857 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/16/84, B-124KC18) PEANUTS. IRRIGATED, COASTAL BEND REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION DISC-TANDEM GRAIN DRILL MB PLOW 4 BOTTOM BEDDER 4R PLANTER PEANUT 4 SPRAYER HERBICID PICKER WHEELS SPRAYER HERBICID CULTIVATOR ROLL SPRAYER HERBICID CULTIVATOR ROLL CULTIVATOR ROLL DIGGER PEANUT COMBINE PEANUT MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 4 81 5 82 4 83 4 67 4 ,85 5 ,86 5 ,87 5 ,86 4 ,88 5 ,86 4 ,88 4 ,88 4 .90 4 ,80 NOV NOV MAR APR APR APR APR MAY MAY JUNE JUNE JULY OCT OCT 1.00 1.00 1.00 2.00 1.00 0.50 0.50 2.00 1.00 1.00 1.00 1.00 1.00 1.00 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION 0.216 0.378 0.644 0.448 0.318 0.161 0 . 11 9 0.644 0.306 0.322 0.306 0.306 1.152 1.152 0.164 0.286 0.488 0.340 0.241 0.122 0.090 0.488 0.232 0.244 0.232 0.232 0.873 0.873 6.474 4.905 TOTALS 1.13 1.99 3.38 2.35 1.67 0.85 0.63 3.38 1.61 1.69 1.61 1.61 6.05 6.05 35.29 33.99 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. ACRE LABOR MONTH INCHES HOURS MAY JUNE JULY AUG SEPT 1.21 1.66 4.64 2.66 1.94 0.54 0.35 2.15 1.74 1.07 1.74 1.74 6.99 6.87 3.00 3.00 3.00 3.00 3.00 0.900 0.900 0.900 0.900 0.900 0.0 0.0 0.0 0.0 0.0 15.00 4.500 0.0 S^lk APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 0.0 4. 18 9.68 7 . 7 0 0 . 0 10.57 0.0 4.77 4 8 . 0 0 7.81 3.69 1.58 2.39 0.0 5 . 0 0 6.34 0.0 4.35 0.0 3.17 0.0 4.35 0.0 4.35 0 . 0 17.03 0 . 0 34.43 6.53 21.03 18.58 9.78 59.42 6.66 3.37 16.86 7.70 5.93 7.70 7.70 30.07 47.35 6 6 . 3 7 11 3 . 0 2 248.67 APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 4.72 4.72 4.72 4.72 4.72 0.0 0.0 0.0 0.0 0.0 12.00 12.00 12.00 12.00 12.00 4 5 . 0 0 23.62 0.0 60.00 128.62 9.00 9.00 9.00 9.00 9.00 25.72 25.72 25.72 25.72 25.72 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF PEANUTS (DOLLARS) 16.00 18.00 20.00 22.00 24.00 24.00 -109.22 -73.22 -37.22 -1.22 34.78 27.00 -87.92 -47.42 -6.92 33.58 74.08 30.00 -66.62 -21.62 23.38 68.38 113.38 33.00 -45.32 4.18 53.68 103.18 152.68 36.00 -24.02 29.98 83.98 137.98 191.98 CWT. QUANTITY OF PEANUTS NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. ***%. 858 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/16/84. B-1241(C18) SOYBEANS, COASTAL BEND REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE /f^K CATEGORY 1 . GROSS RECEIPTS PROJECTED YIELD UNIT SOYBEANS TOTAL PROJECTED RETURNS 2. VARIABLE COSTS PREHARVEST COSTS ♦SOYBEAN SEED ♦NITROGEN ♦PHOSPHOROUS ♦TREFLAN ♦MALATHION INSECT. APPLI. ♦BENLATE FUNGICIDE APPL. FERTILIZER APPL FUEL & LUBE—TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS CUS HARV SOYBEAN HAUL SUBTOTAL, HARVEST 22.00 BU. 7.00 $ YOUR ESTIMATE 154.00 154.00 $ INPUT USE 50.00 20.00 40.00 1.50 8.00 1.00 1.00 1.00 1.00 2.02 0.56 31.17 22.00 22.00 TOTAL VARIABLE COSTS BREAK-EVEN PRICE, VARIABLE COSTS LB. LB. LB. QT. OZ. APPL LB. APPL APPL ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE $ 16.00 4.00 9.60 11.07 1.44 2.75 13.25 2.75 2.75 15.23 1 .49 3.93 1.81 10.61 2.94 4.36 103.99 $ $ 11.00 4.40 15.40 $ ACRE $ 119.39 $ $ SOYBEANS BU. BU. ACRE ACRE 4 . FIXED COSTS DEPREC.,INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND—NET SHARE-RENT TOTAL FIXED COSTS 5. TOTAL PROJECTED COSTS BREAK-EVEN PRICE, TOTAL COSTS 0..32 0,.20 0,.24 7,.38 0.,18 2.,75 13..25 2..75 2..75 5,,25 5..25 0 . '140 0,.50 0,.20 5 . 43/BU, 3. INCOME ABOVE VARIABLE COSTS 6. NET PROJECTED RETURNS PROJECTED VALUE $/UNIT $ 34.61 $ ACRE ACRE ACRE ACRE $ 22.29 18.32 31.41 72.02 $ ACRE $ 191.41 $ $ SOYBEANS 8 . 70/BU ACRE $ -37.41 $ LAND RENT EQUALS 1/3 OF GROSS LESS 1/3 OF FERTILIZER. HERBICIDE. FUNGICIDE. HARVEST. AND HAUL. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 858 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/16/84 B-1241(C18) SOYBEANS. COASTAL BEND REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER 4R CHISEL PLOW TANDEM DISC 6R TANDEM DISC 6R FIELD CULT. 6R HERB. APPLI. BEDDER 6R ROW DISC 6R ROW DISC 6R PLANTER 6R CULTIVATOR 6R ROLLER 6R CULTIVATOR 6R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 2.31 2,45 2,36 2,36 2,43 2,49 2,35 2,41 2,41 2,40 2,42 2,38 2,42 SEPT SEPT SEPT OCT OCT OCT NOV JAN MAR APR APR APR MAY TOTALS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.209 0.151 0.146 0.146 0.136 0.203 0.151 0.146 0.146 0.202 0.136 0 . 11 3 0.136 0.159 0 . 11 5 0 . 11 0 0 . 11 0 0.103 0.154 0 . 11 5 0 . 11 0 0 . 11 0 0.153 0.103 0.086 0.103 2.022 1.532 2.13 1.52 1.53 1.53 1.37 2.08 1.53 1.46 1.46 2.19 1.44 1.09 1.44 APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 3.52 3.92 3.34 3.34 3.67 3.30 2.35 2.72 2.72 4.60 2 . 11 1.50 2 . 11 6.75 6.23 5.63 5.63 5.76 17.52 4.67 4.94 4.94 33.45 4.27 3.18 4.27 1.10 0.79 0.77 0.77 0.71 0.0 0.0 0.0 0.0 0.0 1 .07 0.79 0.77 0.77 1.06 0.71 0.60 0.71 11 . 0 7 20.77 10.61 0.0 0.0 0.0 25.60 0.0 0.0 0.0 3 6 . 6 7 3 9 . 1 9 107.24 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF SOYBEANS (DOLLARS) 5.60 6.30 7.00 7.70 8.40 17.60 -31.88 -23.63 -15.37 -7.12 1.14 19.80 -24.66 -15.37 -6.09 3.20 12.49 22.00 -17.44 -7.12 3.20 13.52 23.84 24.20 -10.21 1.14 12.49 23.84 35.19 26.40 -2.99 9.39 21.77 34.15 46.54 BU. QUANTITY OF SOYBEANS NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. 859 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/16/84. B-1241(C18) WATERMELONS, COASTAL BEND REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS WATERMELONS TOTAL PROJECTED RETURNS 2. VARIABLE COSTS PREHARVEST COSTS ♦WATERMELON SEED ♦NITROGEN ♦PHOSPHOROUS ♦POTASSIUM ♦SEVIN ♦METHYLATE ♦METHYL PARATHION ♦DIFOLITAN INSECT/FUNG APPL HOEING FERTILIZER APPL FUEL & LUBE—TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS BROKERAGE WATERMELON HAUL HAND HARVEST SUBTOTAL, HARVEST PROJECTED YIELD UNIT 160.00 CWT. PROJECTED YOUR VALUE ESTIMATE $/UNIT 6 . 5 0 1040.00 $ 1040.00 $ INPUT USE 0.75 30.00 60.00 30.00 1.50 0.10 2.00 2.00 2.00 1.00 1.00 2.89 2.66 9.45 160.00 160.00 1.00 TOTAL VARIABLE COSTS LB. LB. LB. LB. LB. GAL. QT. QT. APPL ACRE APPL ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 4.00 0.20 0.24 0.22 2.88 17.80 2.72 6.20 2.75 12.00 2.75 5.25 5.25 0.140 $ 3.00 6.00 14.40 6.60 4.32 1.78 5.44 12.40 5.50 12.00 2.75 9.56 7.09 2.01 2. 14 15. 15 13.96 1.32 125.43 $ CWT. CWT. ACRE ACRE 0.50 3.50 62.00 $ 80.00 560.00 62.00 702.00 $ ACRE $ 827.43 $ BREAK-EVEN PRICE, VARIABLE COSTS $ 5.17/CWT. WATERMELONS 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 2 1 2 . 5 7 $ FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 TO TA L FIXED COSTS 5. TOTAL PROJECTED COSTS BREAK-EVEN PRICE, TOTAL COSTS 6. NET PROJECTED RETURNS ACRE ACRE ACRE ACRE ACRE 23,.32 16,.49 18,.00 18.00 $ 57.81 $_ $ 885.23 $_ $ 5.53/CWT. WATERMELONS ACRE $ 154.77 $ RENT EQUALS $18/ACRE INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/16/84, 859 B-124KC18) WATERMELONS, COASTAL BEND REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION CHISEL PLOW TANDEM DISC 4R BEDDER 3R BEDDER 3R TANDEM DISC 2R TANDEM DISC 2R PLANTER 1R TANDEM DISC 2R CULTIVATOR 1R CULTIVATOR 4R CHISEL PLOW SPRAYER 6R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 3,69 4,62 4,78 4,78 5,61 5,61 5,75 5,61 5,76 4,68 3,69 5,46 OCT OCT NOV FEB FEB MAR MAR APR APR APR MAY MAY TOTALS 1.00 1.00 1.00 1.00 0.67 0.67 1.00 0.67 1.00 0.70 0.67 2.00 0.252 0.216 0.168 0.168 0.326 0.326 0.224 0.326 0.151 0.141 0.169 0.419 0.191 0.164 0.127 0.127 0.247 0.247 0.170 0.247 0 . 11 5 0.107 0.128 0.317 2.885 2.186 1.91 1.23 0.94 0.94 0.96 0.96 0.66 0.96 0.43 0.87 1.28 1.62 1.32 1.13 0.88 0.88 1.71 1.71 1.18 1.71 0.79 0.74 0.89 2.20 12.74 15.15 S ^ k APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 4.81 3.51 1.74 1.74 3.08 3.08 1.87 3.08 1.17 1.53 3.22 4.21 8.04 5.87 3.55 3.55 5.75 5.75 6.71 5.75 2.39 3.14 5.39 20.43 15.40 33.05 76.34 0.0 0.0 0.0 0.0 0.0 0.0 3.00 0.0 0.0 0.0 0.0 12.40 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF WATERMELONS (DOLLARS) 5.20 5.85 6.50 7.15 7.80 128.00 -33.83 49.37 132.57 215.77 298.97 144.00 -14.63 78.97 172.57 266.17 359.77 160.00 4.57 108.57 212.57 316.57 420.57 176.00 23.77 138.17 252.57 366.97 481.37 192.00 42.97 167.77 292.57 417.37 542.17 CWT. QUANTITY OF WATERMELONS NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. •^•^v 861 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/16/84. B-1241(C18) COASTAL BERMUDAGRASS ESTAB., DRYLAND, TEXAS COASTAL BEND REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY GROSS RECEIPTS COASTAL HAY TOTAL PROJECTED RETURNS VARIABLE COSTS PREHARVEST COSTS CUSTOM SPRIGGING ♦NITROGEN ♦PHOSPHOROUS FERTILIZER APPL FUEL & LUBE—TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS MOW,RAKE,BALE CUSTOM BALE HAUL SUBTOTAL, HARVEST PROJECTED YIELD UNIT 1.00 YOUR ESTIMATE TON 60.00 $ 60.00 60.00 $ ACRE LB. LB. APPL ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 36.00 0.20 0.24 2.75 5.25 5.25 0.140 $ 36.00 8.00 9.60 2.75 11.21 0.75 2.89 1.98 7.81 1.47 4.18 86.64 $ BALE BALE ACRE 0.69 0.40 $ 22.77 13.20 35.97 $ ACRE $ 122.61 $ INPUT USE 1.00 40.00 40.00 1.00 1.49 0.28 29.87 33.00 33.00 TOTAL VARIABLE COSTS BREAK-EVEN PRICE, VARIABLE COSTS $122.61/TON COASTAL HAY INCOME ABOVE VARIABLE COSTS ACRE FIXED COSTS DEPREC..INTEREST.TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE, TOTAL COSTS NET PROJECTED RETURNS PROJECTED VALUE $/UNIT $ -62.61 $_ 16.40 12.84 15.00 15.00 $ 44.24 $_ $ 166.85 $_ $166.85/T0N COASTAL HAY ACRE $ -106.85 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. # ^ 8 6 1 P R O J E C T I O N S F O R P L A N N I N G P U R P O S E S O N LY NOT TO BE USED WITHOUT UPDATING AFTER 01/16/84. B-1241(C18) COASTAL BERMUDAGRASS ESTAB., DRYLAND, TEXAS COASTAL BEND REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER 4R SHREDDER 4R SHREDDER 4R SHREDDER 4R MOLDBOARD PLOW TANDEM DISC 6R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 2,31 2.31 2.31 2.31 2.33 2.36 APR JUNE JULY AUG AUG AUG TOTALS 1.00 1.00 1.00 1.00 1.00 1.00 APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 0.209 0.209 0.209 0.209 0.504 0.146 0.159 0.159 0.159 0.159 0.382 0 . 11 0 2.13 2.13 2.13 2.13 5.93 1.53 1.10 1.10 1.10 1.10 2.65 0.77 0.0 0.0 0.0 0.0 0.0 0.0 3.52 3.52 3.52 3.52 11.09 3.34 6.75 6.75 6.75 6.75 19.67 5.63 1.488 1.127 15.98 7.81 0.0 28.53 52.31 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF COASTAL HAY (DOLLARS) 48.00 54.00 60.00 66.00 72.00 0.80 -77.01 -72.21 -67.41 -62.61 -57.81 0.90 -75.81 -70.41 -65.01 -59.61 -54.21 1.00 -74.61 -68.61 -62.61 -56.61 -50.61 1.10 -73.41 -66.81 -60.21 -53.61 -47.01 1.20 -72.20 -65.00 -57.80 -50.60 -43.40 TON QUANTITY OF COASTAL HAY NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT. GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. 863 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/16/84. B-1241(C18) KLEINGRASS ESTABLISHMENT, DRYLAND, COASTAL BEND REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY GROSS RECEIPTS TOTAL PROJECTED RETURNS VARIABLE COSTS PREHARVEST COSTS ♦KLEINGRASS SEED CUSTOM PLANT ♦NITROGEN ♦PHOSPHOROUS FERTILIZER APPL ♦BANVEL HERBICIDE APPL FUEL & LUBE—TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS SUBTOTAL, HARVEST /^s PROJECTED YIELD UNIT PROJECTED VALUE $/UNIT $ 0.0 YOUR ESTIMATE $ INPUT USE 0.80 1.00 30.00 30.00 1.00 4.00 1.00 1.04 0.42 37.86 LB. ACRE LB. LB. APPL OZ. APPL ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 5.75 5.08 0.20 0.24 2.75 0.41 2.75 5.25 5.25 0.140 $ 4.60 5.08 6.00 7.20 2.75 1.64 2.75 7.84 1.12 2.02 1.90 5.46 2.20 5.30 55.87 $ ACRE $ TOTAL VARIABLE COSTS ACRE $ 55.87 $ INCOME ABOVE VARIABLE COS;ts ACRE $ -55.87 $ FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE $ 11.47 13.52 15.00 39.99 $ TOTAL PROJECTED COSTS ACRE $ 95.85 $ NET PROJECTED RETURNS ACRE $ -95.85 $ 15.00 0.0 $ LAND CHARGE BASED ON FULL YEAR BASIS. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 863 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/16/84. B-1241(C18) KLEINGRASS ESTABLISHMENT, DRYLAND, COASTAL BEND REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION MOLDBOARD PLOW OFFSET DISC TANDEM DISC 6R TOTALS MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 2 , 3 3 FEB 2,37 FEB 2,36 FEB 1.00 2.00 1.00 APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 0.504 0.390 0.146 0.382 0.296 0 . 11 0 5.93 4.15 1.53 2.65 2.05 0.77 0.0 0.0 0.0 11.09 9.49 3.34 19.67 15.69 5.63 1.040 0.788 11.61 5.46 0.0 23.92 40.99 ^ * ^ L •-^V 862 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/16/84. B-1241(C18) KLEINGRASS PASTURE, DRYLAND, COASTAL BEND REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE /f**^ CATEGORY GROSS RECEIPTS KLEINGRASS SEED TOTAL PROJECTED RETURNS VARIABLE COSTS PREHARVEST COSTS ♦NITROGEN ♦PHOSPHOROUS FERTILIZER APPL FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS GRASS COMBINING SUBTOTAL, HARVEST PROJECTED PROJECTED YIELD U N I T $ / U N I T VA L U E 30.00 YOUR ESTIMATE LB 5.75 172.50 $ 172.50 $" LB. LB. APPL ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 0.20 0.24 2.75 INPUT USE 60.00 30.00 1.00 0.10 0.42 -0.44 1.00 TOTAL VARIABLE COSTS BREAK-EVEN PRICE, VARIABLE COSTS ACRE ACRE 12.00 7.20 75 79 12 20 23 0.55 2.20 -0.06 26.98 $ 25 25 0.140 22.75 22.75 22.75 $. 49.73 $ ACRE $ 1.66/LB KLEINGRASS SEED 3. INCOME ABOVE VARIABLE COSTS ACRE $ 122.77 $ 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 P R O R AT E D E S TA B L 9 5 . 8 5 TOTAL FIXED COSTS ACRE ACRE ACRE 15.00 DOL. 0.10 ACRE $ 1.15 1 .67 15.00 9.59 27.41 $. 5. TOTAL PROJECTED COSTS ACRE $ 77.14 $ $ 2.57/LB, KLEINGRASS SEED ACRE $ 95.36 $ BREAK-EVEN PRICE. TOTAL COSTS 6. NET PROJECTED RETURNS ESTABLISHMENT COSTS PRORATED OVER 10 YEARS, INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 862 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/16/84. B-1241(C18) KLEINGRASS PASTURE, DRYLAND, COASTAL BEND REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER 4R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 2,31 J U LY 0 . 5 0 TOTALS APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 0.105 •0.079 1.06 0.55 0.0 1.76 3.38 0.105 0.079 1.06 0.55 0.0 1.76 3.38 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF KLEINGRASS SEED (DOLLARS) 4.60 5.18 5.75 6.32 6.90 24.00 62.11 75.91 89.71 103.51 117.31 27.00 75.19 90.71 106.24 121.76 137.29 30.00 88.27 105.52 122.77 140.02 157.27 33.00 101.35 120.32 139.30 158.27 177.25 36.00 114.43 135.13 155.83 176.53 197.23 LB. QUANTITY OF KLEINGRASS SEED 864 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/16/84. B-1241(C18) COASTAL BERMUDAGRASS PASTURE, DRYLAND, TEXAS COASTAL BEND REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY GROSS RECEIPTS GRAZING TOTAL PROJECTED RETURNS VARIABLE COSTS PREHARVEST COSTS ♦NITROGEN ♦PHOSPHOROUS FERTILIZER APPL FUEL & LUBE—TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS SUBTOTAL, HARVEST PROJECTED YIELD UNIT 4.00 PROJECTED VALUE $/UNIT YOUR ESTIMATE AUM 6.00 $ 24.00 24.00 $ LB. LB. APPL ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 0.20 0.24 2.75 5.25 5.25 0.140 $ 12.00 7.20 2.75 0.0 0.75 0.0 0.10 0.0 1.47 2.36 26.63 $ ACRE $ ACRE $ INPUT USE 60.00 30.00 1.00 0.0 0.28 16.86 TOTAL VARIABLE COSTS 0.0 $ 26.63 $ BREAK-EVEN PRICE, VARIABLE COSTS $ 6 66/AUM GRAZING 3. INCOME ABOVE VARIABLE COSTS ACRE $ -2.63 $. 4. FIXED COSTS DEPREC.INTEREST,TAXES & INSUR, TRACTOR EQUIPMENT LAND-CASH RENT 1.( P R O R AT E D E S TA B L 1 0 6 . t TOTAL FIXED COSTS ACRE ACRE ACRE DOL. ACRE 15.00 0.10 $ 0.0 0.71 15.00 10.68 26.40 $ 5. TOTAL PROJECTED COSTS ACRE $ 53.02 $ BREAK-EVEN PRICE, TOTAL COSTS 6. NET PROJECTED RETURNS $ 13. 26/AUM GRAZING ACRE $ -29.02 $ ESTABLISHMENT COSTS PRORATED OVER TEN YEARS INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. jPft\ 864 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/16/84. B-124KC18) COASTAL BERMUDAGRASS PASTURE, DRYLAND, TEXAS COASTAL BEND REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 0.0 TOTALS 0.0 0.0 0.0 APPL. MACH INPUT FIXED COSTS COSTS 0.0 TOTAL OPER. COST 0.0 0.0 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF GRAZING (DOLLARS) 4.80 5.40 6.00 6.60 7.20 3.20 - 11 . 2 7 -9.35 -7.43 -5.51 -3.59 3.60 -9.35 -7.19 -5.03 -2.87 -0.71 4.00 -7.43 -5.03 -2.63 -0.23 2.17 4.40 -5.51 -2.87 -0.23 2.41 5.05 4.80 -3.59 -0.71 2.17 5.05 7.93 AUM QUANTITY OF GRAZING NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. /*^\ 866 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/16/84. B-1241(C18) BUFFEL GRASS ESTAB., DRYLAND. TEXAS COASTAL BEND REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY GROSS RECEIPTS TOTAL PROJECTED RETURNS VARIABLE COSTS PREHARVEST COSTS ♦BUFFEL GRASS SD BRUSH CLEARING FUEL & LUBE—TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL. PREHARVEST HARVEST COSTS SUBTOTAL, HARVEST PROJECTED YIELD UNIT PROJECTED VALUE $/UNIT $ 0.0 YOUR ESTIMATE $ INPUT USE 4.,00 1,,00 LB. ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 5.25 5.25 0.140 $ ACRE $ TOTAL VARIABLE COSTS ACRE $ INCOME ABOVE VARIABLE COSTS ACRE $ - 11 2 . 5 0 $ FIXED COSTS DEPREC..INTEREST.TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE $ 7.21 5.37 15.00 27.58 $ TOTAL PROJECTED COSTS ACRE $ 140.08 $ NET PROJECTED RETURNS ACRE $ -140.08 $ 0,.65 0,.21 90,,52 3.25 75.00 15.00 13.00 75.00 4.93 0.56 1.27 0.53 3.43 1.10 12.67 112.50 $ 0.0 $ 112.50 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. # ^ 8 6 6 P R O J E C T I O N S F O R P L A N N I N G P U R P O S E S O N LY NOT TO BE USED WITHOUT UPDATING AFTER 01/16/84. B-124KC18) BUFFEL GRASS ESTAB., DRYLAND, TEXAS COASTAL BEND REGION 1984 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION TANDEM DISC 6R BROADCAST SEEDER CULTIPACKER TOTALS MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 2,36 MAR 2,34 APR 2.39 APR 2.00 1.00 1.00 0.292 0.135 0.227 0.221 0.103 0.172 3.06 1.36 2.23 1.53 0.71 1.19 0.0 13.00 0.0 6.67 2.30 3.08 11.26 17.37 6.50 0.654 0.495 6.65 3.43 13.00 12.05 35.13 "^Hlv