562 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. B-124KC12)

advertisement
562 PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83.
B-124KC12)
FORAGE SORGHUM HAY, DRYLAND
TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
GROSS RECEIPTS
SORGHUM HAY
TOTAL PROJECTED RETURNS
VARIABLE COSTS
PREHARVEST COSTS
♦FORAGE SORG SEED
♦NITROGEN (ANHY)
♦PHOSPHATE
FUEL & LUBE—TRACTOR
EOUIPMENT
R E PA I R S T R A C T O R
EOUIPMENT
LABOR MACHINERY
EOUIPMENT
OPERATING CAPITAL
SUBTOTAL, PREHARVEST
HARVEST COSTS
MOW,RAKE,BALE
CUSTOM HAUL
SUBTOTAL, HARVEST
PROJECTED
YIELD
UNIT
4.50
PROJECTED
VALUE
$/UNIT
YOUR
ESTIMATE
TON
60.00
$
270.00
270.00 $
LB.
LB.
LB.
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
ACRE
0.32
0. 14
0.30
5.00
3.80
0. 135
$
9.60
11.20
12.00
7.53
0.62
1 .90
1. 12
7.34
1 .06
-0.20
52. 18 $
BALE
BALE
ACRE
0.70
0.35
$
104.30
52. 15
156.45 $
ACRE
$
208.63 $
INPUT USE
30.00
80.00
40.00
1 .47
0.28
-1 .49
149.00
149.00
TOTAL VARIABLE COSTS
BREAK-EVEN PRICE, VARIABLE COSTS $ 46.36/TON SORGHUM HAY
INCOME ABOVE VARIABLE COSTS
FIXED COSTS
DEPREC..INTEREST,TAXES & INSUR.
TRACTOR
EQUIPMENT
LAND-CASH RENT 1.00
MISC ADMIN 0/H 0.30
TO TA L
FIXED
COSTS
TOTAL PROJECTED COSTS
BREAK-EVEN PRICE, TOTAL COSTS
NET PROJECTED RETURNS
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
61.37 $
14.52
10. 18
15.00
15.00
15.00
4.50
$ 44.20 $.
$
252.83
$.
$ 56.18/TON SORGHUM HAY
ACRE
$
17.17
$
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
562
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83
B-1241(C12)
FORAGE SORGHUM HAY, DRYLAND
TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
MACH
MACHINERY
OPERATION
SHREDDER
CHISEL PLOW
OFFSET DISC
ANHYDROUS SPRDER
DRY FERT SPRDER
GRAIN DRILL
ANHYDROUS SPRDER
ITEM OPER
TIMES LABOR MACHINE OPER
LABOR
NO. MONTH OVER HOURS HOURS COSTS COSTS
3,30
3,33
3,34
3,61
3,60
3,46
3,61
OCT
NOV
NOV
FEB
FEB
FEB
MAY
TOTALS
1.00
1 .00
1.00
1.00
1.00
1.00
1.00
APPL. MACH
INPUT FIXED
COSTS COSTS
TOTAL
OPER.
COST
0.263
0.202
0.228
0. 151
0.203
0.270
0. 151
0.199
0. 153
0. 173
0. 115
0. 154
0.205
0 . 11 5
1.92
1.51
1.62
0.97
1.46
1.99
0.97
1.31
1.01
1 .14
0.76
1.02
1.35
0.76
0.0
0.0
0.0
5.60
12.00
9.60
5.60
3.62
2.62
4.72
1 .50
3.82
6. 13
1.50
6.85
5. 14
7.49
8.82
18.29
19.07
8.82
1.468
1.112
10.46
7.34
32.80 2 3 . 9 0
74.50
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF SORGHUM HAY
(DOLLARS)
48.00
54.00
60.00
66.00
72.00
3.60
-4.54
17.06
38.66
60.26
81 .86
4.05
1 .42
25.72
50.02
74.32
98.62
4.50
7.37
34.37
61.37
88.37
11 5 . 3 7
4.95
13.33
43.03
72.73
102.43
132.13
5.40
19.28
51.68
84.08
11 6 . 4 8
148.88
TON
QUANTITY OF
SORGHUM HAY
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT
STRATEGIES.
^
\
563 PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83.
B-1241(C12)
FORAGE SORGHUM HAY. IRRIGATED
TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
GROSS RECEIPTS
SORGHUM HAY
TOTAL PROJECTED RETURNS
PROJECTED
YIELD
UNIT
10.00
60.00
$
VARIABLE COSTS
INPUT USE
PREHARVEST COSTS
♦FORAGE SORG SEED
40.00
♦NITROGEN (ANHY)
240.00
♦PHOSPHATE
60.00
IRRIGATION WATER
20.00
FUEL & LUBE—TRACTOR
EQUIPMENT
IRRIGATION
R E PA I R S T R A C T O R
EQUIPMENT
IRRIGATION
LABOR MACHINERY
1.87
IRRIGATION
2.00
0.63
EQUIPMENT
OPERATING CAPITAL
11 . 19
SUBTOTAL, PREHARVEST
HARVEST COSTS
MOW,RAKE,BALE
330.00
CUSTOM HAUL
330.00
SUBTOTAL, HARVEST
TOTAL VARIABLE COSTS
TON
PROJECTED
VALUE
$/UNIT
0.32
0. 14
0.30
YOUR
ESTIMATE
600.00
600.00 $
LB.
LB.
LB.
ACIN
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
HOUR
DOL.
ACRE
5.00
3.80
3.80
0. 135
$
9.57
1 .39
63.20
2.42
1 .30
15.20
9.33
7.60
2.39
1.51
178.31 $
BALE
BALE
ACRE
0.70
0.35
$
231.00
115.50
346.50 $
ACRE
$
524.81 $
12.80
33.60
18.OO
BREAK-EVEN PRICE, VARIABLE COSTS $ 52.48/TON SORGHUM HAY
3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 7 5 . 1 9 $
FIXED COSTS
DEPREC..INTEREST,TAXES & INSUR.
TRACTOR
EQUIPMENT
I R R I G AT I O N
LAND-CASH RENT 1.00
MISC ADMIN 0/H 0.50
TO TA L
FIXED
COSTS
TOTAL PROJECTED COSTS
BREAK-EVEN PRICE. TOTAL COSTS
NET PROJECTED RETURNS
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
40.00
15.00
$
18.46
12.22
40.80
40.00
7.50
118.98 $
ACRE
$
643.79 $
$ 64.38/TON SORGHUM HAY
ACRE
$
-43.79
$
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
563
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. B-1241(C12)
FORAGE SORGHUM HAY, IRRIGATED
TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
MACH
MACHINERY ITEM OPER TIMES LABOR MACHINE OPER ' LABOR
OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS
SHREDDER
CHISEL PLOW
OFFSET DISC
LAND PLANE
ANHYDROUS SPRDER
DRY FERT SPRDER
GRAIN DRILL
ANHYDROUS SPRDER
ANHYDROUS SPRDER
ANHYDROUS SPRDER
3,30
3,33
3,34
3,50
3,61
3,60
3,46
3,61
3,61
3,61
NOV
NOV
NOV
NOV
FEB
FEB
FEB
MAY
JUNE
JULY
1 .00
1 .00
1 .20
0 .20
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
TOTALS
IRRIGATION
APPLICATION
0
0
0
0
0
0
0
0
0
0
263
202
273
050
151
203
270
151
151
151
1 866
APPL. ACRE LABOR
MONTH INCHES HOURS
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
FEB
APR
JUNE
JULY
AUG
TOTALS
4.00
4.00
4.00
4.00
4.00
0.400
0.400
0.400
0.400
0.400
APPL. MACH TOTAL
INPUT FIXED 'OPER.
COSTS COSTS COST
199
153
207
038
115
154
205
115
115
115
1.92
1.51
1.95
0.35
0.97
1.46
1.99
0.97
0.97
0.97
1.31
1.01
1.37
0.25
0.76
1.02
1.35
0.76
0.76
0.76
0.0
0.0
0.0
0.0
8.40
18.00
12.80
8.40
8.40
8.40
1 414
13.07
9.33
64.40 28 .88 115 .68
IRRIG
SYSTEM OPER. LABOR
HOURS COSTS COSTS
APPL. IRRIG TOTAL
INPUT FIXED IRRIG
COSTS COSTS COSTS
0
0
0
0
0
0
0
0
0
0
0.0
0.0
0.0
0.0
0.0
20.00 2.000 0.0
15.68
15.68
15.68
15.68
15.68
1 .52
1 .52
1 .52
1 .52
1 .52
0.0
0.0
0.0
0.0
0.0
3 .62
2 62
5 67
1 04
1 .50
3 .82
6 .13
1 .50
1 .50
1 .50
8
8
8
8
8
16
16
16
16
16
6 .85
5 .14
8 .98
1 .63
11 .62
24 .29
22 .27
11 62
11 .62
11 .62
25
25
25
25
25
36
36
36
36
36
78.40 7.60 0.0 40.80 126.80
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF SORGHUM HAY
(DOLLARS)
48 00
54.00
60.00
66.00
72.00
8.00
-71 51
-23.51
24.49
72.49
120.49
9.00
-58 16
-4. 16
49.84
103.84
157.84
10.00
-44 81
15. 19
75.19
135.19
195. 19
11 .00
-31 46
34.54
100.54
166.54
232.54
12.00
-18 11
53.89
125.89
197.89
269.89
TON
QUANTITY OF
SORGHUM HAY
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT
STRATEGIES.
^*l|y
564 PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 04/08/83.
B-124KC12)
CORN FOR SILAGE, IRRIGATED
TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
- CATEGORY
1. GROSS RECEIPTS
CORN SILAGE
TOTAL PROJECTED RETURNS
PROJECTED
YIELD
UNIT
15.00
2. VARIABLE COSTS
INPUT USE
PREHARVEST COSTS
♦SEED CORN/SILAGE
20.00
♦NITROGEN (ANHY)
160.00
♦PHOSPHATE
80.00
♦HERBICIDE
1.00
HERBICIDE APPLI.
1.00
♦INSECTICIDE
1.00
IRRIGATION WATER
16.00
FUEL & LUBE—TRACTOR
EOUIPMENT
IRRIGATION
R E PA I R S T R A C T O R
EQUIPMENT
IRRIGATION
LABOR MACHINERY
2. 13
IRRIGATION
1 .60
EQUIPMENT
0.98
OPERATING CAPITAL
56.58
SUBTOTAL, PREHARVEST
HARVEST COSTS
SUBTOTAL, HARVEST
TOTAL VARIABLE COSTS
BREAK-EVEN PRICE, VARIAB LE COSTS
23.00
$
LB.
LB.
LB.
ACRE
ACRE
APPL
ACIN
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
HOUR
DOL.
ACRE
1.00
0.14
0.30
10.00
4.00
16.00
20.00
22.40
24.00
10.00
4.00
16.00
5.00
3.80
3.80
0. 135
$
12.80
2. 16
50.56
3. 12
2.04
12. 16
10.66
6.08
3.72
7.64
207.33 $
ACRE
$
ACRE
$
345.00
345.00 $
0.0
$
207.33 $
$ 13. 82/TON CO RN SILAGiE
ACRE
4. FIXED COSTS
DEPREC..INTEREST,TAXES & INSUR.
TRACTOR
EOUIPMENT
IRRIGATION
LAND-CASH RENT
1.00
MISC ADMIN 0/H
0.50
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
5. TOTAL PROJECTED COSTS
ACRE
6. NET PROJECTED RETURNS
YOUR
ESTIMATE
TON
3. INCOME ABOVE VARIABLE COST S
BREAK-EVEN PRICE, TOTAL COSTS
PROJECTED
VALUE
$/UNIT
$
137.67 $
$
23.64
18.82
32.64
40.00
7.50
122.61 $
$
329.94 $
40.00
15.00
$ 22.00/TON CORN SILAGE
ACRE
$
15.06
$
SOLD STANDING IN FIELD.
A FALL APPLICATION OF A HERBICIDE MAY BE NECESSARY IF WEEDS BECOME A PROBLEM
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
0**>
564
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 04/08/83
B-124KC12)
CORN FOR SILAGE, IRRIGATED
TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
MACH
MACHINERY
OPERATION
CHISEL PLOW
OFFSET DISC
LAND PLANE
OFFSET DISC
BEDDER 6R
ROLLING CULT 6R
ANHYDROUS SPRDER
DRY FERT SPRDER
PLANTER 6R
ROLLING CULT 6R
ROLLING CULT 6R
LABOR
ITEM OPER
TIMES LABOR MACHINE OPER
NO. MONTH OVER HOURS HOURS COSTS COSTS
1,33
1,34
2,50
1.34
3,36
3,38
3,61
3,60
3,42
3,38
3,38
AUG
AUG
AUG
OCT
NOV
DEC
FEB
FEB
FEB
MAR
APR
1.00
1 .20
0.20
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
TOTALS
IRRIGATION
APPLICATION
WATER
WATER
WATER
WATER
0.202
0.273
0.050
0.228
0. 151
0.216
0. 151
0.203
0.224
0.216
0.216
0.153
0.207
0.038
0.173
2. 131
1.615
APPL.
ACRE LABOR
MONTH INCHES HOURS
FEB
MAR
APR
MAY
APPLICATION
APPLICATION
APPLICATION
APPLICATION
TOTALS
0. 115
0.164
0.115
0. 154
0.170
0. 164
0.164
2.12
2.78
0.43
2.31
1.07
1.52
0.97
1.46
1.89
1.52
1.52
1.01
1.37
0.25
1. 14
0.76
1.08
0.76
1.02
1.12
1.08
1.08
17.60 10.66
IRRIG
SYSTEM OPER. LABOR
HOURS COSTS COSTS
y^v
APPL. MACH
INPUT FIXED
COSTS COSTS
TOTAL
OPER.
COST
3.36
6.66
6.49
10.81
1.73
9.01
3.70
6.08
25.62
30.29
44.41
6.08
6.08
0.0
0.0
0.0
0.0
0.0
0.0
22.40
24.00
36.00
0.0
0.0
1 .04
5.55
1.88
3.48
1.50
3.82
5.40
3.48
3.48
82.40 3 9 . 6 6 1 5 0 . 3 1
APPL. I R R I G
INPUT FIXED
COSTS COSTS
4.00
4.00
4.00
4.00
0.400
0.400
0.400
0.400
0.0
0.0
0.0
0.0
15.68
15.68
15.68
15.68
1.52
1.52
1.52
1.52
0.0
0.0
0.0
0.0
16.00
1.600
0.0
62.72
6.08
0.0
8.16
8.16
8.16
8.16
TOTAL
IRRIG
COSTS
25.36
25.36
25.36
25.36
3 2 . 6 4 101.44
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF CORN SILAGE
(DOLLARS)
18.40
20.70
23.00
25.30
27.60
12.00
13.47
41.07
68.67
96.27
123.87
13.50
41.07
72.12
103.17
134.22
165.27
15.00
68.67
103.17
137.67
172.17
206.67
16.50
96.27
134.22
172.17
210.12
248.07
18.00
123.87
165.27
206.67
248.07
289.47
TON
QUANTITY OF
CORN SILAGE
5 6 5 P R O J E C T I O N S F O R P L A N N I N G P U R P O S E S O N LY
NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. B-1241(C12)
FOOD CORN, IRRIGATED
TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
PROJECTED
YIELD
UNIT
1. GROSS RECEIPTS
CORN
DEFICIENCY PMT.
TOTAL PROJECTED RETURNS
100.00
100.00
2. VARIABLE COSTS
INPUT USE
PREHARVEST COSTS
♦SEED CORN/GRAIN
15.00
♦NITROGEN (ANHY)
160.00
♦PHOSPHATE
80.00
♦NITROGEN (DRY)
33.00
♦HERBICIDE
1.00
HERBICIDE APPLI.
1.00
♦INSECTICIDE
1 .00
GEN. & HAIL INS.
1 .00
IRRIGATION WATER
16.00
FUEL & LUBE—TRACTOR
EQUIPMENT
IRRIGATION
R E PA I R S T R A C TO R
EOUIPMENT
IRRIGATION
LABOR
MACHINERY
2.39
IRRIGATION
1 .60
EOUIPMENT
0.63
OPERATING CAPITAL
76. 17
SUBTOTAL, PREHARVEST
HARVEST COSTS
CUSTOM HARVEST
1 .00
HAUL CORN
100.00
SUBTOTAL, HARVEST
TOTAL VARIABLE COSTS
BREAK-EVEN PRICE. VARIABLE COSTS
BU.
BU.
350.00
21 .00
371.00 $
LB.
LB.
LB.
LB.
ACRE
ACRE
APPL
ACRE
ACIN
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
HOUR
DOL.
ACRE
1 .40
0.14
0.30
0.25
10.00
4.00
16.00
13.00
21 .00
22.40
24.00
8.25
10.00
4.00
16.00
13.00
5.00
3.80
3.80
0.135
$
14.68
1 .39
50.56
3.65
2. 14
12.16
11 .97
6.08
2.39
10.28
233.95 $
ACRE
BU.
ACRE
25.00
0.17
$
25.00
17.00
42.00 $
ACRE
$
275.95 $
$ 2.55/BU. CORN
ACRE
4. FIXED COSTS
DEPREC..INTEREST.TAXES & INSUR.
TRACTOR
EQUIPMENT
IRRIGATION
LAND-CASH
RENT
1
.00
MISC
ADMIN
0/H
1
.00
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
5. TOTAL PROJECTED COSTS
ACRE
6. NET PROJECTED RETURNS
3.50
0.21
$
3. INCOME ABOVE VARIABLE COSTS
BREAK-EVEN PRICE, TOTAL COSTS
PROJECTED YOUR
S/UNIT
VA L U E E S T I M AT E
$
95.05
$
$
26.29
18.84
32.64
50.00
15.00
142.76 $
$
418.72 $
50.00
15.00
$ 3.98/BU. CORN
ACRE
$
-47.72
$
A FALL APPLICATION OF A HERBICIDE MAY BE NECESSARY IF WEEDS BECOME A PROBLEM
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
565
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83
B-124KC12)
FOOD CORN, IRRIGATED
TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
MACH
MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR
OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS
OFFSET DISC
BEDDER 6R
ROLLING CULT 6R
DRY FERT SPRDER
PLANTER 6R
ANHYDROUS SPRDER
ROLLING CULT 6R
ROLLING CULT 6R
SHREDDER
CHISEL PLOW
OFFSET DISC
LAND PLANE
1
2
3
3
3
3
3
3
2
1
1
2
34
36
38
60
42
61
38
38
30
33
34
50
OCT
NOV
DEC
FEB
FEB
FEB
MAR
APR
AUG
AUG
AUG
AUG
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.20
0 .20
0 . 173
0 . 115
0 . 164
0 . 154
0 . 170
0 . 115
0 . 164
0 . 164
0 . 199
0 . 153
0 . 207
0 . 038
2
1
1
1
1
0
1
1
2
2
2
0
31
33
52
46
89
97
52
52
38
12
78
43
1
0
1
1
1
0
1
1
1
1
1
0
14
76
08
02
12
76
08
08
31
01
37
25
0.0
0.0
0.0
32.25
37.00
22.40
0.0
0.0
0.0
0.0
0.0
0.0
5
1
3
3
5
1
3
3
3
3
6
1
55
90
48
82
40
50
48
48
65
36
66
04
9.01
3.98
6.08
38.54
45.41
25.62
6.08
6.08
7.34
6.49
10.81
1.73
2 . 3 9 4 1 . 8 1 4 2 0 . 2 4 11 . 9 7 9 1 . 6 5 4 3 . 3 2 1 6 7 . 1 8
TOTALS
IRRIGATION
APPLICATION
0.228
0.151
0.216
0.203
0.224
0.151
0.216
0.216
0.263
0.202
0.273
0.050
APPL. MACH TOTAL
INPUT FIXED OPER.
COSTS COSTS COST
APPL. ACRE LABOR
MONTH INCHES HOURS
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
JAN
APR
MAY
JUNE
TOTALS
3
3
6
4
00
00
00
00
0.300
0.300
0.600
0.400
I R R I G A P P L . I R R I G T O TA L
SYSTEM OPER. LABOR INPUT FIXED IRRIG
HOURS COSTS COSTS COSTS COSTS COSTS
0.0
0.0
0.0
0.0
16.00 1.600 0.0
11
11
23
15
.76
.76
.52
68
1
1
2
1
14
14
28
52
0.0
0.0
0.0
0.0
6
6
12
8
12
12
24
16
19
19
38
25
62.72 6.08 0.0 32.64 101.44
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF CORN
(DOLLARS)
2.80
3. 15
3.50
3.85
4.20
80.00
-31.75
-3.75
24.25
52.25
80.25
90.00
-3.35
28. 15
59.65
91 . 15
122.65
100.00
25.05
60.05
95.05
130.05
165.05
110.00
53.45
91 .95
130.45
168.95
207.45
120.00
81 .85
123.85
165.85
207.85
249.85
BU.
QUANTITY OF
CORN
02
02
04
36
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT
STRATEGIES.
566 PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83.
r
COTTON IRRIGATED, LONG SEASON VARITIES
TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
1. GROSS RECEIPTS
COTTON LINT
COTTONSEED
DEFICIENCY PMT.
TOTAL PROJECTED RETURNS
# ^
B-124KC12)
PROJECTED
YIELD
UNIT
900.00
0.73
900.00
2. VARIABLE COSTS
INPUT USE
PREHARVEST COSTS
♦SD COTTON-UPLAND
16.00
♦NITROGEN (ANHY)
80.00
♦PHOSPHATE
50.00
♦HERBICIDE
1.00
GEN. & HAIL INS.
1.00
♦INSECTICIDE
10.00
PESTICIDE APPLI.
10.00
♦DEFOLIANT
1.00
DEFOLIANT APPLI.
1.00
♦GROWTH RETARDANT
1.00
CUST RETARD APPL
1.00
IRRIGATION WATER
16.00
FUEL & LUBE--TRACTOR
EQUIPMENT
IRRIGATION
R E PA I R S - T R A C TO R
EQUIPMENT
IRRIGATION
LABOR MACHINERY
2.82
IRRIGATION
1.60
0.63
EQUIPMENT
OTHER
4.00
OPERATING CAPITAL
76.22
SUBTOTAL. PREHARVEST
HARVEST COSTS
CUST COTTON PICK
900.00
1.90
GIN. BAG, TIES
SUBTOTAL, HARVEST
TOTAL VARIABLE COSTS
PROJECTED YOUR
VALUE ESTIMATE
$/UNIT
LB.
TON
LB.
0.50
90.00
0.21
$
450.00
65.70
189.00
704.70 $
LB.
LB.
LB.
ACRE
ACRE
APPL
ACRE
ACRE
ACRE
APPL
APPL
ACIN
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
HOUR
HOUR
DOL.
ACRE
0.50
0. 14
0.30
4.00
13.00
7.50
3.50
12.50
2.75
12.00
3.50
5.00
3.80
3.80
3.80
0. 135
$
LB.
BALE
ACRE
0. 11
49.00
$
192.10 $
ACRE
$
521.97 $
8.00
11 .20
15.00 .
4.00
13.00
75.00
35.00
12.50
2.75
12.00
3.50
18.53
1 .39
50.56
4.60
2.60
12.16
14. 12
6.08
2.39
15.20
10.29
329.87 $
99.00
93.10
BREAK-EVEN PRICE, VARIABLE COSTS $ 0.30/LB. COTTON LINT
3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 1 8 2 . 7 3 $ .
4. FIXED COSTS
DEPREC..INTEREST,TAXES & INSUR
TRACTOR
EQUIPMENT
IRRIGATION
LAND-CASH
RENT
1
.(
MISC
ADMIN
0/H
1
.(
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
50.00
15.00
$
32. 15
24.07
32.64
50.00
15.00
153.86 $
5. TOTAL PROJECTED COSTS
ACRE
$
675.82 $
BREAK-EVEN PRICE. TOTAL COSTS
6. NET PROJECTED RETURNS
$ 0 . 4 7/LB. CO TTON LINT
ACRE
$
28.88 $
A FALL APPLICATION OF A HERBICIDE MAY BE NECESSARY IF WEEDS BECOME A PROBLEM
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
566
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83
B-1241(C12)
COTTON IRRIGATED, LONG SEASON VARITIES
TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
MACH
MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR
OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS
SHREDDER
CHISEL PLOW
OFFSET DISC
LAND PLANE
CHISEL PLOW
OFFSET DISC
OFFSET DISC
BEDDER 6R
HERBICIDE SPRAYR
DRY FERT SPRDER
ANHYDROUS SPRDER
PLANTER 6R
ROLLING CULT 6R
ROLLING CULT 6R
ROLLING CULT 6R
2
1
1
2
1
1
1
2
2
3
2
3
3
3
30
33
34
50
33
34
34
36
63
60
61
42
38
38
38
OCT
OCT
OCT
OCT
NOV
DEC
JAN
JAN
JAN
FEB
FEB
MAR
APR
MAY
JUNE
1 .00
1 .00
1 .20
0 .20
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
TOTALS
IRRIGATION
APPLICATION
0.263
0.202
0.273
0.050
0.202
0.228
0.228
0.151
0.0
0.203
0. 151
0.224
0.216
0.216
0.216
0 . 199
0 . 153
0 . 207
0 038
0 153
0 173
0 173
0 . 115
0 264
0 154
0 115
0 170
0 164
0 164
0 164
2.823
2 403
2.38
2.12
2.78
0.43
2. 12
2.31
2.31
1.33
0.08
1.81
0.97
2.28
1.52
1 .52
1 .52
1 31
1 .01
1 37
0 .25
1 .01
1 .14
1 . 14
0 .76
0 .0
1 .02
0 .76
1 . 12
1 .08
1 .08
1 .08
2 5 . 5 0 14 .12
APPL. MACH TOTAL
INPUT FIXED OPER.
COSTS COSTS COST
65
36
66
04
36
55
55
90
13
84
50
43
48
48
48
9.01
9.01
3.98
6.21
21 .67
14.42
16.83
6.08
6.08
6.08
3 8 . 2 0 54 .41
132.23
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
4.00
15.00
11 . 2 0
8.00
0.0
0.0
0.0
3
3
6
1
3
5
5
1
2
3
1
5
3
3
3
7.34
6.49
10.81
1 .73
6.49
I R R I G A P P L . I R R I G T O TA L
APPL. ACRE LABOR SYSTEM OPER. LABOR INPUT FIXED IRRIG
MONTH INCHES HOURS HOURS COSTS COSTS COSTS COSTS COSTS
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
FEB
APR
JUNE
AUG
TOTALS
4
4
4
4
.00
.00
.00
.00
0.400
0.400
0.400
0.400
0.0
0.0
0.0
0.0
16.00 1.600 0.0
15
15
15
15
68
68
68
68
1 .52
1 .52
1 .52
1 .52
0.0
0.0
0.0
0.0
8
8
8
8
16
16
16
16
25
25
25
25
62.72 6.08 0.0 32.64 101.44
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF COTTON LINT
(DOLLARS)
0.40
0.45
0.50
0.55
0.60
720.
8.21
44.21
80.21
116.21
152.21
810.
50.47
90.97
131.47
171.97
212.47
900.
92.73
137.73
182.73
227.73
272.73
990.
134.99
184.49
233.99
283.49
332.99
1080.
177.25
231.25
285.25
339.25
393.25
LB.
QUANTITY OF
COTTON LINT
36
36
36
36
567 PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83,
B-1241(C12)
COTTON IRRIGATED, SHORT SEASON VARIETIES
TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
1. GROSS RECEIPTS
COTTON LINT
COTTONSEED
DEFICIENCY PMT.
TOTAL PROJECTED RETURNS
PROJECTED
YIELD
UNIT
750.00
0.61
750.00
2. VARIABLE COSTS
INPUT USE
PREHARVEST COSTS
♦SD COTTON-UPLAND
16.00
♦NITROGEN (ANHY)
25.00
♦PHOSPHATE
40.00
♦HERBICIDE
1.00
GEN. & HAIL INS.
1.00
♦INSECTICIDE
5.00
PESTICIDE APPLI.
5.00
♦DEFOLIANT
1.00
DEFOLIANT APPLI.
1.00
IRRIGATION WATER
12.00
FUEL & LUBE—TRACTOR
EOUIPMENT
IRRIGATION
R E PA I R S T R A C T O R
EQUIPMENT
IRRIGATION
LAgOR MACHINERY
2.62
IRRIGATION
1 .20
EQUIPMENT
0.63
OTHER
4.00
OPERATING CAPITAL
39.24
SUBTOTAL, PREHARVEST
HARVEST COSTS
CUST COTTON PICK
750.00
GIN, BAG, TIES
1.56
SUBTOTAL, HARVEST
TOTAL VARIABLE COSTS
LB.
TON
LB.
PROJECTED YOUR
$/UNIT
VALUE ESTIMATE
0.50
90.00
0.21
$
0.50
0. 14
0.30
4.00
13.00
7.50
3.50
12.50
2.75
375.00
54.90
157.50
587.40 $
8.00
3.50
12.00
4.00
13.00
37.50
17.50
12.50
2.75
LB.
LB.
LB.
ACRE
ACRE
APPL
ACRE
ACRE
ACRE
ACIN
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
HOUR
HOUR
DOL.
ACRE
5.00
3.80
3.80
3.80
0.135
$
1 .39
37.92
4.24
2.38
9.12
13. 11
4.56
2.39
15.20
5.30
223.34 $
LB.
BALE
ACRE
0.11
49.00
$
82.50
76.44
158.94 $
ACRE
$
382.28 $
16.98
BREAK-EVEN PRICE, VARIABLE COSTS $ 0.23/LB. COTTON LINT
3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 2 0 5 . 1 2 $ _
4. FIXED COSTS
DEPREC..INTEREST,TAXES & INSUR
TRACTOR
EQUIPMENT
IRRIGATION
LAND-CASH
RENT
1.(
MISC
ADMIN
0/H
0.:
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
5. TOTAL PROJECTED COSTS
ACRE
BREAK-EVEN PRICE, TOTAL COSTS
6. NET PROJECTED RETURNS
50.00
15.00
$
29.42
23.44
24.48
50.00
11.25
138.59 $
$
520.87 $
$ 0 . 4 1 / L B . C OTTON LINT
ACRE
$
66.53 $
A FALL APPLICATION OF A HERBICIDE MAY BE NECESSARY IF WEEDS BECOME A PROBLEM
JSP^N
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
567
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83,
B-124KC12)
COTTON IRRIGATED, SHORT SEASON VARIETIES
TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
MACHINERY
OPERATION
SHREDDER
CHISEL PLOW
OFFSET DISC
OFFSET DISC
LAND PLANE
OFFSET DISC
BEDDER 6R
HERBICIDE SPRAYR
DRY FERT SPRDER
ANHYDROUS SPRDER
PLANTER 6R
ROLLING CULT 6R
ROLLING CULT 6R
ROLLING CULT 6R
MACH
ITEM OPER TIMES LABOR MACHINE OPER LABOR
NO. MONTH OVER HOURS HOURS COSTS COSTS
2,30
1,33
1,34
1,34
2,50
1,34
2,36
63
2,60
3,61
2,42
3,38
3,38
3,38
SEPT
SEPT
SEPT
NOV
NOV
JAN
JAN
JAN
JAN
JAN
MAR
APR
MAY
JUNE
1.00
1.00
1.00
1.20
0.20
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
TOTALS
IRRIGATION
APPLICATION
0.263
0.202
0.228
0.273
0.050
0.228
0.151
0.0
0.203
0.151
0.224
0.216
0.216
0.216
0. 199
0. 153
0.173
0.207
0.038
0. 173
0 . 11 5
0.264
0. 154
0. 115
0. 170
0. 164
0. 164
0. 164
2.622
2.251
APPL. ACRE LABOR
MONTH INCHES HOURS
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
FEB
MAY
JUNE
TOTALS
2.38
2. 12
2.31
2.78
0.43
2.31
1.33
0.08
1.81
0.97
2.28
1.52
1 .52
1.52
1.31
1.01
1.14
1.37
0.25
1.14
0.76
0.0
1.02
0.76
1.12
1.08
1 .08
1 .08
APPL. MACH
INPUT FIXED
COSTS COSTS
0.0
0.0
0.0
0.0
0.0
0.0
0.0
4.00
12.00
3.50
8.00
0.0
0.0
0.0
3.65
3.36
5.55
6.66
1.04
5.55
1.90
2.13
3.84
1 .50
5.43
3.48
3.48
3.48
TOTAL
OPER.
COST
7.34
6.49
9.01
10.81
1 .73
9.01
3.98
6.21
18.67
6.72
16.83
6.08
6.08
6.08
2 3 . 3 8 13. 11
2 7 . 5 0 5 1 . 0 5 11 5 . 0 4
IRRIG
APPL. I R R I G
INPUT FIXED
COSTS COSTS
TOTAL
IRRIG
COSTS
SYSTEM OPER. LABOR
HOURS COSTS COSTS
4.00
4.00
4.00
0.400
0.400
0.400
0.0
0.0
0.0
15.68
15.68
15.68
1 .52
1 .52
1 .52
0.0
0.0
0.0
8. 16
8. 16
8. 16
25.36
25.36
25.36
12.00
1.200
0.0
47.04
4.56
0.0
24.48
76.08
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF COTTON LINT
(DOLLARS)
0 40
0.45
0.50
0 55
0.60
600.00
59 42
89.42
119.42
149 42
179.42
675.00
94 77
128.52
162.27
196 02
229.77
750.00
130 12
167.62
205.12
242 62
280.12
825.00
165 46
206.71
247.96
289 21
330.46
900.00
200 81
245.81
290.81
335 81
380.81
LB.
QUANTITY OF
COTTON LINT
5 6 8 P R O J E C T I O N S F O R P L A N N I N G P U R P O S E S O N LY
NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83.
B-124KC12)
COTTON, DRYLAND. SHORT SEASON VARIETIES
TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
J$^\
CATEGORY
PROJECTED
YIELD
UNIT
GROSS RECEIPTS
COTTON LINT
COTTONSEED
DEFICIENCY PMT.
TOTAL PROJECTED RETURNS
VARIABLE COSTS
PREHARVEST COSTS
♦SD COTTON-UPLAND
♦NITROGEN (ANHY)
♦PHOSPHATE
♦HERBICIDE
♦INSECTICIDE
PESTICIDE APPLI.
♦DEFOLIANT
DEFOLIANT APPLI.
FUEL & LUBE--TRACTOR
EQUIPMENT
R E PA I R S T R A C T O R
EOUIPMENT
LABOR
MACHINERY
EQUIPMENT
OPERATING CAPITAL
SUBTOTAL. PREHARVEST
HARVEST COSTS
CUST HARV. STRIP
GIN STRPR COTTON
BL.BG.TIE-ST CTN
SUBTOTAL, HARVEST
350.00
0.28
350.00
LB.
TON
LB.
PROJECTED YOUR
VA L U E E S T I M AT E
$/UNIT
0.50
90.00
0.21
$
175.00
25.20
73.50
273.70 $
LB.
LB.
LB.
ACRE
APPL
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
ACRE
5.00
3.80
0. 135
$
6.00
3.50
6.00
4.00
22.50
10.50
12.50
2.75
10.68
1 .39
2.70
2.04
10.41
2.39
2.08
99.44 $
CWT.
CWT.
BALE
ACRE
1 .75
1.75
13.00
$
24.50
24.50
9. 10
58.10 $
INPUT USE
12.00
25.00
20.00
1 .00
3.00
3.00
1.00
1 .00
2.08
0.63
15.40
14.00
14.00
0.70
TOTAL VARIABLE COSTS
BREAK-EVEN PRICE. VARIABLE COSTS
ACRE
0.50
0. 14
0.30
4.00
7.50
3.50
12.50
2.75
$
157.54
$.
$ 0.17/LB. COTTON LINT
3. INCOME ABOVE VARIABLE COSTS
ACRE
$
4. FIXED COSTS
DEPREC..INTEREST,TAXES & INSUR.
TRACTOR
EQUIPMENT
MISC
ADMIN
0/H
0.50
LAND-CASH
RENT
1.00
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
ACRE
20.59
18.59
15.00
7.50
20.00
20.00
$
66.69
$_
5. TOTAL PROJECTED COSTS
ACRE
BREAK-EVEN PRICE, TOTAL COSTS
6. NET PROJECTED RETURNS
11 6 .
$
16
224.23
$.
$.
$ 0.36/LB. COTTON LINT
ACRE
$
49.47
$
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
jf0&&\
568
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83
B-1241(C12)
COTTON, DRYLAND, SHORT SEASON VARIETIES
TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
MACH
MACHINERY
OPERATION
SHREDDER
CHISEL PLOW
OFFSET DISC
OFFSET DISC
BEDDER 6R
HERBICIDE SPRAYR
DRY FERT SPRDER
ANHYDROUS SPRDER
PLANTER 6R
ROLLING CULT 6R
ROLLING CULT 6R
ITEM OPER TIMES LABOR MACHINE OPER LABOR
NO. MONTH OVER HOURS HOURS COSTS COSTS
3,30
3,33
3,34
3,34
3,36
63
3,60
3,61
3,42
3.38
3.38
SEPT
SEPT
SEPT
DEC
JAN
JAN
JAN
JAN
MAR
APR
MAY
TOTALS
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.263
0.202
0.228
0.228
0. 151
0.0
0.203
0.151
0.224
0.216
0.216
0. 199
0. 153
0. 173
0. 173
0 . 11 5
0.264
0.154
0. 115
0.170
0. 164
0.164
2.082
1 .842
1.92
1.51
1.62
1.62
1.07
0.08
1 .46
0.97
1.89
1.52
1.52
APPL. MACH
INPUT FIXED
COSTS COSTS
0.0
0.0
0.0
0.0
0.0
1.31
1.01
1.14
1.14
0.76
3.62
2.62
4.72
4.72
1.88
2.13
3.82
1 .50
5.40
3.48
3.48
6.85
5.14
7.49
7.49
3.70
6.21
12.29
6.72
14.41
6.08
6.08
19.50 37.38
82.48
0.0
4.00
6.00
3.50
6.00
1.02
0.76
1. 12
1.08
1.08
15. 19 1 0 . 4 1
TOTAL
OPER.
COST
0.0
0.0
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF COTTON LINT
(DOLLARS)
0.40
0.45
0.50
0.55
0 60
45.04
59.04
73.04
87.04
101 04
63.10
78.85
94.60
11 0 . 3 5
126 10
350.00
81.16
98.66
11 6 . 1 6
133.66
151 16
385.00
99.22
11 8 . 4 7
137.72
156.97
176 22
420.00
11 7 . 2 8
138.28
159.28
180.28
201 28
LB.
280.00
315.00
QUANTITY OF
COTTON LINT
•
>*%
5 6 9 P R O J E C T I O N S F O R P L A N N I N G P U R P O S E S O N LY
NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83.
B-1241(C12)
GRAIN SORGHUM, DRYLAND
TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
1. GROSS RECEIPTS
GRAIN SORGHUM
DEFICIENCY PMT.
TOTAL PROJECTED RETURNS
2. VARIABLE COSTS
PREHARVEST COSTS
♦GRAIN SORG. SEED
♦NITROGEN (ANHY)
♦PHOSPHATE
♦HERBICIDE
HERBICIDE APPLI.
♦INSECTICIDE
I N S E C T. A P P L I .
FUEL & LUBE—TRACTOR
EOUIPMENT
R E PA I R S T R A C TO R
EQUIPMENT
LABOR
MACHINERY
EOUIPMENT
OPERATING CAPITAL
SUBTOTAL, PREHARVEST
HARVEST COSTS
CUSTOM HARVEST D
HAUL GRAIN SORG
SUBTOTAL, HARVEST
PROJECTED
YIELD
UNIT
25.00
25.00
CWT.
CWT.
YOUR
ESTIMATE
PROJECTED
$/UNIT
VALUE
$
108.00
9.00
117.00 $
LB.
LB.
LB.
ACRE
ACRE
APPL
APPL
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
ACRE
5.00
3.80
0. 135
$
3.04
8.40
12.00
8.00
4.00
16.00
5.50
11 .01
1 .39
2.78
2.00
10.73
2.39
3.26
90.51 $
ACRE
CWT.
ACRE
18.00
0.30
$
18.00
7.50
25.50 $
ACRE
$
116.01 $
4.32
0.36
INPUT USE
4.00
60.00
40.00
1.00
1.00
2.00
2.00
2. 15
0.63
24.17
1.00
25.00
TOTAL VARIABLE COSTS
0.76
0. 14
0.30
8.00
4.00
8.00
2.75
BREAK-EVEN PRICE. VARIABLE COSTS $ 4.28/CWT. GRAIN SORGHUM
3.
INCOME
ABOVE
VA R I A B L E
FIXED COSTS
DEPREC..INTEREST,TAXES & INSUR.
TRACTOR
EOUIPMENT
LAND-CASH
RENT
1.00
MISC
ADMIN
0/H
0.30
TO TA L
FIXED
COSTS
TOTAL PROJECTED COSTS
BREAK-EVEN PRICE, TOTAL COSTS
NET PROJECTED RETURNS
COSTS
ACRE
$
0.99
$
ACRE
ACRE
ACRE
ACRE
ACRE
15.00
15.00
$
21 .23
17.42
15.00
4.50
58.15 $
ACRE
$
174.16 $
$ 6.61/CWT. GRAIN SORGHUM
ACRE
$
-57.16
$
A FALL APPLICATION OF A HERBICIDE MAY BE NECESSARY IF WEEDS BECOME A PROBLEM
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
/0&\
569
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. B-1241(C12)
GRAIN SORGHUM, DRYLAND
TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
MACHINERY
OPERATION
SHREDDER
CHISEL PLOW
OFFSET DISC
OFFSET DISC
ANHYDROUS SPRDER
DRY FERT SPRDER
PLANTER 6R
ROLLING CULT 6R
ROLLING CULT 6R
ROLLING CULT 6R
MACH
ITEM OPER TIMES LABOR MACHINE OPER LABOR
NO. MONTH OVER HOURS HOURS COSTS COSTS
3,30
3.33
3,34
3.34
3,61
3,60
3.42
3.38
3.38
3,38
AUG
AUG
SEPT
DEC
FEB
FEB
FEB
MAR
APR
MAY
TOTALS
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.263
0.202
0.228
0.228
0.151
0.203
0.224
0.216
0.216
0.216
0.199
0. 153
0.173
0.173
0. 115
0.154
0. 170
0. 164
0. 164
0. 164
2. 147
1.626
1 .92
1.51
1.62
1.62
0.97
1 .46
1 .89
1.52
1 .52
1.52
1.31
1.01
1.14
1. 14
0.76
1.02
1 .12
1.08
1.08
1.08
15.57 10.73
APPL. MACH
INPUT FIXED
COSTS COSTS
TOTAL
OPER.
COST
3.62
2.62
4.72
4.72
1.50
3.82
5.40
3.48
3.48
3.48
6.85
5.14
7.49
7.49
11.62
18.29
11.45
6.08
6.08
6.08
23.44 36.85
86.59
0.0
0.0
0.0
0.0
8.40
12.00
3.04
0.0
0.0
0.0
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF GRAIN SORGHUM
(DOLLARS)
3.46
3.89
4.32
4.75
5.18
20.00
-38.19
-29.55
-20.91
-12.27
-3.63
22.50
-29.40
-19.68
-9.96
-0.24
9.48
25.00
-20.61
-9.81
0.99
11 . 7 9
22.59
27.50
- 11 . 8 2
0.06
11 . 9 4
23.82
35.70
30.00
-3.03
9.93
22.89
35.85
48.81
CWT.
QUANTITY OF
GRAIN SORGHUM
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT
STRATEGIES.
570 PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83.
B-124KC12)
GRAIN SORGHUM, IRRIGATED
TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
1. GROSS RECEIPTS
GRAIN SORGHUM
DEFICIENCY PMT.
TOTAL PROJECTED RETURNS
PROJECTED
YIELD
UNIT
50.00
50.00
2. VARIABLE COSTS
INPUT USE
PREHARVEST COSTS
♦GRAIN SORG. SEED
6.00
♦NITROGEN (ANHY)
120.00
♦PHOSPHATE
60.00
♦HERBICIDE
1.00
HERBICIDE APPLI.
1.00
♦INSECTICIDE
2.00
INSECT. APPLI.
2.00
GEN. & HAIL INS.
1.00
IRRIGATION WATER
12.00
FUEL & LUBE—TRACTOR
EQUIPMENT
IRRIGATION
R E PA I R S T R A C T O R
EQUIPMENT
IRRIGATION
LABOR MACHINERY
2.39
IRRIGATION
1 .20
EQUIPMENT
0.28
OPERATING CAPITAL
46.85
SUBTOTAL. PREHARVEST
HARVEST COSTS
CUSTOM HARVEST I
50.00
HAUL GRAIN SORG
50.00
SUBTOTAL, HARVEST
TOTAL VARIABLE COSTS
PROJECTED YOUR
$/UNIT
VALUE ESTIMATE
CWT.
CWT.
4.32
0.36
LB.
LB.
LB.
ACRE
ACRE
APPL
APPL
ACRE
ACIN
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
HOUR
DOL.
ACRE
0.76
0. 14
0.30
8.00
4.00
8.00
2.75
13.00
CWT.
CWT.
ACRE
$
4.56
16.80
18.00
8.00
4.00
16.00
5.50
13.00
$
12.28
0.62
37.92
3. 11
2.02
9. 12
11.97
4.56
1.06
6.33
174.84 $
$
22.50
15.00
37.50 $
$
212.34 $
5.00
3.80
3.80
0. 135
0.45
0.30
ACRE
216.00
18.00
234.00 $
BREAK-EVEN PRICE, VARIABLE COSTS $ 3.89/CWT. GRAIN SORGHUM
INCOME ABOVE VARIABLE COSTS
FIXED COSTS
DEPREC..INTEREST.TAXES & INSUR.
TRACTOR
EOUIPMENT
I R R I G AT I O N
LAND-CASH RENT 1.00
MISC ADMIN
0/H
1.00
TO TA L
FIXED
COSTS
TOTAL PROJECTED COSTS
BREAK-EVEN PRICE. TOTAL COSTS
NET PROJECTED RETURNS
ACRE
21.66 $
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
40.00
15.00
$
23.68
17.83
24.48
40.00
15.00
120.99 $
ACRE
$
333.33 $
$ 6.31/CWT. GRAIN SORGHUM
ACRE
$
-99.33
$
A FALL APPLICATION OF A HERBICIDE MAY BE NECESSARY IF WEEDS BECOME A PROBLEM
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83
570
B-124KC12)
GRAIN SORGHUM, IRRIGATED
TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
MACH
MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR
OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS
CHISEL PLOW
OFFSET DISC
OFFSET DISC
LAND PLANE
BEDDER 6R
DRY FERT SPRDER
ANHYDROUS SPRDER
PLANTER 6R
ROLLING CULT 6R
ROLLING CULT 6R
ROLLING CULT 6R
SHREDDER
3
3
3
3
3
3
3
3
3
3
3
3
33
34
34
50
36
60
61
42
38
38
38
30
AUG
AUG
DEC
DEC
JAN
FEB
FEB
MAR
MAR
APR
MAY
JULY
1 .00
1.00
1.20
0 .20
1 .00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
TOTALS
IRRIGATION
APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
0.202
0.228
0.273
0.050
0.151
0.203
0.151
0.224
0.216
0.216
0.216
0.263
0 . 153
0 . 173
0 . 207
0 . 038
0 . 115
0 . 154
0 . 115
0 . 170
0 . 164
0 . 164
0 . 164
0 . 199
1 .51
1 .62
1.95
0 .35
1 .07
1.46
0 .97
1 .89
1 .52
1 .52
1.52
1 .92
1
1
1
0
0
1
0
1
1
1
1
1
01
14
37
25
76
02
76
12
08
08
08
31
>*:^\
APPL. MACH TOTAL
INPUT FIXED OPER.
COSTS COSTS COST
0.0
0.0
0.0
0.0
0.0
18.00
16.80
4.56
0.0
0.0
0.0
0.0
2
4
5
1
1
3
1
5
3
3
3
3
62
72
67
04
88
82
50
40
48
48
48
62
5. 14
7.49
8.98
1.63
3.70
24.29
20.02
12.97
6.08
6.08
6.08
6.85
2 . 3 9 4 1 . 8 1 4 1 7 . 3 0 11 . 9 7 3 9 . 3 6 4 0 . 7 1 1 0 9 . 3 4
APPL. ACRE LABOR
MONTH INCHES HOURS
JAN
MAR
MAY
4 .00
4 .00
4 .00
0.400
0.400
0.400
IRRIG
SYSTEM OPER. LABOR
HOURS COSTS COSTS
0.0
0.0
0.0
12.00 1.200 0.0
TOTALS
15 68
15 68
15 68
1.52
1.52
1.52
APPL. IRRIG TOTAL
INPUT FIXED IRRIG
COSTS COSTS COSTS
0.0
0.0
0.0
8 16
8. 16
8. 16
25 36
25 36
25 36
47.04 4.56 0.0 24.48 76.08
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF GRAIN SORGHUM
(DOLLARS)
3.46
3.89
4.32
4.75
5. 18
40.00
-52.20
-34.92
-17.64
-0.36
16.92
45.00
-36.87
-17.43
2.01
21 .45
40.89
50.00
-21.54
0.06
21 .66
43.26
64.86
55.00
-6.21
17.55
41.31
65.07
88.83
60.00
9.12
35.04
60.96
86.88
112.80
CWT.
QUANTITY OF
GRAIN SORGHUM
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT
STRATEGIES.
-''^V
5 7 1 P R O J E C T I O N S F O R P L A N N I N G P U R P O S E S O N LY
NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83.
B-124KC12)
GUAR. IRRIGATED, TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
/fpN
CATEGORY
1. GROSS RECEIPTS
GUAR
TOTAL PROJECTED RETURNS
PROJECTED
YIELD
UNIT
17.50
CWT.
2. VARIABLE COSTS
INPUT USE
PREHARVEST COSTS
♦INSECTICIDE
1.00
♦GUAR SEED
8.00
♦INNOCULANT
1.00
♦NITROGEN (ANHY)
100.00
♦PHOSPHATE
45.00
♦HERBICIDE
1.00
HERBICIDE APPLI.
1.00
INSECT. APPLI.
1.00
IRRIGATION WATER
13.00
FUEL & LUBE--TRACTOR
EQUIPMENT
IRRIGATION
R E PA I R S T R A C T O R
EQUIPMENT
IRRIGATION
LABOR MACHINERY
1 .97
IRRIGATION
1 .30
EQUIPMENT
0.63
OTHER
2.00
OPERATING CAPITAL
38.86
SUBTOTAL, PREHARVEST
HARVEST COSTS
CUS HARV GUAR
1.00
HAUL GUAR
17.50
SUBTOTAL, HARVEST
TO TA L
VA R I A B L E
COSTS
-
APPL
LB.
ACRE
LB.
LB.
ACRE
ACRE
APPL
ACIN
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
HOUR
HOUR
DOL.
ACRE
ACRE
CWT.
ACRE
ACRE
PROJECTED YOUR
VALUE ESTIMATE
$/UNIT
20.00
$
350.00
350.00 $
8.00
0.65
0.50
0. 14
0.30
4.00
4.00
2.75
8.00
5.20
0.50
14.00
13.50
4.00
4.00
2.75
8.80
$
1 .39
41 .08
1 .86
2.04
9.88
9.86
4.94
2.39
7.60
5.25
147.04 $
$
25.00
4.38
29.38 $
5.00
3.80
3.80
3.80
0.135
25.00
0.25
$
176.41
$_
BREAK-EVEN PRICE, VARIABLE COSTS $ 10.08/CWT. GUAR
INCOME ABOVE VARIABLE COSTS
FIXED COSTS
DEPREC..INTEREST.TAXES & INSUR.
TRACTOR
EQUIPMENT
I R R I G AT I O N
LAND-CASH
RENT
1.00
MISC
ADMIN
0/H
0.50
TO TA L
FIXED
COSTS
5. TOTAL PROJECTED COSTS
BREAK-EVEN PRICE, TOTAL COSTS
6. NET PROJECTED RETURNS
ACRE
$ 173.59 $
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
20.31
16.05
26.52
30.00
30.00
15.00
7.50
$ 100.38 $"
ACRE
$
276.79
$.
$ 15.82/CWT. GUAR
ACRE
$
73.21
$
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
571
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83
B-1241(C12)
GUAR, IRRIGATED, TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
M A C H A P P L . M A C H TO TA L
MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR INPUT FIXED OPER.
OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS COSTS COSTS COST
MOLDBOARD PLOW
CHISEL PLOW
TANDEM DISC
BEDDER 6R
ROLLING CULT 6R
PLANTER 6R
DRY FERT SPRDER
ANHYDROUS SPRDER
ROLLING CULT 6R
ROLLING CULT 6R
3
3
3
4
4
4
3
3
4
4
32
33
58
36
38
42
60
61
38
38
DEC
DEC
JAN
JAN
FEB
APR
APR
APR
MAY
JUNE
0 .50
0 .50
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
1 .00
TOTALS
IRRIGATION
APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
0
0
0
0
0
0
0
0
0
0
285
101
208
151
216
224
203
151
216
216
0 . 216
0 . 076
0 . 158
0 . 115
0 . 164
0 170
0 . 154
0 . 115
0 . 164
0 164
2
0
1
0
1
1
1
0
1
1
35
76
43
77
10
45
46
97
10
10
1
0
1
0
1
1
1
0
1
1
43
50
04
76
08
12
02
76
08
08
0.0
0.0
0.0
0.0
0.0
5.70
13.50
14.00
0.0
0.0
5 87
1 31
3 54
2 00
3 65
5 58
3 82
1 .50
3 65
3 65
9
2
6
3
5
13
19
17
5
5
1.972 1.494 12.48 9.86 33.20 34.56 90.10
I R R I G A P P L . I R R I G T O TA L
APPL. ACRE LABOR SYSTEM OPER. LABOR INPUT FIXED IRRIG
MONTH INCHES HOURS HOURS COSTS COSTS COSTS COSTS COSTS
MAR
4.00
M AY 3 . 0 0
JUNE 3.00
J U LY 3 . 0 0
TOTALS
0.400
0.300
0.300
0.300
0.0
0.0
0.0
0.0
13.00 1.300 0.0
15
11
11
11
.68
76
.76
76
50.96
1
1
1
1
52
14
14
14
8
6
6
6
0.0
0.0
0.0
0.0
4.94
0.0
16
12
12
12
26.52
25
19
19
19
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF GUAR
(DOLLARS)
16.00
18.00
20.00
22.00
24.00
14.00
48.46
76.46
104.46
132.46
160.46
15.75
76.02
107.52
139.02
170.52
202.02
17.50
103.59
138.59
173.59
208.59
243.59
19.25
131.15
169.65
208.15
246.65
285.15
21.00
158.71
200.71
242.71
284.71
326.71
CWT.
.36
02
02
02
82.42
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
QUANTITY OF
GUAR
64
57
02
52
83
85
79
22
83
83
572 PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83.
B-124KC12)
GUAR, DRYLAND, TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
J**\
CATEGORY
1. GROSS RECEIPTS
GUAR
TOTAL PROJECTED RETURNS
2. VARIABLE COSTS
PREHARVEST COSTS
♦GUAR SEED
♦INNOCULANT
♦NITROGEN (ANHY)
♦PHOSPHATE
♦HERBICIDE
♦INSECTICIDE
INSECT. APPLI.
HERBICIDE APPLI.
FUEL & LUBE--TRACTOR
EQUIPMENT
R E PA I R S T R A C T O R
EQUIPMENT
LABOR MACHINERY
EQUIPMENT
OPERATING CAPITAL
SUBTOTAL. PREHARVEST
HARVEST COSTS
CUS HARV GUAR
HAUL GUAR
SUBTOTAL. HARVEST
PROJECTED
YIELD
UNIT
8.00
YOUR
ESTIMATE
PROJECTED
VALUE
$/UNIT
CWT.
20.00
$
160.00
160.00 $
LB.
ACRE
LB.
LB.
ACRE
APPL
APPL
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
ACRE
0.65
0.50
$
5.20
0.50
7.00
4.50
4.00
8.00
2.75
4.00
7.94
1 .08
1 .72
1 .64
8.75
1 .86
1.47
60.41 $
$
25.00
2.00
27.00 $
$
87.41 $
INPUT USE
8.00
1.00
50.00
15.00
1 .00
1.00
1.00
1.00
1 .75
0.49
10.88
1.00
8.00
TOTAL VARIABLE COSTS
ACRE
CWT.
ACRE
0. 14
0.30
4.00
8.00
2.75
4.00
5.00
3.80
0.135
25.00
0.25
ACRE
BREAK-EVEN PRICE, VARIABLE COSTS $ 10.93/CWT. GUAR
3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 7 2 . 5 9 $
FIXED COSTS
DEPREC..INTEREST,TAXES & INSUR.
TRACTOR
EQUIPMENT
LAND-CASH RENT 1.00
MISC ADMIN
0/H
0.50
TO TA L
FIXED
COSTS
TOTAL PROJECTED COSTS
BREAK-EVEN PRICE. TOTAL COSTS
NET PROJECTED RETURNS
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
17.93
14.26
20.00 20.00
15.00
7.50
$"
59.70 $.
$
147.
10
$.
$ 18.39/CWT. GUAR
ACRE
$
12.90
$
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
#***
572
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83,
B-124KC12)
GUAR, DRYLAND, TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
MACHINERY
OPERATION
MOLDBOARD PLOW
TANDEM DISC
TANDEM DISC
BEDDER 6R
DRY FERT SPRDER
ANHYDROUS SPRDER
PLANTER 6R
ROLLING CULT 6R
ROLLING CULT 6R
MACH
ITEM OPER TIMES LABOR MACHINE OPER LABOR
NO. MONTH OVER HOURS HOURS COSTS COSTS
3,32
3.58
3,58
4,36
3,60
3,61
4,42
4,38
4,38
NOV
JAN
MAY
MAY
MAY
MAY
JUNE
JULY
AUG
TOTALS
0.30
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.171
0.208
0.208
0.151
0.203
0.151
0.224
0.216
0.216
0.130
0.158
0.158
0. 115
0.154
0. 115
0. 170
0. 164
0. 164
1.41
1.43
1 .43
0.77
1.46
0.97
1.45
1.10
1. 10
0.86
1.04
1 .04
0.76
1.02
0.76
1.12
1.08
1.08
1 .750
1.325
11. 12
8.75
>^%
APPL. MACH
INPUT FIXED
COSTS COSTS
TOTAL
OPER.
COST
3.52
3.54
3.54
2.00
3.82
1.50
5.58
3.65
3.65
5.78
6.02
6.02
3.52
10.79
10.22
13.85
5.83
5.83
17.20 30.79
67.86
0.0
0.0
0.0
0.0
4.50
7.00
5.70
0.0
0.0
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF GUAR
(DOLLARS)
16.00
18.00
20.00
22.00
24.00
6.40
15.39
28. 19
40.99
53.79
66.59
7.20
27.99
42.39
56.79
71. 19
85.59
8.00
40.59
56.59
72.59
88.59
104.59
8.80
53. 19
70.79
88 .39
105.99
123.59
9.60
65.79
84.99
104.19
123.39
142.59
CWT.
QUANTITY OF
GUAR
^ %
5 7 3 P R O J E C T I O N S F O R P L A N N I N G P U R P O S E S O N LY
NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83.
B-1241(C12)
PEANUTS. FLORUNNER. IRRIGATED
TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
PROJECTED
YIELD
UNIT
1. GROSS RECEIPTS
FLORUNNER PEANUT
TOTAL PROJECTED RETURNS
CWT.
27.50
28.00
$
2. VARIABLE COSTS
INPUT USE
PREHARVEST COSTS
♦PEANUT SEED
100.00
♦NITROGEN (DRY)
20.00
♦PHOSPHATE
50.00
CUSTOM FERTILIZE
1.00
♦NEMATICJDE
1.00
♦HERBICIDE
1 .00
RISK INSURANCE
1.00
♦INSECTICIDE
2.00
1 .00
CUST INSECT.
♦FUNGICIDE
7.00
PESTICIDE APPLI.
7.00
1 .00
CUST. PCNB FUNG.
ALLOTMENT LEASE
27.50
IRRIGATION WATER
17.00
FUEL & LUBE—TRACTOR
EQUIPMENT
IRRIGATION
R E PA I R S T R A C TO R
EQUIPMENT
IRRIGATION
LABOR
MACHINERY
2.56
IRRIGATION
1.70
0.60
EOUIPMENT
OTHER
3.00
OPERATING CAPITAL
57.00
SUBTOTAL. PREHARVEST
HARVEST COSTS
♦CUSTOM HAUL
1.50
♦CUSTOM DRYING
1.50
FUEL & LUBE--TRACTOR
R E PA I R S T R A C TO R
EQUIPMENT
LABOR
MACHINERY
1 .63
SUBTOTAL. HARVEST
TOTAL VARIABLE COSTS
PROJECTED YOUR
VALUE ESTIMATE
$/UNIT
LB.
LB.
LB.
ACRE
ACRE
ACRE
ACRE
APPL
APPL
APPL
ACRE
APPL
CWT.
ACIN
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
HOUR
HOUR
DOL.
ACRE
0.58
0.25
0.30
1.80
8.60
4. 10
15.00
4. 10
16.50
7.00
3.50
43.00
2.65
TON
TON
ACRE
ACRE
ACRE
HOUR
ACRE
7.00
25.00
58.00
5.00
15.00
1.80
8.60
4.10
15.00
8.20
16.50
49.00
24.50
43.00
72.87
5.00
3.80
3.80
3.80
0. 135
$
17.98
1.32
53.72
4.51
3.06
12.92
12.82
6.46
2.28
11 .40
7.69
455.74 $
$
10.50
37.50
10.45
2.86
2.00
8.15
71.46 $
$
527.20 $
5.00
ACRE
770.00
770.00 $
BREAK-EVEN PRICE, VARIABLE COSTS $ 19.17/CWT. FLORUNNER PEANUT
3.
INCOME
ABOVE
VA R I A B L E
COSTS
4. FIXED COSTS
DEPREC..INTEREST,TAXES & INSUR.
TRACTOR
EQUIPMENT
I R R I G AT I O N
MISC
ADMIN
0/H
1.00
LAND-CASH
RENT
1.00
TO TA L
FIXED
COSTS
TOTAL PROJECTED COSTS
BREAK-EVEN PRICE. TOTAL COSTS
NET PROJECTED RETURNS
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
$
15.00
50.00
ACRE
242.80
$
$
46.20
28.40
34.68
15.00
50.00
174.28 $
$
701.48 $
$ 25.51/CWT. FLORUNNER PEANUT
ACRE
$
68.52
$
0^\
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
573
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83
B-124KC12)
PEANUTS. FLORUNNER, IRRIGATED
TEXAS WINTER GARDEN REGION
1983 PROJECTED COSTS AND RETURNS PER ACRE
MACH
MACHINERY
OPERATION
OFFSET DISC
TANDEM DISC
CHISEL PLOW
MOLDBOARD PLOW
BEDDER 6R
PEANUT PLANTER
ROLLING CULT 6R
HERBICIDE SPRAYR
CULTIVATOR 6R
CULTIVATOR 6R
PEANUT DIG SHK2R
PEANUT COMB. 4R
LABOR
ITEM OPER TIMES LABOR MACHINE OPER
NO. MONTH OVER HOURS HOURS COSTS COSTS
SEPT
1,34
1,58
1 ,33
1,32
2,36
2,68
2,38
63
2.40
2,40
2.66
2,67
OCT
DEC
JAN
FEB
APR
APR
APR
APR
MAY
AUG
AUG
1.00
1.00
1.00
1.00
2.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
TOTALS
IRRIGATION
APPLICATION
WATER
WATER
WATER
WATER
APPLICATION
APPLICATION
APPLICATION
APPLICATION
0.228
0.208
0.202
0.571
0.302
0.318
0.432
0.0
0.151
0. 151
1 .084
0.546
0. 115
0. 115
0.821
0.414
4. 193
3.441
APPL.
ACRE LABOR
MONTH INCHES HOURS
MAY
JUNE
JULY
AUG
TOTALS
0.173
0.158
0.153
0.432
0.229
0.241
0.327
0.264
1.14
2.31
2.07
2.12
6.42
2.66
3.25
3.80
0.08
1.32
1.32
9.74
5.57
1 .04
1.01
2.85
1.51
1.59
2.16
0.0
0.76
0.76
5.42
2.73
APPL. MACH
INPUT FIXED
COSTS COSTS
TOTAL
OPE"R.
COST
5.55
4.30
3.36
13.81
3.80
58.00 6.47
0.0
7.01
4 . 1 0 2. 13
0.0
2.32
0.0
2.32
0 . 0 11 .57
4 8 . 0 0 10.25
9.01
7.41
6.49
23.09
7.97
69.30
12.97
6.31
4.39
4.39
26.72
66.55
0.0
0.0
0.0
0.0
0.0
40.65 2 0 . 9 6 11 0 . 1 0 7 2 . 8 8 244.59
IRRIG
SYSTEM OPER. LABOR
HOURS COSTS COSTS
APPL. IRRIG
INPUT FIXED
COSTS COSTS
TOTAL
IRRIG
COSTS
19.02
38.04
38.04
12.68
3.00
6.00
6.00
2.00
0.300
0.600
0.600
0.200
0.0
0.0
0.0
0.0
11.76
23.52
23.52
7.84
1. 14
2.28
2.28
0.76
0.0
0.0
0.0
0.0
6. 12
12.24
12.24
4.08
17.00
1.700
0.0
66.64
6.46
0.0
34.68 107.78
'**«%
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF FLORUNNER PEANUT
(DOLLARS)
22.40
25.20
28.00
30.80
33.60
22.00
-10.22
51 .38
11 2 . 9 8
174.58
236.18
24.75
QUANTITY OF
FLORUNNER PEANUT 27.50
39.29
108.59
177.89
247.19
316.49
88.80
165.80
242.80
319.80
396.80
30.25
138.32
223.02
307.72
392.41
4 7 7 . 11
33.00
187.83
280.23
372.63
465.03
557.43
CWT.
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT
STRATEGIES.
Download