UNCLASSIFIED National Security Agency Overseas Contingency Operations Military Construction, Defense-Wide FY 2011 Budget Estimates ($ in thousands) State/Installation/Project Classified Location Classified Project Unspecified Worldwide Locations Planning and Design Total Authorization Request Approp. Request 41,900 41,900 - 4,600 46,500 46,500 UNCLASSIFIED New/ Current Mission Page No. C 280 284 279 UNCLASSIFIED 1. COMPONENT February 2010 3. INSTALLATION AND LOCATION 4. COMMAND 5. AREA CONSTRUCTION COST INDEX NSA/CSS Classified 6. PERSONNEL STRENGTH Army Installation 2. DATE FY 2011 MILITARY CONSTRUCTION PROGRAM NSA/CSS DEFENSE OFF PERMANENT ENL CIV OFF x CLASS a. AS OF b. END FY 7. INVENTORY DATA ($000) STUDENTS ENL CIV OFF SUPPORTED ENL TOTAL CIV IFIED A. TOTAL ACREAGE B. INVENTORY TOTAL AS OF C. AUTHORIZED NOT YET IN INVENTORY D. AUTHORIZATION REQUESTED IN THIS PROGRAM E. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM F. PLANNED IN NEXT THREE YEARS G. REMAINING DEFICIENCY H. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM: PROJECT CATEGORY NUMBER CODE 442-758 0 0 0 41,900 0 41,900 PROJECT TITLE Classified Project (FY11) 9. FUTURE PROJECTS: a. INCLUDED IN FOLLOWING PROGRAM CATEGORY CODE b. PLANNED IN NEXT THREE YEARS CATEGORY CODE COST ($000) DESIGN START COMPLETE $41,900 AUG09 DEC10 PROJECT TITLE COST ($000) PROJECT TITLE COST ($000) 10. MISSION OR MAJOR FUNCTION Agency activities are classified. 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES: A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 DD Form 1390, DEC 76 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED UNCLASSIFIED 280 UNCLASSIFIED 1. Component NSA/CSS DEFENSE FY 2011 MILITARY CONSTRUCTION PROJECT DATA 3. Installation and Location Classified 5. Program Element 2. Date February 2010 4. Project Title Classified Project 6. Category Code 82117 7. Project Number PTN 22573 8. Project Cost ($000) $41,900 9. COST ESTIMATES Item U/M Quantity Unit Cost Cost ($000) Primary Facility Administrative Technical Building Utility Systems and Support Areas LS LS LS 17,232 (3,955) (6,550) (6,727) Supporting Facilities Electrical Service Mechanical Systems Site Improvements / Demolition LS LS LS 19,780 8,755 6,675 4,350 Total Construction Cost 37,012 AT / FP Requirements (2%) Sub Total Contingency (5.0%) Sub Total SIOH (5.7%) Total Project Request 740 37,752 1,888 39,640 2,259 41,899 Total Project Cost (Rounded) 41,900 10. DESCRIPTION OF PROPOSED CONSTRUCTION: Construct a combined administrative and technical facility with supporting mechanical, electrical, security and IT/Comms infrastructure. In addition, the project will include necessary demolition, excavation, grading and other site improvements as required. Perimeter physical and technical security measures will also be provided for the facility. 11. REQUIREMENT: 2322 SM ADEQUATE: 0 SUBSTANDARD: 0 PROJECT: Classified Project: Due to classified nature of the project, additional details can be provided separately upon request. REQUIREMENT: Provide administrative and technical spaces for conducting mission support activities within the protected perimeter of the subject site. Ensure critical mission support systems and infrastructures are capable of concurrent maintainability. Provide mission assurance and sustainability measures consistent with other primary facilities within the subject site perimeter. CURRENT SITUATION: Above referenced activities are currently conducted within a nearby building that has been altered from its original purpose to serve as a temporary solution for this requirement. In addition to an inefficient floor plan and internal layout, the building has structural deficiencies that present potential life safety risks to agency personnel. IMPACT IF NOT PROVIDED: If this project is not funded, the agency will continue conducting mission-critical activities in a substandard facility until the host nation resumes occupancy of the building in December of 2011. If suitably located and equipped replacement facilities are not provided prior to that date, a critical mission activity will be forced to terminate. This would result in the loss of valuable, actionable information for the war fighter and would have substantial negative impact on the Global War on Terrorism. UNCLASSIFIED UNCLASSIFIED 1. Component NSA/CSS DEFENSE 3. Installation and Location Classified 5. Program Element FY 2011 MILITARY CONSTRUCTION PROJECT DATA 6. Category Code 82117 2. Date February 2010 4. Project Title Classified Project 7. Project Number PTN 22573 12. SUPPLEMENTAL DATA: a. Estimated Design Data: 1. Status (a) Date Design Started (b) Percent Complete as of JAN 09 (c )Date Design 35% Complete (d) Date Design Complete (e) Type of Contract 8. Project Cost ($000) $41,900 AUG 09 5% AUG 10 DEC 10 Design /Bid/ Build 2. Basis (a) Standard or Definitive Design (b) Where Design was most recently used No N/A 3. Total Design Cost (c ) = (a) + (b) or (d) + (e) (a) Production of Plans and Specifications (b) All Other Design (c ) Total Design Cost (d) Contract (assumed) (e) In-House 2,514 2,086 4,600 2,924 1,676 4. Construction Award FEB 11 5. Construction Start APR 11 6. Construction Complete FEB 12 /s/_______________________ Jeffrey P. Rutt, P.E. Technical Director, I&L DD Form 1390, DEC 76 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED UNCLASSIFIED 282 UNCLASSIFIED 1. COMPONENT 2. DATE FY 2011 MILITARY CONSTRUCTION PROGRAM NSA/CSS DEFENSE February 2010 3. INSTALLATION AND LOCATIONS 4. COMMAND Classified (Planning & Design) 5. AREA CONSTRUCTION COST INDEX NSA/CSS N/A 6. PERSONNEL STRENGTH Tenant of US ARMY OFF PERMANENT ENL CIV A. AS OF B. END FY 7. INVENTORY DATA ($000) OFF STUDENTS ENL CLASS IFIED CIV OFF SUPPORTED ENL TOTAL CIV A. TOTAL ACREAGE B. INVENTORY TOTAL AS OF Aug 1999 C. AUTHORIZED NOT YET IN INVENTORY D. AUTHORIZATION REQUESTED IN THIS PROGRAM E. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM F. PLANNED IN NEXT THREE YEARS G. REMAINING DEFICIENCY H. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM: PROJECT CATEGORY NUMBER CODE N/A 0 0 4,600 0 0 0 4,600 PROJECT TITLE COST ($000) Planning and Design FY 11 4,600 9. FUTURE PROJECTS: a. INCLUDED IN FOLLOWING PROGRAM CATEGORY CODE b. PLANNED IN NEXT THREE YEARS CATEGORY CODE DESIGN START STATUS COMPLETE PROJECT TITLE COST ($000) PROJECT TITLE COST ($000) 10. MISSION OR MAJOR FUNCTION 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES: A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 DD Form 1390, DEC 76 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED UNCLASSIFIED 283 UNCLASSIFIED 1. Component NSA/CSS Defense FY 2011 MILITARY CONSTRUCTION PROJECT DATA 2. DATE February 2010 3. INSTALLATION AND LOCATION Classified (Planning & Design) 5. PROGRAM ELEMENT N/A 4. PROJECT TITLE Classified Project 6. CATEGORY CODE N/A 7. PROJECT NUMBER N/A 8. PROJECT COST ($000) $4,600 9. COST ESTIMATES ITEM U/M QUANTITY UNIT COST COST ($000) Total Planning and Design 4,600 10. Description of Proposed Construction Funds are used for preparing plans, specifications, and other A&E services required for developing a complete design package to include geotechnical services, engineering calculations, project scheduling, and cost estimating. 11. Requirement: The estimated construction cost for MILCON projects does not include funds for Planning and Design (P&D) activities. Therefore, separate P&D amounts are required for the accomplishment of the planning and design effort associated with the Agency MILCON Program. 12. Supplemental Data: /s/ ___________________ Jeffrey P. Rutt, P.E. Technical Director, I&L DD Form 1391, DEC 76 284 UNCLASSIFIED