOTAL, HARVEST TOTAL VARIABLE COSTS YOUR ESTIMATE PROJECTED VALUE $/UNIT CWT. CWT. 4.80 0.82 LB. LB. LB. APPL APPL APPL APPL ACIN ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. ACRE 0.77 0.27 0.25 3.53 1 .72 4.50 15.00 4.50 4.50 4.50 0. 130 $ 15.04 2.75 4.93 3.50 12.26 20.25 5.35 8. 10 217.82 $ CWT. CWT. ACRE 0.35 0.35 $ 17.50 17.50 35.00 $ ACRE $ 252.82 $ $ 240.00 41 .00 281.00 $ 6. 16 32.40 15.00 3.53 12.04 31 .50 45.00 BREAK-EVEN PRICE, VARIABLE COSTS $ 4.24/CWT. GRAIN SORGHUM 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 2 8 . 1 8 $ _ 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EOUIPMENT LAND-CASH RENT 1.O TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 5. TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE, TOTAL COSTS 6. NET PROJECTED RETURNS 50.00 $ 29. 18 17.48 50.00 96.66 $ $ 349.48 $ $ 6.17/CWT. GRAIN SORGHUM ACRE $ -68.48 $ PRICE BASED ON LOAN RATE ADJUSTED FOR STORAGE. DEFICIENCY PAYMENT BASED ON COMPLIANCE WITH GOVT SET ASIDE PROGRAM. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 904 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/23/84. B-1241(C19) GRAIN SORGHUM, IRRIGATED, TEXAS RIO GRANDE VALLEY REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER 4R OFFSET DISC MOLDBOARD PLOW CHISEL PLOW OFFSET DISC BEDDER 6R FERT.APPL,RNTD RLNG CULT 6R RLNG CULT 6R PLANTER 6R CULTIVATOR 6R DITCHER BLADE CULTIVATOR 6R DITCHER BLADE DITCHER BLADE MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 4,46 2,38 2,30 2,32 2,38 2,35 2.59 2.34 2,34 2,36 2,44 4,48 2,44 4,48 4,48 AUG AUG AUG AUG SEPT DEC JAN JAN FEB FEB MAR MAR APR APR MAY 1.00 1.00 0.50 0.50 2.00 1.00 1.00 1.00 1.00 1.25 1.00 0.01 1.00 0.01 0.01 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION 0.283 0.210 0.285 0.101 0.421 0.151 0.203 0.194 0.194 0.252 0.207 0.005 0.207 0.005 0.005 0.214 0.159 0.216 0.076 0.319 0.115 0.154 0.147 0.147 0.191 0.157 0.004 0.157 0.004 0.004 2.725 2.065 APPL. ACRE LABOR MONTH INCHES HOURS MAR APR MAY TOTALS 1.34 1.87 2.66 0.89 3.74 1.27 1.57 1.80 1.80 2.44 1.80 0.02 1.80 0.02 0.02 1 .27 0.95 1 .28 0.45 1.89 0.68 0.91 0.88 0.88 1.13 0.93 0.02 0.93 0.02 0.02 23.04 1 2 . 2 6 APPL. MACH INPUT FIXED COSTS COSTS 0.0 0.0 0.0 0.0 0.0 0.0 47.40 0.0 0.0 6.16 0.0 0.0 0.0 0.0 0.0 4.41 3.82 5.37 1.52 7.63 2.02 2.16 2.78 2.78 4.61 3.00 0.09 3.00 0.09 0.09 TOTAL OPER. COST 7.03 6.63 9.31 2.86 13.27 3.97 52.04 5.45 5.45 14.35 5.73 0.13 5.73 0.13 0.13 5 3 . 5 6 4 3 . 3 6 132.23 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. I R R I G INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 6.00 6.00 6.00 1.500 1.500 1.500 0.0 0.0 0.0 0.0 0.0 0.0 6.75 6.75 6.75 15.00 15.00 15.00 0.0 0.0 0.0 21.75 21.75 21.75 18.00 4.500 0.0 0.0 20.25 45.00 0.0 65.25 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF GRAIN SORGHUM (DOLLARS) 3.84 4.32 4.80 5.28 5.76 40.00 -59.42 -40.22 -21.02 -1.82 17.38 45.00 -39.62 -18.02 3.58 25.18 46.78 50.00 -19.82 4.18 28.18 52.18 76.18 55.00 -0.02 26.38 52.78 79.18 105.58 60.00 19.78 48.58 77.38 106.18 134.98 CWT. QUANTITY OF GRAIN SORGHUM NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. 908 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/23/84. B-1241(C19) YELLOW ONIONS. IRRIGATED TEXAS RIO GRANDE VALLEY REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE #^N CATEGORY PROJECTED YIELD UNIT 1. GROSS RECEIPTS ONIONS TOTAL PROJECTED RETURNS J|3»S 400.00 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦ONION SEED 2.50 ♦NITROGEN (DRY) 120.00 ♦PHOSPHATE 80.00 HERBICIDE 1.00 ♦INSECTICIDE 4.00 ♦FUNGICIDE 17.00 PESTICIDE APPL. 17.00 FOLFEED 8.00 ♦IRRIG. WATER 6.00 IRRIGATION WATER 36.00 FUEL & LUBE—TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY 2.54 IRRIGATION 9.00 EQUIPMENT 1.19 OTHER 17.00 OPERATING CAPITAL 223.65 SUBTOTAL, PREHARVEST HARVEST COSTS HARVEST 400.00 PACK&CONT 400.00 DRYING 400.00 MKT-VEGETABLES 400.00 SUBTOTAL, HARVEST TOTAL VARIABLE COSTS PROJECTED YOUR VALUE ESTIMATE $/UNIT BAGS 4.86 1944.00 $ 1944.00 $ LB. LB. LB. ACRE APPL APPL APPL APPL APPL ACIN ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 30.00 0.27 0.25 53.10 4.75 4 . 11 4.50 5.24 15.00 75.00 32.40 20.00 53.10 19.00 69.87 76.50 41.92 90.00 4.50 4.50 4.50 4.50 0.130 $ 13.74 2.75 3.80 3.60 11 .45 40.50 5.35 76.50 29.07 664.55 $ BAGS BAGS BAGS CRTN ACRE 1.30 520.00 1.25 500.00 0.25 100.00 0.40 160.00 $ 1280.00 $ ACRE $ 1944.55 $ BREAK-EVEN PRICE. VARIABLE COSTS $ 4.86/BAGS ONIONS 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ - 0 . 5 5 $ 4. FIXED COSTS DEPREC, INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 TO TA L FIXED COSTS 5. TO TA L PROJECTED ACRE ACRE ACRE ACRE COSTS ACRE 32.41 15.20 90.00 90.00 $ 137.61 $ $ 2082.16 $. BREAK-EVEN PRICE, TOTAL COSTS $ 5.21/BAGS ONIONS 6. NET PROJECTED RETURNS ACRE $ -138.16 $_ ONIONS PACKED IN 50 POUND BAGS INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 908 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/23/84. B-1241(C19) YELLOW ONIONS. IRRIGATED TEXAS RIO GRANDE VALLEY REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE MACH MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS SHREDDER 4R OFFSET DISC MOLDBOARD PLOW CHISEL PLOW OFFSET DISC FLOAT PLANE BEDDER 6R FERT.APPL,RNTD STANHAY PLANTR CULTIVATOR 6R DITCHER BLADE DITCHER BLADE DITCHER BLADE CULTIVATOR 6R DITCHER BLADE DITCHER BLADE 5 46 1 38 1 31 1 33 1 38 1 45 2 35 4 59 1 58 4 44 5 48 5 48 5 48 4 ,44 5 .48 5 .48 JULY JULY JULY JULY AUG AUG SEPT SEPT OCT OCT OCT NOV DEC JAN JAN FEB 1.00 1.00 0.50 0.50 2.00 1.00 1.00 1.00 1.00 1.00 0.01 0.01 0.01 1.00 0.01 0.01 WATER WATER WATER WATER WATER APPLICATION APPLICATION APPLICATION APPLICATION APPLICATION 0.214 0.159 0.171 0.064 0.319 0.164 0 . 11 5 0.154 0.235 0.157 0.004 0.004 0.004 0.157 0.004 0.004 0.80 2.12 2.48 0.85 4.25 2.03 1.27 0.85 3.87 1.07 0.01 0.01 0.01 1.07 0.01 0.01 1.27 0.95 1.02 0.38 1 .89 0.97 0.68 0.91 1.40 0.93 0.02 0.02 0.02 0.93 0.02 0.02 0.0 0.0 0.0 0.0 0.0 0.0 0.0 52.40 75.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.04 4.66 4.68 1.63 9.31 4.18 2.02 2.41 5.54 3.26 0.06 0.06 0.06 3.26 0.06 0.06 5 7 8 2 15 7 3 56 85 5 0 0 0 5 0 0 11 73 17 86 45 18 97 58 80 26 10 10 10 26 10 10 2 . 5 4 4 1 . 9 2 8 2 0 . 7 1 11 . 4 5 1 2 7 . 4 0 4 4 . 3 1 2 0 3 . 8 6 TOTALS IRRIGATION APPLICATION 0.283 0.210 0.226 0.084 0.421 0.216 0.151 0.203 0.310 0.207 0.005 0.005 0.005 0.207 0.005 0.005 APPL. MACH TOTAL INPUT FIXED OPER. COSTS COSTS COST APPL. ACRE LABOR MONTH INCHES HOURS OCT NOV DEC JAN FEB 6 6 12 6 6 00 00 00 00 00 1.500 1.500 3 .000 1.500 1.500 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS 0.0 0.0 0.0 0.0 0.0 36.00 9.000 0.0 TOTALS 0.0 0.0 0.0 0.0 0.0 APPL. IRRIG TOTAL INPUT FIXED IRRIG COSTS COSTS COSTS 6.75^5^00 OX) 6.75 15.00^0.0 13.50 30.00 0.0 6.75 15.00 0.0 6.75 15.00 0.0 21 .75 21.75 43.50 21.75 21.75 0.0 40.50 90.00 0.0 130.50 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF ONIONS (DOLLARS) QUANTITY OF ONIONS * BAGS 3.89 4.37 4.86 5.35 5.83 320.00 -444.39 -288.87 -133.35 22.17 177.69 360.00 -416.87 -241.91 -66.95 108.01 282.97 400.00 -389.35 -194.95 -0.55 193.85 388.25 440.00 -361.83 -147.99 65.85 279.69 493.53 480.00 -334.31 -101.03 132.25 365.53 598.81 NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. 909 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/23/84. B-1241(C19) FRESH SPRING TOMATOES. IRRIGATED. TEXAS RIO GRANDE VALLEY REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1 . GROSS RECEIPTS TOMATOES TOTAL PROJECTED RETURNS /fPN PROJECTED YIELD UNIT 165.00 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦TOMATO SEED 2.00 ♦NITROGEN (DRY) 60.00 ♦PHOSPHATE 80.00 ♦HERBICIDE 1 .00 8.00 ♦INSECTICIDE ♦FUNGICIDE 5.00 PESTICIDE APPL. 9.00 ♦IRRIG. WATER 4.00 IRRIGATION WATER 24.00 FUEL & LUBE—TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY 3.07 IRRIGATION 6.00 1.19 EQUIPMENT OTHER 10.00 OPERATING CAPITAL 110.42 SUBTOTAL, PREHARVEST HARVEST COSTS HARVEST 165.00 PACK & CONT 165.00 MKT-VEGETABLES 165.00 FOLFEED 1 .00 SUBTOTAL, HARVEST TOTAL VARIABLE COSTS BREAK-EVEN PRICE, VARIABLE COSTS PROJECTED YOUR $/UNIT VALUE ESTIMATE CRTN 6.50 1072.50 $ 1072.50 $ LB. LB. LB. ACRE APPL APPL APPL APPL ACIN ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 28.00 0.27 0.25 35.75 5.00 4.06 4.50 15.00 56.00 16.20 20.00 35.75 40.00 20.30 40.50 60.00 4.50 4.50 4.50 4.50 0.130 $ 19.56 2.75 5.76 4.44 13.81 27.00 5.35 45.00 14.35 426.78 $ CRTN CRTN CR.TN ACRE ACRE 1.30 1.50 0.40 1.10 $ 214.50 247.50 66.00 1.10 529.10 $ ACRE $ 955.88 $ $ 5.79/CRTN TOMATOES 3. INCOME ABOVE VARIABLE COSTS ACRE 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 43.06 16.70 90.00 90.00 $ 149.75 $. 5. TOTAL PROJECTED COSTS ACRE $ BREAK-EVEN PRICE, TOTAL COSTS 6. NET PROJECTED RETURNS $ 11 6 . 6 2 11 0 5 . 6 4 $. $. $ 6.70/CRTN TOMATOES ACRE $ -33.14 $ SOLD IN 40 POUND CARTONS. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 9 0 9 P R O J E C T I O N S F O R P L A N N I N G P U R P O S E S O N LY NOT TO BE USED WITHOUT UPDATING AFTER 01/23/84. B-1241(C19) FRESH SPRING TOMATOES, IRRIGATED, TEXAS RIO GRANDE VALLEY REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION WTR TANK&TRALR OFFSET DISC MOLDBOARD PLOW CHISEL PLOW OFFSET DISC FLOAT PLANE BEDDER 6R RLNG CULT 6R FERT.APPL,RNTD HERB SPRAYR 6R DITCHER BLADE STANHAY PLANTR RLNG CULT 6R DITCHER BLADE RLNG CULT 6R DITCHER BLADE MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTHI OVER HOURS HOURS COSTS COSTS APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 6 49 1 38 1 31 1 33 1 38 1 45 2 35 4 34 4 59 2 47 5 48 1 58 4 34 5 48 4 .34 5 ,48 0 . 0 10.14 4.66 0.0 4.68 0.0 0.0 1.63 0.0 9.31 0.0 4.18 0.0 2.02 0.0 3.02 36.20 2.41 35.75 2.61 0.0 0.06 56.00 5 . 5 4 0.0 3.02 0.0 0.06 0.0 3.02 0.0 0.06 18.65 7.73 8.17 2.86 15.45 7.18 3.97 5.01 40.38 41.03 0.10 66.80 5.01 0.10 5.01 0.10 JULY JULY AUG AUG SEPT SEPT OCT NOV DEC DEC DEC JAN JAN MAR MAY MAY 1.00 1.00 0.50 0.50 2.00 1.00 1.00 1.00 1.00 1.00 0.01 1.00 1.00 0.01 1.00 0.01 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION 0.440 0.210 0.226 0.084 0.421 0.216 0.151 0.194 0.203 0.209 0.005 0.310 0.194 0.005 0.194 0.005 0.333 0.159 0.171 0.064 0.319 0.164 0 . 11 5 0.147 0.154 0.159 0.004 0.235 0.147 0.004 0.147 0.004 3.069 2.325 APPL. ACRE LABOR MONTH INCHES HOURS DEC MAR MAY TOTALS 6.53 2.12 2.48 0.85 4.25 2.03 1.27 1.11 0.85 1.73 0.01 3.87 1.11 0.01 1.11 0.01 1.98 0.95 1.02 0.38 1.89 0.97 0.68 0.88 0.91 0.94 0.02 1.40 0.88 0.02 0.88 0.02 29.34 13.81 127.95 56.45 227.55 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 12.00 6.00 6.00 3.000 1.500 1.500 0.0 0.0 0.0 0.0 0.0 0.0 13.50 6.75 6.75 30.00 15.00 15.00 0.0 0.0 0.0 43.50 21.75 21.75 24.00 6.000 0.0 0.0 27.00 60.0Q 0.0 87.00 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF TOMATOES (DOLLARS) 5.20 5.85 6.50 7.15 7.80 132.00 -163.88 -78.08 7.72 93.52 179.32 148.50 -130.88 -34.36 62.17 158.69 255.22 165.00 -97.88 9.37 116.62 223.87 331.12 181.50 -64.88 53.09 171.07 289.04 407.02 198.00 -31.88 96.82 225.52 354.22 482.92 CRTN QUANTITY OF TOMATOES NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT. OR OTHER MANAGEMENT STRATEGIES. 910 f*^ PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/23/84. B-1241(C19) CITRUS ESTABLISHMENT, 1ST YEAR, IRRIGATED, TEXAS RIO GRANDE VALLEY 1984 PROJECTED COSTS AND RETURNS PER ACRE C AT E G O RY 1. GROSS RECEIPTS PROJECTED UNIT YIELD TOTAL PROJECTED RETURNS PROJECTED VALUE $/UNIT $ 0.0 YOUR ESTIMATE $ 2. V A R I A B L E C O S T S I N P U T U S E PREHARVEST COSTS NITROGEN (DRY) 15.00 HERBICIDE 1.00 G R A P E F R U I T T R E E 11 6 . 0 0 TREE WRAP 11 6 . 0 0 ♦IRRIG. WAT E R 8.00 I R R I G AT I O N WAT E R 4 8 . 0 0 FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY 1.47 I R R I G AT I O N 1 2 . 0 0 EQUIPMENT 0.98 OTHER 20.00 O P E R AT I N G C A P I TA L 2 8 8 . 5 3 SUBTOTAL, PREHARVEST HARVEST COSTS SUBTOTAL. HARVEST ^ \ 0.27 28.89 4.00 0.75 15.00 4.05 28.89 464.00 87.00 120.00 4.50 4.50 4.50 4.50 0.130 $ 8.49 2.26 2.86 2.09 6.62 54.00 4.41 90.00 37.51 912.19 $ ACRE $ ACRE $ 3. INCOME ABOVE VARIABLE COSTS ACRE $ -912.19 $ 4. FIXED COSTS DEPREC, INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 15.55 13.88 105.00 134.44 $ 5. TOTAL PROJECTED COSTS ACRE $ 1046.63 $ 6. NET PROJECTED RETURNS ACRE $ - 1046.63 $ TOTAL VARIABLE COSTS j LB. ACRE TREE TREE APPL ACIN ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 105.00 $ 0.0 $ 912.19 $ CUSTOM LAND PREPARED INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM'OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 910 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/23/84. B-1241(C19) CITRUS ESTABLISHMENT, 1ST YEAR, IRRIGATED, TEXAS RIO GRANDE VALLEY 1984 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION OFFSET DISC OFFSET DISC MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTHI OVER HOURS HOURS COSTS COSTS 2 , 3 8 SEPT 2 , 3 8 OCT 4.00 3.00 WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION 0.637 0.478 7.48 5.61 3.78 2.84 0.0 0.0 15.27 11.45 26.53 19.90 1.472 1.115 13.09 6.62 0.0 26.72 46.44 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 1.500 1.500 1.500 1.500 1.500 1.500 1.500 1.500 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 21.75 21.75 21.75 21.75 21.75 21.75 21.75 21.75 TOTALS 48.00 12.000 0.0 0.0 54.00 120.00 0.0 174.00 APPL. ACRE LABOR IMONTH INCHES HOURS MAR APR MAY JUNE JULY AUG SEPT OCT TOTAL OPER. COST 0.841 0.631 TOTALS IRRIGATION APPLICATION APPL. MACH INPUT FIXED COSTS COSTS 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 911 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/23/84. B-1241(C19) CITRUS ESTABLISHMENT. 2ND YEAR, IRRIGATED, TEXAS RIO GRANDE VALLEY 1984 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS TOTAL PROJECTED RETURNS PROJECTED UNIT YIELD INPUT USE 2. VARIABLE COSTS PREHARVEST COSTS NITROGEN (DRY) 30.00 ♦HERBICIDE 3.00 ♦INSECTICIDE 3.00 ♦IRRIG. WATER 5.00 TREE REPLACEMNT 1.00 INSECT. APPL. 3.00 IRRIGATION WATER 30.00 FUEL & LUBE—TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY 3.52 IRRIGATION 7.50 0.98 EQUIPMENT OTHER 10.00 OPERATING CAPITAL 257.25 SUBTOTAL, PREHARVEST HARVEST COSTS SUBTOTAL, HARVEST PROJECTED VALUE $/UNIT $ LB. APPL APPL APPL TREE APPL ACIN ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 0.0 YOUR ESTIMATE $ 0.27 56.71 60.00 15.00 5.00 20.00 8.10 170.13 180.00 75.00 5.00 60.00 4.50 4.50 4.50 4.50 0.130 $ 10.63 2.26 3.09 5.54 15.85 33.75 4.41 45.00 33.44 652.21 $ ACRE $ 0.0 ACRE $ 652.21 $ 3. INCOME ABOVE VARIABLE COSTS ACRE $ -652.21 $ 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 PRORATED ESTABL 1046.63 TOTAL FIXED COSTS ACRE ACRE ACRE DOL. ACRE $ 28.32 25.75 105.00 104.66 263.73 $ 5. TOTAL PROJECTED COSTS ACRE $ 915.94 $ 6. NET PROJECTED RETURNS ACRE $ -915.94 $ TOTAL VARIABLE COSTS 105.00 0.10 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. Jp"*v 911 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/23/84, B-1241(C19) CITRUS ESTABLISHMENT, 2ND YEAR. IRRIGATED, TEXAS RIO GRANDE VALLEY 1984 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION BORDER DISC OFFSET DISC BORDER DISC DITCHER BLADE ORCH SPRAYR OFFSET DISC DITCHER BLADE OFFSET DISC DITCHER BLADE ORCH SPRAYR OFFSET DISC BORDER DISC DITCHER BLADE ORCH SPRAYR OFFSET DISC BORDER DISC DITCHER BLADE MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTHI OVER HOURS HOURS COSTS COSTS 5,53 2,38 5,53 5,48 5,51 2,38 5,48 2,38 5,48 5,51 2,38 5,53 5.48 5,51 2,38 5,53 5,48 FEB MAR MAR MAR APR MAY MAY JULY JULY JULY SEPT SEPT SEPT OCT NOV NOV NOV 1.00 1.00 1.00 0.01 1.00 1.00 0.01 1.00 0.01 1.00 1.00 1.00 0.01 1.00 1.00 1.00 0.01 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION TOTALS 0.486 0.210 0.486 0.005 0.168 0.210 0.005 0.210 0.005 0.168 0.210 0.486 0.005 0.168 0.210 0.486 0.005 0.368 0.159 0.368 0.004 0.127 0.159 0.004 0.159 0.004 0.127 0.159 0.368 0.004 0.127 0.159 0.368 0.004 3.523 2.669 APPL. ACRE LABOR MONTH INCHES HOURS MAR MAY JULY SEPT NOV 1.15 1.87 1.15 0.01 1.63 1.87 0.01 1.87 0.01 1.63 1.87 1.15 0.01 1.63 1.87 1.15 0.01 2.19 0.95 2.19 0.02 0.75 0.95 0.02 0.95 0.02 0.75 0.95 2.19 0.02 0.75 0.95 2.19 0.02 APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 0.0 0.0 0.0 0.0 56.71 0.0 0.0 0.0 0.0 56.71 0.0 0.0 0.0 56.71 0.0 0.0 0.0 7.37 6.63 7.37 0.10 64.37 6.63 0.10 6.63 0. 10 64.37 6.63 7.37 0.10 64.37 6.63 7.37 0.10 4.03 3.82 4.03 0.06 5.28 3.82 0.06 3.82 0.06 5.28 3.82 4.03 0.06 5.28 3.82 4.03 0.06 18.91 15.85 170.13 51.35 256.24 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 6.00 6.00 6.00 6.00 6.00 1.500 1.500 1.500 1.500 1.500 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.75 6.75 6.75 6.75 6.75 15.00 15.00 15.00 15.00 15.00 0.0 0.0 0.0 0.0 0.0 21.75 21.75 . 21.75 21.75 21.75 30.00 7.500 0.0 0.0 33.75 75.00 0.0 108.75 9 1 2 P R O J E C T I O N S F O R P L A N N I N G P U R P O S E S O N LY NOT TO BE USED WITHOUT UPDATING AFTER 01/23/84. B-1241(C19) Afy*K GRAPEFRUIT ESTABLISHMENT, 3RD YEAR, IRRIGATED, TEXAS RIO GRANDE VALLEY 1984 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY PROJECTED YIELD UNIT GROSS RECEIPTS GRAPEFRUIT TOTAL PROJECTED RETURNS 2.00 YOUR ESTIMATE PROJECTED VALUE $/UNIT TON 70.00 VARIABLE COSTS INPUT USE PREHARVEST COSTS NITROGEN (DRY) 58.00 ♦HERBICIDE 3.00 ♦INSECTICIDE 3.00 TREE REPLACEMNT 1.00 ♦IRRIG. WATER 5.00 INSECT. APPL. 3.00 IRRIGATION WATER 30.00 FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY 7.02 IRRIGATION 7.50 EQUIPMENT 0.98 OTHER 6.00 OPERATING CAPITAL 262.41 SUBTOTAL, PREHARVEST HARVEST COSTS SUBTOTAL, HARVEST LB. APPL APPL TREE APPL APPL ACIN ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 0.27 56.71 60.00 5.00 15.00 20.00 ACRE $ TOTAL VARIABLE COSTS ACRE $ $ 140.00 140.00 $ 15.66 170.13 180.00 5.00 75.00 60.00 4.50 4.50 4.50 4.50 0.130 $ 17.09 2.26 4.56 6.79 31.60 33.75 4.41 27.00 34.11 667.37 $ 0.0 $ 667.37 $ BREAK-EVEN PRICE, VARIABLE COSTS $333.68/T0N GRAPEFRUIT 3. INCOME ABOVE VA R I A B L E COSTS FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 P R O R AT E D E S TA B L 1962.57 TOTAL FIXED COSTS TOTAL PROJECTED COSTS BREAK-EVEN PRICE, TOTAL COSTS 6. NET PROJECTED RETURNS ACRE $ -527.37 ACRE ACRE DOL. ACRE $ 52.68 30.39 105.00 196.26 384.33 $ $ 1051.70 $ 105.00 0.10 ACRE $ $525.85/T0N GRAPEFRUIT ACRE $ - 9 11 . 7 0 $ CROP SOLD ON TREES. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. j|P<\ 912 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/23/84, B-1241(C19) GRAPEFRUIT ESTABLISHMENT. 3RD YEAR, IRRIGATED, TEXAS RIO GRANDE VALLEY 1984 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION BORDER DISC TREE HOE OFFSET DISC BORDER DISC DITCHER BLADE TREE HOE ORCH SPRAYR OFFSET DISC DITCHER BLADE OFFSET DISC DITCHER BLADE ORCH SPRAYR OFFSET DISC BORDER DISC DITCHER BLADE TREE HOE ORCH SPRAYR OFFSET DISC BORDER DISC DITCHER BLADE TREE HOE MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 5,53 5,54 2,38 5,53 5,48 5,54 5,51 2,38 5,48 2,38 5,48 5,51 2,38 5,53 5,48 5,54 5,51 2,38 5,53 5,48 5,54 FEB FEB MAR MAR MAR MAR APR MAY MAY JULY JULY JULY SEPT SEPT SEPT SEPT OCT NOV NOV NOV NOV 1.00 1.00 1.00 1.00 0.01 1.00 1.00 1.00 0.01 1.00 0.01 1.00 1.00 1.00 0.01 1.00 1.00 1.00 1.00 0.01 1.00 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION 0.486 0.875 0.210 0.486 0.005 0.875 0. 168 0.210 0.005 0.210 0.005 0. 168 0.210 0.486 0.005 0.875 0.168 0.210 0.486 0.005 0.875 0.368 0.663 0.159 0.368 0.004 0.663 0.127 0.159 0.004 0.159 0.004 0.127 0.159 0.368 0.004 0.663 0.127 0.159 0.368 0.004 0.663 7.022 5.319 1\PPL. ACRE LABOR MONTH INCHES HOURS MAR MAY JULY SEPT NOV TOTALS 1.15 2.30 1.87 1.15 0.01 2.30 1.63 1.87 0.01 1.87 0.01 1.63 1.87 1.15 0.01 2.30 1.63 1.87 1.15 0.01 2.30 2.19 3.94 0.95 2.19 0.02 3.94 0.75 0.95 0.02 0.95 0.02 0.75 0.95 2.19 0.02 3.94 0.75 0.95 2.19 0.02 3.94 APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 4.03 7.25 3.82 4.03 0.06 7.25 5.28 3.82 0.06 3.82 0.06 5.28 3.82 4.03 0.06 7.25 5.28 3.82 4.03 0.06 7.25 7.37 13.48 6.63 7.37 0.10 13.48 64.37 6.63 0.10 6.63 0.10 64.37 6.63 7.37 0.10 13.48 64.37 6.63 7.37 0.10 13.48 0.0 0.0 0.0 0.0 0.0 0.0 56.71 0.0 0.0 0..0 0.0 56.71 0.0 0.0 0.0 0.0 56.71 0.0 0.0 0.0 0.0 28.09 31.60 170.13 80.35 310.17 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 6.00 6.00 6.00 6.00 6.00 1.500 1.500 1.500 1.500 1.500 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.75 6.75 6.75 6.75 6.75 15.00 15.00 15.00 15.00 15.00 0.0 0.0 0.0 0.0 0.0 21.75 21.75 21.75 21.75 21.75 30.00 7.500 0.0 0.0 33.75 75.00 0.0 108.75 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF GRAPEFRUIT (DOLLARS) 56.00 63.00 70.00 77.00 84.00 1.60 -577.77 -566 57 -555.37 -544.17 -532.97 1.80 -566.57 -553 97 -541.37 -528.77 -516.17 2.00 -555.37 -541 37 -527.37 -513.37 -499.37 2.20 -544.17 -528 77 -513.37 -497.97 -482.57 2.40 -532.97 -516 17 -499.37 -482.57 -465.77 TON QUANTITY OF GRAPEFRUIT NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. 913 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/23/84. B-1241(C19) GRAPEFRUIT ESTABLISHMENT, 4TH YEAR, IRRIGATED, TEXAS RIO GRANDE VALLEY 1984 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY GROSS RECEIPTS GRAPEFRUIT TOTAL PROJECTED RETURNS PROJECTED UNIT YIELD PROJECTED VALUE $/UNIT YOUR ESTIMATE TON 70.00 $ 175.00 175.00 $ VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦NITROGEN (DRY) 88.00 ♦INSECTICIDE 3.00 ♦HERBICIDE 3.00 ♦IRRIG. WATER 5.00 TREE REPLACEMNT 1.00 INSECT. APPL. 3.00 IRRIGATION WATER 30.00 FUEL & LUBE—TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY 7. 18 IRRIGATION 7.50 EQUIPMENT 0.98 OTHER 6.00 OPERATING CAPITAL 231.53 SUBTOTAL, PREHARVEST HARVEST COSTS SUBTOTAL, HARVEST LB. APPL ACRE APPL TREE APPL ACIN ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 0.27 60.00 28.89 15.00 5.00 20.00 23.76 180.00 86.67 75.00 5.00 60.00 4.50 4.50 4.50 4.50 0.130 $ 17.39 2.26 4.63 6.79 32.33 33.75 4.41 27.00 30.10 589.09 $ ACRE $ TOTAL VARIABLE COSTS ACRE $ 2.50 BREAK-EVEN PRICE, VARIABLE COSTS 0.0 $ 589.09 $ $235. 64/TON GR!APEFRUI1 INCOME ABOVE VARIABLE COSTS ACRE $ -414.09 $ FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 PRORATED ESTABL 2874.27 TOTAL FIXED COSTS ACRE ACRE ACRE DOL. ACRE 53.81 30.47 105.00 287.43 476.71 $ TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE, TOTAL COSTS 6. NET PROJECTED RETURNS 105.00 0.10 $ $ 1065.80 $ $426.32/T0N GRAPEFRUIT ACRE $ -890.80 $ CROP SOLD ON TREES. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION.