PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 02/15/82,
WHEAT FOR GRAIN, DRYLAND, LOWER SOUTH CENTRAL TEXAS
1982 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
1. GROSS RECEIPTS
WHEAT
TOTAL PROJECTED RETURNS
2. VARIABLE COSTS
PREHARVEST COSTS
♦SEED WHEAT
NITROGEN (DRY)
PHOSPHATE
FUEL 5 LUBE—TRACTOR
EQUIPHENT
R E PA I R S T R A C T O R
EQUIPHENT
LABOR HACHINERY
EQUIPHENT
i
OPERATING CAPITAL
SUBTOTAL, PREHARVEST
HARVEST COSTS
CUST HARV WHEAT
HAUL WHEAT
SUBTOTAL, HARVEST
PROJECTED
YIELD
UNIT
20.00
60.00
20.00
20.00
0.75
0.63
12.84
20.00
20.00
BREAK-EVEN PRICE, VARIABLE COSTS
YOUR
ESTIMATE
BU.
3.85
77.00
77.00 S
LB.
LB.
LB.
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
ACRE
0.15
0.35
0.30
$
9.00
7.00
6.00
3.19
1.58
0.41
1.13
2.60
2.17
2.44
35.51 S
$
6.00
4.00
10.00 $
S
45.51 S
BU.
BU.
ACRE
i
3.45
3.45J
0.190
0.30
0.20
$ 2 . 28/BU. WHEAT
ACRE
4. FIXED COSTS
DEPREC.,INTEREST,TAXES S INSUR.
TRACTOR
EQUIPHENT
1.00
LAND-CASH RENT
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
5. TOTAL PROJECTED COSTS
ACRE
BREAK-EVEN PRICE, TOTAL COSTS
i
ACHE
3. INCOME ABOVE VARIABLE COSTS
6. NET PROJECTED RETURNS
PROJECTED
VALUE
S/UNIT
INPUT USE
TOTAL VARIABLE COSTS
r
B-1241 (C17)
!$
31.49 $
8.60
7.79
7.50
23.89 $
7.50
$
69.39 $
S 3 . 47/BU. WHEAT
ACRE
$
7.61 $
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARH OH RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF HEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 0 2/15/82,
810
B-1241 (C17)
WHEAT FOR GRAIN, DRYLAND, LOWER SOUTH CENTRAL TEXAS
1982 PROJECTED COSTS AND RETURNS PER ACRE
MACHINERY
OPERATION
OFFSET DISC
GRAIN DRILL
OFFSET DISC
MACH
ITEH OPER TIMES LABOR MACHINE OPER LABOR
NO. MONTH OVER HOURS HOURS COSTS COSTS
APPL. MACH TOTAL
INPUT FIXED OPER.
COSTS COSTS COST
1.25 0-73
2.03 1.15
1.25 0.73
CO
4.41
6.39
9.00 5.87 18.04
0.0
4.41
6.39
0.753 0.570 4.53 2.60
9.00 14.68 30.81
4,38 SEPT
4,72 OCT
4,38 NOV
TOTALS
1.00
1.00
1.00
0.210
0.332
0.210
0.159
0.252
0.159
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF WHEAT
(DOLLARS)
3.08
3.46
3.85
4.23
4.62
BU.
QUANTITY OF
HHEAT
~
16.00 |
5.77
11 . 9 3
18.09
24.25
30.41 |
18.00 |
10.93
17.86
24.79
31.72
38.65 |
20.00 |
16.09
23.79
31.49
39.19
46.89 J
22.00 J
21.25
29.72
38.19
46.66
55.13 |
24.00 J
26.41
35.65
44.89
54.13
63.37 !
■ >
811
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 02/15/82
3-1241 (C17)
PEANUTS, SPANISH, DRYLAND, LOWER SOUTH CENTRAL TEXAS REGION
1982 PROJECTED COSTS AND RETURNS PER ACRE
PROJECTED
C AT E G O RY
PROJECTED
UNIT
YIELD
S/UNIT VALUE
1. GROSS RECEIPTS
25.00 750.00
PEANUTS
3 0 . 0 0 CWT.
S 75TJ7T7U
TOTAL PROJECTED RETUHNS .
2. V A R I A B L E C O S T S I N P U T U S E
PREHARVEST COSTS
♦PEANUT
SEED
5 0 . 0 0 LB.
1.60 80.00
♦NITROGEN
(DRY)
1 6 . 0 0 LB.
0.35
5.60
♦ P H O S P H AT E
2 4 . 0 0 LB.
0.30
7.20
0.30
3.60
♦ P O TA S H
1 2 . 0 0 LB.
7.28
7.28
HERBICIDE-PEANUT
1 . 0 0 ACRE
1.25 50.00
RYEGRASS
SEED
4 0 . 0 0 LB.
4.48 17.92
INSECTICIDE-PNUT
4 . 0 0 APPL
0.20
6.00
A L L O T M E N T L E A S E 3 0 . 0 0 CWT.
5.29 15.87
F O L I A R F U N G I C I D E 3 . 0 0 APPL
ACRE
10.87
FUEL S LUBE—TRACTOR
ACRE
1.94
EQUIPHENT
R E PA I R S T R A C T O R
ACRE
1.38
ACRE
3.46
EQUIPMENT
3.45
8.86
LABOR
HACHINERY
2 . 5 7 HOUR
3.45
2.66
E Q U I P H E N T 0 . 7 7 HOUR
O P E R A T I N G C A P I T A L 6 7 . 0 8 DOL.
0.190 12.75
ACRE
ST 2J5.J8
SUBTOTAL, PREHARVEST
HARVEST COSTS
CUSTOH
HAULING
1 . 5 0 TON
8.00 12.00
CUSTOH
DRYING
1 . 5 0 TON
20.00 30.00
FUEL & LUBE—TRACTOR
ACRE
0.35
R E PA I R S T R A C T O R
ACRE
0.04
ACRE
0.12
EQUIPHENT
LABOR
HACHINERY
0 . 0 8 HOUR
3.45
0.28
ACRE
.$" ' 42. BU
SUBTOTAL, HARVEST
TOTAL VARIABLE COSTS
ACRE
$ 278.18
BREAK-EVEN PRICE, VARIABLE COSTS S 9 . 27/CWT. PEANUTS
3. INCOME ABOVE VARIABLE COSTS
ACRE
$ 471.82
4. FIXED COSTS
DEPREC,INTEREST,TAXES 5 INSUH.
TRACTOR
ACRE
30.28
20.83
ACRE
EQUIPHENT
LAND-CASH
RENT
1 . 0 0 ACRE
20.00 20.00
ACRE
S 71.10
TOTAL FIXED COSTS
ACHE
$ 349.29
5. TOTAL PROJECTED COSTS
BREAK-EVEN PHICE, TOTAL COSTS
$ 11. 64/CWT. PEANUTS
6. NET PROJECTED RETURNS
ACRE
$ 400.71
LAND CHARGE BASED ON CURRENT CASH RENT PRICE IN REGION
YOUR
ESTIMATE
S
5
s
s
$
$
s
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND 13
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
311
PROJECTIONS FOH PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 02/15/82.
B-1241 (C17)
1
PEANUTS, SPANISH, DRYLAND, LOWEE SOUTH CENTRAL TEXAS REGION
1982 PROJECTED COSTS AND RETURNS PER ACRE
MACHINERY
OPERATION
MOLDBOARD PLOW
CHISEL PLOW
DITCHER BLADE
FERT.APPL,RNTD
MOLDBOARD PLOW
CHISEL PLOW
PLANTER 6R
OFFSET DISC
OFFSET DISC
GRAIN CART
MACH
LABOR
I T E M OPER
TIMES LABOR MACHINE OPER
HOURS HOURS COSTS COSTS
NO. MONTH OVER
4,31
4,33
4,48
4,59
4,31
4,33
4,36
4,38
4,38
4,61
SEPT
SEPT
OCT
OCT
FEB
FEB
MAR
MAR
APR
AUG
TOTALS
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
APPL. HACH
INPUT F I X E D
COSTS COSTS
TOTAL
OPER.
COST
13.30
4.53
13.56
20.40
13.30
4.53
86.32
6.39
6.39
1.85
0.451
0.168
0.504
0.203
0.451
0.168
0.202
0.210
0.210
0.082
0.342
0.127
0.382
0.154
0.342
0.127
0-153
0.159
0.159
0.063
3.08
1.00
2.50
0.97
3.08
1.00
1.36
1.25
1.25
0.52
1.56
0.58
1.74
0.70
1.56
0.58
0.70
0.73
0.73
0.28
0.0
0.0
0.0
16.40
0.0
0.0
80.00
0.0
0.0
0.0
8.67
2.95
9.32
2.33
8.67
2.95
4.27
4.41
4.41
1.05
2.651
2.008
16.00
9.15
9 6 . 4 0 4 9 . 0 2 170.56
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
^
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF PEANUTS
(DOLLARS)
20.00
22.50
25.00
27.50
30.00
2 11 . 4 2
271.42
331.42
391.42
451.42 |
266.62
334.12
401.62
469.12
536.62 |
321.82
396.82
471.82
546.82
621.82 l
377.02
459.52
542.02
624.52
707.02 |
432.22
5 22.22
612.22
702.22
792.22 |
CWT.
QUANTITY OF
PEANUTS
!
24.00 J
I
27.00 J
I
30.00
1
33.00 1
36.00 1
1
- >
812
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 02/15/82.
B-1241 (C17)
PEANUTS, SPANISH- IRRIGATED, LOWER SOUTH CENTRAL TEXAS REGION
1982 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
PROJE C T E D
PROJECTED
YIELD
UNIT
S7TnrrT
CWT.
25.00
LB.
LB.
LB.
LB.
ACRE
ACRE
LB.
APPL
ACRE
CWT.
APPL
ACIN
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
HOUR
DOL.
ACRE
1.60
0.35
0.30
0.30
7.28
18,75
1.25
4.48
6.00
0-20
5.29
1. GROSS RECEIPTS
PEANUTS
33.00
TOTAL PROJECTED RETURNS
2- VARIABLE COSTS
INPUT USE
PREHARVEST COSTS
♦PEANUT SEED
90.00
♦NITROGEN (DRY)
16.00
♦PHOSPHATE
24.00
♦POTASH
12.00
HERBICIDE-PEANUT
1.00
SOIL FUNGICIDE
1.00
RYEGRASS SEED
40.00
INSECTICIDE-PNUT
3.00
HOEING
1.00
ALLOTMENT LEASE
33.00
FOLIAR FUNGICIDE
6.00
IRRIGATION WATER
24.00
FUEL S LUBE—TRACTOR
EQUIPMENT
IRRIGATION
R E PA I R S T R A C T O R
EQUIPMENT
IRRIGATION
LABOR MACHINERY
2.74
IRRIGATION
24.00
0.77
EQUIPMENT
OPERATING CAPITAL
128.60
SUBTOTAL, PREHARVEST
HARVEST COSTS
CUSTOM HAULING
1.60
CUSTOM DRYING
1.60
FUEL 5 LU3E—TRACTOR
R E PA I R S T R A C T O R
EQUIPMENT
LABOR MACHINERY
0.08
SUBTOTAL, HARVEST
TOTAL VARIABLE COSTS
BREAK-EVEN PRICE, VARIABLE COSTS
3. INCOME ABOVE VA.RIABLE COSTS
4. FIXED COSTS
DEPREC, INTEREST,TAXES S INSUR.
TRACTOR
EQUIPMENT
IRRIGATION
LAND-CASH
RENT
1.00
TOTAL FIXED COSTS
5. TOTAL PROJECTED COSTS
TON
TON
ACRE
ACRE
ACRE
HOUR
ACRE
3.45
3.45
3,45
0. 190
YOUR
T S T u T ! E S T I M AT E
825.00
S ■'8'2_..UU $
144.00
DmbO
/.2U
3.60
7.2 8
id. fD
DU.00
13.44
6.0
b.bU
'
31. /<.
11 . 5 8
1.94
53.52
!.«♦/
3.65
18.00
y.44
dz_.au
Z.bb
__4. UJ
S~" 503: /I $
8.00
20.00
3.45
0
12.80
3 2.00
0.35
0.04
0.12
$
U._.d
4_>.bU 5
ACRE $ 549.31 $_
$ 16.65/CWT. PEANUTS
ACRE
S 275.69 $
ACRE
32.20
ACRE
21.85
ACRE
60.24
ACRE
40.00 40,00
ACRE
$ T5TTTT9
ACRE
$ 703.60 $.
BREAK-EVEN PRICE, TOTAL COSTS
S 21.32/CWT. PEANUTS
6. NET PROJECTED RETURNS
ACRE
S
121.40
S
LAND CHARGE BASED ON CURRENT CASH RENT PRICE IN REGION. ALLOTMENT RENT BASED
2. CENTS PER POUND. IRRIG COSTS BASED ON SIDEROLL SPRINKLER SYSTEM AT 24 ACI
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
8 1 2 „ „ m P R O J E C T I O N S F O R P L A N N I N G P U R P O S E S O N LY
NOT TO BE USED WITHOUT UPDATING AFTER 02/15/82.
B-1241 (C17)
PEANUTS, SPANISH. IRRIGATED, LOWER SOUTH CENTRAL TEXAS REGION
1982 PROJECTED COSTS AND RETURNS PER ACRE
MACHINERY
OPERATION
MOLDBOAR D PLOW
CHISEL P LOW
DITCHER BLADE
FERT. APP L, RNTD
MCLDBOAR D PLOW
CHISEL P LOW
PLANTER 6R
OFFSET D I S C
OFFSET D ISC
GRAIN CA RT
TOTALS
IRRIGATION
APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
TOTALS
^
HACH
APPL. MACH
TOTAL
I T E M OPER
T I M E S LABOR MACHINE OPER
LABOR
INPUT FIXED
OPER.
NO. MONTH OVER
HOURS
HOURS
COSTS COSTS
COSTS COSTS
COST
4 r 3 1 SEPT
1-00
0.451
0.342
3.08
1.56
0.0
8.67
13.30
4 , 3 3 SEPT
1-00
0. 168
0.127
1-00
0.5 8
0
.
0
2
.
9
5
4.53
4 , 4 8 OCT
1.00
0.504
0.382
2.50
1.74
0.0
9.32
13.56
4 , 5 9 OCT
1.00
0.203
0.154
0.97
0.70
16.40
2.3 3
20.40
4 , 3 1 FEB
1.00
0.451
0.342
3.08
1.56
0.0
8
.
6
7
13.30
4 , 3 3 PEB
2.00
0.336
0.255
1.99
1. 16
0.0
5
.
9
0
9.05
4 , 3 6 MAR
1-00
0.202
0. 153
1.36
0.70 144.00
4 . 2 7 150.32
4 , 3 8 MAR
1.00
0.210
0.159
1.25
0.73
0.0
4.4 1
6.39
1.00
4 , 3 8 APR
0.210
0-159
1.25
0.73
0.0
4.41
6.39
4 , 6 1 AUG
1.00
0.082
0-0 63
0.52
0.28
0.0
1.05
1.85
2.819 2.136 17.00 9.73 160.40 51.96 239.09
IRRIG
A P P L . IRRIG TOTAL
SYSTEM OPER. LABOR INPUT FIXED IRRIG
HOURS COSTS COSTS COSTS COSTS COSTS
APPL. ACRE LABOR
MONTH INCHES HOURS
MAR
3.00 3 - 0 0 0
APR
3.00 3 . 0 0 0
MAY
6-00 6 . 0 0 0
JUNE 6 . 0 0 6 . 0 0 0
JULY 6 . 0 0 6 . 0 0 0
0.0
0.0
0.0
0.0
0.0
8.94
8.94
17.88
17.88
17.88
24.00 24-000 0.0
71,52
10.35
10.35
20.70
20.70
2 0.70
0.0
0.0
0.0
0.0
0.0
82.80
0.0
7.53
7,53
15.06
15.06
15.06
60.24
26.82
26.82
53.64
53.64
53.64
214.56
^
m
.ncSISI2HiL^S5?SRNS.
XT ALTERNATIVE
AND
ADJUSTED
FOR YIELD-RELATED
COSTS AND YIELDS
CHANGES
IN PRICES
SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
CWT.
QUANTITY OF
PEANUTS
20.00
PRICE OF PEANUTS
(DOLLARS)
22.50
25.00
27.50
30.00
26.40
- 11 . 0 3
54.97
120.97
186.97
252.97
29.70
49.83
124.08
198.33
272.58
346.83
33.00
11 0 . 6 9
193. 19
275.69
358.19
440.69
36.30
171.55
262.30
353.05
443.80
534.55
39.60
232.41
331.41
430.41
529.41
628.4 1
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
eJ5*£i.?!.
riBAND0NMENT' GRAZE-OUT, OR OTHER MANAGEMENT
STRATEGIES.
^
>
w O o z m
M O Z O - J
H t - * r t H r t
mm
o
z m w h w
uintfmatm
HHwH;w
OrtHWH
a o n z H
n o o
in;s»Ortz
aasHCD
won* ts
x
wHw
HO
Ort
OMrt in
toxtftoto
w w w z
tso
ow
wroz
t*-o
tS
MM
WNW
wro>w
tOXOS W
o
noro
•<in__iww
dpi
ts
CDtfO^Stf
W W W W
H
t f
aa
o
u\
2:
H
O
H
a-
rt
o
ro
H
t f
W
ro
o
rt
CD
i>
tn
rt
o
O
ts
n
a
to
to
rt
aa
H
w
O
C-i
W
n
H
W
o
ro
rt
H
p
ro
ro
w
rt
tn
I
ra
x
rt
25
ts
to
M
o
rt
25
ui
H
O
H
Ul
M
to
o
C-i
W
O
H
rt
o
n
o
tn
H
in
H
O
P i H
tf3»
ro
uiaa
* p i
m
H
w
tn
cn
M
25
-»
•
0
o
rt
o
Vi
Ul
1
ro
ra
in
H
%
td
25
H
n
w
rt
H
o<<
rtrt
X l f t SH *
in
rttnt-_O *
H
u r o wW M t n
25 2 5
o » H H
o w
W
H
in
ro
rt
m z wH W O
a ow r o
ra T g > W O
M O Mn n o
H
tn
t f O i - i n t f
ra
tI o
I
>
n
o
w
ro
M
Vf
O
rtrt wwt>a
o
mom
a a > H
WHOtn
»03HHO
O t fl O H
w w z h w
MW» tCM
Htn WK
o
Hrtrootn
h ratn
as
1
tf 2»z»?»tf
n
nnnn
ro rororo ro
w rt Wrt ra
as
n
o
tM
ra
W S - W
H » z z
w o o w
xc_i w
s x w w t f
m o w m
H H
0050G
C O Z Z H
Hintno
n
rt
o * r t
h w w >
H W O z
P r t a o
ro
tf
tr*
>H
zw
M
=5
\
»
rt
H
O
H
O
2:
1
W
ro
H
to
o
o
O
ai
ro
H
n
t?a
<
o
o
tn
H
tn
w
rowin
•<wo
raHro
tn H
H H O
O H
ro
M
t f
ro
w
ts
0
t f
H
ro
ro
W
f
rt
»
»
in in* o
w
t f
ts
n
o
in
H
tn
■*.#
tn
I
I
H W E K W H
H O t x O W
t f a n a t f
c - ' H r o M O
W
O
a
M
tOtf
tatatsroH w w z « w r o
t s - W W P Z o r o M *»roH
z w w z wH O Hy^tftf
o r o H C i w > w w wroro
HMMO w w o » < t - «
MOOOH r o r o o s*row
> M H H H > r ow t n
t - o o o r i H = 5H r - i n
O r t W W H to o
o
to
f
O
aanui
«>- w
o
O H
W cocy.cn
H W
W H
r t f
Wtn
0
tSHtSPirO
3 Z 3 0 3
rtwwrow
zwz ai.
H
Hxt-a
O
ro
n
H * 3 0
t f t f U l
M H t n
o
H
ra
o
o
ro
x
w
^roro
W 3 W
o w n
H
W
C.
H
to
w
DC
to
w
- * H
H
P
M
torn
rt
SOO
CDOS
ro
H
Ul
ts
M
w
as
to
ui
•
O
I
-_o-»
iii
-O-er-J
O
-Al_-0
tO*=4?
Ln -_.to to toooo**
•
••llllll
OOOOOOOOO
OOOOOOOOO
Ui
W
G
H
a
ui
rt
ta
-*
xo
tO
Ln
I
HC-i
WW
o
o
O
n n
H
w
0
tf >o tfCDtata3»*»tftftatftftf>'HHHH
n
o«
nooonr.fino'ontiwrorororo
ro WH roMPPtowwwpwwww* • • •
w w» w» wwrowwwroMWMt-1
n
o
s: ro
H
M
•
H
Ol LrtCJ—»-»
-_
UjOOvO
■
-til
to ~Joui*r
■o o c j o t o c r t*.
VI
Ln
00
•
Ln
ti
ro
cc
«
H
O
aa
Ui
lj as ui ui o^. o o o as
a\
•
iiiiiiii
tSQUiOstOUlUlUSO
oinLn
uitoasotsacDUio
0
o
Ui
Ui
ui
Co
K tO
a as
n to
J
a_|o -»<_ntoo—k-*4-jcr>-o-»tooMO ts ts
«-«o
alLn
olo
00
U L n
C O
vduicrtcotovotototoooui-croooo
ai uiso 00 Ln to U)-»u.toooc oooooo
c o
c o
Ui
Ui
Ui
U)
t f
H
1
O
I LOUJ
__« I
V-O-p-C?
to
1
H
ro
ts
w o
o w
a x
can
n t f
H Z
w o
o *
O M
0 0
in an
H W
tnw
tfUl
aaO
O
o
ro
<_
*
O
H
*1
t f
H
W
as
ui
.3
z
C i H w
W O M
5-
o
»
W
H
t f
OiUltf
p i H
n
o
in
H
in
o
W
H
h
t f
\
t f
H
W
- J
LJ
rota
ro
H
Ui
■_
to
o
ro
co __:
<
n
in
0
w
•
H
tsx
—
*
n
t/»
?>.
I
W
X
O H W H t e *
zroratn
•
ra
o
t>
t l
23
H
t>
ro
o
CD
W
W
>
ro
o
<
w
ro
H
so
1
• •
I
]•
llllllllllllll!
1
1
1
1
Ui
P
H
wro
w
v.
NI
ci
2: ^
H r o
H O
C-4
w
n
< : H
> ra
_-a
c i
C.
H
O ' O
w
roo
wc_,
w
P O
W H
W M
ooz
mm
M
Hrt
rao
o w
p
H W
H
a t f
W Z
O Z
V»H
H Z
Hen
z
o w
p
> w
rtw
H
H O
P W
W Z
Z H
>
_»M
U \ X
tnw
t S H
w
ron
w
&-«
n?win
w
\
00
t o
I
ro
I
W
in
H r <
M O
DCP
Jto-W
H
W
O
wen
WW
tn
o
too
\ z
to
O
—1
-J
813
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 02/15/82,
B-1241 (C17;
WATERMELONS, DRYLAND, LOWER SOUTH CENTRAL TEXAS
1982 PROJECTED COSTS AND RETURNS PER ACRE
MACHINERY
OPERATION
CHISEL PLOW
CHISEL PLOW
CHISEL PLOW
CULTIVATOR 6R
RLNG CULT 6R
RLNG CULT 6R
MACH
ITEM OPER TIMES LABOR MACHINE OPER LABOR
NO. MONTH OVER HOURS HOURS COSTS COSTS
*,33
4,32
4,33
4,44
4,34
4,34
OCT
FEB
FEB
MAR
APR
MAY
TOTALS"
2.00
1.00
1.00
2.00
1.50
1.50
0.336
0.202
0.168
0.415
0.292
0.292
0.255
0.153
0.127
0.314
0.221
0.221
1.99
1. 18
1.00
2.38
1.84
1.84
A P P L . M A C H T O TA L
INPUT FIXED OPER.
COSTS COSTS COST
0.0
0.0
0.0
0.0
0.0
0.0
1.16
0.70
0.58
1.43
1.01
1.01
5.90
3.45
2.95
6.76
4.70
4.70
9.05
5.33
4.53
10.58
7.54
7.54
1.704 1.291 10.23 5.88 0.0 28.46 44.57
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF WATERMELON
(DOLLARS)
CWT.
100.00
4.80
5.40
6.00
6.60
1
1
141.02
201.02
261.02
321.02
381.02 |
1
174.77
242.27
309.77
377.27
444.77 |
1
208.52
283.52
358.52
433.52
508.52 J
1
242.27
324.77
407.27
489.77
572.27 |
1
1
276.02
366.02
4 56.0 2
546.02
636.02 |
lI
11 2 . 5 0
QUANTITY OF
WATERMELON
i
125.00
i
137.50
l
I
150.00
7.20
814
r
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 02/15/82.
B-124 1 (C17)
WATERMELONS, IRRIGATED. LOWER SOUTH CENTRAL TEXAS REGION
1982 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
1. GROSS RECEIPTS
WATERMELON
TOTAL PROJECTED RETURNS
PROJECTED
YIELD
UNIT
150.00 CWT.
PROJECTED YOUR
VALUE ESTIMATE
900.00
6.00
'9U0."0U S"
2. VARIABLE COSTS
INPUT USE
PREHARVEST COSTS
WATERMELON SEED
6-00
24.00
4.00 LB.
NITROGEN (DRY)
40.00 LB0.35
14.00
PHOSPHATE
40.00 LB.
0.30
12.00
b.OU
POTASH
20.00 LB.
0.30
♦INSECTICIDE
".OO APPL
6.2 4
24.96
♦FUNGICIDE
4.00 APPL
5.69
22. /b
PESTICIDE APPL.
4.00 ACRE
3.50
14,00
1.00 APPL
6.02
6.02
HERBICIDE-WATER
HAND LABOR
8.00 HOUR
3.45
27. bO
IRRIGATION WATER
12.00 ACIN
FUEL S LUBE—TRACTOR
9.68
ACRE
1.83
ACRE
EQUIPHENT
IRRIGATION
ACRE
26.76
R E PA I R S T R A C T O R
ACRE
1.2J
ACHE
J.22
EQUIPHENT
9.00
IRRIGATION
ACRE
LABOR HACHINERY
7.89
2 . 2 9 HOUR
3.45
IRRIGATION
165.60
48.00 HOUR
3.45
3.45
0.75 HOUR
2. bd
EQUIPMENT
4. 3D
OPERATING CAPITAL
22.91 DOL.
0. 190
ACRE
$ JdJ.5J 5
SUBTOTAL, PREHARVEST
HARVEST COSTS
315.00
HARVEST S SELL
150.00 CWT.
2- 10
ACRE
S Jlb.UU S
SUBTOTAL, HARVEST
TOTAL VARIABLE COSTS
ACRE
$ 698.53 S
BREAK-EVEN PRICE, VARIABLE COSTS $ 4.66/CWT. WATERMELON
3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E S 2 0 1 . 4 7 $
4. FIXED COSTS
DEPREC,INTEREST,TAXES 6 INSUH.
TRACTOR
ACRE
26.12
ACRE
13.76
EQUIPMENT
IRRIGATION
ACRE
30.12
LAND-CASH
RENT
1 . 0 0 ACRE
45.00
45.00
TOTAL FIXED COSTS
ACHE
$" 11 5 . 0 0
5. 'TOTAL PROJECTED COSTS
ACRE
$ 813.53 S.
BREAK-EVEN PRICE, TOTAL COSTS
S 5.42/CWT. WATERMELON
6. NET PROJECTED RETUHNS
ACRE
$
86.47
$
12 ACIN. OF IRRIGATION WATER APPLIED WITH SIDE ROLL SPRINKLER SYSTEM.
LAND CHARGE BASED ON CURRENT CASH RENT PRICE IN REGION.
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
r
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 02/15/82.
814
B-124 1 (C17)
WATERMELONS, IRRIGATED, LOWER SOUTH CENTRAL TEXAS REGION
1982 PROJECTED COSTS AND RETURNS PER ACRE
MACHINERY
OPERATION
CHISEL PLOW
CHISEL PLOW
CHISEL PLOW
CULTIVATOR 6R
RLNG CULT 6R
RLNG CULT 6R
APPL. MACH TOTAL
INPUT FIXED OPER.
COSTS COSTS COST
MACH
ITEM OPER TIMES LABOR MACHINE OPER LABOR
NO- MONTH OVER HOURS HCURS COSTS COSTS
4,3 3 OCT
4.32 FEB
4.33 FEB
4,44 MAR
4.34 APR
4,34 MAY
TOTALS
2.00
1.00
1.00
2.00
3.00
3.00
0-336
0.202
0.168
0.415
0.583
0.583
0-255
0.153
0-127
0.314
0-442
0.442
1.99
1.18
1.00
2.38
3-68
3.68
0.0
0.0
0.0
0.0
0.0
0.0
1.16
0.70
0.58
1.43
2.01
2.01
5.90
3.45
2.95
6.76
9.40
9.40
9.05
5.33
4.53
10.53
15.09
15-09
2.287 1.733 13.91 7.89 0.0 37.86 59.66
"
IRRIGATION
APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
APPL. ACHE LABOR
MONTH INCHES HOURS
APPL. IRRIG
INPUT FIXED
COSTS COSTS
IRRIG
SYSTEM OPER. LABOB
HOURS COSTS COSTS
TOTAL
IRRIG
COSTS
MAR 3.00 12.000 0.0
APR 6.00 24.000 0.0
M AY 3 . 0 0 1 2 . 0 0 0 0 . 0
8. 94 41. 40
17. 88 8 2. 80
8, 94 41. 40
0.0 7.53 57.87
0 . 0 1 5 . 0 6 11 5 . 7 4
0.0 7.53 57.87
12.00 48.000 0.0
35. 7 6 1 6 5 . 60
0.0 30. 12 231.48
TOTALS
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF WATERMELON
(DOLLARS)
4.80
5.40
6.00
6-60
7120
-59.53
12-47
84.47
156.47
228.47 |
135.00 |
-19.03
61.97
142-97
223.97
304.97 |
150.00 |
21.47
111.47
201.47
291.47
381.47 I
165.00 |
61.97
160.97
259.97
358.97
457.97 |
180-00 |
102.47
210.47
318-47
426.47
534.47 |
CWT.
120.00
QUANTITY OF
WATERMELON
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT
STRATEGIES.