r TEXAS COASTAL BEND t FOREWORD The enterprise budgets for Texas Coastal Bend Region are based on estimates of yields, production input quantities, and production practices which represent the best judgment of local producers, county Extension agents-agriculture, financial insti tution representatives, farm machinery dealers and others knowledgeable of the area. Variation in yields, production inputs and production practices should be expected for particular farms. Budgets for all major crops produced in the area are included for two levels of management, when applicable. Crop yields are directly related to levels of management. These differences are due largely to timing of operational practices which may not be evident in the budgets. r The machinery inventory is applicable to both typical and high level management. In some bud gets custom rates, primarily harvesting, were used in lieu of the assumption that harvesting equip ment was owned. Budgets for establishing permanent type pasture grasses were prepared and used for prorating estab lishment costs in the respective pasture and hay budgets. Forage crops include expenses only be cause it is expected that the income will be derived from livestock enterprises. Land charges were based on the customary land lord's crop share less his proportionate share of certain production and harvesting inputs. A per acre land charge was made when crop share was not used. B-1241 (C 18) TEXAS AGRICULTUHAL EXTENSION SERVICE . THE TEXAS ASM UNIVERSITY SYSTEM D a n i e l C . P f a n n s t i e l , D i r e c t o r . C o l l e g e S t a t i o n , Te x a s TEXAS ENTERPRISE BUDGETS TEXAS COASTAL BEND REGION Projected for 1982 Educational programs conducted by the Texas Agricultural Extension Service s e r v e p e o p l e o f a l l a g e s r e g a r d l e s s o f s o c i o - e c o n o m i c l e v e l , r a c e , c o l o r, sex, religion or national originCooperative Extension Work in Agriculture and Home Economics, The Texas ASH University System and the United States Department of Agriculture coopera ting- Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 191U. 500 1-82, New ECO 7-2 851 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 02/18/82. B-1241 (C18) UPLAND COBN, CCASTAL BEND REGION 1982 PBOJECTED COSTS AND RETURNS PER ACRE CATEGORY PROJECTED YIELD UNIT 1. GROSS RECEIPTS CORN TOTAL PBOJECTED RETURNS 2. VARIABLE COSTS PREHARVEST COSTS ♦SEED ♦NITROGEN ♦PHOSPHOROUS* ♦POTASSIUM ♦FURADAN ♦ERADICANE FUEL & LUBE—TRACTOR EQUIPMENT R E PA I R S TBACTOR EQUIPMENT LABOR MACHINEBY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS CORN HARV 5 HAUL SUBTOTAL, HABVEST 60.00 PROJECTED VALUE S/UNIT BU. 2.80 LB. LB. LBLB. PINT LB. ACRE ACRE ACRE ACRE HOUR HOUR DOLACRE 1.00 0.20 0.32 0. 16 5.58 4.68 YOUR ESTIMATE $ 168.00 168.00 $ $ 13.00 20.00 9.60 2.40 8.93 28.08 13.72 3.55 2.28 2.02 14-09 5.32 6.02 129.01 S $ 20.16 20.16 $ $ 149.17 $ INPUT USE 13.00 100.00 30.00 15.00 1.60 6.00 3.13 1.33 40-14 33.60 TOTAL VARIABLE COSTS CWT. ACRE 4.50 4.00 0.150 0.60 ACRE BREAK-EVEN PHICE, VABIABLE COSTS $ 2.49/BU. CORN 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 1 8 . 8 3 $ . 4. FIXED COSTS DEPREC,INTEREST,TAXES t INSUR. TRACTOR EQUIPMENT LAND NET SHARE-BENT TOTAL FIXED COSTS ACRE ACRE ACRE ACRE $ 21.37 16.11 48-79 86.26 $ 5. TOTAL PROJECTED COSTS ACRE $ 235.44 $ $ 3 . 92/BU. CORN ACRE $ BREAK-EVEN PRICE, TOTAL COSTS 6. NET PROJECTED RETURNS -67.44 $ RENT EQUALS 33% OF GROSS LESS 33% OF HARVEST INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS SERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 851 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 02/18/82, B-124 1 (C18) UPLAND CORN, COASTAL BEND REGION 1982 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER 4R TANDEM DISC 4R BEDDER 4R BEDDER 4R F E R T. A P P L I . R N T D RCW DISC 4R PLANTER 4R ROLLER 4R SPRAYER 4R F E R T. A P P L I . R N T D CULTIVATOR 4R CHISEL PLOW F E R T. A P P L I . R N T D CULTIVATOR 4R MACH I T E M OPER T I M E S LABOR MACHINE OPER LABOR NO. MONTH OVER HOUBS HOURS COSTS COSTS 5,31 4,62 4,67 4,67 2,89 5,66 4,72 5,77 5,74 2,89 4,68 4,69 2,89 4,68 AUG 1.00 AUG -1.00 SEPT 1.00 DEC 1.00 DEC 1.00 FEB 1-00 MAR 1.00 MAR 1.00 MAR 1.00 MAR 1.00 APR 1.00 APR 1.00 APR 1.00 MAY 1.00 TOTALS : * , APPL. MACH INPUT F I X E D COSTS COSTS TOTAL OPER. COST 4. 19 5.41 4-34 4.34 16.50 5. 10 19-66 2-56 42-68 19.50 4.00 6.22 9.50 4.00 0.2C9 0.216 0.224 0.224 0.203 0.216 0.299 0.168 0.310 0.203 0.202 0.252 0.203 0.202 0. 159 0-164 0.170 0.170 0.154 0. 164 0.226 0. 127 0.235 0.154 0.153 C.191 0.154 0.153 0.70 1.18 1.28 1.28 1.82 0.64 1.82 0.46 1.08 1„ 82 1.20 1.34 1.82 1.20 0.94 0.97 1.01 1.01 0.91 0-97 1.34 0.76 1-40 0.91 0.91 1.13 0.91 0.91 0.0 0-0 0-0 0.0 12.00 0.0 13.00 0.0 37.01 15.00 0.0 0.0 5.00 0.0 3.132 2.372 17.63 14.09 82.01 2.55 3.26 2.05 2.05 1.76 3.49 3.50 1.34 3. 19 1-76 1.89 3.74 1-76 1.89 34-26 147.99 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE 07 CORN (DOLLARS) 2.24 2-5 2 2.80 3.08 48.00 -67.78 -58.77 -49.77 -40.76 54.00 -60.12 -49.99 -39.86 -29.73 60.00 -52.47 -41.21 -29.96 -18.70 66.00 -44.82 -32.43 -20-05 -7.67 -7.4 5 | l 4.71 | 72.00 i -37.16 -23-66 - 10. 15 3.36 16.87 | 3.36 BU. QUANTITY 0? CORN I -31-76 | I -19.60 | I I NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. * > 852 PROJECTIONS FOR PLANNING PURPOSES ONLY ^ NOT TO BE USED WITHOUT UPDATING AFTER 02/17/82. B-1241 (C18) COTTON, DRYLAND, TEXAS COASTAL BEND REGION 1982 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS COTTON LINT COTTONSEED TOTAL PROJECTED RETURNS 2. VARIABLE COSTS PREHARVEST COSTS ♦SEED ♦NITROGEN ♦PHOSPHOROUS ♦TREFLAN ♦BIDRIN ♦PYDRIN ♦GUTHION INSECT. APPLI. SCOUTING FUEL & LUBE—TRACTOR PROJECTED UNIT YIELD 580.00 LB. 0.46 TON INPUT USE 20.00 50.00 35.00 1.50 4.00 4.00 1.00 3.00 1.00 EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LA30R MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS ♦DEF ♦ACCELERATE ♦DESICCANT DEFOLIANT APPL STRIP 5 HAUL COTTON GINNING BAGGING & TIES SUBTOTAL, HARVEST 2.42 0.56 36.64 1.00 1.00 1.50 2.00 26.40 26.40 1.21 TOTAL VARIABLE COSTS BREAK-EVEH PRICE, VARIABLE COSTS 3. INCOME ABOVE VARIABLE COSTS LB. LB. LB. QT. 02. OZ. PINT APPL ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE PINT PINT QT. APPL CWT. CWT. BALE ACRE PBOJECTED S/UNTT VIXTTE 0.53 100.00 336.40 46.00 T827T0 0.58 0.20 0.32 7.40 0.38 1.04 2. 13 2.50 3.00 11 . 6 0 10.00 11 . 2 0 11 . 1 0 1.52 4.16 2.13 7.50 3-00 18.22 1.49 3.47 1.85 10.88 2.24 5-50 10b.87 4.50 4.00 0.150 $■ YOUR ESTIMATE 2-75 2.09 1.50 2.75 2.00 2-00 15.00 ACRE $ 242.21 $. $ 0.34/LB. COTTON LINT, ACRE $ 140.19 $ ACRE ACRE ACHE ACRE 21-00 18.83 72-56 1V2-jy $' ACRE $ 354.60 $. $ 0.53/LB. COTTON LINT ACRE $ 4. FIXED COSTS DEPREC.,INTEREST,TAXES C INSUR. TRACTOR EQUIPMENT LAND NET SHARE-RENT TOTAL FIXED COSTS 5. TOTAL PROJECTED COSTS BREAK-EVEN PRICE, TOTAL COSTS 6. NET PROJECTED RETURNS 27.80 $ LAND (NET RENT) BASED ON 25% OF GROSS INCOME LESS 25% OF FERT, GIN-BAG-TIES. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 852 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 02/18/82. B-124 1 (C18) COTTON, DRYLAND, TEXAS COASTAL BEND REGION 1982 PROJECTED COSTS AND RETURNS PES ACRE MACHINERY OPERATION SHREDDER 4R CHISEL PLOW TANDEM DISC 6R TANDEM DISC 6R F I E L D C U LT. 6 R HERB. APPLI. BEDDER 6R P E RT. A P P L I . R N T D ROW DISC 6R PLANTER 6R ROLLER 6R CULTIVATOR 6R F E RT- A P P L I . R N T D CULTIVATOR 6R CULTIVATOR 6R I T E M OPER TIMES NO. MONTH OVER 2,31 2,45 2,36 2,36 2,43 2,49 2,35 2,89 2,41 2,40 2,38 2,42 2,89 2,42 2,42 SEPT SEPT SEPT OCT OCT OCT NOV NOV JAN MAR HAR MAR MAR APR MAY TOTALS 1.00 1.00 1.00 1.00 1.00 1-00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MACH LABOR MACHINE OPER LABOR HOURS HOURS COSTS COSTS APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 0.2C9 0.151 0.146 0.146 0. 136 0.203 0.151 0.203 0.146 0.202 0 . 11 3 0.136 0.2C3 0.136 0.136 0.159 0. 115 0. 110 0 . 11 0 0.103 0.154 0. 115 0. 154 0 . 11 0 0-153 0.086 0.103 0.154 0.103 0. 103 2.02 1-44 1.46 1.46 1-30 1.98 1.45 1-82 1.38 2.09 1.03 1.38 1.82 1.38 1.38 0.94 0-68 0-66 0.66 0.61 0.91 0.68 0.91 0.66 0.91 0.51 0-61 0.91 0.61 0.61 0.0 0.0 0.0 0.0 0.0 11. 10 0.0 10.00 0.0 11 . 6 0 0.0 0.0 11 . 2 0 0.0 0.0 3 . 11 3.71 3 . 11 3 . 11 3.49 2.90 2.04 1.76 2.46 4.29 1.25 1.83 1.76 1.83 1.83 6.08 5.83 5.22 5.22 5.41 16.90 4. 17 14.50 4-49 18.39 2.79 3.32 15.70 3.32 3.82 2.418 1.832 23.38 10.88 43.90 38.47 11 6 . 6 3 ^ RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF COTTON (DOLLARS) 0.46 0.52 0.58 0-64 464.00 ] -6.38 13.81 33.99 54-18 74.36 J 522.00 | 5.40 2 8 . 11 50.81 73.52 96.23 | 580.00 | 17.17 42.40 67.63 92.86 11 8 . 0 9 I 638.00 | 28.95 56.70 84.45 11 2 - 2 0 139.96 | 696.00 | 40.72 71.00 101.27 131.55 161.82 | LB. QUANTITY OF COTTON LINT LINT 1 0.70 I NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. 353 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 02/18/82. B-1241 (C18) GRAIN SORGHUM, COASTAL PLAIN, TEXAS COASTAL BEND REGION 1982 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS GRAIN SORGHUM TOTAL PROJECTED RETURNS 2. VARIABLE COSTS PREHARVEST COSTS ♦SEED ♦NITROGEN ♦PHOSPHOROUS ♦ZINC CHELATE ♦FERROUS SULFATE ♦HALATHION INSECT. APPLI. ♦ATRAZINE FUEL 5 LUBE—TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS SORG HARV & HAUL SUBTOTAL, HARVEST 33.00 YOUR ESTIMATE PROJECTED VALUE S/UNIT PROJECTED YIELD UNIT CWT. 4.80 LB. LB. LB. PINT LB. OZ. APPL LB. ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 0.76 0.20 0.32 1.09 0-12 0.13 2.50 2.05 $ 158.40 158.40 S $ 4.56 14.00 9.60 1.09 0.24 1.04 2.50 2.05 15.32 1.49 2.92 1.53 9.15 2.24 2.82 70.55 $ S 18.15 18.15 $ $ 88.70 $ INPUT USE 6.00 70.00 30.00 1.00 2.00 8.00 1.00 1.00 2.03 0.56 18.82 33.00 TOTAL VARIABLE COSTS 4.50 4.00 0.150 CWT. ACRE 0.55 ACRE BREAK-EVEN PRICE, VARIAELE COSTS $ 2.69/CWT. GRAIN SORGHUH 3. INCOME ABOVE VA R I A B L E 4. FIXED COSTS DEPREC,INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND NET SHARE-RENT TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 5. TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE, TOTAL COSTS 6. NET PROJECTED RETURNS r COSTS ACRE S 69.70 $ 17.65 13.30 44.48 75.43 $ U U ii 164.13 $ $ 4.97/CWT. GRAIN SORGHUM ACRE $ -5.73 S LAND CHARGE USES LANDLORD'S SHARE CF GROSS 33% LESS 33% OF FERTILIZER. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 02/18/82. 853 B-1241 (C18) GRAIN SORGHUM, COASTAL PLAIN, TEXAS COASTAL BEND REGION 1982 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER 4R TANDEM DISC 6R BEDDER 6R BEDDER 6R F E R T. A P P L I . R N T D ROW DISC 6R ROW DISC 6R PLANTER 6R HERB. APPLI. CULTIVATOR 6R F E R T. A P P L I . R N T D CULTIVATOR 6R ITEM OPER TIMES NO. MONTH OVER 2,31 2,36 2,35 2,35 2,89 2,41 2,41 2,40 2,49 2,42 2,89 2,42 AUG AUG SEPT NOV NOV JAN FEB MAR MAR MAR MAR APR TOTALS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MACH LABOR LABOR MACHINE OPER HOURS HOURS COSTS COSTS 1 APPL- MACH I N P U T FIXED COSTS COSTS TOTAL OPER. COST 0.209 0.146 0.151 0.151 0.203 0.146 0-146 0-202 0-203 0.136 0.203 0.136 0.159 0. 110 0. 115 0 . 11 5 0.154 0 . 11 0 0. 110 0.153 0.154 0.103 0.154 0.103 2.02 1.46 1.45 1.45 1.82 1.38 1.38 2.09 1.98 1.38 1.82 1.38 0.94 0.66 0-68 0.68 0.9 1 0.66 0.66 0.91 0.91 0.61 0.91 0-6 1 0.0 0-0 0.0 0.0 11 . 0 0 0.0 0.0 4.56 2.05 0.0 13.93 0.0 3- 11 3 . 11 2.04 2.04 1.76 2.46 2.46 4.29 2.90 1.83 1.76 1.83 6.08 5.22 4. 17 4. 17 15.50 4.49 4-49 11 . 8 5 7.35 3.32 18.43 3.82 2.033 1.540 19.60 9.15 31.54 29.59 89.88 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT ^ INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PBICE OF GRAIN SORGHUM (DOLLARS) 3.84 4.32 4,80 5.28 5.76 26.40 -9.36 -0.87 7-62 16. 11 24.60 | 29.70 -2.68 6.87 16.42 25.97 35.52 l 33.00 3.99 14.60 25.22 35.83 46.44 J 36.30 10.67 22-34 34.01 45.69 57.36 | 39.60 17.34 30.08 42.81 55.55 68.28 | CWT. QUANTITY OF GRAIN SORGHUM I NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES.