I r I I TEXAS EDWARDS PLATEAU EASTERN r FOREWORD The enterprise budgets for Texas Edwards Plateau-Eastern Region are based on estimates of yields, production input quantities, and production practices which represent the best judgment of local producers, county Extension agents-agriculture, fi nancial institution representatives, farm machinery dealers and others knowledgeable of the area. Vari ation in yields, production inputs and production practices should be expected for particular farms. Budgets for all major crops produced in the area are included for two levels of management, when applicable. Crop yields are directly related to levels of management. These differences are due largely to timing of operational practices which may not be evident in the budgets. The machinery inventory is applicable to both typical and high level management. In some bud gets custom rates, primarily harvesting, were used in lieu of the assumption that harvesting equip ment was owned. Budgets for establishing permanent type pasture grasses were prepared and used for prorating estab lishment costs in the respective pasture and hay budgets. Forage crops include expenses only be cause it is expected that the income will be derived from livestock enterprises. Crop share rental agreements do not exist to any substantial degree. Land charges were, therefore, calculated by using a fair market value times an interest rate or a cash lease. r P R O J E C T I O N S F O R P L A N N I N G P U R P O S E S O N LY N O T T O B E U S E D W I T H O U T U P D AT I N G A F T E R 1 0 / 0 9 / 8 0 . B-124KC10) G R A I N S O R G H U M . D R Y L A N D . T E X A S E D W A R D S P L AT E A U E A S T E R N E S T I M AT E O C O S T S A N D R E T U R N S P E R A C R E C AT E G O RY PROJECTED YIELO UNIT 1. GROSS RECEIPTS GRAIN SORGHUM T O TA L P R O J E C T E D R E T U R N S 2. VARIABLE COSTS PREHARVEST COSTS GRAIN SORG. SEED NITROGEN FUEL & LUBE—TRACTOR EQUIPMENT REPAIRS-——TRACTOR EQUIPMENT LABOR——-MACHINERY OPERATING CAPITAL SUBTOTAL. PREHARVEST HARVEST COSTS CUST HARV SORG O CUSTOM HAUL SUBTOTAL. HARVEST 20.00 C W T. __B____££IJ_J2 YOUR S/UNIT VA L U E E S T I M AT E 3.83 S 76.60 76.60 $ INPUT USE 6.00 16.00 3.55 6.56 LB. LB. ACRE ACRE ACRE ACRE HOUR DOL. ACRE 0.40 0.25 ACRE CWT. ACRE 8.00 0.25 2.40 4.00 11 . 6 6 1.08 3.70 4.69 15.98 4.50 0.13 2x22 s S 44.36 $ 8.00 5.00 13.00 $ ACRE $ 57.36 $ 3. INCOME ABOVE VARIABLE COSTSS ACRE S 19.24 4. FIXED COSTS DEPREC, INTEREST.TAXES & INSUR. TRACTOR EQUIPMENT LAND <NET SHARE-RENT) TOTAL FIXED COSTS ACRE ACRE ACRE ACRE $ 18.66 12.84 12.00 43.50 S 5. TOTAL PROJECTED COSTS ACRE $ 100.86 S 6. NET PROJECTED RETURNS ACRE S -24.26 $ 1 .00 20.00 TOTAL VARIABLE COSTS s LAND CHARGE BASED ON CASH RENT. GOVERNMENT PYMNT NOT INCLUDED. r INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDELINE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTEO AND/OR DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. Texus Auri.iillural 1.xtension Service . The Texas A&M University System . Daniel C. Pfannstiel, Director . College Station, Texas GRAIN SORGHUM. DRYLAND. TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE ^ OPERATION CHISEL DISK-TANDEM PICKUP LISTER/BEDDER PICKUP F E R T. A P P L I . PLANTER 4-R PICKUP CULT PICKUP PICKUP SHREDDER PICKUP TOTALS ITEM NO. 1 ,44 1 .30 10 1 ,49 10 3,86 1 ,42 10 1,64 10 10 3,61 10 DATE FUEL.OIL. FIXED T I M E S L A B O R M A C H I N E L U B . . R E P. C O S T S OVER HOURS HOURS PER ACRE PER ACRE MAR MAR MAR APR APR MAY MAY MAY JUNE JUNE J U LY AUG AUG 1.00 1.00 0.1 0 1.00 0.1 0 1.00 1 .20 0.10 2.00 0.10 0.10 1.00 0.1 0 0.198 0.159 0.100 0.242 0.100 0 . 11 6 0.469 0.100 0.495 0.100 0.100 0.442 2.82 1.86 0.33 3. 19 0.33 1 .78 7.01 0.33 6.75 0.33 0.33 6.12 .2*122 1.86 1.58 0.57 2.33 0.57 0.74 4.61 0.57 4.19 0.57 0.57 2.39 0.5 7 -2*22 3.551 2.122 21.12 31.50 0.261 0.210 0.125 0.320 0.125 0.153 0.619 0.125 0.653 0.125 0.125 0.584 ______ ^ r PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 10/09/80. COASTAL BERMUDAGRASS ESTAB., DRYLAND, TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE CATEGORY PROJECTED UNIT YIELD EBCJfi£T_L_L__ S / U N I T VA L U E I • GROSS RECEIPTS TOTAL PROJECTED RETURNS r B-124KC10) 2. VARIABLE COSTS PREHARVEST COSTS CUSTOM SPRIGGING NITROGEN PHOSPHATE HERBICIDE FUEL & LUBE— TRACTCR EQUIPMENT R E PA I R S — — T R A C T O R EQUIPMENT LABOR——MACHINERY OPERATING CAPITAL SUBTOTAL. PREHARVEST HARVEST COSTS SUBTOTAL. HARVEST YOUR ESTIMATE 0.0 INPUT USE 1 .00 32.00 40 .00 1 .00 2 .30 21 .72 ACRE LB. LB. LB. ACRE ACRE ACRE ACRE HOUR DOL. ACRE 2 5 ,. 0 0 0.. 2 5 0.. 2 5 7,. 0 0 4.. 5 0 0 .13 $ 25.00 8.00 10.00 7.00 6.52 1.08 2.08 3.92 10.34 2t*2 76.77 S ACRE s 0.0 S ACRE $ 76.77 s S 3. INCOME ABOVE VARIABLE COSTS ACRE s -76.77 s 4. FIXED COSTS DEPREC INTEREST. TAXES £ INSUR. TRACTOR EQUIPMENT LAND (NET SHARE-RENT) TOTAL FIXED COSTS ACRE ACRE ACRE ACRE S 10.38 7.31 8 .00 25.69 S 5. TOTAL PROJECTED COSTS ACRE s 102.46 S 6. NET PROJECTED RETURNS ACRE s TOTAL VARIABLE COSTS -102.46 s LANO CHARGE BASED ON PREVAILING RATES I N R E G I O N . INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIOELINE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND/OR DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. r COASTAL BERMUDAGRASS ESTAB.. DRYLAND* TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE ^ OPERATION CHISEL DISK-TANDEM PICKUP F E R T. A P P L I . OISK-TANDEM PICKUP PICKUP HERBICID SPRAYER PICKUP PICKUP F E R T. A P P L I . PICKUP TOTALS ITEM NO. 1 ,44 1 ,30 10 1 ,86 1,30 10 10 3,73 10 10 1 ,86 10 DATE JAN JAN JAN FEB FEB FEB MAR APR APR MAY JUNE JUNE FUEL.OIL, FIXED TIMES LABOR MACHINE L U B . . R E P. C O S T S OVER HOURS HOURS PER ACRE PER ACRE 1 .00 2.00 0.10 1.00 1.00 0.1 0 0.10 1 .00 0.1 0 0.10 1 .00 0.1 0 0.261 0.421 0.125 0.153 0.210 0.125 0.125 0.349 0.125 0.125 0.153 0.125 0.198 0.319 0.100 0.1 16 0.159 0.100 0.100 0.264 0.100 0.100 0 . 11 6 1 .86 3.15 0.57 1 .05 1.58 0.57 0.57 1 .50 0.57 0.57 1.05 2.82 3.72 0.33 1 .95 1 .86 0.33 0.33 3.40 0.33 0.33 1.95 -2*132 -2*21 -2*22 2.298 1.773 13.60 17.69 . . P R O J E C T I O N S F O R P L A N N I N G P U R P O S E S O N LY N O T T O B f c U S E D W I T H O U T U P D AT I N G A F T E R 1 0 / 0 9 / 8 0 . 8-1241<C10) C O A S TA L BERMUDAGRASS PA S T U R E , D R Y L A N D , T E X A S E D W A R D S P L AT E A U E A S T E R N E S T I M AT E D COSTS AND RETURNS PER ACRE CATEGORY PROJECTED YIELD UNIT 1. GROSS RECEIPTS C O A S TA L PA S T U R E T O TA L P R O J E C T E D R E T U R N S 2 . VA R I A B L E C O S T S PREHARVEST COSTS NITROGEN P H O S P H AT E FUEL & LUBE—TRACTOR EQUIPMENT R E PA I R S — — T R A C TO R EQUIPMENT L ABQR———MACH I NERY O P E R AT I N G C A P I TA L S U B T O TA L . P R E H A R V E S T HARVEST COSTS S U B T O TA L , H A R V E S T r 5.00 JPB-UECTEP S/UNIT YOUR ESTIMATE VALUE AUM 6 . 0 0 _ —22*22 s 30.00 S LB. LB. ACRE ACRE ACRE ACRE HOUR DOL. ACRE 0.25 0 • 25 INPUT USE 120.00 40 .00 2.00 16.64 T O TA L VA R I A B L E C O S T S 3 . I N C O M E A B O V E V A R I A B L E C O S TS - 4 • 50 0.13 _ $ 30.00 10.00 5.20 0.54 1.32 1 .66 9.01 2*1$ 59.89 s ACRE S 0.0 s ACRE * 59.89 s ACRE s -29.89 $ 4. FIXED COSTS DEPREC..INTEREST.TAXES & INSUR. TRACTOR EQUIPMENT P R O R AT E D E S TA B L I S H M E N T LAND (NET SHARE-RENT) T O TA L F I X E D C O S T S 97.81 ACRE ACRE DOL. ACRE ACRE 9.44 9.1 1 6.55 0 .07 2x22 $ 33.10 S s 5 . T O TA L P R O J E C T E D C O S T S ACRE S 93.00 6. NET PROJECTED RETURNS ACRE s -63.00 $ — E S TA B L I S H M E N T C O S T P R O R AT E D O V E R 1 5 Y E A R S . L A N D C H A R G E B A S E D O N P R E VA I L I N G R AT E I N R E G I O N . I N C O M E F R O M C R O P R E F L E C T E D I N T H E L I V E S T O C K B U D G E T S . I N F O R M A T I O N P R E S E N T E D I S P R E PA R E D S O L E L Y A S A G E N E R A L G U I D E L I N E A N D I S N O T INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PA R T I C U L A R F A R M O R R A N C H O P E R AT I O N . T H E S E P R O J E C T I O N S W E R E C O L L E C T E D A N D / O R D E V E L O P E D B Y S TA F F M E M B E R S O F T H E T E X A S A G R I C U LT U R A L E X T E N S I O N S E R V I C E A N D A P P R O V E O F O R P U B L I C AT I O N . r COASTAL BERMUDAGRASS PASTURE. DRYLAND, TEXAS EOWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE FUEL,OIL. FIXED OPERATION SHREDDER F E R T. A P P L I . PICKUP F E R T. A P P L I . PICKUP PICKUP SHREDDER F E R T. A P P L I . TOTALS ITEM NO. 3,61 3,86 10 3,86 10 10 3,61 3.86 DATE AUG SEPT SEPT APR APR MAY JUNE JUNE TIMES LABOR M A C H I N E L U B . , R E P. C O S T S OVER HOURS HOURS PER ACRE PER ACRE 1.00 1.00 0.1 0 1 .00 0.1 0 0.1 0 1.00 1.0 0 0.584 0.153 0.125 0.153 0.125 0.125 0.584 0.442 0.1 16 0. 100 0.1 16 0.100 0.100 0.442 2.39 0.74 0.57 0.74 0.57 0.57 2.39 0.153 2 * 11 6 12 78 33 78 33 33 12 -2*Z± -1*12 2.003 1.533 8.72 18.55 - r PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 10/09/80 COASTAL BERMUDAGRASS ESTAB., IRRIGATED, TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE PROJECTED YIELD UNIT CATEGORY P _ g . E _ T _ P. S/UNIT VA L U E GROSS RECEIPTS TOTAL PROJECTED R E T U R N S YOUR ESTIMATE 0.0 INPUT USE VA R I A B L E C O S T S PREHARVEST COSTS 1 .00 ACRE CUSTOM SPRIGGING 33.00 L 8 . NITROGEN 41 .00 L B . P H O S P H AT E 12.00 A C I N I R R I G AT I O N W AT E R ACRE FUEL & LUBE—TRACTOR ACRE EQUIPMENT ACRE I R R I G AT I O N ACRE R E PA I R S — — T R A C TO R ACRE EQUIPMENT ACRE I R R I G AT I O N HOUR 1 . 3 5 LABOR———MACHI NERY 0.00 HOUR I R R I G AT I O N 23.34 DOL, O P E R AT I N G C A P I TA L ACRE S U B T O TA L , P R E H A R V E S T HARVEST COSTS ACRE S U B T O TA L , H A R V E S T r 25.00 8.25 25.00 0.25 0.25 10.25 3.73 0.54 27.84 1.12 2.00 10.92 6.07 0.00 4.50 3.50 0.13 .-2x3& 98.75 0.0 s. 98.75 S. ACRE T O TA L VA R I A B L E C O S T S 3 . I N C O M E A B O V E VA R I A B L E C O S T S r B-124MC10) ACRE $ -98.75 S. 4. FIXED COSTS DEPREC..INTEREST,TAXES £ INSUR. TRACTOR EQUIPMENT I R R I G AT I O N LAND (NET SHARE-RENT) TO TA L FIXED COSTS ACRE ACRE ACRE ACRE ACRE $ 5. TO TA L COSTS ACRE $ 145.47 $ 6. NET RETURNS ACRE S PROJECTED PROJECTED 6.20 4.65 23.88 _. _. _. 12-OQ -. 46.73 S_. -145.47 S I N F O R M A T I O N P R E S E N T E D I S P R E PA R E D S O L E L Y A S A G E N E R A L G U I D E L I N E A N D I S N O T INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PA R T I C U L A R F A R M O R R A N C H O P E R AT I O N . T H E S E P R O J E C T I O N S W E R E C O L L E C T E D A N O / O R D E V E L O P E D B Y S TA F F M E M B E R S O F T H E T E X A S A G R I C U LT U R A L E X T E N S I O N S E R V I C E A N D A P P R O V E D F O R P U B L I C AT I O N . C O A S TA L B E R M U D A G R A S S E S TA B . , I R R I G AT E D . T E X A S E D W A R D S P L AT E A U E A S T E R N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E ^ OPERATION ITEM NO. CHISEL 1,44 D I S K - TA N D E M 1,30 PICKUP 10 F E R T. A P P L I . 3 . 8 6 PICKUP 10 H E R B I C I D S P R AY E R 3 , 7 3 PICKUP 10 T O TA L S DATE JAN FEB FEB APR APR M AY J U LY FUEL.OIL. FIXEO TIMES LABOR MACHINE LUB.,REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE 1.00 1 .00 0.1 0 1.00 0.10 1.00 0.261 0.210 0.125 0.153 0.125 0.349 0.198 0.159 0.100 0.1 16 0.100 0.264 1.86 1 .58 0.57 0.74 0.57 1 .50 2.82 1 .86 0.33 1.78 0.33 3.40 0.10 -2xX22 _________ -2*21 -2*22 1.349 1.038 7.38 10.85 . r PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 10/09/80 C O A S TA L B E R M U D A G R A S S PA S T U R E . I R R I G AT E D T E X A S E D W A R D S P L AT E A U E A S T E R N R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E CATEGORY PROJECTED YIELD UNIT 1. GROSS RECEIPTS COASTAL PASTURE TOTAL PROJECTED RETURNS r 13.00 AUM YOUR ESTIMATE __3-_______IEfi S / U N I T VA L U E 6.00 12*22 S 78.0 0 $ INPUT USE VARIABLE COSTS PREHARVEST COSTS 325.00 NITROGEN 100.00 PHOSPHATE 15.00 IRRIGATION WATER FUEL S- LUBE—TRACTOR EQUIPMENT I R R I G AT I O N R E PA I R S — — T R A C T O R EQUIPMENT I R R I G AT I O N 1.42 LABOR——MACHINERY 0 .00 I R R I G AT I O N 60.79 OPERATING CAPITAL SUBTOTAL. PREHARVEST HARVEST COSTS SUBTOTAL. HARVEST LB. LB. ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE ACRE S TOTAL VARIABLE COSTS ACRE $ 175.31 S. INCOME ABOVE VARIABLE COSTS ACRE $ -97.31 S. 4. FIXED COSTS OEPREC.,INTEREST,TAXES TRACTOR EQUIPMENT IRRIGATION PRORATED ESTABLISHMENT LAND (NET SHARE-RENT) TOTAL FIXED COSTS r B-124KC10) 81 .25 25.00 0.25 0.25 4.50 3.50 0.13 S 3.33 0.54 34.80 0.85 1.60 13.65 6.39 0.00 7.90 175.31 0.0 $. INSUR. 81 .15 ACRE ACRE ACRE DOL. ACRE ACRE 6.05 6.38 29.85 5.44 0 . 0 7f $ . 12*20 59.72 S 5. TOTAL PROJECTED COSTS ACRE $ 235.03 $ 6. NET PROJECTED RETURNS ACRE $ -157.03 $ I N F O R M AT I O N P R E S E N T E D I S P R E PA R E D S O L E LY A S A G E N E R A L G U I D E L I N E A N D I S N O T INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PA R T I C U L A R F A R M O R R A N C H O P E R AT I O N . T H E S E P R O J E C T I O N S W E R E C O L L E C T E D A N D / O R D E V E L O P E D B Y S TA F F M E M B E R S O F T H E T E X A S A G R I C U LT U R A L E X T E N S I O N S E R V I C E A N D A P P R O V E D F O R P U B L I C AT I O N . COASTAL BERMUDAGRASS PASTURE, IRRIGATED TEXAS EDWARDS PLATEAU EASTERN REGION ESTIMATED COSTS AND RETURNS PER ACRE _ O P E R AT I O N F E R T. A P P L I . PICKUP SHREDDER F E R T. A P P L I . PICKUP F E R T. A P P L I . PICKUP TO TA L S ITEM NO. 3.86 10 3.61 3.86 10 3,86 10 D AT E T I M E S LABOR MACHINE L U B . . R E P. COSTS OVER HOURS HOURS PER ACRE PER ACRE AUG AUG AUG APR APR JUNE JUNE 1.00 0.1 0 1 .00 1.00 0.10 1.00 0.1 0 1.419 0.153 0.125 0.584 0.153 0.125 0.153 0.1 16 0.100 0.442 0.1 16 0.100 0.116 0*125 - 3 x 1 2 2 1.091 0 0 2 0 0 0 74 57 39 74 57 74 1.78 0. 33 6. 12 1.78 0.33 1.78 -2x21 -2x22 6.33 . . . . . . 12.43 - . r PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 10/09/80. C O A S TA L B E R M U D A G R A S S H AY, I R R I G AT E D . T E X A S E D W A R D S P L AT E A U E A S T E R N R E G I O N E S T I M AT E O C O S T S A N D R E T U R N S P E R A C R E CATEGORY PROJECTED YIELD UNIT 1. GROSS RECEIPTS COSTAL HAY TOTAL PROJECTED RETURNS C 8.00 TON INPUT USE VA R I A B L E C O S T S PREHARVEST COSTS 325.00 NITROGEN 100.00 PHOSPHATE 15.00 I R R I G AT I O N W AT E R FUEL & LUBE—TRACTOR EQUIPMENT I R R I G AT I O N R E PA I R S — — T R A C TO R EQUIPMENT I R R I G AT I O N 1 .09 LABOR———MACHI NERY 0.00 I R R I G AT I O N 56.02 O P E R AT I N G C A P I TA L S U B T O TA L , P R E H A R V E S T HARVEST COSTS 264.00 CUSTOM BALING H A U L & S TA C K 264.00 S U B T O TA L . H A R V E S T VALUE YOUR ESTIMATE 6 0.00 *___U_-__ S 480.00 *__. LB. LB. ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 0.25 0.25 BALE BALE ACRE 0.65 0.25 81.25 25.00 1.47 0.90 34.80 0.37 2.33 13.65 4.88 0.00 4.50 Lt 3.50 0 . 1 3 . __ 7*28 $ 171.94 S $ 171.60 66,QQ 237.60 $ S 409.54 s ACRE 3 . I N C O M E A B O V E VA R I A B L E C O S T S 4. FIXED COSTS DEPREC••INTEREST.TAXES TRACTOR EQUIPMENT IRRIGATION PRORATED ESTABLISHMENT LAND (NET SHARE-RENT) TOTAL FIXED COSTS E_3J S/UNIT ACRE T O TA L VA R I A B L E C O S T S r B-124KC10) INSUR. ACRE ACRE ACRE 81.15 DOL. ACRE ACRE 0.07 2.67 4.31 29.85 5.44 12x30. 54.26 S 5. TOTAL PROJECTED COSTS ACRE 463.81 S 6. NET PROJECTED RETURNS ACRE 16.19 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIOELINE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND/OR DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. COASTAL BERMUDAGRASS HAY. IRRIGATED, TEXAS EDWARDS PLATEAU EASTERN REGION ESTIMATED COSTS AND RETURNS PER ACRE ^ OPERATION PICKUP F E R T. A P P L I . PICKUP PICKUP F E R T. A P P L I . PICKUP F E R T. A P P L I . PICKUP TOTALS ITEM NO. 10 3.86 10 10 3,86 10 3,86 10 DATE FUEL,OIL. FIXED TIMES LABOR M A C H I N E L U B . . R E P. C O S T S OVER HOURS HOURS PER ACRE PER ACRE JULY 10 00 AUG AUG 10 SEPT 10 APR 00 APR 10 JUNE 1.00 JUNE 0.10 0._ 0.125 0.153 0.125 0.125 0. 153 0.125 0.153 0.100 0.1 16 0.100 0.100 0.1 16 0.100 0.1 16 0.57 0.74 0.57 0.57 0.74 0.57 0.74 33 78 33 33 78 0.33 1.78 125 __QxIQQ -2x21 .2x22 5.08 6.97 1.085 0.848 . c PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 10/09/80. B-124KC10) H Y B R I D S U D A N - S O R G H U M H AY & G R A Z I N G , D R Y L A N D , T E X A S E D W A R D S P L AT E A U E A S T E R N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E CATEGORY PROJECTED YIELO UNIT EBPJECTEP _ S/UNIT VA L U E YOUR E S T I M AT E 1. GROSS RECEIPTS SORGHUM HAY TOTAL PROJECTED RETURNS 2. VARIABLE COSTS PREHARVEST COSTS FORAGE SORG SEED NITROGEN r 3.50 TON 6 5 . 0 0 _ .- 2 2 1 x 2 2 $ 227.50 $ INPUT USE FUEL & LUBE—TRACTOR EQUIPMENT R E PA I R S — — T R A C TO R EQUIPMENT L A B O R — — M A C H I N E RY O P E R AT I N G C A P I TA L S U B T O TA L , P R E H A R V E S T HARVEST COSTS CUSTOM BALING H A U L & S TA C K S U B T O TA L , H A R V E S T 35.00 100.70 2.66 14.75 167.00 167.00 L B . LB. ACRE ACRE ACRE ACRE HOUR DOL. ACRE 0.40 0.25 BALE BALE ACRE 0.65 108.55 0.25 _ .1 t75 S 150.30 $ 4.50 0.13 __ $ 14.00 25.17 7.01 1.26 2.14 4.62 1 I .95 1x22 68.06 $ T O TA L VA R I A B L E C O S T S ACRE $ 218.36 S I N C O M E A B O V E VA R I A B L E C O S T S ACRE s 9.14 S 4. FIXED COSTS D E P R E C . I N T E R E S T, T A X E S £ I N S U R . TRACTOR EQUIPMENT LAND (NET SHARE-RENT) T O TA L F I X E D C O S T S ACRE ACRE ACRE ACRE 5. TOTAL PROJECTED COSTS 6. NET PROJECTED RETURNS $ 11 . 5 0 7.92 8.0Q 27.42 $ ACRE S 245.79 S ACRE S -18.29 S L A N D C H A R G E B A S E D O N P R E VA I L I N G R AT E S I N R E G I O N . I N F O R M AT I O N P R E S E N T E D I S P R E PA R E D S O L E LY A S A G E N E R A L G U I D E L I N E A N D I S N O T INTENDED TO RECOGNIZE OR PREDICT THE COSTS ANO RETURNS FROM ANY ONE PA R T I C U L A R F A R M O R R A N C H O P E R AT I O N . T H E S E P R O J E C T I O N S W E R E C O L L E C T E D A N D / O R D E V E L O P E D B Y S TA F F M E M B E R S O F T H E T E X A S A G R I C U LT U R A L E X T E N S I O N S E R V I C E A N D A P P R O V E D F O R P U B L I C AT I O N . r