r TEXAS DEEP EAST FOREWORD r The enterprise budgets for Texas Deep East Region are based on estimates of yields, production input quantities, and production practices which represent the best judgment of local producers, county Extension agents-agriculture, financial insti tution representatives, farm machinery dealers and others knowledgeable of the area. Variation in yields, production inputs and production practices should be expected for particular farms. Budgets for all major crops produced in the area are included for two levels of management, when applicable. Crop yields are directly related to levels of management. These differences are due largely to timing of operational practices which may not be evident in the budgets. The machinery inventory is applicable to both typical and high level management. In some bud gets custom rates, primarily harvesting, were used in lieu of the assumption that harvesting equip ment was owned. Budgets for establishing permanent type pasture grasses were prepared and used for prorating estab lishment costs in the respective pasture and hay budgets. Forage crops include expenses only be cause it is expected that the income will be derived from livestock enterprises. Land charges were based on the customary land lord's crop share less his proportionate share of certain production and harvesting inputs. A per acre land charge was made when crop share was not used. PROJECTIONS FOE PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 10/09/80. B-1241(C20) rCORN. ESTIMATED COSTS PER DEEP E A S T AND T ERETURNS XAS R E GACRE ION TYPICAL MANAGEMENT DRYLAND, C AT E G O RY PROJECTED PROJECT _______ YO0R Y I E L D U N I T $ / U N I T VA L U E E S T I M AT E 1. GROSS RECEIPTS CORN 70.00 BU. 2.65 TO TA L PROJECTED RETURNS 2. ___1 85.^0 $ 185.50 $ VA R I A B L E C O S T S I N P U T U S E PREHARVEST COSTS SEED CORN/GRAIN 0.25 BAGS 60.00 15.00 NITROGEN 120.00 LB. 0.23 27.60 PHOSPHORUS 60.00 LB. 0.2. 14.40 P O TA S S I U M 60.00 LB. 0 . 11 6.60 HERB PREMERGE 1.00 LB. 2.50 2.50 LIME 0.50 TON 16.00 8.00 FUEL & LUBE—TRACTOR ACRE 9.87 EQUIPMENT ACRE 0.05 R E PA I R S TRACTOR ACRE 3.10 EQUIPMENT ACRE 2.54 LABOR MACHINERY 2.79 HOUR 4.25 11 . 8 7 O P E R AT I N G C A P I TA L 53.50 DOL. 0.14 7A49 S U B TO TA L , PREHARVEST ACRE $ 109.02 $ CUSTOM COMBINING 70.00 BU. r HARVEST COSTS CUSTOM HAUL 70.00 BU. S U B TO TA L , HARVEST ACRE TO TA L 3. INCOME VA R I A B L E ABOVE COSTS VA R I A B L E ACRE COSTS 4. FIXED COSTS DEPREC.,INTEREST,TAXES 6 INSUR. TRACTOR ACRE EQUIPMENT ACRE LAND (NET SHARE-RENT) TO TA L FIXED COSTS ACRE 5. TO TA L 6. NET PROJECTED PROJECTED COSTS RETURNS 0.30 21.00 0.12 JL.40 $ 29.40 $ $ 138.42 $ ACRE $ $ ACRE $ 12.17 13.61 J5j.2Q 40.78 $ ACRE $ ACRE GOVERNMENT PAYMENTS NOT INCLUDED. PREPARED BY WAYNE D. TAYLOR, TAEX, OVERTON, TEXAS 47.08 179.19 $ 6.31 $ , $ PROJECTED 1980 INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDELINE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE ± ARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS MERE COLLECTED .ND/OR DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. Texu! -Vgricultural Extension Service . The Texas AAM University System . Daniel C. Pfannstiel, Director . College Station, Texas CORN, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT . CEERATION ITEM NO. DATE OFFSET DISC 1,34 NOV TA N D E M D I S C 1 , 3 8 N O V PICKUP 10 NOV TA N D E M D I S C 1 , 3 8 F E B RENT FERT APPLI. 1,86 FEB PICKUP 10 FEB TA N D E M D I S C 1 , 3 8 M A R PLANTER 1,48 MAR S P R AY E R , H E R B 6 2 M A R PICKUP 10 MAR R O L L I N G C U LT. 1 , 5 8 A P R PICKUP 10 APR R O L L I N G C U LT. 1 , 5 8 M AY R E N T F E RT A P P L I . 8 6 M AY PICKUP 10 M AY TOTALS FUEI,OIL, FIXED TIMES LABOR MACHINE LUB.,REP. C0STS OVER HOURS HOURS PER ACRE PER ACRE 1.00 1.00 0.10 1.00 1.00 0.10 1.00 1.10 1.10 0.20 1.00 0.10 1.00 1.00 0.10 0.260 0.243 0.125 0.243 0.135 0.125 0.243 0.334 0.0 0.250 0.292 0.125 0.292 0.0 0.197 0.184 0.100 0.184 0.103 0.100 0.184 0.253 0.262 0.200 0.222 0.100 0.222 0.103 0.100 1.82 1.69 0.20 1.69 0.86 0.20 1.69 2.48 0.09 0.40 2.01 0.20 2.01 0.00 _____ -Hxll 2.793 2.513 15.56 25.77 3x125 3.39 3.09 0. 17 3.09 0.81 0. 17 3.09 3.83 1.59 0.33 2.94 0. 17 2.94 0.00 - ^ . r PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 10/09/80. B-1241 (C20) CORN, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT CATEGORY PROJECTED YIELD UNIT 1. GROSS RECEIPTS CORN TOTAL PROJECTED RETURNS 2. VARIABLE COSTS PREHARVEST COSTS SEED CORN/GRAIN NITROGEN PHOSPHORUS POTASSIUM HERB PREMERGE LIME FUEL & LUBE—TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY OPERATING CAPITAL SUBTOTAL, PREHARVEST ***'■ HARVEST COSTS CUSTOM COMBINING CUSTOM HAUL SUBTOTAL, HARVEST 90.00 BU. Pj_QJE C£ED VALUE S/UNIT $ 238.50 238.50 $ $ 15.00 36.80 19.20 8.80 2.50 16.00 10.52 0.05 3.30 2.54 12.45 9A6 0 136.76 $ 2.65 YOUR ESTIMATE ,. ..ii. INPUT USE 0.25 160.00 80.00 80.00 1.00 1.00 BAGS LB. LB. LB. LB. TON ACRE ACRE ACRE ACRE 60.00 0.23 0.24 0 . 11 2.50 16.00 2.93 68.54 HOUR DOL. ACRE 4.25 0.14 BU. BU. 0.30 0.12 90.00 90.00 . __, __, 27.00 —12x80 mmm «»_» ,t- Ia ACRE $ ACRE $ 174.56 $ - 3. INCOME ABOVE VARIABLE COSTS ACRE $ 63.94 $ 4. FIXED COSTS DEPREC.,INTEREST,TAXES 6 INSUR. TRACTOR EQUIPMENT LAND (NET SHARE-RENT) TOTAL FIXED COSTS ACRE ACRE ACRE ACRE $~ 5. TOTAL PROJECTED COSTS ACRE $ 6. NET PROJECTED RETURNS ACRE $ TOTAL VARIABLE COSTS GOVERNMENT PAYMENTS NOT INCLUDED. PREPARED BY WAYNE D. TAYLOR, TAEX, OVERTON, TEXAS 37.80 $ 12.97 13.61 1_L_00 41.58 $ _ 216.14 $ 22.36 * PROJECTED 1980 INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDELINE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE RTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED D/OR DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. r- CORN, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION ITEM NO. DATE OFFSET DISC 1,34 NOV TA N D E M D I S C 1 , 3 8 N O V PICKUP 10 NOV TA N D E M D I S C 1 , 3 8 F E B RENT FERT APPLI. 1,86 FEB PICKUP 10 FEB TA N D E M D I S C 1 , 3 8 M A R PLANTER 1,48 MAR S P R AY E R , H E R B 6 2 M A R PICKUP 10 MAR R O L L I N G C U LT. 1 , 5 8 A P R PICKUP 10 APR R O L L I N G C U LT. 1 , 5 8 M AY R E N T F E R T A P P L I . 1 , 8 6 M AY PICKUP 10 M AY TOTALS FUEL,OIL, FIXED TIMES LABOR MACHINE LUB.,REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE 1.00 1.00 0.10 1.00 1.00 0.10 1.00 1.10 1.10 0.20 1.00 0.10 1.00 1.00 0.10 0.260 0.243 0.125 0.243 0.135 0.125 0.243 0.334 0.0 0.250 0.292 0.125 0.292 0. 135 0.197 0.184 0.100 0.184 0.103 0.100 0.184 0.253 0.262 0.2O0 0.222 0.100 0.222 0.103 Oj.10 0 1.82 1.69 0.20 K69 0.86 0.20 1.69 2.48 0.09 0.40 2.01 0.20 2.01 0.86 3.39 3.09 0. 17 3.09 0.81 0.17 3.09 3.83 1.59 0.33 2.94 0. 17 2.94 0.81 -0x22 -0x11 2.929 2.513 16.42 26.58 0x125 ^ ^ I - PROJECTICNS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 10/09/80. c COTTON, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT C AT E G O RY YOUR ___________ PROJECTED U N I T S / D N I T VA L U E E S T I M AT E YIELD 1. GBOSS RECEIPTS COTTON LINT COTTONSEED TOTAL PROJECTED RETURNS 2. 260.00 0.20 VA B I A B L E C O S T S I N P U T U S E PREHARVEST COSTS SD COTTON-UPLAND 24.00 NITROGEN 50.00 PHOSPHORUS 30.00 P O TA S S I U M 20.00 HERB PMEBGE EAR 1 .50 HERB PMERGE L AT E 0.87 HERB POST EMERGE 1.75 INSECT E A R LY 2.00 INSET APPL EAR 2.00 INSEC MID SEAS 0.03 INST APP MD SEAS 1.00 BACTERIACIDE 2.00 B A C T. APPL. 2.00 PUEL 6 LUBE—TRACTOR EQUIPMENT R E PA I R S T R A C T O R EOUIPMENT LABOR c B-1241 (C20) MACHINERY 3.43 O P E R AT I N G C A P I TA L 37.70 SUBTOTAL, PREHARVEST HARVEST COSTS DESICCANT 1.00 DEFOLIANT 1.00 CUST CTTN STRIP 260.00 GIN, BAG, TIES 0.52 EQUIPMENT EQUIPMENT LABOR MACHINERY 0.25 SUBTOTAL, HARVEST TOTAL VARIABLE COSTS LB. 0.75 195.00 TON 10 0.00 ______ $ 215.00 $ LB. 0.15 3.60 LB. 0.23 11 . 5 0 LB. 0.2 4 7.20 LB. 0 . 11 2.20 PINT 3.50 5.25 LB. 5.15 4.4 8 LB. 1.2 0 2.10 PINT 2.04 4.08 APPL 2.00 4.00 GAL. 20.30 0.63 APPL 1.00 1.00 LB. 7.40 14.80 APPL 2.00 4.00 ACRE 11 . 9 7 ACRE 0.06 ACRE 3.62 ACRE 3.00 HOUR 4.25 14.59 DOL. 0.14 S_,28 ACRE $ 103.37 S APPL APPL LB. BALE ACRE ACRE HOUR ACRE ACRE 9.7 5 9.75 3.15 3.15 0.06 15.60 39.00 20.28 0.02 0.39 4.25 l x Q fi $ 50.25 $ $ 3. INCOME ABOVE VARIABLE COSTS ACRE $ 4. FIXED COSTS DEPREC,INTEREST,TAXES £ INSUR. TRACTOR EQUIPMENT LAND (NET SHARE-RENT) TOTAL PIXED COSTS ACRE ACRE ACRE ACRE $ 5. TOTAL PROJECTED COSTS ACRE $ 153.62 $ 61.38 $ 14.79 19.68 75.4 2 9 $ 2 9 . 11 $ 6. HET PROJECTED RETURNS ACRE S - 1 4 . 11 $ LAND CHARGE BASED ON LANDLORD'S SHARE OF 1/4 OF GROSS LESS 1/4 OF FERTILIZER, INSECTICIDE AND GINNING. GOVERNMENT PAYMENTS NOT INCLUDED PREPARED BY WAYNE D. TAYLOR, TAEX, OVERTON, TEXAS PROJECTED 1980 INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDELINE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND/OR DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. r COTTCN, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT . OPERATION SHREDDER( .R) PICKUP OFFSET DISC LISTER-BEDDER FICKUP RENT FERT APPLI. POLLING CULT. SPRAYER, HERB PICKUP ROW DISC FICKUP PLANTER SPRAYER, HERB PICKUP POLLING CULT. SFRAYER, HERB PICKUP PICKUP TOTALS ITEM NO. 3,32 10 1,34 1,60 10 1,86 1,58 62 10 3,42 10 1,48 62 10 1,58 62 10 10 EATE FIXED FUEL,OIL, TIMES LABOR MACHINE L U E . , R E P. COSTS OVER HOURS HOURS PER ACRE PER ACRE CCT OCT NOV NOV NOV FEB FEB FEB FEB MAR MAR APR APR APR JUNE JUNE JUNE SEPT 1.00 0.245 0.186 0.10 0. 125 0. 100 1.00 0.260 0.197 1.00 0.227 0.172 0.20 0.250 0.200 1 . 0 0 0. 135 0. 103 1 .00 0.292 0.222 1.00 0.0 0.239 0.10 0.125 0.10C 1.00 0.157 0 . 11 9 0.10 0.125 0.100 1.20 0.364 0.276 0.25 0.0 0.060 C.10 0.125 0 . 1 0 0 3.00 0.877 0.665 1.00 0 . 0 0.239 0. 10 0.125 0.10C 0 . 2 0 _0_.250 -2x220 3.684 3.375 1.29 0.20 1.82 1.55 0.40 0.86 2.01 0.08 0.20 0.79 0.20 2.71 0.02 0.20 6.04 0.08 0.20 -0xH2 6. 15 0. 17 3.39 2. 15 0. 33 0.81 2. 94 1. 44 0. 17 1.29 0. 17 4. 18 0.36 0. 17 8.82 1. 44 0. 17 0. 33 19.06 34.46 . . r PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 10/09/80. GRAIN SORGHUM, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT CATEGORY PROJECTED UNIT YIELD 1. GBOSS RECEIPTS GRAIN SORGHUM TOTAL PROJECTED RETURNS 2. VARIABLE COSTS PBEHARVEST COSTS GRAIN SORG. SEED NITROGEN PHOSPHORUS POTASSIUM PRE-EMERGE HERB POST-EMERGE HERB INSECTICIDE INSECT APPL FUEL & LUBE—TRACTOR EQUIPMENT 26.00 4.65 YOUR ESTIMATE 120x90 1 2 0 . 9 0 $_. INPUT USE $ 3.76 18.40 9.60 4.40 3.07 0.63 ., 0.54 0.50 8.13 0.05 2.47 2.37 10.55 , ,_.75 67.23 $ - $ 15.00 6A50 21.50 ACRE $ 88.73 $ ES 3. INCOME ABOVE VARIABLE COSTS ACRE $ 32.17 $ 4. FIXED COSTS DEPREC,INTEREST,TAXES S INSUR. TRACTOR EQUIPMENT LAND (NET SHARE-RENT) TOTAL FIXED COSTS ACRE ACRE ACRE ACRE $ 10.04 14.97 24.$0 49.61 $ 5. TOTAL PROJECTED COSTS ACRE $ 138.35 $ 6. NET PROJECTED RETURNS ACRE $ -17.45 $ LABOR MACHINERY OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL, HARVEST 8.00 80.00 40.00 40.00 0.75 0.25 0.25 0.25 2.48 19.65 1.00 26.00 TOTAL VARIABLE COSTS r CWT. PROJECTED VALUE $/UNIT $ REPAIRS TRACTOR EQUIPMENT r B-1241(C20) LB. LB. LB. LB. ACRE ACRE ACRE ACRE ACRE ACRE ACRE ACRE HOUR DOL. ACRE 0.47 0.23 0.24 0 . 11 4.10 2.50 2.16 2.00 ACRE CWT. ACRE 15.00 0.25 4.25 0.14 . z$ LAND CHARGE BASED ON LANDLORD'S SHARE OF 30% OF GROSS LESS 30X OF FERTILIZER AND HAULING. GOVERNMENT PAYMENTS NOT INCLUDED. PREPARED BY WAYNE D. TAYLOR, TAEX, OVERTON, TEXAS PROJECTED 1980 INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDELINE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND/OR DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. GRAIN SORGHUM, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION ITEM NO. EATE SHREDDER(4R) 3,32 AUG PICKUP 10 AUG OFFSET DISC 1,34 NOV LISTER-BEDDER 1,60 NOV PICKUP 10 NOV RENT FERT APPLI. 86 FEB LISTER-BEDDER 1,60 FEB PICKUP 10 FEB PLANTER 1,48 MAR RENT FERT APPLI. 86 MAR S P R AY E R , H E R B 6 2 M A R PICKUP 10 MAR R O L L I N G C U LT. 1 , 5 8 A P R S P R AY E R , H E R B 6 2 A P R PICKUP 10 APR PICKUP 10 M AY TOTALS FUEL,OIL, FIXED TIMES LABOR MACHINE LUB.,REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE 1.00 0.10 1.00 1.00 0.10 1.00 1.00 0.10 1.10 1.10 1.10 0.10 1.50 0.25 0.10 0.10 0.245 0.125 0.260 0.227 0.125 0.0 0.227 0.125 0.334 0.0 0.0 0.125 0.439 0.0 0.125 0.1 25 0.186 0.100 0.197 0.172 0.100 0.103 0.172 0.100 0.253 0 . 11 3 0.262 0.100 0.332 0.060 0.100 0.100 1.29 0.20 1.82 1.55 0.20 0.00 1.55 0.20 2.48 0.00 0.09 0.20 3.02 0.02 0.20 -0x20. 6.15 0. 17 3.39 2. 15 0. 17 0.00 2.15 0. 17 3.83 0.00 1.59 0. 17 4.41 0.36 0.17 -Oxll 2.483 2.450 13.03 25.0 1 . . c PROJECTICNS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 10/09/80. GRAIN SORGHUM, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT CATEGORY 1. GROSS RECEIPTS GRAIN SORGHUM TOTAL PROJECTED RETURNS 2. VARIABLE COSTS PROJECTED YIELD UNIT 35.00 CWT. PR O J ECT Ej) YOUR 5 / U N I T VA L U E E S T I M AT E 4.65 163.75 $ 162.75 $_ INPUT USE PREHARVEST COSTS GRAIN SORG. SEED NITROGEN PHOSPHORUS POTASSIUM PRE-EMERGE HERB r B-1241 (C20) POST-EMERGE HERB INSECTICIDE INSECT APPL FUEL & LUBE—TRACTOR EQUIPMENT REPAIRS TRACTOR EQUIPMENT LABOR MACHINERY OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL, HARVEST 8.00 80.00 40.00 40.00 0.75 0.25 0.25 0.25 2.82 20.00 1.00 35.00 LB. LB. LB. LB. ACRE ACRE ACRE ACRE ACRE ACRE ACRE ACRE HOUR DOL. ACRE 0.47 0.23 0.24 0 . 11 4.10 2.50 2.16 2.00 ACRE CWT. ACRE 15.00 0.25 3.76 18.40 9.60 4.40 3.07 0.63 0.54 0.50 9.78 0.05 2.99 2.28 12.00 —2x§0 70.80 $ 4.25 0.14 15.00 JL_.75 23.75 $ ACRE 94.55 $ 3. INCOME ABOVE VARIABLE COSTS ACRE 68.20 $ 4. FIXED COSTS DEPREC. ,INTEREST,TAXES 6 INSUR. TRACTOR EQUIPMENT LAND (NET SHARE-RENT) TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 12.07 13.95 _36^48 62.50 $ ~ 5. TOTAL PROJECTED COSTS ACRE 157.06 $ 6. NET PROJECTED RETURNS ACRE TOTAL VARIABLE COSTS $ ,_. 5.69 $ LAND CHARGE BASED ON LANDLORD'S SHARE OF 30% OF GROSS LESS 30% OF FERTILIZER AND HAULING. GOVERNMENT PAYMENT NOT INCLUDED. PREPARED BY WAYNE D. TAYLOR, TAEX, OVERTON, TEXAS PROJECTED 1980 INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDELINE AND IS NOT .:NTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND/OR DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. GRAIN SORGHUM, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION SHREDDER (4R) PICKUP OFFSET DISC LISTER-BEDDER PICKUP RENT FERT APPLI. LISTER-BEDDER PICKUP PLANTER RENT FERT APPLI. SPRAYER, HERB PICKUP TOOL BAR CULT. PICKUP TOOL BAR CULT. RENT FERT APPLI. PICKUP TOTALS ITEM NO. 3,32 10 1,34 1,60 10 86 1,60 10 1,48 86 62 10 1,56 10 1,56 86 10 DATE TIMES LABOR OVER HOURS AUG AUG NOV NOV NOV FEB FEB FEB MAR MAR MAR MAR APR APR MAY MAY MAY 1.00 0.10 1.00 1.00 0.10 1.00 1.00 0. 10 1.10 1.10 1.10 0.10 1.50 0.10 1.00 1.00 0.10 FUEL,OIL, FIXED ACHINE LUB.,REP. COSTS HOURS PER ACRE PER ACRE 2x102 1.29 0.20 1.82 1.55 0.20 0.00 1.55 0.20 2.48 0.00 0.09 0.20 3.07 0.20 2.04 0.00 0_t20 -SLxll 2.752 15.10 26.02 0.245 0.125 0.260 0.227 0.125 0.0 0.227 0.125 0.334 0.0 0.0 0.125 0.468 0.125 0.312 0.0 0.125 0.186 0.100 0.197 0.172 0.100 0.103 0.172 0.100 0.253 0 . 11 3 0.262 0.100 0.354 0.100 0.236 0.103 2.824 6.15 0.17 3.39 2. 15 0. 17 0.00 2.15 0. 17 3.8 3 0.00 1.59 0.17 3.47 0.17 2.31 0.00 . .