PROJECTIONS FOR PLANNING PURPOSES ONLY ft<_ 786 B-1241 (C16)

advertisement
PROJECTIONS FOR PLANNING PURPOSES ONLY ft<_
B-1241 (C16)
NOT TO BE USED WITHOUT UPDATING AFTER 02/17/82.
CUCUMBERS (PICKLES) IRRIGATED
TEXAS EDWARDS AQUIFER REGION
1982 PROJECTED COSTS AND RETURNS PER ACRE
PROJECTED YOUR
PROJECTED
CATEGORY
VALUE ESTIMATE
YIELD
UNIT
5/UNIT
1. GROSS RECEIPTS
787.50
105.00 CWT.
7.50
CUCUMB. PICKLES
$
78/.bU 5
TOTAL PROJECTED RETURNS
2. VARIABLE COSTS
INPUT USE
PREHARVEST COSTS
2.25 LB.
8.00
18.00
♦CUCUMBER-PCKL SD
♦ NITROGEN (LIQ)
40.00 LB.
0.23
9.20
80..00 LB.
0.32
25.60
♦PHOSPHATE
1.00 ACRE
4.00
4.00
♦HERBICIDE
45.00
'"""
6.00 APPL
7.50
♦INSECTICIDE
6.00 ACRE
3.50
21.00
PESTICIDE APPLI.
0.50 ACRE
15.00
/.bU
BEEHIVE RENT
40.00 LBo
0.26
10.40
♦NITROGEN (DRY)
HAIL INSURANCE1.00 ACRE
8.00
8 . 0 0 " '■
IRRIGATION WATER
12.00 ACIN
FUEL 5 LUBE—TRACTOR
ACHE
17.70
ACHE
0.69
EQUIPMENT
IRRIGATION
ACRE
31.44
R E PA I R S T R A C T O R
ACRE
3.37 ~
ACRE
2.DJ
EQUIPHENT
IRRIGATION
ACRE
8.04
LABOR HACHINERY
2.72 HOUR
5.00
13.62
IRRIGATION
1.20 HOUR
3.80
4.56
0.28 HOUR
3.80
1.06
EQUIPHENT
OTHER
10.00 HOUR
3.80
38.00
OPERATING CAPITAL
30.10 DOL.
0.155
4.6/
SUBTOTAL. PREHARVEST
ACRE
$
HARVEST COSTS
105.00 CWT.
4.00
420.00
HARVEST, PICKLES
ACRE
$ 42U.U0 $
SUBTOTAL, HARVEST
TOTAL VARIABLE COSTS
ACRE
$ 694.48 $
BREAK-EVEN PRICE, VARIABLE COSTS $ 6.61/CWT. CUCUMB. PICKLES
3. INCOHE ABOVE VARIABLE COSTS
ACRE
$
93.02 $
4- FIXED COSTS
DEPREC,INTEREST,TAXES 5 INSUR.
TRACTOR
ACRE
27.81
ACRE
24.74
EQUIPHENT
IRRIGATION
ACRE
19.85
LAND-CASH
RENT
1 . 0 0 ACRE
30.00
30.00 "
MISC
ADMIN
0/H
0 . 5 0 ACRE
10.00
5.00
TOTAL FIXED COSTS
ACRE
107.4U $
5. TOTAL PROJECTED COSTS
ACRE
801.89 $
BREAK-EVEN PRICE, TOTAL COSTS
$ 7-64/CWT. CUCUHB. PICKLES
6. NET PROJECTED RETURNS
ACRE
$
-14.39
$
PRODUCTION VALUE AND HARVESTING EXPENSE BASED ON A WEIGHTED AVERAGE OF 8%*1 ■
13%#2»S, 34%#3«S, NAD 45%#4'SBUDGET BASED ON FALL CROP.
INFORHATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROH ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
786
r
786
_,..«. mER8_5ES£IQN§..£OR
PLANNING
PURPOSES
ONLY
NOT
TO BE USED WITHOUT
UPDATING
AFTER 02/17
/T7/82.
B-1241 (C16)
CUCUMBERS (PICKLES) IRRIGATED
_,
TEXAS
EDWARDS
REGION
1982 PROJECTED
COSTSAQUIFER
AND RETURNS
PER ACRE
MACHINERY
OPERATION
SHREDDER
OFFSET DISC
MCLDBOARD PLOW
LAND PLANE
BEDDER 6R
CULTIVATOR 4R
HERBICIDE SPRAYR
DRY FERT SPRDER
STANHAY PLANTER
CULTIVATOR 4R
CULTIVATOR 4R
MACH
ITEH OPER TIMES LABOR MACHINE OPER LABOR
NO- MONTH OVER HOURS HOURS COSTS COSTS
3,30 AUG
3,34 AUG
1,32 AUG
1,50 AUG
1,36 AUG
3,39 AUG
63 AUG
3,60 AOG
3,44 AUG
3,39 SEPT
3,39 OCT
1-00
2.20
1.00
0-20
1.00
1.00
1.00
1.00
1.00
1.00
1-00
TOTALS
IRRIGATION
APPLICATION
WATER APPLICATION
iATER APPLICATION
WATER APPLICATION
WATER APPLICATION
TOTALS
APPLACRE
MONTH INCHES
AUG
3.00
SEPT 3.00
OCT
3.00
NOV
3-0 0
12.00
0.263
0-501
0.571
0-050
0.151
0.227
0-0
0-203
0-303
0.227
0.227
2.723
0. 199
0.380
0-432
0.038
0.115
0.172
0.264
0.154
0.230
0.172
0.172
2-328
2.02
3.76
6.78
0-53
1.62
1.66
0-08
1.54
2.32
1-66
1-66
1.31
2.51
2.85
0.25
0.76
1.13
0.0
1.02
1.52
1. 13
1. 13
23.62 13-62
LABOR
HOURS
0.3 00
0.300
0.300
0.3C0
1.200
IRRIG
SYSTEM OPER. LABOR
HCURS COSTS COSTS
0.0
9 . 8 7 1. 14
0.0
9.87 1. 14
0.0
9.87 1- 14
0.0
9 . 8 7 1- 14
0.0
39.48 4 . 5 6
3
APPL. MACH TOTAL
INPUT FIXED OPER.
COSTS COSTS COST
0.0
3.51
6.84
0.0 10.43 16.70
0.0 13.85 23.49
0.0
1.22
2.01
0.0
4.74
2.36
0.0
3.10
5.89
4.00 2.29
6-37
36.00 3 . 8 0 42.36
18.00 5 . 1 0 26.93
0.0
3.10
5.89
0.0
3.10
5.89
58.00 5 1 . 8 7 147. 11
APPL- IRRIG
INPUT FIXED
COSTS COSTS
0.0
4.96
0.0
4.96
9-20 4.96
0.0
4.96
TOTAL
IRRIG
COSTS
15.97
15.97
25. 17
15.97
73.09
9-20 19.85
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCCME ABOVE VARIABLE COSTS LESS SHARE-RENT
QUANTITY OF
CUCUMB. PICKLES
6.00
CWT.
84.00 J -106.48
94.50
-85.48
105.00
-64.48
115.50
-43.48
126.00
-22.48
PRICE OF CUCUMB. PICKLES
(DOLLARS)
6.75
8.25
7.50
-43.48
-14.61
14.27
43.14
72.02
19.52
56.27
93.02
129.77
166.52
82.52
127.14
171.77
216.39
261.02
/
9.00
145.52
198.02
250-52
303-02
355-52
NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT
STRATEGIES.
787
PROJECTIONS FOR PLANNING PURPOSES ONLY n^
NOT TO BE USED WITHOUT UPDATING AFTER 02/17/82-
B-1241 (C16)
LETTUCE, IRRIGATED
TEXAS EDWARDS AQUIFER REGION
1982 PROJECTED COSTS AND RETURNS PER ACRE
PROJECTED YOUR
CATEGORY
PROJECTED
YIELD
UNIT
VALUE ESTIMATE
S/UNIT
1. GROSS RECEIPTS
500.00 CRTN
5.50 2750.00
LETTUCE
$ 2/bU.UU $ """
TOTAL PROJECTED RETURNS
INPUT USE
2. VARIABLE COSTS
PREHARVEST COSTS
1.00 LB.
24.00
24.00
♦LETTUCE SEED
♦ NITROGEN (LIQ)
150.00 LB.
0.23
34.bO
80.00 LB0.32
25.60
♦PHOSPHATE
1.00 ACRE
8.00
8.00
♦HERBICIDE
11.00 APPL
6.50
71.50
♦INSECTICIDE
6.00 APPL
6.00
3b.OO
♦FUNGICIDE
11.00 ACRE
3.50
Jti.bO
PESTICIDE APPLI.
♦NITROGEN (DRY)
75.00 LB.
0-26
19.50
IRRIGATION WATER
12.00 ACIN
FUEL 6 LUBE—TRACT.OR
ACRE
18.13
ACRE
l.bb
EQUIPMENT
IRRIGATION
ACRE
31.44
R E PA I R S T R A C T O R
ACRE
3-39
ACRE
EQUIPMENT
2. 62
IRRIGATION
ACRE
8.04
LABOR MACHINERY
2.55 HOUR
5.00
12.73
IRRIGATION
1.20 HOUR
3.8 0
4.Sb
0-63 HOUR
3.80
_..jy
EQUIPMENT
OTHER
12.00 HOUR
3-80
4 5.60
OPERATING CAPITAL
11.67 DOL.
0.155 " 389.88
1.81 $
ACRE
$'
SUBTOTAL, PREHARVEST
HARVEST COSTS
500.00 CRTN
4.25 2125.00
HARV,PKG,HAUL
ACRE
$ 212b.00 $
SUBTOTAL, HARVEST
TOTAL VARIABLE COSTS
ACRE
$ 2514.88 $
BREAK-EVEN PRICE, VARIABLE COSTS $ 5.03/CRTN LETTUCE
3. INCOME ABOVE VARIABLE COSTS
ACRE
$ 235.12 $
4- FIXED COSTS
DEPREC,INTEREST,TAXES S INSUR.
TRACTOR
ACRE
28-03
ACRE
24.21
EQUIPMENT
IRRIGATION
ACRE
19.85
LAND-CASH
RENT
1 . 0 0 ACRE
40.00 40.00
MISC
ADMIN
0/H
0 . 5 0 ACRE
10.00
5.00
TOTAL FIXED COSTS
ACRE
5. TOTAL PROJECTED COSTS
ACRE $ 2631.97 $.
BREAK-EVEN PRICE, TOTAL COSTS
$ 5.26/CRTN LETTUCE
6. NET PROJECTED RETURNS
ACRE
$
11 8 . 0 3
$
LETTUCE IS PACKED AND MARKETED IN 50 POUND CARTONS,
BUDGET BASED ON A FALL CROP
INFORMATION PRESENTED IS PREPAHED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
787
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 02/17/82
B-1241 (C16)
LETTUCE, IRRIGATED
TEXAS EDWARDS AQUIFER REGION
1982 PROJECTED COSTS AND RETURNS PER ACRE
MACHINERY
OPERATION
SHREDDER
OFFSET DISC
OFFSET DISC
MOLDBOARD PLOW
LAND PLANE
BEDDER 6R
BED SHAPER 6R
STANHAY PLANTER
BED SHAPER 6R
HERBICIDE SPRAYR
DBY FERT SPRDER
M A C H A P P L . M A C H TO TA L
ITEM OPER TIMES LABCR MACHINE OPER LABOR INPUT FIXED OPER.
NO. MONTH OVER HOURS HOURS COSTS COSTS COSTS COSTS COST
3,30
3,34
3,34
1,32
1,50
1,36
1,48
3,44
1,48
63
3,60
JULY
JULY
AUG
AUG
AUG
AUG
SEPT
OCT
OCT
OCT
OCT
1.00
1.00
1.20
1.00
0.20
1.00
1.00
1.00
1-00
1.00
1.00
TOTALS
IRRIGATION
APPLICATION
WATER APPLICATION
WATER APPLICATION
WATER APPLICATION
0-263
0.228
0.273
0.571
0.050
0.151
0-252
0.303
0-252
0.0
0.203
0-199
0.173
0-207
0.432
C.038
0 . 11 5
0.191
0.230
0.191
0.264
0.154
2.02
1-71
2-05
6.78
0.53
1.62
2.66
2.32
2.66
0.08
1.54
1.31
1. 14
1.37
2-85
0.25
0.76
1.26
1.52
1.26
0.0
1-02
2-547
2.194
23-96
12-73
APPL. ACRE LABCR
MONTH INCHES HOUBS
OCT
NOV
DEC
4.00
4.00
4.00
IRRIG
SYSTEM OPER. LABOR
HOURS COSTS COSTS
0.400 0.0
0.400 0.0
0.400 0.0
12.00 1.200 0.0
TOTALS
13.16
13- 16
13.16
1.52
1.52
1.52
0.0
3.51
0.0
4.74
0.0
5.69
0-0
13.85
0.0
1.22
0.0
2.36
0-0
4.07
24.00 5.10
0.0
4.07
8.00 2.29
45.10 3.80
6.84
7.59
9. 11
23.49
2.01
4.74
7.99
32.93
7.99
10.37
51.46
7 7 . 1 0 5 0 . 7 0 164.49
APPL. IRRIG TOTAL
INPUT FIXED IRRIG
COSTS COSTS COSTS "
17.25
0.0
17.25
6 . 6 2 38.55
6.62 21.30
6.62 '38.55
39.48 4.56 34.50 19.85 98.39
RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF LETTUCE
(DOLLARS)
4.40
4.95
5.50
6.05
-329.88
-109.88
110-12
330.12
-322.38
-74.88
172.62
420.12
-314.88
-39.88
235.12
510.12
-307.38
-4.88
297.62
600-12
-299.88
30.12
360.12
690-12
6-60
CRTN
QUANTITY OF
LETTUCE
400.00 J
I
450.00 |
I
500.00 \
I
550.00 1
1
600.00 I
I
550-12 |
I
667.62 |
I
785-12 |
I
902.62 |
l
1020.12 I
L
NOTES NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE
VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER HANAGEHENT
STRATEGIES.
788
PROJECTIONS FOR PLANNING PURPOSES
NOT TO BE USED WITHOUT UPDATING AFTER 0 2 / ^ 7 / 8 2 -
B-1241 (C16)
ONIONS, IRRIGATED
TEXAS EDWARDS AQUIFER REGION
1982 PROJECTED COSTS AND RETURNS PER ACRE
PROJECTED
YOUR
PBOJECTED
CATEGORY
ESTIMATE
YIELD
UNIT
S/UNIT VHTTE
1. GROSS RECEIPTS
5.50 2475.00
ONIONS
450.00 BAGS
$ 2475.00 5
TOTAL PROJECTED RETURNS
INPUT USE
2- VARIABLE COSTS
PREHARVEST COSTS
3.00
♦ONION SEED
♦ NITROGEN (LIQ)
50.00
80.00
♦PHOSPHATE
♦HERBICIDE
1.00
♦INSECTICIDE
3.00
♦FUNGICIDE
6.00
PESTICIDE APPLI.
6.00
♦NITROGEN (DRY)
50.00
HAIL INSURANCE
1.00
IRRIGATION WATER
18.00
PUEL 5 LUBE—TRACTOR
EQUIPMENT
IRRIGATION
LB.
12-00 36.00
LB.
0 . 2 3 11 . 5 0
LB.
0.32 25.60
ACRE
4.00
4.00
APPL
6.00 18.00
APPL
6.00 36.00
3.50 21-00
ACRE
0.26 13.00
LB.
ACRE
8.00
8.00
ACIN
21.15
ACRE
1.21
ACRE
47.16
ACRE
4.01
ACRE
2.92
ACRE
12.06
ACRE
HOUR
5.00 16.01
HOUR
3.80
6.84
HOUR
3.80
1.86
HOUR
3.80 38.00
DOL.
0.155
8.89
ACRE
$"" '333.21
BAGS
3.30 1485.00
ACRE
$ 148b.UU
ACRE
$ 1818.21
$ 4 . 04/BAGS ONIONS
ACRE
$ 656.79
EQUIPMENT
IRRIGATION
LABOR MACHINERY
3.20
IRRIGATION
1.80
0.49
EQUIPMENT
OTHER
10..00
57.36
OPERATING CAPITAL
SUBTOTAL, PREHARVEST
HARVEST COSTS
450.0C
HARV,PKG,MKT
SUBTOTAL, HARVEST
TOTAL VARIABLE COSTS
BREAK-EVEN PRICE, VARIA] BLE COSTS
3. INCOHE ABOVE VARIABLE COS! rs
4. FIXED COSTS
DEPREC,INTEREST,TAXES 1 . INSUR.
33-13
TRACTOR
ACRE
ACRE
27.11
EQUIPHENT
IRRIGATION
ACRE
29.77
LAND-CASH RENT
50.00 50.00
1.00 ACRE
MISC ADMIN 0/H
1.00 ACRE
10.00 10.00
TOTAL FIXED COSTS
ACRE
$ IbU.UI
5- TOTAL PROJECTED COSTS
ACRE
$ 1968.22
BREAK-EVEN PRICE, TOTAL COSTS
$ 4 . 37/BAGS ONIONS
6. NET PROJECTED RETURNS
ACRE
$ 506.78
ONIONS ARE PACKED AND MARKETED IN 50 POUND BAGS.
$
5
$
$
$
$
$
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OH PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION- THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
788
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTEB 02/17/82.
B-1241 (C16;
ONIONS, IRRIGATED
TEXAS EDWARDS AQUIFER REGION
1982 PROJECTED COSTS AND RETURNS PER ACRE
MACHINERY
OPERATION
SHREDDER
OFFSET DISC
OFFSET DISC
MOLDBOARD PLOW
LAND PLANE
BEDDER 6R
HERBICIDE SPRAYR
DRY FEHT SPRDER
BED SHAPER 6R
CULTIVATOR 4R
STANHAY PLANTER
CULTIVATOR 4R
CULTIVATOR 4R
CULTIVATOR 4R
MACH
I T E M OPER
TIMES LABOR MACHINE OPER
LABOR
NO. MONTH OVER
HCURS
HCURS COSTS COSTS
3,30
3,34
3,34
1,32
_'59
1,36
63
3,60
1,48
3,39
3,44
3,39
3,39
3,39
SEPT
SEPT
OCT
OCT
OCT
OCT
OCT
OCT
OCT
NOV
NOV
JAN
FEB
MAR
1.00
1.00
1.20
1.00
0.20
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1-00
TOTALS
I R R I G AT I O N
APPLICATION
WATER
WATER
WATER
WATER
WATER
APPLICATION
APPLICATION
APPLICATION
APPLICATION
APPLICATION
TOTALS
TOTAL
OPER.
COST
0-2 63
0.228
0-273
0.571
0.050
0-151
0.0
0.203
0.252
0.227
0.303
0.227
0.2 27
0.227
0.199
0.173
0-207
0.432
0.038
0 . 11 5
0.264
0.154
0.191
0. 172
0.230
0.172
0. 172
0.172
2.02
1.71
2.05
6.78
0.53
1-62
0.08
1.54
2-66
1.66
2. 32
1.66
1.66
1-66
1.31
1. 14
1.37
2.85
0.25
0.76
0.0
1.02
1.26
1. 13
1.52
1. 13
1. 13
1. 13
0.0
3.51
0.0
4.74
0.0
5-69
0.0
13-85
0.0
1.22
0.0
2-36
4.00
2-29
38.60
3-80
0.0
4.07
0.0
3-10
36.00
5-10
0.0
3. 10
0.0
3-10
0.0
3.10
6.34
7.59
9. 11
23.49
2.01
4.74
6.37
44.96
7.99
5.89
44.93
5-89
5-89
5-89
3.202
2-690
27.93
16.01
78.60 59-04
181.59
IRRIG
SYSTEM OPER. LABOR
HOURS COSTS COSTS
APPL. I R R I G
I N P U T FIXED
COSTS COSTS
TOTAL
IRRIG
COSTS
APPL.
ACRE
LABOB
MONTH INCHES HOURS
OCT
DEC
JAN
MAR
APR
APPL. MACH
INPUT F I X E D
COSTS COSTS
4-00
4.00
4.00
3.00
3.00
0.4C0
0.400
0.400
C.3C0
0.300
0-0
0.0
0.0
CO
0.0
13- 16
13. 16
13. 16
9.87
9.87
1.52
1.52
1.52
1. 14
1. 14
0.0
11 . 5 0
0.0
0.0
0.0
6.62
6.62
6.62
4.96
4.96
21.30
32.80
21.30
15.97
15.97
18.00
1.8C0
0.0
59.22
6.84
11 . 5 0 2 9 . 7 7
107.33
RESIDUAL RETUHNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-BENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PBICE OF ONIONS
(DOLLARS)
;UANTITY OF
INIONS
BAGS
360-00
405.00
450.00
495.00
540.00
4.40
4.95
5.50
6.05
6.60
62.79
112.29
161.79
211.29
260.79
260.79
335.04
409.29
483.54
557.79
458.79
557.79
656.79
755.79
854.79
656.79
780.54
904.29
1028.04
1151.79
854.79
1003.29
1151.79
1300.29
1448.79
789
r
PROJECTIONS FOR PLANNING PURPOSES
NOT TO BE USED WITHOUT UPDATING AFTER 02/
" . . /82B-1241 (C16;
FRESH MARKET SPINACH, IRRIGATED
TEXAS EDWARDS AQUIFER REGION
1982 PROJECTED COSTS AND RETURNS PER ACRE
CATEGORY
PROJECTED
PROJECTED YOUR
YIELD UNIT
37UHTT VTLTTE ESTIMATE
1. GROSS RECEIPTS
400.00 BU.
5-75 2300-00
SPINACH, FRESH
TOTAL PROJECTED RETURNS
$ 2J0U.UU $
2- VARIABLE COSTS
INPUT USE
PBEHABVEST COSTS
♦SPINACH-FRESH SD
00 LB.
2.00
16.00
♦NITROGEN (LIQ)
60, 00 LB.
0.23
13.80
♦PHOSPHATE
120. 00 LB.
0.32
38.40
♦HERBICIDE
1, 00 ACRE
20.00
20-00
♦INSECTICIDE
6, 00 APPL
7.50
45.00 "
♦FUNGICIDE
7 00 APPL
5-00
35.00
PESTICIDE APPLI.
7, 00 ACRE
3.50
24.50
♦NITROGEN (DRY)
30 00 LB0.26
7.80 ;
IRRIGATION WATER
16. 00 ACIN
FUEL S LUBE—TRACTOR
ACRE
21.79
ACRE
EQUIPMENT
1.91
IRRIGATION
ACRE
41.92 "
REPAIRS ^-TRACTOR
ACRE
4 . 11
EQUIPMENT
ACRE
3. 1 1
IRRIGATION
ACRE
10.72
LABOR MACHINERY
2 98 HOUR
5.00
14.88 *
IRRIGATION
1 60 HOUR
3.80
6-08
EQUIPMENT
0. 77 HOUR
3.80
2.93
OTHER
7. 00 HOUR
3.80
26.60
OPERATING CAPITAL
71, 31 DOL.
0.155
11 . 0 5 ■
SUBTOTAL, PREHARVEST
ACRE
$" 1TT5TFU $•
HARVEST COSTS
HARV,PKG,MKT
400.00 BU.
4.50 1800.00
SUBTOTAL, HABVEST
ACRE
$-T8UU.OU $■
TOTAL VARIABLE COSTS
ACRE
$ 2145.60 $
BBEAK-EVEN PRICE, VARIABLE COSTS $ 5 . 3 6 / B U . SPINACH, FRESH
3. INCOME ABOVE VARIABLE COSTS ACRE
$ 154.40 $
4. FIXED COSTS
DEPREC, INTEREST,TAXES 8 INSUR.
TRACTOR
ACRE
32.44
EQUIPMENT
ACRE
28.17
IRRIGATION
ACRE
26.46
LAND-CASH
RENT
1 . 0 0 ACRE
40.00
40.00
MISC
ADMIN
0/H
0 . 5 0 ACRE
10.00
5.00
TOTAL FIXED COSTS
ACRE
$
■ I32-U/ $■
5. TOTAL PROJECTED COSTS
ACRE
$ 2277.67 $
BREAK-EVEN PRICE, TOTAL COSTS
$ 5 . 6 9 / B U . SPINACH, FHESH
6. NET PROJECTED RETURNS
ACRE
$ 22.33 $
SPINACH IS PACKED AND MARKETED IN 25 POUND BUSHELS
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PHEDICT THE COSTS AND RETURNS FROM ANY
2£?.?£5S5C?L£H._FABW
0H SANCH
OPERATION.
THESE
PROJECTIONS
WERE
COLLECTED AND DEVELOPED
BY STAFF
MEMEERS
OF THE
TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION. AbHLCULTURAL
789
PROJECTIONS FOR PLANNING PURPOSES ONLY
NOT TO BE USED WITHOUT UPDATING AFTER 02/17/82
B-1241 (C16;
FRESH MARKET SPINACH, IRRIGATED
TEXAS EDWARDS AQUIFER REGION
1982 PROJECTED COSTS AND RETURNS PER ACRE
MACHINERY
OPERATION
SHREDDER
OFFSET DISC
HCLDBCARD PLOW
LAND PLANE
BEDDER 6R
HERBICIDE SPRAYR
DBY FERT SPRDER
CULTIVATOR 4R
PLANTER 4R
BED SHAPEE 6R
CULTIVATOR 4R
CULTIVATOR 4R
MACH
ITEM OPER TIMES LABOR MACHINE OPEH LABOR
NO- MONTH OVER HOURS HOURS COSTS COSTS
3,30
2,34
1.32
1,50
1,36
63
3,60
1,39
3.41
3,48
1.39
1,39
AUG
AUG
AUG
AUG
AUG
AUG
AUG
SEPT
SEPT
SEPT
OCT
NOV
1.00
2.20
1-00
0.20
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
TOTALS
IRRIGATION
APPLICATION
W AT E R
W AT E R
W AT E R
W AT E R
0.263
0.501
0.571
0.050
0.151
0.0
0.203
0-227
0-3 03
0.252
0.227
0.227
0. 199
0.380
0.432
0.038
0 . 11 5
0.264
0.154
0.172
0.230
0-191
0. 172
0.172
2.975
2.519
28.79 14.88
82.20 5 8 . 7 2 184.59
SYSTEM
HOURS
0.0
0.0
0.0
0.0
IRRIG
OPER. LABOR
COSTS COSTS
13. 16 1.52
13. 16 1.52
13.16 1.52
13. 16 1.52
APPL. IRRIG
INPUT FIXED
COSTS COSTS
0.0
6.62
13.80 6 . 6 2
0.0
6.62
0.0
6.62
APPL. ACRE LABOR
HONTH INCHES HOURS
A P P L I C AT I O N
A P P L I C AT I O N
A P P L I C AT I O N
A P P L I C AT I O N
HAR
SEPT
NOV
JAN
TOTALS
4.00
4.00
4.00
4.00
0.400
0.400
0.400
0.400
16.00 1.600 0.0
2.02
4.64
6.78
0.53
1.62
0.08
1.54
2.40
2.55
1.83
2.40
2.40
1-31
2.51
2-85
0.25
0.76
0.0
1-02
1.13
1.52
1.26
1. 13
1.13
APPL- MACH TOTAL
INPUT FIXED OPER.
COSTS COSTS COST
0-0
3.51
0-0
10.27
0-0
13.85
0.0
1.22
0.0
2.36
20.00
2.29
46.20
3-80
0.0
3-93
16.00
6.48
0.0
3.15
0-0
3.93
0.0
3.93
6.84
17.41
23-49
2-01
4.74
22.37
52.56
7.47
26.55
6.24
7.47
7.47
TOTAL
IRRIG
COSTS
21.30
35.10
21.30
21-30
52.64 6.08 13.80 26.46 98.98
'
RESIDUAL RETUHNS AT ALTERNATIVE YIELDS AND PRICES
ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT
INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT
PRICE OF SPINACH, FRESH
(DOLLARS)
IDANTITY OF
IPINACH, FRESH
BU.
320.00
360.00
400.00
440.00
480.00
4.60
5.18
5.75
6.32
6.90
-313.60
-309.60
-305.60
-301.60
-297.60
-129.60
-102.60
-75.60
-48.60
-21.60
54.40
104.40
154.40
204.40
254.40
238.40
311.40
384.40
457.40
530.40
422.4 0
518.40
614.40
710.40
806.40
NOTE: NEGATIVE BETUBNS OVEB VARIABLE COSTS MAY BE AVOIDABLE
VIA CHOP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT
STRATEGIES.
^
790
PROJECTIONS FOR PLANNING PURPOSES ONLY
B-1241 (C16)
NOT TO BE USED WITHOUT UPDATING AFTER 02/17/82PROCESSED SPINACH, IRRIGATED
TEXAS EDWARDS AQUIFER REGION
1982 PROJECTED COSTS AND RETUHNS PER ACRE
PROJECTED
PROJECTED YOUR
CATEGORY
YIELD
UNIT
VA L U E E S T I M AT E
S/UNIT
1. GROSS RECEIPTS
7 . 5 0 TON
84.50
633.75
SPINACH, PROCESS
SPINACH SECONDS
0 . 8 0 TON
1.50
1.20
TOTAL PROJECTED RETURNS
$ bJ4.yb $
2- VARIABLE COSTS
INPUT USE
PREHARVEST COSTS
♦ SPINACH-PROC SD
16.00
LB1.65
26.40
♦ NITROGEN (LIQ)
60.00
LB.
0.23
IJ-tfU
♦PHOSPHATE
150-00 LB.
0.32
48.00
♦HERBICIDE
1 . 0 0 ACRE
20-00
20.00
♦INSECTICIDE
8.00
APPL
7.50
60.00
♦FUNGICIDE
3-00
APPL
5.00
15.00
PESTICIDE APPLI.
8 . 0 0 ACRE
3.50
28.00 " '"
♦NITROGEN (DRY)
60.00
LB.
15-60
0.26
IRRIGATION WATER
2 0 . 0 0 ACIN
FUEL S LUBE—THACTOH
ACBE
2 4.32
ACRE
1-04
EQUIPMENT
IRRIGATION
ACRE
b2-4U
R E PA I R S T R A C T O R
ACHE
4.53
EQUIPMENT
ACHE
3-01
IRRIGATION
ACRE
13.40
LABOR MACHINERY
2 . 9 8 HOUR
5.00
14.88
IRRIGATION
2 . 0 0 HOUR
3.80
7.60
0 . 4 2 HOUR
EQUIPMENT
3.80
1.60
OTHER
6 - 0 0 HOUR
3.80
22-80
OPERATING CAPITAL
9 5 . 1 2 DOL.
0- 155
14./4
ACRE
$
SUBTOTAL, PREHARVEST
HARVEST COSTS
9 . 0 0 TON
4.8 5
43.65
HARV,PKG,HAUL
ACRE
SUBTOTAL, HARVEST
$
4J.bb $
TOTAL VARIABLE COSTS
ACRE
$ 430.77 $
BREAK-EVEN PRICE, VARIABLE COSTS $ 57.28/TON SPINACH, PROCESS
3. INCOME ABOVE VARIABLE COSTS
ACRE
$ 204-18 $
4. FIXED COSTS
DEPREC,INTEREST,TAXES S INSUR.
TRACTOR
ACRE
35.12
ACRE
EQUIPMENT
27.31
IRRIGATION
ACRE
33.08
LAND-CASH
RENT
1 . 0 0 ACRE
40.00
40.00
MISC
ADMIN
0/H
0 . 5 0 ACRE
10.00
5.00 '
TOTAL FIXED COSTS
ACRE
TT0757 $'
5. TOTAL PROJECTED COSTS
ACRE
571.28 $
BREAK-EVEN PRICE, TOTAL COSTS
6. NET PROJECTED RETURNS
$ 76.01/TON SPINACH, PROCESS
ACRE
$
63.67
S
INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS
NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY
ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE
COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL
EXTENSION SERVICE AND APPROVED FOR PUBLICATION.
Download