204 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFT^R 02/16/82, 1982 MACHINERY OPERATION CHISEL CHISEL CHISFL GRAIN DRILL 3RAIN DRILL GRAIN DRILL 3RAIN DRILL B-1241 (C 5; 1 WHEAT, DRYLAND, SHARE-RENT TEXAS ROLLING PLAINS I REGION ESTIMATED COSTS AND RETURNS PER PLANTED ACRE MACH ITEM OPER TIMES LABOR MACHINE OPER LABOB NO. MONTH OVER HOURS HOURS COSTS COSTS 6,44 6,44 6,44 6,58 58 58 58 JUNE JULY AUG SEPT SEPT SEPT SEPT TOTALS 1.00 1.00 1.00 0-25 0.25 0.25 0.25 APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 0.132 0.100 2 . 3 9 0.66 0.0 1.86 4.91 0.132 0.100 2.39 0.66 0.0 1.86 4.91 0. 132 0. 100 2.39 0.66 0.0 1.86 4.91 0 . 0 7 0 0.053 1.21 0.35 7.20 1.03 9.79 0.0 0.053 0. 15 0 . 0 0.0 0-29 0.44 0.0 0.053 0.15 0.0 0-0 0.2 9 0.44 0.0 0.053 0.15 0.0 0.0 0.29 0.44 . — — ————— . . . . . ————— ————— 0 . 4 6 5 0 . 5 11 8 . 8 4 2 . 3 2 7 . 2 0 7 . 4 9 2 5 . 8 5 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOB YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF WHEAT (DOLLARS) 3.08 3.46 3.85 4.23 16.00 J -7.30 -3.17 0.96 5.09 18.00 | -3.37 1.27 5.92 10.56 20.00 | 0.56 5.72 10.87 16.03 22.00 J 4.48 10. 16 15.83 21.51 24.00 l 8.41 14.60 20.79 26.98 BU. QUANTITY OF WHEAT ^ 4.62 i 9.21 | I 15.20 | I 21. 19 J I 27.18 J I 33-17 J NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. 205 PROJECTICNS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 02/16/82 B-1241 (C 5) ALFALFA ESTABLISHMENT, DRYLAND, CASH BENT TEXAS ROLLING PLAINS I REGION 1982 ESTIMATED COSTS AND RETURNS PEB PLANTED ACRE CATEGORY 1. GROSS RECEIPTS ALFALFA HAY TOTAL PROJECTED RETURNS 2. VARIABLE COSTS PREHARVEST COSTS ♦ALFALFA SEED FERT (N) APPL'D FERT (P) APPL'D FUEL S LUBE—TRACTCR "EQUIPMENT R E PA I R S T H A C T O R EQUIPHENT PROJECTED YIELD UNIT 1-00 ACRE PROJECTED VALUE S/UNIT 0.0 0.0 0.0 YOUR ESTIMATE $ INPUT USE LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS SUBTOTAL, HARVEST 20.00 LB. 16.00 LB. 20.00 LB. ACRE ACRE ACRE ACRE 0.54 HOUR 0.50 HOUR 14.93 DOL. ACRE TOTAL VARIABLE COSTS 1.30 0.26 0.28 5.00 5.00 0.074 ACRE 26.00 4. 16 5.60 3.38 1.36 0-78 1.39 2.72 2.50 1. 11 48.99 $ 0.0 ACRE $ 48.99 $ BREAK-EVEN PRICE, VARIABLE COSTS $ 48.99/ACBB ALFALFA HAY 3. INCOME ABOVE VARIABLE COSTS ACRE 4. FIXED COSTS DEPREC. ,INTEREST,TAXES & INSUR. TRACTOR acSE EQUIPMENT ACRE LAND-CASH RENT 1.00 ACRE TOTAL FIXED COSTS ACRE 5. TOTAL PROJECTED COSTS BREAK-EVEN PRICE, TOTAL COSTS 6. NET PROJECTED RETURNS ACRE $ -48.99 $ 3.24 3.80 15.00 15.00 $ 22.04 $; $ 71.03 $. S 71.03/ACBE ALFALFA HAY ACRE $ -71.03 $ SG r INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND BETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PBOJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBEBS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 20 5 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 02/16/82. B-1241(C 5) ALFALFA ESTABLISHMENT, DRYLAND, CASH BENT TEXAS ROLLING PLAINS I REGION 1982 ESTIMATED COSTS AND RETURNS PER PLANTED ACBE MACHINERY OPERATION CHISEL CHISEL 3RAIN DRILL MACH OPER LABOB MACHINE OPER LABOB ITEM TIMES NO. MONTH OVER HOURS HOUBS COSTS COSTS 2 , 4 4 JULY 2 , 4 4 AUG 2 , 5 8 SEPT TOTALS 1.00 1.00 1.00 APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPEB. COST 0.132 0.132 0.280 0.100 0.100 0.212 1.43 1.43 2.36 0.66 0.66 1.40 0.0 0.0 26.00 1.25 1.25 2.82 3.34 3,34 32.59 0.543 0 . 4 11 5.23 2.72 26.00 5.32 39.27 BESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PBICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHABE-RENT INCOME ABOVE VABIABLE COSTS LESS SHARE-BENT PRICE OF ALFALFA HAY (DOLLARS) 39.19 44.09 48.99 53-89 58.79 -14.64 -10.72 -6.80 -2.88 1.04 l -12.22 -7.81 -3.40 1.01 5.42 \ -9.80 -4.90 0.0 4.90 9.80 | -7.38 -1.99 3.40 8.79 14.18 J -4.96 0.92 6.80 12.68 18.55 | ACRE 0.80 0.90 QUANTITY OF ALFALFA HAY i 1 I 1.00 i I 1. 10 1 1 1.20 1 1 1 NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OB OTHER MANAGEMENT STBATEGIES. 1 206 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 02/16/82. B-1241 (C 5) ALFALFA, DRYLAND, CASH-LEASE TEXAS ROLLING PLAINS I BEGIOH 1982 ESTIMATED COSTS AND RETURNS PEB ACBE CATEGORY PROJECTED YIELD UNIT 1. GBOSS RECEIPTS ALFALFA HAY TOTAL PROJECTED RETURNS 2. VARIABLE COSTS PREHARVEST COSTS FERT (P) APPL'D FUEL F. LUBE—TBACTOB EQUIPMENT R E PA I R S T R A C TO R EQUIPMENT LABOR MACHINERY EQUIPHENT OPERATING CAPITAL SUBTOTAL, PBEHABVEST HABVEST COSTS CUSTOM BALE HAUL SUBTOTAL, HABVEST 2.50 TON YOUR ESTIMATE PBOJECTED VALUE S/UNIT 70.00 175.00 175.00 $ $ INPUT USE 20.00 0-0 0-50 -19.00 2.50 TOTAL VABIABLE COSTS LB. ACRE ACBE ACRE ACRE HOUR HOUR DOL. ACRE TON ACRE 0.28 5.60 0.0 1.36 0.0 0.31 0.0 2.50 5.00 5.00 0.074 $ 26.40 ACBE 8.37 $ $ 66.00 66.00 $ $ 74.37 $ B B E A K - E V E N P B I C E , VA B I A B L E C O S T S $ 2 9 . 7 5 / T O N A L FA L FA H AY 3. INCOME ABOVE VARIAELE COSTS ACBE 100.63 S 4. FIXED COSTS DEPREC, INTEREST, TAXES S INSUB. TRACTOR EQUIPMENT LAND-CASH BENT 1-00 E S TA B L I S H M E N T 6Y 71.03 TOTAL FIXED COSTS ACHE ACBE ACRE DOL. ACRE 0.0 1.72 15-00 12.08 28.80 $ 5. TOTAL PROJECTED COSTS ACBE BREAK-EVEN PRICE, TOTAL COSTS 6. NET PROJECTED RETURNS 15.00 0.17 $ $ 103.17 $ $ 41.27/TON ALFALFA HAY ACRE $ 71.83 $ ESTABLISHMENT COSTS PRORATED OVEB SIX YEARS. SG C INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND BETURNS FBOM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PBOJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE ANB APPROVED FOR PUBLICATION. 20 6 PBOJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 02/16/82. B-1241 (C 5) ALFAIFA, DRYLAND, CASH-LEASE TEXAS ROLLING PLAINS I REGION 1982 ESTIMATED COSTS AND RETURNS PER ACBE MACHINERY OPERATION MACH ITEM OPER TIMES LABOB MACHINE OPEB LABOB NO. MONTH OVEB HOURS HOURS COSTS COSTS TOTALS 0-0 0.0 0-0 APPL. MACH TOTAL INPUT FIXED OPER. COSTS COSTS COST 0.0 0.0 0.0 0.0 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHABE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PBICE OF ALFALFA HAY (DOLLARS) 56.00 63.00 70.00 77.00 84.00 TON QUANTITY OF ALFALFA HAY 2.00 1 50.83 64.83 78.83 92.83 106.83 2.25 | 58.23 73.98 89.73 105.48 121.23 2.50 I 65.63 83.13 100.63 11 8 . 1 3 135.63 2.75 1 73.03 92.28 111 . 5 3 130.78 150.03 3.00 80.43 101.43 122.43 143.43 164.43 | " > 207 PBOJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 02/16/82. B-1241(C 5) ALFALFA ESTABLISHMENT, IRRIGATED CASH-LEASE TEXAS ROLLING PLAINS I BEGION 1982 ESTIMATED COSTS AND RETURNS PEB PLANTED ACRE r CATEGORY 1. GBOSS RECEIPTS ALFALFA HAY TOTAL PROJECTED RETURNS 2- VARIABLE COSTS PROJECTED YIELD UNIT YOUR ESTIMATE PROJECTED S/UNIT VALUE 0.0 0.0 0.0 1.00 ACRE INPUT USE PREHARVEST COSTS ♦ALFALFA SEED FEBT (N) APPL'D FERT (P) APPL'D IRRIGATION WATER FUEL 5 LUBE —TRACTOR EQUIPMENT IBBIGATION R EP AIR S TRACTOR EQUIPMENT IRRIGATION LABOR MACHINEBY IRRIGATION EQUIPHENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS SUBTOTAL, HABVEST 20.00 16.00 20.00 8.00 0.48 0.80 0.50 24.55 TOTAL VARIABLE COSTS LB. LB. LB. ACIN ACBE ACBE ACRE ACRE ACBE ACBE HOUB HOUR HOUR DOL. ACRE 1.30 0.26 0.28 5.00 5.00 5.00 0.074 26.00 4.16 5.60 3.55 1.36 26.77 0.69 1.33 1.91 2-40 4.00 2.50 1.82 82.08 $ $ ACRE $ ACBE $ 0.0 $ 82.08 $ BREAK-EVEN PRICE, VARIABLE COSTS $ 82-08/ACRE ALFALFA HAY 3. INCOME ABOVE VA B I A B L E COSTS ACRE 4. FIXED COSTS DEPREC,INTEREST,TAXES 6 INSUR. TRACTOR ACBE EQUIPMENT ACRE I R R I G AT I O N ACBE LAND-CASH RENT 1.00 ACRE TO TA L FIXED COSTS ACBE 5. TOTAL PROJECTED COSTS BREAK-EVEN PRICE, TOTAL COSTS 6. NET PROJECTED RETURNS ACRE S -82.08 S 2.,86 3. 89 14. 50 15.00. 15. 00 S 36.26 $. $ 11 8 . 34 $. S118.34/ACBE ALFALFA HAY ACRE $ - 11 8 . 3 4 $ SG INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND BETURNS FBOH ANY ONE PARTICULAR FARM OB RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 02/16/82. 207 B-124 1 (C 5) ALFALFA ESTABLISHMENT, IRRIGATED CASH-LEASE TEXAS ROLLING PLAINS I REGION 1982 ESTIMATED COSTS AND RETURNS PER PLANTED ACBE HACHINEBY OPERATION CHISEL TANDEM DISC GRAIN DRILL 3RAIN DRILL HACH ITEM OPER TIMES LABOR MACHINE OPER LABOB NO. MONTH OVEB HOUBS HOURS COSTS COSTS 2,44 2,40 2,58 58 JULY AUG SEPT SEPT 1.00 1.00 0.50 0.50 WATER APPLICATION WATER APPLICATION 0.100 0. 158 0. 106 0.106 1.43 2.07 1.44 0.30 0.66 1.04 0.70 0.0 0.0 0.0 26.00 0-0 1.25 1.79 1.41 0.58 3.34 4.91 29.55 0.88 0.480 0.470 5.25 2.40 26.00 5-03 38.68 TOTALS IRRIGATION APPLICATION 0.132 0.208 0.140 0.0 APPL. MACH TOTAL INPUT FIXED OPER. COSTS COSTS COST APPL. ACRE LABOR MONTH INCHES HOURS AUG OCT TOTALS IRRIG SYSTEM OPEB. LABOR HOURS COSTS COSTS APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 4.00 4.00 0.400 0.400 3.155 3.155 14.34 14.34 2.00 2-00 0.0 0.0 7.25 7.25 23.59 23.59 8,00 0.800 6.310 28.68 4.00 0.0 14.50 47.18 ~ > RESIDUAL RETUBNS AT ALTERNATIVE YIELDS AND PBICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHABE-BENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF ALFALFA HAY (DOLLARS) 65.67 73.87 82.08 90.29 98.50 -26.55 -19.98 -13.42 -6.85 -0.28 I -21.48 -14.10 -6.71 0.68 -16.42 -8.21 0.0 8.21 1.10 \ - 11 . 3 5 -2.32 6.71 15.74 ! 1.2Q J -6.28 3.57 13.42 23.27 ACRE _ QUANTITY OF ALFALFA HAY I 0.80 1 I 0.90 1 I 1.00 | \ I 8.07 I I 16.42 | i 24.77 I 1 33.12 | L NOTE: NEGATIVE RETUBNS OVER VARIABLE COSTS HAY BE AVOIDABLE VIA CBOP ABANDONMENT, GBAZE-OUT, OB OTHEB MANAGEMENT STBATEGIES. 208 r PBOJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 02/16/82. CATEGORY B-1241(C 5) A L FA L FA . I R R I G AT E D , C A S H - L E A S E TEXAS ROLLING PLAINS I REGION 1982 ESTIMATED COSTS AND RETURNS PER ACRE PROJECTED PROJECTED YIELD UNIT snnrrT—ttute 1. GROSS RECEIPTS ALFALFA HAY TOTAL PROJECTED RETURNS 2. VARIABLE COSTS PREHARVEST COSTS 6.50 TON 46.00 1.00 3.00 27.50 0.0 2.75 0.50 1.00 -3.31 6.50 TOTAL VARIABLE COSTS BREAK-EVEN PBICE, VARIABLE COSTS 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS DEPREC ,INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT I R R I G AT I O N . nn RENT E S TA B L I S H M E N T TOTAL FIXED COSTS 6Y ,-2-29 11 8 . 3 4 5. TOTAL PROJECTED COSTS BREAK-EVEN PBICE, TOTAL COSTS 6. NET PROJECTED BETUBNS 70.00 455.00 _ $—T.557UT. $Z INPUT USE FERT (P) APPL'D MISC EXPENSE INSECTICIDE IRRIGATION HATER FUEL S LUBE—TRACTOR EQUIPMENT I R R I G AT I O N R E PA I R S T R A C TO R EQUIPMENT I R R I G AT I O N LABOB MACHINERY I B B I G AT I O N EQUIPMENT OTHER OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS CUSTOM BALE HAUL SUBTOTAL, HARVEST LAND-CASH YOUR ESTIMATE LB. DOL. APPL ACIN ACRE ACRE ACRE ACBE ACRE ACRE HOUR HOUB HOUR HOUR DOL. ACRE TON ACRE 12-88 1.00 9.00 0-28 1.00 3.00 0-0 1.36 92.01 0.0 0.31 6.57 0.0 13.75 2.50 5.00 5.00 5.00 5.00 5.00 0.074 26.40 T5 r-iifc2" $ $" 171,60 TTTf o"U $■ ACRE $ 315,74 $ $ 48.57/TON ALFALFA HAY ACRE $ 139.26 $ ACBE ACRE ACRE ACRE DOL. ACRE 15.00 0.17 $ 0.0 1.72 " 49.86 ' 15.00 " 20XJ2 $ "3^7F9 ACRE $ 402.43 $. $ 61.91/TON ALFALFA HAY ACRE $ 5 2. 57 $ ESTABLISHMENT COSTS PBORATED OVER SIX YEARS. SG TM.nPR&TTnN PRFSFNTED IS PBEPARED SOLELY AS A GENEBAL GUIDE AND IS NOT INTENDED TO BECOGBlls OB PBEBICT THE COSTS AND RETURNS FROM ANY OMF PARTICULAR FARM OR RANCH OPEBATION- THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 02/16/82, 208 B-1241 (C 5) ALFALFA, IRRIGATED, CASH-LEASE TEXAS ROLLING PLAINS I REGION 1982 ESTIMATED COSTS AND RETURNS PER ACHE MACHINERY OPERATION MACH ITEM OPER TIMES LABOR MACHINE OPER LABOB NO. MONTH CVER HOURS HOURS COSTS COSTS TOTALS IRRIGATION APPLICATION 0.0 APR MAY A P P L I C AT I O N APPLICATION APPLICATION A P P L I C AT I O N f 0.0 0.0 0.0 0.0 0.0 IRRIG A P P L . I B B I G T O TA L APPL. ACRE LABOB SYSTEM OPER. LABOB INPUT F I X E D I B B I G MONTH INCHES HOURS HOURS COSTS COSTS COSTS COSTS COSTS WATER APPLICATION STATER STATER WATER WATER 0.0 APPL. MACH TOTAL INPUT FIXED OPEB. COSTS COSTS COST JUNE J U LY AUG _OTALS 50 50 50 50 b . 50 0. 550 0. bbO 0. 550 0-.SbO 0. 550 4, 338 4. 338 4. 338 4..338 4. 338 27. 50 2. 750 21. 692 5. 5. 5. 5. 19. 19, 19. 19. 19. 72 72 72 72 72 2. 75 2. 7b 2.,75 2. 7b 2. ,75 98. 58 13, ,75 0. 0. 0. 0. 0. 0 0 0 0 0 0. 0 9. 97 9, 9 / 9, 9 / 9. 9 / 9, 9 / 32. 44 3 2 . 44 32. 44 32. 44 32. 44 49. 86 162. 18 RESIDUAL BETUBNS AT ALTERNATIVE YIELDS AND PBICES ADJUSTED FOR YIELD-HFIAT ED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT TON 5.20 QUANTITY OF ALFALFA HAY 5.85 6.50 7.15 7,80 56.00 9.78 29.02 48. 26 67.50 86.74 PRICE OF ALFALFA HAY (DOLLABS) 63.00 77.00 70.00 46. 18 69.97 93.76 82.58 110.92 139.26 117.55 141.34 167.60 195.94 118.98 151.87 184.76 217.65 250.54 84.00 155.38 192.82 230.26 267.70 305.14 ^N