r TEXAS TRANS PECOS FOREWORD r The enterprise budgets for Texas Trans Pecos Region are based on estimates of yields, production input quantities, and production practices which represent the best judgment of local producers, county Extension agents-agriculture, financial institution representatives, farm marchinery dealers and others knowledgeable of the area. Variation in yields, production inputs and production practices should be expected for particular farms. Budgets for all major crops produced in the area are included for two levels of management, when applicable. Crop yields are directly related to levels of management. These differences arc due largely to timing of operational practices which may not be evident in the budgets. The machinery inventory is applicable to both r typical and high level management. Jn some budgets custom rates, primarily harvesting, were used in lieu of the assumption that harvesting equipment was owned. Budgets for establishing permanent type pasture grasses were prepared and used for prorating establishment costs in the respective pasture and hay budgets. Forage crops include expenses only because it is expected that the income will be derived from livestock enterprises. Land charges were based on the customary landlord's crop share less his proportionate share of certain production and harvesting inputs. A per acre land charge was made using a fair market value times an interest rate when crop share was not used. B 1241 (C 8) TEXAS AGRICULTURAL EXTENSION SERVICE - THE TEXAS ASH UNIVERSITY SYSTEM Daniel C. Pfannstiel, Director - College Station, Texas TEXAS ENTERPRISE BUDGETS TEXAS TRANS PECOS REGION Projected for 1982 Educational programs conducted by the Texas Agricultural Extension Service serve people of all ages regardless of socio-economic level, race, color, sex, religion or national origin. ^operative Extension Work in Agriculture and Home Economics, The Texas A&H University System and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of Hay 8, 1914, as amended, and June 30, 1914. 500 - 1-82, New SCO 7-2 351 r PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 0 2 / W 8 2 . B-1241 (C 8) UPLAND COTTON- IRRIGATED- TRANS PECOS REGION 1982 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY PROJECTED PROJECTED YOUR UNIT YIELD 5/UNIT VALUE ESTIMATE GROSS RECEIPTS 0.58 650.00 LB. 377.00 COTTON LINT 0.52 TON 90.00 46.80 COTTONSEED 4iij.au $ TOTAL PROJECTED RETURNS VARIABLE COSTS INPUT USE PREHARVEST COSTS *SD COTTON-UPLAND 0.35 25.00 LB. 8.75 HERBICIDE 1.00 APPL 8.00 8.00 FERTILIZER 200.00 LB. 0. 12 24.00 INSECTICIDE 4.00 APPL 8.00 32.00 OTHEH INS, CONTR 1.00 ACRE 3.50 3.50 MISCELLANEOUS 1.00 ACRE 10.00 10.00 OTHER WD CONT TP 1.00 ACRE 15.00 15.00 IRRIGATION WATER 25.00 ACIN FUEL 5 LUBE—TRACTOR ACRE 11.32 EQUIPMENT ACRE 3.12 IRRIGATION ACRE 110.00 REPAIRS TRACTOR ACRE 2.30 EQUIPMENT ACRE 2.41 IRRIGATION ACRE 15.00 LABOR MACHINERY 1.60 HOUR 6.00 9.63 IRRIGATION 5.00 HOUR 6.00 30.00 EQUIPMENT 1.19 HOUR 6.00 7.14 OPERATING CAPITAL 105.73 DOL. 0. 180 19.03 SUBTOTAL, PREHARVEST ACRE $ ~ -J 1 1 <• £ \J HARVEST COSTS TRANSPORT MODULE 1.30 BALE 3.00 3.90 GIN, BAG, TIES 1.30 BALE 51.00 66.30 DESICCANT 0.40 ACRE 8.00 3.20 FUEL S LUBE—TRACTOR ACRE 2.87 i EQUIPMENT ACRE 4.74 REPAIRS TRACTOR ACRE 0.58 EQUIPMENT ACRE 12.08 LABOR MACHINERY 1.24 HOUR 6.00 7.44 EQUIPMENT 0.04 HOUR 6.00 0.24 SUBTOTAL, HARVEST $" 101.35 ACRE $ 412.55 $. TOTAL VARIABLE COSTS ACRE BREAK-EVEN PRICE, VARIABLE COSTS $ 0.56/LB. COTTON LINT $ 11.25 $ 3. INCOME ABOVE VARIABLE COSTS ACRE 4. FIXED COSTS DEPREC,INTEREST,TAXES 5 INSUR. 19.53 ACRE TRACTOR 78.92 EQUIPMENT ACRE 20.00 IRRIGATION ACRE LAND-CASH RENT 200.00 DOL. 0. 10 20.00 TOTAL FIXED COSTS ACRE $ 13B.45 $ 551.00 $ 5. TOTAL PROJECTED COSTS ACRE $ S 0.78/LB. COTTON LINT BREAK-EVEN PRICE, TOTAL COSTS 6. NET PROJECTED RETURNS ACRE $ -127.20 $ BUDGET BASED ON COTTON PLANTED SOLID. LAND CHARGE EQUALS 10* OF $200 LAND VALUE. r INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. r, -PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 02/12/82, UPLAND COTTON. IRRIGATED, TRANS PECOS REGION 1982 PROJECTED COSTS AND RETURNS PER ACRE 351 MACHINERY OPERATION SHREDDER 4R OFFSET DISC CHISEL MOLDBOAHD 6B OFFSET DISC LISTER 12R LISTER 12R LISTER 12R PLANTER 12R ROLLING CULT CULTIVATOR PLANTER 12R CULTIVATOR CULTIVATOR CULTIVATOR COTTON STRIPR SP MODULE BUILDER ITEM NO. ,57 ,43 ,44 ,47 ,43 '72 ,72 ,72 ,74 ,31 ,78 2,,74 2,,78 2 ,78 2 ,78 14 2,80 OPER MONTH JAN JAN FEB FEB FEB MAR APR MAY MAY MAY MAY JUNE JUNE JULY AUG NOV NOV APPL. MACH MACH TIMES LABOR MACHINE OPER LABOR INPUT FIXED OVER HOURS HOURS COSTS COSTS COSTS COSTS 0.0 3.06 1.93 1.23 1.00 0.205 ~o7l55 2.40 0.0 1.17 0.62 1.00 0.104 0 . 0 7 9 0.60 0.40 0.24 0.0 0.30 0.039 0 . 0 3 0 4.83 2.61 1.59 0.0 0.70 0.265 0 . 2 0 1 2.40 1.17 0.62 0.0 1.00 0.104 0 . 0 7 9 4.02 0.68 0.45 0.0 1.00 0.076 0 . 0 5 7 4.02 0.68 0.45 1.00 0.076 0 - 0 5 7 0.0 2.01 0.34 0.23 0.50 0-038 0 . 0 2 9 0.0 2.83 1.09 0.68 1.00 0.113 0 . 0 8 6 8.75 0.62 0.43 0.26 0.30 0.044 0 - 0 3 3 0.0 1.66 0.94 0.62 1.00 0.104 0 . 0 7 9 0.0 0.57 0.22 0. 14 0 . 0 0.20 0.023 0 . 0 1 7 3.32 1.88 1.24 2.00 0.207 0 . 1 5 7 0.0 1.66 0.94 0.62 1.00 0.104 0 . 0 7 9 0.0 1.66 0.94 0.6 2 1.00 0.104 0 . 0 7 9 0.0 22.27 15.57 5.0 0 1.00 0.833 0 . 6 6 6 0.0 13.73 5.41 2.44 1.00 0.4 07 0 . 3 0 9 0.0 2.845 TOTALS IRRIGATION APPLICATION 2.191 10.00 APR 5.00 JUNE 5.00 JULY 5.00 AUG 2-000 1.000 1.000 1.0C0 SYSTEM HOURS 0.0 0.0 0.0 0.0 25.00 5.0C0 0.0 LABOR ACRE APPL. MONTH INCHES HOURS WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION TOTALS B-1241 (C 8) 36.39 17.07 IRRIG OPER. LABOR COSTS COSTS 50-00 25.00 25-00 25.00 TOTAL OPER. COST 6.22 4.20 1.24 9.03 4.20 5.15 5 . 15 2.53 13.35 1.31 3.22 0.92 6.44 3.22 3.22 42.83 21.58 8 . 7 5 7 1 . 6 5 133.86 APPL. IRRIG INPUT FIXED COSTS COSTS 12.00 6.00 6.00 6.00 0.0 0.0 0.0 0.0 125.00 3 0 . 0 0 0.0 8.00 4.00 4.00 4.00 20.00 TOTAL IRRIG COSTS 70.00 35-0(^\ 35.0 35.00 175.00 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OP COTTON (DOLLARS) 0.46 0.52 0.58 0.64 0.70 520.00 -119.79 -89.63 -59.47 -29.31 0.85 585.00 -91.97 -58.04 -24.11 9.82 43.75 650.00 -64.15 -26.45 11.25 48.95 86.65 715.00 -36.33 5 . 14 46.61 88.08 129.55 780.00 -8.51 36.73 81.97 127.21 172.45 LB. QUANTITY OF COTTON LINT LINT | NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. I —<• . * LISTING CODE OF THE NAME SET ITEM NAME EER CALVES H E I F E R CALVES 9 3 COTTON L I N T 9 4 COTTONSEED 1 0 3 SALT & M I N . I 12 P R O T . SUPPLEMENT 1 5 3 PASTURE RENT 210 FERTILIZER 2 6 5 DESICCANT 2 8 2 G I N , BAG, T I E S 2 9 1 SD C O T T O N - U P L A N D 3 9 2 MARKETING 3 9 3 M I S C EXPENSE 4 1 0 VET M E D I C I N E 5 0 1 HERBICIDE 503 INSECTICIDE 5 0 6 TRANSPORT MODULE 5 0 7 OTHER I N S . CONTR 5 0 8 MISCELLANEOUS 5 1 1 OTHER WD CONT TP ANC P R I C E NMOD 15 14 HEAD = BU. = TON DOZ. AL. 5 "1 2 3 = 6 7 8 9 10 = BALE = ACRE = HOUR = DAYS = AUM LIVE LIVE COTT COTT COTT COT I COT I COTT 11 12 13 1 A = = = = VECTOR UNIT PRICE CWT. CWT. LB . TON LB. LB. ACRE LB • ACRE BALE LB . OOL. OOL • DOL. APFL APFL BALE ACRE ACRE ACRE 100.00 90.00 0.58 90.00 0 .10 0.10 75.00 0 .12 8.00 51 .00 0.35 1.00 1 .00 5.00 8.00 8.00 3.00 3 .50 10.00 15.00 AON LB. PINT QT. 15 16 17 18 = = = = REGION ITEM CODE DATE: NUMBER: NAME NMOD 021282 UNIT PRICE __ — — — ' — — — — — DOL. CWT. OZ. MILE 19 20 21 22 = = = FEET APPL SOFT LBGN 23 = 24 = 25 = 26 = CRTN CRAT BAGS TREE 2 7 - EACH 2 8 = GPM 2 9 a KWH 3 0 = MCF . TABLE ROW . DEFAULT PARAMETER VALUES AND D E F I N I T I O N S REGICN: 8 O A T E : 021282 PARAMETER DEFAULT VALUE CEFIMTION 1. PRICE PER GALLON CF GASOLINE 1.2500 2. PRICE PER GALLON CF L.P. GAS 0*4400 3. PRICE PER GALLCN CF DIESEL 1.1000 4. PRICE PER KILOWATT HOUR OF ELECTRICITY 0.0500 5. PRICE PER 1000 CU. FT, OF NATURAL GAS 0.0 6. NOMINAL INTEREST RATE 0. 1800 7. MACHINERY 0.0100 INSUR. RATE (AVERAGE INVESTMENT) 8. MACHINERY TAX RATE (PURCHASE VALUE) 0.0050 9. IRRIGATION SYSTEM NUMBER 1. 10. HOURLY MACHINERY WAGE RATE 6.00 11. HOURLY OTHER LAGOR WAGE RATE 6.00 12. HOURLY IRRIG./L IVESTOCK WAGE RATE 6.00 13. DEATH LOSS (PERCENT OF TOTAL RECEIPTS) 0.0 14. LIVESTOCK INSUR. RATE (AVERAGE INVESTMENT) 0.0100 15. EQUIPMENT INSUR. RATE (AVERAGE INVESTMENT) 0.0 100 16. LIVESTOCK TAX RATE (AVERAGE VALUE) 0.0050 17. EQUIPMENT TAX RATE (AVERAGE VALUE) 0.0050 18. IRRIGATION LABOR MULTIPLIER 0.2000 (HRS/ACIN) 19. FACTOR TO CONVERT MACHINE HRS TO TRACTOR HRS 1. 1000 20. FACTOR TO CONVERT TRACTOR HRS TO LABOR HRS 1.2000 21. FACTOR TO CONVERT SELF-POWERED MACHINERY HRS TO LABOR HRS 1 .2S00 22. LUBRICATION COST MULTIPLE OF MACHINERY FUEL COSTS 0.1000 23. INFLATION 0.0 24. LUBRICATION RATE FUEL COSTS COST MULTIPLE OF EQUIPMENT 0.0500 n r LISTING OF BCONOtllC AND ENGIMEERING DATA FOB flACHIHEBT IN REGION 3ACHINE TRACTOR THACTOB THACTOB THACTOB TRACTOH THACTOB 4 ?H DB PICKUP TROCK PICKUP 4 3H DR. COTTON STRIPS SP SBATHEH S . P . 80LLING CtJLT ROLLING COLT PL2X BOT BOE COtTIVATOB 6 8 CDLTIVATOB 88 LISTER-PLNTSR LI5TEB-PLNT88 BED PLANTER6B .BED PLANTER8R M»DBH DISC HDEH DISC vPPSET DISC OrPSET DISC caiszL C3TSZL «L3D ROLLOVER 30LDBOARD 6 8 HOLDBOABD 123 0N2VAI BODWEEDER 1 2 CODE WIDTH NO. IT!) 1. 2. 3. 4. s. 6. 10. 11. 14. 23. 30. 31. 32. 33. 34. 36. 37. 38. 39. 40. 11. 42. 43. 40. 45. 46. 47. 48. 49. 50- 150.0 125.0 100.0 75.0 40.0 225.0 0.5 0.5 6.6 14.0 20.0 26.6 20.0 20.0 26.6 20.0 26.6 20.0 26.6 14.0 20.0 14.0 28.0 23.0 41.0 5.3 8.0 16.0 16. 0 30.0 3 LIST PBICS 39030. 32330. 2794 0 . 18370. 1120 0 . 57650. 8500. 8300. 45000. 26000. 3500. 4500. 2500. 4 000. 5200. 4500. 5250. 3540. 4500. 4500. 7500. 7000. 15000. 6200. 1150 0 . 7770. 500 0 . 11000. 3200. 4800. 5 6 4 SPEED FIELD BC1 (BPH) EFF. 4.5 4.5 4.S 4.5 4.5 4.5 30.0 30.0 2.8 5.0 3.5 3.5 8.0 3.5 3.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 5.0 5.0 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.67 0.77 0.80 0.80 0.60 0.75 0.75 0.80 o.ao 0.60 0.60 0.83 0.33 0.3 3 0.83 0.80 0.80 0.80 0.80 0.80 0.80 0-80 1.20 1.20 1.20 1.20 1.20 1.20 0.80 o.ao 0.60 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.30 0.80 0.65 0.65 0.65 0.65 1.00 1.00 1.00 1.00 1.00 0.65 1.00 7 8 AGE BC3 (HHS) 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 00. 0. 0. 0. 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.30 1.80 1.80 1.30 1.80 1.80 1.80 1.80 1.60 1.60 1.80 1.80 1.80 1.80 1.80 1.80 1.30 1.30 1.30 1.80 1.80 3 DAT2:021582 9 10 ANNUAL TEABS HHS OWNED 11 RFT1 12 BFT2 7. 7. 7. 7. 7. 7. 3. 3. 7. 5. 7. 7. 7. 7. 7. 77. 7. 7. 7. 7. 7. 7. 7. 7. 3. 7. 7. 7. 7. 0.68 0.68 0.68 0.68 0.68 0.68 0.60 0.60 0.60 0.66 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.6O 0.60 0.6O 0.60 0.60 0.60 0.60 0.60 0.60 0.92 0.92 0.92 0.92 0.92 0.92 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 500. 600. 500. 300. 300. 600. 700. 700. 300. 300. 200. 200. 100. 100. 100. 150. 150. 100. 100. 200. 200. 200. 200. 200. 200. 155. 100. ISO. 150. 240. 13 14 poaca i'OTH, PBICS rn?E 35130. 29100. 25150. 16530. 10080. 51885.. 7650. 7000. 40000. 25000. 3200. 4500. 2300. 3600. 4700. 4200. 4750. 3200. 4050. 4250. 7200. 6700. 14000. 5700. 11000. 6220. 4500. 10500. 3000. •400. 3. 3. 3. 3. 3. 3. 1. 1. 3. 3. 0. 0. 0. 0. 000. 0. 0.. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 15 LIFE (BBS) 16 3P 12000. 150. 12000. 125. 12000. 100. 12000. 7512000. 40. 12000. 223. 2800. 30. 4000. 1. 2100. 105. 1500. 40. 2000. 0. 2000. 0. 0. 2000. 2000. 0. 2000. 0. 2000. 0. 2000. 0. 1200. 0. 1200. 0. 2000. 0. 2000. 0. 2000. 0. 2000. 0. 2000. 0. 2000. 0. 0. 2000. 2000. 0. 2000. 0. 2000. 0. 2000. 0. LISTING OP 2CONONIC AMD 2SGI32EBING DATA FOB flACHINEBY IN BZGION 1 MACHINE SAND FIGHT2B HABRO* PACK2B LisTsa 5a L I S T E B aa SHBEDDEB 2R SHBEDDEB UB GBAIN DRILL G8 DRILL/FEET BOX ?LOAT HEBB SPB/DISC COTTON TB 3BL COTTON TB SBL COTTON STH/3SX CHISEL HABBOW/SPG.TOOTH LIST2B 12R BED KNIFE 128 PtANTEB 12B ROTARY HOE 12B SAHD FIGHTEB 21B BOH KNIFE CULTIVATOR STBIPP2B 2B T BT aODOLE 3UILDE2 COTTON TBAILEBS 2 CODE WIDTH NO. (Ftl 51. 22-5 16.0 52. 53. 54. 55. 56. 57. 58. 59. 60. 61. 62. 63. 6a. 70. 71. 72. 73. 7U. 75. 76. 77. 78. 79. 80. 81. 8.3 20.0 26.6 6.6 13-3 13.5 13.5 7.0 14.0 6.6 6.6 6.6 18.0 33.0 UO.O UO.O UO.O 40.0 70.0 to.o UO.O 6.7 13.3 13.3 3 LIST PBICS 100 02000. 550. 1590. 2500120 0. 5810. UUOO. UUOO. 575. 650. 2400. 4000. 12500. 3310. 3850. 10500. 28307920. 5460. 1990. 2830. 4560. 16530. 22000. 12500. 4 5 6 SPEED FIELD BC1 (HPH) EFF. 3.0 4.5 6.0 4.5 4-5 3-7 5-0 4.0 4.0 6.0 4.5 10.0 10.0 2.8 4.5 6.0 4.5 4.5 4.0 6.0 6.0 4.S 3-5 3.0 3.0 3.0 0.80 1.00 0.80 0.65 0.80 0.30 o.ao 1.00 0.80 1.00 0.80 0.60 0.80 0.60 0.72 0-75 0.72 0.75 0.60 0.60 0.83 0.65 0.82 1.00 0.82 1.00 0-67 0.60 0.80 0.65 0.80 0.65 0-80 0.65 0.80 0.65 0.60 0.75 0.80 1.00 0.80 0.80 0-75 0.65 0-75 0.65 0.67 0-75 0-67 0.75 0.67 0.30 7 AGE 3 BC3 (HHS) 0. 0. 0. 0. 0. 00. 0. 0. 0. 0. 0. 0. 00. 0. 00. 00. 0. 0. 0. 0. 0. 0. 1.80 1.30 1.80 1.80 1.80 i.ao 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.60 1.80 1.80 1.80 1.80 1.60 1.30 1.30 1.80 1.80 1.60 1.60 1.30 a DATE:021582 14 12 BPT1 BPT2 POBCH POEL LI7B PHICS rips (BBS) 7. 7. 7. 7. 7. 7. 8. 7. 7. 7. 7. 7. 7. 5. 3. 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.38 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.38 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 900. 1750. 450. 1400. 2200. 1100. 4650. 4000. 4000. 500. 500. 1600. 2700. 12000. 2650. 34S0. 8400. 2270. 6330. 4370. 1600. 2270. 3650. 13230. 21000. 10000. 9 100. 120. 200. 150. 150. 125. 160. 120. 120. 100. 100. 150. 150. 300. 55. 65. 35. 100. 75. 45. 50. 130. 105. 160. 160. 160. 10 13 11 ANNUAL T8ABS BBS 09NED a. 8. 3. a. 8. a. a. 3. a. a. 3. 0. 0. 0000. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 00. 0_ 0. 0. 0. 0. 0. IS 750. 2000. 2000. 2000. 2000. 2000. 2000. 1000. 1000. 2500. 2000. 2000. 2000. 1500. 2000. 2000. 2000. 2000. 2000. 2000. 2000. 2000. 2000. 2000. 2000. 2000. 16 UP 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. B-1241 (L 8) TEXAS AGRICULTUEAL EXTENSION SERVICE - THE TEXAS ASM UNIVERSITY SYSTEM Daniel C. Pfannstiel, Director . College Station, Texas TEXAS ENTERPRISE BUDGETS TEXAS TRANS PECOS REGION Projected for 1982 Educational programs conducted by the Texas Agricultural Extension Service serve people of all ages regardless of socio-economic level, race, color, sex, religion or national origin. ^ Cooperative Extension Work in Agriculture and Home Economics, The Texas ASM University System and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914. 500 - 1-82, New ECO 7-2 391 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 01/27/82, COW-CALF BUDGET, TEXAS TRANS PECOS REGION 1982 PROJECTED COSTS AND RETURNS PER HEAD INVESTMENT REQUIREMENTS NUMBER COW 1.00 BULL 0.05 HORSE 0.02 TOTAL LIVESTOCK INVESTMENT UNIT HEAD HEAD HEAD SIZE 1.00 1.00 1.00 B - 1 2 4 1 (L 8) PROJECTED YOUR 57TTHTT 7TL"0E~ ESTIMATE 447.92 67.19 13.36 447.92 1343-75 667.97 PRODUCTION PROJECTED WGT. TOTAL NUMBER EACH UNITS UNIT S/UNIT RETURN 4.75 2.0 CWT100.00 204.25 STEER CALVES 0.43 4.50 1.9 CWT. 90.00 170.10 HEIFER CALVES 0.42 $ 3/U.Jb TOTAL PROJECTED RETURNS PROJECTED OPERATING INPUTS S/UNIT COST INPUT USE UNIT 0.10 30.00 PROT. SUPPLEMENT 300.00 LB. 12.00 0.10 1.20 LBSALT S MIN. 1.00 7.50 DOL. 7.50 VET MEDICINE 11.00 1.00 11.00 DOL. MARKETING 15.00 15.00 1.00 DOL. MISC EXPENSE 12.86 EQUIPMENT FUEL AND LUBE 1.42 EQUIPMENT REPAIR $ 78.98 TOTAL OPERATING COST RESIDUAL RETURNS TO LAND, LA BOR, CAPITAL , OWNERSHIP, $ 295.37 NT, AND PROF:LT MANAGEME UNIT RATE OF PROJECTED QUANTITY CAPITAL INVESTMENT COST INVESTED RETURN DOL. 3.21 21.42 0.150 6.71 ANNUAL OPERATING CAPITAL 44.73 DOL. 0. 150 EQUIPMENT INVESTMENT 79.27 528.46 DOL. 0.150 LIVESTOCK INVESTMENT $ 89.19 TOTAL CAPITAL COST RESIDUAL RETURNS TO LAND, LABOR, OWNERSHIP, MANAGEMENT, AND PROFIT OWNERSHIP COSTS (DEPRECIATION, TAXES, AND INSURANCE) EQUIPMENT LIVESTOCK TOTAL OWNERSHIP COST RESIDUAL RETURNS TO LAND, LABOR, MANAGEMENT, AND PROFIT OPERATOR LABOR COSTS LABOR USE UNIT RATE OF RETURN HOUR 5.00 4.90 EQUIPMENT HOUR 5.00 15.00 LIVESTOCK TOTAL LABOR COST RESIDUAL RETURNS TO LAND, MANAGEMENT, AND PROFIT RATE OF LAND COSTS INPUT USE UNIT PASTURE RENT TOTAL LAND COST r 1-00 HEAD RESIDUAL RETURNS TO MANAGEMENT AND PROFIT TOTAL PROJECTED COST OF PRODUCTION 85% CALF CROP, 20 COWS PER BULL, 2% DEATH LOSS, 1296 REPLACEMENT RATE, 300 COW HERD RETURN 75.00 5 $ $ $ $ 206.17 $ PROJECTED COST 11.04 32.35 ' $—znrcfT} r $ 162-78 $ PROJECTED COST 24.50 75.00 " $~^J9T57J $ £ 63.28 $ PROJECTED COST 75.00 $ 757110 T $ $ -11.72 $ 386.07 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OS PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF HEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. ~> 391 PROJECTION FOB PLASBIltG PURPOSES OBIT . . . BOT TO 8B OSXD B1TBO0T OPOATZBO ATTEB 0 1 / 2 7 / 8 2 . COt-CALE BUDGET, TEXAS TBABS PECOS RE6Z0B 1 9 8 2 PBOJECTBD COSTS ABO BETOBBS PE8 BEAD AVER. 1 JAB 2 3 BAB 4 APB 5 SAX 6 JOB 2.36 3.18 3.66 4.40 4.50 4.61 0.0 0.41 1.50 0.0 0.41 1.50 0.0 0.41 1.50 0.0 0.41 1.50 0.0 0.41 1.00 0.0 0.41 1.00 1.91 1.91 1.91 1.41 1.41 MIliUAL CAPITAL LABOH HEQOIBEBEBTS HACHIHEHT LABOB 2QUIPSEBT LA80B LIVESTOCK LABOB TOTAL LABOR 1.91 7 JOX. 8 A 06 1.41 11 HOT 12 DEC 5.25 -18.36 0.42 1.24 TOTAL 21.42 0.0 0.41 1.00 0.0 0.41 1.00 0.0 0.41 1.50 0.0 0.41 1.00 0.0 0.41 1.50 TOTAL 0.0 4.90 15.00 1.41 1.41 1.91 1.41 1.91 19.90 (DOLLARS) 5.03 5.14 (BOOBS) 0.0 0.41 1.00 10 OCT 9 SEP EQUIPBEBT FIXED AMD VARIABLE COSTS PEB XEAB EQUIPBEHT CODE PICXOP T3UCK EQUIPMENT COB BOLL HOBSE 2 5 52 55 70 DEPR ZBT. xas. 1400.00 9.50 20.83 62.50 23.44 885.00 8.59 67.19 201.56 100.20 59.00 0.57 4.46 13.44 6.68 TAX 29.50 0.29 2.24 6.72 3.34 IEPAXB 160.00 5.00 0.0 0.0 0.0 TOTAL OBB. TOTAL OPEB. BOUBS LABOR ALLOC 8 7 .. 5 0 2 3 7 3 . 3 0 0 ., 0 18.95 0 ., 0 94.74 0 ,. 0 284.22 0 ,, 0 133.65 1997.50 3.00 0.0 0.0 0.0 700.00 0.0 0.0 0.0 0.0 0.007 0.060* 1.000 0.030 0.020 rOXL 1750.00 0.0 0.0 0.0 0.0 LUB. SELECTED EQOXPBEIT COBTLSSER XBFORBATTOI ECUIF3EHT PICKUP TRUCK EQUIPBEBT COM BULL HOBSE 1 CODE SO. 2. 5. 52. 55. 70. 2 3 4 5 SIZE OBIT TTPE LIST PIXCZ 6 POBCB fBICS 7 LZ7E (TBS) 1 . TOB 1 0 0 . OGL. 1 . BEAD 1 . BEAD 1 . BEAD 8000. 100. 500. 1500. 750. 4. 10. 6. 6. 8. 2. 2. 1. 1. 1. 8000. 100. 500. 1500. 750. 8 9 10 SALT. BBPAI1 TOIL (UP) («U>) o s x 14 11 12 13 AIIOAX AJROAI. XXXXXX XXXXXX LABOB OSB 0.30 O.OS 0.73 0.75 0.75 700.0 0.0 0.0 0.0 0.0 0.08 0.30 0.0 0.0 0.0 1400.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.0 0.0 0.0 15 arr. 0.0 0.0 0.0 0.0 0.0 3 X ™ c : S G O O o > ' 3 » 3 » » : a ] « : c 3 c : ^ : o o r ) C n o o o ^ : i - i c 3 , r " « : « : « : H O G G c 3 I n I 33 ^3 ro n n O m w M 3 3 3 M r a m r < t „ p» ?* . Hs-jr-int-iis:*.-. in 1,1 I TS ro :l M I I l a m » - 3 3 t 1 - S 3 r r l H I S P I H ' O ' t l ' D ' O T I ' O ' O T I ' T J I H T3 *a x T J I 3 I "0 r X3 *& X H TjJ T3 *T2 H H TJ SB "O 33 33 H 3» G o o ~ a .. — • • —. I (/> -»-• -»• Tfl I I I I I I I I I — I _J •»- . • «_• k-d t-n -*- • j •X) ^ n M n r » w S3 o o o — _ . _ » - l _ 4 - . _ - _ - . - . - . _ . _ l _ l _ i _ . _ l _ » _ . _ l _ 4 0 J _ 0 0 0 - » - » - « o G M a. M H U H S3 T3 f 33 M H M U 1 3> H —ft _»_>—» (VJ03 CO CD 03 ov v i O M / i u i u i uiy.cn i n u i u i m u i u < u i u i - > - > - ' O O o O U l O O O O t O t O v O O O O C N O t O t O O O O O O O O O O O O O O ooooooooooooooooooooooooooooo n n J - » -J O -J cz co co lit ~4 a t i n u i U i yiuiui u i u i L n u . V i / i o < T t - » - » — « o o o O U l O O O O v O v f l t C O O O O t C t a t O O O O O O O U l O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O H n o M a: -. O O O O O O O O O O O O O O O O O O O O O O O O O O O O O J v l ' J l M W W W t O U U l U U - P C - ' J J - J O O - J O M W U l O ' J l - U J C o u i o o o o o o o o o o o o o o u - o o y o o o o t n o o o o O > J O O O O C 0 O t: f •m w oG M TJ 3 W z H *•»• -»• >-» (/) 3» M 9S r* f Co Tj « ; .— W M n t-" "a ta 03 m en H O as tO TJ > — M 33 -a o o ooooooooooooooooooooooooooooo G O O O O O O O O O O O O O O O O O O O O O O O O O O U l O U l tn m o W f -J O >• •< M 30 »fl ->J CO M •*»-* l ooooooooooooooooooooooooooooo ooooooooooooooooooooo-*-»uiuiui-»o-» o o 93 TJ "9 33 G M 33 Ot • c j t a a t c c c u i u i u i w u u i n u i v i c c i t a t - j o t o t a c o o o u e u i as -.1 O ooooooooooooooooooooooooooooo ooooooooooooooooooooooooooooo >V G -» f » > as C3 as - » O G — W N p" 9» o» o• o• o• o• o• o• o• o> o• o• o• o •o •o •o •o •o •o •o •o •o •o •o •o •o •o •o •o < ooooooooooooooooooooooooooooo a as ( A Z -> PICS) a* f X o a» H tn •o • —• (O oj 03 ro ooooooooooooooooooooooooooooo ooooooooooooooooooooooooooooo oooooooooooooooooooooo-»oooo-»o ooooooooooooooooooooooooooooo o o ooooooooooooooooooooooooooooo ooooooooooooooooooooooooooooo n G J