r TEXAS HIGH PLAINS II r FOREWORD The enterprise budgets for Texas High Plains II Region are based on estimates of yields, produc tion input quantities, and production practices which represent the best judgment of local produc ers, county Extension agents-agriculture, financial institution representatives, farm machinery dealers and others knowledgeable of the area. Variation in yields, production inputs and production prac tices should be expected for particular farms. Budgets for all major crops produced in the area are included for two levels of management, when applicable. Crop yields are directly related to levels of management. These differences are due largely to timing of operational practices which may not be evident in the budgets. The machinery inventory is applicable to both typical and high level management. In some bud gets custom rates, primarily harvesting, were used in lieu ol the assumption that harvesting equip ment was owned. Budgets for establishing permanent type pasture grasses were prepared and used for prorating estab lishment costs in the respective pasture and hay budgets. Forage crops include expenses only be cause it is expected that the income will be derived from livestock enterprises. Land charges were based on the customary land lord's crop share less his proportionate share of certain production and harvesting inputs and a percentage of fixed cost on the irrigation system when applicable. A per acre land charge was made when crop share was not used. ,_ % B-1241 (C 2) TEXAS AGHICULTUBAL EXTENSION SEBVICE . THE TEXAS ASH UNIVEBSITY SYSTEM Daniel C. Pfannstiel, Director . College Station, Texas r TEXAS ENTEBPBISE BUDGETS TEXAS HIGH PLAINS II BEGION Projected for 1982 Educational programs conducted by the Texas Agricultural Extension Service serve people of all ages regardless of socio-economic level, race, color, sex, religion or national origin. - ooperative Extension Work in Agriculture and Home Economics, The Texas ASH University System and the United States Department of Agriculture coopera ting. Distributed in furtherance of the Acts of Congress of Hay 8, 1914, as amended, and June 30, 1914, 500 1-82, New ECO 7-2 / PHOJECTIONS FOB PLANNING PUBPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 02/12/82. 51 r B-1241 (C 2) ALFALFA ESTABL., FURROW IRRIGATED (NATURAL GAS), TEX HIGH PLAINS II REGK 1982 PROJECTED COSTS AND RETUBNS PEB ACBE CATEGORY PROJECTED YIELD UNIT GROSS BECEIPTS TOTAL PBOJECTED BETUBNS PROJECTED $ / U N I T VA L U E 0.0 2. VABIABLE COSTS PBEBABVEST COSTS ♦ALFALFA SEED IBRIGATION WATER FUEL S LUBE—TfiACTOR EQUIPMENT IBBIGATION B E PA I B S T B A C T O B EQUIPMENT IBBIGATION YOUB ESTIMATE $ INPUT USE IBBIGATION EQUIPMENT OPEBATING CAPITAL SUBTOTAL. PREHARVEST HABVEST COSTS SUBTOTAL, HABVEST 15.00 10.00 1.00 1.00 0.63 20. 43 LBACIN ACBE ACBE ACBE ACBE ACBE ACBE HOUB HOUB HOUR DOL. ACBE 2.,39 5.,00 5.,00 5..00 0 . "I80 35.85 $ 8.82 1.39 23.80 1.55 1.52 2.80 4.98 5.00 3.15 3.68 9 2.53 ACBE 0.0 $. ACRE 92.53 $. 3. INCOME ABOVE VABIABLE COSTS ACBE •92.53 $ 4. FIXED COSTS DEPBEC.,INTEBEST,TAXES S INSUB. TBACTOB EQUIPMENT LAND-CASH BENT 1.00 IBB EQUIP (50%) 10.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACIN ACBE $ 14.01 6.50 50.00 5.30 75.81 $ 5. TOTAL PROJECTED COSTS ACBE $ 168.34 $ TOTAL VARIABLE COSTS 6. NET PROJECTED RETUBNS ACBE 50.00 0.53 $ -168.34 $. LAND CHABGE USES $50/ACBE LESS 505. OF IBBIGATION FIXED COSTS. INFOBflATION PBESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO BECOGNIZE OR PREDICT THE COSTS AND RETURNS FBOM ANY ONE PABTICULAR FARM OB RANCH OPEBATION. THESE PROJECTIONS WEBE COLLECTED AND DEVELOPED BY STAFF MEMBEBS OF THE TEXAS AGBICULTUBAL EXTENSION SEBVICE AND APPBOVED FOR PUBLICATION. 4 51 PBOJECTIONS FOB PLANNING PUBPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTEB 02/12/82. B-1241 (C 2) ALFALFA ESTABL., FUBBOW IBBIGATED (NATURAL GAS), TEX HIGH PLAINS II REGN '^ 1982 PROJECTED COSTS AND RETURNS PER ACRE MACHINEBY OPERATION CHISEL OFFSET DISC TANDEM DISC GRAIN DRILL PACKER MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOUBS COSTS COSTS APPL. MACH TOTAL INPUT FIXED OPEB. COSTS COSTS COST 1 , 4 4 J U LY 1 . 0 0 1.00 1,78 AUG 1.00 1,40 AUG 1.00 1,93 AUG 1.00 1,88 AUG 0.0 0.0 0.0 35.85 0.0 2.56 2.85 3.77 5.72 3.95 4.82 4.75 7.15 46.49 8.17 11 . 7 0 4 . 9 8 35.85 18.85 71.38 IBBIG I B B I G A T I O N A P P L . A C B E L A B O B S Y S T E M OPEB. LABOB APPLICATION MONTH INCHES HOUBS HOUBS COSTS COSTS APPL. IBBIG INPUT FIXED COSTS COSTS TOTAL IBBIG COSTS 10.64 2.00 0.0 2.12 15.96 3.00 0.0 3.18 14.76 22.14 26.60 5.00 36.90 TO TA L S WATEB APPLICATION WATEB APPLICATION TOTALS 0.996 0.132 0.104 0.208 0.280 0.272 0.100 0.079 0.158 0,212 0.206 0.755 NOV 4.00 0.400 0.0 SEPT 6.00 0.6 00 0.0 10.00 1.000 0.0 1.60 1.37 2.34 3.52 2.87 0.66 0.52 1.04 1.40 1.36 0.0 5.30 — ^ 52 PBOJECTIONS FOB PLANNING PUBPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTEB 02/12/82. B-1241 (C 2) ALFALFA, FUBROW IBRIGATED (NATURAL GAS), TEXAS HIGH PLAINS II REGN 1982 PROJECTED COSTS AND RETUBNS PER ACRE CATEGORY 1. GROSS BECEIPTS HAYALFALFA TOTAL PBOJECTED BETUBNS c PROJECTED YIELD UNIT 7.00 60.00 $ 2. VABIABLE COSTS INPUT USE PREHARVEST COSTS FE.HT (P) APPL«D 100.00 IBBIGATION WATEB 40.00 FUEL S LUBE—TBACTOR EQUIPMENT IRBIGATION BEP AIBS TB ACTO B EQUIPMENT IBBIGATION LABOB MACHINEBY 0.0 IBBIGATION 4.00 EQUIPMENT 0.77 OPEBATING CAPITAL 15.52 SUBTOTAL, PBEHABVEST HABVEST COSTS SUBTOTAL, HABVEST TOTAL VABIABLE COSTS TON PROJECTED VALUE S/UNIT / LB. ACIN ACBE ACBE ACRE ACBE ACBE ACBE HOUB HOUB HOUB DOL. ACBE 0. 10 YOUR ESTIMATE 420.00 420.00 $ 10.00 5.00 5.00 5.00 0.180 $ ACBE $ ACRE $ 0.0 1.70 95.20 0.0 0.22 11 . 2 0 0.0 20.00 3.85 2.79 144.97 $ 0.0 $ 144.97 $ BBEAK-EVEN PBICE, VABIABLE COSTS $ 20.71/TON HAYALFALFA 3. INCOME ABOVE VABIABLE COSTS ACRE 4. FIXED COSTS DEPREC,INTEBEST,TAXES S INSUR. TBACTOR ACBE EQUIPMENT ACBE PBOBATED ESTABL 168.34 DOL. LAND-CASH BENT 1.00 ACBE IBB EQUIP (50%) 40.00 ACIN TOTAL FIXED COSTS ACBE 5. TOTAL PBOJECTED COSTS BREAK-EVEN PRICE, TOTAL COSTS 6. NET PBOJECTED RETUBNS r ACRE $ 275.03 0.20 50.00 0-53 $ $ $. 0.0 2.03 33.67 50.00 21.20 106.90 $. 251.86 $. $ 35.98/TON HAYALFALFA ACBE $ 168.14 $ LAND CHABGE USES S50/ACBE LESS 50 PEBCENT OF IBBIGATION FIXED COSTS. ESTABLISHMENT COSTS PBOBATED OVEB 5 YEABS. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENEBAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETUBNS FROM ANY ONE PABTICULAR FARM OR RANCH OPERATION. THESE PBOJECTIONS WEBE COLLECTED AND DEVELOPED BY STAFF MEMBEBS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 52 PBOJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 02/12/82. B-1241 (C 2) ALFALFA, FURBOW IRRIGATED (NATURAL GAS)- TEXAS HIGH PLAINS II BEGN 1982 PROJECTED COSTS AND BETURNS PER ACBE MACHINEBY OPERATION MACH ITEM OPER TIMES LABOR MACHINE OPEB LABOB NO. MONTH OVER HOUBS HOUBS COSTS COSTS TOTALS IBBIGATION APPLICATION WATEB WATEB WATEB WATEB WATEB WATER WATEB 0.0 APPL. ACBE LABOB MONTH INCHES HOURS APPLICATION APPLICATION APPLICATION APPLICATION APPLICATION APPLICATION APPLICATION FEB MAB APB MAY JUNE JULY AUG TOTALS 0.0 0.0 APPL. MACH TOTAL INPUT FIXED OPEB. COSTS COSTS COST 0.0 0.0 IB RIG SYSTEM OPEB. LABOR HOUBS COSTS COSTS 6.00 6.00 4.00 6.00 6.00 6.00 6.00 0.600 0.600 0.4 00 0.600 0.600 0.600 0.600 0.0 0.0 0.0 0.0 0.0 0.0 0.0 40.00 4.000 0.0 15.96 15.96 10.64 15.96 15.96 15.96 15.96 0.0 0.0 A P P L . I B B I G TO TA L INPUT FIXED IBBIG COSTS COSTS COSTS 3.00 3.00 2.00 3.00 3.00 3.00 3.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 106.40 2 0 . 0 0 0.0 3.18 3.18 2.12 3.18 3.18 3.18 3.18 22.14 22.14 14.76 22.14 22. 14 22.14 22.14 21.20 147.60 * > BESIDUAL BETUBNS AT ALTEBNATIVE YIELDS AND PBICES ADJUSTED FOB YIELD-BELATED COSTS AND CHANGES IN SHABE-BENT INCOME ABOVE VABIABLE COSTS LESS SHABE-BENT PBICE OF HAYALFALFA (DOLLABS) 48.00 54.00 60.00 66.00 72.00 5.60 123.83 157.43 191.03 224.63 258.23 | 6.30 157.43 195.23 233.03 270.83 308.63 7.00 | 191.03 233.03 275.03 317.03 359.03 | 7.70 | 224.63 270.83 317.03 363.23 409.43 1 258.23 308.63 359.03 409.43 459.83 | TON QUANTITY OF HAYALFALFA 8.40 V r 53 PBOJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 02/12/82. B-1241 (C 2) CORN FOR GRAIN, SPRINKLER IRRIGATED, (NAT.GAS), TEX HIGH PLAINS II REGN 1982 PROJECTED COSTS AND RETURNS PER ACBE CATEGORY 1. GROSS RECEIPTS CORN TOTAL PBOJECTED RETUBNS 2. VARIABLE COSTS PREHARVEST COSTS ♦SEED CORN/GBAIN FERT (N) APPL'D FERT (P[ APPL'D ♦HERBICIDE INSECT. CORN IRRIGATION WATER FUEL S LUBE—TRACTOR EQUIPMENT IRRIGATION B E PA I B S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY IRRIGATION EQUIPMENT OPEHATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS CUST HARV CORN ♦CUSTOM HAULING CUSTOM DRYING SUBTOTAL, HARVEST TOTAL VARIABLE COSTS PROJECTED YIELD UNIT 145.00 BU. PROJECTED YOUB ESTIMATE 57TJTfT_! r&TTTE 2.90 .-■ 420.50 42U.5U $■ INPUT USE 0. 200. 60, 1, 1 24, 35 00 00 00 00 00 1, 0. 0. 35. 16 79 77 05 145. 00 145 00 145. 00 BBEAK-EVEN PBICE, VARIABLE COStS BAGS LB. LB. ACRE ACRE ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUB HOUR DOL. ACRE 48.00 0. 14 0. 10 12.00 30.00 16.80 28.00 6.00 12.00 30.00 10.25 1.70 70.80 1.80 1.79 11 . 0 4 5.79 3.96 3.85 6.31 21U.U9 $; 5.00 5.00 5.00 0.180 BU. BU. BU. ACRE 0.25 36.25 0.05 7.25 0. 12 17-^0 " $ 5TJ79TJ $; ACRE $ 270.99 $. $ 1 . 87/BU. COBN 3. INCOME ABOVE VABIABLE COSTS ACRE 4. FIXED COSTS • DEPREC,INTEREST,TAXES S INSUB. TBACTOB EQUIPMENT LAND NET SHARE-RENT IRRIG. E Q U I P. 24.00 TOTAL FIXED COSTS ACRE ACBE ACRE ACIN ACBE 5. TOTAL PROJECTED COSTS ACBE $ 387.98 $. $ 2.68/BU. CORN ACBE $ BBEAK-EVEN PBICE, TOTAL COSTS 6. NET PBOJECTED BETUBNS $ 149-51 $ 16.29 11 . 1 5 50.90 38.64 1.61 nS.y. 32.52 r $ LAND CHAHGE 33% GBOSS LESS 33%, FERT, CHEM, GAS, HABVEST S 50% OF IRRIG. FIXED COSTS. GOV«T DEFICIENCY PAYMENT NOT INCLUDED. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OH BANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 53 PROJECTIONS FOB PLANNING PUBPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTEB 02/12/82- B-1241 (C 2) COBN FOR GRAIN, SPRINKLES IBBIGATED, (NAT.GAS), TEX HIGH PLAINS II HEGN 1982 PBOJECTED COSTS AND BETUBNS PER ACBE MACH MACHTNEBY OPEBATION SHBEDDEB 4R OFFSET DISC CHISEL OFFSET DISC HERB SPR/DISC LISTER-PLNT6R CULTIVATOB 6B ITEM OPEB TIMES LABOB MACHINE OPER LABOB NO. MONTH OVEB HOUBS HOURS COSTS COSTS JAN MAB MAB APB APB MAY MAY 1.57 1,43 1,44 1,<*3 61 1,36 1,33 1.00 1.00 2-00 1.50 1.00 1.00 1.00 TOTALS WATEB WATEB WATEB WATEB WATEB 0.210 0.079 0.199 0 . 11 8 0.158 0 . 11 5 0.157 2.99 1.37 3.20 2-06 0.01 1.68 2.29 1.38 0.52 1.32 0.78 0.0 0.76 1.04 0.0 0.0 0.0 0.0 12.00 16.80 0.0 5.28 2.85 5.13 4.28 0.19 3.34 4.34 9.66 4.75 9.64 7.12 12.21 22.58 7.67 1.159 1.036 13.61 5.79 28.80 25.42 73.62 SYSTEM OPEB. LABOB HOURS COSTS COSTS APPL. I B B I G INPUT FIXED COSTS COSTS TOTAL IBBIG COSTS ACBE LABOB &.PPL. MONTH INCHES HOURS APPLICATION APPLICATION APPLICATION APPLICATION APPLICATION MAB APB JUNE J U LY AUG TOTALS TOTAL OPEB. COST 0.277 0.104 0.263 0.156 0.0 0.151 0.2 07 IBBIG IBBIGATION APPLICATION APPL. MACH INPUT F I X E D COSTS COSTS 3.00 3.00 4.00 8.00 6.00 0.099 0.099 0.132 0.264 0.198 0.0 0.0 0.0 0.0 0.0 10.23 10.23 13.64 27.28 20.46 0.49 0.49 0.66 1.32 0.99 0.0 0.0 0.0 0.0 0.0 4.83 4.83 6.44 12.88 9.66 15.55 15.55 20.7"41.4 3 1 . 11 24.00 0.792 0.0 81.84 3.96 0.0 3 8 . 6 4 124.44 BESIDUAL BETUBNS AT ALTEBNATIVE YIELDS AND PBICES ADJUSTED FOB YIELD-BELATED COSTS AND CHANGES IN SHABE-BENT INCOME ABOVE VABIABLE COSTS LESS SHARE-RENT PBICE OF CORN (DOLLABS) 2.32 2.61 2.90 3.19 3.48 5.35 27.88 50.42 72.96 95.50 | 23.80 49.16 74.52 99.87 125.23 | 42.26 70.44 98.61 126.78 154.96 | 60.72 91.71 122.70 153.69 184.68 | 79.18 112.99 146.80 180.60 214.41 | BU. I 116.00 1 1 130.50 3 QUANTITY OF COBN 1 145.00 1 1 159.50 1 I 174.00 1 _ ^ r 54 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 02/«2/82. B-1241 (C 2) CORN FOB GRAIN, FURROW IRRIGATED, (NAT GAS), TEX HIGH PLAINS II REGN 1982 PBOJECTED COSTS AND BETURNS PER ACRE CATEGORY PROJECTED PBOJECTED YOUB YIELD UNIT VALUE ESTIMATE J/.-Ut 1. GROSS RECEIPTS COBN 145.00 BU. 2.90 420.50 TOTAL PBOJECTED RETUBNS 42U.5U $ 2. VARIABLE COSTS PUT USE PREHARVEST COSTS ♦SEED CORN/GRAIN 0.35 BAGS 48.00 16.80 FERT (N) APPL'D 220.00 LB. 0.14 30.80 FEBT (P) APPL'D 40.00 LB. 0. 10 4.00 ♦HERBICIDE 1.00 ACRE 12.00 12.00 INSECT. CORN 1.00 ACBE 30.00 30.00 IRRIGATION WATER 30.00 ACIN FUEL & LUBE—TRACTOB ACBE 14.45 ACBE 2.47 EQUIPMENT IBBIGATION ACBE 71.40 BEPAIBS TB ACTO R ACBE 2.54 ACBE 2.08 EQUIPMENT IRRIGATION ACBE 8.40 LABOR MACHINERY 1.63 HOUB 5.00 8.16 IRRIGATION 3.00 HOUR 5.00 15.00 EQUIPMENT 1.12 HOUR 5.00 5.60 OPERATING CAPITAL 49.88 DOL. 8.98 0.180 ACRE $ 232mbl 5 SUBTOTAL, PREHARVEST HARVEST COSTS CUST HABV COBN 145.00 BU. 0.25 36.25 CUSTOM HAULING 145.00 BU. 0.05 7.25 CUSTOM DRYING 145.00 BO. 0. 12 17.40 ACRE $ bU.9U $ SUBTOTAL, HABVEST TOTAL VABIABLE COSTS ACBE $ 293.57 $ BBEAK-EVEN PBICE, VABIABLE COS..S $ 2.02/BU. COBN 3 . I N C O M E A B O V E VA B I A B L E C O S T S A C B E $ 1 2 6 . 9 3 $ 4. FIXED COSTS DEPBEC, INTEREST,TAXES S INSUB. TBACTOB ACRE 22.96 ACBE 12.08 EQUIPMENT LAND NET SHABE-RENT ACBE 53.86 " IBBIG. E Q U I P. 3 0 . 0 0 ACIN 1.06 31.80 " TOTAL FIXED COSTS ACRE $—12-271 r 5. TOTAL PBOJECTED COSTS ACBE $ 414.28 $. BBEAK-EVEN PBICE, TOTAL COSTS $ 2 . 8 6 / B U . COBN 6. NET PROJECTED BETUBNS ACBE $ 6.22 $ LAND CHARGE 33% GROSS LESS 33%, FERT, CHEM, GAS, HARVE HABVEST S 50% OF IRRIG. FIXED COSTS. GOVT DEFICIENCY PBOGBAM NOT INCLUD ED. INFOBMATION PBESENTED IS PBEPABED SOLELY AS A GEHEBAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OB PREDICT THE COSTS AND BETURNS FROM ANY ONE PARTICULAB FARM OB BANCH OPEBATION. THESE PBOJECTIONS WEBE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGBICULTUBAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. r 54 PBOJECTIONS FOR PLANNING PURPOSES QNL_ NOT TO BE USED WITHOUT UPDATING AFTER 02/12/82. B-1241 (C 2) COBN FOB GBAIN, FUBBOW IBRIGATED, (NAT GAS), TEX HIGH PLAINS II BEGN 1982 PROJECTED COSTS AND RETURNS PER ACBE MACHINERY OPERATION SHREDDER 4R OFFSET DISC CHISEL OFFSET DISC TANDEM DISC HEBB SPfi/DISC BOX FLOAT LISTER 8 BOW RODWEEDER BED PLNTR 8R ROLLING CULT MACH TIMES LABOB MACHINE OPEB LABOR ITEM OPER NO. MONTH OVER HOURS HOURS COSTS COSTS 1,57 1,43 1,44 1,42 1,41 61 1,60 1,90 1,50 1,74 1,30 NOV NOV DEC FEB FEB FEB MAR MAR APR APR M AY 1.00 1.00 1.00 1.00 1.00 1.00 0.50 1.00 1.00 1.00 1.00 TOTALS IBBXGATION APPLICATION WATEB WATER WATER WATER APPLICATION APPLICATION APPLICATION APPLICATION JUNE J U LY AUG TOTALS TOTAL OPER. COST 0.277 0.104 0.132 0.208 0.146 0.0 0.2 16 0 . 11 4 0.091 0.152 0.194 0.210 0.079 0.100 0.158 0 . 11 0 0.158 0.164 0.086 0.069 0 . 11 5 0.147 2.99 1.37 1.60 2.44 1.72 0.01 2.26 1.25 1.02 1.87 2.22 1.38 0.52 0.66 1.04 0.73 0.0 1.08 0.57 0.45 0.76 0.97 0-0 0.0 0.0 0.0 0.0 12.00 5.28 2.85 2.56 4.26 3.05 0.19 3.24 1.92 2.04 3.36 3.33 9.66 4.75 4.82 7.74 5.50 12.21 6.58 3.73 3.51 22.79 6.52 1.633 1.395 18.74 8.16 28.80 32.10 87.80 IBBIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. I R R I G INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS APPL. ACRE LABOR MONTH INCHES HOURS MAR APPL. MACH INPUT F I X E D COSTS COSTS OrnO 0.0 0.0 16.80 0.0 8.00 8.00 8.00 6.00 0.800 0.800 0.800 0.600 0.0 0.0 0.0 0.0 21.28 21.28 21.28 15.96 4.00 4.00 4.00 3.00 0.0 0.0 0.0 0.0 30.00 3.000 0.0 79.80 15.00 0.0 8.48 8.48 8.48 6.36 33.76 33.76 33.76 25.32 31.80 126.60 > BESIDUAL BETUBNS AT ALTEBNATIVE YIELDS AND PRICES ADJUSTED FOB YIELD-BELATED COSTS/AND CHANGES IN SHABE-BENT INCOME ABOVE VABIABLE COSTS LESS SHABE-RENT PRICE OF CORN (DOLLABS) QUANTITY OF COBN BU. 116.00 130.50 145.00 159.50 174.00 2.32 2.61 2.90 3.19 3.48 -20.20 -1.74 16.72 35.18 53.63 2.34 23.61 44.89 66.17 87.44 24.88 48.97 73.06 97.16 121.25 47.42 74.33 101.24 128.15 155.06 69.95 99.68 129.41 159.14 188.87 NOTE: NEGATIVE BETURNS OVER VARIABLE COSTS HAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OB OTHEB MANAGEMENT S T S AT E G I E S .