762 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. B-1241(C16) FORAGE SORGHUM HAY DRY LAND TEXAS EDWARDS AQUIFER REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS SORGHUM HAY TOTAL PROJECTED RETURNS 2. VARIABLE COSTS PREHARVEST COSTS ♦FORAGE SORG SEED ♦NITROGEN (ANHY) ♦PHOSPHATE FUEL & LUBE—TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS MOW.RAKE,BALE CUSTOM HAUL SUBTOTAL, HARVEST PROJECTED YIELD UNIT 4.50 PROJECTED VALUE $/UNIT YOUR ESTIMATE TON 60.00 $ 270.00 270.00 $ LB. LB. LB. ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 0.32 0.14 0.30 5.00 3.80 0. 135 $ 9.60 11 .20 12.00 7.53 0.62 1 .90 1. 12 7.34 1.06 -0.20 52. 18 $ BALE BALE ACRE 0.70 0.35 $ 104.30 52. 15 156.45 $ ACRE $ 208.63 $ INPUT USE 30.00 80.00 40.00 1 .47 0.28 -1 .49 149.00 149.00 TOTAL VARIABLE COSTS BREAK-EVEN PRICE, VARIABLE COSTS $ 46.36/TON SORGHUM HAY INCOME ABOVE VARIABLE COSTS FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 MISC ADMIN 0/H 0.30 TO TA L FIXED COSTS TOTAL PROJECTED COSTS BREAK-EVEN PRICE, TOTAL COSTS NET PROJECTED RETURNS ACRE ACRE ACRE ACRE ACRE ACRE ACRE 61.37 $ 14.,52 10. 18 10.00 10.,00 15.00 4..50 $ 39.20 $. $ 247.83 $. $ 55.07/TON SORGHUM HAY ACRE $ 22.17 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 762 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83 B-1241(C16) FORAGE SORGHUM HAY DRY LAND TEXAS EDWARDS AQUIFER REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER CHISEL PLOW OFFSET DISC ANHYDROUS SPRDER DRY FERT SPRDER GRAIN DRILL ANHYDROUS SPRDER MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 3,30 3,33 3,34 3,61 3.60 3.46 3.61 OCT NOV NOV FEB FEB FEB MAY TOTALS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.263 0.202 0.228 0. 151 0.203 0.270 0. 151 0.199 0. 153 0. 173 0. 115 0. 154 0.205 0. 115 1.92 1.51 1.62 0.97 1.46 1 .468 1. 112 APPL. MACH INPUT FIXED COSTS COSTS 0.0 0.0 0.0 TOTAL OPER. COST 1 .99 0.97 1.31 1.01 1. 14 0.76 1.02 1 .35 0.76 5.60 12.00 9.60 5.60 3.62 2.62 4.72 1 .50 3.82 6. 13 1 .50 6.85 5. 14 7.49 8.82 18.29 19.07 8.82 10.46 7.34 32.80 23.90 74.50 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF SORGHUM HAY (DOLLARS) 48.00 54.00 60.00 66.00 72.00 3.60 -4.54 17.06 38.66 60.26 81.86 4.05 1.42 25.72 50.02 74.32 98.62 4.50 7.37 34.37 61.37 88.37 115.37 4.95 13.33 43.03 72.73 102.43 132.13 5.40 19.28 51.68 84.08 116.48 148.88 TON QUANTITY OF SORGHUM HAY NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT. GRAZE-OUT. OR OTHER MANAGEMENT STRATEGIES. ^*««?v 763 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. B-1241(C16) FORAGE SORGHUM HAY, IRRIGATED TEXAS EDWARDS AQUIFER REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY GROSS RECEIPTS SORGHUM HAY TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 10.00 VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦FORAGE SORG SEED 40.00 ♦NITROGEN (ANHY) 240.00 ♦PHOSPHATE 60.00 IRRIGATION WATER 20.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 1 .87 IRRIGATION 2.00 EQUIPMENT 0.63 OPERATING CAPITAL 8.35 SUBTOTAL, PREHARVEST HARVEST COSTS MOW,RAKE,BALE 330.00 CUSTOM HAUL 330.00 SUBTOTAL. HARVEST TOTAL VARIABLE COSTS BREAK-EVEN PRICE. VARIABLE COSTS TON 60.00 LB. LB. LB. ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. ACRE 0.32 0. 14 0.30 BALE BALE ACRE 0.70 0.35 $ YOUR ESTIMATE 600.00 600.00 $ 12.80 33.60 18.00 $ 9.57 1 .39 57.60 2.42 1 .30 13.40 9.33 7.60 2.39 1 . 13 170.53 $ $ 231.00 115.50 346.50 $ $ 517.03 $ $ 51.70/TON SORGHUM HAY ACRE 4. FIXED COSTS DEPREC..INTEREST,TAXES &' INSUR. TRACTOR EQUIPMENT IRRIGATION LAND-CASH RENT 1.00 MISC ADMIN 0/H 0.50 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE ACRE 5. TOTAL PROJECTED COSTS ACRE 6. NET PROJECTED RETURNS 5.00 3.80 3.80 0. 135 ACRE 3. INCOME ABOVE VARIABLE COSTS BREAK-EVEN PRICE. TOTAL COSTS PROJECTED VALUE S/UNIT $ 82.97 $ $ 18.46 12.22 33.00 35.00 7.50 106.18 $ $ 623.21 $ 35.00 15.00 $ 62.32/TON SORGHUM HAY ACRE $ -23.21 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF' MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. /jjH^N 763 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. B-1241(C16) FORAGE SORGHUM HAY, IRRIGATED TEXAS EDWARDS AQUIFER REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE MACH MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS SHREDDER CHISEL PLOW OFFSET DISC LAND PLANE ANHYDROUS SPRDER DRY FERT SPRDER GRAIN DRILL ANHYDROUS SPRDER ANHYDROUS SPRDER ANHYDROUS SPRDER 3 3 3 3 3 3 3 3 3 3 30 33 34 50 61 60 46 61 61 61 NOV NOV NOV NOV FEB FEB FEB MAY JUNE JULY 1.00 1 .00 1.20 0 .20 1.00 1.00 1 .00 1 .00 1 .00 1 .00 WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION 263 202 273 050 151 203 270 151 151 151 0 0 0 0 0 0 0 0 0 0 199 153 207 038 115 154 205 115 115 115 1.92 1.51 1.95 0.35 0.97 1.46 1.99 0.97 0.97 0.97 1 1 1 0 0 1 1 0 0 0 31 0.0 01 0.0 37 0.0 25 0.0 76 8.40 02 18.00 35 12.80 76. 8 . 4 0 76 8.40 76 8.40 3 .62 2 62 5 .67 1 .04 1 .50 3 .82 6 .13 1.50 1.50 1.50 6 85 5 14 8 .98 1 63 11 62 24 .29 22 .27 11 .62 11 62 11 62 1 . 8 6 6 1 . 4 1 4 1 3 . 0 7 9 . 3 3 6 4 . 4 0 2 8 . 8 8 11 5 . 6 8 TOTALS IRRIGATION APPLICATION 0 0 0 0 0 0 0 0 0 0 APPL. MACH TOTAL INPUT FIXED OPER. COSTS COSTS COST APPL. ACRE LABOR MONTH INCHES HOURS FEB APR JUNE JULY AUG 4.00 4.00 4.00 4.00 4.00 0.400 0.400 0.400 0.400 0.400 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS 0.0 0.0 0.0 0.0 0.0 20.00 2.000 0.0 TOTALS 14.20 14.20 14.20 14.20 14.20 1 1 1 1 1 APPL. IRRIG TOTAL INPUT FIXED IRRIG COSTS COSTS COSTS 52 52 52 52 52 0.0 0.0 0.0 0.0 0.0 6.60 6.60 6.60 6.60 6.60 22 22 22 22 22 7 1 . 0 0 7 . 6 0 0 . 0 3 3 . 0 0 111 . 6 0 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF SORGHUM HAY (DOLLARS) 48.00 54.00 60.00 66.00 72.00 8.00 -63.73 -15.73 32.27 80.27 128.27 9.00 -50.38 3.62 57.62 111 . 6 2 165.62 10.00 -37.03 22.97 82.97 142.97 202.97 11.00 -23.68 42.32 108.32 174.32 240.32 12.00 -10.33 61.67 133.67 205.67 277.67 TON QUANTITY OF SORGHUM HAY 32 32 32 32 32 NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT. OR OTHER MANAGEMENT STRATEGIES. 764 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 04/08/83. B-1241(C16) CORN FOR SILAGE. IRRIGATED TEXAS EDWARDS AQUIFER REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY GROSS RECEIPTS CORN SILAGE TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 15.00 TON . PROJECTED VALUE $/UNIT 23.00 $ VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦SEED CORN/SILAGE 20.00 ♦NITROGEN (ANHY) 160.00 ♦PHOSPHATE 80.00 ♦HERBICIDE 1.00 HERBICIDE APPLI. 1.00 ♦INSECTICIDE 1.00 IRRIGATION WATER 16.00 FUEL & LUBE—TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR —MACHINERY 2.13 IRRIGATION 1.60 0.98 EQUIPMENT OPERATING CAPITAL 54.36 SUBTOTAL, PREHARVEST HARVEST COSTS SUBTOTAL, HARVEST LB. LB. LB. ACRE ACRE APPL ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. ACRE 5.00 3.80 3.80 0. 135 $ ACRE $ TOTAL VARIABLE COSTS ACRE $ 1.00 0.14 0.30 10.00 4.00 16.00 YOUR ESTIMATE 345.00 345.00 $ 20.00 22.40 24.00 10.00 4.00 16.00 12.80 2. 16 46.08 3. 12 2.04 10.72 10.66 6.08 3.72 7.34 201.11 $ 0.0 $ 201.11 $ BREAK-EVEN PRICE. VARIABLE COSTS $ 13.41/TON CORN SILAGE INCOME ABOVE VARIABLE COSTS FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT I R R I G AT I O N LAND-CASH RENT 1.00 MISC ADMIN 0/H 0.50 TO TA L FIXED COSTS TOTAL PROJECTED COSTS BREAK-EVEN PRICE, TOTAL COSTS NET PROJECTED RETURNS ACRE $ 143.89 $ ACRE ACRE ACRE ACRE ACRE ACRE $ 23.64 18.82 26.40 40.00 7.50 116.37 $ $ 317.48 $ 40.00 15.00 ACRE $ 21.17/TON CORN SILAGE ACRE $ 27.52 $ SOLD STANDING IN FIELD. A FALL APPLICATION OF A HERBICIDE MAY BE NECESSARY IF WEEDS BECOME A PROBLEM INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 764 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 04/08/83 B-124KC16) CORN FOR SILAGE, IRRIGATED ■ TEXAS EDWARDS AQUIFER REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION CHISEL PLOW OFFSET DISC LAND PLANE OFFSET DISC BEDDER 6R ROLLING CULT 6R ANHYDROUS SPRDER DRY FERT SPRDER PLANTER 6R ROLLING CULT 6R ROLLING CULT 6R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 1 ,33 1,34 2,50 1,34 3,36 3,38 3,61 3,60 3,42 3,38 3,38 AUG AUG AUG OCT NOV DEC FEB FEB FEB MAR APR 1.00 1 .20 0.20 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 TOTALS IRRIGATION APPLICATION WATER WATER WATER WATER 0.202 0.273 0.050 0.228 0. 151 0.216 0. 151 0.203 0.224 0.216 0.216 0.153 0.207 0.038 0.173 0.115 0.164 0.115 0. 154 0. 170 0. 164 0.164 2.131 1.615 APPL. ACRE LABOR MONTH INCHES HOURS FEB MAR APR MAY APPLICATION APPLICATION APPLICATION APPLICATION TOTALS 2. 12 2.78 0.43 2.31 1.07 1.52 0.97 1.46 1.89 1.52 1.52 1.01 1.37 0.25 1.14 0.76 1 .08 0.76 1.02 1.12 1.08 1.08 APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 3.36 6.66 1.04 5.55 1.88 3.48 1.50 3.82 5.40 3.48 3.48 6.49 10.81 1.73 9.01 3.70 6.08 25.62 30.29 44.41 6.08 6.08 0.0 0.0 0.0 0.0 0.0 0.0 22.40 24.00 36.00 0.0 0.0 1 7 . 6 0 10.66 82.40 39.66 150.31 IRRIG APPL. IRRIG INPUT FIXED COSTS COSTS SYSTEM OPER. LABOR HOURS COSTS COSTS TOTAL IRRIG COSTS 4.00 4.00 4.00 4.00 0.400 0.400 0.400 0.400 0.0 0.0 0.0 0.0 14.20 14.20 14.20 14.20 1.52 1.52 1.52 1.52 0.0 0.0 0.0 0.0 6.60 6.60 6.60 6.60 22.32 22.32 22.32 22.32 16.00 1.600 0.0 56.80 6.08 0.0 26.40 89.28 ,*^1\ RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF CORN SILAGE (DOLLARS) 18.40 20.70 23.00 25.30 27.60 12.00 19.69 47.29 74.89 102.49 130.09 13.50 47.29 78.34 109.39 140.44 171.49 15.00 74.89 109.39 143.89 178.39 212.89 16.50 102.49 140.44 178.39 216.34 254.29 18.00 130.09 171.49 212.89 254.29 295.69 TON QUANTITY OF CORN SILAGE 765 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. B-1241(C16) FOOD CORN, IRRIGATED TEXAS EDWARDS AQUIFER REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY GROSS RECEIPTS CORN DEFICIENCY PMT. TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 100.00 100.00 BU. BU. VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦SEED CORN/GRAIN 15.00 ♦NITROGEN (ANHY) 160.00 ♦PHOSPHATE 80.00 ♦HERBICIDE 1.00 HERBICIDE APPLI. 1.00 ♦INSECTICIDE 1.00 GEN. & HAIL INS. 1.00 IRRIGATION WATER 16.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 2.39 IRRIGATION 1 .60 EQUIPMENT 0.63 OPERATING CAPITAL 69.04 SUBTOTAL, PREHARVEST HARVEST COSTS CUSTOM HARVEST 1.00 HAUL CORN 100.00 SUBTOTAL, HARVEST TO TA L VA R I A B L E COSTS LB. LB. LB. ACRE ACRE APPL ACRE ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. ACRE ACRE BU. ACRE PROJECTED YOUR VALUE ESTIMATE S/UNIT 3.50 0.21 1 .40 0. 14 0.30 10.00 4.00 16.00 13.00 BREAK-EVEN PRICE, TOTAL COSTS NET PROJECTED RETURNS ACRE $ 25.00 17.00 42.00 $ 25.00 0.17 $ 260.82 $. I N C O M E A B O V E VA R I A B L E C O S T S A C R E TOTAL PROJECTED COSTS $ 1 .39 46.08 3.65 2. 14 10.72 11 .97 6.08 2.39 9.32 218.82 $ 5.00 3.80 3.80 0. 135 ACRE ACRE ACRE ACRE ACRE ACRE ACRE 21 .00 22.40 24.00 10. OQ 4.00 16.00 13.00 14.68 BREAK-EVEN PRICE, VARIABLE COSTS $ 2.40/BU, FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT I R R I G AT I O N LAND-CASH RENT 1.00 MISC ADMIN 0/H 1.00 TO TA L FIXED COSTS $ 350.00 21 .00 371.00 $ CORN $ 11 0 . 1 8 $ 26.29 18.84 26.40 50.00 50.00 15.00 15.00 $ 136.52 $. $ 397.35 $. $ 3.76/BU. CORN ACRE $ -26.35 $ A FALL APPLICATION OF A HERBICIDE MAY BE NECESSARY IF WEEDS BECOME A PROBLEM INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. /jfGRfty 765 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83 B-1241(C16) FOOD CORN, IRRIGATED TEXAS EDWARDS AQUIFER REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE MACH MACHINERY OPERATION OFFSET DISC BEDDER 6R ROLLING CULT 6R DRY FERT SPRDER PLANTER 6R ANHYDROUS SPRDER ROLLING CULT 6R ROLLING CULT 6R SHREDDER CHISEL PLOW OFFSET DISC LAND PLANE ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 1 ,34 2 ,36 3 38 3 60 3 42 3 ,61 3 38 3 .38 2 30 1 33 1 ,34 2 ,50 OCT NOV DEC FEB FEB FEB MAR APR AUG AUG AUG AUG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1 .00 1.00 1.00 1.20 0.20 TOTALS IRRIGATION APPLICATION 0.228 0.151 0.216 0.203 0.224 0. 151 0.216 0.216 0.263 0.202 0.273 0.050 0.173 0. 115 0. 164 0. 154 0.170 0 . 11 5 0.164 0. 164 0.199 0. 153 0.207 0.038 2.394 1 .814 APPL. ACRE LABOR MONTH INCHES HOURS WATER APPLICATION WATER'APPLICATION WATER APPLICATION WATER APPLICATION JAN APR MAY JUNE TOTALS 2.31 1.33 1.52 1.46 1.89 0.97 1.52 1.52 2.38 2.12 2.78 0.43 1. 14 0.76 1.08 1.02 1. 12 0.76 1.08 1.08 1.31 1.01 1.37 0.25 2 0 . 2 4 11 .97 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. MACH INPUT FIXED COSTS COSTS 0.0 0.0 0.0 24.00 37.00 22.40 0.0 0.0 0.0 0.0 0.0 0.0 5.55 1.90 3.48 3.82 5.40 1.50 3.48 3.48 3.65 3.36 6.66 1 .04 TOTAL OPER. COST 9.01 3.98 6.08 30.29 45.41 25.62 6.08 6.08 7.34 6.49 10.81 1.73 8 3 . 4 0 4 3 . 3 2 158.93 APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 3.00 3.00 6.00 4.00 0.300 0.300 0.600 0.400 0.0 0.0 0.0 0.0 10.65 10.65 21.30 14.20 1. 14 1. 14 2.28 1.52 0.0 0.0 0.0 0.0 4.95 4.95 9.90 6.60 16.74 16.74 33.48 22.32 16.00 1 .600 0.0 56.80 6.08 0.0 26.40 89.28 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF CORN (DOLLARS) 2.80 3.15 3.50 3.85 4.20 80.00 -16.62 11 38 39.38 67.38 95.38 90.00 11 .78 43 28 74.78 106.28 137.78 100.00 40. 18 75 18 110.18 145.18 180.18 11 0 . 0 0 68.58 107 08 145.58 184.08 222.58 120.00 96.98 138 98 180.98 222.98 264.98 BU. QUANTITY OF CORN NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. ^ " \ 766 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. B-124KC16) COTTON IRRIGATED, LONG SEASON VARITIES TEXAS EDWARDS AQUIFER REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY GROSS RECEIPTS COTTON LINT COTTONSEED DEFICIENCY PMT. TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 900.00 0.73 900.00 VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦SD COTTON-UPLAND 16.00 ♦NITROGEN (ANHY) 80.00 ♦PHOSPHATE 50.00 ♦HERBICIDE 1.00 GEN. & HAIL INS. 1.00 ♦INSECTICIDE 10.00 PESTICIDE APPLI. 10.00 ♦DEFOLIANT 1.00 DEFOLIANT APPLI. 1.00 IRRIGATION WATER 16.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 2.82 IRRIGATION 1 .60 0.63 EQUIPMENT OTHER 4.00 OPERATING CAPITAL 67.30 SUBTOTAL, PREHARVEST HARVEST COSTS CUST COTTON PICK 900.00 1 .90 GIN, BAG, TIES SUBTOTAL, HARVEST TO TA L VA R I A B L E COSTS PROJECTED YOUR VALUE ESTIMATE S/UNIT LB. TON LB. 0.50 90.00 0.21 $ 450.00 65.70 189.00 704.70 $ LB. LB. LB. ACRE ACRE APPL ACRE ACRE ACRE ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 0.50 0. 14 0.30 4.00 13.00 7.50 3.50 12.50 2.75 11 .20 15.00 4.00 13.00 75.00 35.00 12.50 2.75 5.00 3.80 3.80 3.80 0. 135 $ 18.53 1 .39 46.08 4.60 2.60 10.72 14.12 6.08 2.39 15.20 9.09 307.25 $ LB. BALE ACRE 0. 11 49.00 $ ACRE TOTAL PROJECTED COSTS BREAK-EVEN PRICE, TOTAL COSTS NET PROJECTED RETURNS ACRE 93. 10 192.10 $ COTTON LINT INCOME ABOVE VARIABLE COSTS ACRE ACRE ACRE ACRE ACRE ACRE ACRE 99.00 $ 499.34 $. BREAK-EVEN PRICE, VARIABLE COSTS $ 0.27/LB FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT I R R I G AT I O N LAND-CASH RENT 1.00 MISC ADMIN 0/H 1.00 TO TA L FIXED COSTS 8.00 $ 205.35 $ 50.00 15.00 32.15 24.07 26.40 50.00 15.00 $ 147.62 $. $ 646.96 $. $ 0.44/LB. COTTON LINT ACRE $ 57.74 $ A FALL APPLICATION OF A HERBICIDE MAY BE NECESSARY IF WEEDS BECOME A PROBLEM INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 766 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83 B-1241(C16) COTTON IRRIGATED. LONG SEASON VARITIES TEXAS EDWARDS AQUIFER REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE MACH MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS SHREDDER CHISEL PLOW OFFSET DISC LAND PLANE CHISEL PLOW OFFSET DISC OFFSET DISC BEDDER 6R HERBICIDE SPRAYR DRY FERT SPRDER ANHYDROUS SPRDER PLANTER 6R ROLLING CULT 6R ROLLING CULT 6R ROLLING CULT 6R OCT OCT OCT OCT NOV DEC JAN JAN JAN FEB FEB MAR APR MAY JUNE 0.263 0.202 0.273 0.050 0.202 0.228 0.228 0. 151 0.0 0.203 0. 151 0.224 0.216 0.216 0.216 0 199 0. 153 0. 207 0 038 0 153 0 173 0. 173 0 115 0. 264 0. 154 0. 115 0. 170 0. 164 0. 164 0. 164 2.823 2 . 4 0 3 2 5 . 5 0 14. 12 3 8 . 2 0 54.41 132.23 APPL. ACRE LABOR MONTH INCHES HOURS IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. I R R I G INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 2 1 1 2 1 1 1 2 30 33 34 50 33 34 34 36 63 2 60 3 61 2 ,42 3 ,38 3 ,38 3 .38 1 .00 1 .00 1 .20 0 .20 1 .00 1 .00 1 .00 1 .00 1 .00 1 .00 1 .00 1 .00 1 .00 1 .00 1 .00 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION FEB APR JUNE AUG 4.00 4.00 4.00 4.00 0.400 0.400 0.400 0.400 0.0 0.0 0.0 0.0 2.38 2.12 2.78 0.43 2.12 2.31 2.31 1.33 0.08 1.81 0.97 2.28 APPL. MACH TOTAL INPUT FIXED OPER. COSTS COSTS COST 1 .52 1 .52 1 .52 1 .31 1 .01 1 .37 0 .25 1 .01 1 .14 1 .14 0 76 0 0 1 02 0 .76 1 12 1 08 1 08 1 08 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3 3 6 1 3 5 5 1 2 3 1 5 3 3 3 4.00 15.00 11 .20 8.00 0.0 0.0 0.0 14.20 14.20 14.20 14.20 1 .52 1 52 1 .52 1 52 0.0 0.0 0.0 0.0 56.80 6.08 65 36 66 04 36 55 55 90 13 84 50 43 48 48 48 6 .60 6 60 6 60 6 60 7 6 10 1 6 9 9 3 6 21 14 16 6 6 6 22 22 22 22 34 49 81 73 49 01 01 98 21 67 42 83 08 08 08 32 32 32 32 / ^ h TOTALS 16.00 1.600 0.0 0.0 26.40 89.28 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF COTTON LINT (DOLLARS) 0.40 0.45 0.50 0.55 0.60 720. 30.83 66.83 102.83 138.83 174.83 810. 73.09 113.59 154.09 194.59 235.09 900. 115.35 160.35 205.35 250.35 295.35 990. 157.61 207.11 256.61 306.11 355.61 1080. 199.87 253.87 307.87 361.87 415.87 LB. QUANTITY OF COTTON LINT ^ 767 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. COTTON IRRIGATED. SHORT SEASON VARITIES TEXAS WINTER GARDEN REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE J0^\ CATEGORY GROSS RECEIPTS COTTON LINT COTTONSEED DEFICIENCY PMT. TOTAL PROJECTED RETURNS /^P=N, B-1241(C16) PROJECTED YIELD UNIT 750.00 0.61 750.00 VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦SD COTTON-UPLAND 16.00 ♦NITROGEN (ANHY) 25.00 ♦PHOSPHATE 40.00 ♦HERBICIDE 1.00 GEN. & HAIL INS. 1.00 ♦INSECTICIDE 5.00 PESTICIDE APPLI. 5.00 ♦DEFOLIANT 1.00 DEFOLIANT APPLI. 1.00 IRRIGATION WATER 12.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION L"ABOR MACHINERY 2.62 IRRIGATION 1.20 EQUIPMENT 0.63 OTHER 4.00 OPERATING CAPITAL 37.51 SUBTOTAL, PREHARVEST HARVEST COSTS CUST COTTON PICK 750.00 GIN, BAG, TIES 1.56 SUBTOTAL. HARVEST TOTAL VARIABLE COSTS LB. TON LB. PROJECTED YOUR VALUE ESTIMATE S/UNIT 0.50 90.00 0.21 $ 375.00 54.90 157.50 587.40 $ LB. LB. LB. ACRE ACRE APPL ACRE ACRE ACRE ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 0.50 0.14 0.30 4.00 13.00 7.50 3.50 12.50 2.75 8.00 3.50 12.00 4.00 13.00 37.50 17.50 12.50 2.75 5.00 3.80 3.80 3.80 0. 135 $ 16.98 1.39 34.56 4.24 2.38 8.04 13. 11 4.56 2.39 15.20 5.06 218.67 $ LB. BALE ACRE 0. 11 49.00 $ 82.50 76.44 158.94 $ ACRE $ 377.61 $ BREAK-EVEN PRICE. VARIABLE COSTS $ 0.22/LB. COTTON LINT 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 2 0 9 . 7 9 $ FIXED COSTS DEPREC..INTEREST.TAXES & INSUR. TRACTOR EQUIPMENT I R R I G AT I O N LAND-CASH RENT 1.00 MISC ADMIN 0/H 0.75 TO TA L FIXED COSTS TOTAL PROJECTED COSTS BREAK-EVEN PRICE, TOTAL COSTS NET PROJECTED RETURNS ACRE ACRE ACRE ACRE ACRE ACRE 50.00 15.00 $ 29.42 23.44 19.80 50.00 11.25 133.91 $ ACRE $ 511.52 $ $ 0.40/LB. COTTON LINT ACRE $ 75.88 $ A FALL APPLICATION OF A HERBICIDE MAY BE NECESSARY IF WEEDS BECOME A PROBLEM JP^V INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 767 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83, B-124KC16) COTTON IRRIGATED, SHORT SEASON VARITIES TEXAS WINTER GARDEN REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE MACH MACHINERY OPERATION SHREDDER CHISEL PLOW OFFSET DISC OFFSET DISC LAND PLANE OFFSET DISC BEDDER 6R HERBICIDE SPRAYR DRY FERT SPRDER ANHYDROUS SPRDER PLANTER 6R ROLLING CULT 6R ROLLING CULT 6R ROLLING CULT 6R ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 2.30 1,33 1,34 1,34 2,50 1,34 2,36 63 SEPT SEPT SEPT NOV NOV JAN JAN JAN JAN JAN MAR APR MAY 2,60 3.61 2.42 3,38 3,38 3 , 3 8 JUNE 1.00 1.00 1 .00 1 .20 0.20 1 .00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 TOTALS IRRIGATION APPLICATION 0.263 0.202 0.228 0.273 0.050 0.228 0. 151 0.0 0.203 0. 151 0.224 0.216 0.216 0.216 0. 199 0. 153 0. 173 0.207 0.038 0.173 0. 115 0.264 0.154 0. 115 0. 170 0. 164 0. 164 0.164 2.622 2.251 FEB MAY JUNE TOTALS 1 .31 1.01 1 . 14 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1 .37 0.25 1 .14 0.76 0.0 1.02 0.76 1.12 1 .08 1 .08 1 .08 23.38 1 3 . 11 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. ACRE LABOR MONTH INCHES HOURS WATER APPLICATION WATER APPLICATION WATER APPLICATION 2.38 2.12 2.31 2.78 0.43 2.31 1.33 0.08 1.81 0.97 2.28 1.52 1.52 1.52 APPL. MACH INPUT FIXED COSTS COSTS 4.00 12.00 3.50 8.00 0.0 0.0 0.0 3.65 3.36 5.55 6.66 1 .04 5.55 1.90 2.13 3.84 1.50 5.43 3.48 3.48 3.48 TOTAL OPER. COST 7.34 6.49 9.01 10.81 1 .73 9.01 3.98 6.21 18.67 6.72 16.83 6.08 6.08 6.08 2 7 . 5 0 51.05 11 5 . 0 4 APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 4.00 4.00 4.00 0.400 0.400 0.400 0.0 0.0 0.0 14.20 14.20 14.20 1.52 1.52 1.52 0.0 0.0 0.0 6.60 6.60 6.60 22.32 22.32 22.32 12.00 1.200 0.0 42.60 4.56 0.0 19.80 66.96 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF COTTON LINT (DOLLARS) 0.40 0.45 0.50 0.55 0.60 600.00 64 10 94 10 124 10 154.10 184 10 675.00 99 44 133 19 166 94 200.69 234 44 750.00 134 79 172 29 209 79 247.29 284 79 825.00 170 13 211 38 252 63 293.88 335 13 900.00 205 48 250 48 295 48 340.48 385 48 LB. QUANTITY OF COTTON LINT 768 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. B-1241(C16) COTTON, DRYLAND, SHORT SEASON VARIETIES TEXAS EDWARDS AQUIFER REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY GROSS RECEIPTS COTTON LINT COTTONSEED DEFICIENCY PMT. TOTAL PROJECTED RETURNS VARIABLE COSTS PREHARVEST COSTS ♦SD COTTON-UPLAND ♦NITROGEN (ANHY) ♦PHOSPHATE ♦HERBICIDE ♦INSECTICIDE PESTICIDE APPLI. ♦DEFOLIANT DEFOLIANT APPLI. FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS CUST HARV, STRIP GIN STRPR COTTON BL.BG.TIE-ST CTN SUBTOTAL. HARVEST PROJECTED YIELD UNIT 350.00 0.28 350.00 LB. TON LB. 0.50 90.00 0.21 $ 175.00 25.20 73.50 273.70 $ LB. LB. LB. ACRE APPL ACRE ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 0.50 0.14 0.30 4.00 7.50 3.50 12.50 2.75 $ 6.00 3.50 6.00 4.00 22.50 10.50 12.50 2.75 10.68 1.39 2.70 2.04 10.41 2.39 2.08 99.44 $ $ 24.50 24.50 9. 10 58.10 $ INPUT USE 12.00 25.00 20.00 1.00 3.00 3.00 1.00 1.00 2.08 0.63 15.40 14.00 14.00 0.70 TOTAL VARIABLE COSTS BREAK-EVEN PRICE. VARIABLE COSTS 1.75 1.75 13.00 ACRE $ 157.54 $. $ 0.17/LB. COTTON LINT ACRE 4. FIXED COSTS DEPREC..INTEREST.TAXES & INSUR. TRACTOR EQUIPMENT MISC ADMIN 0/H 0.50 LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE 5. TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE. TOTAL COSTS 5.00 3.80 0. 135 CWT. CWT. BALE ACRE 3. INCOME ABOVE VARIABLE COSTS 6. NET PROJECTED RETURNS PROJECTED YOUR VALUE ESTIMATE S/UNIT $ 11 6 . 1 6 $. 20.59 18.59 15.00 7.50 20.00 20.00 $ 66.69 $. $ 224.23 $. $ 0.36/LB. COTTON LINT ACRE $ 49.47 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 768 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83, B-124KC16) COTTON. DRYLAND, SHORT SEASON VARIETIES TEXAS EDWARDS AQUIFER REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER CHISEL PLOW OFFSET DISC OFFSET DISC BEDDER 6R HERBICIDE SPRAYR DRY FERT SPRDER ANHYDROUS SPRDER PLANTER 6R ROLLING CULT 6R ROLLING CULT 6R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 3.30 3.33 3.34 3.34 3,36 63 3,60 3,61 3,42 3,38 3.38 SEPT SEPT SEPT DEC JAN JAN JAN JAN MAR APR MAY TOTALS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.263 0.202 0.228 0.228 0. 151 0.0 0.203 0. 151 0.224 0.216 0.216 0. 199 0.153 0.173 0. 173 0. 115 0.264 0. 154 0. 115 0.170 0. 164 0.164 2.082 1.842 1.92 1.51 1.62 1.62 1.07 0.08 1.31 1.01 1.14 1.14 0.76 1 .46 0.97 1 .89 1.52 1.52 1.02 0.76 1.12 1 .08 1.08 0.0 15. 19 1 0 . 4 1 APPL. MACH INPUT FIXED COSTS COSTS 0.0 0.0 0.0 0.0 0.0 TOTAL OPER. COST 3.62 2.62 4.72 4.72 1 .88 2.13 3.82 1 .50 5.40 3.48 3.48 6.85 5. 14 7.49 7.49 3.70 6.21 12.29 6.72 14.41 6.08 6.08 19.50 37.38 82.48 4.00 6.00 3.50 6.00 O.O 0.0 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF COTTON LINT (DOLLARS) 0 40 0.45 0.50 0.55 0 60 280.00 45 04 59.04 73.04 87.04 101 04 315.00 63 10 78.85 94.60 110.35 126 10 350.00 81 16 98.66 116.16 133.66 151 385.00 99 22 118.47 137.72 156.97 176 22 420.00 117 28 138.28 159.28 180.28 201 28 LB. QUANTITY OF COTTON LINT • 16 769 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. B-124KC16) GRAIN SORGHUM, DRYLAND TEXAS EDQARDS AQUIFER REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS GRAIN SORGHUM DEFICIENCY PMT. TOTAL PROJECTED RETURNS 2. VARIABLE COSTS PREHARVEST COSTS ♦GRAIN SORG. SEED ♦NITROGEN (ANHY) ♦PHOSPHATE ♦HERBICIDE HERBICIDE APPLI. ♦INSECTICIDE INSECT. APPLI. FUEL & LUBE—TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS CUSTOM HARVEST D HAUL GRAIN SORG SUBTOTAL, HARVEST PROJECTED YIELD UNIT 25.00 25.00 YOUR ESTIMATE CWT. CWT. 4.35 0.36 $ 108.75 9.00 117.75 $ LB. LB. LB. ACRE ACRE APPL APPL ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 0.76 0. 14 0.30 8.00 4.00 8.00 2.75 3.04 8.40 12.00 8.00 4.00 16.00 5.50 11.01 1 .39 2.78 2.00 10.73 2.39 3.25 90.50 $ INPUT USE 4.00 60.00 40.00 1.00 1.00 2.00 2.00 2. 15 0.63 24. 11 1 .00 25.00 TOTAL VARIABLE COSTS /fP^N PROJECTED VALUE S/UNIT ACRE CWT. ACRE 5.00 3.80 0. 135 $ 18.00 0.30 ACRE $ 18.00 7.50 25.50 $ $ 116.00 $ BREAK-EVEN PRICE, VARIABLE COSTS $ 4.28/CWT. GRAIN SORGHUM INCOME ABOVE VARIABLE COSTS FIXED COSTS DEPREC. INTEREST. TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 MISC ADMIN 0/H 0.30 TO TA L FIXED COSTS TOTAL PROJECTED COSTS BREAK-EVEN PRICE, TOTAL COSTS NET PROJECTED RETURNS ACRE 1 .75 $ ACRE ACRE ACRE ACRE ACRE 10.00 15.00 $ 21 .23 17.42 10.00 4.50 53.15 $ ACRE $ 169.15 $ $ 6.41/CWT. GRAIN SORGHUM ACRE $ -51.40 $ A FALL APPLICATION OF A HERBICIDE MAY BE NECESSARY IF WEEDS BECOME A PROBLEM INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. /fRN 769 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83 B-124KC16) GRAIN SORGHUM, DRYLAND TEXAS EDQARDS AQUIFER REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER CHISEL PLOW OFFSET DISC OFFSET DISC ANHYDROUS SPRDER DRY FERT SPRDER PLANTER 6R ROLLING CULT 6R ROLLING CULT 6R ROLLING CULT 6R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS •COSTS COSTS 3,30 3,33 3,34 3.34 3.61 3.60 3,42 3,38 3,38 3.38 AUG AUG SEPT DEC FEB FEB FEB MAR APR MAY TOTALS 1 .00 1 .00 1.00 1 .00 1 .00 1 .00 1 .00 1.00 1.00 1.00 0.263 0.202 0.228 0.228 0. 151 0.203 0.224 0.216 0.216 0.216 0. 199 0.153 0. 173 0. 173 0 . 11 5 0.154 0.170 0.164 0.164 0. 164 2. 147 1 .626 1.92 1.51 1.62 1.62 0.97 1.46 1.89 1.52 1.52 1 .52 1 .31 1 .01 1 .14 1. 14 0.76 1.02 1. 12 1.08 1.08 1 .08 15.57 10.73 APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 3.62 2.62 4.72 4.72 1.50 3.82 5.40 3.48 3.48 3.48 6.85 5. 14 7.49 7.49 11 .62 18.29 11 . 4 5 6.08 6.08 6.08 23.44 36.85 86.59 0.0 0.0 0.0 0.0 8.40 12.00 3.04 0.0 0.0 0.0 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF GRAIN SORGHUM (DOLLARS) 3.48 3.91 4.35 4.78 5.22 20.00 -37.70 -29.00 -20.30 - 11 . 6 0 -2.90 22.50 -28.85 -19.06 -9.28 0.51 10.30 25.00 -20.00 -9. 13 1 .75 12.62 23.50 27.50 -11 . 15 0.81 12.77 24.74 36.70 30.00 -2.30 10.75 23.80 36.85 49.90 CWT. QUANTITY OF GRAIN SORGHUM NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT. GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. 7 7 0 P R O J E C T I O N S F O R P L A N N I N G P U R P O S E S O N LY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. GRAIN SORGHUM, IRRIGATED TEXAS EDWARDS AQUIFER REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE >#pW-V CATEGORY PROJECTED YIELD UNIT GROSS RECEIPTS GRAIN SORGHUM DEFICIENCY PMT. TOTAL PROJECTED RETURNS /fp!>\ B-124KC16) CWT. CWT. 50.00 50.00 VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦GRAIN SORG. SEED 6.00 ♦NITROGEN (ANHY) 120.00 ♦PHOSPHATE 60.00 ♦HERBICIDE 1.00 HERBICIDE APPLI. 1.00 ♦INSECTICIDE 2.00 I N S E C T. A P P L I . 2.00 GEN. & HAIL INS. 1.00 IRRIGATION WATER 12.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C TO R EQUIPMENT IRRIGATION LABOR- -MACHINERY 2.39 IRRIGATION 1.20 EQUIPMENT 0.28 OPERATING CAPITAL 44.88 SUBTOTAL, PREHARVEST HARVEST COSTS CUSTOM HARVEST I 50.00 HAUL GRAIN SORG 50.00 SUBTOTAL, HARVEST TOTAL VARIABLE COSTS* LB. LB. LB. ACRE ACRE APPL APPL ACRE ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. ACRE CWT. CWT. ACRE PROJECTED YOUR VALUE ESTIMATE S/UNIT 4.35 0.36 $ 4.56 16.80 18.00 8.00 4.00 16.00 5.50 13.00 0.76 0.14 0.30 8.00 4.00 8.00 2.75 13.00 5.00 3.80 3.80 0. 135 0.45 0.30 ACRE 217.50 18.00 235.50 $ 12.28 0.62 34.56 3.11 2.02 8.04 11 .97 4.56 $ 1 .06 6.06 170.13 $ $ 22.50 15.00 37.50 $ $ 207.63 $ BREAK-EVEN PRICE, VARIABLE COSTS $ 3.79/CWT. GRAIN SORGHUM INCOME ABOVE VARIABLE COSTS ACRE 27.87 $ FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT I R R I G AT I O N LAND-CASH RENT 1.00 MISC ADMIN 0/H 1.00 TO TA L FIXED COSTS TOTAL PROJECTED COSTS BREAK-EVEN PRICE, TOTAL COSTS NET PROJECTED RETURNS ACRE $ 23 17 19 35 15 111 $ 318 . 9 4 $ ACRE ACRE ACRE ACRE ACRE 35.00 15.00 ACRE .68 .83 .80 .00 .00 .31 $ $ 6.02/CWT. GRAIN SORGHUM ACRE $ -83.44 $ A FALL APPLICATION OF A HERBICIDE MAY BE NECESSARY IF WEEDS BECOME A PROBLEM INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. v^fe\ 770 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83 B-1241(C16) GRAIN SORGHUM, IRRIGATED TEXAS EDWARDS AQUIFER REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION CHISEL PLOW OFFSET DISC OFFSET DISC LAND PLANE BEDDER 6R DRY FERT SPRDER ANHYDROUS SPRDER PLANTER 6R ROLLING CULT 6R ROLLING CULT 6R ROLLING CULT 6R SHREDDER MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTHI OVER HOURS HOURS COSTS COSTS 3,33 3,34 3,34 3,50 3,36 3,60 3,61 3,42 3.38 3.38 3.38 3.30 AUG AUG DEC DEC JAN FEB FEB MAR MAR APR MAY JULY 1.00 1.00 1.20 0.20 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION 0.202 0.228 0.273 0.050 0. 151 0.203 0. 151 0.224 0.216 0.216 0.216 0.263 0. 153 0. 173 0.207 0.038 0. 115 0.154 0 . 11 5 0.170 0.164 0.164 0.164 0.199 2.394 1.814 APPL. ACRE LABOR MONTH INCHES HOURS JAN MAR MAY TOTALS 1.51 1.01 1.14 1.37 0.25 0.76 1.02 0.76 1.12 1.08 1.08 APPL. MACH INPUT FIXED COSTS COSTS 0.0 0.0 0.0 0.0 0.0 TOTAL OPER. COST 2.62 4.72 5.67 1.04 1.88 3.82 1.50 5.40 3.48 3.48 3.48 3.62 5. 14 7.49 8.98 1 .63 3.70 24.29 20.02 12.97 6.08 6.08 6.08 6.85 17.30 11 .97 39.36 40.71 109.34 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. I R R I G INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 1 .62 1.95 0.35 1.07 1.46 0.97 1.89 1.52 1.52 1.52 1.92 1 .08 1.31 18.00 16.80 4.56 0.0 0.0 0.0 0.0 4.00 4.00 4.00 0.400 0.400 0.400 0.0 0.0 0.0 14.20 14.20 14.20 1 .52 1.52 1.52 0.0 0.0 0.0 6.60 6.60 6.60 22.32 22.32 22.32 12.00 1.200 0.0 42.60 4.56 0.0 19.80 66.96 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF GRAIN SORGHUM (DOLLARS) 3.48 3.91 4.35 4.78 5.22 40.00 -46.53 -29.13 - 11 . 7 3 5.67 23.07 45.00 -31.08 - 11 . 5 0 8.07 27.65 47.22 50.00 -15.63 6. 12 27.87 49.62 71.37 55.00 -0. 18 23.75 47.67 71.60 95.52 60.00 15.27 41 .37 67.47 93.57 119.67 CWT. QUANTITY OF GRAIN SORGHUM NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT. OR OTHER MANAGEMENT STRATEGIES. 771 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. B-1241(C16) GUAR, IRRIGATED 1983 PROJECTED COSTS AND RETURNS PER ACRE ESTIMATED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS GUAR TOTAL PROJECTED RETURNS J0^\ PROJECTED YIELD UNIT 17.50 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦INSECTICIDE 1.00 ♦GUAR SEED 8.00 ♦INNOCULANT 1.00 ♦NITROGEN (ANHY) 100.00 45.00 ♦PHOSPHATE ♦HERBICIDE 1.00 HERBICIDE APPLI. 1.00 INSECT. APPLI. 1.00 IRRIGATION WATER 13.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 1.97 IRRIGATION 1.30 0.63 EQUIPMENT OTHER 2.00 OPERATING CAPITAL 36.49 SUBTOTAL, PREHARVEST HARVEST COSTS CUS HARV GUAR 1.00 HAUL GUAR 17.50 SUBTOTAL, HARVEST TOTAL VARIABLE COSTS CWT. 20s 00 APPL LB. ACRE LB. LB. ACRE ACRE APPL ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 8.00 0.65 0.50 0.14 0.30 4.00 4.00 2.75 ACRE CWT. ACRE YOUR ESTIMATE PROJECTED VALUE S/UNIT 5.00 3.80 3.80 3.80 0. 135 25.00 0.25 ACRE $ 350.00 350.00 $ 8.00 5.20 0.50 14.00 13.50 4.00 4.00 2.75 $ 8.80 1 .39 37.44 1 .86 2.04 8.71 9.86 4.94 2.39 7.60 4.93 141.91 $ $ 25.00 4.38 29.38 $ $ 171.28 $ BREAK-EVEN PRICE, VARIABLE COSTS $ 9.79/CWT. GUAR 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 1 7 8 . 7 2 $ FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT I R R I G AT I O N LAND-CASH RENT 1.00 MISC ADMIN 0/H 0.50 TO TA L FIXED COSTS TOTAL PROJECTED COSTS BREAK-EVEN PRICE. TOTAL COSTS NET PROJECTED RETURNS ACRE ACRE ACRE ACRE ACRE ACRE 30.00 15.00 $ 20.31 16.05 21.45 30.00 7.50 95.31 $ ACRE $ 266.59 $ $ 15.23/CWT. GUAR ACRE $ 83.41 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 771 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83, B-124KC16) GUAR, IRRIGATED 1983 PROJECTED COSTS AND RETURNS PER ACRE ESTIMATED COSTS AND RETURNS PER ACRE MACH MACHINERY OPERATION MOLDBOARD PLOW CHISEL PLOW TAMDEN DISC BEDDER 6R ROLLING CULT 6R PLANTER 6R DRY FERT SPRDER ANHYDROUS SPRDER ROLLING CULT 6R ROLLING CULT 6R ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 3,32 3,33 3.58 4,36 4,38 4,42 3,60 3,61 4,38 4,38 DEC DEC JAN JAN FEB APR APR APR MAY JUNE 0.50 0.50 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION TOTALS TOTAL OPER. COST 5.87 1.31 3.54 2.00 3.65 5.58 3.82 1.50 3.65 3.65 9.64 2.57 6.02 3.52 5.83 13.85 19.79 17.22 5.83 5.83 0.285 0. 101 0.208 0. 151 0.216 0.224 0.203 0. 151 0.216 0.216 0.216 0.076 0. 158 0. 115 0. 164 0. 170 0. 154 0. 115 0. 164 0. 164 2.35 0.76 1.43 0.77 1.10 1.45 1.46 0.97 1.10 1.10 1 .43 0.50 1 .04 0.76 1 .08 1.12 1 .02 0.76 1 .08 1.08 1.972 1 .494 12.48 9.86 33.20 34.56 90.10 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS APPL. ACRE LABOR MONTH INCHES HOURS MAR MAY JUNE JULY APPL. MACH INPUT FIXED COSTS COSTS 0.0 0.0 0.0 0.0 0.0 5.70 13.50 14.00 0.0 0.0 4.00 3.00 3.00 3.00 0.400 0.300 0.300 0.300 0.0 0.0 0.0 0.0 14.20 10.65 10.65 10.65 1 .52 1 . 14 1 . 14 1 . 14 0.0 0.0 0.0 0.0 6.60 4.95 4.95 4.95 22.32 16.74 16.74 16.74 13.00 1.300 0.0 46.15 4.94 0.0 21.45 72.54 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF GUAR (DOLLARS) 16.00 18.00 20.00 22.00 24.00 14.00 53.59 81.59 109.59 137.59 165.59 15.75 81 . 15 11 2 . 6 5 144.15 175.65 207.15 17.50 108.72 143.72 178.72 213.72 248.72 19.25 136.28 174.78 213.28 251.78 290.28 21 .00 163.84 205.84 247.84 289.84 331.84 CWT. QUANTITY OF GUAR 772 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. B-124KC16) GUAR, DRYLAND 1983 PROJECTED COSTS AND RETURNS PER ACRE ESTIMATED COSTS AND RETURNS PER ACRE CATEGORY 1 . GROSS RECEIPTS GUAR TOTAL PROJECTED RETURNS 2. VARIABLE COSTS PREHARVEST COSTS ♦GUAR SEED ♦INNOCULANT ♦NITROGEN (ANHY) ♦PHOSPHATE ♦HERBICIDE ♦INSECTICIDE INSECT. APPLI. HERBICIDE APPLI. FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS CUS HARV GUAR HAUL GUAR SUBTOTAL, HARVEST PROJECTED YIELD UNIT 8.00 PROJECTED VALUE S/UNIT YOUR ESTIMATE CWT. 20.00 $ 160.00 160.00 $ LB. ACRE LB. LB. ACRE APPL APPL ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 0.65 0.50 0.14 0.30 4.00 8.00 2.75 4.00 5.00 3.80 0.135 $ 5.20 0.50 7.00 4.50 4.00 8.00 2.75 4.00 7.94 1 .08 1 .72 1 .64 8.75 1 .86 1 .47 60.41 $ ACRE CWT. ACRE 25.00 0.25 $ 25.00 2.00 27.00 $ ACRE $ 87.41 $ INPUT USE 8.00 1.00 50.00 15.00 1.00 1.00 1.00 1.00 1.75 0.49 10.88 1.00 8.00 TOTAL VARIABLE COSTS BREAK-EVEN PRICE. VARIABLE COSTS $ 10.93/CWT. GUAR pjiJPN 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 7 2 . 5 9 $ FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 MISC ADMIN 0/H 0.50 TO TA L FIXED COSTS TOTAL PROJECTED COSTS BREAK-EVEN PRICE, TOTAL COSTS NET PROJECTED RETURNS ACRE ACRE ACRE ACRE ACRE ACRE 17.93 14.26 20.00 20.00 15.00 7.50 $' 59.70 $. $ 147. 10 $. $ 18.39/CWT. GUAR ACRE $ 12.90 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 772 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83 B-124KC16) GUAR, DRYLAND 1983 PROJECTED COSTS AND RETURNS PER ACRE ESTIMATED COSTS AND RETURNS PER ACRE MACHINERY OPERATION MOLDBOARD PLOW TAMDEN DISC TAMDEN DISC BEDDER 6R DRY FERT SPRDER ANHYDROUS SPRDER PLANTER 6R ROLLING CULT 6R ROLLING CULT 6R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 3,32 3,58 3,58 4,36 3,60 3,61 4,42 4.38 4,38 NOV JAN MAY MAY MAY MAY JUNE JULY AUG TOTALS 0.30 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.41 1.43 0.171 0.208 0.208 0.151 0.203 0.151 0.224 0.216 0.216 0.130 0.158 0. 158 0 . 11 5 0. 154 0 . 11 5 0.170 0.164 0. 164 1 .43 0.77 1.46 0.97 1.45 1. 10 1. 10 1.750 1.325 11. 12 APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 3.52 3.54 3.54 2.00 3.82 1.50 5.58 3.65 3.65 5.78 6.02 6.02 3.52 10.79 10.22 13.85 5.83 5.83 17.20 30.79 67.86 0.0 0.0 0.0 0.0 4.50 7.00 5.70 0.0 0.0 0.86 1.04 1.04 0.76 1.02 0.76 1.12 1.08 1.08 8.75 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF GUAR (DOLLARS) 16.00 18.00 20.00 22.00 24.00 6.40 15.39 28. 19 40.99 53 79 66.59 7.20 27.99 42.39 56.79 71 19 85.59 8.00 40.59 56.59 72.59 88 59 104.59 8.80 53. 19 70.79 88.39 105 99 123.59 9.60 65.79 84.99 104.19 123 39 142.59 CWT. QUANTITY OF GUAR 773 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. B-1241(C16) PEANUTS. FLORUNNER, IRRIGATED TEXAS WINTER GARDEN REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE /#^V CATEGORY GROSS RECEIPTS FLORUNNER PEANUT OATS GRAZING AUD TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 27.50 45.00 CWT. DAYS PROJECTED YOUR S/UNIT VALUE ESTIMATE 28.00 0.50 $ VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦PEANUT SEED 100.00 ♦NITROGEN (DRY) 20.00 ♦PHOSPHATE 50.00 ♦POTASH 30.00 CUSTOM FERTILIZE 1 .00 ♦NEMATICIDE 1.00 ♦HERBICIDE 1 .00 GEN. & HAIL INS. 1 .00 ♦INSECTICIDE 2.00 ♦FUNGICIDE 9.00 PESTICIDE APPLI. 9.00 ALLOTMENT LEASE 27.50 ♦OATS SEED 60.00 IRRIGATION WATER 17.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 2.69 IRRIGATION 1.70 EQUIPMENT 0.60 OTHER 3.00 OPERATING CAPITAL 47.49 SUBTOTAL, PREHARVEST HARVEST COSTS ♦CUSTOM HAUL 1 .50 ♦CUSTOM DRYING 1 .50 FUEL & LUBE--TRACTOR R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY 1 .63 SUBTOTAL. HARVEST TON TON ACRE ACRE ACRE HOUR ACRE TOTAL VARIABLE COSTS ACRE LB. LB. LB. LB. ACRE ACRE ACRE ACRE APPL APPL ACRE CWT. LB. ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 0.58 0.25 0.30 0. 12 1.80 8.60 4. 10 13.00 4. 10 7.00 3.50 2.65 0. 15 770.00 22.50 792.50 $ 58.00 5.00 15.00 3.60 1 .80 8.60 4. 10 13.00 8.20 63.00 31 .50 72.87 9.00 19. 11 5.00 3.80 3.80 3.80 0. 135 $ 1 .32 48.96 4.74 3.26 11 . 3 9 13.47 6.46 2.28 11 .40 6.41 422.48 $ $ 10.50 37.50 10.45 2.86 2.00 8. 15 71.46 $ 7.00 25.00 5.00 $ 493.94 $ BREAK-EVEN PRICE, VARIABLE COSTS $ 17.14/CWT. FLORUNNER PEANUT 3. INCOME ABOVE VARIABLE COSTS ACRE 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT IRRIGATION MISC ADMIN 0/H 1.00 LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE ACRE 5. TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE, TOTAL COSTS 6. NET PROJECTED RETURNS $ 298.56 $ $ 48.31 32. 18 28.05 15.00 50.00 173.54 $ 15..00 50,.00 $ 667.48 $ $ 23.45/CWT. FLORUNNER PEANUT ACRE $ 125.02 $ OATS GRAZING IS IN ANIMAL UNIT DAYS (AUD). INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 773 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83 B-1241(C16) PEANUTS, FLORUNNER, IRRIGATED TEXAS WINTER GARDEN REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE MACH MACHINERY OPERATION OFFSET DISC TAMDEN DISC GRAIN DRILL OFFSET DISC CHISEL PLOW MOLDBOARD PLOW BEDDER 6R PEANUT PLANTER ROLLING CULT 6R HERBICIDE SPRAYR CULTIVATOR 6R PEANUT DIG SHK2R PEANUT COMB. 4R ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 1,34 1,58 2,46 1 ,34 1.33 1,32 2,36 2,68 2,38 63 2,40 2.66 2.67 SEPT SEPT OCT FEB MAR MAR MAR APR APR APR MAY AUG AUG 1.00 1 .00 1.00 1.00 1.00 1.00 2.00 1 .00 1.00 1.00 1 .00 1.00 1.00 TOTALS 0.228 0.208 0.270 0.228 0.202 0.571 0.302 0.318 0.216 0.173 0.158 0.205 0. 173 0.153 0.432 0.229 0.241 0.151 1.084 0.546 0. 164 0.264 0. 115 0.821 0.414 4.323 3.540 0.0 2.31 2.07 2.46 2.31 2.12 6.42 2.66 3.25 1 .90 0.08 1.32 9.74 5.57 1. 14 1.04 1.35 1. 14 1.01 2.85 1.51 1.59 1.08 0.0 0.76 5.42 2.73 WATER WATER WATER WATER APPLICATION APPLICATION APPLICATION APPLICATION APPL. ACRE LABOR MONTH INCHES HOURS SEPT JUNE JULY AUG TOTALS TOTAL OPER. COST 0.0 5.55 0.0 4.30 9 . 0 0 6. 16 0.0 5.55 0.0 3.36 0 . 0 13.81 0.0 3.80 58.00 6 . 4 7 3.51 0.0 4. 10 2. 13 2.32 0.0 0 . 0 11 .57 48.00 1 0 . 2 5 9.01 7.41 18.97 9.01 6.49 23.09 7.97 69.30 6.48 6.31 4.39 26.72 66.55 4 2 . 2 1 21 .62 119.10 7 8 . 7 7 2 6 1 . 7 0 IRRIG IRRIGATION APPLICATION APPL. MACH INPUT FIXED COSTS COSTS SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 3.00 2.00 6.00 6.00 0.300 0.200 0.600 0.600 0.0 0.0 0.0 0.0 7. 10 21.30 21.30 1 . 14 0.76 2.28 2.28 0.0 0.0 0.0 0.0 4.95 3.30 9.90 9.90 16.74 11 . 16 33.48 33.48 17.00 1.700 0.0 60.35 6.46 0.0 28.05 94.86 10.65 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF FLORUNNER PEANUT (DOLLARS) 22.40 25.20 28.00 30.80 33.60 22.00 45 54 107 14 168 74 230.34 291 94 24.75 QUANTITY OF FLORUNNER PEANUT 27.50 95 05 164 35 233 65 302.95 372 25 144 56 221 56 298 56 375.56 452 56 30.25 194 07 278 77 363 47 448.17 532 87 33.00 243 59 335 99 428 39 520.79 613 19 CWT. ^-wsk