c TEXAS HIGH PLAINS II r FOREWORD The enterprise budgets for Texas High Plains II Region are based on estimates of yields, production input quantities, and production practices which represent the best judgment of local producers, county Extension agents-agriculture, financial institution representatives, farm machinery dealers and others knowledgeable of the area. Variation in yields, production inputs and production practices should be expected for particular farms. Budgets for all major crops produced in the area are included for two levels of management, when applicable. Crop yields are directly related to levels of management. These differences are due largely to timing of operational practices which may not be evident in the budgets. The machinery inventory is applicable to both typical and high level management. In some bud- r gets custom rates, primarily harvesting, were used in lieu of the assumption that harvesting equipment was owned. budgets for establishing permanent type pasture grasses were prepared and used for prorating establishment costs in the respective pasture and hay budgets. Forage crops include expenses only because it is expected that the income will be derived from livestock enterprises. Land charges were based on the customary landlord's crop share less his proportionate share of certain production and harvesting inputs and a percentage of fixed cost on the irrigation system when applicable. A per acre land charge was made when crop share was not used. TEXAS HIGH PLAINS 'II REGION Assumed Prices Paid and Received by Farmers V Item Unit Price • Prices Paid (1978) Seed Cotton (Del In ted) Grain Sorghum Soybean Wheat (Cleaned and Treated) Alfalfa Corn (For Grain) Corn (For SHaqe) Forage Sorghum Sugar Beets lb. lb. lb. bu. lb. bag lb. lb. lb. Custom Rates Cottom (Strip and Haul) Combining Corn Combining Soybeans Combining Wheat (Dryland) Combining Wheat (Irrigated) Combining Grain Sorghum (Dryland) Combining Grain Sorghum (Irrigated) Sugar Beets (Harvest and Haul) Hay Harvest, Swath, Bale, Haul Corn (Harvest) Drying Corn cwt. bu. acre acre acre acre cwt. ton bale bu. bu. 1.00 .30 10.00 7.00 7.00 7.00 .30 4.00 .60 .30 .10 Hauling Corn Grain Sorghum Soybeans Wheat bu. cwt. bu. bu. .05 .10 .10 .10 Cotton Ginning cwt. 1.75 Fuel and Lubricants Gasoline L.P. Gas Diesel Fuel Motor 011 (Heavy Duty, Detergent) gal. gal. gal. gal. .55 .35 .42 2.40 $ .33 .45 .18 4.00 1.50 45.00 45.00 .35 1.25 ft Texas High Plains II Region - 2- Item Unit Fertilizer (Bulk) Nitrogen (Anhydrous) Phosphorous lb. lb. Labor (Tractor) Labor (Irrigation) hour hour Chemicals Pre-emergence Herbicide Methyl Parathion Malathion 5 gal. gal. gal. Hail Insurance Wheat Cotton Corn $100 $100 $100 Price .10 .18 6.00 5.00 140.00 5.25 11.00 8.00 12.00 8.00 .10 Interest Prices Received (1978) Cotton Cottonseed Wheat Grain Sorghum Alfalfa Hay (Standing in Field) Forage Sorghum Hay (Baled) Ensilage (Corn) Standing in Field Corn (Grain) ^vbeans Sugar Reets (14% Sugar) 1/ lb. l i n t ton bu. cwt. ton ton ton bu. bu. ton .51 80.00 3.00 3.45 45.00 45.00 16.00 2.12 5.35 23.00 These price assumptions are not to be Interpreted as predictions or prospective prices TEXAS HIGH PLAINS II RE6I0N Estimated Machinery and Equipment Cost Per Hour of Use Machinery Item and Size Tractor - 150 HP Tractor - 125 HP Tractor - 90 HP Tractor - 40 HP Pickup 10 Rolling Cult. T Rolling Cult. - 26.6 Ft. Cultivator 8R Lister Plntr 6R T Bed Plntr 8R Tandem Otsc T Tandem Disc T Offset Disc T Offset Disc T Chisel - 23 Ft. Moldboard 4B Molcfcoard 6B Rodweeder T Sand Fighter Furrow Opener T Packer Lister 6R T Lister 8R T Shredder 2R Shredder 4R T Grain Drill T Item No. 2 3 4 5 10 30 31 34 36 39 40 41 42 43 44 46 47 50 51 52 53 54 55 56 57 58 Purchase Price $22,000 16,500 11,000 6,000 5,000 2,150 2,800 3,450 2,700 3,000 2,000 3,950 3,200 9,000 4,150 1,800 2,200 3,200 535 1,200 350 1,050 1,650 650 2,000 2,300 Estimated Years of Use 5 5 5 10 3 8 Estimated Hours of Use Fixed Costs Per Hour 2500 2500 2500 3000 2l00 1400 1400 1400 1050 1400 1400 1400 1400 1400 1400 1400 1400 1680 $ 3.55 2.09 .71 1.49 1.37 1.13 1.46 1.80 1.89 1.57 1.04 2.07 1.67 7.74 2.17 .95 1.15 1.39 .56 Variable Costs Per Hour $ 5.20 4.36 3.26 2.19 2.68 .86 1.13 1.40 1.44 1.21 .81 1.59 1.29 2.99 1.67 .71 .88 1.08 700 840 1.04 1400 1050 1050 .18 .73 1.14 875 875 840 .54 .43 .81 .15 .57 .90 .42 1.67 2.02 1.29 1.53 (Continued) CJ Texas High Plains II Region (Continued) Machinery Item and Size Box Float T Herb Spr/Disc T Rolling Cult. H Cultivator 8R H Lister Plntr 8R H Bed Plntr 8R H Tandem Disc H Tandem Disc H Offset Disc H Chisel H MlfedRoll over H Moldbotrd 6B H Rodweeder H Sandfighter H Furrow Opener H Packer H Lister 8R H Beet Thinner H Shredder 4R H Grain Drill H Gr Drill H Float Box H Herb Spr/Disc H Item No. 60 61 66 69 72 74 75 76 78 79 81 82 85 86 87 88 90 91 92 93 94 95 96 Purchase Price $ Estimated Years of Use Estimated Hours of Use Fixed Costs Per Hour Variable Costs Per Hour 450 700 700 .48 .35 2,150 3,450 3,200 3,000 2,000 3,950 9,000 4,150 3,000 2,200 3,200 1400 1400 1050 1400 1400 1400 1400 1400 1400 1400 1680 1.46 1.80 2.24 1.57 1.04 2.07 4.92 2.17 1.57 1.15 1.39 1.13 1.40 1.71 1.21 535 1,200 700 840 1.04 350 1400 1050 400 1,650 3,500 2,000 2,300 6,000 400 450 875 875 840 840 700 700 $ .43 .56 .18 $ .31 .81 1.59 3.29 1.67 1.21 .88 1.08 .43 .81 .15 .90 1.14 2.92 1.67 2.00 5.22 2.26 1.29 1.55 4.04 .43 .48 .31 .35 . * ALFALFA 5 E S T A 8 L * * F U R R O W IRRIGATED <NATURAL G A S ) . T E X H I G H P L A I N S II REGION E S T I M A T E D C O S T S A N D R E T U R N S P&* A C R E TYPICAL MANAGEMENT UNIT PRICE OR COST/UNIT 1* G R O S S R E C E I P T S F R O M P R O D U C T I O N TOTAL 2* V A R I A B L E C O S T S PREHARVSST SEEO AERIAL SEEDING MACHINERY TRACTORS IRRIGATION MACHINERY LABOR!TRACTOR S MACHINERY) LABOR!IRRIGATION! INTEREST ON OP, CAP* SUBTOTAL* PftE»HARVEST VALUE Cfi COST QUANTITY < * , t ,„,„ 0*0 S LBS* ACRE ACRE ACRE ACRE HOUR HOUR OOL* 1*50 5*00 2*85 10*52 17*50 6*00 5*00 0*10 20*00 1*00 1*00 1*00 1*00 4*37 1*72 20*31 30*00 5*00 2*85 10*52 17*50 26*20 8*61 ,2*03 102*71 s s HARVEST COSTS 0*0 SUBTOTAL* HARVEST S 102*71 TOTAL VARIABLE COST S-102%71 3* INCOME ABOVE VARIABLE COSTS 4* FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND CNET RENT) TOTAL FtXEO COSTS s s 3*83 12*03 13*86 4frQ7 72*79 5* TOTAL COSTS * 175*50 6* NET RETURNS $-175.50 ACRE ACRE ACRE ACRE 3*83 12*03 13*86 43*07 1*00 1*00 1*00 1*00 LANO CHARGE USES S50/ACRE LESS SOX OF IRRIGATION FIXED COSTS* PREPARED BY RAY SAMMONS* TAEX* AMARILLO* TEXAS PROJECTEO 1979 ALFALFA ESTA8L.0 FUPRO* IRRtGATEO fNATURAL GAS). TEX HIGH PLAINS II REiGlQN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION ITEM NO* OATE FUEL.OIL. FIXEC TIMES LABOR MACHINE LUB*.REP* COSTS OVER HOURS HOURS PER ACRE PER ACRE mmm*mmm*mmmam*oa*nm* MOLOBOARO 4B TM TANOEM DISC TM PICKUP t/2 T O N TANDEM D I S C TM BOX F L O A T TM TANDEM D T S C TM TANDEM 01SC TM PICKUP 1/2 TON 3*46 JULY 3 .4 3 JULY 10 JULY 3*40 AUG 3,60 AUG 3.40 AUG 3.4 0 AUG 10 NOV TOTALS 0*669 1*0© 0*303 LOO 0ol25 0*10 2*00 0*606 2*00 1*212 1*00 0*303 1*00 0*303 0 * 8 0 _£&&££ 0*494 0*166 0*100 0*337 0*673 0*166 0*168 • Qlfiflfl 2*94 1*02 0*27 2403 3*73 1*02 1*02 4*367 2*609 13*37 .JU2S LAND CHARGE USES SSO/ACRE LESS SOX OF I R R I G A T I O N F I X E 0 PREPARED BY RAY SAMMONS. TAEX. AMARILLO. TEXAS BUDGET I D E N T I F I C A T I C N NUMBER-— NNUAL CAPITAL MONTH 12 011002402 220 0 3*73 1*30 0*19 2*60 4*90 1*30 1*30 15*66 COSTS* PROJECTED 1979 ALFALFA. FURROW IRRIGATED (NATURAL GAS I• TEXAS HIGH PLAINS II REGION ESTIMATED COSTS ANO RETURNS PER ACRE TYPICAL MANAGEMENT UNIT GROSS RECEIPTS FROM PRODUCTION HAY TOTAL VARIABLE COSTS PREHARVEST PERT (P>APPL«D MACHINERY IRRIGATION MACHINERY LABOR€TRACTOR & MACHINERYI LABOR(IRRIGATION) INTEREST ON OP* CAP. SUBTOTAL* PftE»HARVEST TON VALUE CR COST PRICE OR COST/UNIT QUANTITY •5.00 6*00 S 270*00 LBS* ACRE ACRE HOUR HOUR DOL* 0*18 2*14 30*00 6*00 5*00 0*10 80*00 1*00 1*00 1*00 2*95 16*66 14*40 2*14 30*00 6*30 14*76 s HARVEST COSTS SUBTOTAL. HARVEST 9m S ~0*0 TOTAL VARIABLE COST 6e*97 3* INCOME ABOVE VARIABLE COSTS 4* FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY PRORATEO ESTAS. COST LANO (NET RENT! TOTAL FIXED CCSTS 66*07 • 201*03 s ACRE ACRE ACRE ACRE ACRE I.51 0*0 23*76 175*50 38* 12 1*00 1*00 1*00 0*20 1*00 1*51 0*0 23*76 39*10 96*49 5* TOTAL COSTS s 167*46 6* NET RETURNS s 102*54 LANO CHARGE USES 650/ACRE LESS 50 PERCENT OF IRRIGATION FIXED COSTS* ESTABLISHMENT COSTS PRORATED OVER 5 YEARS* PREPARED BY RAY SAMMONSt TAEX. AMARILLO* TEXAS PROJECTEO 1979 ALFALFA. FURROW I P P I G A T E O <NATURAL GASft. TEXAS H I G H P C A I N S I I ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT ITEM OPERATION PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP 1/2 NO* TON t / 2 TON 1/2 1/2 1/2 1/2 1/2 1/2 TON TON TON TON TON TON 10 10 10 10 10 10 10 10 DATE OCT MAR APR MAY JUNE JULY AUG SEPT TOTALS REGION FUEL,OIL, FIXED T I M E S LABOR MACHINE L U 6 * * R E P * COSTS OVER HOURS HOURS PER ACRE PER ACRE 0*10 0.10 0*10 o*io o*to 0*10 0*10 0*10 0*125 0*125 0*125 0*125 0*125 0*125 0*125 0*100 0*100 0*100 0*100 0*100 0*100 0*100 -JUI2S ..fl.iflfi 1*000 0*800 0*27 0*27 0*27 0*27 0*27 0*27 0*27 QMIX 0*19 0*19 0*19 0*19 0*19 0*19 0*19 -JUJfi 2*14 1*51 LAND CHARGE USES S50/ACRE LESS 50 PERCENT OF IRRIGATION FIXEO COSTS* ESTABLISHMENT COSTS PRORATED OVER 5 YEARS* PREPARED BY PAY SAMMCNS. TAEX. AMARILLO, TEXAS PROJECTED 1979 BUDGET IDENTIFICATION N U M B E R — \NNUAL CAPITAL MONTH 9 81 002602 220 0 ALFALFA ESTABLe* FURROW IRRIGATED (NATURAL GAS)* TEX HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER/ACRE HIGH LEVEL MANAGEMENT UNIT PRICE OR COST/UNIT QUANTITY 1* GROSS RECEIPTS FROM PRODUCTION TOTAL VALUE OR COST % 0*0 S 30c 00 5*00 2*97 9«18 17#S0 20*38 6*61 JU99 95*63 HARVEST COSTS SUBTOTAL* HARVEST S 0*0 TOTAL VARIABLE COST $ 95*6 3 $ -95*63 2* VARIABLE COSTS PREHARVEST SEED AERIAL SEEDING MACHINERY TRACTORS IRRIGATION MACHINERY LABORS TRACTOR & MACHINERY! LABORSIRRIGATIONI INTEREST ON OP* CAP* SUBTOTAL. PRE-HARVEST LBS* ACRE ACRE ACRE ACRE HOUR HOUR DOL* 1*50 5*00 2*97 9*18 17*50 6*00 5*00 0*10 20*00 1*00 1*00 1*00 1*00 3*40 1*72 19*91 3* INCOMF ABOVE VAGIAeLE COSTS 4* FIXEO COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED CCSTS % ACRE ACRE ACRE ACRE 4*08 12*74 13*66 43*07 4*06 12*74 13*86 1*00 1*00 1.00 1*00 $ 73*75 5* TOTAL COSTS $ 169*38 6* NET RETURNS $•169*38 LANO CHARGE USES 3S0/ACRE LESS 50* OF IRRIGATION FIXED COSTS* PREPARED BV RAY SALMONS* TAEX* AMARILLOo TEXAS PRCJECTEO 1979 10 ALFALFA ESTA8L** FURROtt IRRIGATED (NATURAL GASI* TEX HIGH PLAINS II REGION EST IMATEO COSTS AND RETURNS PER/ACRE HIGH LEVEL MANAGEMENT OPERATION TEM NO* DATE TIMES LABOR MACHINE LU6*«REP* COSTS HOURS HOURS PER ACRE PE& ACRE OVER MLBD ROLLOVR HLM TANDEM DISC HLM PICKUP I/? TON TANDEM DISC HLM BOX FLOAT HLM TANDEM DISC HLM PICKUP 1/2 TON 2.81 2.76 10 2.76 2,93 2.76 10 JULY JULY JULY AUG AUG AUG NOV I. 00 0*815 0*453 I.00 0*175 0*097 0*10 0*125 0*100 UOO 0*175 0*097 2*00 1*131 0*629 2*00 0*350 0*195 0*50 .-£i£2£ -JUS04 TOTALS 3*396 2*070 3*37 0*76 0*27 0*76 4*12 1*52 5*69 2*35 U*2* -4*35 12*15 16*82 5*10 1*16 0*19 uia LAND CHARGE USES SS0/4CRE LESS 50% OF IRRIGATION FIXED COSTS* PREPAREO BY RAY SAMMGNSt TAEX* AMARILLQ. TEXAS BUDGET IDENTIFICATION NUMBER-"— ANNUAL CAPITAL MONTH 12 811002401 220 0 PROJECTED 1979 11 ALFALFA. FURROW IRRIGATEO (NATURAL GAS!. TEXAS HIGH PLAINS II REGION ESTIMATED COSTS ANO RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT I* GROSS RECEIPTS FROM PRODUCTION HAY TOTAL 2* VARIABLE COSTS PREHARVEST FERT <P! APPL*D MACHINERY IRRIGATION MACHINERY LABORITRACTOR & MACHINERY! LABORCIRRIGATION! INTEREST ON OP* CAP* SUBTOTAL* PRE-HARVEST PRICE OR COST/UNIT QUANTITY VALUE CR COST s TON 45*00 8*00 .3fiOfv3 360*00 s LBS* ACRE ACRE HOUR HOUR DOL* 0*18 2* 14 42*50 6*00 5*00 0*10 21*60 2*14 42*50 6*10 20*91 120*00 1*00 1*00 1*00 4*18 26*77 $" 95*83 HARVEST COSTS 9 * 0*0 $ 95.83 SUBTOTAL* HARVEST jg^*-\ TOTAL VARIABLE CCST $ 264*17 3* INCOME ABOVE VARIABLE COSTS A* FIXEO COSTS MACHINERY TRACTORS IRRIGATION MACHINERY PRORATED ESTAB* COST LAND (NET RENT! TOTAL FIXED CCSTS s ACRE ACRE ACRE ACRE ACRE 1*51 0*0 33*66 169*38 33*17 1*51 0*0 33.66 24*22 . 1*00 1*00 1*00 0*14 1*00 $ 92*57 5. TOTAL COSTS s 186*40 6* NET RETURNS s 171*60 LANO CHARGE USES SSO/ACRE LESS SO PERCENT OF IRRIGATION FIXEO COSTS* ESTABLISHMENT COSTS PPGRATEO OVER 7 YEARS* PREPARED BY RAY SAMMONS. TAEX* AMARILLO* TEXAS PROJECTED 1979 12 ALFALFA. FURROW IRRIGATED {NATURAL GAS*. TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT l a a w a a n a a i a ITEM NO. OPERATION PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP 1/2 1/2 1/2 1/2 1/2 1/2 1/2 i/2 TON TON TON TON TON TON TON TON 10 10 I 0 10 10 10 10 to DATE MAR APR MAV JUNE JULY AUG S6PT OCT TOTALS TIMES OVER 0.10 0.10 0*10 o.io 0.10 0.10 0.10 0.10 FIXEC F U E L . O I L .• COSTS LABOR M A C H I N E L U 8 . . R E P a , HOURS P E R ACRE P E R ACRE HOURS o* it 0.125 0.125 0.125 0.125 0.125 0.125 0.125 OelOO 0.100 0.100 0.100 0.100 0.100 0 . 100 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.19 0.19 0 . IS 0.19 0.19 0 . 19 .. £ A 1 2 £ -JUiflfl -JU2Z -JUAS 1.000 0.600 2.14 1.51 LANO CHARGE USES S5C/ACRE LESS 50 PERCENT OF IRRIGATION FIXED COSTS. fcSTAflLISHMENT COSTS PRCRATEO OVER 7 YEARS. PREPARED 8Y PAY SAMMCNS. TAEX. AMAfcILLO. TEXAS PROJECTEO 1579 c*UO'*ET IDENTIFICATION NUMBER-—* NNUAL CAPITAL MONTH 10 81 002901 220 0 ^ \ 13 CORN FOR GRAIN. IRRIGATED, (NATURAL G A S ) . TEXAS HIGH P L A I N S I I ESTIMATED COSTS AND RETURNS PER AC«E TYPICAL MANAGEMENT UNIT GROSS RECEIPTS FRCM PRODUCTION CORN TOTAL VARIABLE COSTS PREHARVEST SEED FERT CN> APPL«0 HERB. POSTEMERCE INSECTICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR!TRACTOR 6 MACHINERY) LABOR(IRRIGATION) INTEREST ON CP* CAP. SUBTOTAL* PRE-HARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL CUSTOM DRYING SUBTOTAL. HARVEST VALUE OR COST PRICE OR COST/UNIT QUANTITY * BU* 2*12 125*00 .2££A4* % 265*00 $ BAGS LBS* ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. 45*00 0*10 8*75 15*00 4*87 8*77 27*50 6*00 5*00 0* 10 15*75 20*00 e*7S 15*00 4*37 6*77 27*50 27*09 13*53 0*35 200*00 1*00 1*00 1*00 1*00 1*00 4*52 2*71 50*70 f.fQ7 * 146*33 $ BU* BU* BU* 0*30 0*05 0*10 s 37*50 6*25 12*50 56*26 s 202*58 125*00 125*00 125*00 TOTAL VARIABLE CCJjT 3* INCOME ABOVE VARIABLE COSTS A* FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND <NET RENT) TOTAL FIXEO COSTS ftfiGION 62*42 ACRE ACRE ACRE ACRE 5*83 10*03 21*78 37*03 1*00 1*00 1*00 1*00 5*63 10*03 21*78 * 74*67 5. TOTAL COSTS * 277*25 6* NET RETURNS S -12*25 LANO (NET RENT) BASED ON 33% OF GROSS INCOME LESS 33X OF FERT, GAS. HERB. INSECT* HARVEST 6 5 0 % OF FIXEO IRRIG COSTS* GOVT PROGRAM PAVMT NCT INCL. PREPARED BY RAY SAMMQNS. TAEX. AMARILLO. TEXAS PROJECTED 1979 14 CURN FOR G R A I N * I R R I G A T E D * (NATURAL G A * » * TEXAS H I G H P L A I N S E S T I M A T E D C O S T S AND RETURNS PER ACRE T Y P I C A L MANAGEMENT • •«O««0l OPERATION TM SHREDDER 4R P I C K U P 1 / 2 TON OFFSET D I S C TM BOX F L O A T TM TM L I S T E R 6P L I S T E R - P L N T 6 R TM TM RODWEEOER ROLLING CULT TM FURROW OPENER TM ITEM NO* 3,57 10 3*42 3*60 3*54 3*36 3*50 3.30 3*52 REGION FUEL.OIL. FIXE COST LUB**REP* PER ACRE PER AC DATE T I M E S LABOR M A C H I N E HOURS HOURS OVER NOV DEC FEB MAR MAR APR APR MAY MAY 0 • 354 1*00 1*20 1*500 3*00 0*909 1-00 0*606 0*221 1*00 0*371 1*00 0*141 1*00 0*212 1*00 1 * 0 0 ,.JU£0£ 0*197 1*200 0*505 0*337 0*A2J 0*206 0*079 0*118 1*29 3*22 3*30 1*67 0*71 1*36 0*50 0*72 1*72 2*27 4*42 2*25 0*86 1*88 0*65 0*92 -saui ~*U£Z -£*££ 4*516 £•675 13*64 15*86 TOTALS LAND ( N E T R E N T ) I N S E C T * HARVEST PREPARED 9 V RAY II BASEC ON 3 3 % O F GROSS INCOME L E S S 3 3 X OF F E R T . G A S * M E R 6 • C SOX CF F I X E D I f t R | G C O S T S * GOVT PROGRAM PAYMT NOT I N C L * SAMMQNS* T A E X * A M A R I L L O . T E X A S PROJECTED 1979 >JDGET I D E N T I F I C A T I C N A 1UAL C A P I T A L MOKTp NUMBER—10 72 002602 220 0 / ^% 15 CORN FOR GRAIN* IRRIGATED* (NATURAL GAS)* TEXAS HIGH PLAINS II RfeGICN ESTIMATEO COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT GROSS RECEIPTS FRCM PRODUCTION CORN TOTAL VARIABLE COSTS PREHARVEST SEED FERT (N> APPL'D INSECTICIDE HERBICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR<TRACTOR 6 MACHINERY) LABOR(IRRIGATION! INTEREST ON OP* CAP* SUBTOTAL* PRE-MARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL CUSTOM DRYING SUBTOTAL* HARVEST PRICE OR COST/UNIT QUANTITY $ BU* 2*12 190*00 .dlSAfiJ * 316*00 S BAGS LBS* ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL* 45*00 0*10 20*00 9*60 4*62 10*07 30*00 6*00 5*00 0*10 0*32 240*00 1*00 1*00 1*00 1«00 1*00 4*40 2*95 56*85 14*40 24.00 20*00 9.^0 4*82 10*07 30*00 26*42 14*76 _«£&£2 $ 159*76 $ BU* BU* BU* 0*30 0*05 0*10 45*00 7*50 150*00 180*00 150*00 $ TOTAL VARIABLE COPT ~1£*S4 67*30 S 227*26 3* INCOME ABOVE VARIABLE COSTS 4« FIXEO COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND CNET RENT) TOTAL FIXED COSTS VALUE OR COST S 90*74 9 ACRE ACRE ACRE ACRE 5*80 13*98 23*76 45.97 1*00 1*00 1*00 1.00 5*80 13.98 23*76 S 69*51 5* TOTAL COSTS * 316*77 6* NET RETURNS S 1.23 LAND CNET RENT) BASED ON 33X OF GROSS INCOME LESS 33X OF PERT* GAS* HEQE. INSECT* HARVEST € 50* CF FIXED IRRIG COSTS* GOVT PROGRAM PAYMT NOT INCL* PREPAREO BY RAY SAPPGNS* TAEX* AMARILLO* TEXAS PRCJECTEO 1979 16 CORN FOR G R A I N * I R R I G A T E D * CNATURAL G A S ) * T E X A S H I G H E S T I M A T E D C O S T S ANO R E T U R N S PER ACRE H I G H L E V E L MANAGEMENT OPERATION TEV NO* OATE T I M E S LABOR M A C H I N E OVER HOURS HOURS SHREDDER 4 R HLM CHISEL HLM CHISEL HLM P I C K U P 1 / 2 TON OFFSET D I S C HLM BOX F L O A T HLM L I S T E R 8R HLM BOOWEEDER HLM L I S T E R 8R HLM L I S T - P L N T R 8 R HLM R O L L I N G C U L T HLM FURROW OPENERHLM 2,92 2*79 2*79 10 2.70 2*99 2*90 2*85 2*90 2*72 2*66 2*87 KOV NOV DEC OEC FEB MAR MAR APR APR APR MAT MAY 1.00 0*279 0*155 0*104 1.00 0*188 0.104 LOO 0.188 1*500 U20 1*200 0*074 1.00 0.133 0*629 2.00 1*131 I.00 0*145 0*081 0.071 0*127 1.00 0*149 I . 00 0.081 0*233 0*129 1.00 0*086 1.00 0*155 1 . 0 0 ..4±l£ft - G A I A A 4*404 TOTALS BUDGET ANNUAL II REGION mmummimmmm • • « « « •»«««••»•* LAND ( N E T RENT I NSECT* HARVEST •• FPARED BY R A Y PLAINS 2*813 FUEL.OIL* FIXEO LUG*.REP* COSTS PER ACRE PER ACRE 1*17 0.82 0.82 3.22 0.70 4*12 0.58 0.62 0*58 1*03 0.64 1*77 1*28 1*28 2*27 1*22 5*89 0.85 0.77 0.85 1*60 0*9C -5*25 .1*45. 14.89 19.78 BASED ON 3 3 X OF GROSS INCOME L E S S 3 3 X OF F E R T . G A S * H E R B . & 5 0 * OF F I X E O I R R I G C O S T S * GOVT PROGRAM PAYMT NOT I N C L * SAPMCKS. TAEX* A M A R I L L O . TEXAS PROJECTED 1 9 7 9 IOENTIFICATICN C A P I T A L MONTH NUMBER-*10 72 002601 220 0 17 CORN FOR SILAGE. IRRIGATED, (NATURAL GAS I, TEXAS HIGH PLAINS It «6<iICN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT GROSS RECEIPTS FROM PRODUCTION CORN SILAGE TOTAL 2* VARIABLE COSTS PREHARVEST SEED PERT (N) APPL«D FERT IP! APPL»D HERBICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LABQR(TRACTOR & MACHINERYI LABOR(IRRIGATION) INTEREST ON OP* CAP* SUBTOTAL* PRE-HARVEST TON PRICE OR COST/UNIT QUANTITY 16*00 VALUE CR COST ie*oo $ 2ae»o© LBS* LBS* LBS* ACRE ACRE ACRE ACRE HOUR HOUR DOL* 0*60 0*10 0*19 8*75 4*74 11*15 27*S0 6*00 5*00 0*10 25*00 200*00 60*00 1*00 1*00 1*00 1*00 5*21 2*71 42*96 15*00 20*00 11*40 e**5 4*74 11*15 27*50 31*27 13*53 4*j0. $ 147*64 s_ HARVEST COSTS t 0*0 SUBTOTAL« HARVEST s 147*64 TOTAL VARIABLE COST s 140*36 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET R£KT> TOTAL FIXED COSTS $ ACRE ACRE ACRE ACRE 5*95 12*76 21*76 64*37 1*00 1*00 1*00 t*0C 5*95 12*76 21*76 s I04*e7 5* TOTAL COSTS 252*51 6, NET RETURNS 35*49 LAND (NET RENT) BASED ON LANDLORD'S SHARE OF 33% OF GRCSS INCOME LESS J3X FERT.. CHEM*» GAS* ANO SOX OF FIXED IRRIG* COSTS* CRCP SOLD IN FIELO. PREPAREO BY RAY SA**CNS# TAEX* AMARILLO. TtXAS PROJECTED 1979 18 CORN FOR SILAGE, IRRIGATED), (NATURAL GAS I • TEXAS HIGH PLAINS ESTIMATED COSTS ANO RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION SHUEDDEP 4P TM TANDEM OISC TM CHISEL TM PICKUP 1/2 TONI OFFSET DISC TM TANOEM DISC TM BOX FLOAT TM LISTER 69 TM ROOWEEDER TM LISTER-PLNT6R TM ROLLING CULT TM FURROW OPENER TM ITEM NO* 3.5? 3.43 3.44 10 3.42 3.40 3.60 3.54 3.30 3.36 3,30 3.52 DATE NOV NOV DEC OEC FEB FE8 MAR MAR APR APR MAY MAY TOTALS II R€<GLON FUEL.OIL. FIXEO TIMES LABOfc MACHINE LU6..REP* COSTS OVER HOURS HOURS PER ACRE PER ACRE t.00 1.00 uoo u to uoo 1*00 2*00 1*00 1*00 1*00 1*00 1*00 0*354 0*303 0*215 1*375 0*303 0*303 1*212 0*221 0*141 0*371 0*212 0*197 0* 168 0*119 1*100 0*166 0* 168 0*673 0*123 0*079 0*206 0*118 1*29 1*02 0*82 2*95 1*10 1*02 3*73 0*71 0*50 1*38 0*72 W72 1*30 1*14 2*08 U47 1*30 4*30 d*86 0*65 1*88 01*92 3*231 15*90 16*72 .SL±22Q. 5*211 LAND <NET RENT) 8ASEC ON LANDLORD*S SHARE OF 33% OF GROSS INCOME LESS 33* OF PERT.. CMFMoo GAS. ANO 50X OF FIXEO IRRIG* COSTS* CROP SOLD IN FIELD* tEPAPED BY RAY SAPMCNS* TAEX* AMARILLO. TEXAS PROJECTED 1979 BUDGET IDENTIFICATXCK N U M B E R — ANNUAL CAPITAL MONTH 9 723002602 220 0 19 COPN FOR SILACB, IRRIGATED* (NATURAL GAS>« TEXAS HIGH PLAINS II REGION ESTIMATED COSTS ANO RETUkNS PER ACRE HIGH LEVEL MANAGEMENT UNIT 1* GROSS RECEIPTS FROM PRODUCTION CORN SILAGE TOTAL 2* VARIABLE COSTS PREHARVEST SEEO FERT (N) APPL'D FERT <P> APPL«0 HERBICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LAB0R4TRACT0R & MACHINERY) L A B O R U R R IGATION ) INTEREST ON OP* CAP* SUBTOTAL* PRE-HARVEST TON PRICE OR COST/UNIT QUANTITY 16*00 25.00 VALUE CP COST -4Sfla4fl S 4CO*00 LBS* LBS* LBS* ACRE ACRE ACRE ACRE HOUR HOUR DOL* 0*60 0*10 0*19 9*60 4*62 10*13 30*00 6*00 5*00 0*10 25*00 220*00 60*00 1*00 1*00 1*00 1*00 4*30 2*95 44*01 15*00 22*00 11*40 9.-SO 4*62 10*13 30*00 25*76 14*76 4*44 $" 147*66 HARVEST COSTS %m % 0*0 SUBTOTAL* HARVEST $ 147*66 TOTAL VARIABLE CCST $ 252*32 3* INCOME ABOVE VARIABLE COSTS A* FIXEO COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENTI TOTM. FIXEO CCSTS s ACRE ACRE ACRE ACRE 5*74 14*07 23.76 96*80 1*00 1*00 1*00 1*00 5*74 14*07 23*76 s 142*37 5* TOTAL COSTS * 290*06 6* NET RETURNS * 109*94 LANO (NET RENT) EASED ON LANDLORD'S SHARt OF 33X OF GRCSS INCOME LESS 33X Q FERT*, CHEM*« GAS* ANO 50% OF FIXED IRRIG* COSTS* CRCP SCLO IN FIELD* PREPARED BY RAY SALMONS. TAEX, AMARILLO* TEXAS PROJECTEO 1979 20 CORN FOR SILAGE. IRRIGATED* {NATURAL GAS)• TEXAS HIGH PLAINS ESTIMATED COSTS ANO RETURNS PER ACRE HIGH LEVEL MANAGEMENT ITEM OPERATION SHREDDER 4R HLM TANDEM DISC HLM CHISEL HLM PICKUP 1/2 TON OFFSET DISC HLM TANDEM DISC HLM EiOx FLOAT HLM LlSTfcQ BR HLM RODWEEDER HLM LIST-PLNTR8R HLM ROLLING CULT HLM FURWOW 0»£NERHLM DATE 2,92 2*76 2.?9 10 2.78 2.76 2.95 2.99 2.95 2.72 2.66 2.<*-* NOV NOV OEC CEC FES FEB PAR MAR APR APR MAY MAY TOTALS II REGION FUEL.OIL. FIXED TIMES LABOR MACHINE LU6..REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE 0.279 0.175 0*186 W375 0*133 woo 0 * 1 7 5 2.00 W131 woo 0 * 1 4 5 WOO 0*127 I . 00 0*233 woo 0*15t> woo - 3 * 1 8 . 0 . 0*155 0*097 0*104 1*100 0*074 0*097 0*629 0*081 0*071 0*129 0*086 W17 0*76 0*82 2*95 0*70 0*76 4*12 0*58 0*52 1*03 0*64 1*77 1*18 W28 2*oe 1*22 Wttf 5*89 0*85 0*77 W60 0*96 .QjJJIO. -4*24 ~Ufi4 4*296 2*723 14*75 19*81 loOO 1*00 WOO 1*10 1.00 LANO (NET RENT! 8ASEC CN LANDLORD'S SHAPE UF 33X OF GROSS INCOME LESS 23% GF " E P T * . C H E M * , GAS* ANO SOX OF F I X E D I R R I o * COSTS* CROP SOLO I N F I E L D * . EPARfO 8Y RAY SAMNGNS, TAEX. AMARILLQ* TEXAS PROJECTEO 1979 BUDGE Y IDENTIFICATICN NUMBER' ANNUAL CAPITAL MONTH 9 723002601 220 0 21 COTTON* DRYLAND, TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPtCAL MANAGEMENT f^ UNIT VALUE CR COST PRICE OR COST/UNIT QUANTITY I* GROSS RECEIPTS FRCM PRCDUCTION COTTON LINT COTTONSEED TOTAL LBS* TON 0*51 80*00 150*00 0*12 76*50 £JL£S S 66*10 2* VARIABLE COSTS PREHARVEST SEEO HERBICIDE HAIL INSURANCE MACHINERY TRACTORS LABORCTRACTOR 6 MACHINERY) OTHER LABOR INTEREST ON OP* CAP* SUBTOTAL* PPE-HARVeST HARVEST COSTS STRIP 6 HAUL GIN* BAG* TIES LBS* LBS* DOL* ACRE ACRE HOUR HOUR DOL* 0*33 7*00 0*12 3*99 9*05 6*00 4*00 0*10 4*95 7*00 IS* 00 1*00 70*00 1*00 1*00 4*54 2*00 e**o 3*99 9*05 27*23 8*00 20*69 , . ; fcrJtf S CWT* CWT* 1*00 1*75 70*68 7*00 7*00 SUBTOTAL* HARVEST 7*00 S 19*25 $ 89*93 3* INCOME ABOVE VARIABLE COSTS $ -3*63 4* FIXED COSTS * TOTAL VARIABLE COST MACHINERY TRACTORS LANO ( N E T TOTAL F I X E D 5* TOTAL 6* NET RENT) COSTS ACRE ACRE ACRE 5*10 10*30 18*46 COSTS RETURNS LANO CHARGE QASEO ON L A N D L O R D ' S SHARE ( 1 / 4 ) OF G R O S S * G I N N I N G * GOVERNMENT D E F I C I E N C Y PAYMENT NOT I N C L U D E D * PREPARED BY RAY SAMMONS* T A E X * A M A R I L L O * T E X A S 5*10 10*30 1*00 1*00 1*00 * 33*66 * 123*79 f -37*69 LESS 1/4 OF PROJECTED 1979 22 C O T T O N * D R Y L A N D * TEXAS H I G H P L A I N S E S T I P A T E O COSTS ANC RETURNS PER ACRE T Y P I C A L MANAGEMENT DATE T I M E S LABOR M A C H I N E OVER HOURS HOURS CEC DEC DEC JAN FEB FEB FEB MAR APR APR APR MAY MAY JUNE JUNE JUNE JULY OCT loOO 0*714 0*397 !«00 0*303 0*168 0*10 0*125 0*100 0*10 0*125 0*100 1*00 0*617 0*343 1*00 0*0 0*329 0*10 0*125 0*100 OclO 0*125 0*100 1*00 0*303 0*166 1*00 0*354 0*196 0*10 0*125 0*100 1*25 0*464 0*258 0*10 0*125 0*100 2*00 0*300 0*167 2*00 0*356 0*199 0*10 0*125 0*100 0*l6 0*125 0*100 0 * 1 0 _J2*.123, _ 2 j . 1 0 . f i iTEy OPERATION SHREDOER 2 9 TM TANDEM D I S C TM P I C K U P 1 / 2 TON P I C K U P 1 / 2 TON MQLOBQARD 6 B TM PACKER TM P I C K U P 1 / 2 TON P I C K U P 1 / 2 TON TANDEM D I S C TM HERB S P R / D I S C TM P I C K U P 1 / 2 TON L I S T E R - P L N T 6 R TM P I C K U P 1 / 2 TON f>AND F I G H T E R TM C U L T I V A T O R 8R TM P I C K U P 1 / 2 TON P I C K U P 1 / 2 TON P I C K U P 1 / 2 TON 4.56 3,40 10 10 2.47 53 10 10 3*40 3,61 10 3,36 10 5.51 4.14 10 10 10 4*538 TOTALS 3*125 NUMBER*" 11 REGION FUELtOlL. FIXED LU8**REP* COSTS PER ACRE PEH ACRE 1*70 1*30 0*19 0*19 3*62 0*10 0*19 0*19 1*30 1*33 0*19 2*35 0 * 19 0**3 1*27 0 * 19 0*19 1*72 1*02 0*27 0*27 2*44 0*05 0*27 0*27 1*02 1*10 0*27 1*72 0*27 0*51 1*06 0*27 0*27 ___£Z _JU12 13*04 15*40 LAND CHARGE BASEO OK L A N D L O R D ' S SHARE ( 1 / 4 ) OF G R O S S * G I N N I N G * GOVERNMENT C E F I C I E N C V PAYMENT NOT I N C L U D E D * PREPARED BY RAY SAfrWCKS. T A E X * A M A R I L L O * T E X A S OUDGET I D E N T I F I C A T I O N NNUAL C A P I T A L MOKTh II LESS 1/4 OF PROJECTED 1979 9 3 00200*1 2 0 0 0 / *^\ 23 COTTONo CfiVLANO* TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE U G H LEVEL MANAGEMENT UNIT GROSS RECEIPTS FROM PRODUCTION COTTON LINT COTTONSEED TOTAL VARIABLE COSTS PREHARVEST SEED FERT <N) APPL'D HERBICIDE HAIL INSURANCE MACHINERY TRACTORS LABQR1TRACT0R 6 MACHINERY! OTHER LABOR INTEREST ON OP* CAP* SUBTOTAL* PIE-HARVEST HARVEST COSTS STRIP t, HAUL GIN* BAG* TIES SUBTOTAL* HARVEST LBS* TON PRICE OR COST/UNIT QUANTITY 0*51 80*00 VALUE OR COST 200*00 0*16 102*00 * 114*60 LBS* LBS* ACRE OOL* ACRE ACRE HOUR HOUR OOL* 0*33 0*11 7*00 0*12 3*90 5*76 6*00 4*00 0*10 16*00 30*90 1*90 60*00 1*00 1*00 3*27 2*00 19*13 4*95 3*30 7*00 7*20 3*90 S.76 19*S9 8*C0 1*31 S CMT* CUT* 1*00 1*75 9*00 9*00 9*00 wlglZS S 24*75 TOTAL VARIABLE CCST 86*36 3* INCOME ABOVE VARIABLE COSTS 4* FIXED COSTS MACHINERY TRACTORS LANO fNET RENT) TOTAL FIXEO CCSTS 61*61 26*44 ACRE ACRE ACRE 4*90 6*70 23*94 1*90 1*00 1*00 S 4*90 6*70 23^94 35.54 5. TOTAL COSTS % 121*90 6* NET RETURNS * -7*10 LAND CHARGE BASEC ON LANDLORD'S SHARE (1/41 OF GROSS* LESS 1/4 OF FERTILIZER AND GINNING* GOVERNMENT DEFICIENCY PAYMENT NOT INCLUDED* PREPARED BY RAY SAWMONS* TAEX* AMARILLO* TEXAS PROJECTED 1979 24 COTTON* CRYLANO* TEXAS H^GH PLAINS II REGION EST IMATEC COSTS AND RETURNS PER ACRE HlGN LEVEL MANAGEMENT OPERATION ITEM NO* DATE TIMES OVER LABOR M A C H I N E HOURS HOURS 1*00 1.00 1*00 0*279 0*0 0 . 126 0*125 0*809 0*125 0*175 woo a*o 0*10 0«I0 1*25 0*10 2*00 2*00 0*10 0*125 0*125 0*291 0*125 0*267 0*319 0*125 0*125 LU6*.REP* COSTS P E R ACRE PER ACRE am n>a *m w SHREDDER 4R HLM TANDEM D I S C HLM P I C K U P t / 2 TON P I C K U P 1 / 2 TON M 0 L 0 B 0 A R O 6 8 HLM P I C K U P 1 / 2 TON TANOEM D I S C HLM HERB S P R / O I S C H L M P I C K U P t / 2 TON P I C K U P 1 / 2 TON L I S T - P L N T R B R HLM e»ICKUP 1 / 2 TON t-ANOFIGHTER HLM C U L T I V A T 0 R 8 R HLM P I C K U P 1 / 2 TON P I C K U P 1 / 2 TON P I C K U P 1 / 2 TON 2*<32 75 10 10 3.62 10 3.76 96 10 10 3*72 10 5.86 4.69 10 10 10 OEC DEC DEC JAN FEB FEB MAR MAR MAR APR MAY MAY JUNE JUNE JUNE AUG OCT TOTALS 0*155 0*139 0*100 0*100 0*450 0*100 0*097 0*099 0*100 0*100 0*162 0*100 0*148 0*177 0*100 0*100 1.17 0*11 0*27 0*27 2.75 0*27 0.66 0*C3 0*27 0*27 1*12 0*27 0*45 0*94 0*27 0*27 1*77 0*24 0*19 0*19 3*55 0*19 0*91 0*08 0.19 0*19 1*56 0*19 3.65 1*13 0*19 0*19 0 « 1 0 .-4*12% -flxlftft J»*AZ ~1U1£ 3*265 2*327 a* to a* IO 1*50 o*to o.tg 9*66 11*60 LAND CHARGE BASED ON LANDLORD'S SHARE <1/4I OF GROSS* LESS 1/4 OF FERTILIZER AND GINNING* GOVERNMENT DEFICIENCY PAYMENT NOT INCLUDED* PREPAREO BY RAY SAMMGNS* TAEX* AMARILLO* TEXAS PROJECTED 1979 BUDGET IDENT1FICATICN NUMBER' ANNUAL CAPITAL MONTI- 11 93 002001 ZOO 0 25 COTTON. IRRIGATED. {NATURAL GAS>• TEXAS HIGH PLAINS II REGION ESTIMATEO COSTS ANO RETURNS PER ACRE TYPICAL MANAGEMENT UNIT U GROSS RECEIPTS FRCP PRODUCTION COTTON LINT COTTONSEED TOTAL 2. VARIABLE COSTS PREHARVEST SEEO FERT fNI APPL'O PERT <P> APFL»0 HERBICIDE HAIL INSURANCE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOR G MACHINERY I LASOR<I IRRIGATION J OTHER LABOR INTEREST ON OP* CAP. SUBTOTAL. PRE«HARVEST HARVEST COSTS STRIP & HAUL GINo BAG* TIES SUBTOTAL. HARVEST LBS. TON PRICE OR COST/UNIT QUANTITY 0.51 80.00 VALUE CR COST 500.00 0.40 255.00 % 287.0C LBS* LBS* LBS* ACRE DOL* ACRE ACRE ACRE HOUR HOUR HOUR DOL* 0*33 0*11 0*19 7*00 0*12 5*04 10*06 17*50 6*00 5.00 4*00 0*10 25*00 40*00 20*00 1*00 135*00 1*00 1*00 1*00 4*88 1*72 3.00 40*33 e.25 4.40 3.30 7.00 16.20 5.04 10*06 17.50 29*25 e.ei s s CtfT* CWT. 1*00 1*75 22*00 22*00 22*00 * TOTAL VARIABLE CCST 60.50 s 18C.65 3o INCOME ABOVE VARIABLE COSTS 4o FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND «NET RENT> TOTAL FIXED COSTS 12.00 &*fij 126*15 100o35 % ACRE ACRE ACRE ACRE 6.58 12.32 13.86 53*14 1*00 1*00 1.00 1*00 6.56 12.32 13.86 6 85.91 So TOTAL COSTS s 272.55 6o NET RETURNS % 14.45 LAND CHARGE BASED CW 1/4 OF GROSS LESS 1/4 OF FERT.. GINNING ANO 50% OF FIXED COST OF IRRSGo SYSTEM* GOV'T PAYMENT NOT INCLUDED. PREPARED BY RAY SALMONS. TAEX. AMARILLO* TEXAS PROJECTED 1979 26 COTTON, IRRIGATED. fNATURAL G A S ) . TEXAS HIGH PLAINS II REGION ESTIMATED COSTS ANO RETURNS PER ACRE TYPICAL MANAGEMENT I TEM KC. OPERATION SHREDDER 4R TM TANDEM DISC TM MOLOBOARD 68 TM PICKUP 1/2 TON CHISEL TM PICKUP 1/2 TON TANDEM DISC TM PICKUP 1/2 TON TANDEM DISC TM HERB SPR/OISC TM »1CKUP 1/2 TON LISTER 8R TM .MCKUP 1/2 TON ROLLING CULT TM tJED PLANTERfiR TM PICKUP 1/2 TON :>AND FIGHTER TM ROLLING CULT TM »!CKUP 1/2 TON *:KUP 1 / 2 P K UP 1 / 2 PICK.'>P 1 / 2 PICKUP 1 / 2 t TON TON TON TON 3.57 2.41 2.47 10 2.44 10 3.41 10 3.41 3.61 10 2.55 10 4.31 3.39 10 8.SI 4.31 10 10 10 10 10 DATE OEC OEC OEC DEC JAN JAN FEB FEB MAR MAR MAR APR APR MAY MAY MAY JUNE JUNE JUNE JULY AUG SEPT OCT TOTALS FUEL.OIL. FIXED TIMES LABOR MACHINE LUB«.REP* COSTS OVER HOURS HOURS PER ACRE PER ACRE 1.00 1*00 1*00 0*10 &*O0 O«10 woo 0*10 1.00 1*00 OolO 1*00 0*10 1*00 1*25 0*1Q 2*00 2*QO 0*10 0*10 0*10 OolO 0*10 1*29 0*92 2*44 0*27 0*94 0*27 0*80 0*27 0*60 1*10 0*27 0*70 0*27 0*47 1*25 0*27 0*91 0*93 0*27 0*27 0*27 0*27 1*72 1*42 3*62 0*19 1*46 0*19 1*11 0*19 1*11 1*33 0*19 1*04 0*19 0*54 1*66 0*19 0*73 1*07 0*19 0*19 0*19 0*19 0*354 0*212 0*617 0*125 0*215 0*125 0*212 0*125 0*212 0*354 0*125 0*177 0*125 0*166 0*349 0*125 0*300 0*332 0*125 0*125 0*125 0*125 0 . 1*7 0*118 0*343 0*100 0*119 0*100 0*118 0*100 0*118 0*196 0*100 0*098 0*100 0*092 0*194 0*100 0*167 0*185 0*100 0*100 0*100 0*100 ,OtlSS Qtiflfl iJUll -JUiS 4*875 3*045 15*10 18*90 LAND CHARGE BASED ON 1/4 OF GROSS LESS 1/4 OF FERT* . GINNING ANO SOX OF r "X.ED COST OF IRRIG* SYSTEM* G0V*T PAYMENT NOT INCLUDED* P»JP.P«r : 1 BY RAY SAMMONS. TAEX. AMARILLO. TEXAS PROJECTEO 1079 BUDGET IDENTIFICATION N U M B E R — ,\MNi«£L <~*PIT*L MONT** 11 93 002402 220 0 27 COTTON, IRRIGATED* CNATURAL GAS** TEXAS HIGH PLAINS II REGION ESTIMATED COSTS ANO RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT % I. GROSS RECEIPTS FRCM PRODUCT ION COTTON LINT COTTONSEEO TOTAL LBS. TON 0.51 80.00 HARVEST COSTS STRIP £ HAUL GIN. BAG* TIES SUBTOTAL. HARVEST ABOVE 4. F I X E D COSTS MACHINERY TRACTORS ?e«,4p VARIABLE IRRIGATION MACHINERY LANO (NET RENT) TOTAL FIXED CCSTS 344*40 t LBS. LBS. LBS. ACRE DOL. ACRE ACRE ACRE HOUR HOUR HOUR DOL. 0.33 0.11 0.19 7.00 0.12 4.61 8.05 17.50 6.00 5.00 4.00 0.10 8*25 4*40 3*80 &C.S0 15.60 4*81 8*05 17*50 25.35 6.61 12.00 25*00 40*00 20.00 1.50 130.00 1*00 1*00 1*00 4*22 1*72 3*00 39*99 4&2il $ 122.87 S CWT. CWT. 1.00 1.75 COSTS ACRE ACRE ACRE ACRE 6.09 9.74 13.86 65.74 26.00 26*00 26*00 TOTAL VARIABLE CCST INCOME 306*00 600*00 0.48 9 VARIABLE COSTS PREHARVEST SEED FERT <N> APPL'C FERT <P> APPL«D HERBICIOE HAIL INSURANCE MACHINERY TRACTORS IRRIGATION MACHINERY LA80R4TRACTOR € (MACHINERY? LA90R<IRRIGATION* OTHER LABOR INTEREST ON OP. CAP. SUBTOTAL* PRE-HARVEST 3. VALUE OR COST PRICE OR COST/UNIT QUANTITY 4$tSC % 71.50 $ 194.37 s s 150.03 e.09 9.74 13*86 1*00 1*00 1*00 1*00 $ 95*43 5. TOTAL COSTS $ 289*80 6. NET RETURNS * 54*60 LAND CHARGE BASEO ON 1/4 OF GROSS LESS 1/4 OF FERT*. GINNING ANO 50ft Of FIXEO COST OF IRRIG* SYSTEM* GOV'T PAYMENT NOT INCLUDED* PREPARED BY PAY SAVMONS* TAEX. AMARtLLO* TEXAS PROJECTEO 1979 28 C O T T O N , I R R I G A T E D * (NATURAL G A S * . TEXAS H I G H E S T I M A T E D COSTS ANO RETURNS PER ACRE H I G H L E V E L MANAGEMENT OPERATION SHREDDER 4 R HLM TANOEM D I S C HLM P I C K U P 1 / 2 TON MOLOBOARD 6 8 HLM PACKER HLM CHISEL HLM P I C K U P 1 / 2 TON TANOEM D I S C HLM HERB S P R / O I S C H L M P I C K U P 1 / 2 TON TANOEM D I S C HLM L I S T - P L N T R 8 R HLM P I C K U P 1 / 2 TON P I C K U P 1 / 2 TON R O L L I N G C U L T HLM BEO P L N T R 8R HLM P I C K U P 1 / 2 TON SANDFIGMTER HLM R O L L I N G C J L T HLM P I C K U P 1 / 2 TON M C K U P 1 / 2 TON M»CKUP 1 / 2 TON P I " . K U P 1 / 2 TON PICKUP 1/2 TON I TEW INC* 2*92 76 10 2.62 3*86 2.79 10 3«76 3,96 10 2,76 2,72 10 10 4,66 3,74 10 £,86 4*66 10 10 10 10 io PLAINS II REGION / FUEL.OIL, FIXEO LUB,.PEP. COSTS PER ACRE PER ACRE DATE TIMES OVER LABOR M A C H I N E HOURS HOURS OEC OEC OEC JAN JAN JAN JAN FE8 FEB FEB MAR MAR MAR APR MAY MAY MAY JUNE JUNE JUNE JULY AUG SEPT U00 1.00 0*10 0*50 0*50 0«50 0*10 U00 1*00 0*10 2.00 1*00 0.10 0,a 0 1*00 1*25 Oe&O 2*00 2*00 0*10 OolO 0*ftO 0*10 0*27fc 0«0 0*125 0*270 0*24o 0a094 0ol25 0*175 0*l7b 0*K25 0 , 350 0*23j 0-125 0*125 0*155 0*291 0,325 0o267 0*310 0*125 0**25 0*125 0*H2b 0<>I55 0*097 0*100 0»150 0*138 0*052 0.100 0.097 0a099 0*100 0.195 0*129 0*100 0.100 0*086 0*162 0*100 0*148 0*172 0*100 0*100 0*100 0*100 1*17 0.15 0*27 1.07 0o74 0*41 0«27 0.66 0*55 0*27 1.33 1.03 0.27 0*27 0*43 1*04 0*27 0*45 0*87 0*27 0*27 0*27 0*27 1*77 0*33 0*19 1*58 0*66 0*64 0.19 0.91 0*67 0.19 U63 1*60 0.15 0*19 0*50 1*39 0*19 0*65 1*00 0*19 0*19 0*19 0*19 OCT o « i o _<UIZ5 _iialflfi -£JL2Z -4*12 12*86 15*83 TOtALS 4*224 2*780 ^ \ ) LAND CHARGE BASED CN 1/4 OF GROSS LF:SS 1/4 OF FERT* , GINNING ANO SOX OF F*,..rr> COST OF IRRIG* SYSTEM* G O V T PAYMENT NOT INCLUDED* PROJECTED 1979 PREPARE.0 BY RAY SANMCNS, TAEX. AMARILLOi TEXAS rn'O^PT IDENTIFICATION NUMBER ANNUAL v*. " T AL MQfcTF 11 93 002401 220 O 29 FORAGE SORGHUM FOR GRAZING* DRYLAND* TEXAS HIGH PCAINS II REGION EST IMATEO COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT PRICE OR COST/UNIT QUANTITY to GROSS RECEIPTS FRCP PRODUCTION TOTAL 2* VARIABLE COSTS PREHARVEST SEED. MACHINERY TRACTORS LABOR(TRACTOR £ MACHINERY) INTEREST ON OP* CAP* SUBTOTAL* PRE-HARVEST VALUE OR COST $ 0*0 s LBS* ACRE ACRE HOUR OOL* 0*35 2*97 3*98 6*00 0*10 1 l*7S 2*97 3*98 13*47 fc^ij 5*00 1*00 1*00 2*24 2.27 «" 22* 4 J HARVEST COSTS SUBTOTAL* HARVEST «_.-.. « r.» % 0*0 TOTAL VARIABLE COST % 3. INCOME ABOVE VARIABLE COSTS 4* FIXEO COSTS MACHINERY TRACTORS LANO «NET REhT) TOTAL FIXEO COSTS 22*40 -22*40 t % ACRE ACRE ACRE 3*68 4.56 10*00 3.68 4*56 1*00 1*00 WOO ~1£&££ t" ie*24 5* TOTAL COSTS * 40*63 6* NET RETURNS s LANO CHARGE BASED CN ESTIMATED RENT. PREPARED BY RAY SAMMONS* TAEX* AMARILLO* TEXAS -40*63 PROJECTED 1979 30 FORAGE SORGHUM FOR GRAZtNGo DRYLAND* TEXAS HIGH PLAINS II REGION ESTIMATED COSTS ANO RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION CHISEL TM CHISEL TM TANDEM DISC TM GRAIN DRILL TM PICKUP 1/2 TON ITEM NO* 3.44 3.44 3.40 3.53 10 DATE FUEL.OIL. FIXED TIMES LABOR MACHINE LUB*.REP* COSTS OVER HOURS HOURS PER ACRE PER ACRE FES MAR APR MAY AUG 1*00 2*00 UOO leOO 0*70 TOTALS 0*215 0*429 0*303 0*423 0*119 0*238 0*168 0*235 0«82 1*65 1*02 1*59 1*14 2*28 1*30 2*19 2*245 1*461 6*95 8*24 LAND CHARGE BASEO ON ESTIMATED RENT* PREPARED BY RAY SAPPONS. TAEX. AMARILLO. TEXAS BUDGET IDENTIFICATION NUMBER* ANNUAL CAPITAL MOfcTh 8 871002002 200 0 PROJECTEO 1979 31 FORAGE SORGHUM FOR GRAZING* IRRIGATED* TEXAS HIGH PLAINS II REGION ESTfMATEO COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT VALUE OR COST PRICE OR COSTZUNIT QUANTITY 1* GROSS RECEIPTS FROM PRODUCTION TOTAL 2* VARIABLE COSTS PREHARVEST SEED FERT (NJ APPL*D FERT <P> APPL'O MACHINERY TRACTORS IRRIGATION MACHINERY LABORCTRACTOR C MACHINERY) LABOR<IRRIGATION I INTEREST ON OP* CAP* SUBTOTAL* PRE-HARVEST e*o~ LBS* LBS* LBS* ACRE ACRE ACRE HOUR HOUR OOL* 0*35 0*10 0*11 4*46 8*97 17*50 6*00 5*00 0*10 20*00 150*00 50*80 1*00 1*00 1*00 4*46 1*72 26*14 7*00 15*00 5*50 4*46 8*97 17*50 26*7* 8*61 S HARVEST COSTS 96*41 %m % 0*0 SUBTOTAL* HARVEST % 96*41 TOTAL VARIABLE COST $ •96*44 3* INCOME ABOVE VARIABLE COSTS 4* FIXEO COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LANO CNET RENT I TOTAL FIXED COSTS 5* TOTAL COSTS 6* NET RETURNS % ACRE ACRE ACRE ACRE 5*35 10*26 13*86 43*07 5*35 10*26 13*86 1*00 1*00 1*00 1*00 72*54 s 166*95 •166.95 LANO CHARGE USES 9S0/ACRE LESS 50 PERCENT OF IRRIGATION FIXED COSTS* NATURAL GAS PREPARED BY RAY SAMMONS* TAEX* AMARILLO* TEXAS PROJECTED 1979 32 FORAGE SORGHUM FOR GRAZING* IRRIGATED. TEXAS HIGH PLAINS II REGION ESTIMATED COSTS ANO RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION SHREODER 4R TM TANDEM OXSC TM CHISEL TM PICKUP 1/2 TON CHISEL TM BOX FLOAT TM LISTER 6R TM ROOWEEDER TM GRAIN ORILL TM ITEM hO. DATE 3*5 7 3*4 0 3*4 4 10 3*44 3*60 3*94 3*50 3*58 NOV NOV DEC OCC FEB MAR MAR MAY MAY TOTALS FUEL«OtL* FIXEO TIMES LABOR MACHINE LUB«*R£P. COSTS OVER HOURS HOURS PER ACRE PER ACRE 1*00 IQOO 1.00 1*10 1*00 2*00 I.00 WOO 1*00 0*354 0*303 0.215 1.375 0.215 1.212 0.221 0*141 Of 423 0.197 0.168 0.119 1.100 0.119 0.673 0.123 0*079 4.459 2.813 1.29 1*02 0.82 2.95 0*62 3.73 0.71 0.50 1.72 1.30 1.14 2.08 1.14 4.50 0.88 0.65 .3tl2 13.43 15.61 LAND CHARGE USES fSO/ACRE LESS 50 PERCENT OF IRRIGATION FIXEO COSTS. NATURAL GAS PREPARED BY RAY SALMONS* TAEX. AMARILLO* TEXAS PROJECTED 1979 BUOGET IDENTIFICATICN ANNUAL CAPITAL MONTH NUMBER' 9 871002402 220 0 33 FORAGE SORGHUM FOR GRAZING* IRRIGATED* TEXAS HIGH PLAINS II REGION EST IMATEO COSTS ANO RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT PRICE OR COST/UNIT QUANTITY t.^ S GROSS RECEIPTS FROM PRODUCTION TOTAL VARIABLE COSTS PREHARVEST SEEO PERT CN) APPL"D PERT <P» APPL a O MACHINERY TRACTORS IRRIGATION MACHINERY LABORCTRACTOR & MACHINERY! LABOR4IRRIGATIGNJ INTEREST ON OP* CAP* SUBTOTAL* PRE»HARVEST VALUE Gfi COST f 0*0 t LBS* LBS* LBS* ACRE ACRE ACRE HOUR HOUR OOL* 0*35 0*11 0*19 4*39 9*09 22*50 6*00 e0 o 50*10 ° 7*00 22*00 11.40 4*39 9*09 22*50 23*96 11*07 20*00 200*00 60*00 1*00 1*00 1*00 4*00 2*21 27*60 a*u $ 114*22 HARVEST COSTS SUBTOTAL* HARVEST $ $ TOTAL VARIABLE CCST S 114*22 0*0 3* INCOME ABOVE VARIABLE COSTS $-114*22 4* FIXEO COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED CCSTS f ACRE ACRE ACRE ACRE 5*21 12*63 17*82 41*09 1*00 1*00 1*00 1*00 $ 5.21 12*63 17*82 41*09 76*74 5* TOTAL COSTS S 190*96 6* NET RETURNS $-190*96 LANO CHARGE USES $50/ACRE LESS SO PERCENT OF IRRIGATION FIXED COSTS* NATURAL GAS PREPAREO BY RAY SAMMONS* TAEX* AMARILLO* TEXAS PROJECTED 1979 34 FORAGE SORGHUM FOR GRAZING* IRRIGATED. TEXAS HIGH PLAINS II REGI ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION SHREOOER 4R HLM TANDEM DISC HLM CHISEL HLM PICKUP 1/2 TON TANOEM DISC HLM BOX FLOAT HLM LIST-PLNTR8R HLM RODWEEOER HLM GRAIN DRILL HLM ITEM NO* 2*92 2*76 2.79 10 2.76 2*95 2.72 2*85 2*93 DATE FUEL.OIL. FIXEC TIMES LABOR MACHINE LU8**REP* COSTS OVER HOURS HOURS PER ACRE PER ACRE NOV NOV DEC OEC PES MAR MAR MAY MAY 1*00 1*00 1.00 1«10 1*00 2*00 1*00 1*00 1*00 TOTALS 0*279 OotSS 0*175 0*097 0*188 0*104 1*375 1*100 0*175 0*097 1*131 0*629 0*233 0*129 0*127 0*071 Qf.31,4. .Qfll7§ 1*17 0*76 0*82 2*95 0*76 4*12 1*03 0*S2 uLx2& 1*77 WI8 1*28 2*08 1*18 5*89 1*60 0*77 -£jt£3 3*997 13*49 17*83 2*557 LAND CHARGE USES S50/ACRE LESS 50 PERCENT OF IRRIGATICN FIXED COSTS* NATURAL GAS PREPARED BY RAY SAMMCNS* TAEX* AMARILLO. TEXAS PROJECTEO 1979 BUDGET IDENTIFICATION N U M B E R — ANNUAL CAPITAL MONTH 9 871002501 220 0 35 FORAGE SORGHUM FOR H A Y * D R Y L A N D * T E X A S H I G H E S T I M A T E O C O S T S ANO R E T U R N S PER T Y P I C A L MANAGEMENT UNIT 1* GROSS RECEIPTS FRCM PRCOUCTION HAY TOTAL 2* VARIABLE COSTS PREHARVEST SEEO MACHINERY TRACTORS LABORfTRACTOR & MACHINERY I INTEREST ON OP* CAP* SUBTOTAL* PFE-HARVEST HARVEST COSTS CUSTOM BALING SUBTOTAL* HARVEST TON PLAINS ACRE II PRICE OR COST/UNIT QUANTITY 45*00 VALUE OR COST 1*00 * LBS* ACRE ACRE HOUR DOL* 0*35 1*63 3*98 6*00 0*10 5*00 1*00 1*00 1*52 2*29 46«QO 45*00 1*75 1*63 3*98 9*72 17*31 * BALE 0*60 33*00 19*80 TOTAL VARIABLE COST 3* INCOME ABOVE VARIABLE COSTS 4* FIXED COSTS MACHINERY TRACTORS LAND (NET PEKTI TOTAL FIXEO COSTS REGION * 37*11 * 7*89 9 ACRE ACRE ACRE 2*73 4*56 6*32 2*73 4*56 1*00 1*00 1*00 •.flag* $"" 15*60 5* TOTAL COSTS S 6* NET RETURNS $ 52*71 •7*71 LAND CHARGE BASED CN 3 3% CF GROSS LESS 33X OF BALING* PREPARED BY RAY SAMMONS* TAEX* AMARILLO* TEXAS PROJECTED 1979 36 FORAGE SORGHUM FOR HAY* DRYLAND* TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT HRa«<i**ii««» OPERATION TM CHISEL TM CHISEL TM TANDEM DISC TM GRAIN DRILL PICKUP 1/2 TON PICKUP 1/2 TON ITEM NO* 3*44 3*44 3*40 3*58 10 10 DATE FIXED FUEL .OIL* COSTS TIMES LABOR MACHINE LUB**REP* OVER HOURS HOURS PER ACRE PER ACRE FEB MAR APR MAY JULY AUG UOO 2o00 1*00 1*00 0*10 0.10 , TOTALS 0*215 0*119 0*429 0*238 0*303 0*168 0*423 0*235 0*125 0*100 0*125 -4s.l££ 1*620 0*961 0*82 1*65 1*02 1*99 0*27 -£±21 5*61 LAND CHARGE BASEC CN 33X OF GROSS LESS 33% OF BALING. PREPAREO BY RAY SAMMONS* TAEX. AMARILLO* TEXAS BUOGET IDENTIFICATION NUMBER' ANNUAL CAPITAL MONTH 8 1*14 2*28 1*30 2*19 0*19 J°%1% 7*29 PROJECTED 1979 875002002 200 0 /- *N 37 GRAIN SORGHUM* ORYLAND* TEXAS HIGH PLAINS It REGION ESTIMATEO COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT GROSS RECEIPTS FROM PRODUCTION GRAIN SORGHUM TOTAL 2* VARIABLE COSTS PREHARVEST SEEO FERT <N> APPL'D MACHINERY TRACTORS LABOR!TRACTOR & MACHINERY) INTEREST ON OP. CAP* SUBTOTAL* PRE-HARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL* HARVEST CHT< PRICE OR COST/UNIT QUANTITY 3*45 VALUE QR COST 15.00 —51*15 $ LBS* LBS* ACRE ACRE HOUR OOL* 0*45 0*10 2*40 4*87 6*00 0*10 51.75 1*35 3.08 2*40 4*87 13*8' 3*00 30*00 1*00 1*00 2*30 5*24 CfoS? 25.95 s $ ACRE CUT. 7*00 0*10 7*00 1.00 13*00 UM s 8*50 s TOTAL VARIABLE CCST 34*49 3* INCOME ABOVE VARIABLE COSTS $ 4* $ 17*30 F I X E D COSTS MACHINERY TRACTORS LAND ( N E T RENT) TOTAL F I X E O COSTS ACRE ACRE ACRE 3*22 5*56 13.28 3*22 5*58 1.00 1*00 1*00 s JSMM 22*08 5. TOTAL COSTS * 6* NET RETURNS s 56.53 •4*78 LANO CHARGE BASED ON 3 3% OF GROSS INCOME LESS 33X OF FERTILIZER* HARVEST AND HAULING* GOV'T DEFICIENCY PAYMENT NOT INCLUDED* PREPAREO BY RAY SAMMONS. TAEX. AMARILLO* TEXAS PROJECTEO 1979 % 38 GRAIN SORGHUM* DRYLAND* TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT l * W B * W OPERATION SHREDDER 4R TM TM CHISEL TANDEM DISC TM LISTER 6R TM LISTER-PLNT6R TM ROLLING CULT TM PICKUP 1/2 TON ITEM KC. 3.57 3.44 3*40 3*54 3*36 3*30 10 DATE TIMES LABOR MACHINE LU6* *RE:P* COSTS OVER HOURS HOURS PER ACRE PER ACRE DEC DEC APR APR JUNE JUNE SEPT 1*00 0.354 1*00 0*215 1*00 0*303 1*00 0*221 1*00 0*371 1*00 0*212 0*50 .„&a£2£t gaggfl 2*301 1*431 TOTALS 0. 197 0*119 0*168 0*123 0*206 0*116 1*29 0*82 1*02 0*71 1*38 0*72 .1*2± 7*27 1*72 1* 14 1*30 0*68 1*88 0*92 -iU25 8*80 LAND CHARGE BASED ON 33% OF GROSS INCOME LESS 33X OF FERTILIZER* HARVEST ANO HAULING* GOV'T DEFICIENCY PAYMENT NOT INCLUDED* PREPAREO BY RAY SAMMONS* TAEX* AMARILLO* TEXAS PROJECTEO 1979 BUDGET IDENTIFICATION N U M B E R — ANNUAL CAPITAL MONTH 10 73 002002 200 0 39 /f^ GRAIN SORGhUV* IRRIGATED* (NATURAL GAS)* TEXAS HIGH PLAINS II REGION ESTtMATEO COSTS ANO RETURNS PER ACRE TYPICAL MANAGEMENT UNIT 1* GROSS RECEIPTS FROM PRODUCTION GRAIN SORGHUM TOTAL VARIABLE COSTS PREHARVEST SEED FERT <NI A P P L ' O HERBICIDE INSECTICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOR t MACHINERY! LABOR(IRRIGATION) INTEREST ON CP. CAP* SUBTOTAL* PRE-HARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL* HARVEST TOTAL VARIABLE CWT< LBS* LBS* ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. PRICE OR COST/UNIT QUANTITY VALUE OP COST 3*40 52*00 171*90 * 176*80 0*45 0*10 7*25 10*50 4*61 12*03 22*50 6*00 5*00 0*10 10*00 100*00 1*00 1*00 1*00 1*00 1*00 5*39 2*21 32*61 4*50 10*00 7*25 10*50 4*«: 12*03 22*50 32*34 11*07 * iie.oe s CWT. CWT* 0*30 0*10 52.00 52*00 COST 15*00 —3.fia24 20*80 $ 136*88 3* INCOME ABOVE VARIABLE COSTS FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXEO COSTS 37*92 ACRE ACRE ACRE ACRE 6*06 13.77 17.82 28.06 6*06 13*77 17.82 1.00 1.00 1*00 1.00 * 65*71 5. TOTAL COSTS S 204.59 6. NET RETURNS * -27.79 LAND (NET RENT I BASED ON 33* OF GROSS INCOME LESS 33X OF FERT* GAS* CHEM. HARVEST* HAUL ANC 50* OF FIXED IRRIG COSTS* GOVT PROGRAM NOT INCL* PREPARED BY RAY SAMMONS. TAEX. AMARILLO* TEXAS PROJECTED 1979 40 GRAIN SORGHUM, IRRIGATED* (NATURAL GAS I• TEXAS HIGH PLAINS II REGION ESTIMATED COSTS ANO RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION SHREODER 4R TM TANDEM DISC TM CHISEL TM PICKUP 1/2 TON OFFSET DISC TM TANDEM DISC TM BOX FLOAT TM LISTER 6R TM ROLLING CULT TM RODWEEDER TM LISTER-PLNT6R TM FURROW OPENER TM ITEM NO* 3,57 3,40 3,44 10 3,42 3,40 3.60 3*54 3,30 3,50 3,36 3,52 DATE FUEL,OIL. FIXED COSTS TIMES LABOR MACHINE LUB*«REP* OVER HOURS HOURS PER ACRE PER ACRE NOV NOV OEC DEC FEB FEB MAR MAR APR M*Y MAY JUNE 1*00 0*354 2,00 0*606 1*00 0*215 1*00 1*250 1*00 0*303 1*00 0*303 2*00 1*212 1*00 0*221 1*00 0*212 1*00 0*141 1*00 0*371 1*00 _fi*_2£fi 0,197 0*337 0*119 1*000 0*168 0*168 0*673 0*123 0*118 0*079 0*206 Q»AU 1.29 2*03 0*82 2*66 1*10 1*02 3*73 0*71 0*72 0*50 1*36 _fl*£Z 1,72 2*60 1,14 1*69 1*47 1*30 4*50 C*88 0*92 0*65 1*68 -Jk-flfi 5*389 3*300 16*64 19*82 TOTALS LAND (NET RENT) BASED ON 33X OF GROSS INCOME LESS 33% OF FERT. GAS. CHEP. HARVEST, HAUL ANC SO* CF FIXED IRRIG COSTS* GOVT PROGRAM NOT 1NCL* PREPARED BY RAY SALMONS, TAEX. AMARILLO, TEXAS PROJECTED 1979 4UDGET IDENTIFICATION NUMBER"' ANNUAL CAPITAL MONTH 10 73 002502 220 0 41 f^ GRAIN SORGHUM* IRRIGATED. <NATURAL GAS)* TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT 1* GROSS RECEIPTS FRCM PRODUCTION GRAIN SORGHUM TOTAL 2* VARIABLE COSTS PREHARVEST SEED PERT <N> APPL'O PERT IPI APPL'O HERBICIDE INSECTICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LABORCTRACTCP & MACHINERY) LABOR!IRRIGATIONI INTEREST ON OF* CAP* SUBTOTAL* FRE*MARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL* HARVEST CWTi 3*45 75*00 $ 236*75 LBS* LBS* LBS* ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL* 0*45 0*10 0*19 7*00 10*50 5*69 10*13 27*50 6*00 5*00 0*10 3*60 14*00 7*60 7*00 10*50 5*59 10*13 27*50 26*78 13*53 8*00 140*80 40*00 1*00 1*00 1*90 1*80 1*00 4*80 2*71 41*15 8*732*44 8 CWT* CUT* 0*30 0*10 79*00 75*00 22*50 t TOTAL VARIABLE COST 39*00 S 162*44 3* INCOME ABOVE VARIABLE COSTS 4* FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LANO 4 NET RENT) TOTAL PIXED COSTS VALUE Of! COST PRICE OR COST/UNIT QUANTITY * ACRE ACRE ACRE ACRE 6*50 14*07 21*78 45*16 96*31 6*50 14*07 21*78 1*00 1*00 1*00 1*00 . ftfelf $ 87*81 5* TOTAL COSTS * 249*95 6* NET RETURNS 8 8*80 LANO <NET RENT) BASSO ON 33X OF GROSS INCOME LESS 33X OF PERT. GAS* CHEM* HARVEST* HAUL ANO SOX CF FIXEO IRRIG COSTS* GOVT PROGRAM NOT INCL* PREPARED BY RAY SAMMONS* TAEX. AMARILLO* TEXAS PROJECTED 1979 42 GRAIN SORGHUM* IRRIGATED, (NATURAL GAS). TEXAS HIGH PLAINS II EST IMATEO COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION HLM SHREDDER 4fl HLM TANDEM D I S C HLM CHISEL PICKUP 1 / 2 TON OFFSET 01SC HLM HLM TANDEM D I S C BOX F L O A T HLM L I S T E R 8R HLM R O L L I N G C U L T HLM PICKUP 1 / 2 TON RODWEEDER HLM L I S T - P L N T R 8 R HLM PICKUP 1 / 2 TON FURROW OPENERHLM PICKUP 1 / 2 TON PICKUP 1 / 2 TON PICKUP 1 / 2 TON ITEM NO* 2.92 2*76 2*79 10 2*78 2*76 2.9S 2*90 2*66 10 2.85 2*72 10 2*87 10 10 10 TIMES DATE oven NOV NOV DEC OEC FEB MAR MAR MAR APR APR MAY MAY MAY JUNE JUNE JULY. SEPT 1.00 1*00 1*00 1.00 TOTALS i*oo 1.00 2.00 1*00 woo 0*10 1*00 1*00 0*10 1*00 0*10 0*10 0*10 LABOR M A C H I N E HOURS HOURS QN FUEL.OIL. FIXE6 COSTS LU6**REP* PER AORE P E R ACRE 0*279 0*175 0*188 1*250 0*133 0*175 1*131 0*145 0*155 0*125 0*127 0*233 0*12S 0*180 0*125 0*125 0*155 0*097 0*104 1*000 0*074 0*097 0*629 0*081 0*086 0*100 0*071 0*129 0*100 0*100 0*100 0*100 1*17 0*76 0*82 2*68 0*70 0*76 4*12 0*98 0*64 0*27 0*52 U03 0*27 0*70 0*27 0*27 1*77 1*18 1*28 1*89 1*22 1*18 5*89 0*85 0*96 0*19 0*77 1*60 0*19 1*04 0*19 0*19 .J2«JL2& -flllpfl -JU22 -lUtiS 4*796 3*123 15*82 20*97 I AND (NET RENT) BASEO ON 33* OF GROSS INCOME LLSS 33* OF PERT, GAS. CHE*', HARVEST. HAUL ANO 50* OF FIXED tRRIG COSTS* GOVT PRCGRAM NOT INCL* PREPARED BY RAY SAMMONS* TAEX. AMARILLO* TEXAS PROJECTED 1979 BUDGET IDENTIFICATION NUMBERANNUAL CAPITAL MONTH 10 73 002601 220 0 43 PERMANENT PASTURE ESTABLISHMENT* IRRIGATED, TEXAS HIGH PLAINS IIREGICK ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT PRICE OR COST/UNIT QUANTITY VALUE OR COST GROSS RECEIPTS FROM PRODUCTION TOTAL 2« VARIABLE COSTS PREHARVEST JEED SEED FERT CN> APPL'D FERT (P» APPL«0 MACHINERY TRACTORS IRRIGATION MACHINERY LABORITRACTGR 6 MACHINERY! LABOR(IPRIGATION) INTEREST ON CP» CAP. SUBTOTAL* PRE-HARVEST 0*0 LBS* LBS* LBS* LBS* ACRE ACRE ACRE HOUR HOUR DOL* 0*50 1*75 0*11 0*19 2*77 13*43 15*00 6*00 v 5*00 0*10 15.00 5*00 150.00 90*00 1*00 1*00 1*00 5.24 1*48 22*61 7*90 e*75 16*50 9*90 2*77 13*43 1S*0C 31*46 7*36 s 114*96 HARVEST COSTS $_ s ~~o7o SUBTOTAL* HARVEST % 114*96 TOTAL VARIABLE COST %••114*36 3. INCOME ABOVE VARIABLE COSTS 4* FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LANO (NET RENT) TOTAL FIXED CCSTS % ACRE ACRE ACRE ACRE 4*04 15*36 11*88 19*06 4*04 15*36 11*86 1*00 1*00 1*00 1*00 t 50*34 5* TOTAL COSTS 164*90 6* NET RETURNS $•164*90 LANO CHARGE BASED ON S25/ACRE (1/2 ANNUAL RENTAL) LESS 90 PERCENT OF IRRIGATION FIXED COSTS* NATURAL GAS PREPARED BY RAY SAMMONSt TAEX* AMARILLO* TEXAS PROJECTEO 1979 44 PERMANENT PASTURE ESTABLISHMENT* IRRIGATEDt TEXAS HIGH PLAINS IIPEG!£* ESTIMATED COSTS AND RETURNS PER ACRE ^ TYPICAL MANAGEMENT OPERATION ITEM NO* DATE FUEt.OIC. FIXED TIMES LABOR MACHINE LUB.#REP* COSTS oven HOURS HOURS PER ACRE PER ACRE MMiaaapM MOLOBOARO 4 8 TM TANDEM D I S C TM TANDEM D I S C TM BOX FLOAT TM PACKER TM GRAIN D R I L L TM PACKER TM PICKUP 1 / 2 TON 3*46 3*40 3*40 3*60 3*53 3*58 3*53 10 JULY JULY AUG AUG AUG AUG AUG NCV TOTALS LOO 1*00 2*00 2.00 1*00 1*00 1*00 0*50 2*94 1*02 2*03 3*73 1*77 1*59 1*77 3*73 1*30 2*60 4*50 2*07 2*19 2*07 -JU622 0*494 0*168 0*337 0*673 0*329 0*235 0*329 0*500 ~UJ4 -iUJS 5*244 3*066 16*19 19*40 0*889 0*303 0*606 1*212 0*592 0*423 0*592 LAND CHARGE BASED ON S25/ACRE <1/2 ANNUAL RENTAL) LESS 50 PERCENT OF IRRIGATION FIXED COSTS* NATURAL GAS PREPARED BY RAY SALMONS* TAEX* AMARILLO* TEXAS PROJECTED 197*. BUOGET IDENTIFICATION NUMBER*— ANNUAL CAPITAL MONTH 12 817002302 220 0 45 PERMANENT PASTUREt IRRIGATED, (NATURAL G A S ) * TEXAS HIGH PLAINS II REGI ESTIMATEO COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT PRICE OR COST/UNIT QUANTITY VALUE OR COST GROSS RECEIPTS PROM PRODUCTION TOTAL 2* VARIABLE COSTS PREHARVEST FERT <N> APPL'D FERT (PI APPL'O MACHINERY IRRIGATION MACHINERY LA80R(TRACTOR t MACHINERY I LABOR*IRRIGATION) INTEREST ON OP* CAP* SUBTOTAL* PRE-HARVEST 0*0 LBS* LBS* ACRE ACRE HOUR HOUR OOL* 0*10 0*19 2*14 32*50 6*00 5*00 0*10 100*00 40*00 1*00 1*00 1*00 3*20 31*56 10*00 7*60 2*14 32*50 6*00 15*99 I HARVEST COSTS 77*39 %m $ 0*<T $ 77*39 SUBTOTAL* HARVEST TOTAL VARIABLE COST $ •77*39 3* INCOME ABOVE VARIABLE COSTS 4* FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY PRORATED ESTAB* COST LAND (NET RENT) TOTAL FIXEO COSTS * ACRE ACRE ACRE ACRE ACRE 1*51 0*0 25*74 171*04 37*13 1*51 0*0 25*74 24*46 1*00 1*00 1*00 0*14 1*90 s 88*84 166*23 «>• TOTAL COSTS t 6* NET RETURNS $-166*23 LANO CHARGE BASEO ON S50/ACRE LESS 50 PERCENT OF IRRIGATION FIXEO COSTS. ESTABLISHMENT COSTS PRORATED OVER 7 YEARS* PREPARED BY RAY SAMMCNS* TAEXt AMARILLO* TEXAS PROJECTED 1979 46 PERMANENT PASTURE* IRRIGATED. (NATURAL GAS)* TEXAS HIGH PLAINS II P'.XIC ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT ITEMM KG • OPERATION DATE •T-— PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP 1/2 1/2 1/2 1/2 1/2 1/2 1/2 1/2 TON TON TON TON TON TON TON TON 10 10 10 10 10 10 10 10 MAR APR MAY JUNE JULY AUG SEPT OCT TIMES OVER TT"T!r- q*io 0*10 Q.IO 0*10 COSTS LUB**REP*• PER ACRE PER ACRE HMIflMVMIWI '-,7- 0*10 0*10 0*10 0*10 TOTALS LABOR M A C H I N E HOURS HOURS 0*125 0*125 0*125 0*125 0*125 0*125 0*125 0*100 0*100 0*100 0*100 0*100 0*100 0*100 Qt.2S -JbJJLSL 1*000 0*800 0*27 0*27 0*27 0*27 0*27 0*27 0*27 0* IS 0 . 19 0 . 19 0.19 0 * 19 0*19 0 * 19 -fl*27 _4Uli 2*14 1*51 LANO CHARGE BASEO CN S50/ACRE LESS 50 PERCENT Of IRRIGATION FIXEO COSTS* ESTABLISHMENT COSTS PRORATED %Y$* 7 YEARS* ^%. PREPARED BY RAY SAMMONS* TAE**, AMARILLO. TEXAS PROJECTED !9T£ ) BUDGET IDENTIFICATION NUMBER-***. ANNUAL CAPITAL MONTH 12 818002702 220 0 47 PERMANENT PASTURE* IRRIGATED* (NATURAL GASI* TEXAS HIGH PLAINS II REGI ESTIMATffO COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT GROSS RECEIPTS FRO* TOTAL P R I C E OR COST/UNIT PRODUCTION 2* VARIABLE COSTS PREHARVeST PERT INI APPL - 0 PERT <P) APPL*D MACHINERY TRACTORS IRRIGATION MACHINERY LABORCTRACTOR & MACHINERY) LABOR!IRRIGATION) INTEREST ON OP. CAP* SUBTOTAL* PRE-HARVEST VALUE OR COST QUANTITY tm % LBS* LBS* ACRE ACRE ACRE HOUR HOUR DOL* 0*10 0*19 2*21 1*04 32*50 6*00 5.00 0*10 250*00 80*00 1*00 1*00 1*00 1*36 3*20 43*09 0«O 25*00 15*20 2*21 1*04 32*50 8* 14 is*or S 104*39 HARVEST COSTS %m % 0*0 SUBTOTAL* HARVEST % 104*39 TOTAL VARIABLE CCST $- •104*39 3. INCOME ABOVE VARIABLE COSTS 4* FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY PRORATEO ESTAB* COST LANO (NET RENT) TOTAL FIXEO COSTS $ ACRE ACRE ACRE ACRE ACRE 1.67 1*19 25.74 171*04 37*13 1*67 1*19 25*74 24*46 1*00 1*00 1*00 0*14 1*00 3.Z&U s 90*19 5* TOTAL COSTS % 194*58 6* NET RETURNS • - •194*58 LAND CHARGE BASEO ON SSO/ACRE LESS 50 PERCENT OF IRRIGATION FIXEO COSTS* ESTABLISHMENT COSTS PRORATED OVER 10 YEARS* PREPARED BY RAY SAMMCNS* TAEX* AMARILLO* TEXAS PROJECTED 1979 48 PERMANENT PASTURE* IRRIGATEO* (NATURAL GAS)» TEXAS HTGH PLAINS Il_REC! ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION HERB SPR/DISCHLM HERB SPR/OISCHLM PICKUP 1/2 TON ITEM NO* 3t96 3*96 10 DATE MAR JUNE OCT TOTALS FUEfctOILt FIXED COSTS TIMES LABOR MACHINE LUB*«REP« OVER HOURS HOURS PER ACRE PER ACRE U00 1*00 0*178 0*176 0*099 0*099 0*55 0*55 0*67 0*67 0 * 8 0 _I*.fiO.Q. JUfiflp. ftUl _US1 1*357 0*998 3*25 2*86 LAND CHARGE BASED ON S50/ACRE LESS 50 PERCENT OF IRRIGATION FIXEO COSTS* ESTABLISHMENT COSTS PRQRATEO OVER 10 YEARS. PREPAREO BY RAY SAMMQNS* TAEX* AMARILLO* TEXAS PROJECTED 1979 BUDGET IDENTIFICATION NUMBER' ANNUAL CAPITAL MONTH 12 818002901 220 0 49 SOYBEANS, IRRIGATED* (NATURAL GAS)t TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT !• GROSS RECEIPTS FROM PRODUCTION SOYBEANS TOTAL 2. VARIABLE COSTS PREHARVEST SEED HERBICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LABORCTRACTOR & MACHINERY) LABOR(IRRIGATION) INTEREST ON OP. CAP. SUBTOTAL* PRE-HARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL. HARVEST TOTAL VARIABLE BU. PRICE OR COST/UNIT QUANTITY 5*35 VALUE SR COST 35.00 S 187.25 LBS. ACRE ACRE ACRE ACRE HOUR HOUR DDL. 0.18 7.50 5.07 11.76 17.50 6.00 5.00 0.10 60.00 1.00 1.00 1.00 1.00 5.55 1.72 25.12 10.80 7.50 5.07 11*76 17.50 33.26 8.61 97.03 S ACRE BU. 10.00 0.10 1.00 35.00 CCST 10.00 • • ft 50, s 13.50 S 110.53 3. INCOME ABOVE VARIABLE COSTS 4. FIXEO COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED CCSTS 76.72 ACRE ACRE ACRE ACRE 6.25 13.46 13.86 43.77 1.00 1.00 1.00 1.00 6.25 13.46 13.86 fit?? S 77.35 TOTAL COSTS S 187.87 6. NET RETURNS -0.62 LANO (NET RENT) EASED CN 33X OF GROSS INCOME LESS 33X OF FERT* GAS* CHEM, HARVEST* HAUL ANO SOX OF FIXEO IRRIG COSTS. GOVT PROGRAM NOT INCL. PROJECTED 1979 PREPAREO BY RAY SALMONS* TAEX. AMARILLO* TEXAS 50 SOYBEANS* IRRIGATED* <&ATURAL GAS). TEXAS HIGH PLAINS II REGI ESTIMATEO COSTS ANO RETURNS PER ACRE TYPICAL MANAGEMENT ijiiy.ii OPERATION SHREOOER 4 R TM TM TANDEM D I S C TANDEM D I S C TM P I C K U P 1 / 2 TON OFFSET O I S C TM BOX F L O A T TM TANOEN O I S C TM HERB S P R / D I S C TM TM L I S T E R 6R ROLLING CULT TM L I S T E R - P L N T 6 R TM ROLLING CULT TM FURROW OPENER TM ITEM KC* 3.5T 3*40 3*40 10 3*42 3*60 3*40 3*61 3*54 3*30 3*36 3*30 3*52 DATE NOV NOV OEC DEC FEB MAR MAR MAR MAR APR MAY JUNE JULY TOTALS TIMES OVER 1*00 i*oo 1*00 1*20 1*00 1*00 2*00 1*00 1*00 I.00 1*00 l«O0 1*00 LABOR HOURS MACHINE L U 6 * . R E P * COSTS HOURS PER ACRE PER ACRE 0*354 0*303 0*303 1*500 0*303 0*606 0*606 0*354 0*221 0*212 0*371 0*212 . 0*200 0*197 0*166 0*166 1*200 0*166 0*337 0*337 0*196 0*123 0*116 0*206 0*118 1*29 1*02 1*02 3*22 1*10 1*87 2*03 1*10 0*71 0*72 1*38 0*72 1*72 1*30 1*3C 2*27 1*47 2*25 2*60 1*33 0*88 0*92 1*86 0*92 -4*111 -Q*« .JU&S 5*546 3*448 i6*e3 19*71 LAND I NET RENTI BASED ON 33X OF GROSS INCOME LESS 33* OF FERT. GAS. CH8*« HARVEST* HAUL ANO SOX OF FIXED IRRIG COSTS* GOVT PROGRAM NOT INCL* PREPARED BY RAY SAMMONS* TAEX. AMARILLO* TEXAS PROJECTED 1979 BUDGET IDENTIFICATION NUMBER ANNUAL CAPITAL MONTH 10 981002402 220 0 51 SUGAR BEETS* IRRIGATED, {NATURAL G A S ) . TEXAS HIGH PLAINS II REGION ESTIMATEO COSTS ANO RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT 1* GROSS RECEIPTS FROM PRODUCTION SUGAR BEETS TOTAL 2* VARIABLE COSTS PREHARVEST SEED FERT (32-0*0) FERT (18-46*0) HERBICIDE LABOR-HOEING MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOP & MACHINERY) LABOR(IRRIGATION) INTEREST ON CP* CAP* SUBTOTAL. PRE-HARVEST HARVEST COSTS CUSTOM HARVetiAUL SUBTOTAL* HARVEST PRICE OR COST/UNIT QUANTITY TON 24.80 23*00 •570*40 S 570*40 LBS* LBS* LBS* ACRE ACRE ACRE ACRE ACRE HOUR HOUR OOL* 1*25 0*08 0*09 4*00 45*00 5*35 9*40 43*75 6*00 5*00 0*10 10*00 200*00 200*00 7*00 1*00 1*00 1*00 1*00 4*21 4*30 80*17 12*50 16*00 18*00 28*00 45*00 5*35 9*40 43*75 25*27 21.52 TON 4*00 s 232*61 s 92*00 23*00 s 324*81 TOTAL VARIABLE COST s 245*59 3* INCOME ABOVE VARIABLE COSTS 4* FIXEO COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXEO COSTS VALUE OR COST s ACRE ACRE ACRE ACRE 7*03 13*06 34*65 78*35 1*00 1*00 1*00 1*00 7*03 13*0€ 34*65 *76*, jg S 133*09 5* TOTAL COSTS $ 457*89 6* NET RETURNS S 112*51 LANO CHARGE BASED ON 1/5 OF GROSS LESS 1/5 OF HARVEST* HAULING t SOX OF IRRIGATION FIXEO COSTS* BEETS ARE 14 PERCENT SUGAR* PREPARED BY RAY SALMONS* TAEX. AMARILLO* TEXAS PROJECTED 1979 52 SUGAR BEETS* IRRIGATED* (NATURAL GAS). TEXAS HIGH PLAINS II R ESTIMATSO COSTS AND RETURNS PER ACRE HIOH LEVEL MANAGEMENT OPERATION PICKUP 1/2 TON CHISEL HLM TANDEM DISC HLM BOX FLOAT HLM LISTER 8R HLM ROLLING CULT HLM BEO PLNTR 8R HLM ROLLING CULT HLM BEET THINNER HLM CULTIVATOR8R HLM SHREDDER 4R HLM OFFSET DISC HLM OFFSET DISC HLM ITEM NO* 10 2.79 2*76 2.95 2*90 2.66 2.74 2.66 2*91 2.69 2.92 2.78 2.78 DATE FUEL.OIL. FIXED TIMES LABOR MACHINE LUB*.REP* COSTS OVER HOURS HOURS PER ACRE PER ACRE OEC JAN JAN FEB FEB MAR MAR MAY MAY JUNE JULY AUG SEPT 1.20 1*00 1.00 1.00 1.00 2.00 LOO WOO 0*25 LOO LOO LOO 2*00 TOTALS 1.500 0 * 188 0*175 0*566 0*145 0*310 0*233 0*155 0*103 0*160 0*279 0*133 1*200 0*104 0*097 0*314 0*081 0.172 0*129 0*066 0*057 0.089 0*155 0*074 -JU24S -flAiaZ 4*211 2*706 3*22 0*82 0*76 2*06 0*56 1*27 0*96 0*64 0*49 0*68 1*17 0*70 «U4JB 2*27 1*28 1.18 2*94 0*85 L91 1*46 0*96 0*77 1*03 1*77 1.22 2*4,4, 14*75 20*09 LAND CHARGE BASEC ON 1/5 QF GROSS LESS 1/5 OF HARVEST. HAULING & 50X OF IRRIGATION FIXED CCSTS* BEETS ARE 14 PERCENT SUGAR* PREPARED BY RAY SAMMQNS. TAEX. AMARILLO. TEXAS PROJECTED 1979 BUDGET IDENTIFICATION N U M B E R — ANNUAL CAPITAL MONTH 10 911002701 220 0 ON 53 WHEAT FOR GPAlN, ORVLANO. TEXAS HIGH PLAINS II ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT U GROSS RECEIPTS FRO* PRODUCTION WHEAT GRAZING TOTAL 2* VARIABLE COSTS PREHARVEST SEED MACHINERY TRACTORS LABORITRACTOR G MACHINERY) INTEREST ON OP* CAP* SUBTOTAL* PRE-HARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTALt HARVEST TOTAL 9* INCOME VARIABLE ABOVE P R I C E OR COST/UNIT REGION * BU* DAYS 3*00 0*07 16*00 120*00 BU* ACRE ACRE HOUR DDL* 4*00 3*64 3*36 6*00 0*10 0*80 1*00 1*00 2*53 6*40 4* FIXED COSTS MACHINERY TRACTORS LANO INET R E M ) TOTAL FIXED COSTS 46*00 w .fafrO $ 56*40 s 3*20 3*84 3*36 19*18 -~Q*6& $~ 26*22 s ACRE BU* 7*00 0*10 1*00 16*00 COST V^IHELE VALUE OR COST QUANTITY COSTS ACRE ACRE ACRE 4*01 3*84 18*61 7*00 - U*J * 6*60 % 34*82 * 21*58 4*01 3*84 1*00 1*00 1*00 S 26*46 5* TOTAL COSTS % 61*28 6* NET RETURNS 9 •4*88 LANO CHARGE BASED ON LANDLORD'S SHARE OF 33% OF GROSS INCOME* STOCKING RATE IS 3 ACRE/HEAO* GOV'T DEFICIENCY PAYMENT NOT INCLUDED, PREPARED BY RAY SAMMONS* TAEX, AMARILLO* TEXAS PROJECTED 1979 54 WHEAT FQB GRAIN* DRYLAND* TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT mm—m OPERATION ITEM NO* DATE FUEfc.OlL* FIXED TIMES LABOR MACHINE LUB*«REP* COSTS OVER HOURS HOURS PER ACRE PER ACRE l» PIUIPI III II •» CHISEL TM CHISEL TM TANDEM DISC TM GRAIN DRILL TM PICKUP 1/2 TON 3,44 3,44 3*40 3.5e 10 JULY AUG SEPT SEPT OEC TOTALS U 0 0 0.215 0.119 liOO 0*215 0*119 1.00 0*303 0*168 1*00 0*423 0*235 l»tO .1*215. _U19J2 2*530 1*742 0*62 0*62 1*02 1*59 1*14 1*14 1*30 2 * 19 -£*£5 _£*.££ 7.20 7*85 LANO CHARGE BASED ON LANDLORD*S SHARE OF 33X OF GROSS INCOME* STOCKING RATE IS 3 ACRE/ftSAO* GOV'T DEFICIENCY PAYMENT NOT INCLUOEO* PREPARED BY RAY SAMMONS. TAEX. AMARILLO. TEXAS PROJECTED 1979 BUDGET IDENTIFICATION *UM6ER«wt*i ANNUAL CAPITAL MONTH 5 76 002002 200 0 55 WHEAT FOR GPAIN, DRYLAND, TEXAS HIGH PLAINS II REGION EST IMATEO COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT I* GROSS RECEIPTS FROM PRODUCTION WHEAT GRAZING TOTAL 2* VARIABLE COSTS PREHARVEST SEED INSECTICIDE MACHINERY TRACTORS LABOR(TRACTOR 6 MACHINERY) INTEREST ON CP« CAP* SUBTOTAL, PRE-HARVEST BU* DAYS 3*00 0*07 k2*00 120*00 66*00 1 Btftft S 74*40 BU* ACRE ACRE ACRE HOUR DOL. 4*00 3*00 3*91 2*51 6*00 0*10 0*60 1*00 1.00 1*00 2*24 7*98 3*20 3*00 3*91 2*51 13*44 s ACRE BU* 7.00 0*10 7*00 1*00 22*00 9*20 > TOTAL VARIABLE CCST 3. INCOME ABOVE VARIABLE COSTS A, FIXEO COSTS MACHINERY TRACTORS LAND «NET RENT) TOTAL FIXED CCSTS VALUE OR COST 26*86 HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL, HARVEST PRICE OR COST/UNIT QUANTITY s 36*06 * 38*34 s ACRE ACRE ACRE 4*14 2*88 24*55 4*14 2*86 1*00 1*00 1*00 s l fifttSS 31*57 5, TOTAL COSTS s 67.63 6, NET RETURNS 1 6*77 LAND C H A R G E B A S E D CN L A N D L O R D * S SHARE OF 3 3 X OF G R O S S INCCME* STOCKING RATE IS 3 A C R E / F E A O * GOV'T DEFICIENCY PAYMENT NOT INCLUCEO* P R E P A R E D BY RAY S A M M O N S , TAEX, A M A R I L L O , T E X A S P R O J E C T E O 1979 56 WHEAT FOR GRAIN* OtfvtlAND. TEXAS HIGH PLAINS II REGION ESTIMATED g&STS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION ITEM NO* DATE FUEL.OIL. FIXED TIMES LABOR MACHINE LU6*.R£P* COSTS OVER HOURS HOURS PER AORE PER ACRE >mmmmmmmmmmmiiiitSimmmmmmtmmmtm — * — — • n a i CHISEL HLM CHISEL HLM TANOEM 01SC HLM GR ORILL HLM PICKUP 1/2 TON 3.79 3*79 3.76 3.94 10 JULY AUG SEPT SEPT DEC TOTALS 2*00 0*376 0*209 i*00 0*186 0*104 1*00 0*175 0*097 1*00 0*126 0*070 U I O _U3.7£ .1*1 Q9. 2*239 1*580 1*44 0.72 0*66 0«65 2*00 1*00 0«91 1*03 6*42 7*02 LAND CHARGE BASEC CN LANDLORD'S SHARE OF 33X OF GROSS INCOME. STOCKING RATE IS 3 ACRE/HEAD* GOV'T DEFICIENCY PAYMENT NOT INCLUCEO. PREPARED BY RAY SAMMONS. TAEX. AMARILLO. TEXAS PROJECTED 1979 BUOGET IDENTIFICATION NUMBER-** ANNUAL CAPITAL MONTH 5 76 002001 200 0 57 f^ WHEAT FOR GRAIN, IRRIGATED* fNATURAL GAS)* TEXAS NIGH PLAINS II REGION ESTIMATEO COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT 1* GROSS RECEIPTS FROM PRODUCTION WHEAT GRAZING TOTAL VARIABLE COSTS PREHARVEST S6E0 PERT CNI APPL'O HERBICIDE INSECTICIDE HAIL INSURANCE MACHINERY TRACTORS IRRIGATION MACHINERY LABORCTRACTOR & MACHINERY) LABOR!IRRIGATION) INTEREST ON 0P« CAP* SUBTOTAL* PPe-HARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL* HARVEST PRICE OR COST/UNIT QUANTITY VALUE OR COST $ BU* OAYS 3*00 0*13 40*00 140.00 120*00 —i£*J2 $ 136*62 BU* LBS* ACRE ACRE OOL* ACRE ACRE ACRE HOUR HOUR OOL* 4*00 0*10 3*50 3*50 0*08 4*07 5*55 15*00 6*00 5*00 0*10 1*50 100*00 1*00 1*00 90*00 1*00 1*00 1*00 3*28 1*48 34*18 8*00 10*00 3*50 3*59 7*20 4.07 S.5S 15*00 19*71 7«38 t ACRE BU* 9*00 0*10 9*00 1*00 40*00 **fl£ S TOTAL VARIABLE COST 13*00 96*32 3* INCOME ABOVE VARIAEL6 COSTS FIXED COSTS MACHINERY TRACTORS IRRIGATION VACHIHERY LAND CNET RENT) TOTAL FIXED CCSTS 3f4? 68*32 4C*30 ACRE ACRE ACRE ACRE 4*49 6*35 11*68 26*34 4*49 1*00 1*00 1*00 1*00 6*35 11*86 I 36*34 49*07 S* TOTAL COSTS $ 147*39 6* NET UPTURNS « -€.77 LANO CHARGE IS 31* OF GROSS* LESS 1/3 FERT • CHEM, HARVEST* GAS & SOX OF IPRIG FIXED CCSTS. STKG RATE 1-5 AC/HD* GOV'T PYMNT* NOT INCL* PREPAREO BY RAY SAMMONS* TAEX* AMARILLO. TEXAS PROJECTED 1979 58 WHEAT FOR GRAIN* IRRIGATE©, (NATURAL GAS>• TEXAS NIGH PLAINS II R ESTIMATED COSTS ANO RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION TANDEM D I S C TM TANDEM D I S C TM TM CHISEL TM L I S T E R 6R TM ROOWEEDER TM GRAIN D R I L L PICKUP 1 / 2 TON ITEM NO* 3*40 3*40 3*44 3.54 3*50 3*56 10 DATE FUEL.OIL. PIXEC TIMES LABOR MACHINE LUB**REP* COSTS OVER HOURS HOURS PER ACRE PER ACRE JULY AUG AUG AUG AUG AUG OEC 2*00 1*00 1*00 1*00 1*00 1*00 1*10 TOTALS 0*606 0*303 0*215 0*221 0*141 0*423 0*337 0*168 0*119 0*123 0*079 0*235 2*03 1*02 0*62 0*71 0*50 1*59 2*60 1*30 1.14 0*08 0*65 2*19 . I t 375 LOUP. x**«S ,£tQ£ 9*62 10*84 3*204 2*161 LAND CHARGE IS 33X CF GROSS* LESS 1/3 FERT. CHEM* HARVEST. GAS 6 90% OF IRRIG FIXED COSTS* STKG RATE 1*5 AC/HO* GOV*T PYMNT* NOT INCL* PREPAREO BY RAY SAMMONS* TAEX* AMARILLO. TEXAS PROJECTEO 1979 BUDGET IDENTIFICATION NUMBER* ANNUAL CAPITAL MONTH 5 76 002302 220 0 ON 59 WHEAT FOR GRAIN, IRRIGATED, fNATURAL GASI, TEXAS HIGH PLAINS LI REGIQh ESTIMATED COSTS ANO RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT 1* GROSS RECEIPTS FROM PRODUCTION WHEAT GRAZING TOTAL 2* VARIABLE COSTS PREHARVEST SEED FERT (Nl APPL«0 HERBICIDE INSECTICIDE HAIL INSURANCE MACHINERY TRACTORS IRRIGATION MACHINERY LABORCTRACTOR 6 MACHINERY) LABORCIRRIGATION I INTEREST ON CP* CAP* SUBTOTAL, PPE-HARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL. HARVEST au. DAYS BU* LBS* ACRE ACRE OOL* ACRE ACRE ACRE HOUR HOUR DOL* VALUE OR COST PRICE OR COST/UNIT QUANTITY 3*00 0.13 150*00 50*00 140*00 * 160*62 4*00 0*10 3*50 3*50 0*08 4*14 4*01 20*00 6*00 5*00 0*10 6»B0 15*00 3*30 3*5C 7*20 4*14 4*01 20*00 15*94 9*84 1*50 150.00 1*00 1*00 90*00 1.00 1*00 1*00 2*66 1*97 40*02 s Iftgfi 93*13 s ACRE BU* 10*00 0*10 10*00 1*00 50*00 &9J s 15*00 s TOTAL VARIA8LE COST 3. INCOME ABOVE VARIABLE COSTS s 4* FIXEO COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LANO (NET RENT! TOTAL FIXED COSTS $ 108*13 6C*49 5. TOTAL COSTS 6. NET RETURNS ACRE ACRE ACRE ACRE 4*24 5*5T 15*84 30*76 1*00 1*00 1*00 1*00 4*24 5*57 15*64 - -34*t7l % 96*41 s 164.54 4*08 LANO CHARGE IS 33* OF GROSS. LESS 1/3 FERT*• CHEM*• HARVEST. GAS & SOX OF IRRIG* FIXED COSTS* STOCKNo RATE 1*5 AC/HEAO* GOV'T PVMEKT* NCT If PREPARED BY RAY SAMMCKS. TAEX. AMARILLO. TEXAS PROJCCTEO 1979 60 WHEAT FOR GRAIN* IRRIGATED* (NATURAL GAS). TEXAS HIGH PLAINS II REG1Q* ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION ITEM NO. M M M M W M H TANDEM DISC HLM CHISEL HLM LISTER 8R TM RODWEEDER HLM GRAIN ORILL HLM PICKUP 1/2 TON FUEL.OIL. FIXEC TIMES LABOR MACHINE LU8*tREP* COSTS DATE OVER HOURS HOURS PER ACRE PER ACRE » ' mm ••••——••••••••••< 2*76 JULY 2*00 2*79 2*55 2*85 2*93 10 AUG AUG AUG AUG DEC $•00 0*188 0*104 1*00 0*177 0*098 1*00 0*127 0*071 1*00 0*314 0*175 1*20 ..USJljQ _lA2Jtt TOTALS 0*350 2*656 0*195 1*842 1*52 0*82 0*70 0452 1*36 -3A£J 2*35 1*28 1*04 0*77 2*09 Stttf 8*15 9*81 LANO CHARGE IS 33X OF GROSS* LESS 1/3 FERT*, CHEM.. HARVEST* GAS & SOX OF IRRIG* FIXED COSTS* STOCKNG RATE 1*5 AC/HEAD* GOV'T PVMENT* NOV IM PREPARED BY RAY SAMMONS* TAEX* AMARILLO* TEXAS PROJECTED 1979 BUDGET IDENTIFtCATICN NUMBER«J» ANNUAL CAPITAL MONTF 5 76 002401 220 0 B-124KL2) COW-CALF BUDGET —TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURN5 PER HEAD 300 COW HERD, JAN-FEB-HAfi CALVING ITEM WEIGHT EACH UNIT U. 50 CWT. CWT. CWT. PRICE OR COST/UNIT QUANTITY VALUB nr COST GROSS RECEIPTS STEER CALVES HEIFER CALVES CULL COWS TOTAL 2. a.25 10.00 100.00 90.00 48.00 0.43 0.31 0. 11 193.50 118.57 5 2^80 364.87 150.00 15.00 1.00 15.00 30.00 1.00 1.00 1.00 1.00 1.00 15.00 30.00 5.00 6.00 2.10 3.00 5.0C 4.00 2.50 1.55 3.82 0.31 5.20 0.29 28.80 4X93 VARIABLE COSTS COTTONSEED CAKF HAY VET MEDICINE RANGE IHPROVEMEN SALT 6 HIN. MISC EXPENSE MARKETING FENCE REPAIR WATER FACIL REPR CORRAL REPAIR MACHINERY(FUEL,LUBE,REP) EQUIPMENT(FUEL,LUBE,RIP) LABOR, TRACTOR 5 MACHINERY LABOR, EQUIPMENT LABOR, LIVESTOCK INTEREST ON OPER.CAP., TOTAL VARIABLE COSTS 3. INCOME ABOVE VARIABLE COSTS 4, FIXED COSTS LAND RENT INT. OK LIVESTOCK CAPITAL INT. ON OTHER EQUIPMENT DEPR ON BEEF BULL PURCH. DEPR. ON HORSE DEPR. ON OTHER EQUIP. OTHER FC, EACH 5 EQUIP. TOTAL FIXED COSTS LB. BALE HEAD ACRE LB. HEAD HEAD HEAD HEAD HEAD DOL. DOL. HRS. HRS. HRS. DOL. 0. 10 2.00 5.00 0.40 0.07 3.00 5.00 4.00 2.50 1.55 4.50 4.50 &.50 0. 10 1. 15 0.06 6.40 49.30 117.50 247.38 ACRE DOL. DOL. DOL. DOL. DOL. DOL. 4.00 0.10 0. 10 15.00 571.36 34.00 . 60.00 57.14 3.40 8.40 0.33 5.55 ,1<?r83„ 145.65 5. TOTAL COSTS 263.14 6. NET RETURNS 101.73 NATIVE RANGE, NO CREEP FEED, 86% CALF CHOP, 12% REPLACEMENT RATE, 1* DEATH LOSS ON COWS, STOCKING RATE 15 ACRES/COW, 7 SECTION RANCH ESTIMATED FOR 1 9 7 9 - 8 0 , TEXAS AGRICULTURAL EXTENSION SERVICE Budget information presented i s prepared s o l e l y as a general g u i d e l i n e and i s not intended tc recognize or to predict the c o s t s and returns from any one p a r t i c u l a r farm or ranch operation Te*as Agricultural Extension Service . The Texas A M I University System . ueniti C. PfanastM, Director - College Station, Texas vO to « »n tflaia a, o « O U h X l t f o »— • t K a o o o o o i n ©coo*u">iriM©oe>© o S U p w to § ffl^oy w n B m »CU 2H O f i < 8 N h » i « o o o o • CU • J « X «C a o rg o O I I I wH to3 « C X o H * O sID o S O O u l N P - i f l O O O O s* 1 AS 52 T - Q «- t~ r- *— ^ m M O O O O O O O O O O u C B O O O O O O O O O O •4 w to « r— X to W «C O X D •* O O to cc (^ * B" « (N O — * N to o a: n o --. ts © «•* r- r» r* r- r- o • •«••*»••• © O O O O f n O O O © w o o i n M V I T o r* i/i r> U(N<-(vjrrrNi\iO'-r'(\i M n 3 to H eIB M Q M H cc (9 ca 9 CQ \« M "1 © w o » SB O © £-r m 10 fN u m IS K i co X] w to o SB fe aj H 1W u c D CO I M 0 3 CM ft. to . M O — a n 10 to H z M hA 10 <4<H Q totocu =c o to w a a r M U o o o o o o o o o o o in M M 4 N H to M O tO «N cr OJ p» :» VJO X l^ c> © o o o o o o o © H •e ce o o o o o o o o o o -i K U to O i n ro > a a - ' - c o ^ o r - v c r ' K us «r r o i n c O w ^ a ^ c o m r n V> a . ec o i N o o o ^ - r - c o c o W K SB U (3 K (MC0(Nt*-«r»OOOO g W o c o m m o o o o \ o o o u i r - N m o c o o v o • • • • • • » • * « fN"-CN«n(Nr<iinr»ro<N ft. H to O u « o 1 <:t3 to M U IB <* o o i n r » c \ » i n o o o n oino»co«-r>imej>m<n to l-i C4 Q » • i A » • i - M C I N n f » • P5 to C H I u W D1 e, M SCS o H to •: M •CD a-• -: -J a O (J to •J o to O EC S3 V a. •4 D * S4 U H a. < * o . o o o o cc W r- ' r O u o• o o PS o < o o o se K to o to • ^ o o o o o u i o r - ^ r O t f l M r o o o o o » - o » . » - , ( o o o » - o o o to in • a 0 M U H H (0 Cr. H ft. •I o o o o o o o o o o o o o o o o o o o o • * • • * • • • • * o o o o o o o o o o o o o m m o o o o o « tN»r P » * m < N n c ts n •- H H g • . t - < Q O Q Q o O O C O O O O O O O M O O O O O O O O O O o o o o o o o o o m © o o i n i n m o o © f > a r s i n r - «t I N f(*< o c e CJ - - J j tototoUOtoKECtCIS o o o © © © © o o o o o o o o o o © ' K K O H «n 10 t 9 to B M i . i k . t s Q » . e a 3 : B o o o o o © tNJ v * a f « r © r - © » - » " » - t r-NrlT © r- So a M U «s H H es W W to OS O H M © W J J Si H a. <» w to M to M *» to t a cc to ft ** «J to m o» t ed M J H M B» 9 M k i fri H to Q to o co ts «* ic a la u M M U M M ! - a >^ U K M k . tototo 4 to CO to -etoM H CO « tototoca M w o CO CO 33 in IA in o • M u ; 3 s r o « - 0 ' - » - « - « to »- CM • - m o rin 01 •. B CO « « e-t-Hf-" • M M «e to . K (J O O H O i . es o D to t n 04 rn tocoooooooooo CQ M O O O O O O O O O O C f> . , . o o o o o o o o o o o o o » r » n © © o o v o • • • • « • • • • • o o m h N i r o c o o i o fN»»«MnP«tNinr»nM t. £ O ri m M M I 0 O O O O O O O O O O !.) ts O O O O O O O O O O • o © r* •x: i-- H m a. M M to CO t» 10 o c: H) :c ru 3 ! m o -•: :• M a -3 3 DO J OS p= O f - O O o o o o o in © o D o i n m f M O O o o •4 to w r-j o o o OJ o to ft) w ec IK es «•)•)•• w M » H «e I i tc I u ««! E >- co ec a . M g« to IN • • 9B O S M M W O •* C ! / ) ( ! CO to M to H * C K to a; cu C» J to (VI » »4 M O a w r * t j CQ 0= «C K M w U M ( j U tO Dototot o o «« o u a; cu ru u a*. as to 'J uj E-< fO M b) w c Q H t O C E in m if> * STOCKER CALF BUDGET TEXAS HIGH PLAINS II REGION ESTIHATED COSTS AND RETURNS PER HEAD PDRCHASE NO? 1, SELL HARCH 10 ~ ITEH 1. WEIGHT EACH UNIT 5.77 CNT. CWT. HEAD DAIS BALE HEAD QUANTITY VALUE OR CO: ? 85.00 1.00 49Q.U5 'u907<J5 100.00 400.00 0.30 2.00 5.00 0.07 4.00 0.03 130.00 tt.00 1.00 8.00 1.00 5.77 130.00 23 1.60 400.00 12.00 3S>.00 8.00 5.00 0.56 GROSS RECEIPTS FEEDER STEERS TOTAL 2. PRICE OR COST/UNIT VARIABLE COSTS STOCKER STEERS DEATH LOSS WHEAT PASTURE HAY VET 6 PROCESSING SALT S MIN. HISC EXPENSE HAULING 6 HKTG. FENCE REPAIR INTEREST ON OPER. CAP. , TOTAL VARIABLE COSTS 1. INCOME ABOVE VARIABLE COSTS <4. FIXED COSTS DEPR. ON OTHER EQUIP. TOTAL FIXED COSTS 5. TOTAL 6. NET RETURNS LB. HEAD CWT. DAYS DOL. a.00 0.75 0.05 0. 10 a.00 a.33 6.50 2 3.11 502.55 -12.10 i 0^0 DOL. COSTS ^c.o 502.^5 -12. >0 PRIMARILY GRAZING OF DRYLAND 8HEAT PASTURE, STOCKING RATE OF 3 AC/HEAD, 130 DAYS GRAZING, 3% DEATH LOSS AND SHRINK, 1 . 5 LBS. GAIN/DAY. ESTIHATED FOR 1 9 7 9 - 8 0 , TEXAS AGRICULTURAL EXTENSION SERVICE Budget information presented i s prepared s o l e l y as a general g u i d e l i n e and i s not intended to recognize or to predict the c o s t s and returns from any one p a r t i c u l a r farm or ranch o p e r a t i o n . Educational programs conducted race, color, sex, religion or national by the Texas Agricultural Extension Service serve people of all ages regardless of socio-economic level, origin. Cooperative Extension Work in Agriculture and Home Economics, The Texas A & M University System and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 19">4. AECO 6 7 5 0 - 1 1 - 7 9 , Revised B-1241(L2) COW-CALF BUDGET ~~ TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER HEAD 3 0 0 COW HERD, JAR-FEB-MAR CALVING ITEM GROSS UNIT 4.50 4.25 10.00 CRT. CRT. CRT. VARIABLE QUANTITY VALU? OR COST 100.00 90.00 48.00 0.43 0.31 0. 11 193.50 118.57 52.80 364.87 150.00 15.00 1.00 15.00 30.00 1.00 1.00 1.00 1.00 1.00 15.00 30.00 5.00 6.00 2.10 3.00 5.00 4.00 2.50 1.55 3.82 0.31 5.20 0.29 28.80 4A93 117.50 COSTS COTTONSEBD CAKF HAY VET MEDICINE RANGE IHPROVEMEN SALT S B I N . MISC EXPENSE MARKETING FENCE REPAIR WATER FACIL REPR CORRAL REPAIR MACHINERY(FUEL,LUBE,RIP) EQUIPMENT(FUEL,LUBE,RIP) LABOR, TRACTOR 5 MACHINERY LABOR, EQUIPMENT LABOR, LIVESTOCK INTEREST ON O P E R . C A P . , TOTAL VARIABLE COSTS c PHICE OR COST/UNIT RECEIPTS STEER CALVES HEIFER CALVES COLL COWS TOTAL 2. HEIGHT EACH 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS LAND RENT I N T . OR LIVESTOCK CAPITAL I N T . ON OTHER EQUIPMENT DEPR. ON BEEF BULL PURCH. DEPR. ON HORSE DEPR. ON OTHER E Q U I P . OTHER F C , MACH S E Q U I P . TOTAL FIXED COSTS LB. BALE HEAD ACRE LB. HEAD HEAD HEAD HEAD HEAD DOL. DOL. HRS. HRS. HRS. DOL. 0. 10 2.00 5.00 0.40 0.07 3.00 5.00 4.00 2.50 1.55 4.50 4.50 .**.5 0 0. 10 1. 15 0.06 6.40 49.30 247.38 ACRE DOL. DOL. DOL. DOL. DOL. DOL. 4.00 0. 10 0. 10 15.00 571.36 34.00 60.00 57.14 3.40 8.40 0.33 5.55 10*83, 145.65 5. TOTAL COSTS 263.14 6. NET RETURNS 101.73 NATIVE RANGE, NO CREEP FEED, 86% CALF CROP, 12% REPLACEMENT RATE, ^\ DEATH LOSS ON COWS, STOCKING RATE 15 ACRES/COW, 7 SECTION RANCH ESTIMATED FOR 1 9 7 9 - 8 0 , TEXAS AGRICULTURAL EXTENSION SERVICE Budget i n f o r m a t i o n p r e s e n t e d i s prepared s o l e l y a s a g e n e r a l g u i d e l i n e and i s not i n t e n d e d tc r e c o g n i z e or t o p r e d i c t t h e c o s t s and r e t u r n s from any one p a r t i c u l a r farm o r ranch o p e r a t i o r Tex* Aorieultursl Extension Service - The Tex* AMI University System . ueniej C. Pferwetiel, Director . College Station. Te*»* -"> £-i ra "i • a a a > -• o u h a o Cu O W O ~ £4 \ O O H l t W O i & •< BO «VK • M B °s Hs IN O CN 00 • J 06 N , o •c M tk. » r-y AI m a, «• M Q» f • m as & H O M I O o O tS3 o O IN o o •r" 1 1 1 05 3 M Z O H H S e •" to 1W IB O K O . M: o © H «T \ IN O t— <N £ • no IB tfl tu 09 M f- M a as e> & D a to EM IB B aa M M o CM o o m CN «n 05 • O O O X < to H a M B H N. • m vo M 03 CN it & • w o •* O CE o M Z 1 3* " 1 O •0 o O 03 Ml «J • • • • • • • • a ©oooonooo© o o e a o o o o o o o o o i o •« r- r* (*• l*> r~ o ovO\a>jD«3ooooo • Q f " f— ?~ r» ?- m w o o o o o o o as CQ B3 Ml U (/)WtM«-r'IirfN(\|0'-|>(N M O . . . . a 3 KI ea oooooooooo * •• •t> • t t • oooooooooo O as M) & i v f f l r s M r e o o o o 5 M in M o o D 03 1 1 (• H -4 c c O ' - o o o » - o n r « o M M : B: H » LI U a ; [ « - c - o o o o o o o o o f r • e p i o o o o o o o o o o K •! M C On U O DJ t n r o \ 0 3 r » - o 0 » o » > \ c t * - M Ml > D M (0 Ml M o o o o o o o o o i n o B f r t - ^ i - r OtfNi• « o o o o o o » - o o o o ^ N O ' - N i n s i i f l n wm <-lA<"»-»"<l(v|fi1»"i- • as H OS 1 0 O O O O O O O O O O O J « : O O O O O O O O O O W M O O O O O O O O O O n M •M >• a Mi C oooooooooo o o i / i h N i n o o o c at H 1 (J W a X O H H P4 «C W O M M U [- - * to as M a. «l o o o o o o o o o o o o o o o o o i n ooo»nu*)«iooo'~> a P4U1 h tf IN »(•> CN »IS o o o o o o o o o o o o o o o o o o o o • * # • • • • • • • oooooooooo o c o u > i n o o o o c j fc « O u a. Ml ts «a H M H H H • ' H O O C Ci g csnqlajpJiWMiMjMi-e h » < ! b I } O I > ' C E I : & H 03 •a o o O O O O I O O O Ot O O ' Ml OT * - tN t - «"> a* o o o I o i M as 09 as a H a M fiK OS W O M M w M »4 »J 1« w M H »: 0 . •< •< CB i a n t i i a a H u < a a M a MI a, a (a o M •J ou •J M O M a a se as td M as u M O V: CO DM P- a« to u a= M w w a <« H ca H « M M M W O a to o w M? » o << o H *- a, a a a a — (M i 32 O O O O O O O O O O W O O O O <r o o o o o t-i i c u a- O 10 "~ <N r- \fi .- O •"•"»o «-. as a a a: ta pjeatr.ee •2 (0 Q M M M Oi H W l J J H H *1 H H M < a ru JG Pu »e << ee O w i a ae a M » O f ^ K H f - W M O • o u • c te a t ws ce u M u M ' 1 i« • - o «* O U =r M w (4 < H K | < w to u to F J a . v. -'. •- > t as H o MI CO P3 a C. ce M -J fc J H a w m B :. oa tq na fto w en H »l en O cr m vo •— -3- irt «1 ifiiflin* a M to u> t * U u H U M K ^ .' M < « < ^ MWMWrtOWMWCilW 3t!«0u{iL,t5Ofc-a:»a:rs M »- » • - (N m =r •^ o J » o U Oi -B S as * U; L-" • ' • • • • < • BM«-»-«-«-»-*-*-r'«-f- O D O l f l / l O O O O l O e* a> a o K « O N O O O i - [ s C C O < j o o o o o o o © » - o H te u o O H O n a S b lo P M H O w ir> to • Ninoco©vD # • • • • • « • « o o m r ^ o j m o o o r o K e m • • CM»-MfO<NfNirtr~nif>i 1 W os U a as M Ex • & oomir t* 3) MS •3 O o KC tu o c o i / iv « n o o o o > £ > a M o C K S 8 M M eu M to « « M x c l~ w m M l-l VI < ce o • 3 O W O " O H I O 35 33 a r~ Ml 3 1to f>J n X en »* *Am D to *Minn> a a o o o o O IT) ©aoouiinrMOooo M O «e «c f n to >• m H Otfif*i0'»ir*vnr«in«r fr- W Ml U O Q l ^ l S M A O O O ^ M •J c *• M ** as a B 33 £ a -3 ea M CQ H : M u. M 0H *W cNO(NIP-3vOOOOO m w V— \t « o M to BE O C O © U » ( as o O M 33 < U< H O O O O O IT ooodiAinmooao §•»« H s a s*c a u M H a (a o *- ar in tn in m m & 1 STOCKER CALF BUDGET TEX1S HIGH PLAINS II REGION ESTIHATED COSTS AND RETURNS PER HEAD PURCHASE NOV 1, SELL MARCH 10 ITEM WEIGHT EACH UNIT PBICE OR COST/UNIT 5.77 CfT, 85.00 CUT. HEAD DAIS BALE HEAD LB. HEAD CBT. DAYS DOL. 100.00 400.00 0.30 2.00 5.00 0.07 4.00 0.75 0.05 0. 10 QUANTITY VALTJ5 OR COS? 1.00 490.45 490.45 4.00 0.03 130.00 4.00 1.00 8.00 1.00 5.77 130.00 231.60 400.00 12.00 39.00 8.00 5.00 0.56 4.00 4.33 6.50 GROSS RECEIPTS FEEDER STEERS TOTAL VARIABLE COSTS STOCKER STEERS DEATH LOSS WHEAT PASTURE HAY VET 6 PROCESSING SALT B HIN. HISC EXPENSE HAULING 6 MKTG. FENCE REPAIR INTEREST ON OPER.CAP., TOTAL VARIABLE COSTS 1. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS DEPR. ON OTHER EQUIP. TOTAL FIXED COSTS 23 . ' 502.55 -12.10 |„ 0.0, 0.0 DOL. 5. TOTAL COSTS 502.55 6. NET RETURNS - 1 2 . (0 PRIMARILY GRAZING OF DRYLAND WHEAT PASTURE, STOCKING RATE OF 3 AC/HEAD, 130 DAYS GRAZING, 3% DEATH LOSS AND SHRINK, 1 . 5 LBS. GAIN/DAY. ESTIHATED FOR 1 9 7 9 - 8 0 , TEXAS AGRICULTURAL EXTENSION SERVICE Budget information presented i s prepared s o l e l y as a general g u i d e l i n e and i s not intended t o recognize or t o predict the c o s t s and returns from any one p a r t i c u l a r farm or ranch o p e r a t i o n . Educational programs conducted race, color, sex, religion or national by the Texas Agricultural Extension Service serve people of all ages regardless of socio-economic level, origin. Cooperative Extension Work in Agriculture and Home Economics, The Texas A & M University System and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914. 7 5 0 - 1 1 - 7 9 , Revised AECO 6