Department of the Air Force Military Family Housing Fiscal Year (FY) 2006/2007 Budget Estimates Justification Data Submitted to Congress February 2005 FAMILY HOUSING DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST NARRATIVE SUMMARY --~-- ~ --- This Military Family Housing request reflects the Air Force's commitment to revitalize inadequate houses and provide service members with homes that meet contemporary standards similar to the size and floor pattern of homes constructed in the local community. The Air Force created the Air Force Family Housing Master Plan (FHMP) as the "roadmap" to guide our planning and programming of investment, operations and maintenance, and privatization in military family housing. This budget request fully funds the AF FHMP to meet Air Force's 2007/2009 goal: eliminating all inadequate housing units in CONUS by FY 2007 (except 4 northern bases by FY 2008) and overseas by FY 2009. The Air Force FHMP provides a balanced, requirements based strategy that integrates and prioritizes traditional construction and operations and maintenance, with a measured approachto privatization into a single "roadmap." The FHMP recognizes that we rely on the local community to provide 60 percent of our military family housing needs. When local community housing is unavailable, or inadequate, or demand for base housing is high due to economic factors, we construct, replace, improve, or repair and maintain existing military family housing to modem-day, industry standards. Also, where possible and fiscally appropriate, we attempt to lease adequatehousing for our families. Consistent with AF FHMP priorities, this budget provides a program that emphasizes construction to upgrade homes to whole-house standards,and supports operations and maintenance of our housing inventory for daily operations to "keep the doors open" and where needed to keep "good housesgood." In this way we prevent deterioration in our existing adequate inventory. We are accelerating revitalization of inadequate homes in the worst condition by improving or replacing to contemporary standards,where economically justifiable. The operations, maintenance and leasing accounts predominantly support "must pay" requirements. These costs include service contracts, lease contracts, utilities, and essential maintenance for operating the units and contract funding to correct life safety, health, and facility preservation issues that cannot wait for MILCON funding. DoD developed a new Housing Requirements and Market Analysis (HRMA) process to determine the housing requirements in 2003. As a result, the Air Force conducted HRMAs for all installations in 2003/2004. The on-base housing requirements were reduced and surplus housing identified. The Air Force established policy and strategy to dispose of the unneeded surplus housing through Military Construction (MILCON), privatization, conveyance, transfer, conversions and demolition. This budget request reflects the implementation of our surplus housing policy and strategy. . The Air Force is also committed to continuing a measured approachto privatization to revitalize where projected life-cycle costs are similar or better than traditional military construction and operations and maintenancelife-cycle costs. The AF FHMP proposesthree additional housing privatization initiatives in FY 2006. We propose to privatize more than 2,200 housing units at '., . c"'-"'-- February 2005 Page No. 3 0 7 ~ ,;::: DEPARTMENT OF urn AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST threebases:PetersonAFB andAir ForceAcademy,CO; and F.E. WarrenAFB, WY. The alternativeprojectwill only be executedif privatization is unsuccessful.Thesethree improvementprojectshavea total budgetcostof$65.1 million. We believethis fundingprofile representsa well-balanced,fiscally constrainedprogram. By allocatingmore fundsto constructioninvestment,we are more aggressivelyattackingour inadequateunits, and ensuringM&R dollars are working to fund "must pay" bills and essential housingrepairs. We respectfullyrequestfull supportfor the Air Force family housingneeds presentedherein. February2005 PageNo. .- 308 DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST Program AssessmentRating Tool The Administration has applied the Program AssessmentRating Tool (PART) to the DoD Family Housing Program. The Housing PART received high scores for purpose and planning. It also revealed that DoD needs to work toward eliminating inadequate housing by 2007, eliminating all out-of-pocket housing expenses,and privatize government-owned housing, where feasible. For more details see next chart. . February 2005 Page No. 309 ~ .-00' -0 > 0) ,- e .0 '" '... v ~.= v, '" r~'\ -~ ~ ~ >< ~ ~tJ --~V ~ ...0 ~ ~ ~ ~ ~ §--=a i ~~ ~ ~ <. ~'u; ~ ,b Q '. ~ ~ .~ ~... ~ Q g -0 ~.:t ~ ~ o.s ~ -.!. ~ ~ ~ ~ Q,,; .a. '" ~ '" 0) .g '" ~ ~ ~..c '" 2. ~ > 00 ~ ~ ~ ~ -.'"v E ~.5 ~ ~;=: ~ '" s... go 8: ~ '" ~ ~ ...~ ~ ~ ~ v -0 v.5 '" '" "E -.-0 '" "tU ~ 0 CD ~ ,- .-0 .5 ",'" ""'.A ~ .= '" 0 0 '" '" G) ~n N~ '.g ",.5 >.~'" 'c ='= g ~ "'= g .-Q. ~ ~ v'e~ = .-v v-> ~ ~ =.= ?' U .5 -d "0 N <0 0 0) ~ ~ ~ ~ a) r-.: M N. 0 ~ In CD 0) r-. N r-. 0) ~ a) II) 0) 0) 0) ~ ~ ~ ~0) 0 11; II) ~ ~CD ~N C'!. N ~ ~. N ...r-. In' In .0 '" ~ ~ ~ v 0 0 ,..: ~ N 0 >'" ~ ;3 "'~u ~ ,- "0 In M In u ~ ~'+; 2. ", ,3 ~~ .a ~ 6 ~ 0 V '" ~'~.0 ~ . =~= ", ...M. In ~~ N ~ ~ E U g'.~ ~ § In ~ '.. '1:3 .o~~ ]~~ ~ -v--~ CD > v .'ti'g ~.= In ..0). = .-v ~ ..v -o!.t:u v'- -U"~ ~ i; 0) ~ ~ = s '" c v .0 00 10 = ~-. ~ 0 ~ ~ £0.0.= -a> 0) 0) -0 '""'~ .->>- ~ .5 g. = 0 0 ~ 0 '-= 2.'" ~~ -g 00"tU ;.., ~ 0) ~ 1 ~;3 N r- N j£ "0 ~a ~~ ,. O._~ -0 .-v v ~ ~ ~ .g ~ E ~"Z;'}; -III W In. ~ ~-~ -, ~ ~ .~ -"" ~ '~.s ~ ,0)5 V)~Po '" ~ ~ ~ "'I ~ 'C 00 8 ~.S 0 0 ~ ...: U '.. ~ U 0 .00 0) = Q S ~= O)~ .§ -0 00 -.~ ~ >< >v ~ ,~ "' Po.. "" ,-, ~ ~ ~ '" ... 0) '" U §", .-0) ~ -v Po ;.., ~ ~ ,- "' NUO) '" .-.~ '" ..c 0 ~ ut'J '="'" 0 v '"."'.=Po ~-~ ~ "'.0) = a", ~. ,-- 0 0 ~ II) 0 0 00 N N N 0 0 ~N CD '" 8 ~ In CD '" N N N N 0 0 N 0 0 0 0 ~ 8 Po'+; ~ v03 >< Po'a In 0 0 0 0 N N '" v .., 00 ~ U ~ v.- °"i~ po., Eo.. ~ "" ;... ...' '.. ~ "" 0<. I ~ ~ I:: ~- ~.o ~ ~,N ~ ~" ""J ~ '-~ -'" N " " ~ ~ ..\\j ~ ~ ~ ~ ~.. ~ ~ Q.; ~ E ~ ~" -.0 '" ~ \\j 1""\ ~ ~ '--6"" -'" ~~ ~ ~ \\j tJ ~ \\j "-..,E (:. ...~ ~ ~ ;:: Q ~ 0<. .,'. ~ ~ ~ ~ ~ ~ ~ ~ ~ = ~ ~ In r-. '!ij 0 0 O;i N >- 0).0 ~ !!. ca " C" QI "tJ ca ~ ~ -~ 5 ~Q) ~.. ~ i: ~ ".0 III E I.; ~" ..S!! ~; i:' ~.c t:'"~ QI(I) ""'... U ~ 0)" ~ ~ 5~ -J ~ O)'U;.5 In .c " ~ °ca .-,"a;~ ~ E u0 ca J:c: ~" .-0 QI 0 -.c ~ III .c 900... U n co ~ QI N ~ '" .> I: Co In ."=' " 0) .,c ~ 'u; " g ~ .c Q)- :2;0 "'(ij10 "E ~ " ~ Z <j> ..g -ca ,,~ 0 ., In "'= QI.0 0 E QI~ E.g Q)U "U~ ~ .--r~ 0 I+!.Q.= 0 v .S 00",0 cE r- .-0 ~ 0) ~ 0 SOO~ 0 0 u ~.+; 2 '.~ ~"'~.a~S '" .0 ",N ~ ~ ,...0 8 ~ 00 ~..U 0""" -~ ;3 "'" 0 .., '" ~ B.OO~~ ~ = , ,- ~ .--0 ~ ~"'~ 0 0 ~ ~ =:=.=o'+" ~ 2: -'" ...v " ~ ca ~ 5: ~ Q)~O~ ", "'(ij~ C 2U(I) '" 2. -g ~ 'g, g u ...0 0) ~ ~...><,-o) -pov > -~ Po co v '+; ~ "'~co~ t; a; ~ ~ [l. Q) ~ ~'v -g '8 .-.) .(.0.0.- -- 31 0 0) IO_~~:: ~N- 0 f".(¥)'Ot (¥)(¥) 'Ot'Ot 0 ~ f". (¥) ~ M(Of". 'OtN..- ~ CO."-. f".. Of" NM(¥) ~ f".(¥)0'Ot0 ~ ~ ~ (O 'Ot..100) 0 (¥) ~ 11). NN 'Otf". (¥) ~ 0)00) cocoa f".'Ot0)1l) ~ Nf".OIOO ~ (¥) g N r..: 'OtC o ~ W .C I- N N o O N :) Q) 01l)1l) NON >- 0)0) a~I:::[C;~ f5~ m,..fN~ ~ o ,..fc-i 1O00f".,m(¥) (¥)1l)0)f".'Ot 1l)0MOO) ~c-iN~ri [C; N CX)(¥) 'Ot N N 1l)0 ~ 'Ot'Ot 1t)(O rir..: N 'Ot u. Nf".10 f".,..-10 .--'Ot a) 5~ g<a"~~ ~~. N 0) 'Ot 10 f"., ..-f". E ~ E a)1O(¥) (/) a (0- f".. 0)- ~ (¥)Il)N(O(¥) m ..-'Ot ~Q) ~- <a"r..: ~ 'Ot °'OtNN N >u. 'Ot(Oa) 1l)00N(o g~<a"~ Oog :I: IV ,,-C N LL 0)C~ 'in 0" r..: ~ (¥) °r..:,..fri O ..-'Ot f".CX) >- (O~~,,> ~~ f". N'OtN..- ~ ~.- f".,(¥) 0)'Ot... f".,0 0)'Ot1l) 0 a)a)0) NO) (¥) ~ o f".,a)f".N'Ot NN 10 ~ oc-i<a"~,..f~,..f (0 ~ 'Ot 00 N'OtOf".,o) oo ~ ~ CO (¥) .a)0a)0'ft' OMf". ~ f".,-O. It) (0 'Ot(¥)~ a)'Ot m ION 1Of". ~- a). Il)CO 100) It) ~ N(¥)o)(¥),.p Oa)ON Ri ~ (¥).0- ~ ON(¥)Il)(¥) f".,OO(ON(O ~ co O. ~. a)- (¥)I()(O O(¥)(O Il) COMN I I ~'>- e 2:' '0 0°"" ""cC C Q) Q) Q» - () C .-""' C rn 0)- m « "0 U) u. --"0 C) ' ,5 ~c"'C;)"O olS ° Q) > m~,* Q) cu ~ >-~C""" Q) cu C"Q) "0 cu C U) ~ ~ 0 C -= -=- -ro 0- Q) N > ,- ~ -oZNOCU B) ~ -[t: C" Q) 1.. 80~§,~ ~U,>:Pa.-OS -o-JC= Q)~a. oE ,-S ~ ()Q) CU cu c Q.CU E~ --'"" C Q)"OQ) Q) C) cu e"Oc Q) c.. ~ CO. moo Il)m ..- > (¥)a) I()O) ~ CD -U) Q)~ OQ) -' co ~ > c= ::).9 Q) C Q) cu > ~C g= CUo -=1>- >00 311 ww "0"0 ~ c""" Q) Q)Q) cucu "0 E «~:p ww E U) Air Force InadeQuate Family HousinQ Units Eliminated in FY2002 Total Inventory MAJCOM Project Type Units at t Base FY2002 FY2002 traditional construction, improvement, and O&M ro"ects to eliminate inade uate units PACAF Improve Hsg Andersen AMC Replace Hsg Andrews 11th WG Improve Hsg Bolling 11 th WG Replace Hsg Bolling AMC Improve Hsg Charleston AMC Replace Hsg Dover ACC Replace Hsg Ellsworth AMC Improve Hsg Grand Forks PACAF Replace Hsg Hickam PACAF Improve Hsg Kadena USAFE Improve Hsg Kaiserslautem I Ramstein USAFE Replace Hsg Lajes Field ACC Replace Hsg Langley ACC Improve Hsg Langley AETC Replace Hsg Luke USAFE Improve Hsg RAF Croughton USAFE Improve Hsg RAF Lakenheath/Mildenha.l1 USAFE Replace Hsg RAF Lakenheath/Mildenhall USAFE Improve Hsg RAF Molesworth USAFE Improve Hsg Spangdah.lem AMC Replace Hsg Travis AMC Improve Hsg Travis PACAF Improve Hsg Yokota Privatization projects executed to eliminate inade uate housin AFMC Privatize Hsg Brooks City Base AFMC Privatize Hsg Wright-Patterson AETC Privatize Hsg Lackland ACC Privatize Hsg Dyess AFMC Privatize Hsg Robins PACAF Privatize Hsg Elmendorf Units demolished/otherwise from fami ." US AF Oth er perman minus Leased & Privatized Total Inadequate Inventory Total Inadequate Addressed 103,883 1,348 1,512 1,008 1,489 2,560 8,162 5,019 468 1,512 785 276 603 1,128 1,490 3,583 3,307 256 226 2,930 112 202 2 136 178 120 78 181 102 108 407 64 4 66 120 158 156 31 119 138 118 49 281 2,863 170 1,379 272 0 666 376 25 Various bases -Adjustments for O&M "whole house" projects, demolition, and adjustments in execution 25 312 ~ Air ForceInadeQuate FamilyHousinQ UnitsEliminated in FY2002 Total Inventory minus leased& MAJCOM Project Type Privatized Total Total Inadequate Inadequate Inventory Addressed 252 32 56 164 0 = 98,698 59,953 -5,185 -6,070 6,070 NOTES: 1. Bases without 313 Air Force InadeQuate Familv HousinQ Units Eliminated in FY2003 Total Inventory MAJCOM Project Type ase Y2003 FY2003 traditional construction, improvement, and O&M ro"ects to eliminate inade uate units PACAF Improve Hsg Andersen AMC Replace Hsg Andrews AMC ReplaceHsg Dover ACC Replace Hsg Dyess ACC Replace Hsg Ellsworth AMC Replace Hsg Grand Forks PACAF Replace Hsg Hickam ACC Replace Hsg Holloman PACAF Improve Hsg Kadena USAFE Replace Hsg Kaiserslautem I Ramstein USAFE Improve Hsg Kaiserslautern I Ramstein ACC Improve Hsg Langley AETC Replace Hsg Luke AMC Replace Hsg MacDili AFSPC Replace Hsg Malmstrom ACC Replace Hsg Minot ACC Replace Hsg Mountain Home PACAF Construct Hsg Osan AFSPC Improve Hsg Peterson USAFE Replace Hsg RAF Lakenheath/Mildenhall AETC Replace Hsg Randolph ACC Replace Hsg Seymour Johnson AMC Replace Hsg Travis AFA Replace Hsg USAF Academy AFA Improve Hsg USAF Academy AETC Replace Hsg Vance ACC Replace Hs Whiteman minus Leased & Privatized Total Inadequate Inventory 98,698 Total Inadequate Addressed ,cf%,:1 1,390 2,077 1,548 992 1,008 1,489 2,660 1,440 8,162 5,019 444 1,427 924 808 525 947 1,056 904 3,475 2,900 1,512 874 794 1,406 2,387 1,530 123 493 1,130 1,103 1,689 2,428 1247 156 668 591 1,027 1,540 1,052 0 208 662 802 1,258 1,212 845 2,660 112 105 112 85 22 150 96 101 124 19 376 46 140 96 18 214 95 0 87 96 112 126 110 71 66 59 22 314 Air Force InadeQuate Family Housina Units Eliminated in FY2003 Total MAJCOM Privatization inad. AFM Project Type projects Base executed Total Inadequate Inventory -1 -1 se permanently 1,573 1 573 , removed ..490 Various bases -Adjustments for ?&M "whol~ ~ouse" projects, demolition, and adjustments in execution Other Pr 490 revious FY AC 75 n 75 De PA AFSPC Total Inadequate Addressed to eliminate Kirtland Units from fami USAF Inventory minus Leased & Privatized 0 Construct Hsg Peterson Units at end of FY2003 Differe = 96,872 55,155 -1,826 -4,798 4,798 NOTES: 1. Bases without ro.ects are not shown. 315 Air Force Inadeauate Familv Housina Units Eliminated in FY2004 Total Inventory minus MAJCOM Project Type Units at the beginning Base of FY2004 FY2004 traditional construction, improvement, and O&M 'p:!ojects to eliminate inad~uate units PACAF Improve Hsg Andersen AMC Replace Hsg Andrews ACC Replace Hsg Davis-Monthan ACC Replace Hsg Dyess AFMC Replace Hsg Eglin ACC Replace Hsg Ellsworth AMC Replace Hsg Grand Forks PACAF Improve Hsg Hickam USAFE Replace Hsg Incirlik (Note 2) PACAF Improve Hsg Kadena USAFE Improve Hsg Kaiserslautern I Ramstein USAFE Replace Hsg Lajes Field AFSPC Improve Hsg Los Angeles AFSPC Replace Hsg Malmstrom ACC Replace Hsg Minot PACAF .11"~.Misawa ACC Replace Hsg Mountain Home PACAF Construct Hsg Osan USAFE Replace Hsg RAF Lakenheath/Mildenhall AETC Replace Hsg Randolph -'ACC Replace Hsg Seymour Johnson USAFE Improve Hsg Spangdahlem (Note 2) AMC Replace Hsg Travis ACC Replace Hsg Whiteman PACAF Improve H~g Yokota Leased & Privatized Total Inadequate Inventory 96,872 55,155- 47,016 1,390 1,536 1,256 992 2,359 1,008 1,489 2,660 900 8,162 5,270 468 645 1,406 2,387 2,256 1,492 123 1,130 803 1,583 1,604 2,428 1,129 2,540 27,003 332 995 1,028 723 1,476 818 1,098 1,142 900 5,601 2,784 196 546 884 1,347 292 1,171 0 648 626 1,170 374 1,102 656 1,094 Total Inadequate Addressed 2,648 165 50 93 116 0 75 144 190 122 182 42 279 94 200 120 186 89 0 138 0 100 263 316 Air Force InadeQuate Familv Housina Units Eliminated in FY2004 Total Inventory MAJCOM Project Type minus Leased & Privatized Base Privatization projects executed to eliminate inade uate housin Pro ram Year ACC Privatize Hsg Beale AFSPC Privatize Hsg Buckley AFMC Privatize Hsg Hanscom PACAF Privatize Hsg Hickam AETC Privatize Hsg Little Rock AFSOC Privatize Hsg Moody ACC Privatize Hsg Nellis ACC Privatize Hsg Offutt AFSPC Privatize Hsg Patrick its demolished/otherwise m fami ..-1,07 USAF USAFE Other Demolish permanently Total Inadequate Inventory -10,051 -1,444 0 -687 -1,356 -1,535 -300 -1,313 -2,456 -960 Total Inadequate Addressed 8,623 1,246 0 575 1356 1201 78 900 2,307 960 removed 1,076 Various bases -Adjustments for ?&M "whol~ ~ouse" projects, demolition, and adjustments in execution -1,07 1,076 Ramstein -1,07 1,076 0 0 11 11 ni = 0 84,942 48,682 -11,930 -6,473 12,347 NOTES: 1. Bases without ro.ects are not shown. 317 Air Force InadeQuate Familv Housina Units Eliminated in FY2005 Total Inventory MAJCOM Units at t Project Type Base Y2005 FY2005 traditional construction, improvement, and O&M ro.ects to eliminate inade uate units Note 1 AMC Improve Hsg Andrews ACC Improve Hsg Barksdale PACAF Improve Hsg Kadena USAFE Replace Hsg Kaiserslautem I Ramstein AMC Replace Hsg MacDill AFSPC Replace Hsg Malmstrom ACC Replace Hsg Minot ACC Replace Hsg Mountain Home PACAF Construct Hsg Osan USAFE Replace Hsg RAF Lakenheath/Mildenhall ACC Replace Hsg Seymour Johnson ACC Replace Hsg Whiteman PACAF Improve Hsg Yokota Privatization projects executed to eliminate inade uate housin Note 2 AETC Privatize Hsg Altus ACC Privatize Hsg Barksdale ACC Privatize Hsg Cannon AETC Privatize Hsg Columbus ACC Privatize Hsg Davis-Monthan AMC Privatize Hsg Dover AFMC Privatize Hsg Eglin PACAF Privatize Hsg Elmendorf II AMC Privatize Hsg Fairchild AFPSC Privatize Hsg FE Warren AETC Privatize Hsg Goodfellow AFMC Privatize Hsg Hill ACC Privatize Hsg Holloman AFSOC Privatize Hsg Hurlburt AETC Privatize Hsg Keesler AETC Privatize Hsg Lackland ACC PrivatizeHsg Langley AETC Privatize Hsg Laughlin ACC Privatize Hsg Luke AETC Privatize Hsg Maxwell AMC Privatize Hsg McChord AMC Privatize Hsg McGuire AETC Privatize Hsg Randolph AFMC Privatize Hsg Robins II ACC Privatize Hsg Shaw AMC Privatize Hsg Scott AETC Privatize Hs Sheppard minus Leased & Privatized Total Inadequate Inventory Total Inadequate Addressed 84,942 1,536 729 8,162 4,194 743 1,413 2,095 1,492 235 1,137 1,583 1,085 2,540 945 426 5,479 1,526 503 898 1,285 978 0 544 1,061 540 1,006 2,059 239 132 144 61 115 142 147 154 167 160 88 22,397 406 426 712 545 935 1,262 1197 434 776 265 96 703 803 69 1,568 564 1,112 58 528 361 498 1,420 710 634 1,704 420 626 318 ., Air Force InadeQuate Familv Housina Units Eliminated in FY2005 Total Inventory minus Leased & Privatized MAJCOM Project Type Base AFMC AMC AETC AFSPC AFMC Privatize Privatize Privatize Privatize Privatize Tinker Travis Tyndall Vandenburg Wright-Patterson Hsg Hsg Hsg Hsg Hsg II Total Inadequate Inventory Total Inadequate Addressed -730 -2,428 -934 -1969 -518 337 1,046 546 1340 296 -1,079 681 anently removed revious FY Deficit Construction ro"ects PACAF Construct Hsg Osan Units at end of FY200S Different from Beginnin = 0 0 117 117 0 0 47,640 -37,302 23,545 -25,137 2S,137 NOTES: 1. Bases without pro.ects are not shown. 2. Privatization assumes Congressional relief from the Famil Housin Investment Fund (FHIF ca . ~ .319 , Air Force InadeQuate Family HousinQ Units Eliminated in FY2006 Total MAJCOM Units at t Project Type Base FY200 FY2006 traditional construction, improvement, and O&M ro"ects to eliminate inade uate units Note 1 AMC Improve Hsg Andrews AFMC Improve Hsg Amold 11th WG Replace Hsg Bolling 11th WG Improve Hsg Bolling AMC Replace Hsg Charleston ACC Replace Hsg Dyess AFMC Replace Hsg Edwards PACAF Replace Hsg Eielson ACC Replace Hsg Ellsworth AMC Replace Hsg Grand Forks USAFE Replace Hsg Incirlik USAFE Improve Hsg Incirlik PACAF Improve Hsg Kadena USAFE Replace Hsg Kaiserslautern I Ramstein USAFE Improve Hsg Kaiserslautem I Ramstein USAFE Improve Hsg Lajes Field AFSPC Improve Hsg Los Angeles AMC Replace Hsg MacDili AMC Improve Hsg MacDili AFSPC Replace Hsg Malmstrom ACC Replace Hsg Minot PACAF Improve Hsg Misawa USAFE Improve Hsg Moron ACC Replace Hsg Mountain Home ACC Improve Hsg Mountain Home AFSPC Privatize Hsg Peterson AMC Improve Hsg Pope USAFE Replace Hsg RAF Lakenheath/Mildenhall USAFE Improve Hsg RAF Lakenheath/Mildenhall ACC Replace Hsg Seymour Johnson USAFE Improve Hsg Spangdahlem AFA Privatize Hsg USAF Academy ACC Replace Hsg Whiteman PACAF Improve Hsg Yokota Privatization projects executed to eliminate inade uate housin Note 2 AFSPC Privatize Hsg FE Warren PACAF Privatize Hsg Hickam AFSPC Privatize Hsg Peterson USAFA Privatize Hsg USAFA AETC Privatize Hsg Goodfellow (Note 3) Inventory minus Total Total Leased& Inadequate Inadequate Privatized Inventory Addressed 47,640 , 4,685 178 40 159 24 10 190 226 92 60 300 100 235 570 101 16 150 188 109 5 296 223 281 34 194 12 0 138 107 10 255 79 0 111 192 2,772 356 1,236 360 820 0 320 Air Force InadeQuate Familv Housina Units Eliminated in FY2006 Total Inventory minus Leased & MAJCOM Project Type Units demolished/otherwise fro Base permanently Privatized Total Total Inadequate Inadequate Inventory Addressed removed 1,57 1,576 Pr 0 De 30 PA 30 Un 42,489 14,509 -5 I 151 -9036 I = 0 9,033 NOTES: 1. Bases without projects are not shown. 2. Assumes Congressional relief from the Family Housing Investment Fund (FHIF) cap. 3. Goodfellow is rivatization deficit construction 321. Air Force InadeQuateFamilvHousinQUnits Eliminated in FY2007 "-' MAJCOM Units at t Project Type Base FY2007 traditional construction, eliminate inade uate units Total Inventory minus Total Total Leased & Inadequate Inadequate Privatized FY2007 42,489 improvement, and O&M projects I Inventory Addressed 14,509.§I,cc:\1\,%!;;i\, to 5,047 322 11111111111 1 "~'i-:.. ""..,",~3i ;;, ;;;i Air Force InadeQuate Familv Housing Units Eliminated in FY2007 Total Inventory MAJCOM Project Type minus Leased & Privatized Base Total Inadequate Inventory Total Inadequate Addressed 0 2,745 0 0 = 37,843 6,717 -4,646 -7,792 7,792 NOTES: 1. Bases without ., " r-" 323 Air Force InadeQuate Familv HousinQ Units Eliminated in FY2008 Total Inventory minus Leased & MAJCOM Project Type Base Units at the beginni"-9-of FY200S FY200Straditional construction, improvement, and O&M.E!°jects to eliminate inadequate units Privatized 37,S43 Total Inadequate Inventory Total Inadequate Addressed 6,717. 2,213 324 Air Force Inadequate Familv Housing Units Eliminated in FY2008 Total Inventory minus leased& MAJCOM Project Type Privatized Total Total Inadequate Inadequate Inventory Addressed 0 -30 250 0 0 37,591 -252 ",325 4,254 -2,463 2,463 Air Force Inadeauate Family Housina Units Eliminated in FY2009 Total MAJCOM Project Type Inventory minus Leased & Privatized Base Units at t Y2009 Units fro' projects .0 execu e Total Inadequate Addressed 37,591 FY2009 traditional construction, improvement, O&M ro'ects to eliminate inade uate units Privatization inad Total Inadequate Inventory and 4,254 0 eliminate se permanently removed ..0 Pro ious FY 0 Def 0 Units at end of FY2009 37,591 = nt 0 0 4,254 -4,254 2,911 326 Air Force InadeQuate Family Housina Units Eliminated in FY2010 Total Inventory MAJCOM Project Type Base Unitsatt FY2010 minus Total Total Leased & Privatized Inadequate Inventory Inadequate Addressed 37,591 FY2010 traditional construction, improvement, and O&M ro"ects to eliminate inade uate units Privatization projects ex inade Units fro. 484 eliminate .0 emo IS 0 ..-0 se permanently removed Pro 0 Def 1 Uni 37,645 = 0 54 0 484 0 Not 1. 327 Air Force Inadeauate Familv Housina Units Eliminated in FY2011 Total Illventory MAJCOM minus Leased & Privatized Project Type Uni FY2011 traditional construction, improvement, O&M ro"ects to eliminate inade uate units Total Inadequate Inventory Total Inadequate Addressed 37,645 and 548 Pri ina 0 Uni fro 0 Pro 0 Def 0 Uni 37,747 102 0 548 0 Note: 1. Kadena & Yokota units will become inade ...,328 . ..~ I INDEX ,,~..:; DEPARTMENT OF THE AIR FORCE MILITARY FAMIL Y HOUSING FISCAL YEAR 2006 BUDGET REQUEST INDEX SUBJECT .PAGE FAMILY HOUSING NARRATIVE 307 INDEX 329 FINANCIAL SUMMARY 333 LEGISLATIVE LANGUAGE Authorization 335 Appropriation 337 NEW CONSTRUCnON New/Current Mission Activities 339 Construction Purposeand Scope 341 Eielson AFB, AK Eielson AFB, AK Edwards AFB, CA Bolling AFB, DC MacDil1 AFB, FL Mountain Home AFB, ill Whiteman AFB, MO Malmstrom AFB, MT Seymour JohnsonAFB, NC Grand Forks AFB, ND Minot AFB, ND Charleston AFB, SC Ellsworth AFB, SD Dyess AFB, TX Ramstein AB, Germany SpangdahlemAB, Germany Incirlik AB Adana, Turkey RAP Lakenheath, UK February2005 343 347 .348 352 356 360 364 368 372 376 380 384 388 392 397 401 405 409 PageNo. ;,. "'~;; r,cil. I DEPARTMENT OF THE AIR FORCE MILITARY FAMIL Y HOUSING FISCAL YEAR 2006 BUDGET REQUEST INDEX SUBJECT PAGE POST ACQUISITION CONSTRUCTION Purposeand Scope California Colorado District of Columbia Florida Idaho Kansas Maryland North Carolina Tennessee Wyoming 413 416 416 417 417 417 418 418 419 419 419 Overseas Germany Japan Portugal Spain Turkey United Kingdom 420 420 421 421 422 .422 Post Acquisition Over $50,000 per Unit Fort MacArthur Family Housing Annex, CA USAF Academy, CO PetersonAFB, CO Bolling AFB, DC MacDil1 AFB, FL Mountain Home AFB, ill McConnell AFB, KS Andrews AFB, MD Pope AFB, NC ArnoldAFB , TN Francis E. Warren AFB, WY February 2005 425 427 429 431 433 435 437 439 441 443 445 PageNo. '" DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST INDEX SUBJECT PAGE Overseas Rarnstein AB, Gennany Kadena AB, Japan Misawa AB, Japan Yokota AB, Japan Lajes Field, Portugal Moron AB, Spain Incirlik AB Adana, Turkey RAF Mi1denhall, UK 447 449 451 453 455 457 459 461 ADVANCE PLANNING AND DESIGN 463 OPERATION AND MAINTENANCE SUMMARY Narrative (purpose and Scope) Operations & MaintenanceReprogramming Actions (FY04) Inventory and Funding Summary FH-2 Historic Housing FH-6 465 468 469 473 OPERATIONS Management OP-5 Services OP-5 Furnishings OP-5 Miscellaneous OP-5 475 476 478 480 482 UTILITIES OP-5 485 MAINTENANCE OP-5 487 MAINTENANCE AND REPAIR OVER $20,000 PER UNIT 491 GFOQ O&M COSTS 493 REIMBURSABLE PROGRAM OP-5 495 February 2005 PageNo. ., "',. DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST INDEX SUBJECT LEASING PAGE Purposeand Scope OP-5 Exhibit FH-4, Leasing (Other than Section801 & 802) Exhibit FH-4A, High Cost Foreign LeasedUnits Exhibit FH-4B, Section801 Leases 497 499 501 502 503 HOUSING PRIVATIZATION Overview 505 OP-5 508 Executive Summary Housing Privatization Initiative 509 511 DEBT PAYMENT 517 PB-18 EXHIBIT, Foreign CurrencyExchange Data 519 February 2005 PageNo. SUMMARY DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST FY 2006 FINANCIAL SUMMARY AUTHORIZATION FOR APPROPRlAnON REQUESTEDFOR FY 2006: FUNDING PROGRAMFY 2006 (iQQQl Construction $790,501 Post-AcquisitionConstruction 420,203 Advance Planning and Design 40,404 ApproDriationReQuest:Construction 1,251,I 08 Operations,Utilities and Maintenance 575,594 Operating Expenses Utilities 148,169 116,946 Maintenance 310,479 Housing Privatization 36,437 Leasing-Worldwide 154,907 Debt Payment Premiumsfor Servicemen's MortgageInsuranceCoverage 1 AppropriationReQuest:O&M. Leasing. HousinQPrivatizationand Debt Pavrnent 766,939 ApproDriationReguest 2,018,047 ReimbursementProgram 11,782 FY 2006 FAMILY HOUSING PROGRAM $2,029,829 February2005 PageNo.3 --- 33 This Page Intentionally Left Blank ~~ic': 334 LEGISLATIVE LANGUAGE DEPARTMENT OF llIE AIR FORCE MILITARY FAMll.. Y HOUSING FISCAL YEAR 2006 BUDGET REQUEST EY 2006 Authorization Langyage SEC. 2302. FAMJL Y HOUSING (a) CONSTRUCTION AND ACQUISITION. -Using amounts appropriated pursuant to the authorization of appropriations in section 2304(a)(5)(A)), the Secretary of the Air Force may construct or acquire family housing units (including land acquisition) at the installations, for the purposes, and in the amounts set forth in the following table: STATE INSTALLATION Alaska Eielson AFB 92 Units $37,650,000 Alaska Eielson AFB 300 Units $18,144,000 California Edwards AFB 226 Units $59,699,000 District of Columbia Bolling AFB 159 Units $48,711,000 Florida MacDill AFB 109 Units $40,982,000 Idaho Mt. Home AFB 194 Units $56,467,000 Missouri Whiteman AFB 111 Units $26,917,000 Montana MalmstromAFB 296 Units $68,971,000 North Carolina Seymour JohnsonAFB 255 Units $48,868,000 North Dakota Grand Forks AFB 300 Units $86,706,000 North Dakota Minot AFB 223 Units $44,548,000 South Carolina Charleston AFB 10 Units $15,935,000 South Dakota Ellsworth AFB 60 Units $14,383,000 Texas Dyess AFB 190 Units $43,016,000 Germany Ramstein AB 101 Units $62,952,000 February 2005 PURPOSE AMOUNT PageNo': --- 335 DEPARTMENT OF11-IEAIR FORCE MILITARY F~ Y HOUSING FISCAL YEAR 2006 BUDGET REQUEST STATE INSTALLATION PURPOSE AMOUNT Germany Spangdahlem AB 79 Units $45,385,000 Turkey Incirlik AB 100Units $22,730,000 UK RAP Lakenheath 107 Units $48,437,000 Total $790,501,000 . (b) PLANNING AND DESIGN. -Using amountsappropriatedpursuantto the authorizationof appropriationsin section2304(a)(5)(A),the Secretaryof the Air Forcemaycarry out architecturaland engineeringservicesand constructiondesign activities with respectto the constructionor improvementof military family housing units in an amountnot to exceed$40,404,000. SEC.2303. IMPROVEMENTTO MILITARY F~ Y HOUSINGUNITS Subjectto section2825of Title 10,United StatesCode,andusingamountsappropriated pursuantto the authorizationof appropriationsin section2304(a)(5)(A),the Secretaryof the Air Force mayimproveexisting military family housingunits in an amountnot to exceed $420,203,000. SEC.2304. AUTHORIZATION OFAPPROPRIATIONS,AIR FORCE (a) IN GENERAL (5) for Military FamilyHousingfunctions(A) For constructionand acquisition,planning and design,and improvementof military family housingandfacilities, $1,251,108,000. (B) For supportof military family housing (includingfunctionsdescribedin section2833 of Title 10,United StatesCode),$766,939,000. February2005 PageNo. 336 DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST FY 2006 AoQrooriationLangyage Family HousingConstruction,Air Force For expensesof family housingfor the Air Forcefor construction,including acquisition, replacement,addition, expansion,extensionand alteration,asauthorizedby law, $1,251,108,000,to remainavailableuntil September30, 2010. Family Housing OperationandMaintenance,Air Force For expensesof family housingfor the Air Force for operationand maintenance, including debtpayment,leasing,minor construction,principal and interestcharges,and insurancepremiums,as authorizedby law, $766,939,000. February2005 PageNo. :3 3 7 This Page Intentionally Left Blank 338 NEW CONSTRUCTION ~- DEPARTMENT OF mE AIR FORCE MILITARY FAMll. Y HOUSING FISCAL YEAR 2006 BUDGET REQUEST FY 2006 NEW/CURRENT MISSION ACTIVITIES In compliance with the SenateAppropriations Committee Report (100-380) on the FY 1989 Military Construction Appropriation Act, the Air Force has included the following exhibit that displays construction projects requested in two separatecategories: new mission and current mission. "New Mission" projects are projects that support deployment and beddown of new weapon systems, new program initiatives, and major mission expansions. "Current Mission" projects are projects that either replace inadequate existing facilities or construct new facilities which are not available to meet current requirements. NUMBER OF UNITS REQUESTED AUTHORIZATION AMO:u;MI ($000) LOCATION MISSION ACQUISITION HOUSING Eielson AFB, AK Current 300 $18,144 REPLACE:MENT HOUSING Eielson AFB, AK Edwards AFB, CA BollingAFB,DC MacDi11 AFB, FL Mt Home AFB, ill Whiteman AFB, MO Malmstrom AFB, MT Seymour JohnsonAFB, NC Grand Forks AFB, ND Minot AFB, ND Charleston AFB, SC Ellsworth AFB' SD Dyess AFB, TX Ramstein AB, Germany SpangdahlemAB, Germany Incirlik AB, Turkey RAF Lakenheath, UK Current Current Current Current Current Current Current Current Current Current Current Current Current Current Current Current Current 92 226 159 109 194 111 296 255 300 223 10 60 190 101 79 100 107 $37,650 $59,699 $48,711 $40,982 $56,467 $26,917 $68,971 $48,868 $86,706 $44,548 $15,935 $14,383 $43,016 $62,952 $45,385 $22,730 $48,437 February 2005 I Page No. 339 DEPART1\.1ENTOF mE AIR FORCE MILITARY FAMll. Y HOUSING FISCAL YEAR 2006 BUDGET REQUEST REQUESTED AUTHORIZATION SUMMARY: NEW MISSION TOTAL AMOUNT ($OOO) $0 CURRENT MISSION TOTAL $790,501 IMPROVEMENTS $420,203 PLANNING AND DESIGN GRAND TOTAL February 2005 $40.404 $1,251,108 Page No. -.'340 DEPARTMENT OF THE AIR FORCE Mll.IT AR Y FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST FY 2006 NEW CONSTRUCTION Program(In Thousands) FY 2006 Program $790,501 FY 2005 Program $570,340 Purposeand ScoQe This program provides for the construction of new homes where the local community cannot provide adequatehousing and replacement of existing homes, where improvements for Air Force personnel are not economically feasible, and support facilities where existing facilities are inadequate. Costs reflect all amounts necessaryto provide complete and usable facilities. ProgramSummary Authorization is requestedfor: replacement of2,612 units and acquisition of300 units. A summary of the funding program for FY 2006 is as follows: AU11IORIZA TION Number of TVDe/Locations Mission ACQUISmON HOUSING Eielson AFB, AK Current 300 $18,144 REPLACEMENT HOUSING Eielson AFB, AK Edwards AFB, CA Bolling AFB, DC MacDil1 AFB, FL Mt Home AFB, ID Whiteman AFB, MO Malmstrom AFB, MT Seymour Johnson AFB, NC Grand Forks AFB, ND Minot AFB, ND Charleston AFB, SC Ellsworth AFB, SD Current Current Current Current Current Current Current Current Current Current Current Current 92 226 159 109 194 111 296 255 300 223 10 ') 60 $37,650 $59,699 $48,711 $40,982 $56,467 $26,917 $68,971 $48,868 $86,706 $44,548 $15,935 $14,383 Dyess AFB, TX Ramstein AB, Germany SpangdahlemAB, Germany Incirlik AB, Turkey Current Current Current Current 190 101 79 100 $43,016 $62,952 $45,385 $22,730 February 2005 ~ Requested Amount ($000) PageNo. . 341 DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST AUTHORIZATION Number of Type/Locations Mission RAF Lakenheath, UK Current NEW MISSION TOTAL ~ 107 1 Requested Amount($000) $48,437 $0 CURRENT MISSION TOTAL $790,501 IMPROVEMENTS $420,203 PLANNING AND DESIGN GRAND TOTAL February 2005 $40.404 $1,251,108 PageNo. 342 1. COMPONENT FY 2006 MILITARY CONSTRUCTION PROGRAM 2. DATE AIR FORCE INSTALLATION AND lOCATION COMMAND 5. AREA CONST EIElSON AIR FORCE BASE PACIFIC COMMAND COST INDEX ALASKA 2.04 6. Personnel PERMANENT STUDENTS SUPPORTED Strength OFF ENl CIV OFF ENl CIV AS OF 30 SEP 04 425 3845 945 0 0 0 END FY 2009 414 3715 773 0 0 0 7. INVENTORY DATA ($000) Total Acreage: 19,940 Inventory Total as of: (30 Sep 04) Authorization Not Yet in Inventory: Authorization Requested in this Program: Authorization Included in the Following Program: (FY 2007) Planned in Next Three Years Program: OFF 1 1 ENL 1 1 CIV 0 0 3,244,655 41,000 55,794 0 10,381 Remaining Deficiency: Grand Total: 8. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY ~ PROJECT TITLE 711-142 Replace Military Family Housing 711-142 Purchase Build/lease 272865 3,624,695 (FY 2006) SCOPE 92 UN 300 UN 9a. Future Projects: Included in the Following Program None 9b. Future Projects: Typical Planned Next Three Years: 711-142 Construct Military Family Housing TOTAL 5,217 4,904 COST DESIGN $,000 START 37,650 Aug-04 18,144 STATUS CMPl May-05 (FY 2007) (FY08-11) 18 UN 10,381 9c. Real Propery Maintenance Backlog This Installation 1,102 10. The host fighter wing supports an F-16 squadron, an A/OA-10 squadron, and a training squadron which conducts COPE THUNDER exercises. The installation also hosts an Air National Guard air refueling squadron (KC-135) and a training group which conducts arctic survival training. DD Form 1390, 24 Jul 00 .,.., -.' ." c ~ :,., 43 1. COMPONENT AIR FORCE 2 DATE FY 2006 MILITARY CONSTRUCTION PROJECT DATA. 3. INSTALlATION AND LOCATION 4. PROJECT TITLE EIELSONAIR FORCE BASE,ALASKA 5. PROGRAM ELEMENT REPLACEFAMILY HOUSING 6. CATEGORY CODE 88741 7. PROJECT NUMBER 711-142 9. COST ESTIMATE U/M QUANTITY ITEM 8. PROJECT COST ($000) FT W044804C Military Family Housing Dwellings Other SpecialConstruction SupportCosts: Landscaping Utility Mains Recreation Demolition Environmental OtherSite Work UN UN $37,650 UNIT COST 92 92 COST $000 30,939 ( 30,865 ) (74) 2,730 ( 497 ) ( 392 ) (392 ) ( 497 ) ( 262 ) (690) 335,489 804 LS LS LS LS LS LS Subtotal Contingency (5%) Total ContractCost SIOH (6.5%) 33,669 1,683 35,352 2,297 ProjectCost 37,650 Area CostFactor 2.04 10. Descriptionof ProposedConstruction:Demolish92 and construct92 Military FamilyHousing (MFH) units with all necessaryamenitiesandsupportingfacilities. Projectincludessite preparation,garages,air conditioning,energyconservingfeatures,parking,patios,privacy fencing,and supportinfrastructureof roads, utilities, recreationareas,landscaping, asbestos removal,and demolition. Programmed Paygrades E4-E6 E4-E6 Bedrooms ~ 3 4 1,610 1,870 ~ 2,002 2,322 Project ~ tl.cJ;Qr 186 216 2.122 2.122 Cost Per ~ 784 784 Totals: Maximum size: E4-E6 3 Bedroom Maximum size: E4-E6 4 Bedroom 11. REQUIREMENT: 1812 UN No ~ ($000) IQ.tg.! 44 48 13,615 17,250 92 30,865 1720 NSF /2132 GSF /199 GSM 2090 NSF /2592 GSF /241 GSM ADEQUATE: 1181 UN SUBSTANDARD: 631 UN PROJECT:ReplaceFamilyHousing REQUIREMENT: Projectis requiredto provide modemand efficienthousingfor military membersand their dependentsat EielsonAFB. All unitswill meetmodemhousingstandardsand areprogrammedin accordance with the Housing CommunityProfile (HCP).The designwill providea modemkitchen,living room, bedroom,and bath configuration,with ampleinterior and exteriorstorage.The numberof bedroomswill range from threeto four, asidentifiedin the mostrecentHousingRequirementsand Market Analysis(HRMA). Units will be provided with garagesand exteriorparking.Adequateinfrastructuresupportfor utilities shall alsobe provided.The HCP andHRMA are elementsof the GeneralPlan for EielsonAFB andarethebasis for this . project. CURRENTSITUATION: The existin housin unitswereconstructedbetween1962and 1964.The show DDFORM1391,DEC99 PREVIOUS EDITIONS MAYBEUSEDINTERNALLY UNnLEXHAUSTED 344 ~c;~;~~~ FY 2006 MILITARY CONSTRUCTION PROJECT DATA 2. DATE 3. INSTALLATION ANDLOCATION 4. PROJECT TITLE EIELSONAIR FORCEBASE, ALASKA REPLACEFAMILY HOUSING 5. PROGRAM ELEMENT 6.CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 88741 711-142 FT W044804C $37,650 the effectsof ageand heavyuse. Theyhavehad no majorupgradessinceconstruction,and they do not meetthe needsof today'sfamilies,nor do theyprovide a modemhomeenvironment.The roof, walls, and foundations areantiquatedanddo not meetcurrentstandardsfor efficiencyandsafety.Interiorsare generallyinadequateby modemcriteria. Bathroomsare smalland lack adequateclosetspace.Kitchenshave insufficient cabinets. IMP ACT IF NOT PROVIDED: Units will continueto deterioraterapidly, resultingin increasingoperations, maintenanceand repairto the governmentand inconvenienceto residents.Without this project, repair of these units will continuein a costly piecemealfasionwith little or on improvementin living quality. ADDITIONAL: This project meetsthe criteria/scopespecifiedin the Air ForceFamily HousingGuide. An economicanalysishasbeenpreparedcomparingthe alternativesof new construction,improvement,leasing,and statusquo operations.Basedon the net presentvaluesand benefitsof respectivealternatives,new construction was found to be the most costeffectivealternativeoverthe life of theproject.The costof improving the existing unitsis 75% of the cost of replacingtheseunits. Sincethis is replacementhousing,there will be no increasein studentpopulationandthereforeno impacton the local schooldistrict. The constructionagentfor this projectis the Army Corpsof Engineers,resulting in a SIOHrateof6.5%. Base Civil Engineer:Lt Col Alan J. Wieder,(907)377-5213. DOFORM1391C,DEC99 PREVIOUS EDITIONS MAYBEUSEDINTERNALLY UNTILEXHAUSTED 345 !!:c MILITARY FAMILY HOUSING JUSTIFICATION 3. DOD COMPONENT AIR FORCE 1. DATE OF REPORT July-04 2. FISCAL YEAR 2006 4. REPORTING INSTALLATION a. NAME 5. DATA AS OF REPORT CONTROL SYMBOL DD-A&L(AR)1716 b. LOCATION EIELSON AIR FORCE BASE ALASKA Nov-04 ANALYSIS CURRENT OF OFFICER REQUIREMENTS 6. TOTAL PERSONNEL 7. PERMANENT AND ASSETS (a) PROJECTED E9-E7 (b) E6-E1 (c) TOTAL (d) OFFICER (e) E9-E7 E6-E1 (f) (g) TOTAL STRENGTH 256 250 2,544 256 250 2,544 0 0 0 0 0 92 0 13 0 3,050 256 250 2,551 256 250 2,551 PARTY PERSONNEL 8. GROSS FAMILY HOUSING REQUIREMENTS 9. TOTAL UNACCEPTABLY HOUSED (a+b+c) a. INVOLUNTARILYSEPARATED b. IN MILITARYHOUSINGTO BE DISPOSED/REPLACED C. UNACCEPTABLYHOUSEDIN COMMUNITY 10. VOLUNTARY 11. EFFECnVE SEPARAnONS HOUSING REQUIREMENTS 12. HOUSING ASSETS (a + b) a. UNDER MILITARYCONTROL (1) HOUSEDIN EXISTINGDOD OWNED/CONTROLLED (2) UNDERCONTRACT/APPRDVED (3) VACANT (4) INACTIVE b. PRIVATEHOUSING (1) ACCEPTABLYHOUSED (2) ACCEPTABLEVACANTRENTAL 13. EFFECTIVE HOUSING DEFICIT 14. PROPOSED PROJECT 0 92 15. REMARKS DO FORM 1513. NOV N 3.46 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. CONSTRUCTION PROJECT DATA (computer INSTALLATION AND LOCATION PROGRAMELEMENT 6. 4. PROJECT TITLE PURCHASE 801 HOUSING UNITS CATEGORYCODE 88741 DATE generated) EIELSON AIR FORCE BASE, ALASKA 5. 2. 7. PROJECT NUMBER 711-221 9 8. PROJECT COST ($000) FTQW044803 18,144 COST UNIT ITEM COST U/M:..Q.UANTITY PRIMARYFACILITIES 18,144 FAMHSG LEASED UN 300 60,480 ( 18,144 ) SUPPORTINGFACILITIES 0 SUBTOTAL TOTAL 18,144 CONTRACT COST 18,144 TOTAL REQUEST AREA COST 18,144 FACTOR 2 .04 10. Description of Proposed Construction: Implement the accordance with contract F65501-86-LOO02, of 06 Aug 1986, "Section 801 Housing" MFH units from Fischer Enterprises. 11. REQUIREMENT: PROJECT: Purchase REQUIREMENT: 1,494UN ADEQUATE: 479UN 300 Sprucewood Discontinue buyout cost option for 300 Sprucewood the Homes annual lease "Section 801 Housing" payments in Homes SUBSTANDARD: 331UN units. by purchasing (Current Mission) 300 units. CURRENT SITUATION: Under lease agreements with Polar Star, the Air Force has been leasing these 300 MFH units since they were built in 1986. These units consist of 150 2-bedroom JNCO units and 150 3-bedroom JNCO units. The Air Force is currently paying $3.8 million per year for all 300 units until the lease expires in August 2006. Once expired, the option exists to purchase the units instead entering into another lease agreement. IMPACT IF NOT PROVIDED: The Air Force will renegotiated prior to August 2006. continue to pay an annual fee that must be ADDITIONAL: An economic analysis has been prepared comparing the alternatives of the buyout cost option and continuing the lease payment. Based on the net present values and benefits of the respective alternatives, the buyout cost option was found to be the most cost effective over the life of the project. Base Civil Engineer: Lt Col Alan Wieder, (907) 377-5213. DD FORM 1391, DEC 99 Previous editions are obsolete. Page No. 341 1. COMPONENT FY 2006 MILITARY CONSTRUCTION PROGRAM 2. DATE AIR FORCE INSTALLATION AND LOCATION COMMAND 5. AREA CONST EDWARDS AIR FORCE BASE AIR FORCE MATERIAL COST INDEX CALIFORNIA COMMAND 1.28 6. Personnel PERMANENT STUDENTS SUPPORTED Strength OFF ENL CIV OFF ENL CIV OFF ENL CIV ASOF30SEP04 818 2477 5129 0 0 0 29 20 112 END FY2009 786 2333 5141 0 0 0 29 20 112 7. INVENTORY DATA ($000) Total Acreage: 300,911 Inventory Total as of: (30 Sep 04) Authorization Not Yet in Inventory: Authorization Requested in this Program: Authorization Included in the Following Program: (FY 2007) Planned in Next Three Years Program: Remaining Deficiency: Grand Total: 8. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY TOTAL 8,585 8,421 3,571,891 40,873 59,699 61,758 1,841 39840 3,775,902 (FY 2006) COST DESIGN ~ PROJECTTITLE SCOPE 711-142 Replace Military Family Housing 226 UN 9a. Future Projects: Included in the Following Program 711-142 Replace Military Family Housing 174 UN 9b. Future Projects: Typical Planned Next Three Years: 711-142 Replace Hsg Maint & Supp/Stor Fac LS $.000 59,699 START Aug-04 STATUS CMPL May-05 (FY 2007) 61,758 (FY08-11) 1,841 9c. Real Propery Maintenance Backlog This Installation 897 10. Air Force Flight Test Center which is responsible for flight test activities for all USAF aircraft and related avionics, flight control, and weapons systems; a test wing; an air base wing; Air Force Test Pilot School; the Propulsion Directorate of the Air Force Research Laboratory; a space surveillance squadron; and a landing site for the space shuttle. DD Form 1390, 24 Jul 00 .348 I 1. COMPONENT AIR FORCE FY 2006 MILITARY CONSTRUCTION 1REPLACE FAMILY 3. INSTALLATION AND LOCATION DATE 4. PROJECT TITLE EDWARDS AIR FORCE BASE, CALIFORNIA 1 5. PROGRAM ELEMENT 1 2. PROJECT DATA J7. PROJECT NUMBER 6. CATEGORY CODE 88741 711-142 FSPM064501 9. COST ESTIMATE U/M QUANTITY ITEM Military Family Housing Dwellings Support Costs: Site Improvements UN 226 HOUSING l B. PROJECT COST ($000) $59,699 UNIT COST COST~OOO) 31,410 (31,410) 22,482 ( 1,961 ) 138,982 LS Landscaping Utility Mains Streets Recreation Demolition Environmental Other Site Work LS LS LS LS LS LS LS ( ( ( ( ( ( ( 1,636 ) 5,325 ) 2,352 ) 1,200 ) 5,253 ) 3,330 ) 1,425 ) Subtotal 53,892 Contingency (5%) Total Contract Cost SIGH (5.5%) 2,694 56,586 3,112 Project Cost 59,699 Area Cost Factor (1.2~ 10. Description of Proposed Construction: Replace and demolish 226 housing units in Area F and Area A, JNCO/SNCO housing units with all necessaryamenities and supporting facilities. Project includes site preparation, attached two car garages,air conditioning, energy conserving features, parking, exterior patios and privacy walls, support infrastructure of roads, utilities, recreation areas, landscaping, asbestosremoval, and demolition. Surplus demo of 107 units (20 Area C JNCO 2/3/4 br, 87 Area F JNCO 3/4 br units). Other site work includes parking lots, pedestrian walks, and boundary fencing in housing area. Programmed Pa~arades Bedrooms E1-E3 E1-E3 E7-E8 E7-E8 Maximum Maximum Maximum Maximum 2M 4 3 4 size: size: size: size: E1-E3 2M Bedroom E1-E3 4 Bedroom E7-E8 3 Bedroom E7-E8 4 Bedroom 11. REQUIREMENT: 2023 UN ~ ~ 1,180 1,570 1,500 1,730 1,480 1,950 1,860 2,150 1300 1790 1650 2020 NSF NSF NSF NSF /1630 /2220 /2050 /2500 ADEQUATE: 1623 UN Project Q.sM ~ 137 181 173 200 GSF GSF GSF GSF 1.19 1.19 1.19 1.19 /151 /206 /190 /232 Cost Per Q.sM No ~ ($OOO) IQ1el 773 773 773 773 166 20 8 32 20,920 3,330 1,273 5,887 Totals: 226 31,410 GSM GSM GSM GSM SUBSTANDARD: 400 UN PROJECT: Replace and demolish 226 housing units in Area F and Area A, JNCO/SNCO housing units. Construct a total of 186 units ( 166 duplex JNCO 2BR units, 20 single family JNCO 4 BR units) in Area F, and Construct a total of 40 sin.E1efami!:¥-units (8 SNCO 3 BR and 32 SNCO 4 BR unitsl in Area A. Surplus DDFORM1391,DEC99 PREVIOUS EDITIONS MAYBEUSEDINTERNALLY UNllL EXHAUSTED ,349 , -- 1 COMPONENT AIR FORCE I FY 2006 MILITARY CONSTRUCTION PROJECT DATA 3. INSTALLATION AND LOCATION 20 DATE 14. PROJECT TITLE EDWARDS AIR FORCEBASE,CALIFORNIA 5. PROGRAM ELEMENT 1 1 6. CATEGORY CODE 1 REPLACEFAMILY HOUSING 7. PROJECT NUMBER 1 8. PROJECT COST ($000) 88741 711-142 FSPM064501 $59,699 demoof 107units (20 Area C JNCO 2/3/4br, 87Area F JNCO 3/4br). REOUIREMENT: Projectis requiredto provide modernand efficienthousingfor military membersand their dependentsat EdwardsAFB. All units will meetmodernhousingstandardsandareprogrammedin accordance with the Housing CommunityProfile. The designwill provide a modernkitchen,living room, family room, bedroom,and bath configuration,with ample interior and exteriorstorage.The numberof bedroomswill range from two to four, asidentified in the most recentHousingRequirements and MarketAnalysis. Units will be provided with a two car garageand exteriorparking for a visitor'svehicle.Adequateinfrastructuresupportfor roadsandutilities shallalsobe provided.This is the secondphaseof a multiphaseinitiative to replacean additional226 housingunits for EdwardsAFB. The HousingCommunityProfile andHousingRequirements and MarketAnalysisare elementsof the GeneralPlan for EdwardsAFB, andarethe basis for this project. CURRENTSITUATION: Theseexistinghousingunitswereconstructedin the 1950s.They showthe effects of ageand heavyuse.Theyhavehadno majorupgradessinceconstruction,and theydo not meetthe needsof today'sfamilies, nor do theyprovidea modemhomeenvironment.The roof, walls, foundations,and exterior pavementsrequiremajor repairor replacementdueto age.Theplumbingand electricalsystemsare antiquated and do not meetcurrentstandardsfor efficiency and safety.Interiorsare generallyinadequateby modemcriteria. Bathroomsare smalland lack adequateclosetspace.Kitchenshaveinsufficientcabinets,storage,and counter space.Lighting, heating,and air conditioning systemsrequireupgradeandreplacement.The currentHousing Requirementsand MarketAnalysisandHousing CommunityProfile supportreplacement. IMPACT IF NOT PROVillED: Asbestoslimits maintainability,units are40+ yearsold, infrastructureis dilapidateddueto constantcontinuoususe,andunits do not meettheneedsof modemMilitary Family needs. This project conformsto the HousingMasterPlanwhich indicatesArea F asthe mostdire areaneeding replacement. ADDInONAL: This projectmeetsthe criteria/scopespecifiedin the Air ForceFamily Housing Guide. An economicanalysishasbeenpreparedcomparingthe alternatesof new construction,improvement,leasingand statusquo operation.Basedonthe net presentvaluesandbenefitof respectivealternatives,new construction wasfound to be the mosteffectivealternativeoverthe life of theproject.The improvementcostis more than the replacementcost.Sincethis is replacementhousing,therewill be no increasein the studentpopulationand thereforeno impact on local schooldistrict. BaseCivil Engineer:Mr. JamesE. Judkins,(DSN) 527-2910. DDFORM1391C,DEC99 PREVIOUS EDITIONS MAYBEUSEDINTERNALLY UNTILEXHAUSTED 350 MILITARY FAMILY HOUSING JUSTIFICATION 1. DATE OF REPORT 2. FISCALYEAR July-04 3. DOD COMPONENT 4. REPORTING AIR FORCE 5. DATA CONTROL SYMBOL DD-A&L(AR)1716 INSTALlATION a. NAME b. AS OF REPORT 2006 EDWARDS AIR FORCE LOCATION BASE CALIFORNIA Nov-03 ANALYSIS CURRENT OF OFFICER REQUIREMENTS 6. TOTAL 7. PERSONNEL PERMANENT 8. GROSS 9. TOTAL AND E6-E1 TOTAL (b) (c) (d) 690 325 2,289 675 326 2,312 690 325 2,289 675 326 2,312 ASSETS (a) OFFICER (e) E9-E7 (I) E6-E1 TOTAL (9) h STRENGTH PARTY FAMILY PROJECTED ES-E7 PERSONNEL HOUSING UNACCEPTABLY REQUIREMENTS HOUSED (a + b + c) a INVOLUNTARILY SEPARATED b IN MILITARY HOUSING TO BE DISPOSED/REPLACED 0 C. UNACCEPTABLY HOUSED IN COMMUNITY 0 10. VOLUNTARY 11. EFFECTIVE 12. HOUSING SEPARATIONS 3 HOUSING ASSETS REQUIREMENTS (a + b) a UNDER MILITARY CONTROL (1) HOUSED IN EXISTING DOD OWNED/CONTROLLED (2) UNDER CONTRACT/APPROVED (3) VACANT (4) INACTIVE b. PRIVATE HOUSING (1) ACCEPTABLY HOUSED (2) ACCEPTABLE VACANT RENTAL 13. EFFECTIVE 14. PROPOSED 15. REMARKS HOUSING DEFICIT PROJECT DO FORM 1523. NOV" 351 1. COMPONENT FY 2006 MILITARY CONSTRUCTION PROGRAM 2. DATE AIR FORCE INSTALLATION AND LOCATION COMMAND 5. AREA CONST BOLLING AIR FORCE BASE AIR FORCE DISTRICT OF COST INDEX DISTRICT OF COLUMBIA WASHINGTON 1.02 6. Personnel PERMANENT STUDENTS SUPPORTED Strength OFF ENL CIV OFF ENL CIV OFF ENL CIV AS OF 30 SEP 04 392 1245 916 0 0 0 301 784 40 END FY 2009 392 1231 953 0 0 0 301 784 40 7. INVENTORY DATA ($000) Total Acreage: 607 Inventory Total as of: (30 Sep 04) Authorization Not Yet in Inventory: Authorization Requested in this Program: Authorization Included in the Following Program: (FY 2007) Planned in Next Three Years Program: Remaining Deficiency: Grand Total: 551,780 3,473 48,711 82,455 0 15000 701,419 8. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY QQQS PROJECT TITLE 711-142 Replace Military Family Housing SCOPE 159 UN 9a. Future Projects: Included in the Following Program 711-142 Replace Military Family Housing 264 UN 9b. Future Projects: Typical Planned Next Three Years: None TOTAL 3,678 3,701 (FY 2006) COST DESIGN $.000 START 48.711 Aug-04 STATUS CMPL Jun-05 (FY 2007) 82,455 (FY08-11) 9c. Real Propery Maintenance Backlog This Installation 10. A support wing for Air Force personnel in the National Capitol Region; Headquarters USAF functions including Chief of Chaplains, Surgeon General, and Historian; Headquarters Air Force Office of Special Investigation; Air Force Office of Scientific Research; Air Force Legal Services Agency; Air Force Medical Operations Agency; USAF Band; and USAF Honor Guard. 806 DD Form 1390, 24 Jul 00 352 1. COMPONENT AIR FORCE 1 FY 2006 MILITARY CONSTRUCTION PROJECT DATA. 3. INSTALLATION AND LOCATION 4. PROJECT TITLE BOLLING AIR FORCEBASE, DISTRICT OF COLUMBIA REPLACEFAMIL Y HOUSING 1 5. PROGRAM ELEMENT 60CATEGORY CODE 88741 1 711-142 70 PROJECT NUMBER BXUR221164 9. COST ESTIMATE U/M QUANTITY ITEM Military Family Housing Dwellings RenewableEnergySource Other SpecialConstruction SupportCosts: Lot Costs Site Improvements 2 DATE S. PROJECT COST ($000) $48,711 UNIT COST COSTi$ooQl LS LS 23,687 (21,016) (730) ( 1,941 ) 20,286 ( 865 ) ( 3,050 ) LS LS LS LS LS LS LS ( 884 ) ( 6,000 ) ( 2,800 ) ( 800 ) ( 3,000 ) ( 2,200 ) ( 687 ) UN UN UN Landscaping Utility Mains Streets Recreation Demolition Environmental OtherSite Work l 1 159 159 159 132,176 4,591 12,208 Subtotal Contingency (5%) Total ContractCost SIOH (5.5%) 43,973 2,198 46,171 2,539 ProjectCost 48,711 Area CostFactor (1.021 10. Descriptionof ProposedConstruction:Demolish278 and construct159 multiplex family housingunits with all necessaryamenitiesandsupportingfacilities. Projectincludessite preparation,two car garages,air conditioning,energyconservingfeatures,parking, exteriorpatiosand privacy fencing,supportinfrastructureof roads,utilities, recreationareas,landscaping,asbestosremoval,anddemolition.Renewenergyincludessolar heatingand groundwaterheatpumps.Specialconstructionincludespatios,porches,decks,exteriorstorages, etc. Programmed Project .G.SM No ($000) 773 773 773 64 47 11 6,914 6,411 1,631 1.02 1.02 1.02 773 773 773 11 15 9 1,865 2,046 1,661 1.02 773 2 Pa~grades Bedrooms ~ Q.s.E ~ E4-E6 E7-E8 E9 2M 3 3 1,180 1,500 1,630 1,480 1,860 2,020 137 173 188 1.02 1.02 1.02 E9 01-03 06 4 3 4 1,860 1,500 2,030 2,310 1,860 2,520 215 173 234 07+ 4 2,690 3,330 309 Cost Per .G.SM!.lnit§ Totals: Maximum size: E4-E6 2M Bedroom Maximum size: E7-E8 3 Bedroom Maximum size: E9 3 Bedroom Maximum size: E9 4 Bedroom DDFORM1391,DEC99 IQtg.! 159 488 21,016 1300 NSF /1630 GSF /151 GSM 1650 NSF /2050 GSF /190 GSM 1850 NSF /2300 GSF /214 GSM 2180 NSF /2700 GSF /251 GSM PREVIOUS EDITIONS MAYBEUSEDINTERNAllYUNTil EXHAUSTED 3:53 - ~--- 1. COMPONENT AIR FORCE 1 FY 2006 MILITARY CONSTRUCTION PROJECT DATA. 3. INSTALLATION AND LOCATION 4. PROJECT TITLE BOLLING AIR FORCEBASE, DISTRICT OF REPLACEFAMILY HOUSING COLUMBIA 5. PROGRAM ELEMENT 1 11. REQUIREMENT: 6217 UN 2 DATE ' 6. CATEGORY CODE 88741 Maximum size:01-03 3 Bedroom Maximum size:06 4 Bedroom Maximum size:07+ 4 Bedroom 1 l a, PROJECT $48,711 COST ($000) 17. PROJECT NUMBER 711-142 BXUR221164 1650NSF/2050GSF/190GSM 2350NSF/2920GSF/271GSM 3270NSF/4060GSF/377GSM ADEQUATE: 5760 UN SUBSTANDARD: 457 UN PROJECT:REPLACEFAMILY HOUSING REOUIREMENT:Projectis requiredto provide modemand efficienthousingfor military membersand their dependentsatBolling AFB. All units will meetmodernhousingstandardsand areprogrammedin accordance with the HousingCommunityProfIle.The designwill providea modernkitchen, living room, family rooIn, bedrooIn,and bath configuration,with ample interior and exteriorstorage.The numberof bedroomswill range from two to four, asidentified in the mostrecenthousingmarketanalysis.Units will be provided with a two car garageand exteriorparking for anothervehicle.Adequateinfrastructuresupportfor roadsandutilities shall alsobe provided.This is part of a multiphaseinitiative to replacean additional159housing units for Bolling AFB. Housing CommunityProfile andHousingRequirements andMarketAnalysis are consistentwith the GeneralPlan for Bolling AFB, andarethebasisfor this project. CURRENTSI11JATIQN:Theseexistinghousingunits wereconstructedin the 1970s.They showthe effects of ageand heavyuse.Theyhavehadno majorupgradessinceconstruction,and theydo not meetthe needsof today'sfamilies,nor do theyprovidea modernhomeenvironment.Roof, wall, foundationsand exterior pavementsrequiremajor repair of replacementdueto age.Plumbingand electricalsystemsareantiquatedand do not meetcurrentstandardsfor efficiencyandsafety.Interiorsare generallyinadequateby moderncriteria. Bathroomsare smalland bedroomslack adequateclosetspace.Kitchenshave insufficient cabinets,storageand counterspace.Lighting, heatingand air conditioningsystemsrequireupgradeandreplacement.Current HousingRequirements and MarketAnalysis andthe HousingCommunityProfile renovationcostsexceedthe currentreplacementcost.The costto correcteminentproblemsexistingwith the inventory,spacedeficiencies, and modernizationrequirementshasprovento be more costlythanthe original vouchercostandthe capitalizationcombined. IMP ACT IF NOT PROVIDED:Units will continueto deterioraterapidly,resultingin increasingoperations, maintenanceand repairto the governmentandinconvenienceto residents.Without this project,repairto these unitswill continuein a costlypiecemealfashionwith little or no improvementin living quality. ADDITIONAL: Demolish/replace159 multiplex family housingunits with all necessaryamenitiesand supportingfacilities. Projectincludessite preparation,attachedtwo car garages,air conditioning,energy conservingfeatures,parking,exteriorpatiosand privacy fencing,supportinfrastructureof roads,utilities, recreationareas,landscaping,asbestosremoval,anddemolition.Work includesthe lastphaseof an electrical loop for Westoverhousing.This projectalsoincludesthe buyoutcostof amortizingthe naturalgaslines that will be removedduring construction.BaseCivil Engineer:Lt CotDennisJasinski,(202)767-5565. .. DDFORM1391C,DEC99 PREVIOUS EDITIONS MAYBEUSEDINTERNALLY UNTILEXHAUSTED 354 ! MILITARY FAMILY HOUSING JUSTIFICATION 1. DATE OF REPORT 2. FISCAL YEAR July-o4 3. DOC COMPONENT REPORT CONTROL SYMBOL 2006 DD-A&L(AR)1716 4. REPORTING INSTALLATION AIR FORCE a. NAME b. LOCATION 5. DATA AS OF BOLLING AIR FORCE BASE DISTRICT OF COLUMBIA May-o4 ANALYSIS CURRENT OF REQUIREMENTS AND ASSETS 6. TOTAL PERSONNEL STRENGTH 7. PERMANENT PROJECTED OFFICER (a) E9-E7 (b) E6-E1 (c) TOTAL (d) OFFICER (e) E9-E7 (f) E6-E1 (g) 4,716 1,327 2,601 8,644 4,615 1,335 2,615 4,716 1,327 2,601 4,615 1,335 2,615 26 69 64 0 0 37 TOTAL (h) PARTY PERSONNEL 8. GROSS FAMILY HOUSING REQUIREMENTS 3,832 9. TOTAL UNACCEPTABLY HOUSED (a+b+c) 26 a INVOLUNTARILYSEPARATED 0 b. IN MILITARYHOUSINGTO BE DISPOSEDIREPLACED C. UNACCEPTABLYHOUSEDIN COMMUNITY 10. VOLUNTARY SEPARAnONS 117 11. EFFECTIVE HOUSING REQUIREMENTS 12. HOUSING ASSETS (a + b) a. UNDERMILITARYCONTROL (1) HOUSEDIN EXISTINGDOD OWNED/CONTROLLED (2) UNDERCONTRACT/APPROVED (3) VACANT (4) INACTIVE b. PRIVATEHOUSING (1) ACCEPTABLYHOUSED (2) ACCEPTABLEVACANTRENTAL 13. EFFECTIVE HOUSING DEFICIT 14. PROPOSED PROJECT 15. REMARKS DDFORM 1513, Nav.. 355 1. COMPONENT FY 2006 MILITARY CONSTRUCTION PROGRAM 2. DATE AIR FORCE INSTALLATION AND LOCATION COMMAND 5. AREA CONST MACDILL AIR FORCE BASE AIR MOBILITY COMMAND COST INDEX FLORIDA 0.89 6. Personnel PERMANENT STUDENTS SUPPORTED Strength OFF ENL CIV OFF ENL CIV ASOF30SEP04 328 1943 1182 0 0 0 END FY2009 327 1938 1182 0 0 0 7. INVENTORY DATA ($000) Total Acreage: 5,767 Inventory Total as of: (30 Sep 04) Authorization Not Yet in Inventory: Authorization Requested in this Program: Authorization Included in the Following Program: (FY 2007) Planned in Next Three Years Program: OFF 1252 1338 ENL 2114 2147 CIV 806 806 1,287,356 76,400 40,982 24,171 0 Remaining Deficiency: Grand Total: 8. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY ~ PROJECT TITLE 711-142 Replace Military Family Housing, Ph 7 9a. Future Projects: Included in the Following Program 711-142 Replace Military Family Housing, Ph 8 9b. Future Projects: Typical Planned Next Three Years: TOTAL 7,625 7,738 130000 1,558,909 (FY 2006) SCOPE 109 UN COST DESIGN $,000 START 40,982 Aug-04 STATUS CMPL Jul-05 (FY 2007) 70 UN 24,171 (FY08-11) None 9c. Real Propery Maintenance Backlog This Installation 376 10. An air refueling wing with a KC-135 squadron; tenets include US Special Operations Command and US Central Command. DD Form 1390,24 Jul 00 356 'i~Wt~;::: 1. COMPONENT AIR FORCE FY 2006 MILITARY CONSTRUCTION PROJECT DATA 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MACDll..L AIR FORCEBASE, FLORmA 5. PROGRAM ELEMENT 2. DATE REPLACEFAMll..Y HOUSING PHASE 7 6. CATEGORY CODE 88741 7. PROJECT NUMBER 711-142 9. COST ESTIMATE U/M QUANTITY ITEM Military Family Housing Dwellings Other SpecialConstruction SupportCosts: Site Improvements Utility Mains Streets Demolition OtherSite Work 8. PROJECT COST ($000) NVZR043701R1 UN UN 109 109 $40,982 UNIT COST COST $000 21,059 ( 15,114) (5,945 ) 15,867 ( 5,967 ) (5,152 ) ( 2,552 ) ( 1,170 ) ( 1,026) 138,661 54,541 LS LS LS LS LS Subtotal Contingency (5%) Total ContractCost SIOH (5.7%) 36,926 1,846 38,772 2,210 ProjectCost 40,982 Area CostFactor 0.89 10. Descriptionof ProposedConstruction:Replaces109 Military FamilyHousingUnits. Includessite clearing,replacementand/orupgradeof utility systemsand roads,and designand constructionof singlefamily, duplexor town houseunits. Providesnormalamenitiesto includeappliances,carports,parking, air conditioning,patiosand privacyfencing. Specialconstructionfeaturesdenotedesignand constructionof units to withstandhurricanesand stormsurges.Demolishes86 surplusinadequateunits. Programmed Payarades Bedrooms ~ Y.§E Project ~ ~ Cost Per No ($000) ~.!.!.!:!1!.$. IQ!El E1-E3 E1-E3 3 4 1,310 1,570 1,630 1,950 151 181 0.89 0.89 773 773 26 24 2,701 2,989 04-05 04-05 06 3 4 4 1,630 1,860 2,030 2,020 2,310 2,520 188 215 234 0.89 0.89 0.89 773 773 773 12 24 11 1,552 3,550 1,771 07+ 4 2,690 3,330 309 0.89 773 Totals: Maximum size: E1-E3 3 Bedroom 1420 NSF /1760 GSF /164 GSM Maximum size: E1-E3 4 Bedroom Maximum size: 04-05 3 Bedroom 1790 NSF /2220 GSF /206 GSM 1850 NSF /2300 GSF /214 GSM Maximum size: 04-05 4 Bedroom Maximum size: 06 4 Bedroom Maximum size: 07+ 4 Bedroom 2180 NSF /2700 GSF /251 GSM 2350 NSF /2920 GSF /271 GSM 3270 NSF /4060 GSF /377 GSM 11. REQUIREMENT: 3476 UN ADEQUATE: 3292 UN 12 2,551 109 15,114 SUBSTANDARD: 184 UN PROJECT:ReplaceFamily Housing,Phase7. (CurrentMission) RE UIREMENT: This ro.ectis re uired to rovide modemandefficientre lacementhousin DDFORM1391,DEC99 PREVIOUS EDITIONS MAYBEUSEDINTERNALLY UNnLEXHAUSTED 357 1. COMPONENT AIR FORCE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MACDILL AIR FORCEBASE, FLORIDA 5. PROGRAM ELEMENT 1 ! 2 DATE FY 2006 MILITARY CONSTRUCTION PROJECT DATA' 6. CATEGORY CODE REPLACEFAMIL Y HOUSING PHASE 7 7. PROJECT NUMBER 8. PROJECT COST ($OOO) 88741 711-142 NVZRO43701Rl $40,982 membersand their dependents stationedatMacDil1AFB. All units will meet"whole house"standardsand are programmedin accordancewith MacDill's Housing CommunityPlan andGOQ MasterPlan. Replacement housingwill providea safe,comfortable,andappealingliving environmentcomparableto the off-basecivilian community.The replacementhousingwill provide a modemkitchen,living room,dining room and bath configuration,with ample interior and exteriorstorageandvehicleprotection.Off-streetparking will be provided for a secondvehicle.The basicneighborhoodsupportinfrastructurewill be upgradedto meetmodem housingneeds.Neighborhoodenhancements will include landscaping, playgrounds,and recreationareas. Climatic considerations require specialconstructionmeasuresto withstandseverestorms(hurricanes)and tidal surges.Five percentof the replacementhousingunits,by type/rank,shallbe madeaccessibleto the disabledas mandatedby the Americanswith DisabilitiesAct. CURRENTSI11JATION:This projectreplaceshousesthat are over45 yearsold andare showingthe effectsof ageand continuousheavyuse.Theyhavehadno majorupgradessinceconstructionand do not meetthe needs of today'sfamilies.Existing housesareinadequatein size.Roofs,walls, foundations,and exteriorpavements require major repairor replacement.Plumbingand electricalsystemsareantiquatedanddo not meetcurrent standardsfor efficiency or safety.Lack of adequateparking spacesfor occupantshascreatedexcessive congestion.Housinginteriorsareinadequateby any modemcriteria. Bedroomsare smalland lack sufficient closetspace.Bathroomsare small;fIXturesareoutdatedand energyinefficient. Kitchenshaveinadequate storageand counterspace;cabinetsareold andunsightly; countertopsand sinksare badlyworn. Flooring throughoutthe housesis worn andsomecontainsasbestos.Utility systemsrequireexcessivemaintenanceand repair.Housing densityis excessive,creatinga noisy,chaoticliving environment. IMPACT IF NOT PROVIDED: Air Forcemembersand their families will continueto live in extremelysmall, outdatedand unsatisfactoryhousing.The unitswill deterioratefurther,resultingin escalatingandunacceptable maintenanceand repair costsas well asinconveniencingthe occupants.Without this and subsequent phasesof this initiative, repairswill continuein a costly,piecemealfashionwith little or no improvementin occupant quality of life. Thesedeficiencieswill continueto adverselyaffectthe morale of all personneland their family membersassignedto the base. ADDITIONAL: This projectmeetsthe criteria/scopespecifiedin PartII of Military Handbook1190,"Facility Planningand DesignGuide".Sincethis is replacementhousing,therewill be no increasein the student populationor impacton the ability of the local schooldistrictto supportbasedependents. An economic analysishasbeenpreparedcomparingthe alternativesof new construction,revitalization,leasing,and status quo operation.Basedon the net presentvaluesandbenefitsof therespectivealternatives,improvementwas foundto be the most costeffective overthe life of the project. However,sincerevitalizationexceeded70% of the replacementvalue of the houses,replacementconstructionwasselected.The constructionagentfor this project will be the Army Corpsof Engineers,resultingin SIOHof 5.7%.BaseCivil Engineer:Lt Col AnthonyA. Foti, (813)828-3577. DOFORM1391C, DEC99 PREVIOUS EDmONSMAYBEUSEDINTERNAlLY UNTlLEXHAUSTED ,.358 II MILITARY FAMILY HOUSING JUSTIFICATION 1. DATE OF REPORT 2. FISCAL YEAR July-04 3. DOD COMPONENT REPORT CONTROL SYMBOL DD-A&L(AR)1716 4. REPORTING INSTALLATION AIR FORCE 5. 2006 a. NAME DATA AS OF b. LOCATION MACDILL AIR FORCE BASE Phase 7 FLORIDA Aug-04 ANALYSIS OF REQUIREMENTS AND ASSETS 6. TOTAL PERSONNEL STRENGTH 7. PERMANENT CURRENT OFFICER E9-E7 (a) (b) E6-E1 (c) TOTAL (d) PROJECTED OFFICER E9-E7 (e) (f) E6-E1 (g) 1,580 563 3,494 5,637 1,665 574 3,511 1,580 563 3,494 5,637 1,665 574 3,511 0 0 0 59 0 50 27 0 634 TOTAL PARTY PERSONNEL 8. GROSS FAMILY HOUSING REQUIREMENTS 1,320 9. TOTAL UNACCEPTABLY HOUSED (a+b+c) a INVOLUNTARILYSEPARATED b. IN MILITARYHOUSINGTO BE DISPOSED/REPLACED C UNACCEPTABLYHOUSEDIN COMMUNITY 10. VOLUNTARY SEPARATIONS 81 11. EFFECTIVE HOUSING REQUIREMENTS 12. HOUSING ASSETS (a + b) a UNDERMILITARYCONTROL (1) HOUSEDIN EXISTINGDOD OWNED/CONTROLLED (2) UNDERCONTRACT/APPROVED (3) VACANT (4) INACTIVE b. PRIVATEHOUSING (1) ACCEPTABLYHOUSED .13. (2) ACCEPTABLEVACANT RENTAL EFFECTIVE HOUSING DEFICIT 14. PROPOSED ~ 1:1 I 0 PROJECT 15. REMARKS DD FORM1523,NOV" 359 1. COMPONENT FY 2006 MILITARY CONSTRUCTION PROGRAM 2. DATE AIR FORCE INSTALLATION AND lOCATION COMMAND 5. AREA CONST MOUNTAIN HOME AIR FORCE BASE AIR COMBAT COMMAND COST INDEX IDAHO 1.11 6. Personnel PERMANENT STUDENTS SUPPORTED Strength OFF ENl CIV OFF ENl CIV OFF ENl CIV AS OF 30 SEP 04 453 4208 1139 0 32 0 0 0 59 END FY 2009 450 4139 601 0 32 0 0 0 59 7. INVENTORY DATA ($000) Total Acreage: 10,050 Inventory Total as of: (30 Sep 04) Authorization Not Yet in Inventory: Authorization Requested in this Program: Authorization Included in the Following Program: (FY 2007) Planned in Next Three Years Program: Remaining Deficiency: Grand Total: 8. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY 1,935,638 15,137 56,467 111,614 0 65700 2,184,556 (FY 2006) COST DESIGN ~ PROJECTTITLE SCOPE 711-142 Replace Military Family Housing, Ph 7 194 UN 56,467 9a. Future Projects: Included in the Following Program 711-142 Replace Military Family Housing, Ph 8 457 UN (FY 2007) 111,614 9b. Future Projects: Typical Planned Next Three Years: TOTAL 5,891 5,281 $.000 START STATUS CMPl Aug-04 May-05 (FY08-11) None 9c. Real Propery Maintenance Backlog This Installation 1,130 10. A composite wing with one F-16 squadron; one F-15 C/O squadron, one F-15E squadron, one KC-135R squadron, a B-1 B squadron, and the AEF Battlelab. DO Form 1390, 24 Jul 00 ..,. c:,.", ".~ 'i~ 60 ~~~:c;~~'~'" 1. COMPONENT AIR FORCE 2 DATE FY 2006 MILITARY CONSTRUCTION PROJECT DATA. 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MOUNTAIN HOME AIR FORCE BASE,IDAHO 5. PROGRAM ELEMENT REPLACEMILITARY FAMILY HOUSING PH 7 6. CATEGORY CODE 88741 7. PROJECT NUMBER 711-142 9. COST ESTIMATE U/M QUANTITY ITEM 8. PROJECT COST ($000) YZH887176 Military Family Housing Dwellings OtherSpecialConstruction SupportCosts: Lot Costs Site Improvements Landscaping Utility Mains Streets Recreation Demolition Environmental OtherSite Work UN UN 194 194 $56,467 UNIT COST COST $000 34,447 ( 29,095 ) (5,352) 16,431 ( 1,166 ) ( 1,867) ( 806 ) ( 5,201 ) ( 2,043 ) ( 874 ) ( 2,067 ) ( 1,485 ) (922) 149,974 27,588 LS LS LS LS LS 18 LS LS LS Subtotal Contingency (5%) Total ContractCost SIOH (5.7%) 50,878 2,543 53,421 3,044 ProjectCost 56,467 Area Cost Factor 1.11 10. Descriptionof ProposedConstruction:Demolish258 and construct194family housingunits with all necessaryamenitiesand supportingfacilities. Projectincludessite preparation,attachedgarages,air conditioning,energyconservingfeatures,parking,exteriorpatiosand privacy fencing. Supportinfrastructure areasinclude roads,utilities, recreationareas,landscaping,demolitionplus asbestosandleadbasedpaint removal.Specialconstructionincludes,arctic climate construction,crawl spacesfor utilities, concretefootings and foundationwalls to preventfrost upheaval,andvinyl or hardi-planksiding. Programmed Project Paygrades Bedrooms NSE ~ .G.SM E4-E6 E4-E6 2M 3 1,180 1,310 1,480 1,630 137 151 E4-E6 4 1,570 1,950 E7-E8 E7-E8 01-03 01-03 01-03 04-05 04-05 06 3 4 2M 3 4 3 4 4 1,500 1,730 1,350 1,500 1,730 1,630 1,860 2,030 1,860 2,150 1,670 1,860 2,150 2,020 2,310 2,520 ~ Cost Per ~ Maximum size: E4-E6 2M Bedroom 1300 NSF /1630 ($000) IQtgl 1.11 1.11 773 773 13 30 1,528 3,887 181 1.11 773 39 6,057 173 200 155 173 200 188 215 234 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.11 773 773 773 773 773 773 773 773 9 8 31 17 19 11 11 6 1,336 1,373 4,123 2,523 3,260 1,775 2,029 1,204 194 29,095 Totals: DD FORM 1391, DEC 99 No ~ GSF /151 GSM PREVIOUSEDITIONSMAYBE USED If'lTERNALLYUNTIL EXHAUSTED 361 1. COMPONENT AIR FORCE FY 2006 MILITARY CONSTRUCTION PROJECT DATA 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MOUNTAIN HOME AIR FORCEBASE, IDAHO 5. PROGRAM ELEMENT size: size: size: size: REPLACEMILITARY FAMILY HOUSING PH 7 6. CATEGORY CODE 88741 Maximum Maximum Maximum Maximum 7. PROJECT NUMBER 711-142 E4-E6 3 Bedroom E4-E6 4 Bedroom E7-E8 3 Bedroom E7-E8 4 Bedroom Maximum size: 01-03 Maximum size: 01-03 Maximum size: 01-03 2M Bedroom 3 Bedroom 4 Bedroom Maximum size: 04-05 1420 1790 1650 2020 NSF NSF NSF NSF 8. PROJECT COST ($000) YZH887176 $56,467 /1760 GSF /164 GSM /2220 GSF /206 GSM /2050 GSF /190 GSM /2500 GSF /232 GSM 1540 NSF /1920 1650 NSF /2050 2020 NSF /2500 GSF /178 GSM GSF /190 GSM GSF /232 GSM 3 Bedroom 1850 NSF /2300 GSF /214 GSM Maximum size: 04-05 4 Bedroom Maximum size: 06 4 Bedroom 2180 NSF /2700 2350 NSF /2920 GSF /251 GSM GSF /271 GSM 11. REQUIREMENT: 2794 UN 2. DATE ADEQUATE: 2131 UN SUBSTANDARD: 663 UN PROJECT:REPLACE FAMIL Y HOUSING (Phase7) A DesigniBuild Project REOUIREMENT:This projectis requiredto provide modernand efficient housingfor military membersand their dependentsstationedat MountainHome Air ForceBase(MHAFB). All units will meetmodern"Whole House"standardsandprogrammingin accordancewith the HousingCommunityProfile (HCP). Construct housing,providing a comfortableandappealingliving environmentcomparableto the off-basecivilian community.Providemodernkitchens,living rooms,dining rooms,bath configurationsandtwo to four bedroomsasidentified in the mostrecentHousingRequirements and MarketAnalysis(HRMA). Supply ample interior and exteriorstorageareas,enclosedgaragesand off-streetparking for an additionalvehicle. Providebasicneighborhoodsupportinfrastructure,roadsand utilities, constructappropriaterecreationareasfor dependentyouthand childrenplus install bussheltersto meetmodernhousingneeds.Performlead and asbestosabatementasrequired.Housesinclude crawl spacesfor utilities, foundationwalls for frost heave prevention,vinyl or hardi-planksiding and residentialirrigation systems.Needto reworkexisting subdivision footprints,gradingandutilities in newneighborhoods plus substantialrock excavationfor footing and utility installation.Not all existingfunctionalutilities canbe usedbecausetheycouldbe sizedtoo small for the new usesor locatedin the wrong places. CURRENTSITUATION: Currenthousingunits,constructedin 1956and 1962,do not meet"Whole House" standardsand are in unsatisfactoryconditiondueto the affectsof ageand heavyuse.Efficiency and safety deficienciesincludeinfrastructure-electrical, plumbingand mechanicalsystems;antiquatedkitchensand bathrooms;flat/low pitchedroofsrequiringhigh maintenance;leadpaintandasbestos containingmaterials; deterioratingkitchen/bathroomcabinets,sinksandfloors plus inadequatecounterspaceand storageareas. IMPACT IF NOT PROVIDED: Units will continuedeterioraterapidlyand Air ForceFamilies will continue to live in unsatisfactoryhousingconditions.As the existing units age,the maintenanceand repair costson theseunits increaseswith little or no improvementin living quality. ADDInONAL: This projectincludesthe demolitionof the lastremainingsurplusunitsidentified in the Housing CommunityProfile (HCP)document.The economicanalysiscomparedall construction,renovation andstatus-quoalternativestowardprovidingthe bestquality military family housing.The economicanalysis found new constructionto be the mostcosteffectiveoption overthe life of the project.This replacement housingwill not increasethe studentpopulationor negativelyimpactthe local schooldistrict. The improvementcostis 79% of replacement cost.The Corpsof Engineerswill be the agencyto provide contract management and supervisionof this project.The 366thCivil EngineerSquadronCommanderis Lt. Col. ScottR. Jarvis, (208)828-6353. DDFORM1391C, DEC99 PREVIOUS EDITIONS MAYBEUSEDINTERNALLY UNT1L EXHAUSTED 362 ;~i; MILITARY FAMILY HOUSING JUSTIFICATION 1. DATE OF REPORT July-04 4. REPORTING INSTALLATION 3. DOD COMPONENT AIR FORCE 2. FISCAL YEAR 2006 a. NAME REPORT CONTROL SYMBOL DD-A&L(AR)1716 b. LOCATION 5. DATA AS OF MOUNTAIN HOME AIR FORCE BASE Phase 7 IDAHO Dec-03 ANALYSIS OF REQUIREMENTS 6. TOTAL PERSONNEL 7. PERMANENT CURRENT AND ASSETS PROJECTED OFFICER (a) E9-E7 (b) E6-E1 (c) TOTAL (d) OFFICER (e) E9-E7 (f) E6-E1 (g) 407 428 3,485 4,320 417 449 3,655 407 428 3,485 4,320 417 449 3,655 17 82 TOTAL STRENGTH PARTY PERSONNEL 8. GROSS FAMILY HOUSING REQUIREMENTS 390 9. TOTAL UNACCEPTABLY HOUSED (a+b+c) 50 82 0 0 0 95 17 82 0 33 0 a. INVOLUNTARILY SEPARATED b. IN MILITARYHOUSINGTO BE DISPOSED/REPLACED C. UNACCEPTABLYHOUSEDIN COMMUNITY 10. VOLUNTARY SEPARATIONS 1 17 11. EFFECTIVE HOUSING REQUIREMENTS 12. HOUSING ASSETS (a + b) a. UNDERMILITARYCONTROL (1) HOUSEDIN EXISTINGDOD OWNED/CONTROLLED (2) UNDERCONTRACT/APPROVED (3) VACANT (4) INACTIVE b. PRIVATEHOUSING (1) ACCEPTABLYHOUSED (2) ACCEPTABLEVACANT RENTAL 13. EFFECTIVE HOUSING DEFICIT 14. PROPOSED PROJECT 15. REMARKS DD roRMU13.NOV.. "'c';" 363 1. COMPONENT FY 2006 AIR FORCE INSTALLATION AND LOCATION WHITEMAN AIR FORCE BASE MISSOURI 6. Personnel PERMANENT Strength OFF ENL AS OF 30 SEP 03 457 4098 END FY 2008 450 4010 MILITARY CONSTRUCTION PROGRAM. DATE COMMAND AIR COMBAT COMMAND CIV 916 854 STUDENTS OFF ENL CIV 0 5 0 0 5 0 7. INVENTORY DATA ($000) Total Acreage: 5,214 Inventory Total as of: (30 Sep 03) Authorization Not Yet in Inventory: Authorization Requested in this Program: Authorization Included in the Following Program: Planned in Next Three Years Program: Remaining Deficiency: Grand Total: 5. AREA CONST COST INDEX 1.07 SUPPORTED OFF ENL CIV 0 1 0 0 1 0 1,372,989 61,289 26,917 22,001 0 0 1,483,196 (FY 2007) 8. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY ~ PROJECT TITLE 711-142 Replace Military Family Housing SCOPE 111 UN 9a. Future Projects: Included in the Following Program 711-142 Replace Military Family Housing 95 UN 9b. Future Projects: Typical Planned Next Three Years: None TOTAL 5,477 5,320 (FY 2006) COST DESIGN $.000 START 26,917 Aug-04 STATUS CMPL Jun-05 (FY 2007) 22,001 (FY08-11) 9c. Real Propery Maintenance Backlog This Installatior 800 10. A bomber wing with two squadrons of B-2 aircraft; and an Air Force Reserve fighter wing with one NOA-1 0 squadron. DD Form 1390, 24 Jul 00 384 t 1 1. COMPONENT AIR FORCE FY 2006 MILITARY CONSTRUCTION PROJECT DATA. J2 DATE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE WHITEMAN AIR FORCEBASE, MISSOURI REPLACEMILITARY FAMILY HOUSING AND LAND ACj;lillSITION 1 5. PROGRAM ELEMENT 6. CATEGORY CODE 88741 17. PROJECT NUMBER 711-142 YWHG029303R1 9. COST ESTIMATE U/M QUANTITY ITEM Military Family Housing Dwellings Other SpecialConstruction SupportCosts: Force ProtectionFence Lot Costs Site Improvements Landscaping Utility Mains Streets Recreation Demolition Environmental OtherSite Work Land Purchase UN UN 111 111 LF LS LS 4,000 1 8. PROJECT COST ($000) $26,917 UNIT COST COST-L$oo~ 18,420 ( 14,559) (3,861 ) 5,832 ( 80 ) ( 672 ) ( 483 ) 131,162 34,784 20 LS LS LS LS LS LS LS LS ( 179 ) ( 2,080 ) ( 385 ) ( 59 ) ( 1,235 ) ( 282 ) (27) ( 350 ) Subtotal Contingency (5%) Total ContractCost SIOH (5.7%) 24,252 1,212 25,464 1,451 ProjectCost 26,917 Area CostFactor (1.07) 10. Descriptionof ProposedConstruction:Designand construct111JNCOand SNCOsingle or duplex family housingunits with all necessary support.Includes:land acquisition,site development,utilities, pavements,streetlighting, forceprotection,air conditioning,recreationfacility and play areas,landscaping,and othernecessarysupport.Specialconstructionincludes:2 car garages,stormshelters,and crawl space foundations.Projectis to includedemolitionof 111 existingunits. Programmed Pavarades Bedrooms ~ Y.QE E4-E6 E4-E6 E4-E6 E7-E8 2M 3 4 3 1,180 1,310 1,570 1,500 1,480 1,630 1,950 1,860 E7-E8 4 1,730 2,150 Project Cost Per No ($000) 137 151 181 173 1.07 1.07 1.07 1.07 773 773 773 773 42 25 24 10 4,759 3,122 3,593 1,431 200 1.07 773 ~ ~ ~!.!:nj1§. Totals: Maximum Maximum Maximum Maximum Maximum size: size: size: size: size: E4-E6 E4-E6 E4-E6 E7-E8 E7-E8 DOFORM1391,DEC99 2M Bedroom 3 Bedroom 4 Bedroom 3 Bedroom 4 Bedroom 1300 1420 1790 1650 2020 NSF NSF NSF NSF NSF 11630 11760 12220 12050 12500 GSF GSF GSF GSF GSF 1151 1164 1206 1190 1232 IQ.!,g1 10 1,654 111 14,559 GSM GSM GSM GSM GSM PREVIOUS EDITIONS MAYBEUSEDINTERNALLY UN11L EXHAUSTED 3'65 ,---~ , ~ ~~~~;~~ J FY 2006 MILITARY CONSTRUCTION PROJECT DATA 12. DATE 3. INSTALLATION AND LOCATION 4. PROJECTTITLE WHITEMAN AIR FORCE BASE, MISSOURI REPLACEMILITARY FAMILY HOUSING AND LAND AGQUISITION 5. PROGRAM ELEMENT 88741 11. REQUIREMENT: 1978UN 1 6. CATEGORYCODE 711-142 ADEQUATE:1772UN 1 7. PROJECTNUMBER YWHG029303R1 18. PROJECTCOST($000) $26,917 SUBSTANDARD: 206 UN PROJECT:ReplaceMilitary Family Housingandacquirenecessary land to meetwhole-houseand new housingsite standards.(CurrentMission) REOUIREMENT:This projectis requiredto provide modem,efficienthousingfor military membersand their families stationedat WhitemanAFB. All units will meetwhole-housestandardsandareprogrammedin accordancewith the Housing CommunityPlan.This housingwill provide safe,comfortable,and appealing living environmentcomparableto the off-basecivilian community.Stormsheltershave beenauthorizeddueto the high likelihood of severeweatherincluding tornadoes.Crawlspacefoundationsarerequireddue to highly expansiveclaysoils thatareprohibitive for slab on gradeconstruction. CURRENTSI1UAnON: The rural communitysurroundingWhitemanAFB doesnot have sufficient, adequatehousingassetsto supportexistingrequirements.Off-basehousingis very difficult to find and expensive.No land is availablewithin currentbaseboundariesto supportconstructionof the largersized replacementhomesdueto an agreementwith the NaturalResourcesDepartmentto closean environmental restotationsite for Chlordaneby convertingland use from residentialto administrativeor industrial.This changeis shownin theWhitemanAFB Comprehensive Plan thatis currentlyunderrevision. IMPACT IF NOT PROVIDED: Units will continueto deterioraterapidly,resulting in increasingoperations, maintenanceand repairto the governmentandinconvenienceto residents.Without the project,repair of these units will continuein acostlypiecemealfashionwith little or no improvementin living quality. ADDITIONAL: This projectmeetsthe criteria/scopespecifiedin the Air ForceFamily Housing Guide for Planning,Programming,Design,andConstruction.An economicanalysishas beenpreparedcomparingthe alternativesof new construction,improvement,andstatusquo operation.The economicanalysisfound new constructionis the mostcosteffectiveoption.The improvementcostis more than 100%of the replacement cost.The constructionagentfor this projectis the Army Corpsof Engineers,resultingin SIOH costsof 5.7%. BaseCivil Engineer:JefferyYinger at DSN 975-3503. DDFORM1391C,DEC99 PREVIOUS EDITIONS MAYBEUSEDINTERNALlY UNTILEXHAUSTED ".. '~ ..,.~. 66 MILITARY FAMILY HOUSING JUSTIFICATION 1. DATE OF REPORT 2. FISCAL July-Q4 3. DOD AIR 5. COMPONENT 4. FORCE DATA REPORTING REPORT CONTROL SYMBOL DD-A&L(AR)1716 INSTALLATION a. NAME b. AS OF YEAR 2006 WHITEMAN AIR FORCE LOCATION BASE MISSOURI Oct-03 ANALYSIS CURRENT OF OFFICER REQUIREMENTS 6. TOTAL 7. PERSONNEL PERMANENT 8. GROSS 9. TOTAL AND (a) (b) E6-E1 TOTAL (c) (d) OFFICER (e) E9-E7 (f) E6-E1 TOTAL (g) STRENGTH PARTY FAMILY ASSETS PROJECTED E9-E7 425 336 2,821 3,582 424 336 2,817 425 336 2,821 3,582 424 336 2,817 0 20 91 56 0 52 PERSONNEL HOUSING UNACCEPTABLY REQUIREMENTS HOUSED (a + b + c) a. INVOLUNTARILY SEPARATED b. IN MILITARY HOUSING TO BE DISPOSED/REPLACED C. UNACCEPTABLY 10. VOLUNTARY 11. EFFECTIVE 12. HOUSING HOUSED IN COMMUNITY SEPARATIONS 3 HOUSING ASSETS REQUIREMENTS (a + b) a UNDER MILITARY CONTROL (1) HOUSED IN EXISTING DOD OWNED/CONTROLLED (2) UNDER CONTRACT/APPROVED (3) VACANT (4) INACTIVE b. PRIVATE HOUSING (1) ACCEPTABLY HOUSED (2) ACCEPTABLE VACANT 13. EFFECTIVE 14. PROPOSED 15. REMARKS HOUSING RENTAL DEFICIT PROJECT DD FORM1513,NOY.. 367 1. COMPONENT FY 2006 MILITARY CONSTRUCTION PROGRAM 2. DATE AIR FORCE INSTALLATION AND LOCATION COMMAND 5. AREA CONST MALMSTROM AIR BASE AIR FORCE SPACE COST INDEX MONTANA COMMAND 1.16 6. Personnel PERMANENT STUDENTS SUPPORTED Strength OFF ENL CIV OFF ENL CIV OFF ENL CIV AS OF 30 SEP 04 494 3051 542 0 0 0 0 0 0 END FY 2009 494 3051 542 0 0 0 0 0 0 7. INVENTORY DATA ($000) Total Acreage: 3,701 Inventory Total as of: (30 Sep 04) Authorization Not Yet in Inventory: Authorization Requested in this Program: Authorization Included in the Following Program: (FY 2007) Planned in Next Three Years Program: Remaining Deficiency: Grand Total: TOTAL 4,087 4,087 505,493 0 68,971 136,191 14,189 0 724,844 8. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY QQQ£ PROJECT TITLE 711-142 Replace Military Family Housing (FY 2006) COST DESIGN SCOPE $,000 296 UN 68,971 9a. Future Projects: Included in the Following Program 711-142 Replace Military Family Housing 487 UN (FY 2007) 136,191 9b. Future Projects: Typical Planned Next Three Years: 711-142 Construct Military Family Housing 52 UN START Aug-04 STATUS CMPL Jul-05 (FY08-11) 9c. Real Propery Maintenance Backlog This Installation 10. AFSPC strategic missile base supporting the 341st Space Wing. 14,189 1,175 DD Form 1390,24 Jul 00 368 1 1. COMPONENT AIR FORCE 1 2. DATE FY 2006 MILITARY CONSTRUCTION PROJECT DATA 1REPLACEFAMIL Y HOUSING 1 NZAS034007 1 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MALMSTROM AIR FORCE BASE, MONTANA J6. 5. PROGRAM ELEMENT 88741 CATEGORY CODE 7. PROJECT NUMBER 711-142 9. COST ESTIMATE U/M QUANTITY ITEM Military FamilyHousing Dwellings Other SpecialConstruction SupportCosts: Lot Costs Site Improvements $68,971 UNIT COST COSTj$OOQL LS LS 45,509 (43,647 ) ( 1,862 ) 16,636 ( 1,661 ) ( 1,192 ) LS LS LS LS LS LS LS ( 1,065 ) ( 6,494 ) ( 1,638 ) ( 501 ) ( 2,731 ) (696) ( 658 ) UN UN Landscaping Utility Mains Streets Recreation Demolition Environmental OtherSite Work 8. PROJECT COST ($000) 296 296 147,456 6,291 Subtotal 62,145 Contingency (5%) Total ContractCost SIOH (5.7%) 3,107 65,252 3,719 ProjectCost 68,971 Area CostFactor J1.l~ 10. Descriptionof ProposedConstruction:Replace296housingunits.Includesdemolition,site clearing, replacement/upgrade of utility systemsand roads,and constructionof new multiplex units. Providesnormal amenitiesto includeparking,air conditioning,exteriorpatiosandprivacyfencing,garages,neighborhood playgrounds,andrecreationareas.Includesdemolition,asbestosandlead-basedpaintremoval. Special constructionfeaturesincludepier andgradebeamfoundationsystemsfor problemsoils. Programmed Pavarades Bedrooms ~ YS.E E4-E6 E4-E6 E9 E9 2M 4 3 4 1,480 1,870 1,930 2,160 1,852 2,322 2,392 2,682 E9 Installation SNCO 4 2,350 2,912 Project Cost Per 172 216 223 250 1.079 1.079 1.079 1.079 271 1.079 ~ ~ No ($000) 773 773 773 773 268 20 4 3 38,447 3,603 745 626 773 1 ~ Totals: Maximum size: E4-E6 Maximum size: E4-E6 2M Bedroom 4 Bedroom 11. REQUIREMENT: 1880 UN DDFORM1391.DEC99 296 IQml 226 43,647 1600 NSF /2002 GSF /186 GSM 2090 NSF / 2592 GSF / 241 GSM Maximum size: E9 3 Bedroom Maximum size: E9 4 Bedroom Maximum size: E9 Installation SNCO 4 Bedroom PROJECT:R~ace Mili~ ~ 2150 NSF /2672 GSF /249 GSM 2480 NSF / 3072 GSF / 286 GSM 2480 NSF / 3072 GSF /286 GSM ADEQUATE: 1097 UN SUBSTANDARD: 783 UN Fami~ Housing,296 units in Atlas Vill~e and W ashin~tonCircle. PREVIOUS EDITIONS MAYBEUSEDINTERNALLY UNTILEXHAUSTED 369 1. COMPONENT AIR FORCE 1 FY 2006 MILITARY CONSTRUCTION PROJECT DATA. 3. INSTALLATION AND LOCATION 14. PROJECT TITLE MALMSTROM AIR FORCE BASE, MONTANA 5. PROGRAM ELEMENT 1 2 DATE 1 6. CATEGORY CODE 1 REPLACE FAMIL Y HOUSING 7. PROJECT NUMBER 18. PROJECT COST ($000) 88741 711-142 NZAS034007 $68,971 REOUIREMENT:This projectis requiredto provide modemand efficient housing for military membersand their dependentsstationedat MalmstromAFB. All units will meetwhole housestandardsandare programmedin accordancewith the Housing CommunityProfile. Replacementhousingwill provide a safe, comfortable,andappealingliving environmentcomparableto the off-basecivilian community.Of the 1412 housingunitsto be replacedin this multiphaseinitiative, 630 arecompleted,or includedin prior programs, and486 will follow in subsequent phases.The replacement housingwill provide a modemkitchen,living room, bedroomand bath configuration,with ample interiorand exteriorstorageanda singlecar garage. Exteriorparking will be provided for a secondoccupantvehicleandguests.The basicneighborhoodsupport infrastructurewill be upgradedto meetmodemhousingneeds.Neighborhoodenhancement will include landscaping,playgrounds,and recreationareas. CURRENTSITUATION: This projectreplaces296 housingunits, which were constructedin 1961.These45 year-oldhousesareshowingthe effectsof ageandcontinuousheavyuse. They havehadno majorupgrades sinceconstructionanddo not meetthe needsof today'sfamilies,nor do theyprovide a modemhome environment.Roofs,walls, foundations,and exteriorpavementsrequiremajor repair or replacementdue to the effectsof ageandthe environment.Roof structuresshowsignsof rot; leakshavemadealreadyinadequate insulationlesseffective.Foundationandpavementsareshowingsignsoffailure dueto settlement.Plumbing and electricalsystemsareantiquatedanddo not meetcurrentstandardsfor efficiency or safety.Housing interiors generallyhaveinadequatestorageand counterspace, cabinetsare old and countertopsand sinksare badlyworn. Flooring throughoutthe houseis outdated,andcontainsevidenceof asbestos.Plumbingand electricalsystemsareoutdatedanddo not meetmodembuilding codes.Thereis no GroundFault Interrupter Circuit protectionand manyelectricaloutletslackgroundingprotection.Lighting andheatingsystems throughoutthe housesare inefficientandrequirereplacement. IMPACT IF NOT PROVIDED:The housingwill continueto be occupieduntil it becomestotally uninhabitablebecauseadequate, affordableoff-basehousingis not available.The currentHousingRequirements andMarketAnalysis showsan on-basehousingdeficit of 59 units. Without this and subsequent phasesof this initiative, costly piecemealrepairswill continuewith no improvementin the living quality. . ADDmONAL: Replace296housingunits. Includesdemolition,site clearing,replacement/upgrade of utility systemsand roads,and constructionof new multiplexunits.Providesnormalamenitiesto include parking, heatingand air conditioning,appliances,exteriorpatiosand privacy fencing,garages,neighborhood playgrounds,and recreationareas.Includesdemolition,asbestosandlead-basedpaintremoval.Special constructionfeaturesincludepier andgradebeamfoundationsystemsfor problemsoils.This projectmeetsthe criteria/scopespecifiedin the Air ForceFamilyHousingGuide.An economicanalysishasbeenprepared comparingthe alternativesof new construction,improvement,leasingand statusquo operation.Basedon the netpresentvaluesand benefitof respectivealternatives,new constructionwas found to be the most costeffective alternativeoverthe life the project.The costof improvingexistingunitsis 83% of the costof replacingthese units. Sincethis is replacementhousing,therewill be no increasein the studentpopulationandthereforeno impacton local schooldistrict. The constructionagentfor this projectis the Army Corpsof Engineers, resultingin SIOH costsof 5.7%.BaseCivil Engineer:Lt ColDavid J. Crow, (406)731-6188. DDFORM1391C,DEC99 PREVIOUS EDITIONS MAYBEUSEDIf'lTERNALLY UNTILEXHAUSTED 370 ~~ ---~ - , MilITARY FAMILY HOUSING JUSTIFICATION 1. DATE OF REPORT 2. FISCAL YEAR July-o4 3. DOD COMPONENT 2006 REPORT CONTROL SYMBOL DD-A&L(AR)1716 4. REPORTING INSTALLATION AIR FORCE a. NAME b. LOCATION 5. DATA AS OF MALMSTROM AIR FORCE BASE MONTANA Sep-o3 ANALYSIS OF REQUIREMENTS AND ASSETS 6. TOTAL PERSONNEL STRENGTH 7. PERMANENT CURRENT OFFICER E9-E7 (a) (b) E6-E1 (c) TOTAL (d) 3,430 493 207 2,730 493 207 2,730 PROJECTED OFFICER E9-E7 (e) (f) E6-E1 (g) 493 207 2,730 493 207 2,730 TOTAL h PARTY PERSONNEL 8. GROSS FAMILY HOUSING REQUIREMENTS 9. TOTAL UNACCEPTABLY HOUSED (a + b + c) a INVOLUNTARILY SEPARATED 0 b. IN MILITARYHOUSINGTO BE DISPOSED/REPLACED 0 0 8 288 0 0 26 C UNACCEPTABLYHOUSEDIN COMMUNITY 10. VOLUNTARY SEPARATIONS 11. EFFECTIVE HOUSING REQUIREMENTS 12. HOUSING ASSETS (a + b) a. UNDERMILITARYCONTROL (1) HOUSEDIN EXISTINGDOD OWNED/CONTROLLED (2) UNDERCONTRACT/APPROVED (3) VACANT (4) INACTIVE b. PRIVATEHOUSING (1) ACCEPTABLYHOUSED (2) ACCEPTABLEVACANTRENTAL 13. EFFECTIVE HOUSING DEFICIT 14. PROPOSED PROJECT 15. REMARKS DO FORM 1523, NQV.. 371 I 1. COMPONENT J FY 2006 MILITARY CONSTRUCTION PROGRAM 2. DATE AIR FORCE INSTALLATION AND LOCATION COMMAND 5. AREA CONST SEYMOUR JOHNSON AIR FORCE BASE AIR COMBAT COMMAND COST INDEX NORTH CAROLINA 0.82 6. Personnel PERMANENT STUDENTS SUPPORTED Strength OFF ENL CIV OFF ENL CIV OFF ENL CIV AS OF 30 SEP 03 617 4733 1007 7 1 0 0 0 0 END FY 2008 613 4606 938 7 1 0 0 0 0 7. INVENTORY DATA ($000) Total Acreage: 4,107 Inventory Total as of: (30 Sep 03) Authorization Not Yet in Inventory: Authorization Requested in this Program: Authorization Included in the Following Program: (FY 2007) Planned in Next Three Years Program: Remaining Deficiency: Grand Total: TOTAL 6,365 6,165 791,711 65,306 48,868 50,794 1,347 0 958,026 8. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY ~ PROJECT TITLE 711-142 Replace Military Family Housing, Ph 9 (FY 2006) SCOPE 255 UN 9a. Future Projects: Included in the Following Program 711-142 Replace Military Family Housing, Ph 10 227 UN 9b. Future Projects: Typical Planned Next Three Years: 711-142 Replace Housing Maintenance Facility LS COST DESIGN $.000 START 48,868 Sep-04 STATUS CMPL Jun-05 (FY 2007) 50,794 (FY08-11) 1,347 9c. Real Propery Maintenance Backlog This Installatior 1,029 10. A fighter wing with 4 F-15E squadrons, including 2 which conduct all initial qualification training, and an Air Force Reserve KC-135 air refueling wing. DD Form 1390, 24 Jul 00 312 1. COMPONENT AIR FORCE 1 J 2 DATE FY 2006 MILITARY CONSTRUCTION PROJECT DATA. 3. INSTALLATION AND LOCATION, 4. PROJECT TITLE SEYMOUR JOHNSONAIR FORCEBASE, NORTH CAROLINA REPLACEFAMIL Y HOUSING (pH 9) 1 5. PROGRAM ELEMENT 6. CATEGORY CODE 88741 17. PROJECT NUMBER 711-142 VKAG056002R1 9. COST ESTIMATE UIM QUANTITY ITEM Military Family Housing Dwellings Other SpecialConstruction SupportCosts: Lot Costs Site Improvements Landscaping Utility Mains Streets Recreation Demolition Environmental OtherSite Work UN UN 1 8. PROJECT COST ($000) UNIT COST 255 255 86,235 23,824 349 6,702 LS LS LS LS LS LS UN LS LS $48,868 COST-1$0001 28,065 (21,990 ) (6,075 ) 16,049 ( 1,024) ( 1,521 ) ( 657 ) ( 4,005 ) ( 1,010 ) ( 1,109 ) ( 2,339 ) ( 1,210 ) (3,174) Subtotal Contingency (5%) Total ContractCost 44 114 , 2,205 46,319 SIOH (5.5%) 2,547 ProjectCost 48,868 Area CostFactor (0.82) 10. Descriptionof ProposedConstruction:Demolish349 inadequatehousingunits with their associated infrastructureand construct255 duplexanddetachedfamily housingunits with all necessaryamenitiesand supportingfacilities. Projectincludessite preparation,attachedsingleanddoublecar garages,brick facing to the eavesto achievearchitecturalcompatibilitycompliance,crawlspacesfor maintenanceaccess,noise controldue to locationwithin the noisezone,hurricanewind-loadprovisionsdueto 110mph designwind requiredby the building code,handicappedaccess,air conditioning,energyconservingfeatures,visitor parking, exteriorpatios and privacy fencing,supportinfrastructureof roads,utilities, recreationand greenareas,landscaping,and asbestos/lead basedpaint removalonthe demolishedunits. Specialconstructionincludesbulk storage,porches, patios,decks,etc. Pavarades E1-E3 E1-E3 E4-E6 E7-E8 01-03 Bedrooms 2M 3 4 3 3 Maximum size: E1-E3 2M Bedroom Maximum size: E1-E3 3 Bedroom Maximum size: E4-E6 4 Bedroom Maximum size: E7-E8 3 Bedroom DDFORM1391,DEC99 Programmed ~ ~ 1,180 1,310 1,570 1,500 1,500 1,480 1,630 1,950 1,860 1,860 §S:M 137 151 181 173 173 Project Cost Per 0.763 0.763 0.763 0.763 0.763 ~ No ($000) 773 773 773 773 773 179 18 1 42 15 14,463 1,603 107 4,286 1,531 Totals: 255 21,990 §S:M ~ IQ.tgl 1300 NSF /1630 GSF /151 GSM 1420 NSF /1760 GSF /164 GSM 1790 NSF 12220 GSF /206 GSM 1650 NSF /2050 GSF /190 GSM PREVIOUS EDInONSMAYBEUSEDINTERNALLY UNTILEXHAUSTED '.'" ",; 373 1. COMPONENT AIR FORCE FY 2006 MILITARY CONSTRUCTION PROJECT DATA 2. DATE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE SEYMOUR JOHNSONAIR FORCEBASE, NORTH CAROLINA REPLACEFAMIL Y HOUSING (pH 9) 5. PROGRAM ELEMENT 6. CATEGORY CODE 88741 Maximum size: 01-03 3 Bedroom 11. REQUIREMENT: 2365 UN 711-142 7. PROJECT NUMBER VKAG056002Rl 8. PROJECT COST ($000) $48,868 1650 NSF /2050 GSF /190 GSM ADEQUATE: 1749 UN SUBSTANDARD: 616 UN PROJECT:REPLACEFAMIL Y HOUSING (PHASE 9) REQUIREMENT:This projectis requiredto provide modemand efficient housingfor military membersand their dependents stationedat SeymourJohnsonAFB. All unitswill meetmodemhousingstandardsand are programmedin accordancewith the Housing CommunityProfile.The designwill provide a modemkitchen, living room, family room, bedroom,and bath configuration,with ample interior and exteriorstorage.The numberof bedroomswill rangefrom two (modified)to four bedrooms,as identified in the most recentHousing Requirementsand MarketAnalysis.213 units will be providedwith a single-cargarageand exteriorparking for a secondvehicle. 42 units will be provided with a double-cargarageand exteriorparking fora third vehicle. Adequateinfrastructuresupportfor roadsandutilities shallalsobe provided.This is the ninth phaseof a multiphaseinitiative to replace1687inadequatehousingunits with 1285modemhousingunits for Seymour JohnsonAFB. The HousingCommunityProfile andHousingRequirements and Market Analysisare elements of the GeneralPlan for SeymourJohnsonAFB, and arethebasisfor this project. CURRENTSmJATION: 349 existinghousingunits thatwereconstructedin 1958areto be demolishedand 255 units will be replaced.These46 year-oldunits showthe effectsof ageand heavyuse. Theyhavehad no majorupgradessince construction,and theydo not meettheneedsof today'sfamilies, nor do theyprovide a modemhomeenvironment.Thereare insufficientprovisionsfor handicappedpersons.The roof, wall, foundation,and exteriorpavementsrequiremajor repair or replacement dueto age.The plumbing and electrical systemsareantiquatedanddo not meetcurrentstandardsfor efficiencyandsafety. Interiorsare generally inadequateby modemcriteria. Bedroomsand bathroomsare smalland lack adequateclosetspace.Kitchens have insufficientcabinets,storage,and counterspace.Lighting, heating,and air conditioning systemsrequire upgradeandreplacement.The currentHousingRequirements andMarketAnalysis andHousing Community Profile renovationcostsexceedthe currentreplacementcost.The costto correctimminentproblemsexisting with the inventory,spacedeficiencies,and modernizationrequirements hasprovento be more costly thanthe original vouchercostandthe capitalizationcombined. IMPACT IF NOT PROVIDED:Units will continueto deterioraterapidly, resultingin increasingoperations, maintenanceand repairto the governmentandinconvenience to residents.Without this project,repairof these units will continuein a costlypiecemealfashionwith little or no improvementin living quality. ADDITIONAL: This projectmeetsthe criteria/scopespecifiedin the Air Force Family HousingGuide.An economicanalysishasbeenpreparedcomparingthe alternativesof new construction,improvements,and status quo operation.Basedonthe net presentvaluesandbenefitsof therespectivealternatives,replacement constructionwas found to be the most costeffectiveoverthe life of the project.The demolitionof37% more units thanarebeing built raisesthe costof demolitionto 8.21% of the dwelling cost.Sincethis is replacement housing,therewill be no increasein the studentpopulationor impacton the ability of the local schooldistrict to supportbasedependents. The costof minimumimprovements to existing units wasfound to exceed82% of the costof this replacementproject.This projectprovidesa portionof the greenspaceand community recreationfacilities appropriateto a housingareafor morethan5000personsand necessaryfor the development andmaintenanceof the healthof personnelandfamilies.This requiresincreasingthe costfor recreationto the high value.BaseCivil Engineer:Lt Col Lowell A. Nelson,(919)722-5142. DO FORM 1391C, DEC 99 PREVIOUSEDITIONSMAY BE USED ImERNALLY UNnL EXHAUSTED 374 , ; j --~ MILITARY FAMILY HOUSING JUSTIFICATION 1. DATE OF REPORT 2. FISCAL July-04 3. DOD AIR 5. COMPONENT FORCE DATA 4. REPORTING a. NAME REPORT CONTROL SYMBOL DD-A&L(AR)1716 INSTALLATION b. AS OF YEAR 2006 SEYMOUR JOHNSON AIR FORCE BASE Phase LOCATION 9 NORTH CAROLINA Dec-O3 ANALYSIS CURRENT OF OFFICER REQUIREMENTS 6. TOTAL 7. PERMANENT 8. GROSS 9. TOTAL AND PERSONNEL (a) (b) E6-E1 (c) TOTAL (d) OFFICER (e) E9-E7 (f) E6-E1 (g) TOTAL (h) STRENGTH PARTY FAMILY ASSETS PROJECTED E9-E7 539 385 3,522 539 386 3,496 539 385 3,522 539 386 3,496 15 42 198 11 0 0 PERSONNEL HOUSING UNACCEPTABLY REQUIREMENTS HOUSED (a + b + c) a. INVOLUNTARILY SEPARATED b IN MILITARY HOUSING TO BE DISPOSED/REPLACED C. UNACCEPTABLY 10. VOLUNTARY 11. EFFECTIVE 12. HOUSING HOUSED IN COMMUNITY SEPARATIONS HOUSING ASSETS REQUIREMENTS (a + b) a. UNDER MILITARY CONTROL (1) HOUSED IN EXISTING DOD OWNED/CONTROLLED (2) UNDER CONTRACT/APPROVED (3) VACANT (4) INACTIVE b. PRIVATE HOUSING (1) ACCEPTABLY HOUSED (2) ACCEPTABLE VACANT RENTAL 13. EFFECTIVE 14. PROPOSED 15. REMARKS HOUSING DEFICIT PROJECT DD FORM lS23,NOV.. 375 l 1. COMPONENT FY 2006 MILITARY CONSTRUCTION PROGRAM 2. DATE AIR FORCE INSTAllATION AND lOCATION COMMAND 5. AREA CONST GRAND FORKS AIR FORCE BASE AIR MOBILITY COMMAND COST INDEX NORTH DAKOTA 0.95 6. Personnel PERMANENT STUDENTS SUPPORTED Strength OFF ENl CIV OFF ENl CIV OFF ENl CIV AS OF 30 SEP 05 330 2579 461 5 8 10 0 0 0 END FY 2010 325 2523 455 5 8 10 0 0 0 7. INVENTORY DATA ($000) Total Acreage: 5,422 Inventory Total as of: (30 Sep 05) Authorization Not Yet in Inventory: Authorization Requested in this Program: Authorization Included in the Following Program: (FY 2007) Planned in Next Three Years Program: Remaining Deficiency: Grand Total: TOTAL 3,393 3,326 1,367,000 29,700 86,706 59,914 1,515 82350 1,627,185 8. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY TITLE (FY 2006) COST DESIGN .QQQ.£ PROJECT 711-142 Replace Military Family Housing, Ph J 300 UN 9a. Future Projects: Included in the Following Program 711-142 Replace Military Family Housing, Ph K 228 UN 9b. Future Projects: Typical Planned Next Three Years: 711-142 Construct Housing Maintenance Facility 9c. Real Propery Maintenance Backlog This Installation 10. An air refueling wing with four KC-135 squadrons. SCOPE $,000 86,706 START Aug-04 STATUS CMPl Jun-05 (FY 2007) 59,914 (FY08-11) lS 1,515 805 DD Form 1390,24 Jul 00 376 I 1. COMPONENT I AIR FORCE FY 2006 MILITARY CONSTRUCTION 3. INSTALLATION ANDLOCATION. GRAND FORKS AIR FORCE BASE, NORm DAKOTA 5. PROGRAM ELEMENT 88741 1 1 2 DATE PROJECT DATA. 4. PROJECT TITLE REPLACE FAMILY HOUSING PH J 1 6. CATEGORY CODE I s, PROJECT$86,706 COST($000) 7. PROJECT NUMBER 711-142 JFSD200024 9. COSTESTIMATE ITEM UIM Military Family Housing Dwellings Other Special Construct (F oundations/Garages) Support Costs: Lot Costs Site Improvements QUANTITY UN UN 300 300 UNITCOST COSTi$OO~ 40,342 (36,552 ) ( 3,790 ) 121,840 12,633 LS LS 37,782 (4,313 ) ( 5,043 ) Landscaping Utility Mains Streets Recreation Demolition Environmental Other Site Work LS LS LS LS LS LS LS (2,102 ) ( 9,843 ) ( 2,437 ) ( 1,594 ) ( 5,086 ) (4,131 ) (3,041 ) Handicapped Adaptable Rqmts UN 16 12,000 ( 192 ) Subtotal 78,124 Contingency (5%) 3,906 Total Contract Cost 82 030 , SIOH (5.7%) 4,675 Project Cost 86,706 Area Cost Factor ~0.9?l 10. Description of Proposed Construction: Replace 300 housing units. Site work improvements include underground utilities, parking, landscaping, patios, privacy fencing, recreation, and community improvements. Amenities include energy efficiency, heating, air conditioning, floor coverings, attached garages, storage, and at least 16 units constructed as handicapped adaptable.Includes demolition of 168 surplus units and environmental hazard remediation. Special construction includes removing unsuitable supporting soils, deeper excavation, and backfill and compaction of propor soils. Programmed Pavarades Bedrooms ~ Ys.E E4-E6 2M 1,480 1,852 E4-E6 E4-E6 E7-E8 04-05 3 4 3 3 1,610 1,870 1,800 1,930 2,002 2,322 2,232 2,392 Project Cost Per 172 0.855 186 216 208 223 0.855 0.855 0.855 0.855 ~ Eg..QtQI No ($000) 773 190 21,599 773 773 773 773 38 20 24 28 4,672 2,855 3,299 4,127 300 36,552 ~ Totals: Maximum size: E4-E6 2M Bedroom 1600 NSF 12002 GSF /186 GSM Maximum size: E4-E6 3 Bedroom Maximum size: E4-E6 4 Bedroom Maximum size: E7 -E8 3 Bedroom 1720 NSF /2132 GSF /199 GSM 2090 NSF /2592 GSF /241 GSM 1950 NSF / 2422 GSF /225 GSM Maximum size: 04-05 DO FORM 1391, DEC 99 3 Bedroom ~ IQml 2150 NSF /2672 GSF /249 GSM PREVIOUSEDITIONSMAY BE USED INTERNALLYUNTIL EXHAUSTED "377 1. COMPONENT AIR FORCE I FY 2006 MILITARY CONSTRUCTION PROJECT DATA. 1 2 DATE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE GRAND FORKSAIR FORCEBASE, NORTH REPLACE FAMIL Y HOUSING PH J DAKOTA 5. PROGRAM ELEMENT 88741 11. REQUIREMENT: 1475 UN 16. CATEGORY CODE 711-142 ADEQUATE: 947 UN 17. PROJECT NUMBER ! 8. PROJECTCOST($000) JFSD200024 $86,706 SUBSTANDARD: 528 UN PROJECT:ReplaceMilitary FamilyHousingPhaseJ (CurrentMission). REOUIREMENT: Projectwill provide modernand efficient housingfor military membersand their families assignedat GrandForksAFB. All units will meet"whole house/neighborhood"standardsandprovide a safe, comfortable,and appealingliving environmentcomparableto the off-basecivilian community.Projectis programmedin accordancewith the HousingCommunityPlan and Family Housing MasterPlan. At least 16 units will be constructedashandicappedadaptable.Eachunit includesadditional28 net squaremeters(NSM) authorizedfor recreationspaceat northerntier bases.This projectwill demolish168sUrplusunits,including utilities, pavements,and environmentalhazardremediation.The numberof demolishedunits exceeds replacementunits by 168;theseunitsare in the way of constructionandare surplusto our needs. CURRENTSIl1JATION: This projectreplaceshousesconstructed1958-1959.The units areundersized,meet few of the "whole house/neighborhood" standards, and showthe effectsof ageandcontinuousheavyuse.They havehadno majorupgradessinceconstructionanddo not meettheneedsof today'sfamilies. Roofs,walls, foundationsand exteriorpavementsrequiremajorrepair or replacementdueto the effects of age.Roof structures showsignsof rot. Plumbing and electricalsystemsareantiquatedanddo not meetcurrentstandardsfor efficiency or safety.Housing interiorsareinadequateby any moderncriteria. Bedroomsare smalland lack closetspace.Bathroomsare small,fixturesareoutdatedandenergy-inefficient.Kitchenslack sufficientstorage and counterspace,cabinetsareold and unsightly,andcountertopsand sinksare badly worn. Flooring throughoutthe houseis outdatedand containsasbestos.Outletslackgroundingprotection,andthereis no GroundFault Interruptercircuit protection.Lighting systemsare inefficient andrequirereplacement,and units haveno air conditioning.The unitshaveno patio or backyardprivacy. Housinglacks additional28 netsquare metersfor indoor recreationspaceauthorizedat northerntier bases. IMPACT IF NOT PROVIDED: Air Forcemembersandfamilies will continueto be inadequatelyhoused. Low moraleand retentionproblemscanbe expectedsince comparable, affordableoff-basehousingis not available.Units will continueto deteriorateresultingin escalatingoperations,maintenanceand repair coststo theGovernrnent. ADDITIONAL: This project meetsthe criteria/scopespecifiedin the Air Force Family HousingGuide.An economicanalysishas beenpreparedcomparingthe alternativesof new construction,improvement,leasingand statusquo operation.Basedonthe net presentvaluesand benefitsof the respectivealternatives,new constructionwas found to be the mostcosteffectivealternativeoverthe life of the project.The costof improving existing unitsis 74% of the costof replacingtheseunits. Sincethis is replacementhousing,there will be no increasein the studentpopulationandthereforeno impactonthe local schooldistrict. The constructionagentfor this projectis the Army Corpsof Engineersresultingin SIOH costsof 5.7%. BaseCivil Engineer:Lt Col PatrickF. Fogarty,(701)747-4769. DDFORM1391C,DEC99 PREVIOUS EDITIONS MAYBEUSEDINTERNALLY UNTILEXHAUSTED .378 .. I MILITARY FAMILY HOUSING JUSTIFICATION 1. DATE OF REPORT 2. FISCAL YEAR July-04 3. DOD COMPONENT 2006 REPORT CONTROL SYMBOL DD-A&L(AR)1716 4. REPORTING INSTALLATION AIR FORCE a. NAME 5. DATA AS OF b. LOCATION GRAND FORKS AIR FORCE BASE Phase J NORTH DAKOTA Oct-04 ANALYSIS OF REQUIREMENTS AND ASSETS CURRENT OFFICER E9-E7 (a) (b) E6-E1 (c) TOTAL d PROJECTED OFFICER E9-E7 (e) (f) E6-E1 (9) TOTAL 6. TOTAL PERSONNEL STRENGTH 7. PERMANENT 316 240 2,139 311 242 2,120 316 240 2,139 311 242 2,120 28 24 248 0 0 163 PARTY PERSONNEL 8. GROSS FAMILY HOUSING REQUIREMENTS 9. TOTAL UNACCEPTABLY HOUSED (a + b + c) 3. INVOLUNTARilYSEPARATED 0 b IN MiliTARY HOUSINGTO BE DISPOSED/REPLACED C. UNACCEPTABLYHOUSEDIN COMMUNITY 10. VOLUNTARY SEPARATIONS 11. EFFECTIVE HOUSING REQUIREMENTS 12. HOUSING ASSETS (a + b) 3. UNDER MiliTARY CONTROL (1) HOUSEDIN EXISTINGDaD OWNED/CONTROLLED (2) UNDERCONTRACT/APPROVED (3) VACANT (4) INACTIVE b. PRIVATEHOUSING (1) ACCEPTABLYHOUSED (2) ACCEPTABLEVACANTRENTAL 13. EFFECTIVE HOUSING DEFICIT 14. PROPOSED PROJECT 15. REMARKS DO FORM"13, NOV" 379 1. COMPONENT AIR FORCE FY 2006 MILITARY CONSTRUCTION PROGRAM 2. DATE INSTAllATION AND lOCATION COMMAND 5. AREA CONST MINOT AIR FORCE BASE AIR COMBAT COMMAND COST INDEX NORTH DAKOTA 1.09 6. Personnel PERMANENT STUDENTS SUPPORTED Strength OFF ENl CIV OFF ENl CIV OFF ENl CIV AS OF 30 SEP 04 604 4474 942 0 0 0 0 1 54 END FY 2009 605 4355 878 0 0 0 0 1 54 7. INVENTORY DATA ($000) Total Acreage: 5,383 Inventory Total as of: (30 Sep 04) Authorization Not Yet in Inventory: Authorization Requested in this Program: Authorization Included in the Following Program: (FY 2007) Planned in Next Three Years Program: Remaining Deficiency: Grand Total: 9b. Future Projects: Typical Planned Next Three Years: None 1,709,149 9,500 44,548 114,474 0 41300 1,918,971 8. PROJECTS REQUESTED IN THIS PROGRAM: (FY 2006) CATEGORY COST DESIGN QQQS PROJECT TITLE SCOPE $.000 START 711-142 Replace Military Family Housing, Ph 12 223 UN 44,548 Aug-04 9a. Future Projects: Included in the Following Program 711-142 Replace Military Family Housing, Ph 13 TOTAL 6,075 5,893 490 UN STATUS CMPl May-05 (FY 2007) 114,474 (FY08-11) 9c. Real Propery Maintenance Backlog This Installation 1,549 10. A host bomb wing with B-52H aircraft, and an AF Space Command space wing with Minuteman III missiles. DD Form 1390,24 Jul 00 380 "'" 1. COMPONENT 2 DATE AIR FORCE 3. INSTAllATION FY 2006 MILITARY CONSTRUCTION AND LOCATION PROJECT DATA. 4. PROJECT TITLE MINOT AIR FORCE BASE, NORTH DAKOTA REPLACE MILITARY FAMIL Y HOUSING PHASE 12 5. PROGRAM ELEMENT 6. CATEGORY CODE 88741 7. PROJECT NUMBER 711-142 9. COST ESTIMATE U/M QUANTITY ITEM Military Family Housing Dwellings Support Costs: Lot Costs Site Improvements $44,548 UNIT COST COST $000 LS LS 31,736 (31,736) 8403 , (813) ( 1,400) LS LS LS LS LS LS ( 733 ) ( 1,763 ) ( 1,547 ) ( 626 ) ( 797 ) ( 724 ) UN Landscaping Utility Mains Streets Recreation Demolition Environmental 6. PROJECT COST ($000) NF069014 223 142,314 Subtotal 40,139 Contingency (5%) 2,006 Total Contract Cost SIOH (5.7%) 42,145 2,402 Project Cost 44,548 Area Cost Factor 1.09 10. Description of Proposed Construction: Construct 223 housing units with all necessary supporting facilities including: garages,patios, fencing, utilities, air conditioning, appliances, exterior storage, roads, parking, sidewalks, playground, landscaping, and all other necessary support facilities. This project will include demolition of 327 units with 223 new units being built. Programmed Pa}!orades Bedrooms N.QE .G.QE E1-E3 E1-E3 04-05 04-05 2M 4 3 4 1,480 1,870 1,930 2,160 1,852 2,322 2,392 2,682 Maximumsize: E1-E3 2M Bedroom Maximumsize: E1-E3 4 Bedroom Maximumsize:04-05 3 Bedroom Maximumsize: 04-05 4 Bedroom 11. REQUIREMENT: 2514 UN Project ~ ~ 172 216 223 250 1.014 1.014 1.014 1.014 CostPer ~ No ($000) Un@ IQtg! 773 773 773 773 184 18 11 10 24,806 3,047 1,923 1,960 Totals: 223 31,736 1600NSF/2002 GSF/186 GSM 2090 NSF/2592 GSF/241 GSM 2150 NSF / 2672GSF/249 GSM 2480 NSF / 3072GSF / 286 GSM ADEQUATE: 1644 UN SUBSTANDARD: 870 UN PROJECT: Replace Military Housing, Phase 12, (Current Mission) REOUIREMENT: This project is required to provide modem and efficient housing for military members and their dependants stationed at Minot AFB. All units will be new construction to provide a safe, comfortable, and appealing living environment comparable to the off-base civilian community. This project is programmed in accordance with the Housin Communi Plan. This is the twelfth of multi Ie hases to r lace 1,772 DDFORM1391,DEC99 PREVIOUS EDInONSMAYBE USEDINTERNALLY UNTILEXHAUSTED ","',981 1. COMPONENT AIR FORCE FY 2006 MILITARY CONSTRUCTION PROJECT DATA. 2 DATE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MINOT AIR FORCE BASE, NORTH DAKOTA REPLACEMILITARY FAMILY HOUSING PHASE 12 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 88741 711-142 QJVF069014 $44,548 in accordancewith the Housing ConununityPlan.This is the twelfth of multiple phasesto replace1,772 housingunits for basepersonnel.1059unitshave alreadybeenreplaced.The replacementhousingwill provide a modemkitchen,living rooIn, and bath configurationwith ample interior and exteriorstorageplus an additional300SF per unit to provide an indoorrecreationroom.Parking will be provided for a second vehicle.The neighborhoodsupportinfrastructurewill be upgradedto meetmodemhousingneeds,to include landscaping,playgroundsand recreationareas. CURRENTSITUATION: This projectimprovesCapehart(not all units are Capehart)units built in 1962, which areshowingthe effectsof ageandcontinuousheavyuse.Theyhavehad no major upgradessince construction,do not meetthe needsof today'sfamily, nor do theyprovide a modemhomeenvironment. Kitchensaretoo narrowand dark,anddo notprovideadequatecabinetand countertop space.The bathrooms are very smalland in poor condition.Bathroomfixtures areoutdatedandinefficient. Lighting in hallways, bathrooms,andbedroomsis inadequate.The exteriorsof theseunits lack landscapingand haveno covered patio for protectionfrom the sun.Off streetparkingis severelylimited andtraffic flow in and aroundhousing areasis inefficient. IMP ACT IF NOT PROVIDED: Air Forcemembersand their families will continueto live in extremely outdated,unsuitable,and unsatisfactoryhousing.The housingwill continueto deteriorate,resultingin increasingandunacceptable maintenancecostsandextremeinconvenienceto the occupants.Without this and subsequent phasesof this initiative, repairsof theseunits will continueata costly, piecemealfashion,with little or no improvementin living quality. ADDITIONAL: An economicanalysishasbeenperformedconsideringimprovement,replacement,leasing,and statusquo operation.Basedon the new presentvaluesandbenefitsof the respectivealternatives,replacement was found to be the mostcosteffective overthe life of the project.Improvementcostis 93% of the replacement cost.This projectmeetsthe criteria/scopespecifiedin Part n of the Military Handbook1190,"Facility PlanningDesignGuide". Sincethis is replacementhousing,therewill be no increasein the studentpopulation or impactonthe local schooldistrict to supportbasedependents. 5.7% Supervision,Inspection,and Overhead (SIOH) is beingprogranunedfor Army Corpsof Engineers.BaseCivil Engineer:Lt Col DarrenGibbs,DSN 453-2434. DOFORM1391C,DEC99 PREVIOUS EomONSMAYBEUSEDINTERNALLY UNTILEXHAUSTED 382 ". MILITARY FAMILY HOUSING JUSTIFICATION 3. DOD COMPONENT 1. DATE OF REPORT Jul-04 2. FISCAL YEAR 2006 REPORT CONTROL SYMBOL DD-A&L(AR)1716 4. REPORTING INSTALLATION AIR FORCE a. NAME 5. DATA AS OF b. LOCATION MINOT AIR FORCE BASE Phase 12 NORTH DAKOTA Feb-04 ANALYSIS CURRENT OF REQUIREMENTS AND ASSETS PROJECTED OFFICER (a) E9-E7 (b) E6-E1 (c) 579 346 579 TOTAL (d) OFFICER (e) E9-E7 (1) E6-E1 (g) 3,893 581 338 3,762 346 3,893 581 338 3,762 73 0 150 0 0 0 TOTAL 6. TOTAL PERSONNEL STRENGTH 7. PERMANENT PARTY PERSONNEL 8. GROSS FAMILY HOUSING REQUIREMENTS 9. TOTAL UNACCEPTABLY HOUSED (a + b + c) a.INVOLUNTARILYSEPARATED b. IN MILITARY HOUSING TO BE DISPOSED/REPLACED C UNACCEPTABLY 10. VOLUNTARY HOUSED IN COMMUNITY SEPARATIONS 11. EFFECTIVE HOUSING REQUIREMENTS 12. HOUSING ASSETS (a+ b) 336 a. UNDER MILITARY CONTROL 336 (1) HOUSED IN EXISTING DOD OWNED/CONTROLLED (2) UNDER CONTRACT/APPROVED (3) VACANT (4) INACTIVE b. PRIVATE HOUSING (1) ACCEPTABLY HOUSED (2) ACCEPTABLE VACANT RENTAL 13. EFFECTIVE HOUSING DEFICIT 14. PROPOSED PROJECT 15. REMARKS DD FORM 1523,NOV" 383 'q"'... ,-' i 1. COMPONENT AIR FORCE FY 2006 MILITARY CONSTRUCTION PROGRAM 2. DATE INSTALLATION AND LOCATION COMMAND 5. AREA CONST CHARLESTON AIR FORCE BASE AIR MOBILITY COMMAND COST INDEX SOUTH CAROLINA 0.94 6. Personnel PERMANENT STUDENTS SUPPORTED Strength OFF ENL CIV OFF ENL CIV OFF ENL CIV ASOF30SEP04 526 3216 622 11 39 5 357 1951 618 END FY2009 513 3333 620 11 39 5 357 1951 618 7. INVENTORY DATA ($000) Total Acreage: 3,733 Inventory Total as of: (30 Sep 04) Authorization Not Yet in Inventory: Authorization Requested in this Program: Authorization Included in the Following Program: (FY 2007) Planned in Next Three Years Program: Remaining Deficiency: Grand Total: 8. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY .QQQ£ PROJECT TITLE 711-142 Replace Military Family Housing, Ph 4 1,168,947 55,900 15.935 0 1,172 62000 1.303,954 (FY 2006) SCOPE 10 UN 9a. Future Projects: Included in the Following Program None 9b. Future Projects: Typical Planned Next Three Years: 711-142 Replace Housing Maintenance Facility TOTAL 7,345 7,447 COST DESIGN $.000 START 15.935 Aug-04 STATUS CMPL Jul-05 (FY 2007) (FY08-11) LS 1,172 9c. Real Propery Maintenance Backlog This Installation 520 10. An airlift wing with four C-141/C-17 squadrons; an AFRC C-141/C-17 associate airlift wing; an ANG air defense detachment with F-16 aircraft; and a combat camera squadron. DD Form 1390,24 Jul 00 384 1. COMPONENT AIR FORCE FY 2006 MILITARY CONSTRUCTION PROJECT DATA. 2 DATE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CHARLESTONAIR FORCEBASE, SOUTH CAROLINA REPLACEFAMILY HOUSING PH 4 5. PROGRAM ELEMENT 6. CATEGORY CODE 88741 7. PROJECT NUMBER 711-142 9. COST ESTIMATE U/M QUANTITY ITEM 8. PROJECT COST ($000) DKFX064012 Military Family Housing Dwellings SupportCosts: Garages/Patios StormDrainagelFloodControl SanitarySewerSystem WaterDistributionSystem Sidewalks/Parking/Lighting Site Improvements Landscaping Streets Recreation Demolition Environmental OtherSite Work $15,935 UNIT COST UN 10 201,800 EA LS LS LS LS LS LS LS LS LS LS LS 10 15,000 COST $000 2,018 (2,018 ) 12,367 ( 150 ) ( 1,336 ) ( 1,955 ) ( 1,492 ) ( 532 ) ( 1,510 ) ( 665 ) ( 1,954) ( 643 ) ( 1,082 ) ( 68 ) (980) Subtotal Contingency (5%) Total ContractCost SIOH (5.5%) 14,385 719 15,104 830 ProjectCost 15,935 Area CostFactor 0.94 10. Descriptionof ProposedConstruction:Demolish94 surplusinadequateunitsandreplace10 single family housing4 bedroomunits with all necessaryamenitiesandsupportingfacilities. Projectincludessite preparation,attachedtwo car garages,air conditioning,parking,exteriorpatiosand privacy fencing,support infrastructureof roads,utilities, recreationareas,landscaping,asbestos removal,anddemolition. Project includes1 GOQ (4 bedroom)and9 SOQs(4 bedroom). Programmed Pa~grades Bedrooms N.s.E Y.s.E 06 07+ 4 4 2,030 2,690 2,520 3,330 Project ~ .E.g.(;tQ[ 234 309 Cost Per .G.QM 1.081 1.081 773 773 Totals: Maximum size: 06 Maximum size: 07+ 4 Bedroom 4 Bedroom 11. REQUIREMENT: 2327 UN No Unj:t§. ($000) IQtg1 9 1 1,760 258 10 2,018 2350 NSF / 2920 GSF /271 GSM 3270 NSF /4060 GSF /377 GSM ADEQUATE: 2317 UN SUBSTANDARD: 10 UN PROJECT:REPLACE FAMILY HOUSING (PHASE4) REQUIREMENT: Projectis requiredto provide modemand efficienthousingfor military membersand their dependentsat CharlestonAFB. All units will meetmodemhousingstandardsand areprogrammedin accordancewith the Housin Communi Profile. The desi will rovide a modemkitchen,livin room, DDFORM1391,DEC99 PREVIOUS EDITIONS MAYBEUSEDINTERNALLY UNTILEXHAUSTED 385 1. COMPONENT AIR FORCE 1 FY 2006 MILITARY CONSTRUCTION PROJECT DATA. 1 2 DATE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE CHARLESTONAIR FORCEBASE, SOUTH CAROLINA REPLACE FAMIL Y HOUSING PH 4 5. PROGRAM ELEMENT 1 6. CATEGORY CODE 17. PROJECTNUMBER 1 8. PROJECT COST ($OOO) 88741 711-142 DKFX064012 $15,935 family room,bedroom,and bath configuration,with ampleinterior and exteriorstorage.Units will be four bedroom.Units will be provided with a two car garageand additionalexteriorparking for guests.Adequate infrastructuresupportfor roadsandutilities shallalsobe provided.Projectincludesthe demolitionof 94 surplusinadequateunits. The HousingCommunityProfile andHousingRequirementsand MarketAnalysis arethe basisfor this project. CURRENTSITUATION: After the mostrecentHousingRequirementsand MarketAnalysis,the basehas 746 surplusunits,and 9 inadequateSOQsand 1 inadequateGOQ.Of the surplusunits550 units areinadequate and arescheduledfor demolition.This projectwill demolish94 units to accommodatea sensible relocation/replacement of the 9 SOQsand1 GOQ. Without relocation,the 10replacementunitswould be awkwardlylocatedand inefficiently spreadout. The layoutwould be unacceptableandwould necessitateeven moreinfrastructurework thanis currentlyneeded.Significantneighborhoodinfrastructurework is still needed to meetand maintainAF standards.Many waterand sewerlines have not beenreplacedsinceoriginal constructionin the early 1960s.Stormdrainsare ineffective,often with unsafeinlets. Commonareasand recreationalareasaresubstandard andlacking. Sidewalks,crosswalks,and streetlighting areneeded. Substantialroadworkis required.Considerablelandscapingis neededto provide quality neighborhoodsthat military membersand their families deserve.Many site improvementsare needed,including a long retaining wall to preventerosionand structuraldamageto units alongthe AshleyRiver. IMP ACT IF NOT PROVIDED: Withoutthis project,CharlestonAFB will not be ableto meetthe requirementof 530adequateunits that meetAF standardsandhavethe requiredgradeand bedroommix. ADDITIONAL: This projectmeetsthe criteriaof Air ForceFamily HousingGuidefor Planning, Programming,Design,andConstruction.An economicanalysishasbeenpreparedcomparingthe alternativesof replacement,improvement,and statusquo operation.Basedon the net presentvaluesand benefitof respective alternatives,replacementwas foundto be the mostcosteffectivealternativeoverthe life of the project. Improvementcostis 70% of replacement cost.Sincethis is replacementhousingand demolition,there will be no increasein the studentpopulationandthereforeno impactonthe local schooldistrict. The construction agentfor this projectis the Air Forceresultingin SIOH costsof 5.5%.BaseCivil Engineer:Lt Col Kyle E. Hicks, (843)963-4956. DDFORM1391C, DEC99 PREVIOUS EDITIONS MAYBEUSEDINTERNALLY UNnLEXHAUSTED " 386 i MILITARY FAMILY HOUSING JUSTIFICATION 1. DATE OF REPORT 2. FISCAL YEAR July-04 3. DOD COMPONENT DD-A&L(AR)1716 4. REPORTING INSTALlATION AIR FORCE 5. REPORT CONTROL SYMBOL 2006 a. NAME DATA AS OF b. LOCATION CHARLESTON AIR FORCE BASE Phase 4 SOUTH CAROLINA Aug-04 ANALYSIS CURRENT OF REQUIREMENTS AND ASSETS 6. TOTAL PERSONNEL STRENGTH 7. PERMANENT PROJECTED OFFICER (a) E9-E7 (b) E6-E1 (c) 540 305 540 TOTAL d OFFICER (e) E9-E7 (f) E6-E1 (g) 2,992 542 305 3,006 305 2,992 542 305 3,006 10 0 0 0 0 80 TOTAL PARTY PERSONNEL 8. GROSS FAMILY HOUSING REQUIREMENTS 9. TOTAL UNACCEPTABLY HOUSED (a+b+c) a. INVOLUNTARILYSEPARATED 0 b. IN MILITARYHOUSINGTO BE DISPOSED/REPLACED C UNACCEPTABLYHOUSEDIN COMMUNITY 10. VOLUNTARY SEPARATIONS 11. EFFECTIVE HOUSING REQUIREMENTS 12. HOUSING ASSETS (a+b) a UNDERMILITARYCONTROL (1) HOUSEDIN EXISTINGCOD OWNED/CONTROLLED (2) UNDERCONTRACT/APPROVED (3) VACANT (4) INACTIVE b. PRIVATE HOUSING (1) ACCEPTABLYHOUSED (2) ACCEPTABLEVACANT RENTAL 13. EFFECTIVE HOUSING DEFICIT 14. PROPOSED PROJECT 0 15. REMARKS DD FORM1513, NOV .. 381 ~- I 1. COMPONENT FY 2006 MILITARY CONSTRUCTION PROGRAM 2. DATE AIR FORCE INSTALLATION AND LOCATION COMMAND 5. AREA CONST ELLSWORTH AIR FORCE BASE AIR COMBAT COMMAND COST INDEX SOUTH DAKOTA 0.93 6. Personnel PERMANENT STUDENTS SUPPORTED Strength OFF ENL CIV OFF ENL CIV OFF ENL CIV AS OF 30 SEP 04 350 3123 771 0 11 1 1 1 54 END FY 2009 346 3072 708 0 11 1 1 1 54 7. INVENTORY DATA ($000) Total Acreage: 26,066 Inventory Total as of: (30 Sep 04) Authorization Not Yet in Inventory: Authorization Requested in this Program: Authorization Included in the Following Program: (FY 2007) Planned in Next Three Years Program: Remaining Deficiency: Grand Total: 8. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY QQQg PROJECT TITLE 711-142 Replace Military Family Housing, Ph 5 TOTAL 4,312 4,194 1,957,861 9,300 14,383 0 0 95000 2,076,544 (FY 2006) SCOPE 60 UN COST DESIGN $,000 START 14,383 Aug-04 9a. Future Projects: Included in the Following Program None (FY 2007) 9b. Future Projects: Typical Planned Next Three Years: (FY08-11) STATUS CMPL Aug-05 None 9c. Real Propery Maintenance Backlog This Installation 10. A wing with two B-1 squadrons. 950 DD Form 1390,24 Jul 00 3"88 - "'" 1. COMPONENT AIR FORCE J FY 2006 MILITARY CONSTRUCTION PROJECT DATA. 1 2 DATE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE ELLSWORTHAIR FORCEBASE, SOUTH DAKOTA REPLACEFAMILY HOUSING (pHASE 5) 5. PROGRAM ELEMENT 16. CATEGORY CODE 88741 Military FamilyHousing Dwellings Other SpecialConstruction SupportCosts: Lot Costs Site Improvements Landscaping Utility Mains Streets Recreation Demolition Environmental OtherSite Work 8. PROJECT COST ($000) FXBM994506 9. COST ESTIMATE U/M QUANTITY ITEM 1 17. PROJECT NUMBER 711-142 UN UN 60 60 $14,383 UNIT COST COSTJJ:ooQL 11,256 (8,118 ) (3,138 ) 1,703 ( 98 ) ( 99 ) ( 110 ) ( 302 ) ( 237 ) ( 364 ) ( 113 ) (170) (210) 135,300 52,300 LS LS LS LS LS LS LS LS LS Subtotal Contingency (5%) Total ContractCost SIOH (5.7%) 12,959 647 13,606 775 ProjectCost 14,383 Area CostFactorLO.9:?l 10. Descriptionof ProposedConstruction:Replace60 housingunitsand demolishan additional56. Includes demolition,site clearing,replacement/upgrade of utility systemsand roads,designand constructsingleand duplexfamily units with porches.Providesnormalamenitiesto include appliances,garages,parking,air conditioning,patios with privacy fencing,neighborhoodplaygrounds,and recreationareas.Providesfire detection.Otherspecialconstructionincludesbulk storage,porches,patios,decks,etc. Programmed Pavarades Bedrooms ~ §.QE E4-E6 4 1,570 1,950 Maximum size:E4-E64 Bedroom 11. REQUIREMENT: 1865 UN Project ~ ~ 181 CostPer ~!.!Dl!§. 0.967 773 Totals: No ($000) 60 60 8,118 8,118 Ig!§l 1790NSF/2220GSF/206GSM ADEQUATE: 1805 UN SUBSTANDARD: 60 UN PROJECT:ReplaceMilitary FamilyHousingPhase5 (CurrentMission) REOUIREMENT:This projectis requiredto providemodemand efficienthousingfor military membersand their dependentsstationedat EllsworthAFB. All units will meet"wholehouse"standardsandare programmedin accordancewith the HousingCommunityPlan. Replacement housingwill provide a safe, comfortable,andappealingliving environmentcomparableto the off basecivilian community.This is .thefIfth phaseof an initiative to provideadequatehousingfor basepersonnel.The replacementhousingwill provide a modemkitchen,living room, family roomandbathconfiguration,with ample interior and exteriorstorage.A doublecar garagewill be provided.Thebasicneighborhoods~rt infrastructurewill be ~ded to meet DDFORM1391,DEC99 PREVIOUS EDITIONS MAYBEUSEDINTERNALLY UNTILEXHAUSTED 389 "" 1 I 1. COMPONENT 2. DATE AIR FORCE FY 2006 MILITARY CONSTRUCTION PROJECT DATA 3. INSTALLATION ANDLOCATION 4. PROJECT TITLE ELLSWORTHAIR FORCE BASE, SOUTH REPLACE FAMIL YHOUSING (PHASE 5) DAKOTA 5. PROGRAM ELEMENT 6. CATEGORYCODE 17. PROJECT NUMBER s. PROJECT COST ($000) 88741 711-142 FXBM994506 $14,383 modemhousingneeds.Neighborhoodenhancements will include landscaping,playgrounds,and recreation areas.Properdisposalof asbestos andlead-basedpaint is included.The expansiveclay soils require special foundationconsiderations.AntiterriorismIForceProtectionmeasuresareincluded.Radonnaturallyoccursat the projectsite. CURRENTSITUATION: This projectreplaceshousingthatwasconstructedin 1961-1964.Units havehad no majorupgradesor renovationsinceconstruction,and do not meettheneeds of today'sfamilies, nor do they provide a modemhomeenvironment.Kitchensareundersizedanddo notprovide adequatecabinetand countertopspace.The bathroomsare smalland in poor condition.Bathroomfixtures and lighting throughout thehousesareoutdatedand energyinefficient. The exteriorof theseunits lack landscapingand recreationspace. Thereareno garages,andvehiclesaresubjectedto extremelycold winters with no protectionfrom the elements.Thereis inadequateexteriorstorage.Thereis no groundfault circuit interrupterprotectionas requiredby currentnationalelectricalbuilding codes.Thereis no air conditioning. IMPACT IF NOT PROVIDED:AF membersand their families will continueto live in inadequatehousing. This 42 to 45 year old housingwill continueto deterioratewith age,resulting in increasingmaintenanceand repaircoststo the governmentandinconvenienceto the occupants.Without this project,repairswill continue in a costly, piecemealfashionwith little or no improvementin occupantquality of life. Thesedeficiencieswill continueto adverselyaffectthe moraleof all personnelassignedto EllsworthAFB. ADDITIONAL: An economicanalysishas beenpreparedcomparingthe alternativesof new construction, revitalization,leasingandstatusquooperation.Basedon the net presentvaluesandbenefitsof the respective alternatives,statusquo operationwasfound to be the most costefficient overthe life of the project. However, this alternativeis unacceptable becauseit doesnot repairthe deterioratedstructuresandwould force Air Force personnelto continueto live in inadequate housing.Improvementcostis 93%of replacementcost.Sincethis is replacementhousingtherewill be no increasein the studentpopulationor impacton the ability of the local schoolto supportbasedependents. The constructionagentfor this projectis the Army Corps of Engineers, resultingin SIOH costsof 5.7%.BaseCivil Engineer:Lt Col Gibbs (605)385-2658 1 DOFORM1391C. DEC99 I PREVIOUS EDITIONS MAYBEUSEDINTERNALLY UNTILEXHAUSTED "" 390 MILITARY FAMILY HOUSING JUSTIFICATION 1. DATE OF REPORT 2. FISCAL July-o4 3. DOD AIR 5. COMPONENT 4. REPORTING a. NAME FORCE DATA REPORT CONTROL SYMBOL DD-A&L(AR)1716 INSTALLATION b. AS OF YEAR 2006 ELLSWORTH AIR FORCE BASE Phase LOCATION 5 SOUTH DAKOTA Nov-03 ANALYSIS CURRENT OF OFFICER REQUIREMENTS AND 6. TOTAL PERSONNEL 7. PERMANENT 8. GROSS FAMILY 9. TOTAL UNACCEPTABLY (a) (b) E6-E1 (c) TOTAL (d) OFFICER (e) E&-E7 (f) E6-E1 (g) STRENGTH PARTY 337 285 2,778 3,400 337 286 2,759 337 285 2,778 3,400 337 286 2,759 0 0 60 0 0 0 PERSONNEL HOUSING 3. INVOLUNTARILY ASSETS PROJECTED E&-E7 REQUIREMENTS HOUSED (a + b + c) SEPARATED b. IN MILITARY HOUSING TO BE DISPOSED/REPLACED C. UNACCEPTABLY 10. VOLUNTARY 11. EFFECTIVE 12. HOUSING HOUSED IN COMMUNITY SEPARATIONS 0 HOUSING ASSETS REQUIREMENTS (a + b) a. UNDER MILITARY CONTROL (1) HDUSED IN EXISTING DOD OWNED/CONTROLLED (2) UNDER CONTRACT/APPROVED (3) VACANT (4) INACTIVE b. PRIVATE HOUSING (1) ACCEPTABLY HOUSED (2) ACCEPTABLE VACANT RENTAL 13. EFFECTIVE 14. PROPOSED 15. REMARKS HOUSING DEFICIT PROJECT DD FORM l5D. NOV" 391 TOTAL (h) 1. COMPONENT FY 2006 MILITARY CONSTRUCTION PROGRAM 2. DATE AIR FORCE INSTALLATION AND lOCATION COMMAND 5. AREA CONST DYESS AIR FORCE BASE AIR COMBAT COMMAND COST INDEX TEXAS 0.97 6. Personnel PERMANENT STUDENTS SUPPORTED Strength OFF ENl CIV OFF ENl CIV OFF ENl CIV AS OF 30 SEP 05 721 4600 745 79 86 3 1 10 43 END FY 2010 743 4691 682 79 86 3 1 10 43 7. INVENTORY DATA ($000) Total Acreage: 6,405 Inventory Total as of: (30 Sep 05) Authorization Not Yet in Inventory: Authorization Requested in this Program: Authorization Included in the Following Program: (FY 2007) Planned in Next Three Years Program: Remaining Deficiency: Grand Total: 1,388,299 0 43,016 44,012 0 130100 1,605,427 8. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY ~ PROJECT TITLE 711-142 Replace Military Family Housing, Ph 6 SCOPE 190 UN 9a. Future Projects: Included in the Following Program 711-142 Replace Military Family Housing, Ph 7 199 UN 9b. Future Projects: Typical Planned Next Three Years: TOTAL 6,288 6,338 (FY 2006) COST DESIGN $,000 START 43,016 Aug-04 STATUS CMPl May-05 (FY 2007) 44,012 (FY08-11) None 9c. Real Propery Maintenance Backlog This Installation 1,071 10. A wing with three B-1 bomber squadrons, one of which is responsible for training all B-1 aircrews, and two C-130 airlift squadrons in an AMC airlift group. DD Form 1390, 24 Jul 00 392 1 1. COMPONENT AIR FORCE FY 2006 MILITARY CONSTRUCTION PROJECT DATA. 3. INSTALlATION AND lOCATION 1 REPLACEFAMILY HOUSING PH 6 6. CATEGORY CODE 88741 DATE 14. PROJECT TITLE DYESS AIR FORCEBASE, TEXAS 5. PROGRAM ELEMENT J2 17. PROJECT NUMBER 711-142 J 9. COST ESTIMATE U/M QUANTITY ITEM Military Family Housing Dwellings Other SpecialConstruction SupportCosts: Site Preparation Site Improvements Landscaping Utility Mains Streets Recreation Demolition OtherSite Work 18. PROJECT COST ($000) FNWZ063001 UN UN 190 190 $43,016 UNIT COST COST~$OO~ 25,838 (23,788 ) (2,050) 12,920 ( 547 ) ( 1,187) ( 879 ) (3,431 ) (3,915 ) ( 599 ) ( 1,996 ) ( 366 ) 125,200 10,789 LS LS LS LS LS 1S LS LS Subtotal 38,758 Contingency (5%) Total ContractCost SIOH (5.7%) 1,937 40,695 2,319 ProjectCost 43,016 Area CostFactor (0.97) 1O.Descriptionof ProposedConstruction:Replace190singleand multiplex family housingunits with all necessaryamenitiesincludingsoundreductionasneededandsupportingfacilities. Projectincludessite preparation,attachedgarages,air conditioning,vehicle parking,exteriorpatiosand privacy fencing, support infrastructureof roadsand utilities,neighborhoodplaygrounds,recreationareas,bridges,effluent water for irrigation, and all landscaping.Includesdemolitionof 190singleand multiplexhousingunits, site demolition and asbestosremoval. Specialconstructionfeaturesinclude brick exteriorwalls,doublecar garagesand rib-mat concreteslabfoundations. Pavgrades E4-E6 Bedrooms 3 Programmed N.s.E .G..$E 1,310 1,630 ~ 151 Project EgJ;;tQr 0.97 Cost Per ~ 773 E4-E6 E7-E8 4 3 1,570 1,500 1,950 1,860 181 173 0.97 0.97 773 773 E7-E8 4 1,730 2,150 200 0.97 773 Totals: Maximum Maximum Maximum Maximum size: size: size: size: E4-E6 3 Bedroom E4-E6 4 Bedroom E7-E8 3 Bedroom E7-E8 4 Bedroom 11. REQUIREMENT: 2920 UN 1420 1790 1650 2020 NSF NSF NSF NSF /1760 /2220 /2050 /2500 ADEQUATE: 2531 UN GSF GSF GSF GSF /164 /206 /190 /232 No J,J:nj.t§. 95 47 27 21 190 ($000) IQtgl 10,756 6,379 3,503 3,150 23,788 GSM GSM GSM GSM SUBSTANDARD: 389 UN PROJECT:ReplaceMilitary Farni!LHousingPhase6 (CurrentMissioI!2: DDFORM1391,DEC99 PREVIOUS EDITIONS MAYBEUSEDINTERNALLY UNTILEXHAUSTED ,393I 1. COMPONENT AIR FORCE FY 2006 MILITARY CONSTRUCTION PROJECT DATA' 3. INSTALLATION AND LOCATION 4. PROJECT TITLE DYESSAIR FORCEBASE, TEXAS 5. PROGRAM ELEMENT 2 DATE 6. CATEGORY CODE REPLACEFAMIL Y HOUSING PH 6 7. PROJECT NUMBER 8. PROJECT COST ($000) 88741 711-142 FNWZ063001 $43,016 REQUIREMENT:This projectis requiredto provide modemand efficient housing for military membersand their dependents stationedatDyessAFB. All units will meetmodemhousingstandardsand areprogrammed in accordancewith the HousingCommunityProfile. The housingwill provide a safe,comfortable,and appealingliving environmentcomparableto the off-basecivilian community.The designwill provide a modemkitchen,living room, family room, bedroomandbathconfiguration,with ample interior and exterior storage.The numberof bedroomswill rangefrom threeto four,asidentified in the most recenthousing requirementsand marketanalysis.Units will be providedwith an attachedgarageand exteriorvehicleparking. Land areawill be usedfor adequateinfrastructurerequirements(roads,recreationareas,utilities). This is the sixthphaseof a multiphaseinitiative to replaceall substandard housingunits at Dyess,AFB. Replacementof all supportingfacilities is required.To supportthe wholeneighborhoodconcept,new roads,utility systems, neighborhoodplaygrounds,recreationareas,andarealandscapingand lighting mustbe installed. Special constructionincludesbrick, which is standardin this areabecauseof its durability underlocal climate conditions(severetemperatureextremes,driving hail storms,andhigh solar radiation),low maintenance,and otherlife cycle considerations.Both materialsand laborarereadilyavailable,resultingin minimal increasein initial cost.Resultingappearance is commensurate with localneighborhoods. The rib-mat foundationis requireddueto severe,highly expansiveclay soil conditions.Wetand dry cycles typical of the southwest causesubstantialsoil heaving.This could causecrackingin buildingsthatdo not havethe appropriate foundation. CURRENTSITUATION: Existing family housingunitswereconstructedin 1957.Theseunits havehad no comprehensive upgradeprogramsince construction,and theydo not meetthe needsof today'smilitary families, nor do theyprovide a modemhomeenvironment.The existingjalousiewindows areoriginal. Theyare difficult to open,drafty, andlatchesor cranksare frequentlybroken.Addition of stormwindows 26 yearsago makeswindows evenmore difficult to open,andresultsin unnecessary heatingand air conditioning costsin the springand fall, as well asreducedindoor air quality. TheseCapehartunitswere constructedwith one bathroom,which is smalland lacksadequatelinen closetspace.Kitchenshave insufficient cabinets,storage and counterspace.Lighting, heatingandair-conditioningsystemsrequireupgradeandreplacement. Plumbingand electricalsystemsareantiquatedanddo not meetcurrentstandardsfor efficiency andsafety. Original agedtwo-wire, ungroundedelectricalwiring is causingincreasedfaultsand potentialfor fIre and safety problems.The existing under-slabpiping systemsareold anddeteriorated.Frequencyof leakingpipes under the concretefloor slabis increasing.Roof, wall, foundationsandexteriorpavementsrequiremajor repair or replacementdueto age.SevereTexasweatherand highly expansiveclay soil conditionshavean adverseaging effect onthe family housingunits. The built-up roofmg systemon mosthousingunit carportsis old and deteriorated.The membranefelts are cracking,blistering,andwrinkling. Termite damageto family housing units is extensive.The existingconcretesidewalksanddrivewaysarecrackingand lifting creatingtripping hazards.The soffits and fasciaon the family housingunitsaredeterioratingandneedreplacement.The shingle roofs areclawedandwarping. IMP ACT IF NOr PROVIDED:Dyesswill continueto spendscarceMFH maintenanceand repairdollars trying to extendthe life of thesesubstandardfamily housingunits.Military personneland their dependents will be requiredto occupyinadequateandsubstandard housing.The effectof living in a poorhousing environmentwill be detrimentalto moraleandwelfareof the military and family members. ADDmONAL: A rateof 5.7%hasbeenusedfor supervision,inspection,andoverheadfor using the Army Corpsof Engineers.This projectmeetsthe criteria/scopespecifiedin PartII of Military Handbook1190, Facility Planningand DesignGuide.The local schoolauthorityindicatesa capabilityexiststo accepttheincreasein the studentpopulationgeneratedby this project.An economicanalysishasbeenpreparedand found that replacementis the mostcosteffectiveoption.The Improvementcostis morethan 100%of the replacement cost.No additionalschoolconstructionwill be re uired. Commander, 7th Civil En ineerS uadron:Lt Col DOFORM1391C.DEC99 PREVIOUS EDITIONS MAYBEUSEDINTERNALLY UNTILEXHAUSTED 394 ...,., ","" ,... 1. COMPONENT AIR FORCE J FY 2006 MILITARY CONSTRUCTION PROJECT DATA 3. INSTALLATION AND LOCATION DYESS AIR FORCEBASE, TEXAS 5. PROGRAMELEMENT 16. CATEGORY CODE 88741 711-142 DarrenR. Daniels,(325)696-2250. DDFORM1391C,DEC99 1 2. DATE J4. PROJECTTITLE REPLACEFAMIL Y HOUSING PH 6 17. PROJECT NUMBER 1 8. PROJECT COST ($000) FNWZ063001 $43,016 PREVIOUS EDITIONS MAYBEUSEDItfTERNALLY UNTILEXHAUSTED 395 --- l MILITARY FAMILY HOUSING JUSTIFICATION 1. DATE OF REPORT 2. FISCAL YEAR July-O4 3. DOD COMPONENT REPORT CONTROL SYMBOL DD-A&L(AR)1716 4. REPORTING INSTALlATION AIR FORCE 5. 2006 a. NAME DATA AS OF b. LOCATION DYESS AIR FORCE BASE Phase 6 TEXAS Dec-03 ANALYSIS OF REQUIREMENTS AND ASSETS 6. TOTAL PERSONNEL STRENGTH 7. PERMANENT CURRENT OFFICER E9-E7 (a) (b) E6-E1 (c) TOTAL (d) PROJECTED OFFICER E9-E7 (e) (f) E6-E1 (g) 681 427 3,996 681 434 4,052 681 427 3,996 681 434 4,052 TOTAL (h) PARTY PERSONNEL 8. GROSS FAMILY HOUSING REQUIREMENTS 392 9. TOTAL UNACCEPTABLY a INVOLUNTARILY b IN MILITARY HOUSED (a + b + c) SEPARATED HOUSING TO BE DISPOSED/REPLACED C. UNACCEPTABLY 10. VOLUNTARY 0 48 0 0 HOUSED IN COMMUNITY SEPARATIONS 11. EFFECTIVE HOUSING REQUIREMENTS 12. HOUSING ASSETS (a + b) a. UNDER MILITARY CONTROL (1) HOUSED IN EXISTING DOD OWNED/CONTROLLED (2) UNDER CONTRACT/APPROVED (3) VACANT (4) INACTIVE b. PRIVATE HOUSING (1) ACCEPTABLY HOUSED (2) ACCEPTABLE VACANT RENTAL 13. EFFECTIVE HOUSING DEFICIT 14. PROPOSED PROJECT 15. REt.IARKS DD FORM '523, NOV" '396 1. COMPONENT AIR FORCE FY 2006 MILITARY CONSTRUCTION PROGRAM INSTALLATION AND LOCATION COMMAND RAMSTEIN AIR BASE UNITED STATES AIR GERMANY FORCES EUROPE 6. Personnel PERMANENT STUDENTS Strength OFF ENL CIV OFF ENL CIV AS OF 30 SEP 04 1443 6984 2885 66 946 124 END FY 2009 1471 7040 2894 66 946 124 7. INVENTORY DATA ($000) Total Acreage: 3,187 Inventory Total as of: (30 Sep 04) Authorization Not Yet in Inventory: Authorization Requested in this Program: Authorization Included in the Following Program: (FY 2007) Planned in Next Three Years Program: 2. DATE 5. AREA CONST COST INDEX 1.22 SUPPORTED OFF ENL CIV 302 0 0 302 0 0 TOTAL 12,750 12,843 5,320,630 358,600 62,952 64,234 96,453 Remaining Deficiency: Grand Total: 496930 6,399,799 8. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY .QQQ£ PROJECT TITLE 711-142 Replace Military Family Housing, Ph C (FY 2006) SCOPE 101 UN 9a. Future Projects: Included in the Following Program 711-142 Replace Military Family Housing, Ph 0 101 UN COST DESIGN $.000 START 62,952 Aug-04 STATUS CMPL Apr-05 (FY 2007) 64,234 9b. Future Projects: Typical Planned Next Three Years: (FY08-11) 711-142 Replace Military Family Housing 101 UN 51,060 711-142 Replace Military Family Housing 73 UN 45,393 9c. Real Propery Maintenance Backlog This Installation 2,585 10. A host airlift wing supporting a C-130E squadron, a C-9A squadron and a squadron composed of C-20A, and C-21A aircraft; Headquarters, United States Air Forces in Europe and Headquarters, Allied Air Forces Central Europe. DO Form 1390,24 Jul 00 397 -- ... 1. COMPONENT AIR FORCE I FY 2006 MILITARY CONSTRUCTION PROJECT DATA' RAMSTEIN AIR BASE, GERMANY J6. 1 CATEGORY CODE 88741 2 DATE j 4. PROJECTTITLE 3. INSTALLATION AND LOCATION 5. PROGRAM ELEMENT 1 REPLACEFAMIL Y HOUSING, PH C 7. PROJECT NUMBER 711-142 9. COST ESTIMATE U/M QUANTITY ITEM Military Family Housing Dwellings OtherSpecialConstruction SupportCosts: Site Improvements $62,952 UNIT COST COSTJ!oo~ LS 37,639 (20,557 ) (17,082) 18,656 ( 2,040 ) LS LS LS LS LS LS LS (881 ) (5,371 ) ( 1,355 ) ( 414 ) ( 2,258 ) ( 1,622 ) (4,715) UN UN Landscaping Utility Mains Streets Recreation Demolition Environmental OtherSite Work 18. PROJECT COST ($000) TYFR064130 Subtotal Contingency (5%) Total ContractCost SIOH (6.5%) 101 101 203,535 169,129 .56,295 2,814 59,109 3,842 ProjectCost 62,952 Area CostFactor (l.2:?l 10. Descriptionof ProposedConstruction:Demolish270and construct101 multiplex family housingunits with all necessaryamenitiesandsupportingfacilities. Projectincludessite preparation,attachedsingle car garages,energyconservingfeatures,parking, exteriorpatiosandprivacy fencing, supportinfrastructureof roads, utilities, recreationareas,landscaping,asbestosremoval,anddemolition.Specialconstructionfeaturesinclude a onecar garagefor eachunit, masonry/concrete wall construction,tile roofs,and handicapaccessibilityfor 3 units. Othersite work includesparking lots,pedestrianwalks,boundarybuffers in housingarea. Programmed Pa~grades Bedrooms 01-03 04-05 04-05 06 07+ 4 3 4 4 4 Project N.s.E .G.SE Q..$..M ~ 1,730 1,630 1,860 2,030 2,690 2,150 2,020 2,310 2,520 3,330 200 188 215 234 309 1.22 1.22 1.22 1.22 1.22 Cost Per ~ 784 784 784 784 784 Totals: Maximum size: 01-03 4 Bedroom Maximum size: 04-05 3 Bedroom 1850 NSF /2300 GSF /214 GSM Maximum size: 04-05 4 Bedroom Maximum size: 06 4 Bedroom Maximum size: 07+ 4 Bedroom 2180 NSF /2700 GSF /251 GSM 2350 NSF /2920 GSF /271 GSM 3270 NSF /4060 GSF /377 GSM 11. REQUIREMENT: 6988 UN No ~ I.9..tgl 10 28 35 26 2 101 1,913 5,035 7,198 5,819 592 20,557 2020 NSF /2500 GSF /232 GSM ADEQUATE: 6516 UN SUBSTANDARD: 472 UN PROJECT:ReplaceFamilyHousin~..{!>hase C). Specialconstructionfeaturesinclude a onecar~ar~ DDFORM1391,DEC99 ($000) for each PREVIOUS EDmONSMAYBEUSEDINTERNAllYUNTILEXHAUSTED 398 1. COMPONENT AIR FORCE FY 2006 MILITARY CONSTRUCTION PROJECT DATA' 3. INSTAlLATION AND LOCATION 4. PROJECT TITLE RAMSTEIN AIR BASE, GERMANY 5. PROGRAM ELEMENT 2 DATE 6. CATEGORY CODE REPLACEFAMILY HOUSING, PH C 7. PROJECT NUMBER 8. PROJECT COST ($000) 88741 711-142 TYFR064130 $62,952 unit, masonry/concrete wall construction,tile roofs, andhandicapaccessibilityfor 3 units. REOUIREMENT: Projectis requiredto provide modemand efficienthousingfor military membersand their dependentsat RamsteinAB, Germany.All units will meetmodemhousingstandardsand areprogrammedin accordancewith the Housing CommunityProfile. The designwill provide a modemkitchen,living room, family room,bedroom,and bathconfiguration,with ampleinteriorand exteriorstorage.The number of bedroomswill rangefrom two to four, asidentified in the mostrecentHousingRequirementsand Market Analysis. Units will be provided with a single-cargarageand exteriorparking for a secondvehicle.Adequate infrastructuresupportfor roadsandutilities shallalsobe provided.This is the phaseC of a mu1tiphase initiative to replacean additional101 housingunits for RamsteinAB. The HousingCommunityProfile and HousingRequirementsand MarketAnalysisare elementsof the GeneralPlanfor RarnsteinAB, and arethe basisfor this project. CURRENTSITUAllON: Theseexistinghousingunitswereconstructedin the 1950s.They showthe effects of ageand heavyuse.Theyhavehadno majorupgradessinceconstruction,and theydo not meetthe needs of today'sfamilies,nor do they provide a modemhomeenvironment.The roof, walls,foundations,and exterior pavementsrequire major repair or replacementdue to age.The plumbing and electricalsystemsare antiquated anddo not meetcurrentstandardsfor efficiencyand safety.Interiorsare generallyinadequateby modemcriteria. Bathroomsare smalland lack adequateclosetspace.Kitchenshaveinsufficient cabinets,storage,and counter space.Lighting andheatingsystemsrequireupgradeandreplacement. IMPACT IF NOT PROVIDED:Units will continueto deterioraterapidly, resultingin increasingoperations, maintenanceand repairto the governmentandinconvenienceto residents.Without this project,repair ofthese units will continuein a costlypiecemealfashionwith little or no improvementin liVing quality. ADDlnONAL: This projectmeetsthe criteria/scopespecifiedin the Air ForceFamily HousingGuide.All units will meetmodemhousingstandards.An economicanalysishasbeenpreparedcomparingthe alternatives of new construction,improvement,leasingandstatusquo operation.Basedonthe net presentvaluesand benefit ofrespectivealternatives,new constructionwasfound to be the most costeffectivealternativeoverthe life of theproject. The costof improvingexistingunitsis 80% of the costof replacingtheseunits. Sincethis is a replacementhousing,therewill be no increasein the studentpopulationandthereforeno impact on local schooldistrict. The constructionagentfor this projectis the Army Corpsof Engineersresultingin 6.5% SIOH costs.BaseCivil Engineer:Col CarlosR. Cruz-Gonzales, 314-480-6228FOREIGNCURRENCY: FCF BudgetRateUsed: EURO-DOLLAR .8785 DOFORM1391C,DEC99 PREVIOUS EDITIONS MAYBEUSEDINTERNALLY UNTILEXHAUSTED 399 MILITARY FAMILY HOUSING JUSTIFICATION 1. DATE OF REPORT 2. FISCAL YEAR July-04 3. DOD COMPONENT REPORT CONTROL SYMBOL 2006 DD-A&L(AR)1716 4. REPORTING INSTALLATION AIR FORCE a. NAME b. LOCATION 5. DATA AS OF RAMSTEIN AIR BASE Phase C GERMANY Oct-03 ANALYSIS CURRENT OF REQUIREMENTS AND ASSETS 6. TOTAL PERSONNEL STRENGTH 7. PERMANENT PROJECTED OFFICER (a) E9-E7 (b) E6-E1 (c) TOTAL (d) OFFICER (e) E9-E7 (f) E6-E1 (9) TOTAL (h) 2,496 1,515 10,096 14,107 2,496 1,515 10,096 14,107 2,496 1,515 10,096 14..107 2,496 1,515 10,096 14,107 1,858 1,341 5193 8,392 1,858 1341 5193 8392 282 205 917 1,404 1,576 1,136 4,276 6,988 1,136 4,276 6,735 366 1,797 2,433 366 1,797 PARTY PERSONNEL 8. GROSS FAMILY HOUSING REQUIREMENTS 9. TOTAL UNACCEPTABLY HOUSED (a+b+c) a. INVOLUNTARILYSEPARATED 0 b IN MILITARYHOUSINGTO BE DISPOSED/REPLACED C UNACCEPTABLYHOUSEDIN COMMUNITY 0 10. VOLUNTARY 0 0 0 0 SEPARATIONS 11. EFFECTIVE HOUSING REQUIREMENTS 12. HOUSING ASSETS (a + b) a UNDER MILITARYCONTROL (1) HOUSEDIN EXISTINGDOD OWNED/CONTROLLED (2) UNDERCONTRACT/APPROVED (3) VACANT (4) INACTIVE b. PRIVATEHOUSING (1) ACCEPTABLYHOUSED (2) ACCEPTABLEVACANT RENTAL 0 13. EFFECTIVE HOUSING DEFICIT 0 14. PROPOSED PROJECT 101 0 0 15. REMARKS DO FORM1523.NOV" "400 .I 1. COMPONENT AIR FORCE FY 2006 MILITARY CONSTRUCTION PROGRAM INSTALLATION AND lOCATION COMMAND SPANGDAHlEM AIR BASE UNITED STATES AIR GERMANY FORCES EUROPE 6. Personnel PERMANENT STUDENTS Strength OFF ENl CIV OFF ENl CIV AS OF 30 SEP 04 360 4157 778 0 0 0 END FY 2009 365 4301 781 0 0 0 7. INVENTORY DATA ($000) Total Acreage: 1,377 Inventory Total as of: (30 Sep 04) Authorization Not Yet in Inventory: Authorization Requested in this Program: Authorization Included in the Following Program: (FY 2007) Planned in Next Three Years Program: 2. DATE 5. AREA CONST COST INDEX 1.23 SUPPORTED OFF ENl CIV 1 0 0 1 0 0 TOTAL 5,296 5,448 2,306,551 133,000 45,385 34,346 48,311 Remaining Deficiency: Grand Total: 0 2,567,593 8. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY ~ PROJECT TITLE 711-142 Replace Military Family Housing, Ph 1 (FY 2006) SCOPE 79 UN 9a. Future Projects: Included in the Following Program 711-142 Replace Military Family Housing, Ph 2 60 UN 9b. Future Projects: Typical Planned Next Three Years: 711-142 Replace Military Family Housing 94 UN COST DESIGN $,000 START 45,385 Aug-04 STATUS CMPl May-05 (FY 2007) 34,346 (FY08-11) 48,311 9c. Real Propery Maintenance Backlog This Installation 10. A USAFE installation that is home to the largest fighter operation in Germany. A host Fighter Wing commands three fighter squadrons and an air control squatron flying F-16 C&Ds and OA/A-10s. 758 DD Form 1390, 24 Jul 00 401 -- 1. COMPONENT AIR FORCE FY 2006 MILITARY CONSTRUCTION PROJECT DATA. 2 DATE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE SPANGDAHLEMAIR BASE, GERMANY REPLACEMILITARY FAMILY HOUSING, PHASE 1 5. PROGRAM ELEMENT 6. CATEGORY CODE 88741 7. PROJECT NUMBER 711-142 9. COST ESTIMATE U/M QUANTITY ITEM Military FamilyHousing Dwellings RenewableEnergySource OtherSpecialConstruction SupportCosts: CommunicationConnections Lot Costs Site Improvements Landscaping Utility Mains Streets Recreation Demolition Environmental OtherSite Work 8. PROJECT COST ($000) VYHK064000 UN UN UN $45,385 UNIT COST 79 79 79 COST $000 24,683 ( 14,325) ( 1,516 ) ( 8,842 ) 15,903 ( 450 ) (901 ) ( 2,290 ) ( 578 ) ( 3,850 ) ( 1,250 ) ( 272 ) ( 1,481 ) ( 1,064 ) (3,767) 181,329 19,190 111,924 LS LS LS LS LS LS LS LS LS LS Subtotal Contingency (5%) Total ContractCost SIOH (6.5%) 40,586 2,029 42,615 2,769 ProjectCost 45,385 Area CostFactor 1.23 10. Descriptionof ProposedC'onstruction:Construct79 single/multiplexfamily housingunits with all necessaryamenitiesandsupportingfacilities. Projectincludessitepreparation,energyconservingfeatures, parking,exteriorpatiosand privacy fencing,supportinfrastructureof roads,utilities, recreationareasand landscaping.Work includessolar/renewableenergyfeatures(solarpanelsonroof) and specialconstruction features(garages,tile/slateroofs,andfootings for problemsoils).Includesdemolitionof 126units, asbestos andlead-basedpaint abatement. Programmed Paygrades E4-E6 E4-E6 E7-E8 E7-E8 06 06 Installation COR Bedrooms 3 4 3 4 4 4 Project Cost Per No NSE .G..S.E .G.SM EgJ;;tQr .G.SM Unit§. 1,310 1.570 1,500 1,730 2.030 2.230 1,630 1.950 1.860 2,150 2,520 2,770 151 181 173 200 234 257 1.279 1.279 1.279 1.279 1.279 1.279 784 784 784 784 784 784 18 30 12 12 6 1 2.726 5.445 2.082 2.407 1.408 257 79 14.325 Totals: Maximum size: E4-E6 3 Bedroom Maximum size: E4-E6 4 Bedroom Maximum size: E7-E8 3 Bedroom Maximum size: E7-E8 4 Bedroom DDFORM1391,DEC99 ($000) 19m! 1420 NSF /1760 GSF /164 GSM 1790 NSF /2220 GSF /206 GSM 1650 NSF /2050 GSF /190 GSM 2020 NSF /2500 GSF /232 GSM PREVIOUS EDITIONS MAYBEUSEDINTERNALLY UNTILEXHAUSTED 402 ~..- , 1. COMPONENT AIR FORCE FY 2006 MILITARY CONSTRUCTION PROJECT DATA. 2 DATE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE SPANGDAHLEM AIR BASE, GERMANY REPLACEMILITARY FAMILY HOUSING, PHASE 1 5. PROGRAM ELEMENT 88741 Maximum size: 06 6. CATEGORY CODE 4 Bedroom VYHK064000 8. PROJECT COST ($000) $45,385 2350 NSF / 2920 GSF / 271 GSM Maximum size: 06 Installation COR 4 Bedroom 11. REQUIREMENT: 2039 UN 7. PROJECT NUMBER 711-142 2350 NSF /2920 ADEQUATE: 1806 UN GSF /271 GSM SUBSTANDARD: 233 UN PROJECT:REPLACE FAMILY HOUSINGUNITS, PHASE I (CURRENTMISSION) REQUIREMENT: Projectis requiredto provide modemand efficienthousing for military membersand their dependents stationedat Spangdah1em AB, Germany.All units will meet"whole house"standardsandare programmedin accordancewith the Housing CommunityProfile. The designwill provide a modemkitchen, living room, family room, bedroomand bath configuration,with ampleinterior and exteriorstorage.The numberof bedroomswill rangefrom threeto four, asidentified in the most recentHousingRequirementsand MarketAnalysis.Units will be providedwith a single cargarageand exteriorparking for a secondoccupantcar andguests.Solarpanelswill be installedonthe roof of eachbuilding aspart of the basewideenergy conservation/renewable initiatives.Thebasicneighborhoodsupportinfrastructurewill be upgradedto meet modemhousingneeds.Neighborhoodenhancement will include landscaping,playgrounds,and recreation areas.This is the first phaseof a multiphaseinitiative to replace233 housingunits for Spangdahlem AB, Germany.The Housing CommunityProfile andHousingRequirements and Market Analysis are elementsof the GeneralPlan for Spangdahlem AB, andarethebasisfor this project. Higher supportcostsfor site improvements,utility mainsand streetsarebecausepartof thehousingreplacementis locatedwithin an undevelopedsectionof the housingarea. CURRENT SITUAnON: Currenthousingbuildings consistof 18 stairwell units, built in 1955.Theseunits havehad no majorupgradesin the last 49 yearsand showthe affectsof ageandcontinuousheavyuse.They do not meetcurrentantiterrorism/forceprotection(A TIFP) standards, and areas muchas38% lessthantoday's standardson size.Roofs, walls, foundations,and exteriorpavements require major repair or replacementdueto the effectsof ageandthe environment.Roof structuresarerotting; leakshavemadealreadyinadequate insulationlesseffective andwalls discolored.Foundationsand pavementsarefailing dueto settlement. Plumbingand electricalsystems,to includepublic announcement systems,areantiquatedanddo not meet currentstandardsfor efficiency or safety.Housinginteriorsareinadequatefor storageand counterspace, cabinets areold and countertopsand sinksarebadlyworn. Flooring throughoutthe 18 unit buildings is outdatedand haveasbestos.Lighting systemsthroughoutthe unitsare inefficientanddo not meetrequirements.This projectwill demolish126housingunits (7 buildings). IMPACT IF NOT PROVIDED: If this projectis not executed,structuraldeteriorationwill continueunabated. Major morale problemswill continueto persist.Somepeoplewill continueto occupyinadequatehousing unitswhile otherswill live in newlyrenovatedunits.The inadequatehousingwill continueto be occupied sinceadequate,affordableoff-basehousingis not available.Inadequatefamily housingwill havea negative affect on retaining AF members. ADDITIONAL: This projectis not eligible for the NorthAtlantic Treaty Organization(NATO) security investmentprogram.This projectmeetsthe criteriaspecifiedin the Air Force Family HousingGuide for Planning,Programming,Design,andConstruction.An economicanalysishasbeenpreparedcomparingthe alternativesof new construction,acquisition,andstatusquo operation.Basedonthe net presentvaluesand benefitof respectivealternatives,new constructionwasfoundto be the most costeffective overthe life of the project.Sincethis is replacementhousing,therewill be no increasein the studentspopulationor impacton the ability of local schooldistrictto supportbasedependents. The costto improvethesehousingunitsis 77% of the replacementcost.The constructionagentwill be the Army Corpsof Engineers,SIOH = 6.5%.Base Civil Engineer:Lt Col Kurt Kaisler,011-49-6565-61-6302. FOREIGNCURRENCY:FCF BudgetRate Used:EURO-DOLLAR .8785 ..DD ' } i FORM1391C,DEC99 PREVIOUS EDITIONS MAYBEUSEDINTERNALLY UNTILEXHAUSTED 403 ." I MILITARY FAMILY HOUSING JUSTIFICATION 3. DOD COMPONENT 4. REPORTING AIR FORCE 1. DATE OF REPORT INSTALLATION 2. FISCAL YEAR July-o4 a. NAME 5. DATA AS OF REPORT CONTROL 2006 SYMBOL DD-A&L(AR)1716 b. LOCATION SPANGDAHLEM AIR BASE Phase 1 GERMANY Oct-03 ANALYSIS OF REQUIREMENTS AND ASSETS 6. TOTAL PERSONNEL STRENGTH 7. PERMANENT CURRENT OFFICER E9-E7 (a) (b) E6-E1 (c) TOTAL (d) PROJECTED OFFICER E9-E7 (e) (f) E6-E1 (g) TOTAL (h) 328 346 3,528 4,202 328 346 3,528 4,202 328 346 3,528 4,202 328 346 3,528 4,202 227 319 1,755 2,301 227 319 17 24 48 0 0 0 7 24 48 0 0 0 15 25 262 294 2,039 PARTY PERSONNEL 8. GROSS FAMILY HOUSING REQUIREMENTS 9. TOTAL UNACCEPTABLY HOUSED (a + b + c) a INVOLUNTARILY SEPARATED b. IN MILITARYHOUSINGTO BE DISPOSED/REPLACED C UNACCEPTABLYHOUSEDIN COMMUNITY 10. VOLUNTARY 0 SEPARATIONS 11. EFFECTIVE HOUSING REQUIREMENTS 12. HOUSING ASSETS (a + b) 448 1,815 371 1,394 a. UNDER MILITARYCONTROL (1) HOUSEDIN EXISTINGDOD OWNED/CONTROLLED (2) UNDERCONTRACT/APPROVED 604 758 604 758 48 79 (3) VACANT 0 (4) INACTIVE 0 b. PRIVATEHOUSING 120 (1) ACCEPTABLYHOUSED 120 (2) ACCEPTABLEVACANTRENTAL 0 13. EFFECTIVE HOUSING DEFICIT 14. PROPOSED PROJECT 7 24 15. REMARKS 00 FORM 1523, NOV" 404 I 1. COMPONENT AIR FORCE FY 2006 MILITARY CONSTRUCTION PROGRAM INSTALLATION AND LOCATION COMMAND INCIRLIK AIR BASE UNITED STATES AIR TURKEY FORCES EUROPE 6. Personnel PERMANENT STUDENTS Strength OFF ENL CIV OFF ENL CIV AS OF 30 SEP 04 146 1326 1105 229 0 0 END FY 2009 143 1365 1103 229 0 0 7. INVENTORY DATA ($000) Total Acreage: 3,328 Inventory Total as of: (30 Sep 03) Authorization Not Yet in Inventory: Authorization Requested in this Program: Authorization Included in the Following Program: (FY 2007) Planned in Next Three Years Program: 2. DATE 5. AREA CONST COST INDEX 0.9 SUPPORTED OFF ENL CIV 0 0 0 0 0 0 TOTAL 2,806 2,840 1,187,992 6,101 22,730 0 0 Remaining Deficiency: Grand Total: 8600 1,225,423 8. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY (FY 2006) COST DESIGN ~ PROJECTTITLE SCOPE 711-142 Replace Military Family Housing 100 UN $.000 22,730 9a. Future Projects: Included in the Following Program None (FY 2007) 9b. Future Projects: Typical Planned Next Three Years: None (FY08-11) START STATUS CMPL Aug-04 9c. Real Propery Maintenance Backlog This Installation 10. The 39th Wing provides host services to forces deployed in support of Operation Northern Watch. home to an AMC Air Mobility Squadron. May-05 750 It is also DD Form 1390,24 Jul 00 405 1. COMPONENT AIR FORCE I FY 2006 MILITARY CONSTRUCTION PROJECT DATA 1REPLACEFAMIL Y HOUSING 1 LJYC064002 3. INSTALLATION AND LOCATION 4. PROJECT TITLE INCIRLIK AIR BASE ADANA, TURKEY 1 5. PROGRAM ELEMENT 6. CATEGORY CODE 88741 17. PROJECT NUMBER 711-142 9. COST ESTIMATE U/M QUANTITY ITEM Military Family Housing Dwellings SupportCosts: CommunicationsSupport Site Improvements Landscaping Utility Mains Streets Recreation Demolition Environmental UN 100 l J 2. DATE . 8. PROJECT COST ($000) UNIT COST $22,730 COSTJ.$OOO) 13,893 ( 13,893) 6 434 , ( 850 ) (364) (617) ( 1,133 ) ( 1,500 ) ( 1,153 ) (322) (495) 138,930 LS LS LS LS LS LS LS LS Subtotal 20 Contingency (5%) Total ContractCost SIOH (6.5%) 1,016 21,343 1,387 327 , ProjectCost 22,730 Area CostFactor LO.~ 10. Descriptionof ProposedConstruction:Demolish150and construct100family housingunits. Includes demolition,site clearing,replacement/upgrade of utility systemsandroads,and constructionof new multiplex units. Providesnormalamenitiesto includevehicle parking,air conditioning,exteriorpatios, privacy fencing, playgrounds,and landscaping.Includesdemolition,asbestosandleadbasedpaint removal. Paygrades E4-E6 01-03 04-05 06 06 Installation COR Bedrooms 4 4 4 4 4 Programmed N.s.E .G.SE 1,570 1,950 1,730 2,150 1,860 2,310 2,030 2,520 2,230 2,770 .G.s.M 181 200 215 234 257 Project ~ 0.9 0.9 0.9 0.9 0.9 Cost Per .G.s.M 784 784 784 784 784 Totals: Maximum size: E4-E6 Maximum size: 01-03 Maximum size: 04-05 4 Bedroom 4 Bedroom 4 Bedroom ($000) IQ!2! 6,386 1,976 4,855 495 181 100 13,893 1790 NSF /2220 GSF /206 GSM 2020 NSF /2500 GSF /232 GSM 2180 NSF /2700 GSF /251 GSM Maximum size: 06 4 Bedroom Maximum size: 06 Installation COR 4 Bedroom 11. REQUIREMENT: 850 UN No Un@ 50 14 32 3 1 2350 NSF /2920 2350 NSF /2920 ADEQUATE: 0 UN GSF /271 GSM GSF /271 GSM SUBSTANDARD: 850 UN PROJECT:ReplaceMilitary Family Housing (CurrentMission). REQUIREMENT: This project is requiredto provide modemand efficient housingfor the airmanandU.S. Governmentcivilian ~l~es and their dependents stationedat Incirlik Air Base.All units will meet DOFORM1391,DEC99 PREVIOUS EDITIONS MAYBEUSEDINTERNALLY UNTILEXHAUSTED 406 1. COMPONENT AIR FORCE FY 2006 MILITARY CONSTRUCTION PROJECT DATA. 3. INSTALLATION AND LOCATION 4. PROJECT TITLE INCIRLIK AIR BASE ADANA, ruRKEY 5. PROGRAM ELEMENT 2 DATE 6. CATEGORY CODE REPLACE FAMIL Y HOUSING 7. PROJECT NUMBER 8. PROJECT COST ($000) 88741 711-142 LJYC064002 $22,730 Governmentcivilian employeesand their dependents stationedat Incirlik Air Base.All units will meet modemhousingstandardsandareprogrammedin accordancewith the HousingCommunityProfile. The designwill provide a modemkitchen,living room, family room, bedroomsand bathconfiguration, with ample interior and exteriorstorage.Units will be providedwith a single-cargarageand exteriorparking for a second vehicle.Adequateinfrastructuresupportfor roadsandutilities shallalsobe provided.The project is programmedin accordancewith the FY2004Family Housing MasterPlan. CURRENTSI11JAllON: The currentMFH at Incirlik consistsof 900units; 750 unitswere constructedin 1983thru 1985andneedimprovementsto meetacceptableliving standards.The remaining150units identified for this projectwereconstructedin 1961andarein inadequateconditionandbeyond economical upgrade/improvement. Theseunits weresurplusandprefabricatedbuildings,which wereconvertedinto housing.Despiteextensivemaintenanceandrepair effortsandexpenses,settlementand shifting of foundations continueto causestructuraldamage.Electrical,mechanical,and otherutility systemsareoutdatedand do not meetcodesand regulations,energycapacityand efficiencyrequirements. IMP ACT IF NOT PROVIDED: The assignedpersonneland their families will continueto be housedin inadequatehousingunits, resultingin poorerquality of life. Theseunsatisfactoryconditionswill affectthe moraleandwelfare of our military personneland their families.Also, the U.S. Governmentwill continueto spendMFH fundsperformingpiecemealmaintenanceand repairon outdatedfacilities. ADDinONAL: This projectis not eligible for NATO funding.This projectmeetsthe criteria specified in the Air ForceFamily HousingGuide for Planning,Programming,Design,andConstruction.There will be no increasein the studentpopulationgeneratedwith this project. An economicanalysishasbeenprepared comparingthe alternativesof new constructionandstatusquo operation.Basedon the netpresentvaluesand benefitof this respectivealternative,new constructionwasfoundto be most costeffective overthe life of the project. Improvementis not consideredasa viable alternativebecauseof theunrecoverablefoundation problems.The costto improvethis housingis 100+%of the replacementcost. SIOHis 6.5%to fund U.S. Army Corps of EngineersexecutionagentandAir Forceoversight.Director of Civil Engineering:RobertE. Lally, Civ., DSN 676-6898. DDFORM1391C,DEC99 PREVIOUS EDmDNSMAYBEUSEDINTERNALLY UNTILEXHAUSTED 407 ~ MILITARY FAMILY HOUSING JUSTIFICATION 1. DATE OF REPORT 2. FISCAL YEAR July-o4 3. DOD COMPONENT REPORT CONTROL SYMBOL DD-A&L(AR)1716 4. REPORTING INSTALLATION AIR FORCE 5. 2006 a. NAME DATA AS OF b. LOCATION INCIRLIK AIR BASE TURKEY Jan-O1 ANALYSIS OF REQUIREMENTS AND ASSETS CURRENT OFFICER E9-E7 (a) (b) E6-E1 (c) TOTAL (d) PROJECTED OFFICER E9-E7 (e) (f) E6-E1 (g) TOTAL 6. TOTAL PERSONNEL STRENGTH 7. PERMANENT 315 146 1,149 308 144 1,087 315 146 1,149 308 144 1,087 0 0 0 50 0 50 16 0 0 PARTY PERSONNEL 8. GROSS FAMilY HOUSING REQUIREMENTS 9. TOTAL UNACCEPTABLY a. INVOlUt-rfARll HOUSED (a + b + c) Y SEPARATED b. IN MILITARY HOUSING TO BE DISPOSEO/REPLACED C UNACCEPTABLY 10. VOLUNTARY HOUSED IN COMMUNITY SEPARATIONS 0 11. EFFECTIVE HOUSING REQUIREMENTS 12. HOUSING ASSETS (8 + b) a UNDER MILITARY COt-rfRDL (1) HOUSED IN EXISTING DOD OWNED/CONTROLLED (2) UNDER CONTRACT/APPROVED (3) VACAt-rf (4) INACTIVE b. PRIVATE HOUSING (1) ACCEPTABLYHDUSED (2) ACCEPTABLE VACANT REt-rfAL 13. EFFECTIVE HOUSING DEFICIT 14. PROPOSED PROJECT 15. REMARKS DD FORM 1523,NOY" 4'08 1. COMPONENT FY 2006 MILITARY CONSTRUCTION PROGRAM 2. DATE AIR FORCE INSTALLATION AND LOCATION COMMAND 5. AREA CONST RAF LAKENHEATH UNITED STATES AIR COST INDEX UNITED KINGDOM FORCES EUROPE 1.2 6. Personnel PERMANENT STUDENTS SUPPORTED Strength OFF ENL CIV OFF ENL CIV OFF ENL CIV AS OF 30 SEP 04 554 4398 1002 0 0 0 2 5 344 END FY 2009 555 4470 937 0 0 0 2 5 344 7. INVENTORY DATA ($000) Total Acreage: 2,004 Inventory Total as of: (30 Sep 03) Authorization Not Yet in Inventory: Authorization Requested in this Program: Authorization Included in the Following Program: (FY 2007) Planned in Next Three Years Program: Remaining Deficiency: Grand Total: 8. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY .Q.QQ£ PROJECT TITLE 711-142 Replace Military Family Housing, Ph 3 SCOPE 107 UN 9a. Future Projects: Included in the Following Program 711-142 Replace Military Family Housing, Ph 4 74 UN 9b. Future Projects: Typical Planned Next Three Years: 711-142 Replace Military Family Housing 185 UN TOTAL 6,305 6,313 1,923,593 54,391 48,437 30,883 63,403 73825 2,194,532 (FY 2006) COST DESIGN $.000 START 48,437 Sep-04 STATUS CMPL Jun-05 (FY 2007) 30,883 (FY08-11) 63,403 9c. Real Propery Maintenance Backlog This Installation 10. A fighter wing equipped with two squadrons of F-15Es and one squadron of F-15C/Ds. 2,727 .. DO Form 1390, 24 Jul 00 ;;0 .,,- 409 1. COMPONENT AIR FORCE I 1 2 DATE FY 2006 MILITARY CONSTRUCTION PROJECT DATA. 3. INSTALLATION AND LOCATION 4. PROJECT TITLE RAF LAKENHEA TH, UNITED KINGDOM REPLACEMILITARY FAMIL Y HOUSING (pHASE 1 3J 5. PROGRAM ELEMENT 16. CATEGORY 88741 CODE 1 7. PROJECT NUMBER 711-142 8. PROJECT MSET064026 COST ($000) $48,437 9. COST ESTIMATE ITEM U/M Military Family Housing Dwellings OtherSpecialConstruction SupportCosts: Lot Costs SiteImprovements Landscaping Utility Mains Streets Recreation Demolition Environmental OtherSite Work QUANTITY UN UN UNIT COST 107 107 COST-L$OOO) 22,639 ( 17,030) (5,609) 21,717 ( 1,789 ) (2,713 ) (1,179) ( 5,296 ) ( 1,581 ) ( 964 ) ( 1,936 ) ( 2,222 ) (4,037) 159,159 52,421 LS LS LS LS LS LS LS LS LS Subtotal Contingency (5%) Total ContractCost SIOH (4.0%) 44,356 2,217 46,573 1,862 ProjectCost 48,437 Area CostFactor (1.2) 10. Descriptionof ProposedConstruction:Demolish27 four-plexunits (108 units total) and construct107 singleand multiplex family housingunits with all necessaryamenitiesandsupportingfacilities. Project includessite preparation,singlecar garages, parking,exteriorpatiosand privacy fencing,soundattenuation, recreationalareas,utilities, supportinfrastructureof roads,landscaping,demolition,andasbestosremoval. Specialconstructionincludesmasonryconstruction,concretetile roofs,anddual 11OVand 220V electrical systems,etc. Programmed Payarades E4-E6 E7-E8 01-03 06 07+ Special Command Maximum Maximum Maximum Maximum Maximum size: size: size: size: size: Bedrooms ~ 3 3 3 4 4 E4-E6 3 Bedroom E7-E8 3 Bedroom 01-03 3 Bedroom 06 4 Bedroom 07+ Special Command DD FORM 1391, DEC 99 1,310 1,500 1,500 2,030 2,960 4 Bedroom Project ~ ~ 1,630 1,860 1,860 2,520 3,660 1420 1650 1650 2350 3270 NSF NSF NSF NSF NSF ~ 151 173 173 234 340 /1760 /2050 /2050 /2920 /4060 Cost Per ~ 1.2 1.2 1.2 1.2 1.2 GSF GSF GSF GSF GSF /164 /190 /190 /271 /377 No J.!Dlt§. ($000) IQ.tgl 784 784 784 784 784 40 37 24 5 1 5,682 6,022 3,906 1,100 320 Totals: 107 17,030 GSM GSM GSM GSM GSM PREVIOUSEDITIONSMAY BE USED INTERNAllY UNTil EXHAUSTED 410 1. COMPONENT AIR FORCE I FY 2006 MILITARY CONSTRUCTION PROJECT DATA. 1 2 DATE 3. INSTALLATION AND LOCATION 4. PROJECT TITLE RAP LAKENHEATH, UNITED KINGDOM REPLACEMILITARY FAMILY HOUSING (pHASE 5. PROGRAM ELEMENT 88741 11. REQUIREMENT: 4748 UN 1 3) 6. CATEGORY CODE 711-142 ADEQUATE: 4369 UN 17. PROJECT NUMBER MSET064026 1 8. PROJECT COST ($000) $48,437 SUBSTANDARD: 379 UN PROJECT:ReplaceMilitary Family Housing (CurrentMission). REOUIREMENT:This projectis requiredto provide modemand efficienthousingfor mili~ membersand their dependents stationedatRAP Lakenheath.All units will meetmodemstandardsandareprogrammedin accordancewith the HousingCommunityProfile. This projectis phasethree (3) of a five (5) phasehousing projectto replace606housingunits. The replacementhousingwill providea modemkitchen,laundry room, openplan family andliving rooms,bedrooms,and bath configurations,with ampleinterior and exteriorstorage and a garage.Exteriorparking will be provided for a secondoccupantvehicle andguests.Supportcostsare higherthan normalasthe whole PhaseIII neighborhoodof 408 unitsis replacedandreconfiguredinto Liberty Village, a denserneighborhoodof 606 units to meetcurrentUK communitydesignguidance.Replacement constructionincludesreconfiguringthe neighborhoodto createa senseof communityandincreasedefficiency anddensity.Neighborhoodsupportinfrastructurewill be replacedandupgradedto meetcurrentand future housingrequirements.Pressureratedwaterlines will be installedandattachedto the newbasepressurized system.New sewermainsand pump stationswill be installedto supportthe newhousinglayout plan and connectionsto the basesewermainsand treatmentcenter.Brick pavedroadsanddrivewaysin neighborhood blocks will be substitutedfor stormdrainageto allow stormwaterto soakinto the groundto rechargethe base aquifer,reducingthe needto import waterfrom the localutility. CURRENTSITUATION: This projectreplaces107housingunitsconstructedin the 1950's.These50 plus yearold housesareshowingthe effectsof ageandcontinuousheavyuse.Theyhavehadno majorupgrades since constructionanddo no meetthe needsof today'sfamilies,nor do theyprovide a modemhome environment.Plumbingand electricalsystemsareantiquatedanddo not meetmodembuilding codes. Additionally, the electricalsystemsareundersizedandthe quantityof receptaclesis inadequate.Lighting systemsthroughoutthehousesare inefficient andrequirereplacement. Existinghouseplansdo not meet suitability standards.Threebed unitshave only oneundersizedbathroomper unit anddo not have family rooms.Units haveno coveredentry,inadequatestorage,andno separatelaundryrooms.Kitchensare undersizedand galleyshapedwith old cabinetsand badly worn countertopsandsinks.Flooring throughoutthe houseis outdated. IMPACT IF NOT PROVIDED: Major moraleproblemswill resultif this replacementinitiative is not supported.The housingwill continueto be occupieduntil it becomestotally uninhabitablebecauseadequate andaffordableoff-basehousingis not available.Ifunits arenot replacedthencostlypiecemealrepairswill continuewith no improvementin the living quality. ADDITIONAL: This projectmeetsthecriteria/scopespecifiedin the Air ForceFamily HousingGuide for Planning,Programming,Design,andConstruction.An economicanalysishasbeenpreparedcomparingthe alternativesof new construction,improvement,andstatusquo operation.Basedonthe net presentvaluesand benefit of this respectivealternative,the costto improvethis housingis approximately88%of the replacement cost.Sincethis is replacement housing,therewill be no increasein the studentpopulationor impact on the ability of the local schooldistrictto supportbasedependents. This projectis not eligible for NATO funding. SIOH is 4.0% to fund United Kingdom executionagentsandAir Forceprojectoversight.BaseCivil Engineer: Lt Col DimasalangJunio,(44) 1638-52-2100.FOREIGNCURRENCY:FCF BugetRateUsed: EURO-DOLLAR .8785. DDFORM1391C,DEC99 PREVIOUS EDITIONS MAYBEUSEDINTERNALLY UNTILEXHAUSTED .411 MILITARY FAMILY HOUSING JUSTIFICATION 1. DATE OF REPORT 2. FISCAL YEAR July-04 3. DOD COMPONENT REPORT CONTROL 2006 SYMBOL DD-A&L(AR)1116 4. REPORTING INSTALLATION AIR FORCE a. NAME 5. DATA AS OF b. LOCATION LAKENHEATH RAF Phase 3 UNITED KINGDOM Oct-03 ANALYSIS OF REQUIREMENTS 6. TOTAL PERSONNEL 1. PERMANENT CURRENT AND ASSETS PROJECTED OFFICER (a) E9-E1 (b) E6-E1 (c) TOTAL (d) OFFICER (e) E9-E1 (f) E6-E1 (9) TOTAL (h) 921 823 6,858 8,602 921 823 6,858 8,602 921 823 6,858 8,602 921 823 6,858 8,602 645 692 3,613 4,950 30 31 0 0 30 31 40 0 0 0 24 30 148 202 30 148 621 662 3,465 4,148 662 3,465 4,148 108 681 3,109 5,104 547 546 2,644 3,131 325 267 1,552 2,144 112 267 1,552 1,931 112 267 1,552 1,931 116 821 31 40 STRENGTH PARTY PERSONNEL 8. GROSS FAMILY HOUSING REQUIREMENTS 9. TOTAL UNACCEPTABLY HOUSED (a+b+c) a INVOLUNTARILYSEPARATED b. IN MILITARYHOUSINGTO BE DISPOSED/REPLACED C. UNACCEPTABLYHOUSEDIN COMMUNITY 10. VOLUNTARY SEPARATIONS 11. EFFECTIVE HOUSING REQUIREMENTS 12. HOUSING ASSETS (a + b) a UNDERMILITARYCONTROL (1) HOUSEDIN EXISTINGDOD OWNED/CONTROLLED (2) UNDERCONTRACT/APPROVED I (3) (4) VACANT 0 0 0 INACTIVE 0 0 0 0 383 2,157 2,960 383 2,157 2,960 0 0 0 b. PRIVATEHOUSING (1) ACCEPTABLYHOUSED (2) ACCEPTABLEVACANT RENTAL 13. EFFECTIVE HOUSING DEFICIT 14. PROPOSED PROJECT 30 15. REMARKS DO FORM 15%3, NOV" 412 ," , POST ACQUISITION CONSTRUCTION DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST FY 2006 POSTACOmSITION CONSTRUCTION Program(In Thousands) FY 2006 Program $ 420,203 FY 2005 Program $ 238,353 PYrP:Qse and Scone The Air Force has approximately 90,000 family housing units (includes 42,000 privatized units) for FY 2006. The average age of housing units in the Air Force inventory is over 33 years. Based on recent analysis incorporated into the Air Force Family Housing Master Plan (AF FHMP), in the beginning ofFY 2006 approximately 23,000 of these units now require improvement or renovation to meet contemporary living standardsduring the next decade. Under existing agreements,it is expected the host nations will revitalize 3,000 units leaving 20,000 units for the Air Force to revitalize. Many of these units require major expenditures to repair or replace deteriorated mechanical, electrical, or structural components, and to provide some of the basic modem amenities found in comparable community housing. The Post Acquisition Construction Program provides this neededrevitalization. Each project also includes a significant amount of concurrent maintenance and repair to maximize the project cost effectiveness. The Air Force is the acknowledged DoD leader in developing the "whole house" revitalization concept. Whole house is the combination of neededmaintenance and repair together with improvements to bring the unit to contemporary standards. In addition, we are looking beyond the house to the entire housing area in our requirements plan. Our "whole neighborhood" concept is being refined and includes the development of supporting housing infrastructure requirements, neighborhood vehicular and pedestrian circulation concepts to consider siting, density, landscaping, parking, playgrounds, recreation areasand utilities, in addition to the housing unit itself. A total of three projects are identified as privatization candidates in this submission (Peterson AFB and Air Force Academy, CO, and F.E. Warren AFB, WY). If privatization proves not to be financially feasible or not in the best interest of the Air Force, the Air Force will instead execute an improvement project at such an installation as follows: PetersonAFB, CO Air Force Academy, CO F.E. Warren AFB, WY February 2005 ($15.124M/70 units) ($10.082M/44 units) ($39.936M/103 units) PageNo .413~ DEPARTMENT OF THE AIR FORCE r MILITARY FAMll..Y HOUSING FISCAL YEAR 2006 BUDGET REQUEST Consistentwith Authorizationand AppropriationCommittees'languagein FY 1990,the Air Forceis seekingto maintainfunding in this accountto continuerevitalizing our aginghomes. Consistentwith AppropriationCommittees'languagein FY 1985,the Air Forcehasgathered dataon the postacquisitionconstructionprojectsto detail pastprojectson theseunits and any future work beingprogrammedwithin a threeyearperiod. This information is providedas a part of this submittal. ProgramSummary Authorizationis requestedfor: (1) Variousimprovementsto existingpublic quarters,asdescribedon DD Form 1391. (2) Appropriationof $420,203,000to fund projectsin FY 2006. NOTE: Projectswithin the programare within the statutorylimitation of $50,000per unit adjustedby areacostfactor, exceptasidentified by separateDD Form 1391. February2005 PageNo. 414 1. COMPONENT AIR FORCE 2. DATE FY 2006 MILITARY CONSTRUCTION PROJECT DATA 3. INSTALlATION AND LOCATION 4. PROJECT TITLE VARIOUS AIR FORCEBASES FAMILY HOUSING POSTACQUISITION CONSTRUCTION 5. PROGRAM ELEMENT 6. CATEGORY CODE 88742/31196 7. PROJECT NUMBER 711-000 8. PROJECT COST ($000) 420,203 9. COST ESTIMATE ITEM POST ACQUISITION CONSTRUCTION PROJECTSTO IMPROVE HOUSING UNITS PROJECTSTO PRIVATIZE HOUSING UNITS TOTAL CONTRACT COST TOTAL REQUEST U/M QUANTITY UN UN 2,076 2,253 COST ($000) UNIT COST (355,061) (65,142) 420 203 420'203 , 10. DESCRIPTIONOF PROPOSEDCONSTRUCTION:Includesall work necessaryto revitalize military family housingby providing: air-conditioning,whereauthorized;modemfunctionallayouts;soundproofmg;and utility and site improvements.Energyconservationactionsinclude newand additionalinsulation,stormwindows,solarscreens, and efficient heatingand cooling systems. 11. PROJECT: This requestis for an authorizationand appropriationof $420.203million to accomplishimprovement and privatization in family housing. REQUIREMENT: To revitalize and improvethe livability of older, obsoletefamily housingunits,to conserveenergy in theseolder housingunits, andto bring utility systemsup to currentsafetystandards.Whole-houseimprovements include but are not limited to: kitchenupgrades,bathroomadditions/upgrades, repair/replacement of roofs, upgradeof mechanicaland electricalsystems,replacementof windows,doors,floors, and exterior improvements(patios,fences, storages,etc.) CURRENT SITUATION: The majority of thesefamily housingunits were constructedduring the late 1940's and 1950'susing various designand constructioncriteria, with different typesof material,equipment,and appliances. Many utility and structuralsystemswere constructedduring yearsof plentiful, inexpensiveenergyresources.Insulation, stormwindows and doors,etc., not previouslycosteffective,are now soundinvestment.This programwill extendthe usefullife of many of our older, lessmodemunits by enhancinglivability, functionality,reducingoperationcostsand improving safetystandards. ADDITIONAL: Theseprojectsmeetthe criteria/scopespecifiedin Part II of Military Handbook1190,"Facility Planningand DesignGuide." Energyevaluation/life-cyclecostanalysiswasperformedin supportof theseprojects. The Air Force will improve existing family housing units to the size and floor pattern similar to the local standards and up to the following size: E1-E6: 2 BR (1080 NSF/1340 GSF), 2 BR Modified (1180 NSF/1480 GSF), 3 BR (1310 NSF/1630 GSF), 4 BR (1570 NSF/1950 GSF), 5 BR (1850 NSF/23 00 GSF); E7-E9/01-03: 2 BR (1200 NSF/1490 GSF), 2 BR Modified (1350 NSF/1670 GSF), 3 BR (1500 NSF/1860 GSF),4 BR (1730 NSF/2150 GSF), 5 BR (2020 NSF/2510 GSF); 04-05: 3 BR (1630 NSF/2020 GSF), 4 BR (1860 NSF/2310 GSF); 0-6: 4 BR (2030 NSF/2520 GSF); 0-7: 4 BR (2690 NSF/3330 GSF). DD FORM 1391, DEC 76 ~ r. PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO 415 I 1. COMPONENT AIR FORCE 2. DATE FY 2006 MILITARY CONSTRUCTION 3. INSTALLATION ANDLOCATION VARIOUS AIR FORCEBASES 4. PROJECT TITLE POST ACQUISITION CONSTRUCTION PROJECT DATA 1 5. PROJECT NUMBER 10. Descriptionof work to be accomplished CurrentWorking Estimate ($000) Locationand Project UNITED STATES CALIFORNIA FORT MACARTHUR HOUSING ANNEX WHOLE HOUSE UPGRADE HHEK034017 -Provides "Whole House" renovationof 188housingunits, including six (6) nationalregisteredhistoric units. Includesupgradesto kitchens,bathrooms, mechanicaland electricalsystems.Project includesinfrastructureimprovement work to existing utilities, site work, asphaltshingleroof replacement,stucco crackingrepair, newgaragedoors, waterline replacementdueto foundation settlement,fencing,roadsand sidewalkrepair, utility lighting, and playgrounds. Projectincludesdemolitionof(41) surplushousingunits at Fort MacArthur. (SeparateDD Form1391 attached) -WORK ACCOMPLISHED IN PREVIOUSTHREEYEARS:None -WORK PROGRAMMED FORNEXTTHREEYEARS:None COLORADO AF ACADEMY PRIVATIZE FAMILY HOUSING 19,803 10,082 XQPZ067270 -Convey 1211existingunits and ultimately demolish766units for a privatization end stateatthe USAFA of 445 units with about310 acresof land lease.Without privatization, MILCON cost for this work is $54M for an anticipatedleverageof 12:1 (combinedwith PetersonAFB). Privatizedunits will provide modem interior and exteriorconveniencesand meetcurrentspaceand floor plan requirements. (SeparateDD Form 1391attached) -WORK ACCOMPLISHED IN PREVIOUSTHREEYEARS: MILCON replacement! renovationof92 housingunits in FY 2003. -WORK PROGRAMMED FORNEXTTHREEYEARS: None PETERSONAFB PRIVATIZE FAMIL Y HOUSING TDKA064006 -Convey 493 and construct639 newunits for a privatizationend stateof 1132units supportingPetersonAFB, CheyenneMountain AFS, and SchrieverAFB. Without privatization,MILCON costto improve,replace,and construct1132units is $249M. Combinedwith AF Academy,estimatedleverageis 12:1. The land, approximately 200 acres,supportingthe privatizationproject will be leasedto the developer. The developerwill provide an additional50 plus acresfor someof the new deficit units. (SeparateDD Form 1391attached) -WORK ACCOMPLISHED IN PREVIOUSTHREEYEARS: MILCON whole house renovationof87 units in FY 2003. MILCON constructionof two GOQ'sin FY 2003. Repairhousingelectricaldistribution in FY03-FY04. Repairandreconfigureparking in FY03-FY05. -WORK PROGRAMMED FORNEXTTHREEYEARS: None DDFORM1391c,DEC76 PREVIOUS EDITIONS MAYBEUSEDINTERNALLY 15,124 PAGENO UNTIL EXHAUSTED ,416 1. COMPONENT 2. DATE AIR FORCE FY 2006 MILITARY CONSTRUCTION PROJECT 3. INSTALLATION AND LOCATION VARIOUS AIR FORCE BASES 4. PROJECT TITLE POST ACQUISITION CONSTRUCTION 10. Description DATA 1 S. PROJECT NUMBER of work to be accomplished CUlTent Working Estimate ($000) Location and Project DISTRI~T OF COLUMBIA BOLLING AFB IMPROVE F AMIL Y HOUSING BXUR299 I 18 -Improve 24 GOQs housing units with all necessary amenities and supporting facilities. Project includes interior and exterior modernization, utility upgrade, additions to meet cUlTent standards. Renovates kitchens, bathrooms, and floor 11,090 coverings. Upgrade electrical, plumbing and lighting systems to increase efficiency and improve safety. Includes asbestos & lead-based paint removal. (Separate DD Form 1391 attached) -WORK ACCOMPLISHED IN PREVIOUS THREE YEARS: None -WORK PROGRAMMED FOR NEXT THREE YEARS: None FLORIDA MACDILL AFB IMPROVE FAMILY HOUSING NVZR043712RI -Improve General Officer Quarter (GOQ) units 401, 402, 403, 404 and 405 through whole house (interior and exterior) renovations to bring the units to contemporary standards. Work includes upgrading bathroom and laundry room fixtures and fmishes; repairing or replacing exterior stucco wall finish; 2 246 , replacing windows and frames; replacing exterior door hardware; replacing water heater and HV AC system and its controls; installing electrical service disconnects and smoke detectors; replacing closet shelving; reconfiguring the kitchen eating area and laundry room; upgrading 3 bathrooms; repairing water infiltration problems at chimney and repairing or replacing wood soffit; constructing 2-car garages with bulk storage; and replacing the patio and privacy fences. (Separate DD Form 1391 attached) -WORK ACCOMPLISHED IN PREVIOUS THREE YEARS: None -WORK PROGRAMMED FOR NEXT THREE YEARS: None IDAHO MT HOME AFB IMPROVE FAMILY 4,026 HOUSING QYZH681083 -Upgrade 12 existing two story units through Whole House Renovation. The HCP House Suitability Plan proposes to add a bathroom to the 2nd floor master bedroom, install a larger closet to bedroom #3, enclose the existing laundry room, eliminate the 4th bedroom on the lower floor for the inclusion of a Family Room and relocate the kitchen, living room and dining room arrangement on the lower floor for better efficiency. A new porch with overhang will be added that replicates those on the other renovated units in the subdivision. The existing carport is to be replaced with a combination unit consisting of a single car garage, storage area and trash enclosure at each unit. These 12 units are being downsized from a 4 bedroom unit to a 3 bedroom unit because of their size. Each unit cUlTently contains 1408 NSF and 1769 GSF which is between DO FORM 1391c, DEC 76 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO 417 1. COMPONENT 2. DATE AIR FORCE FY 2006 MILITARY CONSTRUCTION PROJECT DATA 3. INSTALlATION AND LOCATION VARIOUS AIR FORCE BASES 4. PROJECT TITLE POST ACQUISITION CONSTRUCTION 1 5. PROJECT NUMBER 10. Descriptionof work to be accomplished CurrentWorking Estimate ($000) Location and Project IDAHO (Cont.) MT HOME AFB IMPROVE FAMILY HOUSING QYZH681083 the benchmark(1350NSF and 1670GSF)andthe maximumsize(1500 NSF and 1860 GSF) for an improved 3 bedroomSeniorNon-CommissionedOfficer (SNCO)housingunit. (SeparateDD Form 1391 attached) -WORK ACCOMPLISHED IN PREVIOUSlliREE YEARS:None -WORK PROGRAMMED FORNEXTlliREE YEARS: None KANSAS MCCONNELL AFB IMPROVE FAMIL Y HOUSING 4 026 , 699 PRQE069001 -Improves 3 housingunits. Includespavementfor streetsnear westgateand off-streetparking areain this area,electricalservice,communications,mechanical and structuralupgradesto meetcurrentlocal building codecriteria and Stateof Kansasminimumhousingenergycriteria; upgradeskitchens, bathrooms,living areas,providesgarageadditions,additionalclosetstorage capacity,replacementdoorsand molding,replacementof datedlighting fIXtures; constructsfIre protectionenclosuresaroundgasfIred furnacesand hot water heaters;includesasbestos/lead basedpaint abatement,radongas ventilation, providesimproveddriveways;constructsa neighborhoodaccessroad; provides trees for landscapescreening,providesreplacementundergroundelectrical feedSfrom transformersto housingunits,constructsneighborhoodsidewalks, road crossings,and streetlighting. (SeparateDD Form 1391 attached) -WORK ACCOMPLISHED IN PREVIOUSlliREE YEARS:None -WORK PROGRAMMED FORNEXTlliREE YEARS: None MARYLAND ANDREWS AFB IMPROVE FAMIL Y HOUSING 28,216 AJXF064006 -Improve 152 INCO and 26 CGO quarters,with all necessaryamenities and supportingfacilities. Projectincludesinterior and exterior modernization, and utility upgrade.Renovateroof, structural/foundation/exterior walls, structural/otherbuilding elements,mechanical,electrical,general,all kitchen, baths,laundry,housesitework, landscapingand signage.Includesdemolition of 30 surplusunits. (SeparateDD Form 1391attached) -WORK ACCOMPLISHED IN PREVIOUS lliREE YEARS:None -WORK PROGRAMMED FORNEXTlliREE YEARS: None DD FORM 1391c, DEC 76 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO 418 1. COMPONENT 2. DATE AIR FORCE FY 2006 MILITARY CONSTRUCTION PROJECT DATA 3. INSTALLATION AND LOCATION VARIOUS AIR FORCEBASES 4. PROJECT TITLE / POSTACQUISITION CONSTRUCTION 5. PROJECT NUMBER 10. Descriptionof work to be accomplished CurrentWorking Estimate ($000) Locationand Project NORTH CAROLINA POPE AFB IMPROVE FAMILY HOUSING TMKH064002 -Provides generalinterior and exterior modernizationand renovationof 138housingunits. Includesutility upgradesand additionsto meetcurrent standards.Upgradekitchens,bathrooms,and floor coverings,improves floor plans,providesincreasedenergyefficiency, privacy fencing,patios, playgroundsand recreationareas. Replacesexisting overheadelectrical distribution with an undergroundsystemandreplacessewersystem. Constructsan additionalhousingaccessroad and demolishesfour units in way of the road. Includesdemolitionand asbestos/lead-based paint removal. (SeparateDD Form1391 attached) -WORK ACCOMPLISHED IN PREVIOUS THREE YEARS: None -WORK PROGRAMMEDFOR NEXT THREE YEARS: None TENNESSEE ARNOLD AFB IMPROVE FAMIL Y HOUSING ANZY06400 1 -Provide housingandneighborhoodimprovementfor 40 housingunits. Replaceroofs, repairdamageto exterior, convert/constructgarages, add trashenclosures,increaseunit size,upgrademechanicalsystems, and upgradechain-linkto privacy fencing. There are 24 units that requiremaintenanceandrepair only, while 16 unitsrequire maintenance, repair and construction. (SeparateDD Form 1391 attached) -WORK ACCOMPLISHED IN PREVIOUSTHREEYEARS:Mold Remediation 40 units;Guttercaps40units;Maintenance painting7 units;Upgrade playground equipment;Screened-in porches 40 units;PestControl40 units. -WORK PROGRAMMED FORNEXTTHREEYEARS:None WYOMING F E WARREN AFB PRIVATIZE FAMIL Y HOUSING GHLN064000 -Convey 676 existingsingleand multiplex units and construct110 deficit units. Combinedwith prior approved265-unit privatizationproject,this will produce a privatizationendstateof941 units (including 1 GOQ) on approximately400 acresof leasedlands. Without privatization,MILCON cost for this work is $99.5M for an anticipatedleverageof 2.5:1 (by groupingwith otherbasesthe combined leveragewill be greaterthan 3.0:1). Privatizedunits will provide moderninterior and exteriorconveniences and meetcurrentspaceand floor plan requirements. (SeparateDD Form1391 attached) -WORK ACCOMPLISHED IN PREVIOUSTHREEYEARS:None -WORK PROGRAMMEDFOR NEXT THREE YEARS: None DD FORM 1391c, DEC 76 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTILEXHAUSTED -- 16,625 1,930 39,936 PAGE NO 419 ~ 1. COMPONENT 2. DATE AIR FORCE FY 2006 MILITARY CONSTRUCTION PROJECT DATA 3. INSTALLATION AND lOCATION VARIOUS AIR FORCEBASES 1 4. PROJECT TITLE 5. PROJECT NUMBER POSTACQUISITION CONSTRUCTION 10. Descriptionof work to be accomplished CurrentWorking Estimate ($000) Locationand Project OVERSEAS GERMANY RAMSTEIN AB IMPROVE FAMIL Y HOUSING TYFR064009 -Provides generalinterior modernizationand renovationof 16housingunits. Includesutility upgradesand additionsto meetcurrentstandards.Upgrades kitchens,bathrooms,and floor coverings,improvesfloor plans,provides increasedenergyefficiency, privacy fencing,patios,playgroundsand recreationareas. Includesdemolitionand asbestos/lead-based paint removal. (SeparateDD Form 1391 attached) 4519 , -WORK ACCOMPLISHED IN PREVIOUS nIREE YEARS: None -WORK PROGRAMMEDFOR NEXT nIREE YEARS: None JAPAN KADENA AB IMPROVE FAMILY HOUSING LXEZ064152 -Provides generalinterior and exterior modernizationand renovationof 570housingunits. Includesutility upgradesand additionsto meetcurrent standards.Upgradekitchens,bedrooms,bathroomsandfmishes;improves floor plans,provides energyefficiency, fencing,patios,playgroundsand recreationareas.Includesdemolitionand all environmentalremoval/disposal work. Providecoveredgarage(GOQ). Provide handicapimprovementsin the towerincluding emergencypower backup. Convert52 INCO three-bedroom units into two-bedroomunits. Converttwo GOQ 3 BR unitsto 4 BR units. (SeparateDD Form 1391 attached) 107,469 -WORK ACCOMPLISHED IN PREVIOUS nIREE YEARS: None -WORK PROGRAMMEDFOR NEXT nIREE YEARS: None MISA WA AB IMPROVE FAMIL Y HOUSING QKKAO64025 -Provides generalinterior and exterior modernizationand renovationof 281 housingunits. Includesutility upgrades,additionsto meetcurrent standards,force protectionmeasures,site improvement,coveredparking for H-Style units,storagesheds,parking for residents/guests, playground and landscaping.Providespitchedroof, coveredcourtandmud rooms. Replacesfloor heaterswith forced air ceilingmountedheatersto include fan andtemperaturecontroller. Upgradeskitchens,bathrooms,and floor coverings,improvesfloor plans,and install soundinsulationfor Tower (1937) to includereplacingwindowrails and handicapaccessibilityfor 1stand2nd floor. Providesincreasedenergyefficiency, privacyfencing,patiosand recreationareas. Removesasbestosand lead-basedpaint. (SeparateDD Form 1391 attached) 58,046 -WORK ACCOMPLISHED IN PREVIOUS THREEYEARS: None -WORK PROGRAMMEDFOR NEXT THREEYEARS: None DD FORM 1391c, DEC 76 PREVIOUS EDITIONS MAY BE USED INTERNAllY UNTIL EXHAUSTED .-- PAGE NO 420 1. COMPONENT 2. DATE AIR FORCE FY 2006 MILITARY CONSTRUCTION PROJECT DATA 3. INSTALLATION AND lOCATION VARIOUS AIR FORCE BASES 4. PROJECT TITLE POSTACQUISITION CONSTRUCTION 1 5. PROJECT NUMBER 10. Descriptionof work to be accomplished CUlTentWorking Estimate ($000) Locationand Project ! OVERSEAS JAPAN YOKOTA AB IMPROVE FAMIL Y HOUSING ZNRE064301 -Provides generalinterior and exterior modernizationand renovationof 192housingunits including one generalofficer's quarters(GOQ). Includes utility upgradesand additionsto meetcUlTentstandards.Upgradeskitchens, bathrooms,reconfiguresfloor layout, and increasesenergyefficiency. Provides patios,playgrounds,recreationareasandutilities replacement.Includes demolitionand asbestos/lead-based paintremoval. (SeparateDD Form 1391 attached) 54,913 -WORK ACCOMPLISHED IN PREVIOUS THREE YEARS: None -WORK PROGRAMMED FOR NEXT THREEYEARS: None PORTUGAL LAJES FIELD 16,183 IMPROVE FAMIL Y HOUSING MQNA023006 -Provides generalinteriorand exteriorrenovationof 150 housingunits. Includesutility upgradeandadditionsto meetcUlTenthousingstandards. Upgradekitchens,bathrooms,bedroomsand floor coverings,improves floor plans,and providesincreasedenergyefficiency, privacy fencing, patios,playgrounds,and recreationareas. (SeparateDD Form 1391 attached) -WORK ACCOMPLISHED IN PREVIOUS THREE YEARS: Replacedwater distribution, FY03 and FY04. ConstructedBiera Mar InterconnectingRoad,FY03. ReplacedFenceand Gates,FY03 and FY04. Installed Mylar, 300 units,FY03. RenovatedKitchensand Bathrooms (64 units, not included in this scope),FY03. Installed AFN Distribution and TelephoneUpgrade, FY03. Entry Waysand Patios,170units FY03. Landscaping,FY03. ReplacedHeat Pumps, FY02, 300 units. -WORK PROGRAMMEDFOR NEXT THREE YEARS: None SPAIN MORON AB IMPROVE FAMIL Y HOUSING QUUG033002 -Provides generalinterior and exterior modernizationand renovationof 34 housingunits. Includesutility upgradesand additionsto meetcUlTentstandards. Upgradekitchens,bathrooms,floor coverings,improvesfloor plans, family rooms, providesincreasedenergyefficiency, privacy fencing,patios,parking andpavements. Includes demolitionandasbestos/lead-based paintremoval. (SeparateDD Form 1391 attached) 7,128 -WORK ACCOMPLISHED IN PREVIOUS THREE YEARS: None -WORK PROGRAMMED FOR NEXT THREE YEARS: None DD FORM 1391c, DEC 76 PREVIOUS EDITIONS MAY BE USED INTERNAllY UNTil EXHAUSTED PAGE NO 421 1. COMPONENT 2. DATE AIR FORCE FY 2006 MILITARY CONSTRUCTION PROJECT DATA 3. INSTALlATION AND LOCATION VARIOUS AIR FORCEBASES 4. PROJECT TITLE 15. PROJECT NUMBER POST ACQUISITION CONSTRUCTION 1 10. Descriptionof work to be accomplished CurrentWorking Estimate ($000) Locationand Project OVERSEAS TURKEY INCIRLIK AB ADANA IMPROVE FAMILY HOUSING LJYC064003 -Provides generalinterior and exterior modernizationand renovation,and conversion of235 units. Includesupgradeof kitchenand bathrooms,doors,windows, floor and wall fmishes,electrical,HVAC and fIre protectionsystems, improvesfloor plans,providesincreasedenergyefficiency, and upgradespatios, pavements,utility systems,playgroundsand recreationareas. (SeparateDD Form 1391 attached) -WORK ACCOMPLISHED IN PREVIOUS THREE YEARS: FY2003, LJYCO04005,Install Vanity & Shelves,223 UN, $238,000 FY2003, LJYCO04008,RPR PrivacyFences,527 UN, $666,000 FY2003, LJYC034005P1,RPR ReplaceScreenDoors, 75 UN, $75,000 FY2004, LJYC034007,RPR Kitchen Cab/lnstDishwasher& Garbage Disposal,300 UN, $525,000 FY2004, LJYC034005P2,RPR ReplaceScreenDoors, 200 UN, $240,000 FY2005, LJYC034005P3,RPR ReplaceScreenDoors, 300UN, $350,000 FY2005, LJYC044009,RPR PrivacyFences,223 UN, $300,000 -WORK PROGRAMMED FOR NEXT THREE YEARS: None UNITED KINGDOM RAF MILDENHALL IMPROVE FAMIL Y HOUSING QFQE064001 -Provides generalinterior and exteriormodernizationof 10 housingunits. Work to include roof replacements,including underlay,utility upgradesand additionsto meetcurrentstandards;installationof batteryoperatedand additional hard-wiredsmokedetectors;installationof plug-in and hard-wiredcarbonmonoxide detectors;improvementof floor plans; assessment of and any subsequentabatement of asbestosand lead-basedpaint. All work carried out is to comply with currentBase Standards,Host Nation/USAFandNFPA requirements. (SeparateDD Form 1391 attached) -WORK ACCOMPLISHEDIN PREVIOUS THREE YEARS: None -WORK PROGRAMMEDFOR NEXT THREE YEARS: None CLASSIFIED LOCATION IMPROVE INFRASTRUCTURE PAYZ064001 -Improve housingarealandscaping,stormdrainage,waterand electricalsystems. DD FORM 1391c, DEC 76 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED 20,081 2,038 49 PAGE NO 4 22 ii1X,t-~i2 i DEPARTMENT OF THE AIR FORCE Mn.,ITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST A separateDD Fonn 1391follows for eachPostAcquisition Constructionproject which is over$50,000per unit (multiplied by the Area CostFactor). February2005 PageNo. 423 This Page Intentionally Left Blank 424 I 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. CONSTRUCTION PROJECT DATA (compu ter INSTALLATION AND LOCATION 4. FORT MACARTHURFAMILY HOUSING ANNEX, CALIFORNIA 5. PROGRAMELEMENT 6. CATEGORY CODE 88742 7. 711-142 -9- DATE PROJECT TITLE ~ROVE FAMILY HOUSING PROJECT NUMBER 8. PROJECT COST ($000) HHEK034017 19,803 COST ITEM PRIMARY 2. genera ted) UNIT UJM OUANTITY COST FACILITIES LMPROVE FAMILY 13,343 HOUSING UNITS UN 18H 70,971 UN 188 I ( 13,343 SUPPORTINGFACILITIES 4,968 TERMITE PEST CONTROL SEISMIC UPGRADE HISTORIC UNITS 3,000 ( 564) LS INFRASTRUCTURE -FORT INFRASTRUCTURE -PACIFIC CREST INFRASTRUCTURE -PACIFIC HEIGHTS !-m.CARTHUR ( LS 1 DEMOLITION-SURPLUS UNITS ( AREA CONTRACT ( 455) LS ( 538) UN 41 16,195 ( 664) 916 COST 19,226 INSPECTION AND OVERHEAD (3%) 577 -19,803 FACTOR MOST EXPENSIVE 10. (5%) REQUEST COST 1,937) 18,311 SUPERVISION, TOTAL 810) LS SUBTOTAL CONTINGENCY TOTAL ) Description 1 .12 UNIT 316,171 of Proposed Work: Provides "Whole House" renovation of 188 housing units, including six (6) national registered historic units. Includes upgrades to kitchens, bathrooms, mechanical and electrical systems. Project includes infrastructure improvement work to existing utilities, site work, asphalt shingle roof replacement, stucco cracking repair, new garage doors, water line replacement due to foundation settlement, fencing, roads Project includes demolition 11. REQUIREMENT: and sidewalk repair, utility lighting, of (41) surplus housing units at Fort 572 UN ADEQUATE: 350 UN and playgrounds. MacArthur. SUBSTANDARD: 222 UN PROJECT: Improves 3 SNCO (3-BR), 9 JNCO (2-BR), 19 JNCO (3-BR), 15 JNCO (4-BR), 1 Historic GOQ (4-BR), plus 5 Historic SOQs (4-BR) on Fort MacArthur; 45 FGO (4-BR), 11 CGO (4-BR), 61 FGO (3-BR), and 19 CGO (3-BR) at Pacific Crest/Pacific Heights I. Project demolishes 14 JNCO (2-BR), 7 JNCO (3-BR), 8 JNCO (4-BR), 8 CGO (2-BR), and 4 CGO (3-BR) at Fort MacArthur. REQUIREMENT: The existing housing units require upgrading to meet "Whole House" standards to improve units for the next twenty-five years. This project is to comply with the Air Force goal to revitalize all inadequate units by 2007. This is phase two of three phases to provide adequate housing for base personnel. The renovated housing will provide a modern kitchen, living room, family room, bedroom and bath configuration, with ample interior and exterior storage. Project includes infrastructure improvements to utilities, site work, asphalt shingle roof replacement, stucco cracking repair, new garage doors, water line replacement due to foundation settlement, fencing, roads and sidewalk repair, utility lighting, playground and recreation area upgrades, and all DD FORM 1391, DEC 99 Previous editions are obsolete. Page No. 425 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. CONSTRUCTION PROJECT DATA (computer INSTALLATION AND LOCATION PROGRAMELEMENT 88742 6. 4. CATEGORY CODE 7. PROJECT TITLE IMPROVE FAMILY HOUSING PROJECT NUMBER 711-142 landscaping. Additional requirements seismic upgrading of 6 historic units. DATE generated) FORT MACARTHURFAMILY HOUSING ANNEX, CALIFORNIA S. 2. 8. PROJECT COST ($000) HHEK034017 includes termite pest 19,803 control of 188 units and CURRENT SITUATION: This project renovates housing units constructed in the 1980s and seismic upgrading and renovation of 6 historic units (Quarter's # 9A/B, 10A/B & 11A/B). These historic units were constructed in 1918 and have been identified by the US Army Corps of Engineers (CoE) as requiring seismic upgrading per the Rapid Seismic Evaluation of Buildings final report dated July 1996. These housing units have had no major upgrades since construction and do not meet the needs of today's families, nor do they provide a modern home environment. The roof system is in poor condition, including the asphalt shingles (passed their 15-year life expectancy) and the gutter/downspouts (heavily corroded). The exterior walls are worn, faded, and show signs of settlement cracks and the windows are in need of replacement. The mechanical systems are in deteriorated condition, with the water heater and furnaces in poor condition and have passed their life expectancy. The electrical system does not meet current building code and is in need of upgrade, with missing ground fault interrupter receptacles and hardwired smoke and carbon monoxide detectors. Kitchens have little storage and counter space, with antiquated cabinets and badly worn countertops. Vinyl flooring throughout the houses are badly marred and in need of replacement. Lighting fixtures are outdated and energy inefficient. IMPACT IF NOT PROVIDED: The existing housing units will continue to degrade and deteriorate with no other long range program to support this vital housing area for the men and women serving at Los Angeles Air Force Base. Failure to provide these improvements at Fort MacArthur, Pacific Crest, and Pacific Heights I will cause a severe decrease in morale of the personnel, and will adversely impact the retention rate of these vi tal Air Force members. WORKACCOMPLISHED IN PREVIOUS THREE YEARS: WORK PROGRAMMED FOR NEXT THREE YEARS: None. None. ADDITIONAL: An economic analysis has been prepared comparing the alternatives of new construction, improvement, and status quo operation. Based on the net present values and benefit of this respective alternative, improvement was found to be the most cost effective over the life of the project. The cost to improve this housing is 30% of replacement cost for Fort MacArthur units, 19% of replacement cost for Pacific Crest units, and 20% of replacement cost for Pacific Heights I units. Most expensive unit identified as Quarters 11A LOS (GOQ-4BR) with a cost to improve at 74% of replacement cost (National Registered Historic Unit). Base Civil Engineer: Lt Col Sherry M. Bunch, DD FORM 1391, DEC 99 Previous editions (310) 363-0287 are obsolete. Page No. 426 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. CONSTRUCTIONPROJECT DATA (computer INSTALLATION AND LOCATION 4. USAF ACADEMY, COLORADO 5. PROGRAMELEMENT 6. 88742 7. FAMILY HOUSING PROJECT NUMBER 711-111 Q DATE PROJECT TITLE PRIVATIZE CATEGORY CODE 2. generated) 8. PROJECT COST ($000) XQPZ067270 10,082 ~n.c:T UNIT ITEM COST U 1M QUANTITY PRIMARY~CILITIES 10,082 PRIVATIZE FAMILY HOUSING UN 445 22,656 ( 10,082 ) SUPPORTINGFACILITIES o SUBTOTAL 10,082 TOTAL CONTRACT COST 10,082 TOTAL REQUEST 10,082 AREA COST FACTOR 1.11 10. Description of Proposed Work: Convey 1211 existing units and ultimately demolish 766 units for a privatization end state at the USAFA of 445 units including 3 GOQs with about 580 acres of land lease. Without privatization, MILCON cost for this work is $54M for an anticipated leverage of 12: 1 (combining with Peterson AFB). Privatized units will provide modern interior and exterior conveniences and meet current space and floor plan 11. REQUIREMENT: 445UN PROJECT: requirements. Privatize Military ADEQUATE: 92UN Family Housing (Current SUBSTAND1IRD: 353UN Mission) REQUIREMENT: This project is required to provide 445 modern and efficient housing units for military members and their dependents stationed at the Academy. 353 units will be upgraded or newly built to meet current safety codes and to provide a comfortable and appealing living environment comparable to the off -base civilian community. All units will meet "whole house" standards and are programmed in accordance with the Housing Community Profile. Renovated and newly built housing will provide a modern kitchen, liv~ng room, family room, bedroom and bath configuration, with ample interior and exterior storage. Living units will be expanded to meet current space authorizations. Single/two car garages and off street parking will be provided where deficient. Neighborhood improvements are required and will include landscaping, fences, playgrounds and recreations areas. Additionally, 766 units identified as surplus must be demolished. This project will be combined with Peterson AFB, Cheyene Mountain AFS, and Schriver AFB for a joint Colorado Springs privatization housing project. The entire project will have a privatization housing end state of 1,577 units (445 units at USAFA and 1,132 units at Peterson AFB and Schriever AFB). CURRENT SITUATION: Air Force housing in the Colorado Springs area, was constructed in the late 1950's and 1960's. These 50-year old houses require major renovation and repair to upgrade to current standards and correct deterioration resulting from age. The housing units have had no major repair and upgrades since construction and do not meet the needs of today's families and do not provide a modern home environment. Ki tchen and bathroom cabinets, plumbing, lighting and fixtures are obsolete and deteriorated. The housing units have inadequate space in the living, dining, family rooms and bedrooms. Windows, siding and insulation require upgrading. Roofs need to be replaced. Utility infrastructure, such as electrical and sanitary sewer systems, need to be upgraded and replaced. Storage, patios, and backyard privacy need to be enlarged DD FORM 1391, DEC 99 Previous editions are obsolete. cO" Page No. ~ ", ~~iI - 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. CONSTRUCTION PROJECT DATA (computer INSTALLATION AND LOCATION PROGRAMELEMENT 88742 6. 4. PROJECT TITLE PRIVATIZE CATEGORYCODE 7. FAMILY HOUSING PROJECT NUMBER 711-111 8. PROJECT COST ($000) XQPZ067270 and updated. Carports need to be rep1aced with garages. systems, fences and recreation areas for housing residents 10,082 Landscaping, are deficient. IMPACT IF NOT PROVIDED: Units wi11 continue to deteriorate increasing operations, maintenance and repair costs to the to residents. Without this project, repair of these units piecemea1 fashion with 1itt1e or no improvement in 1iving Ana1ysis shows an on-base housing surp1us of 766 units. WORKACCOMPLISHED IN PREVIOUS THREE YEARS: units in FY 2003. WORK PROGRAMMEDFOR NEXT THREE YEARS: DATE generated) USAF ACADEMY, COLORADO 5. 2. sprink1er rapidly, resu1ting in Government and inconvenience wi11 continue in a cost1y, qua1ity. Housing MILCON rep1acement/renovation Market of 92 housing None. ADDITIONAL: This project contains no resa1e merchandise, services or commercia1 recreation operations or activities IAW with the SAF/MI Housing Privatization Interim Operating Instructions memo dated 2 March 1999 and AF/IL memo regarding coordination with AAFES, DeCA, and MWRBoard dated 19 March 1999. A viab1e pro forma and a pre1iminary economic ana1ysis wi11 be deve1oped and provided during the concept approva1 process, and a certified economic ana1ysis wi11 be accomp1ished prior to comp1etion of the so1icitation process. In the event the privatization is financia11y infeasib1e, the Air Force wi11 execute an improvement project for 44 units at the programmed amount requested by this project IAW the insta11ation's Housing Community Profi1e. Base Civi1 Engineer: Co1 Thomas Hayden, (719) 333-2660. DD FORM 1391, DEC 99 Previous editions are obso1ete. Page No. 428 c i..i ; 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. CONSTRUCTION PROJECT DATA (computer INSTALLATION AND LOCATION 4. PETERSON AIR FORCE BASE, COLORADO 5. PROGRAMELEMENT 6. CATEGORY CODE 88742 2. PROJECT TITLE PRIVATIZE 7. FAMILY HOUSING PROJECT NUMBER 711- 8. PROJECT COST ($000) TDKA064006 15,124 UNIT ITEM U M COST UANTITY PRIMARY~CILITIES PRI~TIZE DATE generated) 15,124 FAMcrLYHOUSING ASBESTOS/LEADBASEDPAINT SURVEY UN 1132 UN 331 13,263 ( 15,014 ) 332 ( 110) SUPPORTINGFACILITIES 0 SUBTOTAL 15,124 TOTAL CONTRACTCOST 15,124 TOTAL REQUEST 15,124 AREA COST FACTOR 1 .11 10. Description of Proposed Work: Convey 493 and construct 639 new units for a privatization end state of 1132 units (including 22 GOQs) supporting Peterson AFB, Cheyenne Mountain AFS, and Schriever AFB. Without privatization, MILCON cost to improve, replace, and construct 1132 units is $249M. Combined with AF Academy, estimated leverage is 12:1. The land, approximately 200 acres, supporting the privatization project will be leased to the developer. The developer will provide an addi tional 50 plus acres for some of the new deficit units. !~'" 11. ~:.,: PROJECT: REQUIREMENT: 1,132UN ~, ~;i, ~:': :~ ", ~ REQUIREMENT: This project is required to provide 1132 modern and efficient housing units for military members and their dependents stationed at Peterson AFB, Cheyenne Mountain AFS, and Schriever AFB. The project will improve 334 units to meet current life safety codes and to provide a comfortable and appealing living environment comparable to off-base civilian community. Project will also replace 70 inadequate units and construct 639 new units to reduce deficit. All units will meet whole house standards and are programmed in accordance with the Housing Community Profile. Renovated and newly built housing will provide a modern kitchen, living room, family room, bedroom, and bath configuration, with ample interior and exterior storage. Living units will be expanded to meet current space authorizations. This project will be combined with the United States Air Force Academy for a joint Colorado Springs privatization housing project. The entire project will have a privatization housing end state of 1577 units (445 units at USAFA and 1132 units at Peterson AFB and Schriever AFB) . Privatize Peterson ADEQUATE: 89UN Military Family Housing SUBSTANDARD: 404UN (Current Mission) CURRENT SITUATION: This project upgrades and modernizes Air Force housing in the Colorado Springs area, which was constructed in the late 1950's and 1960's. These 50year old houses require major renovation and repair to upgrade to current standards and correct deterioration resulting from age. The housing units have had no major repair and upgrades since construction and do not meet the needs of today' s families and do not provide a modern home environment. Kitchen and bathroom cabinets, plumbing, lighting, and fixtures are obsolete and deteriorated. The housing units have inadequate space in the living, dining and family rooms, and bedrooms. Windows, siding, and insulation require replacement. Roofs need to be replaced. Utility infrastructure, such as electrical and sanitary sewer systems, need to be upgraded and replaced. Storage, DD FORM ~39~, DEC 99 Previous editions are obsolete. Page No. 429 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. CONSTRUCTIONPROJECT DATA (computer INSTALLATION AND LOCATION 4. PETERSONAIR FORCE BASE, COLORADO 5. PROGRAMELEMENT 6. 88742 patios, replaced deficient. 7. 711-142 Units will FAMILY HOUSING PROJECT NUMBER 8. TDKA064006 and backyard privacy need to be enlarged with garages. Landscaping and recreation IMPACT IF NOT PROVIDED: continue DATE PROJECT TITLE PRIVATIZE CATEGORYCODE 2. generated) and updated. areas for to deteriorate PROJECT COST ($000) 15.124 Carports need to be housing residents are rapidly, resulting in increasing operations, maintenance, and repair costs. Families will continue to live inadequa te housing units that do not meet the needs of today' s military families. Additionally, Schriever AFB and Peterson AFB military families will need to continue commute over one hour to and from their home and duty station. Housing Requirements Market Analysis shows an on-base deficit of 639 units. WORK ACCOMPLISHED IN PREVIOUS THREE YEARS: MILCON whole house renovation of 87 units FY 2003. MILCON construction of two GOQ's in FY 2003. Repair housing electrical distribution in FY03-FY04. Repair and reconfigure parking in FY03-FY05. WORK PROGRAMMEDFOR NEXT THREE YEARS: in to and in None. ADDITIONAL: This project contains no resale merchandise, services, or commercial recreation operations or activities lAW with the SAF/MI Housing Privatization Interim Operating Instructions memo dated 2 March 1999 and AF/IL memo regarding coordination with AAFES, DeCA, and MWRBoard dated 19 March 1999. A viable pro forma and a preliminary economic analysis will be developed and provided during the concept approval process, and a certified economic analysis will be accomplished prior to completion of the solicitation process. In the event the privatization is financially infeasible, the Air Force will execute an improvement project for 70 JNCO town home units at the programmed installation's McCormick, amount requested by this privatization project in accordance with the Housing Community Profile. Base Civil Engineer: Lt Col David B. (719) 556-7633. DD FORM 1391, DEC 99 Previous editions are obsolete. Page No. 430 1. COMPONENT AIR 3. FY 2006 FORCE BOLLING CONSTRUCTION (computer INSTALLATION s. MILITARY AIR PROGRAM ELEMENT 4. DISTRICT 6. OF COLUMBIA CATEGORY CODE 88742 DATA 2. PROJECT ~ROVE 7. PROJECT 711-144 TITLE FAMILY NUMBER HOUSING 8. PROJECT BXUR299118 Q DATE generated) AND LOCATION FORCE BASE, PROJECT COST ($000) 11,090 ,..n~'" UNIT ITEM U/M COST OUANTITY PRIMARYFACILITIES 10,163 IMPROVE 24 GOQs & GARAGES UN 24 423,470 1 I ( 10,163 SUPPORTINGFACILITIES ASBESTOS & LEAD-BASE PAINT REMOVAL UN 24 3,800 ( SUBTOTAL 91) 10,254 CONTINGENCY (5%) 513 TOTAL CONTRACT COST 10,767 SUPERVISION, INSPECTIONAND OVERHEAD (3%) 323 TOTAL REQUEST 11,090 AREA COST FACTOR . 1 .02 EFFECTIVE STATUTORY LIMIT 10. ) 91 Description of o Proposed Work: Improve 24 GOQs housing units with all necessary amenities and supporting facilities. Project includes interior and exterior modernization, utility upgrade, additions to meet current standards. Renovates kitchens, bathrooms, and floor coverings. Upgrade electrical, plumbing and lighting systems to increase efficiency and improve safety. Includes asbestos & lead-based paint removal. 11. REQUIREMENT: PROJECT: bring up and Air Force and the 66 year The Improvement them repairs 968 to on current improves old GOQ units current 24 GOQ units. This contemporary and is are and not of project meet obsolete and Air are the Force not to project with and functional. for contemporary All major GOQs to project guidance Housing Plan 24 This follows General 460 modernize standards. accordance with current required living This in consistant SUBSTANDARD: is units. programmed Analysis, do systems Force efficiency Plan, Market 508 Air energy GOQ Master Housing ADEQUATE: also in Community Bolling the Plan, AFB. living The standards. systems are from the original construction. The plaster wall and ceiling systems are failing. The electrical and mechanical systems are from original construction. The minor modifications to the systems have left them in a hodge podge state. Kitchens require alteration to provide ample space for kitchen work centers. Repair/restoration is needed on fireplaces, floors, door trims, and stair rails. REQUIREMENT: Officers standards GOQ Master bedroom, Project and their and are Plan. and bath is required dependents at programmed in The will design configuration, to provide Bolling accordance All w~th provide with modern AFB. the a modern ample interior and units efficient will Hous~ng kitchen, and housing meet modern Commun~ty liv~ng exterior for Prof~le room, storage. General housing and family Un~ts be provided with a two car garage, 350 SF patio, and exter~or park~ng for other vehicles. Adequate ~nfrastructure support for roads and util~ties shall also be prov~ded. This ~s one phase of a multiphase initiative to renovate 37 GOQ hous~ng for Bolling DD FORM 1391, AFB. Housing DEC 99 Commun~ty Plan Prev~ous and editions Housing Market are obsolete. Analys~s are the room, elements Page No. will . units of the 431 -- 1. AIR 3. COMPONENT FY 2006 MILITARY FORCE PROGRAMELEMENT 6. 4. 88742 General Plan OF COLUMBIA CATEGORY CODE for Bolling PROJECT TITLE 7. PROJECT NUMBER 8. PROJECT COST ($000) BXUR299118 AFB, and are the DATE IMPROVE FAMILY HOUSING 711-144 CURRENTSITUATION: show the effects of 2. generated) INSTALLATION AND LOCATION BOLLING AIR FORCE BASE, DISTRICT 5. CONSTRUCTION PROJECT DATA (computer basis for this 11,090 project. These existing housing units were constructed in the 1930s. age and heavy use. They have had no major upgrades since They construction, and they do not meet the needs of today' s families, nor do they provide a modern home environment. Roof, wall, foundations and exterior pavements require major repair or replacement due to age. Plumbing and electrical systems are antiquated and do not meet current standards for efficiency and safety. Interiors are generally inadequate by modern criteria. Bathrooms are small and bedrooms lack adequate closet space. Kitchens have insufficient cabinets, storage and counter space. Lighting, heating and air conditioning systems require upgrade and replacement. IMPACT IF NOT PROVIDED: increasing residents. Units will operations, maintenance Without this project, continue to deteriorate piecemeal fashion with little or no improvement in WORKACCOMPLISHED IN PREVIOUS THREE YEARS: None WORK PROGRAlon-1ED FOR NEXT THREE YEARS: ADDITIONAL: Project includes site rapidly, living DEC 99 in None preparation, Previous to quality. two car garages, energy conserving features, parking, exterior patios and privacy infrastructure of roads, utilities, recreation areas, landscaping, demolition. Demolition work will include demolition of pavilions Civil Engineer: Lt Col Dennis Janinski, (202) 767-5565. DD FORM 1391, resulting and repair to the government and inconvenience repair of these units will continue in a costly editions are obsolete. air conditioning, fencing, support asbestos removal, and and carports. Base Page No. 432 I 1. COMPONENT AIR 3. MILITARY CONSTRUCTION (computer INSTALLATION MACDILL 5. FY 2006 FORCE AIR AND LOCATION FORCE BASE, PROGRAM ELEMENT 4. FLORIDA 6. 7. 2. DATE TITLE FAMILY PROJECT NUMBER 711-142 9 DATA PROJECT IMPROVE CATEGORY CODE 88742 PROJECT generated) HOUSING, 8. PHASE G PROJECT NVZR043712Rl COST ($000) 2,246 ~n~T UNIT ITEM COST U 1M OUANTITY WHOLE HOUSE RENOVATIONS 2,077 IMPROVE FAMILY HOUSING UN 5 415,349 ( 2,077 SUPPORTINGFACILITIES 0 SUBTOTAL 2,077 CONTINGENCY (5 %) 104 TOTAL CONTRACT COST SUPERVISION, 2,181 INSPECTION AND OVERHEAD (3 %) 65 TOTAL REQUEST 2,246 AREA COST FACTOR .89 MOST EXPENSIVE UNIT 10. 402, the 495,000 Description of Proposed Work: 403, 404 and 405 through whole units ) to contemporary Improve General house (interior standards. Work Officer Quarter (GOQ) units 401, and exterior) renovations to bring includes upgrading bathroom and laundry room fixtures and finishes; repairing or replacing exterior stucco wall finish; replacing windows and frames; replacing exterior door hardware; replacing water heater and HVAC system and its controls; installing electrical service disconnects and smoke detectors; replacing closet shelving; reconfiguring the kitchen eating area and laundry room; upgrading 3 bathrooms; repairing water replacing wood soffit; constructing patio and privacy fences. 11. REQUIREMENT: infiltration 2-car 485 UN problems garages with ADEQUATE: at bulk chimney storage; 301 UN and repairing and replacing SUBSTANDARD: or the 184 UN PROJECT: Improves 5 GOQs through whole-house renovations. Units are located at 2106, 2112, 2132 and 2136 Staff Circle and 7706 Bayshore Boulevard, MacDill AFB, Florida. REQUIREMENT: Deputy Provide Commander, Commander, United Mobility Wing. upgrade outdated Additionally, living States Repairs will comply environment of infrastructure commensurate Central Special Command Operations are required to systems in water damage; life safety codes; to the off-base comparable These historic places. are necessary. units, and Primary and with air provide civilian in the rapidly secondary position of Commander (USSOCOM) accordance built to the deficiencies prevent originally Repairs with (USCENTCOM), Command correct repair with CURRENT SITUATION: register quarters Stated infrastructure it efficiency; adequate United and in Commander and Commander, the floor GOQ Master and Deputy 6th plan Air and to Plan. infiltration, increase a comfortable and energy appealing environment. 1941, are decaying electric, eligible for the national and outdated telephone, cable, and TV lines are fed overhead and should be buried due to high windstorms in the local area. Each facility needs to be gutted back to cinder block construction. Units shall then have the following improvements: new insulation installed; electrical wiring (including GFCI breakers/receptacles as required); alarm (fire, security, and carbon monoxide sensors) wiring; phone lines; cable lines; plumbing; gas lines; interior duct work; DD FORM 1391, DEC 99 Previous editions are obsolete. Page No. ~:J:I 1. AIR 3. COMPONENT FY 2006 MILITARY FORCE CONSTRUCTIONPROJECT DATA (computer INSTALLATION AND LOCATION PROGRAMELEMENT 6. 88742 DATE generated) 4. MA.CDILL AIR FORCE BASE, FLORIDA 5. 2. PROJECT TITLE IMPROVE FAMILY HOUSING, PHASE G CATEGORYCODE 7. 711-142 PROJECT NUMBER 8. NVZR043712R1 PROJECT COST ($000) 2,246 interior walls; carpet; ceilings; mylar windows; sliding glass doors; exterior door hardware; and interior painting. The exterior stucco wall finish is cracked and flashings have deteriorated. The wooden soffits and fascia are rotted. Existing woodwork throughout each unit has accumulated many layers of lead-based paint. The mechanical systems require continual maintenance and do not meet Federal efficiency standards due to the original duplex configuration of exterior placement of ducts (with no insulation), bulkheads and condensing units. The wooden privacy fence has deteriorated and doesn't match the architectural style of home. Many outlets are not grounded properly and do not meet current building code requirements. The metal roofed carports detract from the homes appearance and need to be replaced with garages. IMPACT IF NOT PROVIDED: Aging systems that have already cycle will require increased maintenance attention and discomfort. Unit accommodations will continue to lack that are expected and commensurate to the positions of efficiency of these units will continue to degrade and safety codes. WORKACCOMPLISHED IN PREVIOUS THREE YEARS: WORK PROGRAMMED FOR NEXT THREE YEARS: ADDITIONAL: An economic analysis exceeded their useful life create occupant inconvenience and the distinctiveness and amenities these Commanders. The energy they will not meet fire and None None has been prepared comparing the alternatives of new construction, improvement, and status quo operation. Based on the net present values and benefits of the respective alternatives, improvement was found to be the most cost effective over the life of the project. The cost to improve the units ranges from 88% to 109% of the replacement cost. However, because they are Historic, the GOQ Master Plan and Individual Facility Profiles recommend improvement. Supervision and Inspection will be provided by Chugach Management Services Inc., resulting in an SIOH of 3%. Base Civil Engineer: Lt Col Anthony A. Foti, (813) 828-3577 DD FORM 1391, DEC 99 Previous editions are obsolete. Page No. '"434~ 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. (computer INSTALLATION MOUNTAIN s. CONSTRUCTION 4. FORCE BASE, PROGRAM E~ 6. IDAHO 88742 PROJECT IMPROVE CATEGORY CODE DATA 2. DATE generated) AND LOCATION HOME AIR PROJECT 7. TITLE FAMILY PROJECT NUMBER 711-142 HOUSING 8. PROJECT COST QYZH681083 ($000) 4,026 -9.-~ UNIT ITEM COST U1M _QUANTITY PRIMARYEACILITIES FAM HSG 1,412 (DWELLINGS) APPR FY06 UN 12 90,345 UN 12 27,289 ( 1,084 1 HOUSINGSPECIAL CONSTRUCTION SUPPORTINGFACILITIES SITE 2,215 LS ( 733) LANDSCAPE LS ( 327) UTILITY LS ( 329) IMPROVEMENT ( 251) M1I.INS STREET LS RECREATION EA 12 500 ( 6) ENVIRONMENTAL LS ( 110) OTHER SITE WORK LS ( 175) ROCK EXCAVATION/REl.KJV:AL LS ( 242) DEMOLITION EA 12 3,580 ( 43) SUBTOTAL 3,627 CONTINGENCY (5%) 181 TOTAL CONTRACT COST SUPERVISION, 3,808 INSPECTION AND OVERHEAD (5.7 %) 217 TOTAL REQUEST 4,026 AREA COST EACTOR 1 .11 MOST EXPENSIVE UNIT 10. Description Renovation. floor master room floor for those on bedroom, install 4th kitchen, Plan units in to the lower and dining with to a 3 bedroom 1769 (1500 NSF housing 11. unit GSF which and between 1860 GSF) unit.] Special REQUIREMENT: PROJECT: because is Improve of the for their size. an improved construction Housing. the the inclusion existing Wn?le to the 2nd existing of on the be added that The unit NSF and bulk ADEQUATE: Family enclose arrangement will through a bathroom a family lower replicates carport is to be a single car garage, storage area and are being downsized from a 4 bedroom unit 3 bedroom includes 1,324UN Military (1350 units add for room overhang Each benchmark floor subdivision. replaced with a combination unit consisting of trash enclosure at each unit. These 12 units story to bedroom #3, on the two proposes room A new porch renovated 12 existing closet bedroom living efficiency. other upgrade Suitability a larger the the better Work: HCP House eliminate relocate the Proposed The room, and 97,600 of House laundry ) ( 327) currently contains 1670 and Senior GSF) Non-Commissioned storage areas, 661UN This the patios, 1408 12 SNCO units. size Officer (SNCO) decks SUBSTANDARD: upgrades NSF and maximum etc. 663UN (Current Mission) REQUIREMENT: DD FORM 1391, This project DEC 99 is required Previous to provide editions modern and are obsolete. efficient housing for Page No. 435 -- 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. CONSTRUCTION PROJECT DATA (compu ter INSTALLATION AND LOCATION 4. MOUNTAIN HOME AIR FORCE BASE, IDAHO 5. PROGRAMELEMENT 6. 7. PROJECT TITLE PROJECT NUMBER 711-142 8. PROJECT COST ($000) QYZH681083 military members and their dependents stationed All units will meet modern Whole House standards Housing Community living environment DATE IMPROVE FAMILY HOUSING CATEGORYCODE 88742 2. genera ted) Profile. Renovate housing comparable to the off-base 4,026 at Mountain Home Air Force Base (MHAFB). and programming in accordance with the to provide civilian a comfortable and appealing community. Provide modern kitchens, living rooms, dining rooms, bath configurations and three bedrooms as identified in the most recent Housing Community Profile. Construct ample interior and exterior storage areas, enclosed garages and a trash containment area. Upgrade the basic electrical systems for these units starting with the service disconnect and the electrical panel. Perform lead and asbestos abatement as required. CURRENT SITUATION: The current two story housing units were constructed in 1948 and are structurally sound but have never been Whole House renovated. The other 48 units in this subdivision were renovated in 1997. These 12 units are in unsatisfactory condition due to the affects of age and heavy use. Efficiency and safety deficiencies include infrastructure electrical, plumbing and ventilation systems; antiquated kitchens and bathrooms; lead paint and asbestos containing materials; deteriorating kitchen/bathroom cabinets, sinks and inadequate counter space. The existing electrical system and its components have exceeded normal life expectancy plus the wiring is not grounded per current code. The exterior brick veneer needs to be repointed (refill the masonry joints). The existing units have a single vehicle carport of minimum size. Storage is located in a small damp, musty basement with the furnaces and hot water heaters. Inadequate trash IMPACT IF enclosure NOT PROVIDED: can not Air Force hold two 30 gallon families will housing conditions. As the existing units increase. With antiquated living conditions main tenance/ repair, low morale and retention are permitted to continue. ADDITIONAL: An economical analysis Engineer DD FORM 1391, Commander is Lt. that DEC 99 Col. Previous in unsatisfactory None compared cost. This renovated housing will impact the local school district. contract management and supervision Squadron live None status-quo alternatives toward providing the results found that Whole House renovation is Eagle View units over the life of the project. replacement negatively to provide to age, the maintenance costs on these units and constant attention to problems can be expected if such conditions WORK ACCOMPLISHED IN PREVIOUS THREE YEARS: WORK PROGRAMMEDFOR NEXT THREE YEARS: containers. continue Scott editions all construction; renovation and best quality military family housing. The the most cost effective option for these 12 The improvement cost is 66% of the not increase the student population The Corps of Engineers will be the of this project. The 366th Civil R. Jarvis, (208) or agency 828-6353. are obsolete. Page No. -436 "'"'~." ",, 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. CONSTRUCTION PROJECT DATA (computer INSTALLATION AND LOCATION PROGRAMELEMENT 6. 4. 7. PROJECT NUMBER 711-143 9 PROJECT TITLE IMPROVE FAMILY HOUSING CATEGORY CODE 88742 8. PROJECT COST ($000) PRQE069001 699 co.c;or UNIT ITEM PRIMARY DATE generated) MCCONNELL AIR FORCE BASE, KANSAS 5. 2. U/M COST nUANTITY FACILITIES 239 FAM HSG APPR 50-69 UN 3 79,605 ( 239) SUPPORTINGFACILITIES 391 PAVEMENTS LS ( 177) SIDEWALKS LS ( 10) LANDSCAPING LS ( 12) STORM/SANITARY LS ( 28) LS ( 30) STREETLIGHTING LS ( 34) ELECTRICAL LS ( 89) LS ( 11) 2-CAR DRAINAGE UPGRADE GARAGES UPGRADE COMMUNICATIONS SUBTOTAL 629 CONTINGENCY TOTAL ( 5 %) CONTRACT SUPERVISION, TOTAL AREA 31 COST 661 INSPECTION AND OVERHEAD (5.7 ') 38 REQUEST COST 699 FACTOR MOST EXPENSIVE .98 UNIT 98,000 10. Description of Proposed Work: Improves 3 housing units. Inc~udes pavement for streets near west gate and off-street parking in this area, e~ectrica~ service, communications, mechanica~ and structura~ upgrades to meet current ~oca~ bui~ding code crJ." terJ. " a and S r ate of V-'n "'a "' -i nim,.m h o"ei nrT o.,or ~.., ...r; "or.; a ,...~r~"'o~ 1..'; 1..o- S , -L~ --~---~ ---~---~ -r-~ bathrooms, ~iving areas, provides garage additions, additiona~ c~oset storage capacity, rep~acement doors and mo~ding, rep~acement of dated ~ighting fixtures; constructed fire protection enc~osures around gas fired furnaces and hot water heaters; inc~udes asbestos/~ead based paint abatement, radon gas venti~ation, provides improved driveways; constructs a neighborhood access road; provides trees for ~andscape screening, provides rep~acement underground e~ectrica~ feeds from transformers to housing units, constructs neighborhood sidewa~ks, road crossings, and street lighting. 11. REQUIREMENT: 189UN ADEQUATE: 186UN SUBSTANDARD: 3UN PROJECT: Improve Mi~itary Fami~y Housing. Work includes 3 Senior Officer units, 3001 Winfie~d, 3002 Winfie~d, and 3003 Winfield and infrastructure Winfield and improves neighborhoods. (Current Mission) four-bedroom ~ocated in the REQUIREMENT: This project is required to provide modern and efficient housing for senior officers and their dependents at McConne~~ Air Force Base. The housing must be upgraded to meet current ~ife safety codes and to provide a comfortable and appea~ing living environment comparab~e to housing in the off-base civi~ian community. Al~ units must meet who~e house standards in accordance with the Housing Community Plan. Houses DD FORM 1391, DEC 99 Previous editions are obso~ete. Page No. ::\ ,,-' 437 -"- 1. AIR 3. COMPONENT FY 2006 MILITARY FORCE CONSTRUCTION PROJECT DATA (computer INSTALLATION AND LOCATION PROGRAMELEMENT 6. 88742 DATE generated) 4. MCCONNELL AIR FORCE BASE, KANSAS 5. 2. PROJECT TITLE IMPROVE FAMILY HOUSING CATEGORY CODE 7. PROJECT NUMBER 711-143 8. PROJECT COST ($000) PRQE069001 699 . require modern kitchens, efficient floor plans, bathrooms, and living areas with ample interior and exterior storage. Two vehicle capacity garages and off street parking are needed. Asbestos containing materials, lead based paint and domestic water lead content and radon remediation is likely. Neighborhood suitability requires landscaping, visual screening of transformers, landscape enhancement of common areas Neighborhood safety requires underground housing electrical located at a safe depth, adequate sidewalks, safe crossings Storm drainage adequacy and sanitary system inspection are problems need to be corrected. and streets. feeds that are protected and across high traffic streets. needed, inflow, infiltration CURRENT SITUATION: Current Senior Officer Housing quarters were constructed in 1956. Though the houses are structurally sound, renovation is needed to ensure modern and safe living environment for Air Force members and their families. Existing air conditioning and heating systems are not energy efficient and do not adequately heat and cool some living areas within the houses. The existing electrical system consists of inadequate electrical panels, electrical wiring that does not meet modern grounding standards and is unsafe. Bathrooms, kitchens and living areas contain fixtures, door trim, and other accouterments that are mismatched or out of date. Carports are currently available to the residents in lieu of modern two vehicle garages, which is the minimum standard for all new housing construction in the local off-base area. Off-street visitor parking is a necessity in the SOQ area, but is not available to support team building functions. Neighborhoods are stark without appropriately landscaped streets and common areas with aesthetic screening of transformers, tree lined streets, safe cross walks. Existing neighborhood safety concerns include existing underground electrical feeds to the housing units that are of insufficient depth and lack of sufficient cross walks and sidewalks along the streets. Storm and sewer drainage systems require study and repairs as needed. IMPACT IF NOT PROVIDED: disrepair resulting inconvenience to the to be piecemeal and to the interiors of neighborhoods will electrical safety Units will continue inefficient continue to have a stark appearance, insufficient issues and sanitary, storm sewer deficiencies. WORK ACCOMPLISHED IN PREVIOUS THREE YEARS: WORK PROGRAMMEDFOR NEXT THREE YEARS: ADDITIONAL: to be outdated, and in in increased operations costs, frequent maintenance and repair, and residents. Without the project, repair of the units will continue inefficient with numerous interruptions of the occupants for access the houses and no major improvement in living quality. The housing An economic analysis crosswalks, None None has been prepared comparing the alternatives of new construction, improvement, and status quo. Based upon the net present values and benefits of the respective alternatives, improvement was found to be the most cost effective option over the life of the project. The improvement project cost is 58% of the replacement project cost for the work required. The construction agent for this project is the Army Corps of Engineers resulting in SIOB costs of 5.7%. The Base Civil Engineer is Lt Col Barry Briesmaster III, 316-759-5750. DD FORM 1391, Ii DEC 99 Previous editions are obsolete. Page No. ~:J1i 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. INSTALLATION ANDREWS AIR 5. CONSTRUCTION (computer AND LOCATION FORCE BASE, PROGRAM ELEMENT 4. MARYLAND 6. DATA PROJECT Dfi'ROVE CATEGORY CODE 88742 PROJECT 2. 7. TITLE FAMILY PROJECT NUMBER 711-142 HOUSING 8. PH6 PROJECT AJXF064006 Q DATE generated) COST ($000) 28,216 r'n~... UNIT ITEM U/M COST QUANTITY PRIMARYEACILITIES 18,007 IMPROVE JNCO/CGO QUARTERS PH 2 tJN 178 1 101,165 ( 18,007 SUPPORTINGFACILITIES UTILITIES LS ( 1,602) PAVEMENTS LS ( 1,320) SITE LS ( 1,157) IMPROVEMENTS LANDSCAPING LS ( RECREATIONFACILITIES LS ( 749) DEMOLITION & ASBESTOS/LBP REMOVAL LS ( 420) COMMUNICATIONS LS ( 356) ( 700) ( 150) GARAGES/PATIOS LS HANDICAPPED ADAPTABLE REQUIREIo!ENTS tJN 10 15,000 SUBTOTAL 890) 25,351 CONTINGENCY (5%) 1,268 TOTAL CONTRACT COST 26,619 SUPERVISION, INSPECTIONAND OVERHEAD (6%) 1,597 TOTAL REQUEST 28,216 AREA COST FACTOR 1 .02 MOST EXPENSIVE tJNIT 10. ) 7,344 Description 184,000 of Proposed Work: Improve 152 JNCO and 26 CGO quarters, with all necessary amenities and supporting facilities. Project includes inter~or ~~d exterior modernization, and utility upgrade. Renovate roof, structural/foundation/exterior walls, structural/other building elements, mechanical, electrical, general, all kitchen, baths, 1aundry, sitework, pavements, recreation facilities, landscaping and signage. Inc1udes demolition 11. of 30 surp1us REQUIREMENT: PROJECT: Improve two-bedroom mi1itary modern Plan. This housing to living room, Force Fami1y will the built DD FORM 1391, in and This 1973 830UN includes to programmed civilian SUBSTANDARD: 152 276UN JNCO two-bedroom, in bath be These Previous and Andrews The with and appea1ing design wi11 178 units editions as units are In that all are housing A1l units the and configuration. constructed efficient AFB. accordance comfortab1e, includes 1974. modern at community. and some will project and provide stationed a safe, bedroom Guide, DEC 99 are provide room, Housing phase required dependents off-base family CURRENT SITUATION: duplexes is their standards This 26 CGO Mission) project and housing comparab1e ADEQUATE: Housing. (Current members The 1,106UN Fami1y units. REQUIREMENT: units. Housing 1iving provide are located obsolete. two on meet Community environment a modern accordance handicapped for wi11 with kitchen, the Air adaptab1e. story the west and one side story of Page Andrews N°.4 39 ., - 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. CONSTRUCTION PROJECT DATA (computer INSTALLATION AND LOCATION PROGRAMELEMENT 6. 4. 7. PROJECT NUMBER 711-142 AFB and have had no major upgrades PROJECT TITLE IMPROVE FAMILY HOUSING PH6 CATEGORYCODE 88742 DATE generated) ANDREWSAIR FORCE BASE, MARYLAND 5. 2. 8. PROJECT COST ($000) AJXF064006 s~nce construct~on, 28,216 and they do not meet the needs of today's enl~sted/off~cer famil~es, nor do they prov~de a modern home env~ronment. Plumb~ng and electr~cal systems are ant~quated and do not meet current standards for eff~c~ency and safety. Inter~ors are ~nadequate by modern cr~ter~a. Bathrooms are minimally s~zed for f~xtures and there ~s a lack of closet space. L~ght~ng, heat~ng and a~r condit~on~ng systems requ~re upgrade and/or replacement. IMPACT IF NOT PROVIDED: Air Force members and famil~es w~ll cont~nue to be ~nadequately housed. Un~ts w~ll cont~nue to deter~orate result~ng ~n escalat~ng operat~ons, ma~ntenance and repa~r costs to the Government. WORK ACCOMPLISHED IN PREVIOUS THREE YEARS: WORK PROGRAMMEDFOR NEXT THREE YEARS: ADDITIONAL: An economic analys~s None None has been prepared compar~ng the al terna t~ ves of new construct~on, improvement and status quo operat~ons. Based on the net present values and benef~ts of the respect~ve alternat~ves, improvement was found to the most cost eff~c~ent over the l~fe of the project. The cost to improve these un~ts ~s 64% of the replacement Eng~neer~ng BASE CIVIL DD FORM 1391 cost. The construct~on agent for th~s project Command result~ng ~n SIOH of 6 percent. ENGINEER: Lt Col ' DEC 99 Denn~s D. Yates Prev~ous edit~ons ~s the Naval Fac~l~t~es (301 981-7281) are obsolete. Page No. 440 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. CONSTRUCTION PROJECT DATA (computer INSTALLATION AND LOCATION 4. POPE AIR FORCE BASE, NORTH CAROLINA 5. PROGRAMELEMENT 6. CATEGORYCODE 88742 2. DATE generated) PROJECT TITLE IMPROVE FAMILY HOUSING (PHASE A) 7. 711- PROJECT NUMBER 8. PROJECT COST ($OOO) TMKHO64002 16,625 UNIT ITEM U M COST UJlNTITY PRIMARY FACILITIES IMPROVE FAMILY 12,780 HOUSING (PHASE A) UN 138 1 SUPPORTINGFACILITIES PAVEMENTS LS LS LANDSCAPING ( PAINT ABATEMENT LS ( LS ( 5 %) 749 15,728 (5.7%) 897 REQUEST 16,625 COST FACTOR MOST EXPENSIVE 160) ( 40) COST SUPERVISION, INSPECTIONAND OVERHEAD AREA 75) 14,980 CONTINGENCY TOTAL 125) ( SUBTOTAL CONTRACT ) 800) ( LS DEMOLITION TOTAL 12,780 ( 1,000) LS FACILITIES ASBESTOS/LEAD-BASED ( 2,200 UTILITIES RECREATION 92,605 .88 UNIT 165,000 ~O. Description of Proposed Work: Provides general interior and exterior modernization and renovation of 138 housing units. Includes utility upgrades and additions to meet current standards. Upgrade kitchens, bathrooms, and floor coverings, improves floor p~ans, provides increased energy efficiency, privacy fencing, patios, playgrounds and recreation areas. Replaces existing overhead electrical distribution with an underground system and replaces sewer system. Constructs an additional housing access road and demolishes four units in way of the road. Includes demolition and asbestos/lead-based paint removal. ~1. REQUIREMENT: 843UN ADEQUATE: 293 UN SUBSTANDARD: 334 UN PROJECT: Improve Military Family Housing (Phase A). This phase includes work for 12 JNCO two-bedroom, 77 JNCO three-bedroom, 17 JNCO four-bedroom, 17 SNCO three-bedroom, and 15 SNCO four-bedroom units. 40 of these units are located in the Hillcrest neighborhood and 98 are located in the Cardinal Heights neighborhood (Current Mission). REQUIREMENT: This project is required to provide modern and efficient housing for military members and their dependents stationed at Pope AFB. The housing must be upgraded to meet current life safety codes and to provide a comfortable and appealing living environment comparable to the off-base civilian community. This is the first of multiple phases to upgrade 334 houses. All units will meet "whole house" standards and are programmed in accordance with the Housing Community Plan, phase A. Renovated housing will provide a modern kitchen, living room, family room, bedroom and bath configuration, with ample interior and exterior storage. Living units will be expanded to meet current space authorizations. Garages and off street parking will be provided DD FORM 1391, ';' DEC 99 Previous editions are obsolete. Page NO". "",. 441 ". 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. CONSTRUCTIONPROJECT DATA (computer INSTALLATION AND LOCATION PROGRAMELEMENT 88742 where deficient. 6. 4. 2. DATE PROJECT TITLE :IMPROVE FAMILY HOUSING (PHASE A) CATEGORY CODE 7. PROJECT NUMBER 711-111 Neighborhood "-r;~:'. generated) POPE AIR FORCE BASE, NORTH CAROLINA 5. ;f:,~~ 8. PROJECT COST ($000) TMKH064002 improvements are required playgrounds, recreation areas, burial of existinq replacement of sewer system, and construction of Hi1lcrest neighborhood. 16,625 and will include overhead electrical an additional access landscaping, distribution, road to the CURRENT SITUATION: This project upgrades and modernizes housing that was constructed in 1964 and 1976. These houses require major renovation and repair to correct deterioration resulting from age and heavy use. They do not meet the needs of today's families, nor do they provide a modern home environment. Kitchen and bathroom cabinets and fixtures are obsolete and deteriorated. Plumbing and lighting fixtures are deteriorated and dated. The electrical systems do meet modern construction codes. Ground Fault Circuit Interrupter protection is not provided for bathrooms, kitchens, and exterior circuits. Windows, siding, and insulation require replacement. Many of the units have inadequate living space and storage, and no patio or backyard privacy. Landscaping and recreation areas for housing residents are deficient. Pavements are in disrepair and the Hillcrest housing area requires an additional access road to alleviate congestion and improve emergency vehicle response times. :IMPACT IF NOT PROVIDED: Units will continue to deteriorate rapidly, resulting in increasing operations, maintenance and repair to the Government and inconvenience to residents. Without this project, repair of these units will continue in a costly, piecemeal fashion with little or no improvement in living quality. Housing Requirements Market Analysis shows an on-base housing deficit of 216 units. WORKACCOMPLISHED IN PREVIOUS THREE YEARS: WORK PROGRAMMEDFOR NEXT THREE YEARS: None None ADDITIONAL: An economic analysis has been prepared comparing the alternatives of new construction, improvement, and status quo operation. Based on the net present values and benefits of the respective alternatives, improvement was found to be the most cost effective over the life of the project. The cost to improve the units is 60% of the replacement cost. The construction agent is the Army Corps of Engineers, resulting in SIOH costs of 5.7%. Base Civil Engineer: Lt Ccl ~~chael R. Bass, (910) 394-2561. DD FORM 1391, DEC 99 Previous editions are obsolete. Page No. 442 ..- 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. CONSTRUCTION PROJECT DATA (computer INSTALLATION AND LOCATION PROGRAMELEMENT 6. 4. 7. 711-143 ~ PROJECT TITLE IMPROVE FAMILY HOUSING CATEGORYCODE 88742 DATE generated) ARNOLD AIR FORCE BASE, TENNESSEE 5. 2. PROJECT NUMBER 8. PROJECT COST ($000) ANZY064001 1,930 ~T UNIT ITEM COST U/M ~UANTITY PRIMARYFACILITIES 1,086 IMPROVE ARNOLD VILLAGE MIL FAMILY IMPROVE ARNOLD VILLAGE MIL FAM HOUSING HOUSING UN 241 UN 16 1 12,600 ( 48,998 ( 302) 784) SUPPORTINGFACILITIES COMMON NEIGHBORHOOD 653 IMPROVEMENT LS GROUP GARAGES ( LS ( UTILITIES LS ( PAVEMENTS LS ASBESTOS/LEAD-BASED PAINT ABATEMENT LS ( AREA 87 COST 1,826 INSPECTION AND OVERHEAD (5.7 %) 104 REQUEST 1,930 FACTOR MOST EXPENSIVE 10. .89 UNIT Description 53,400 of Proposed Work: Provide housing and neighborhood housing units. Replace roofs, repair damage to exterior, trash enclosures, increase unit size, upgrade mechanical to privacy fencing. Air 11. Conditioning: improvement for 40 convert/construct garages, add systems, and upgrade chain-link 0 Tons REQUIREMENT: PROJECT: 172) (5%) CONTRACT COST 99) 1,739 SUPERVISION, TOTAL 191) ( SUBTOTAL CONTINGENCY TOTAL 9O) 101) Improve 40UN 40 family ADEQUATE: OUN housing units, community SUBSTANDARD: 40UN area, add Selp-Help facility REQUIREMENT: Project Composition: 3 SOQ (4BR), lEg (4BR) , 2 FGO (4BR), 1 CGO (4BR) , 1 SNCO (4BR), 2 JNCO (4BR), 4 FGO (3BR) , 9 CGO (3BR), 7 SNCO (3BR) , 10 JNCO (3BR). This project is required to provide modern, efficient housing and community atmosphere for military family members and their dependants stationed at Arnold AFB. The housing must be upgraded to provide a comfortable and appealing living environment comparable to offbase civilian housing. There are 24 units that require repairs such as roof replacement and exterior painting. The remaining 16 units require utility upgrades, additions to living space, and trash enclosures. This effort will also increase off street parking as well as provide much needed changes in wastewater, water supply and electrical wiring. There are 12 units that require removal of deteriorated parquet flooring that buckles in moist conditions. Many improvements are detailed in Arnold AFB Housing Community Profile (HCP) . CURRENT SITUATION: housing require units, major DD FORM 1391, The housing complex all of which were built renovation and repair to DEC 99 Previous consists of 28 quad units in 1964 and 1965. correct deterioration editions are obsolete. and 12 single family These 40 year old homes resulting from age and Page No. 443 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. CONSTRUCTIONPROJECT DATA (computer INSTALLATION AND LOCATION PROGRAMELEMENT 6. 4. PROJECT TITLE IMPROVE FAMILY HOUSING CATEGORYCODE 88742 DATE generated) ARNOLD AIR FORCE BASE, TENNESSEE 5. 2. 7. PROJECT NUMBER 711-143 8. PROJECT COST ($000) ANZY064001 heavy use. They do not meet the needs of today' home environment. A GOQ was recently established; uni t does not exceed other repairs taking place, 1,930 s families, nor do they exhibit a modern the improvement scheduled for this and will be in accordance with the Housing Community Profile findings. Occupants of the townhouse units have no covered parking available to protect their vehicles from the weather. All units have aged roofs exhibiting noticeable sagging between trusses. Exterior painted brick surfaces are scaling and faded. Units have carpet installed over buckling parquet flooring installed with asbestos-containing mastic. The current self-help structures are old, separated, inadequate and lack required functions. Common areas in poor condition include bus stops, open recreation areas, crosswalks and pavement markings. Additionally, there is no neighborhood area lighting and no recreation shelters. IMPACT IF NOT PROVIDED: Air Force members and their families will continue to live in inadequate housing that will rapidly deteriorate and remain in a condition of living lower than that of the surrounding community, adversely affecting morale and potentially productivity. As the units continue to age, increasing service calls will yield larger deficiencies. Continuing to maintain these energy inefficient units will continue to drain limi ted funds. WORK ACCOMPLISHED IN PREVIOUS THREE YEARS: units; maintenance painting 7 units; 40 units; pest control 40 units. Mold remediation caps 40 ADDITIONAL: The construction agent is the Army Corps of Engineers, resulting costs of 5.7%. The cost to improve the units is 28% of the replacement cost. Civil Engineer: Lt Col Michael Blaylock, (931) 454-4320. in SIOH Base DEC 99 Previous equipment; gutter porches DD FORM 1391, playground 40 units; screened-in WORK PROGRAMMEDFOR NEXT THREE YEARS: upgrade None editions are obsolete. .," Page No. b 444 1'.llra 1. C~NENT FY 2006 MILITARY AIR FORCE 3. CONSTRUCTION PROJECT DATA (computer INSTALLATION AND LOCATION PROGRAME~ 6. 4. CATEGORY CODE 88742 PROJECT TITLE PRIVATIZE 7. FAMILY HOUSING PROJECT NUMBER 711- 8. PROJECT COST ($000) GBLN064000 39,936 UNIT ITEM U M COST UANTITY PRIMARYFACILITIES PRI~TIZE DATE generated) FRANCIS E WARRENAIR FORCE BASE, WYOMING 5. 2. 39,936 FAMILY HOUSING UN 676 59,077 ( 39,936 ) SUPPORTINGFACILITIES 0 SUBTOTAL 39,936 TOTAL CONTRACT COST 39,936 TOTAL REQUEST 39,936 AREA COST FACTOR 1 10. Description of Proposed Work: Convey 676 existing sing~e and mu~tip~ex units and construct 110 deficit units. Combined with prior approved 265 unit privatization project, this wi~l produce a privatization end state of 941 units (inc~uding 1 GOQ) on approximate~y 400 acres of ~eased ~ands. Without privatization, MILCON cost for this work is $99.5M for an anticipated ~everage of 2.5:1 (by grouping with other bases the combined ~everage wi~l be greater than 3.0:1). Privatized units wi~~ provide modern interior and exterior conveniences and meet current space and f~oor p~an requirements. 11. REQUIREMENT: PROJECT: Privatize 941UN Mi~itary ADEQUATE: 210UN Family Housing (Current SUBSTANDARD: 621UN Mission) REQUIREMENT: This project is required to provide modern and efficient housing for mi~itary members and their dependents stationed at F. E. Warren AFB. 621 units will be upgraded or replaced to meet current ~ife safety codes and to provide a comfortab~e and appealing living environment comparable to the off-base civilian community. Additional~y, 110 new units will be constructed to reduce projected deficits. A11 units will meet who1e house standards and are programmed in accordance with the Housing Community Profile. Renovated hous~ng w~ll provide a modern kitchen, living room, family room, bedroom and bath configuration, with ample interior and exterior storage. As needed, 1iving units wi11 be expanded to meet current space authorizations. Sing1e or double car garages and off street parking will be provided where deficient. Neighborhood improvements are required and will include upgraded utility infrastructure, landscaping, playgrounds, and recreation areas. CURRENT SITUATION: This project upgrades and modernizes housing that was constructed between 1885 and 1987. The majority of these houses require major renovation and repair to correct deterioration resulting from age and heavy use. They have had few upgrades since construction, and most do not meet the needs of today' s fami~~es, nor do they provide a modern home environment. In many of these units, kitchen and bathroom cabinets and fixtures are obso1ete and deteriorated. Counter tops are warped, stained, and separating at the seams. Plumbing and lighting fixtures are deteriorated and dated. The e1ectrical systems do meet modern construction codes. Ground Fau~ t Circuit Interrupter protection is not provided for bathrooms, kitchens, and exterior circuits. F~ooring is stained, ~oose, and mismatched due to the non-avai1abi1ity of origina1 materials for rep~acement. Windows, siding, and insulation require replacement. The units have inadequate ~iving space and storage, and no patio or backyard privacy. DD FORM 1391, DEC 99 Previous editions are obso~ete. Page No. 445 - 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. CONSTRUCTION PROJECT DATA (computer INSTALLATION AND LOCATION PROGRAMELEMENT 6. 4. CATEGORYCODE 88742 Landscaping renovation. IMPACT IF NOT PROVIDED: areas Units 7. FAMILY HOUSING PROJECT NUMBER 8. GBLN064000 for wi11 PROJECT TITLE PRIVATIZE 711-111 and recreation DATE generated) FRANCIS E WARRENAIR FORCE BASE, WYOMING 5. 2. housing residents continue to 39.936 are deficient. deteriorate PROJECT COST ($000) rapidly, Paved areas resu1ting need in increasing operations, maintenance and repair costs to the Government and inconvenience to residents. Without this project. repair of these units wi11 continue in a cost1y, piecemea1 fashion with 1itt1e or no improvement in 1iving qua1ity. Housing Requirement and Market Ana1ysis shows an on-base housing deficit of 110 units. WORKACCOMPLISHED IN PREVIOUS THREE YEARS: WORK PROGRAMMEDFOR NEXT THREE YEARS: None None ADDITIONAL: The scope of this privatization project has been reviewed by the insta11ation commander. This project contains no resa1e merchandise. services or commercia1 recreation operations or activities IAW with the SAF/MI Housing Privatization Interim Operating Instructions memo dated 2 March 1999 and AF/IL memo regarding coordination with AAFES, DeCA, and MWRBoard dated 19 March 1999. A viab1e proforma and a pre1iminary economic ana1ysis wi11 be deve1oped and provided during the concept approva1 process, and a certified economic ana1ysis wi11 be accomp1ished prior to comp1etion of the so1icitation process. In the event Congress does not extend the privatization 1egislation or the privatization is financia11y infeasible. the Air Force will execute an improvement project for 103 units at the programmed amount requested by this project IAW the installation's Housing Community Profile. This project will be accomplished in conjunction with FY04 privatization project GBLN 04-4000, which has already received congressional authorization/approval. GBLN 04-4000 authorized the privatization of 265 Carlin Heights units with a total programmed amount of $5.391M. The 1ocal school authority indicates a capability exists to accept the increased student population 773-3600. ~~":; generated DD FORM 1391, DEC 99 by this project. Previous Base Civil editions are obsolete. ~,":'~):! /" ~ ~, c '. Engineer: .,. Lt Col Steven Ditmer, Page No. (307) ~~t) 1. COMPONENT AIR FY 2006 FORCE 3. RAMSTEIN CONSTRUCTION (computer INSTALLATION 5. MILITARY AIR 4. GEFMAN"i PROGRAM ELEMENT 6. PROJECT IMPROVE CATEGORY CODE 88742 DATA 2. DATE generated) AND LOCATION BASE, PROJECT 7. TITLE FAMILY PROJECT NUMBER 711- HOUSING, 8. PH C PROJECT TYFR064009 COST 4,519 UNIT ITEM U M ($000) COST UANTITY PRIMARY FACILITIES IMPROVE F~LY 3,668 HOUSING UN 16 1 229,267 ( 3,668 SUPPORTINGFACILITIES SITE PREPARATION LS UTILITIES LS ( 139) LANDSCAPING LS ( 119) LS ( 164) ROADS, PAVING' SIDEWALKS ( 68) SUBTOTAL 4,158 CONTINGENCY ( 5 %) 208 TOTAL CONTRACT COST SUPERVISION, 4,366 INSPECTION AND OVERHEAD (3.5 %) 153 TOTAL REQUEST 4,519 AREA COST FACTOR 1.22 MOST EXPENSIVE UNIT 470,909 10. Description of Proposed Work: Provides general interior modernization and renovation of 16 housing units. Includes utility upgrades and additions to meet standards. upgrade provides recreation 11. increased areas. REQUIREMENT: PROJECT: Improve bedroom, kitchens, Family upgraded to current phases previous phases, meet Community house" and living room, exterior Single storage. car garages recreation life 448 family required dependents comparable "whole Neighborhood is to upgrade Profile C). SUBSTANDARD: This 2 E-9 current plans, playgrounds and paint removal. 2,214UN (Phase 8 CGO four-bedroom, their and Housing floor project includes four-bedroom, 472UN 3 GOQ four- and 2 E-9 three- Misssion) project and environment improves ADEQUATE: members multiple coverings, 2,686UN military meet floor privacy fencing, patios, and asbestos/lead-based Military This and energy efficiency, Includes demolition (Current REQUIREMENT: will bathrooms, 1 SOQ four-bedroom, bedroom units. living ) 490 to Ramstein safety codes and to off-base the 472 units. remaining be standards and are GOQ Master Plan. bedroom modern AB, to and provide efficient housing The housing a comfortable community. in programmed Renovated in subsequent configuration, with will provide with ample be appealing phase C of are approved phases. accordance housing is or for must and This have been upgraded accomplished bath and Germany. civilian 2214 units to room, provide at All the in units Housing a modern interior kitchen, and Living units will be expanded to meet current space authorizations. and off street parking will be provided where deficient. improvements are required and will include landscaping, playgrounds and areas. CURRENT SITUATION: the 1950s. DD FORM 1391, These This project 50-year-old DEC 99 upgrades houses Previous and require editions modernizes major housing renovation are obsolete. that was and repair constructed to in correct Page No. ~~47 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. CONSTRUCTIONPROJECT DATA (computer INSTALLATION AND LOCATION PROGRAMELEMENT 6. 88742 DATE generated) 4. RAMSTEIN AIR BASE, GERMANY 5. 2. PROJECT TITLE IMPROVE FAMILY HOUSING, PH C CATEGORYCODE 7. PROJECT NUMBER 711-161 8. TYFR064009 PROJECT COST ($000) 4,519 deter~orat~on result~ng from age and heavy use. They have had no major upgrades s~nce construct~on, and do not meet the needs of today's famil~es, nor do they prov~de a modern home improvement. Kitchen and bathroom cab~nets and f~xtures are obsolete and deter~orated. Counter tops are warped, sta~ned, and separat~ng at the seams. Plumb~ng and l~ght~ng f~xtures are deter~orated and dated. The electr~cal systems do not meet modern construct~on codes. Ground Fault C~rcu~t Interrupter protect~on ~s not prov~ded for bathrooms, k~tchens, and exter~or c~rcu~ts. Floor~ng ~s sta~ned, loose, and mismatched due to the non-ava~lab~l~ty of or~g~nal mater~als for replacement. W~ndows, s~ding, and ~nsulat~on requ~re replacement. The un~ts have ~nadequate l~v~ng space and storage, and no pat~o or backyard pr~vacy. Landscap~ng and recreat~on areas for hous~ng res~dents are def~c~ent. Paved ares need renovation. IMPACT IF NOT PROVIDED: ~ncreas~ng residents. p~ecemeal operations, maintenance and repair to the Government and ~nconven~ence W~thout this project, repa~r of these un~ts w~ll continue ~n a costly fashion w~th l~ttle or no improvement ~n l~v~ng qual~ty. Un~ts w~ll cont~nue WORK ACCOMPLISHED IN PREVIOUS THREE YEARS: WORK PROGRAMMEDFOR NEXT THREE YEARS: to deter~orate rap~dly, result~ng ~n to None None ADDITIONAL: An economic analys~s has been prepared compar~ng the alternatives of new construct~on, improvement, and status quo operation. Based on the net present values and benef~ts of the respect~ve alternat~ves, improvement was found to be the most cost effect~ve over the life of the project. The cost to improve the un~ts ~s 65% of the replacement cost. SIOH ~s 3.5% based on agreement between US Air Force and German execution agent (LEB). Th~s project meets the criteria of the Air Force Hous~ng Guide for Plann~ng, Programming, Design, and Construction. Base C~v~l Engineer: Col Carlos R. Cruz-Gonzales, 314 480-6228 FOREIGN CURRENCY: DD FORM 1391, , ,,\ ~t~, . ~?{j".,..; FCF Budget DEC 99 Rate Used: Previous EURO-DOLLAR .8785 editions are obsolete. Page No. 448 1. COMPONENT AIR FY 2006 3. CONSTRUCTION (computer INSTALLATION KADENA AIR 5. MILITARY FORCE AND LOCATION BASE, 4. JAPAN PROGRAM ELEMENT PROJECT PROJECT ~ROVE 6. CATEGORY CODE 88742 DATA 2. 7. PROJECT 711-171 TITLE FAMILY NUMBER HOUSING, 8. PH 6 PROJECT LXEZ064152 Q DATE generated) COST ($000) 107,469 ~n~rr UNIT ITEM COST U 1M nUANTITY IMPROVE FAMILY HOUSING, PH 6 83,076 GOQ UN NON-GOQ UN 41 300,750 566 ( 1,203 144,652 ( 81,873 SUPPORTINGFACILITIES SITE ) 16,294 IMPROVEMENT/PERIMETER FENCE LS ( 3,551) LANDSCAPING LS ( 1,588) UTILITY LS ( 5,196) ~NS PARKING/STREET/SIDEWALK/PATH LS ( 1,883) PLAYGROUNDS/RECREATION LS ( 2,836) ENVIRONMENTAL -REMOVAL/DISPOSAL LS ( 1,240) SUBTOTAL . 99,370 CONTINGENCY (5%) 4,969 TOTAL CONTRACT COST SUPERVISION, 104 ,339 INSPECTION AND OVERHEAD (3%) 3,130 TOTAL REQUEST .107,469 AREA COST FACTOR 1 .52 MOST EXPENSIVE UNIT 10. Description and renovation current ) of standards. 326,000 of Proposed Work: 570 housing units. Upgrades Provides Includes kitchens, general utility bedrooms, interior and exterior modernization upgrades and additions to meet bathrooms and finishes; improves floor plans, provides energy efficiency, fencing, patios, playgrounds and recreation areas. Includes demolition and all environmental removal/disposal work. Provides covered garage .back (GOQ). up. Provides Convert BR units to Improve This members and upgraded to current meet environment Renovated family project military house " i military housing tower including two-bedroom emergency units. multiple standards bath configuration, will be are will (in required safety to the power Converts two GOQ 3 DEC 99 and to provide interior and to meet editions with living exterior current are work (Current efficient Japan. The community. A1.l units the Housing room, storage standards. obsolete. and housing for housing must and This is meet room, Covered . be appealing will patio. 4 GOQ SNCO Mission) Community family UN for 292 a comfortable units. accordance includes units and US civilian kitchen, types) phase 5,347 3 E9 four-bedroom, Okinawa, inadequate a modern Previous c This modern in off-base in SUBSTANDARD: JNCO two-bedroom provide codes programmed some unit 140 to all ample 6). stationed to upgrade provide with expanded DD FORM 1391, comparable (Phase and dependents life phases and housing is their 2 , 833 UN 56 CGO three-bedroom, 72 JNCO three-bedroom REQUIREMENT: of the into ADEQUATE: 3 SOQ four-bedroom, three-bedroom, living in units 8 , 442 UN four-bedroom, phase improvements 4 BR units. 11 .REQUIREMENT: PROJECT: handicap 52 JNCO three-bedroom the sixth "whole Profile. bedroom Dwelling garage Page and units will No. be 449 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. CONSTRUCTION PROJECT DATA (computer INSTALLATION AND LOCATION PROGRAMELEMENT 6. 88742 DATE generated) 4. KADENA AIR BASE, JAPAN 5. 2. PROJECT TITLE IMPROVE FAMILY HOUSING, PH 6 CATEGORYCODE 7. PROJECT NUMBER 711-171 8. LXEZ064152 PROJECT COST ($000) 107,469 provided for GOQ units, off-street parking, neighborhood improvements are required and will include landscaping, playgrounds and recreation facilities. Conversion of threebedroom into two-bedroom units will resolve deficits in the two-bedroom unit type. Provide infrastructure upgrade. CURRENT SITUATION: This project upgrades and modernizes housing that was built by the Government of Japan (GOJ) during the 1960s and 1980s. These houses require major renovation and repair to correct system deterioration, meet modern standards, and provide major home improvements. They have had no major upgrades since construction. Kitchen and bathroom cabinets and fixtures are obsolete and deteriorated. Counter tops are stained and scratched. Plumbing and lighting fixtures are deteriorated and antiquated. covering is The electrical systems do not meet modern stained, mismatched due to non-availability standards and codes. of similar materials Floor for replacement. Exterior surfaces and roof including windows, doors and frames require replacement. These units have inadequate space for storage and patio. Landscaping and recreation areas dedicated for housing residents are deficient. Utilities systems are deficient and old. IMPACT IF NOT PROVIDED: Units will continue to deteriorate rapidly, resulting in increasing operations, maintenance and repair to the government and inconvenience to residents. Without this project, repair of these units will continue in a costly, piecemeal fashion with little or no improvement in living quality. Housing Requirements and Market Analysis shows an on-base housing deficit of 262 units. WORKACCOMPLISHED IN PREVIOUS THREE YEARS: WORK PROGRAMMEDFOR NEXT THREE YEARS: ADDITIONAL: An economic analysis None None has been prepared comparing the al terna ti ves of reconstruction, improvement, direct compensation and status quo operation. Based on the net present values and benefits of the respective alternatives, improvement was found to be most cost effective over the life of the project. This project is not eligible for Host Nation funding. The cost to improve the units is 32% of the replacement cost. Base Civil Engineer: Colonel Steven K. Lillemon, 011-81-611-734-1807. FOREIGN CURRENCY: DD FORM 1391, FCF Budget DEC 99 Rate Used: Previous YEN 115 editions are obsolete. Page No. 450 --- 1. AIR 3. COMPONENT FORCE CONSTRUCTIONPROJECT DATA (computer AIR BASE, 4. JAPAN PROGRAM E~ 6. CATEGORY CODE 7. FAloaLY PROJECT NUMBER 711-181 HOUSING, 8. PH. PROJECT QKKA064025 Q DATE PROJECT TITLE IMPROVE 88742 2. generated) INSTALLATION AND LOCATION MISAWA 5. FY 2006 MILITARY 1 COST ($000) 58.046 ~n~'r UNIT ITEM COST U 1M OUANTITY PRIMARYFACILITIES 44,269 IMPROVE FAMILY HOUSING UN I 281 157,540 I ( 44,269 SUPPORTINGFACILITIES SITE ) 9,403 IMPROVEMENT LS ( 1,654) LANDSCAPING LS UTILITIES LS ( 561) PAVEMENT/CURBS/GUTTERS LS ( 1,416) PARKING/COVERED PARKING LS ( 2,100) PLAYGROUND/RECREATIONAL LS ( 1,006) ( 2,666) SUBTOTAL 53,672 CONTINGENCY (5%) 2,684 TOTAL CONTRACT COST SUPERVISION, 56,355 INSPECTION AND OVERHEAD (3 %) 1,691 TOTAL REQUEST 58,046 AREA COST FACTOR 1. 68 MOST EXPENSIVE UNIT 287,000 10. Description of Proposed Work: Provides general interior and exterior modernization and renovation of 281 housing units. Includes utility upgrades, additions to meet current standards, force protection measures, site improvement, covered parking for HStyle units, storage sheds, parking for residents/guests, playground and landscaping. Provides pitched roof, covered court and mud rooms. Replaces floor heaters with forced air ceiling mounted ki tchens, heaters bathrooms, and insulation for Tower for 1st and 2nd floor. and recreation areas. 11. REQUIREMENT: PROJECT: REQUIREMENT: military This Housing upgraded living units This will meet Housing Community bedroom and DD FORM 1391, bath Phase is their is 1. required dependents the whole Plan. first This plans, upgrade and install sound and handicap accessibility privacy fencing, patios 1,115UN phase house to SUBSTANDARD: includes work for 1,122UN 5 SOQ four- 64 JNCO three-bedroom, provide stationed standards Previous ample are will editions efficient Air Base, to provide US civilian to upgrade programmed provide interior and Misawa phases and housing with modern at safety codes and to the off-base of multiple Renovated configuration, DEC 99 controller. floor and and in housing Japan. JNCO a comfortable community all accordance are obsolete. storage ".. housing in inadequate a modern kitchen, exterior for The with living space. and the -,~. . " units. the room, Living Page No. c i," 140 ~ssion) to meet current life environment comparable States. temperature 68 JNCO four-bedroom, project and and improves ADEQUATE: (Current members must be appealing ~l Family units fan (1937) to include replacing window rails Provides increased energy efficiency, Removes asbestos and lead-based paint. 4 CGO three-bedroom, two-bedroom United include coverings, 2,380UN Improve bedroom, to floor ., 451 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. CONSTRUCTIONPROJECT DATA (computer INSTALLATION AND LOCATION PROGRAMELEMENT 6. 4. PROJECT TITLE IMPROVE FAMILY HOUSING, PH. 1 CATEGORYCODE 88742 7. PROJECT NUMBER 711-181 units will be expanded provided where deficient. landscaping, playground DATE generated) MISAW1\.AIR BASE, JAPAN 5. 2. to meet current Neighborhood and recreation QKKA064025 space authorizations. improvements are areas. 8. PROJECT COST ($000) 58,046 Off-street parking will required and will include be CURRENT SITUATION: This project upgrades and modernizes housing that was constructed in 1982 thru 1987. These houses require major renovation and repair to correct deterioration resulting from age and heavy use. They have had no major upgrades since construction, and do not meet the needs of today's families, nor do they provide a modern home environment. Kitchen and bathroom cabinets and fixtures are obsolete and deteriorated. Counter tops are warped, stained, and separating at the seams. Plumbing and lighting fixtures are obsolete and deteriorated and outdated. The electrical systems do not meet modern construction codes. Ground Fault Circuit Interrupter protection is not provided for bathrooms, kitchens, and exterior circuits. Flooring is stained, loose, and mismatched due to the non-availability of original materials for replacement. Windows, siding, and insulation require replacement. The washers and dryers in the Tower are located in the kitchen, which is open to the living and dining areas. This creates a lot of noise in these areas since the appliances are not enclosed and have no sound barrier. The kitchen is also exposed to lint particles from the dryer unit. IMPACT IF NOT PROVIDED: Units will continue to deteriorate rapidly, resulting in increasing operations, maintenance and repair to the Government and inconvenience to residents. Without this project, repair of these units will continue in a costly, piecemeal fash~on with little or no improvement in living quality. Housing Requirements and Market Analysis shows an on-base housing deficit of 143 units. WORKACCOMPLISHED IN PREVIOUS THREE YEARS: WORK PROGRAMMEDFOR NEXT THREE YEARS: None None ADDITIONAL: An economic analysis has been prepared comparing the alternatives of new construction, improvement, and status quo operation. Based on the net present values and benefits of the respective alternatives, improvement was found to be the most cost Th;~ ~ P--J--rn;c~T ;~ nnT c';~;h'o ~~U~ s ~~. Na~' effective ov er the l ;~ fe of the pro ;Ject , ~~..c funding. The cost to improve the units is 30% of the replacement cost. Base Civil Engineer: Lt Col David Maharrey, 011-81-3117-66-3089. - FOREIGN CURRENCY: DD FORM 1391, FCF Budget DEC 99 Rate Used: Previous YEN 115 editions are obsoJ.ete. Page No. 452 1. AIR 3. COMPONENT FY 2006 FORCE CONSTRUCTION (computer INSTALLATION YOKOTA AIR 5. MILITARY 4. JAPAN PROGRAM ELEMENT PROJECT ~ROVE 6. CATEGORY CODE BB742 DATA 2. DATE generated) AND LOCATION BASE, PROJECT 7. PROJECT 711 TITLE MFH NUMBER (PHASE B. 4) PROJECT ZNREO64301 COST 54,913 UNIT ITEM ($000) COST UANTI TY PRIMARYFACILITIES 43,666 IMPROVE FAMILY HOUSING UN IMPROVE GENERAL OFFICER QUARTER 694 UN 191 227,324 1 I ( 43,419 247,000 SUPPORTINGFACILITIES 7,109 MECHANICAL LS UTILITY LS ( 2,228) DEMOLITION LS ( 1,223) ASBESTOS ABATEMENT LS ( 1,986) RECREATION FACILITIES LS ( 1,672) ( SUBTOTAL 0) 50,775 CONTINGENCY (5%) 2,539 TOTAL CONTRACT COST 53,314 SUPERVISION, INSPECTIONAND OVERHEAD (3%) 1,599 TOTAL REQUEST 54,913 AREA COST FACTOR 1 .64 MOST EXPENSIVE UNIT 10. Description and renovation Includes ) ( 247) of utility 240,000 of Proposed Work: 192 housing units upgrades and Provides including additions to general interior and exterior modernization one general officer's quarters (GOQ). meet current standards. upgrades kitchens, bathrooms, reconfigures floor layout, and increases energy efficiency. Provides patios, playgrounds, recreation areas and utilities replacement. Includes demolition and asbestos/lead-based paint removal. 11. REQUIREMENT: PROJECT: 2,51BON Improve bedroom, Family units REQUIREMENT: This military members to meet current environment multiple project and life standards and will configuration GOQ will with be early DD FORM 1391, 1970s. DEC 99 This codes This to provide and according project 91BON on 1 GOQ fourand 70 JNCO be upgraded with units Previous the room, the units Housing family storage. and modernizes editions major must and appealing This will is the meet whole Community Plan. for living fourth of house Renovated room, bedroom and bath Units will air conditioned. was constructed AF GOQ Master require housing Housing community. All exterior to upgrades These housing work efficient AB. a comfortable units. living and Yokota US civilian accordance kitchen, interior includes FGO three-bedroom, modern at and to provide inadequate in phase 116 stationed off-base all modern ample required the programmed CURRENT SITUATION: the to modernized 4). SUBSTANDARD: . dependents to upgrade are ~ssion) is their safety provide (Phase l,600ON 4 FGO four-bedroom, (Current comparable phases housing in Housing 1 SOQ four-bedroom, three-bedroom The ADEQUATE: be Plan. housing renovation are obsolete. which and repair to correct Page No. 453 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. CONSTRUCTIONPROJECT DATA (computer INSTALLATION AND LOCATION 4. YOKOTA AIR BASE, JAPAN 5. PROGRAMELEMENT 88742 6. 2. DATE generated) PROJECT TITLE IMPROVE MFH (PHASE 4 ) CATEGORY CODE 7. PROJECT NUMBER 711-171 8. ZNRE064301 PROJECT COST ($000) 54,913 deterioration resu~ting from age and heavy use. They have had no major upgrades since construction, and do not meet the needs of today's families, nor do they provide a modern home environment. Kitchens do not provide adequate storage, cabinet space or countertop area, and are not functiona~~y arranged. P~umbing and ~ighting fixtures are deteriorated. The electrica~ systems do not meet modern construction codes. Ground fau~t circuit interrupter protection is not provided for bathrooms, kitchens, and exterior circuits. Flooring, windows, and roofing require replacement. The units have inadequate ~iving space and storage. P~aygrounds, parking inadequate or nonexistent. The GOQ is deficient and major repairs are identified in the AF GOQ Master Plan. areas, items and ~andscaping of improvements are and IMPACT IF NOT PROVIDED: Units wil~ continue to deteriorate rapidly resu~ting in increasing operations, maintenance and repair costs to the Government and inconvenience to the residents. Without this project repair of these units wi~l be accomp~ished in a costly and piecemeal fashion with ~itt~e or no improvement in ~iving quality. Housing Requirements and Market Ana~ysis shows an on-base surplus of 193 units. WORKACCOMPLISHED IN PREVIOUS THREE YEARS: WORK PROGRAMMEDFOR NEXT THREE YEARS: None None ADDITIONAL: An economic ana~ysis has been prepared comparing the a~ternatives for new construction, improvement, and status quo operation. Based on the net present values and benefits of the respective alternatives, improvement was found to be the most cost effective over the ~ife of the project. The cost to improve this housing is 11% of the replacement cost. This project is not eligible for Host Nation funding. Base Civi~ Engineer: Lt Co~ Martin Granum (011-81-3117-55-7215) DSN 315 225-7215. FOREIGN CURRENCY: FCF Budget Rate Used: DD FORM 1391, Previous DEC 99 YEN 115 editions are obso~ete. Page No. ~!)4I 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. 4. PORTUGAL PROGRAMELEMENT 6. 2. DATE generated) INSTALLATION AND LOCATION LAJES FIELD, 5. CONSTRUCTION PROJECT DATA (computer PROJECT TITLE WHOLE HOUSE IMPROVEMENTS, BIERA ~ CATEGORYCODE 88742 7. 711- PROJECT NUMBER 8. PROJECT COST ($000) MQNA023006 16,183 UNIT ITEM U M COST UANTITY PRIMARYFACILITIES MILITARY ~ILY 12,980 HOUSING SM 150 86,531 I ( 12,980 SUPPORTING FACILITIES SITE ) 1,492 DEVELOPMENT LS ( 36) SITE UTILITIES LS ( 128) SITE LS ( 950) LS ( 378) IMPROVEMENTS PAVEMENTS SUBTOTAL 14,472 CONTINGENCY TOTAL SUPERVISION, TOTAL AREA (5%) CONTRACT 724 COST 15,196 INSPECTION AND OVERHEAD (6.5 %) 988 REQUEST COST 16,183 FACTOR MOST EXPENSIVE 1 .4 UNIT 98,050 10. Description of Proposed Work: Provides general interior and exterior renovation 150 housing units. Includes utility upgrade and additions to meet current housing standards. uPgrades kitchens, bathrooms, bedrooms and floor coverings, improves floor plans, and provides increased energy efficiency, privacy fencing, patios, playgrounds, and recreation areas. 11. REQUIREMENT: PROJECT: Mission). 451UN ADEQUATE: 301UN of SUBSTANDARD: 150UN Improve military family housing at Lajes Field, Azores, Portugal (Current Grade Mix: 30 -JNCO/4BR, 20 -JNCO/3BR, and 100 -JNCO/2BR units. REQUIREMENT: This project is required to provide modern and efficient housing for mili tary members and their dependants stationed at Lajes Field, Azores, Portugal. The housing must be upgraded to meet current life-safety codes and to provide a comfortable and appealing living environment comparable to the off-base civilian community. ~l units will meet "whole house" standards and are programmed in accordance with the February 1999 Lajes Field Housing Community Plan and the 2004 Lajes Field Family Housing Master Plan. Renovated housing will provide modern kitchen, living room, family room, bedroom and bath configuration, with ample interior and exterior storage. Living units will be expanded as necessary to meet current space authorizations. Mechanical and electrical systems will be upgraded to meet current standards and provide adequate capacity and quality to support the lifestyles of todays families. Neighborhood improvements are required and include landscaping, playgrounds, recreation areas, and jogging paths. Windows and doors will be replaced as necessary to meet current Antiterrosism/Force Protection standards. Parking will be provided where deficient. CURRENT SITUATION: and 1989. Current DD FORM 1391, This project upgrades and modernizes housing that houses are inadequate and require major renovation DEC 99 Previous editions are obsolete. was built in to meet new Page No. 1984 455 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. (computer 4. PORTUGAL PROGRAMELEMENT 6. 88742 2. DATE generated) INSTALLATION AND LOCATION LAJES FIELD, 5. CONSTRUCTIONPROJECT DATA PROJECT TITLE WHOLE HOUSE IMPROVEMENTS, BIERA MAR CATEGORY CODE 7. PROJECT NUMBER 711-142 8. PROJECT COST ($000) MQNA023006 16,183 housing size standards and requirements. They have had no major upgrades since construction and do not meet the needs of today's families, nor do they provide a modern home environment. Plumbing and lighting fixtures are deteriorated and dated. The electrical and mechanical systems do not meet modern construction codes. Housing interiors are not functional, storage and counterspace are inadequate, cabinets are old and sinks are worn. Roofs, walls, sidewalks, and pavements require major repair or replacement due to the effects of Lajes' environment. Landscaping, lighting, parking, and recreations areas for housing residents are deficient. IMPACT IF NOT PROVIDED: Units will continue to deteriorate resulting in increasing operations, maintenance, and repair costs to the Air Force and inconvenience to the residents. Without this project, repair of these units will be done in a costly, piecemeal fashion with little or no improvement in living quality, and cause continual interruption to the families living in the units. Low morale and retention problems be expected to exist if conditions are permitted to continue. WORKACCOMPLISHED IN PREVIOUS THREE YEARS: Replaced water distribution, can FY03 and FY04. Constructed Biera Mar Interconnecting Road, FY03. Replaced fence and gates, FY03 and FY04. Installed Mylar, 300 units, FY03. Renovated kitchens and bathrooms (64 units, not included in this scope), FY03. Installed AFN Distribution and Telephone upgrade, FY03. Entry Ways and Patios, 170 units FY03. Landscaping, FY03. Replaced Heat Pumps, FY02, 300 units. WORK PROGRAMMED FOR NEXT THREE YEARS: None ADDITIONAL: This project meets the criteria specified in the Air Force Housing Guide for Planning, Programming, Design and Construction. An economic analysis has been prepared comparing the alternatives of new construction, improvement, and status quo operation. Based on the net present values and benefits of the respective alternatives, improvement was found to be the most cost effective over the life of the project. The cost to improve the units is 53% of the replacement cost. This project is not eligible for NATO funding. Also, shipping costs to the Azores have increased significantly and are accounted for in the FY06 program. The construction agent is NAVFAC, resulting in SIOH costs of 6.5%. Base Civil Engineer: Lt Col Terry Watkins, DSN 314 535-6113. BASE CIVIL ENGINEER: FOREIGN CURRENCY: DD FORM 1391, Haynie FCF Budget DEC 99 Rate Used: Previous EURO-DOLLAR .8785 editions are obsolete. Page No. 456 C)"""'#I;'" .'.' 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. CONSTRUCTION PROJECT DATA (computer INSTALLATION AND LOCATION 4. loK)RONAIR BASE, SPAIN 5. PROGRAME~ 6. 88742 " 2. DATE generated) PROJECT TITLE IMPROVE FAMILY HOUSING CATEGORY CODE 7. 711- PROJECT NOMBER 8. PROJECT COST ($000) QUUG033002 7 ' 128 -; \):,'~~ UNIT ITEM U M COST UANTITY PRIMARY FACILITIES IMPROVE FAMILY 5,353 HOUSING UN 34 157,431 ( SUPPORTINGFACILITIES 5,353 1,022 PAVDIENT LS ( 512) LANDSCAPING LS ( 122) UTILLITIES LS ( 388) SUBTOTAL 6,375 CONTINGENCY TOTAL ( 5 %) CONTRACT 319 COST 6,693 SUPERVISION, INSPECTIONAND OVERHEAD TOTAL AREA (6.5%) 435 REQUEST COST ) 7,128 FACTOR MOST EXPENSIVE 1 .28 UNIT 218,639 10. Description of Proposed Work: Provides general interior and exterior modernization and renovation of 34 housing units. Includes utility upgrades and additions to meet current standards. upgrades kitchens, bathrooms, floor coverings, improves floor plans, family rooms, provides increased energy efficiency, privacy fencing, patios, parking and pavements. Includes asbestos/lead-based paint removal. 11 .REQUIREMENT: PROJECT: JNCO (4), 36 UN ADEQUATE: 2 UN Improve Military Family 4 SNCO (3), 9 JNCO (3), Housing. This work is and 17 JNCO (2) units. SUBSTANDARD: 34 UN for 1 FGO (3), 1 CGO (3), (Current Mission). 2 REQUIREMENT: This project is required to provide modern and efficient housing for military members and their dependents stationed at Moron AB. The housing must be upgraded to meet current life safety codes and to provide a comfortable and appealing living environment. All units will meet "whole house" standards and are programmed in accordance with the Housing Community Plan. Renovated housing will provide a modern kitchen, living room, family room, bedrooms, and bath configuration, with ample interior and exterior storage. Living units will be expanded to meet current space authorizations. Two car garages will be provided. Neighborhood improvements are required and will include landscaping, roads and infrastructure utility replacement. CURRENT SITUATION: This project upgrades/modernizes housing that was constructed in 1957. These 46-year-old houses require major renovation to correct deterioration resulting from age and use. They have had no major upgrades since original construction, and do not meet the needs of today's families, nor do they provide a modern home environment. Kitchen and bathroom cabinets and fixtures are obsolete and deteriorated. Counter tops are warped, stained, and separating at the seams. Plumbing and lighting fixtures are deteriorated and dated. The electrical systems do meet modern construction codes except ground fault interrupter protection is not provided for DD FORM 1391, DEC 99 Previous editions are obsolete. Page No. 457 1. COMPONENT FY 2006 MILITARY AIR FORCE 3. CONSTRUCTION PROJECT DATA (computer INSTALLATION AND LOCATION 4. MORONAIR BASE, SPAIN 5. PROGRAMELEMENT 6. 88742 2. DATE generated) PROJECT TITLE IMPROVE FAMILY HOUSING CATEGORYCODE 7. PROJECT NUMBER 711-151 QUUGO33002 8. PROJECT COST ($000) 7,128 bathrooms, kitchens, and exterior circuits. Flooring is stained and loose. Windows are low grade aluminum and are difficult to maintain and clean. The units have inadequate living space and storage, and no patio or backyard privacy. Landscaping and recreation areas for housing residents are deficient. Paved areas need renovation. IMPACT IF NOT PROVIDED: Units will continue to deteriorate rapidly, resulting in increasing operations, maintenance and repair to the Government and inconvenience residents. Without this project, repair of these units will continue in a costly, piecemeal fashion with little or no improvement in living quality. WORKACC~LISHED IN PREVIOUS THREE YEARS: WORK PROGRAMMEDFOR NEXT THREE YEARS: to None None .ADDITIONAL: This project meets the criteria of the Air Force Housing Guide for Planning, Programming, Design, and Construction. A preliminary economic analysis has been prepared comparing the alternatives of new construction, improvement, and status quo operation. Based on the net present values and benefits of the respective alternatives, improvement was found to be most cost effective over the life of the project. The cost to improve the units is 67% of the replacement cost. This project is not eligible for NATO funding. The construction agent is NAVFAC, resulting in SIOH costs of 6.5%. BASE CIVIL ENGINEER: Mr. Britton Clair, DSN (314) 722-8314 FOREIGN CURRENCY: FCF Budget Rate Used: EURO-DOLLAR .8785 . , .. ~; ~,..; ~, #. ~ \1:' . ~c " , or ~ "i ~' DD FORM 1391, ",;3 DEC 99 Previous editions are obsolete. Page No. 458 1. COMPONENT AIR 3. MILITARY FORCE CONSTRUCTION (computer INSTALLATION INCIRLIK 5. FY 2006 AIR PROGRAM ELEMENT 4. TURKEY 6. 88742 PROJECT IMPROVE CATEGORY CODE 7. 2. DATE TITLE MILITARY PROJECT NUMBER 711-142 -9- DATA generated) AND LOCATION BASE ADANA, PROJECT FAMILY 8. HOUSING PROJECT LJYC064003 COST ($000) 20,081 COST UNIT ITEM COST ULM ~UANTITY IMPROVE FAMILY HOUSING (PHASE 1) 15,422 DWELLINGS UN 235 65,624 1 ( 15,422 ) 2,536 SUPPORTINGFACILITIES PAVEIoIENTS LS ( 650) UTILITIES LS ( 200) LANDSCAPING LS ( 300) RECREATION LS ( 100) COMMONNEIGHBORHOOD LS ( 180) COMMUNICATIONS SUPPORT LS ( 1,106) SUBTOTAL 17,958 CONTINGENCY (5%) 898 TOTAL CONTRACT COST SUPERVISION, 18,855 INSPECTION AND OVERHEAD (6.5 %) 1,226 TOTAL REQUEST 20,081 AREA COST FACTOR .9 I MOST EXPENSIVE UNIT 10. Description and renovation, 137,387 of Proposed Work: Provides and conversion of 235 units. doors, windows, floor improves floor plans, pavements, ll. utility units MOST EXPENSIVE Family and (Current UNIT: REQUIREMENT: This U.S. units, a comfortable This is the programmed common in units upgrade; 100 Housing Master of SUBSTANDARD: 1). This 79 JNCO four-bedroom, phase provides 850UN 5 SNCO four- 76 JNCO three-bedroom and were these to provide personnel neighborhood, and modern stationed infrastructure and at efficient Incirlik require Air 70 JNCO repair housing for Base. The and and appealing living environment and to meet current first of multiple phases to upgrade 750 houses. This with The Plan; required civilian accordance CURRENT SITUATION: l50 OUN (Phase Mission). is Government housing Housing areas. $137,387 project provide codes. and recreation ADEQUATE: Military modernization and bathrooms, electrical, HVAC and fire protection systems, energy efficiency, and upgrades patios, playgrounds 5 SNCO three-bedroom, two-bedroom units; finishes, increased 850UN Improve bedroom, airman systems, REQUIREMENT: PROJECT: and wall provides general interior and exterior Includes upgrade of kitchen current FY2004 constructed 150 750 units units Family Military in are were Housing Family 1961 and proposed constructed Master Housing are for at replacement 1983 thru to life safety project is Plan. Incirlik deteriorated in upgrade consists beyond in FY2006 1985 and of 900 economical per need FY2004 Family improvements to meet today's housing requirements. These houses had no major repair and/or upgrade since construction. Per FY2003 Housing Community Profile and FY2004 Family Housing DD FORM 139l, DEC 99 Previous editions are obsolete. Page No. lI!)!I I 1. COMPONENT AIR 3. FY 2006 MILITARY FORCE (computer 4. UNITED KINGDOM PROGRAMELEMENT 6. 7. 711-181 -9- DATE PROJECT TITLE IMPROVE FAMILY HOUSING CATEGORY CODE 88742 2. generated) INSTALLATION AND LOCATION RAF MILDENHALL, 5. CONSTRUCTION PROJECT DATA PROJECT NUMBER 8. PROJECT COST ($000) QFQE064001 2,038 COST UNIT ITEM COST U-LM~UANTITY PRIMARY FACILITIES 1,731 FAM HSG OTHER UN 10 I 173,130 ( 1,731 ) SUPPORTING FACILITIES 135 ROADS LS ( UTILITIES LS ( 75) CQIoIMUNITY LS ( SUBTOTAL (5 %) CONTRACT SUPERVISION, TOTAL AREA 93 COST 1,960 INSPECTION AND OVERHEAD (4 %) 78 REQUEST COST 30) 1,866 CONTINGENCY TOTAL 30) 2,038 FACTOR MOST EXPENSIVE 1.2 UNIT 201,419 10. Description of Proposed Work: Provides general interior and exterior modernization of 10 housing units; upgrades kitchens, bathrooms; improvement of floor plans; assessment of and any subsequent abatement of asbestos and lead-based paint. Neighborhood improvements to landscaping and utili ties and provision of playground and recreation area within the Airmen Married Quarters. All work carried out is to comply with current Base Standards, Host Nation/USAF and National Fire Protection Association requirements. 11. REQUIREMENT: 101 UN ADEQUATE: 90 UN PROJECT: Improve Family Housing. bedroom, and 4 FGO three-bedroom REQUIREMENT: This project military members and their be upgraded to meet current appealing will meet living "whole This project includes (Current Mission) . SUBSTANDARD: 11 UN 3 SOQ five-bedroom, 3 SOQ four- is required to provide modern and efficient housing for dependants stationed at RAF Mildenhall. The housing needs contemporary standards and to provide a comfortable and environment comparable to the off-base house" standards and are programmed in civilian community. accordance with the to All units Housing Community Profile. Renovated housing will provide modern living area, including family room, adequate bedroom/bathroom configuration, ample interior and exterior storage. Garages will be expanded to meet current authorizations. Neighborhood improvements are required and will include landscaping, playgrounds and recreation areas. CURRENT SITUATION: This project upgrades and modernizes housing that was originally constructed in the 1930s. These units require renovation and repair due to age and heavy use. They currently do not fully meet the needs of today's families. Existing roofs are approximately 70 years old and beyond their expected serviceable life. Smoke and carbon monoxide detectors are to be installed in accordance with current AF standards. DD FORM 1391, DEC 99 Previous editions are obsol.ete. Page No. 461 1. AIR 3. COMPONENT FY 2006 MILITARY FORCE CONSTRUCTIONPROJECT DATA (computer INSTALLATION AND LOCATION 4. RAE' MILDENHAr.L, UNITED KINGDOM 5. PROGRAMELEMENT 1 6. 88742 CATEGORYCODE Units DATE PROJECT TITLE IMPROVE FAMILY HOUSING 7. 711-181 IMPACT IF NOT PROVIDED: 2. generated) PROJECT NUMBER 8. PROJECT COST ($000) QFQE064001 will continue to deteriorate, 2,038 resulting in increased operations, maintenance and repair costs to the Government and inconvenience to the residents. Without this project, repair of these units will continue in a costly, piecemeal fashion with no improvement to living standards. Low morale and retention problems can be expected if such conditions remain. Affordable off-base housing is limited. WORK ACCOMPLISHED IN PREVIOUS THREE YEARS: WORK PROGRAMMED FOR NEXT THREE YEARS: ADDITIONAL: An economic analysis None None has been prepared construction, improvement and status quo operation. benefits of the respective alternatives, improvement effective over the life of the project. The project comparing the alternatives Family Housing Guide for Planning, Programming, Design and Construction. The cost to improve the units is 51% of the replacement cost. This project eligible for NATO funding. Base Civil Engineer, 011-44-1638-54-5630. FOREIGN CURRENCY: FCF Budget DD FORM 1391, DEC 99 Rate Used: Previous of new Based on the net present values and was found to be the most cost meets the criteria of the Air Force is not POUND .593 editions are obsolete. Page No. 462 ADVANCE PLANNING AND DESIGN DEPARTMENT OF THE AIR FORCE Mn..,ITARY FAMJLY HOUSING FISCAL YEAR 2006 BUDGET REQUEST FY 2006 ADVANCE PL~lliG AND DESIGN Program (In Thousands) FY 2006 Program$40,404 FY 2005 Pro~ $38,266 Purpose and ScoQe This programprovidesfor preliminarystudiesto developadditional family housingfacilities, onetime multi-phasedesign,and housingcommunityprofile developments;studiesfor site adaptationand determinationof type and designof units; andworking drawings,specifications, estimates,projectplanningreportsand final designdrawingsof family housingconstruction projects. This includesthe useof architecturaland engineeringservicesin connectionwith any family housingnew or postacquisitionconstructionprogram. Program Summ~ Authorizationis requestedfor: (1) Advanceplanningand designfor future yearhousingprograms; (2) FY 2006 Authorizationand Appropriationof $40,404,000to fund this effort as outlined in the following exhibit: February2005 PageNo. 463 1. COMPONENT AIR FORCE 2. DATE FY 2006 MILITARY CONSTRUCTION 3. INSTALLATION ANDLOCATION VARIOUS AIR FORCEBASES 5. PROGRAM ELEMENT 6. CATEGORY CODE 88742/31196 PROJECT DATA 4. PROJECT TITLE FAMIL Y HOUSING ADVANCE PLANNING AND DESIGN 7. PROJECT NUMBER 8. PROJECT COST($000) 711-000 40,404 9. COSTESTIMATE ITEM FAMIL Y HOUSING ADVANCE PLANNING AND DESIGN SUBTOTAL TOTAL CONTRACT COST TOTAL REQUEST U/M QUANTITY COST UNITCOST LS ($000) 40,404 40,404 40,404 40,404 10. DESCRIPTION OFPROPOSED CONSTRUCTION: Architect-engineer services, survey, fees, etc., in connection with advance planning and design of family housing dwelling units and properties included in or proposed for the Air Force Family Housing Construction Account. 11. PROJECT: This request is for an authorization and appropriation of $40,404million to provide planning and design costs in connection with family housing new or post acquisition construction programs. REOUIREMENT: The funds requested are necessaryto procure architect-engineer services to make site and utility investigations; one time multi-phase design, and housing community profiles (HCP) developments; and for the preparation of design and specifications of advance plans for future year family housing programs in connection with any family housing new or post acquisition construction programs. IMP ACT IF NOT PROVIDED: The funds requested are necessary to support the development of the housing community profiles and to support the new and post acquisition construction programs. Without the requested funds, housing community profiles cannot be developed and the new and post acquisition construction programs cannot be designed and constructed. \ DD FORM1391,DEC76 PREVIOUS EDITIONS MAYBEUSEDINTERNALLY UNTILEXHAUSTED PAGENO 4 6 ., :~~~ O&M SUMMARY DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST OPERATIONS.UTILITIES AND MAINTENANCE (Excluding Leasing, Debt, and Privatization) Program ($ in Thousands) FY 2006 Program $575,594 FY 2005 Program $705,734 Purpose and ScoI2e: Provides operations and maintenanceresourcesto pay for the cost of ownership in terms of property management,utilities, and maintenance of Air Force owned units. The Air Force family housing budget requestsessential resourcesto provide military families with housing either in the private market through assistancefrom a housing referral office, or in privatized or government housing. Increasedemphasishas beenplaced on the proper funding of the family housing operations and maintenanceprogram. The Air Force's FY2006 Operation and Maintenance programs emphasizethe following goals: * Identify affordable housing for military members. Where shortagesexist, identify project proposalsto privatize or requestnew construction or leasing of housing for military families. * Reduce utility consumption through increased managementemphasis on energy conservation, maintenenanceand repair projects to reduce energy consumption, and wholehouse improvements to improve energy efficiency. * Provide government appliances and furniture in foreign countries where member-owned units are inappropriate or non-existent and where new housing units which need governmentsupplied appliances are coming on line. Redistribute excessfurnishings from realigned bases. * Invest wisely in maintenanceand repairs to preservethe existing adequatehousing inventory worldwide. The top priorities are preservation of the good inventory that we have-keeping "good houses good"--and resolving problems that are a threat to life, safety, or health. We continue to adhereto the SPG to eliminate inadequatehousing units, including neglected infrastructure, and sustain our inadequateunits until they are privatized, receive a whole house improvement, or are demolished or replaced. * Schedule maintenanceand repair activities along with whole-house improvements to obtain the greatesteconomies of scale and enhancementin livability while increasing the useful life of housing units with the minimum capital investment and minimum impact on occupants. * Support privatization of utilities through the housing or utilities privatization program as appropriate. a. OI2erations. This portion of the program provides for operating expensesin the following sub-accounts: February 2005 PageNo. 465 i DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST (1) Management. Includes installation-level managementsuch as housing office operations, quality assuranceevaluators, administrative support, and community liaison. It supports the Air Force Family Housing Master Plan (FHMP) and General Officer Quarters (GOQ) Master Plan efforts. It also supports the housing referral program, assisting the 60 percent of Air Force families living in local communities to find quarters in the private sector and implementing the Fair Housing Act of 1968 and assists in placing members in privatized housing. Housing Management offices provide counseling on housing decision-making and advance information on new base of assignment. The managementeffort at installations privatizing housing will gradually be reduced to an appropriate level for inherently governmental tasks to include assetmanagement,housing relocation and referral services, and fiscal analysis. During major construction phasesof privatized units, government oversight is required. Manning levels will remain relatively stable until construction completion at which time they should decreaseas a minimum 20 percent. For baseswith competitively sourced operations, the Air Force must continue to provide oversight support and advise installation leadership. (2) Services. Provides basic support services including refuse collection and disposal; custodial services; fire and police protection; entomology and pest control; and snow removal and street cleaning. Privatized units do not receive funding from this account. (3) Furnishings. Procures household equipment (primarily stoves and refrigerators) and, in limited circumstances (largely overseas),furniture. Controls inventories of furnishings at the warehousesand maintains and repairs furniture and appliances. Becausethe majority of the funds in this account (85%) are spentoverseas,privatization, which is limited to CONUS and US overseaslocations, has little effect on this account. (4) Miscellaneous. Provides mobile home hookups, leasedoffice and warehouse space supporting family housing, payments to other Federal agencies or foreign governments to operate housing units occupied by Air Force personnel, and similar costs. Also funds Department of State surchargeswhere leasedhousing is procured through their services. Privatization has no impact on these activities. b. Utilities. Includes all purchased and base-producedheat, electricity, water, sewer, and gas commodities serving family housing. Occupantspurchase their own telephone and cable TV service. Where required, includes investment, operations and repair costs paid to nongovernment systemowners in the casewhere utilities have beenprivatized. Privatized housing units do not receive funding from this account. c. Maintenance. Privatized housing units do not receive funding from this account. Provides upkeep of family housing real property, as follows: February 2005 PageNo. 466 I DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST (1) Maintenance/Repair of Dwellings. Includesservicecalls, routinemaintenance andrepairs,and replacementof deterioratedfacility components.Housingmaintenance contractsare includedin thesecosts. (2) ExteriorUtilities. Maintenanceandrepairof water, sewer,electric,steamand gaslines supportingfamily housingareas.Whererequired,includesinvestment,operations,and repair costspaid to non-governmentsystemownersin casewhereutilities havebe privatized. (3) OtherRealProperty. Upkeepof grounds,commonareas,roads,parking areas, and otherpropertyfor the exclusiveuseof family housingoccupantsnot discussedabove. (4) AlterationsandAdditions. Minor alterationsto housingunits or housingsupport facilities. Largescopeandhigh dollar-valueprojectssuchaswhole-houseimprovementsare included in the constructionprogram. Operationand MaintenanceFY 2006Prog:ramSummary-Highlights Authorization/Appropriationis requestedin FY 2006 for $575,594. This amount,togetherwith estimatedreimbursements of $11,782will fund the FY 2006 Operationand Maintenance programof $587,376. A summaryof the funding programfor FY 2006 is asfollows ($ in thousands): Operations Utility Maintenance Total Direct Reimburse- Total Reguest Reguest Reguest Reguest ~ Program $148,169 $116,946 $310,479 February2005 $575,594 $11,782 $587,376 PageNo.4 67 - DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST Operations and Maintenance Reprogramming Fiscal Year 2004 Actions ($000) FY 2004 Appropriation Funds Percent FY 2004 Reprogrammed Reprogrammed End of Year Utilities 132,651 31,319 23.61 % 163,970 Operations Management Services 70,083 26,070 3,212 5,291 4.58% 20.30% 73,295 31,361 43,006 2,527 3,085 -410 7.17% -16.22% 46,091 2,117 Leasing 109,514 4,866 4.44% 114,380 Maintenance 394,631 -47,363 -12.00% 347,268 37 o 0.00% 37 44,536 o 0.00% 44,536 823,055 o Furnishings Miscellaneous Interest Privatization Total February2005 Support 823,055 PageNo.4 68 DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST USAF Family FY2006 PB Housing Operation and Maintenance, Summary Excludes Leased Units and Costs Worldwide 2006 Command: USAF Exhibit: FH-2 Summary FiscalYear: Invent~ Data lUnits) Units in Being Beginning of Year Units in Being at End of Year 2004* Average InventC?!:z:.-forYear Historic Units Units R~uiri~ O&M Funding: a. Contiguous US b. U. S. Overseas c. Foreign d. Worldwide Funding Fiscal Year: R~uirements ($OOOi 2005* 94,954 84,942 84,942 47,640 47,640 42,489 89,948 66,291 45,065 1,053 1,036 209 62,222 5,444 22,282 89,9~ Total Cost l$OOQl 2006* Uni Cost_($ 39,723 4,286 22,282 66,291 Total Cost ~$OOQl Uni Cosill 19,794 3,153 22,118 45,0~ Total Cost J$OOQl Uni Cost~$ OPERATIONSjpIRECT) Management * * 115,543 1,285 62,898 949 78,090 1,733 Services Furnishings Miscellaneous Sub-Total Direct Operations Anticj.P-atedReimbursements Gross Obligations, Operations 31,221 46,004 2,077 194,845 1,065 195,910 347 511 18 1,278 12 2,178 26,070 41,959 2,396 133,323 1,014 134,337 393 633 36 2,011 15 2,026 25,740 41,932 2,407 148,169 952 149,121 571 930 53 3,288 21 3,309 UTILITIES lDIRECll Direct Utilities AnticlP-ated Reimbursements Gross Obligations, Utilities 163,857 3,398 167,255 1,822 38 1,859 125,459 3,247 128,706 1,893 49 1,942 116,946 2,882 119,828 2,595 64 2,659 MAINTENANCE jJ;)IRECT) M&R Dwelling M&R Ext. Utiities M&R Other Real Property Alter & Add. Sub-Total Direct Maintenance Anticj.P-atedReimbursements Gross Obligations, Maintenance 196,476 88,073 32,361 28,906 345,816 6,477 352,293 2,184 979 360 2,184 3,845 72 4,608 258,353 117,255 37,729 33,615 446,952 7,335 454,287 3,897 1,769 569 507 6,742 111 6,853 232,841 40,747 24,367 12,524 310,479 7,948 318,427 5,167 904 541 278 6,890 176 7,066 GRAND TOTAL, O&M -Direct Anticipated Reimbursements GRAND TOTAL, O&M -TOA 704,518 10,940 715,458 7,833 122 7,954 705,734 11,596 717,330 10,646 175 10,821 575,594 11,782 587,376 12,773 261 13,034 * Inventory has been adjusted from previous budget to reflect program and execution changes * * For FY 2004 column, Management overstated due to the inclusion of the FY2004 CMA funding ($42,415K) February 2005 Page No.4 6 9 DEPARTMENT MILITARY FISCAL USAF FY2006 2006 HOUSING BUDGET REQUEST PB Fiscal Year: Family Housing Operation Excludes Leased Units and Costs Conterminous YEAR OF THE AIR FORCE FAMILY and Maintenance, Summary Command: Exhibit: 2006 USAF FH-2 US FiscalYear: 2004 Inventory DatajUnits) Units in Being Beginning of Year Units in Being at End of Year Average Inventory for Year 2005 66,550 57,894 62,222 Historic Units 57,894 21,552 39,723 1,02 Fundi~R~uirements ($000) Total Cost -I$OOO) Uni Costj$ 2006 21,552 18,036 19,794 1,01 Total Cost -I$OOQl Uni Costj$ 92~ Total Cost -I$OOQl Unit Coslli OPERATIONS -IDIREC"!l Management Services Furnishings Miscellaneous Sub-Total Direct Operations Antici2-ated Reimbursements Gross Obligations, Operations 49,560 14,661 3,717 809 68,747 781 69,528 797 236 60 13 1,105 13 1,117 38,865 7,415 3,471 1,072 50,823 668 51,491 978 187 87 27 1,279 17 1,296 53,298 10,706 3,224 782 68,010 571 68,581 2,693 541 163 40 3,436 29 3,465 UTILITIES jDIREC"!} Direct Utilities Antici2-ated Reimbursements Gross Obligations, Utilities 81,147 3,133 84,280 1,304 50 1,355 73,910 2,924 76,834 1,861 74 1,934 53,648 2,567 56,215 2,710 130 2,840 134,857 65,356 24,014 21,450 245,677 1,755 247,432 2,167 1,050 386 345 3,948 28 3,977 153,422 69,632 22,405 19,962 265,421 2,032 267,453 3,862 1,753 564 503 6.682 51 6,733 128,082 1,411 10,645 2,255 142,393 1,778 144,171 6,471 71 538 114 7,194 90 7,284 MAINTENANCE jpIRECT) M&R Dwelling M&R Ext. Utiities M&R Other Real Property Alter & Add. Sub-Total Direct Maintenance Antici2-ated Reimbursements Gross Obligations, Maintenance GRAND TOTAL, Anticipated GRAND * Inventory February O&M -Direct 395,571 Reimbursements TOTAL, O&M -TOA has been adjusted 2005 5,669 401,240 from previous budget 6,357 390,154 9,822 264,051 13,340 91 5,624 142 4,916 248 6,449 395,778 9,963 268,967 13,588 to reflect program and execution changes Page No.4 7 0 DEPARTMENT MILITARY FISCAL YEAR OF THE AIR FORCE FAMILY 2006 HOUSING BUDGET REQUEST USAF FY2006 PB Family Housing Operation Excludes Leased Units and Costs and Maintenance, Summary FiscalYear: 2006 Command: Exhibit: USAF FH-2 US Overseas FiscalYear: Invent~ Data lUnits) Units in Being Beginning of Year Units in Being at End of Year 2004 Aver'C!.9:.e Invent<?-!y'-forYear 2005 6,122 4,766 4,766 3,806 3,806 2,500 5,444 4,286 3,153 Historic Units 3 Total Cost Fundi~R~uirements~OOQl l$OOQl OPERATIONS iDIRECn Management Services 4,051 2,122 Furnishings Miscellaneous Sub-Total Direct Operations Anticipated Reimbursements Gross Obligations, Operations 2,255 0 8,428 0 8,428 UTILITIES1DIREC"!l Direct Utilities Anticl2-ated Reimbursements Gross Obligations, Utilities MAINTENANCE iDIRECT) M&RDwelling M&R Ext. Utiities M&ROtherRealProperty Alter & Add. Sub-Total Direct Maintenance AnticlP-ated Reimbursements Gross Obligations, Maintenance GRAND TOTAL, O&M -Direct Anticipated Reimbursements GRAND TOTAL, O&M -TOA * Inventory February 2006 has been adjusted 2005 Uni CosW 744 390 3 Total Cost l$OOQl Uni CosW 3 Total Cost Uni l$OOQl Cost ($ 3,608 6,021 842 1,405 4,570 1,202 1,449 381 414 0 1,548 0 1,548 10,738 6 20,373 0 20,373 2,505 1 4,753 0 4,753 908 0 6,680 0 6,680 288 0 2,119 0 2,119 26,287 0 26,287 4,829 0 4,829 9,776 0 9,776 2,281 0 2,281 18,498 0 18,498 5,867 0 5,867 4,051 2,122 2,255 0 8,428 1,072 9,500 744 390 414 0 1,548 197 1,745 5,097 1,112 1,912 0 8,121 1,098 9,219 1,189 259 446 0 1,895 256 2,151 17,869 244 997 289 19,399 1,511 20,910 5,667 77 316 92 6,153 479 6,632 43,143 7,925 38,270 8,929 44,577 14,138 1,072 44,215 197 8,122 1,098 39,368 256 9,185 1,511 46,088 479 14,617 from previous budget to reflect program and execution changes Page Nc4 71 DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST USAF Family FY2006 PB Housing Operation and Maintenance, Summary Excludes Leased Units and Costs Fiscal Year: 2006 Command: USAF Exhibit: FH-2 Foreign FiscalYear: 2004 2005 2006 Invent~ Data -LUnits) Units in Being Beginning of Year Units in Being at End of Year 22,282 22,282 22,282 22,282 22,282 21,953 Averagelnvent~forYear 22,282 22,282 22,118 Historic Units L ~ Uni Cosli$ 61,932 14,438 2,779 648 20,425 12,634 917 494 20,222 13,832 914 625 40,032 1,268 117,670 284 117,954 1,797 57 5,281 13 5,294 27,750 1,318 62,127 346 62,473 1,245 59 2,788 16 2,804 37,800 1,625 73,479 381 73,860 1,709 73 3,322 17 3,339 UTILITIES -.iDIRECT) Direct Utilities Antic1Q9ted Reimbursements Gross Obligations, Utilities 56,423 265 56,688 2,532 12 2,544 55,567 323 55,890 2,494 14 2,508 44,800 315 45,115 2,026 14 2,040 MAINTENANCE -.iDIRECT) M&R Dwelling M&R Ext. Utiities M&R Other Real Property Alter & Add. Sub-Total Direct Maintenance AnticlQ?ted Reimbursements Gross Obligations, Maintenance 57,568 20,595 6,092 7,456 91,711 3,650 95,361 2,584 924 273 335 4,116 164 4,280 99,834 46,511 13,412 13,653 173,410 4,205 177,615 4,480 2,087 602 613 7,783 189 7,971 86,890 39,092 12,725 9,980 148,687 4,659 153,346 3,929 1,767 292 451 6,723 211 6,933 Fundi':!.a R~uirernents ($OO~ OPERATIONS -1DIREC"!} Management.. Services Furnishings Miscellaneous Sub-Total Direct Operations AnticJpated Reimbursements Gross Obligations, Operations GRAND TOTAL, O&M -Direct Anticipated Reimbursements GRAND TOTAL, O&M -TOA 265,804 4,199 270,003 11,929 188 12,118 Total Cost j§OOQ} 291,104 4,874 295,978 Uni Cosli$ 0 Total Cost -1$00~ 13,065 219 13,283 Total Cost ($000) 266,966 5,355 272,321 Uni Cost ($ 12,070 242 12,312 * Inventory has been adjusted from previous budget to reflect program and execution changes * * For FY 2004 column, Management overstated due to the inclusion of the FY2004 CMA funding ($42,415K) February 2005 Page No.4 7 2 DEPARTMENT OF THE MILITARY FISCAL FY 2006 Budget Summary Estimate of Historic YEAR FAMILY 2006 AIR FORCE HOUSING BUDGET REQUEST Submission Housing Detail Fiscal Year: 1. Historic a. b. c. d. e. 2. Housing Costs, 2004 Fiscal Year: 2006 MAJCOM: USAF Exhibit: FH-6 2005 2006 Non-GOQ Data Number of Non-GOQ units on NHRP (Inventory) Improvement Costs ($000) Maintenance and Repair Costs ($000) Total Historic Maintenance, R~air, Im~ovements Average Cost Per Unit ($000) Historic Housing Costs, GOQ Data 998 1,390 3,879 5,269 5 998 27,635 3,144 30,779 31 203 587 7,168 7,755 38 a. Number of GOQ units on NHRP (Inventory) b. Improvement Costs ($000) c. Maintenance and Repair Costs ($000) d. Total Historic Maintenance, Re~ir, Im--p-rovements ~$OOQl e. Average Cost Per Unit ($000) 3. Total Historic Inventory & Costs (Non-GOQ & GOQ) 55 404 626 1,030 19 38 1,300 388 1,688 44 6 2,116 317 2,433 406 a. Number of Non-GOQ and GOQ units on NHRP (Inventory) b. Improvement Costs ($000) c. Maintenance and Repair Costs ($000) d. Total Historic Maintenance, Repair, Im~rovements ($000) e. Average Cost Per Unit ($000) 1,053 1,794 4,505 6,299 6 1,036 28,935 3,532 32,467 31 209 2,703 7,485 10,188 49 February 2005 ($000) Page No.4 7 3 This Page Intentionally Left Blank , I 1 ! 474 0 P E~I~i~\.. T ION S DEPARTMENT OF THE AIR FORCE Mll-ITARY FAMll-Y HOUSING FISCAL YEAR 2006 BUDGET REQUEST RECONCll-IA TION OF INCREASES AND DECREASES EXHIBIT OP-5 OPERATIONS (Program In Thousands) FY 2006Program$148,169 FY 2005Program$133,323 The FY 2006programrepresentsAir Force family housingrequirementsandwasdeveloped using OSD/OMBapprovedinflation andforeign currencyfluctuationrates. Adjustmentshave beenmadefor force structurechangesand missionrealignments.All programsub-accounts are describedin detail in the following analyses: February2005 PageNo.4 75 DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST Management. The Managementaccountincludesinstallation-level housing office operations,occupancy and contractorinspections,administrative support, community liaison, and the housing referral program, which assistsmembersin finding homes in the private sector. It also supportsstudies suchas the housing requirementsand market analysesand preliminary studiesand surveyrequirementsfor construction plans. ($ in Thousands) 1. FY 2005 President's Budget 2. CongressionalAdjustments: $70,680 a. Congressional Reduction -$7,782 3. FY 2005 Appropriated Amount: $62,898 4. Supplementals: None 5. Price Growth: None 6. Functional Program Transfers: None 7. Program Increases: None 8. Program Decreases: None 9. FY 2005 Current Estimate $62,898 10. Price Growth: None 11. Functional Program Transfer: None 12. Program Increases: a. Inflation (1.6%) +$1,006 b. Foreign Currency Rate Adjustment +$5,259 c. Programmatic Adjustments +$1,007 d. Transfer from Another Agency 14. +$407 e. IncreasedForeign National Salaries Costs +$7,513 FY 2006 Budget Request: $78,090 February 2005 PageNo. 476 I DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST Analvsis of Chan{!e in Management The Managementsub-accountconsistspredominatelyof fixed costssuchas salariesandrequired administrativesupportsuppliesandequipment.However,aspart of our management activity, we continueto use,modify andprovide training on the AutomatedCivil EngineerSystem-Housing Module (ACES-HM). This systemimprovescustomerservicesand datasharingfor overall program management.Training supportis alsoincludedto supporttraining requirementsfor housing operations,furnishingsmanagement,assetmanagement, and generalofficer quartersmanagement. The managementsub-accountprovidesfunds for HousingRequirementsand MarketAnalysesat eachinstallationto determinethe properamountof housingneededto supportthe assigned population;supportsthe Family Housing MasterPlan, which is the sourcedocumentfor future housingdecisions;andfunds GeneralOfficer QuarterMasterPlan efforts. The increasedpaceof housingunit inventoryreductioncontinuesto drive the costper unit up but managementeffort is not reducedon the samegraduatedscaleas inventoryreduction.The Managementsub-accountis not per-unitspecificsincethereis a basiclevel of supportandmanning for housingoffices regardlessof the numberof units. The managementeffort at installations privatizing housingwill graduallybe reducedto an appropriatelevel for inherentlygovernmental tasksto include assetmanagement, housingrelocationandreferralservices,and fiscal analysis. During major constructionphasesof privatizedunits, governmentoversightis required. Manning levelswill remainrelativelystableuntil constructioncompletionat which time they shoulddecrease as a minimum 20 percent. For baseswith competitivelysourcedoperations,the Air Forcemust continueto provide oversightsupportand adviseinstallationleadership. The declinein value of the U.S. dollar comparedto othercountries'currencieshasresultedin the necessityof establishinga lower exchangerate consistentwith the downwardtrend of the dollar. Military family housingoverseasis not privatized,so costshaverisen dramaticallyrelativeto the dollar. This hastranslatedinto increasedmanagement costs,primarily for salaries. February2005 PageNo.4 77 DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST Services.Providesbasicmunicipal-typesupportservicessuchasrefusecollectionand disposal;fire andpolice protection;entomologyand pestcontrol; snowremoval;and streetcleaningand custodial servicesfor government-ownedfamily housingunits. ($ in Thousands) 1. FY 2005 President'sBudget $26,070 2. Congressional Adjustments: None 3. FY 2005AppropriatedAmount: 4. Supplementals: None 5. PriceGrowth: None 6. FunctionalProgramTransfers: None 7. ProgramIncreases: None 8. ProgramDecreases: None 9. FY 2005 CurrentEstimate 10. $26,070 $26,070 PriceGrowth: a. Inflation (1.6%) 11. FunctionalProgramTransfer: 12. ProgramIncreases: +$417 None a. IncreasedCostsfor ServiceContracts + $6,580 b. Foreign CurrencyFluctuation(FCF)RateAdjustment +$4,646 c. Transferfrom AnotherAgency 13. 14. ProgramDecreases: a. Inventorydecrease(-21,224units x $571/unit= -$12,119) FY 2006 BudgetRequest: February2005 .-- +$146 -$12,119 $25,740 PageNo. 478 -1111111DEPARTMENT OF MILITARY FISCAL Analysis The of Changes Services budget units. However, locations. Per contracts (refuse Until The decline not has of 2006 FORCE BUDGET are of the into decreased are REQUEST result U.S. a lower increased as a result at installations due primarily entomology/pest will establishing translated been be required increases contracts in value has will cost in privatization necessity This request collection, privatization Delays YEAR AIR HOUSING in Services services unit THE FAMILY actually service scheduled are not privatization privatizing costs of and in service and housing in overseas maintenance control). awarded, compared exchange that to increased funds in non-programmatic dollar of the to other rate consistent costs, especially still required increases are to this countries' with since to provide currencies the downward military services. account. family has resulted trend of the housing in the dollar. overseas privatized. February 2005 Page No.4 79 is -111111111DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST Furnishings.Includesthe procurementfor initial issueand replacementof householdequipment (primarily stovesand refrigerators)and in limited circumstancesoverseas,furniture; the control, moving, andhandlingof furnishingsinventories;andthe maintenanceandrepair of suchitems. Loanersetsof furniture areissuedto military families overseasso they may occupypermanent quartersprior to the arrival of their personallyownedfurniture. "Loanerkits" consistingof tables, beds,sofas,allow membersto establishthemselvesin a housingunit beforetheir householdgoods arrive. Loanerkits are very costeffectivebecausetheyreducethe costof temporaryquarters. Other items of householdfurnishings,normally built into CONUShouses,which are limited or not included in foreign countrylocal constructionstandards,suchaswardrobes(clothesclosets),kitchen cabinetsor sideboardsandappliances,arealso issuedto military families. Housing in Europealso oftenrequiresthat closets(armoirs)and kitchencabinetsbe issuedsince Europeanunits do not havethe closetsthat areexpectedin the United Statesandkitchensusuallydo not comeequippedwith cabinets. The furnishingsaccountfundsessentialfurnishingsat levels consistentwith the needsof the Air Force. Much of the funding requestedin the furnishingsaccountresultsfrom an analysisof the mosteconomicalor costeffective way to fulfill servicerequirements.Issuingfurnishingsby the governmentavoidshighercostsin otheraccountssuchas military allowancesand other support appropriations. ($ in Thousands) 1. FY 2005President'sBudget 2. Congressional Adjustments: $44,459 a. CongressionalReduction -$2,500 3. FY 2005AppropriatedAmount: $41,959 4. Supplementals: None 5. PriceGrowth: None 6. FunctionalProgramTransfers: None 7. ProgramIncreases: None 8. ProgramDecreases: None 9. FY 2005 CurrentEstimate 10. $41,959 PriceGrowth: February2005 PageNo.4 8 0 DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST a. Inflation (1.6%) b. Foreign CurrencyFluctuation(FCF)RateAdjustment +$671 +$7,843 11. FunctionalProgramTransfer: None 12. ProgramIncrease: None 13. ProgramDecreases: a. Inventorydecrease: -$3,854 CONUS: (-19,929units x $ 163/unit= -$3,248) US Overseas:(-1,133units x $288/unit= -$326) Foreign: (-164units x $1,709/unit= -$280) 14. b. ReducedRequirementfor ReplacementFurnishings -$4,687 FY 2006 BudgetRequest: $41,932 Analvsis of ChanQ:esin Furnishings Furnishingscostsaretrendingdownwardoverthe long term from over$50 million peryear in the late 1980'sto $41.9M in FY06. Inventoryreductionsfrom privatizationdrive decreasesin the fundsrequired;however,all of the inventorydecreases are in the CONUS or US overseasareas,so the effect on the accountis minimal. However,the decline in valueof the U.S. dollar comparedto othercountries'currencieshasresulted in the necessityof establishinga lower exchangerate consistentwith the downwardtrend of the dollar. This hastranslatedinto lost savingssincea significantportionof furnishingsrequirementsis overseas. February2005 PageNo.4 81 DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST Miscellaneous. Includes mobile home hookups, leased office and warehouse spacesupporting family housing, payments to other Federal agencies or foreign governments (i.e. United Kingdom and Australia) to operate housing units occupied by Air Force personnel, and similar costs. Also includes reimbursement to the International Cooperative Administrative Support Services (ICASS) Program administered by the Deptartment of State. ICASS is a system for managing and sharing the administrative support costs of overseasoperations with US Foreign Affairs agenciesand other US Government agencies that operate in countries where the Air Force does not have a significant presence. ($ in Thousands) 1. FY 2005 President's Budget $2,396 2. CongressionalAdjustments: None 3. FY 2005 Appropriated Amount: 4. Supplementals: None 5. Price Growth: None 6. Functional Program Transfers: None 7. Program Increases: None 8. Program Decreases: None 9. FY 2006 Current Estimate 10. b. Foreign Currency Fluctuation Rate Adjustment 11. Functional Program Transfer: 12. Program Increases: a. Increasesin ICASS usage +$38 +$585 None +$513 Program Decreases: a. Inventory decrease(-21,225 units x $53/unit = -$1,125) 14. $2,396 Price Growth: a. Inflation (1.6%) 13. $2,396 FY 2006 Budget Request: February 2005 -$1,125 $2,407 Page No.4 82 DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST Analvsis of Chan2es in Miscellaneous Miscellaneous requirements have remained relatively stable as the inventory has decreasedbecause additional personnel have been stationed in locations where there is no significant Air Force presence. As a result, ICASS billings have increasedas the Air Force has relied more heavily on the Department of State for housing assistancein those areas. Furthermore, the decline in value of the U.S. dollar compared to other countries' currencies has resulted in the necessityof establishing a lower exchange rate consistent with the downward trend of the dollar. February 2005 Page No.4 8 3 This Page Intentionally Left Blank " 484 ,~ ..~ " '""'"'" '" "., UTILITIES DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST RECONCILIATION OF INCREASESAND DECREASES EXHIBIT OP-5 Utilities. This programprovidesfor all utilities consumedin government-owned family housing. Electricity, purchasedheating,water,sewageandwastesystemsareincluded. Military Family Housing (MFH) facilities consumeapproximatelyone-sixthof Air Forcefacility energyusage; therefore,MFH residentsand management sharea significantrole in the achievementof Air Force energyreductiongoals. The programmayalsofund MFH costsassociatedwith the privatizationof utility systems. ($ in Thousands) 1. FY 2005 President'sBudget $125,459 2. Congressional Adjustments: None 3. FY 2005AppropriatedAmount: 4. Supplementals: None 5. PriceGrowth: None 6. FunctionalProgramTransfers: None 7. ProgramIncreases: None 8. ProgramDecreases: None 9. FY 2005 CurrentEstimate 10. $125,459 PriceGrowth: a. Inflation (1.6%) 11. FunctionalProgramTransfer: 12. ProgramIncreases: a. Transferfrom AnotherAgency 13. $125,459 +$2,007 None +$464 b. Offset for increasedenergyprices +$31,397 c. ForeignCurrencyFluctuationRateAdjustment +$12,698 ProgramDecreases: a. Inventorydecrease(-21,225units x $2,595/unit= -$55,079) -$55,079 February2005 PageNo.4 85 1..11 DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST 14. FY 2006 BudgetRequest: $116,946 Analysis of Chaneesin Utilities Recentworld eventshaveresultedin significantincreasesin the price of oil. Althoughthese increasesmaymoderateby FY06 we believe it is prudentto plan for energypricesthat areaboveour recentbudgetinglevel of $1,900 perunit. As we look to the future basedon currentDepartmentof Energyprojections,we expectstableto slowly increasingenergyprices. The requirementfor FY06 has beendevelopedfrom historical expendituresasadjustedfor inventoryreductions. FY06 expendituresareprojectedat $117M or $2,595perunit. The FY05 per unit costswere slightly less thanthis, at $1,893. FY06 funding is budgetedat a per unit rate that reflectsthe FY04 actual programplus costincreases.The upward adjustmentshownin the OP-5 abovewasmadeto achieve this level of funding perunit. This level of funding is dependentuponsuccessfulcompletionof the aggressivehousingprivatization program. If theseprojectsaredelayedadditionalfunding will be requiredto paythese"must pay" bills. The only sourceof flexibility within the MFH accountsis in the maintenancesub-account. Furthermore,if the utility systemsare awardedto a utilities privatizationcontractor,dependingon the contract,eitherthis accountor the maintenanceaccountwill covergovernmentcostsfor up-front capitalinvestmentsto the system. To the maximumextentpossible,utilities will be privatized throughthe housingprivatizationcontractors-in this casetherewill be no governmentcostsincethe systemswill not be governmentsupported.If utilities areprivatizedseparately,capital investments associatedwith operatingandmaintainingthesesystemscanno longerbe deferredandbecomea must paybill. The decline in valueof the U.S. dollar comparedto othercountries'currencieshasresultedin the necessityof establishinga lower exchangerate consistentwith the downwardtrend of the dollar. This hastranslatedinto increasedutility costs,especiallyelectricity, steamheat,and watercosts, sincemilitary family housingoverseashas not yet beenprivatized. February2005 PageNo. 486 MAINTENANCE ,. h' DEPARTMENT OF THE AIR FORCE Mll..UARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST RECONCILIATION OF INCREASES AND DECREASES EXHIBU OP-5 Maintenance. Provides upkeep of family housing real property through service calls, change of occupancyrehabilitation, routine maintenance,preventive maintenance, interior and exterior painting, and major repairs. Pastlimited maintenance funding and a high occupant turnover have accelerated deterioration of the Air Force housing inventory. Housing condition assessments conducted for the Air Force Family Housing Master Plan (FHMP) substantiate that the maintenance and repair funding profile representsa balanced, fiscally constrained program that is consistent with the DOD goal to revitalize all our inadequate housing by or before 2007/2009, while ensuring sufficient Real Property Maintenance by Contract (RPMC) funds are available to maintain the existing adequateinventory. The program is also the fund source for any MFH maintenance and repair chargesassociatedwith the privatization of utility systems which are separatefrom the housing privatization initiative. MFH maintenance is broken into two types of service. The first is routine recurring work such as answering service calls and doing repairs necessaryto keep a house habitable, like repairing leaking faucets, replacing broken windows, or replacing furnace filters. It includes maintenance performed upon change of occupancy, such as painting, or carpet replacement. The Air Force FHMP draws a distinct line between military construction and maintenance funding. Architect and engineering firms gathered housing condition assessmentdata on every housing type in the Air Force. This data documents the existing condition of major housing systemcomponents (ex: roofs, furnaces, carpet, window, cabinets) and then, using industry standard life cycles, projects the replacement requirement for these components (ex: roof: 15-20 years; gas furnace: 20 years). The overall condition of housing components and replacement cost determined whether each requirement was projected for replacement or improvement through the military construction program or to be maintained using RPMC funds. This databasewas then used to project future facility funding requirements. ($ in Thousands) 1. FY 2005 President's Budget $435,782 2. Congressional Adjustments: None a. Reduction for three GOQ Projects Exceeding M&R Threshold -$230 3. FY 2005 Appropriated Amount: February 2005 $435,552 Page No.4 8 7 DEPARTMENT OF THE AIR FORCE Mll..ITARYFAMll..YHOUSING FISCAL YEAR 2006 BUDGET REQUEST i 4. Supplementals -Disaster Relief: 5. Price Growth: None 6. Functional Program Transfers: None 7. Program Increases: None 8. Program Decreases: None 9. FY 2005 Current Estimate 10. $446,952 Price Growth: a. Inflation (1.6%) 11. Functional Program Transfers 12. Program Increases: a. Foreign Currency Rate Adjustment 13. $11,400 $7,151 None +$32,554 b. Transfer from Another Agency +$1,979 c. Nonpay PurchaseAdjustments +$4,958 Program Decreases a. Inventory Decrease(-21,225 x $6,890Iunit = $146,240) -$146,240 b. Privatization savings -$36,875 FY 2006 Budget Request $310,479 Analvsis of Chan!!es in Maintenance Program The FY06 maintenance account reflects Air Force FHMP priorities and begins to show the effects of the privatization program. As a result of Mll..CON and housing privatization, the Air Force FHMP projects the need to revitalize approximately 23,500 inadequatehouses in FY06. As long as privatization initiatives and Mll..CON projects remain on track, the Air Force will be able to properly invest and complete required maintenance on existing units to keep good units good. Delays in the award of privatization projects will result in non-programmatic reductions to February 2005 Page No.4 8 8 DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST this account. The maintenance account is the only source of funds available to cover unprogrammed increases in must-pay accounts (i.e. management,services, utilities). Furthermore, if the utility systemsare awardedto a utilities privatization contractor, depending on the contract provider, either this account or the utilities account will cover government costs for up-front capital investments to the system. To the maximum extent possible, utilities will be privatized through housing privatization contracts -in this case,there will be no government cost since the systemswill not be government supported. !futilities are privatized separately,capital investments associatedwith operating and maintaining these systemscan no longer be deferred and become a must pay bill. The decline in value of the U.S. dollar compared to other countries' currencies has resulted in the necessityof establishing a lower exchangerate consistent with the downward trend of the dollar. This has translated into lost savings of since military family housing overseasis not privatized and still requires full maintenance. February 2005 Page No.4 ,~. 89 This Page Intentionally Left Blank 490 MAINTENANCE & REPAIR OVER $20K DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST NON-GOQUNITS This informationcomplieswith the Houseof Representatives, Military ConstructionAppropriationsBill (Conference Report106-221)requiringthe Servicesto reportmajormaintenance andrepairexpenditures projectedto exceed $20,000perunit. While theseprojectsareshownasline itemshere,themaintenance budgetestimateincludesthem amongoverallrequirementsfor the entireinventory. AF Policyis to programprojectsthatexceed$20Kthreshold whenwork cannotawaitMILCON funding. Workincludesactionsthat keep"goodunitsgood",protectlife, safety, andhealth,andensurefacility preservation. Location Base No of Vnits High Unit Year Built Cost ($000) Vnit (NSM) Proj (NSM) Improvements NonTotal Cost Routine FY2001-2005 ($000) ($000) CONUS FL Patrick 64 1993-96 44 93-135 8,068 1,501 0 Replaceall windowsand slidingglassdoorswith energyefficientwindowsand slidingglassdoors. Repaircrackson all exteriorsurfacesand exteriorfinish insulationsystem(EFIS)on all exteriorstuccosurfaces.Apply color finish coating. Provideguttersanddownspouts andrepairfascia. February 2005 Page No.491 This Page Intentionally Left Blank 492 GFOQ O&M COSTS DEPARTMENT OF THE Am FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST GENERAL OFFICERS QUARTERS This information complies with the 2004 MILCON Appropriations Act languagerequiring the Servicesto report any expenditures from the maintenanceaccount for Generalor Flag Officer housing projected to exceed$35,000 per unit. AF Policy is that all work performed in GOQs will be consistentwith the Individual Facility Profile (preparedas part of the GOQ Master Plan) for the affected quarters. Policy calls for programming projects that exceed $35K threshold when work in not eligible for or cannot await MILCON funding. Work includes actions that keep "good units good", protect life, safety, and health, and ensurefacility preservation. Total maintenancecosts shown below include routine maintenanceactions (e.g. service calls, grass cutting) and major maintenenance actions. co,!""'!, Location :: Base Q~rs ill ,:Size Year ""N~M" Built :':::Oper """ Total'ptilTotal ($QQQ)" M~(pt : "Total ,"Total, O&M Improvem~Ts NonRoutine FY:.2QO)-' 2005 ($000): ($000) ($000) ($000) 9.4 37 67.2 CONUS CO USAF 6950 1,073 1930 20.8 Academy Projected maintenanceand repair costsinclude funding for changeof occupancymaintenanceand repair to include carpetreplacement,grounds maintenanceand routine maintenanceand repair. CO USAF 6776 1,008 1930 23.2 9.4 53.1 85.7 Academy Projected maintenanceand repair costs include funding for changeof occupancymaintenanceand repair to include refinishing floors, grounds maintenanceand routine maintenanceand repair. OVERSEAS No Request February 2005 Page No. 493 00 00 ER-ER- co C C N ;a GI >- COlt) M a;a; ER-ER- oi ... ~ ""iij u u. f/) .-CO ... C') ~ I'--CO ..It) ~ I'-- .E C') ER-ER- ... ..ER- W I- .E 'c :) .. W ~ cn (.,) ~ ~~5 OZW ~~ GI~ u.-~ cn ~~I_ O <,n W ~ ~~g' ..~ W J:..-C >- ~ I-..J"., O fD u.~ .-~ ~'"": ~~ '"": g ER-ER- ~ CON NN ..; o O "Cf/) u. GI"C ..Of/) GI :;;:..Um GI><f/) GI.- UW~ ~ 0 .c~f/)O Gl~ -"1- C ~ oC):a~ OM I-u.o ;u:-g~ ER-ER- ~ Z>-N W~~ E"CGlm tcc.= tk::J>- g.EGIc~g -0 ~« I-I-W m~~g <~..J a.~< W" C m C')CO Glm ~ C cn -m ..-C u. It)~ It)_CO- S ~ 0 ~... ~ 00 "C C m C')C') alai ~ ~ .- f/) ~ 0 ~ '- 0 Q; c. c f/) 0 8'jij "C S 0(.) It) co mall'-c. CO 'u C 0 I'-- co ~ C < ~ .c U U ~ '-'- ~ 0 u. 0 u.LL 0 ~ « '-'- :) 0 N '.:{'.:{ 0 .. E ° < I-' (.) I-' -"C S 13 (/) -I "'0 0 494 - " , REIMBURSABLE PRO G~I~ ~~\ ..M / , DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST Reimbursement.Includescollectionsreceivedfrom rentalof Air Forcefamily housingto foreign nationals,civilians and others. Includedin the estimatearethe anticipatedreimbursements dueto memberswho voluntarily separatethat areauthorizedto live in governmentquartersfor up to six monthsafter separation. ($ in Thousands) 1. FY 2005 President'sBudget $11,596 2. CongressionalAdjustments: None 3. FY 2005 ProjectedAppropriatedAmount: 4. Supplementals: None 5. PriceGrowth: None 6. FunctionalProgramTransfers: None 7. ProgramIncreases: None 8. ProgramDecreases: None 9. FY 2005 CurrentEstimate 10. $ $11,596 PriceGrowth: a. Inflation (1.6%) +$186 11. FunctionalProgramTransfer: None 12. ProgramIncreases: None 13. ProgramDecreases: None 14. FY 2006 BudgetRequest: February2005 $11,782 PageNo.4 95 This Page Intentionally Left Blank 496 I LEASING ! DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST LEASING Program($ in Thousands) FY 2006 Program$154,907 FY 2005 Program$119,908 Pgmoseand Sco12e Supportsleasingof privatelyownedhousingfor assignmentas governmentquartersat both domesticandforeign locationswhenthe local economyandon-basehousingcannotsatisfy requirements.The leasingprogramis authorizedby 10 U.S.C.2828andprovidesfor paymentof rental,operations,andmaintenancecostsof privately-ownedquartersfor assignmentas government quartersto military families. This programalsoincludesfundsneededto pay for servicessuchas utilities andrefusecollectionwhentheseservicesare not part of the contractagreement. The Air Forcecontinuesto rely on the private sectorto meetthe majority of housingneeds. Where the private sectorrentalmarketsandon-basehousingcannotmeetrequirementsandcost-effective alternativesdo not exist, shortand long-termleasesareused.The Air Forcemustusethe leasing programin high costareasandoverseasto obtainadequatehousingto meetcritical needsandto avoid unacceptablyhigh memberout-of-pocketcosts. ProgramSummary-Highlights Authorizationis requestedfor appropriationof $154,907to fund leasesandrelatedexpensesin FY 2006. The FY 2006 requestfor family housingleasingpoints is summarizedasfollows: . EYM LeasePoints ~ Foreign* 9,105 2,726 Section801 5,800 3,835 Domestic 3,333 256 :EY..Q.1 Cost($000) ~ $48,260 2,739 $61,741 3,835 $4,229 244 ~ Cost($000) ~ Cost($OOO) $52,566 2,645 $86,079 $63,267 3,535 $64,831 $4,075 232 $3,997 * Reflectslower exchangerateof the dollar to foreign currencyin FY06. ForeignLeasing Congresscontrolsleasingin foreigncountries:first by the numberof leasepoints authorized,then by the reviewand approvalof contractproposals,and finally by the fundsappropriated.Air Force strategyis to provideadequatehousingfor our personnelwheremilitary family housingis not availablethus avoidingexpensiveoff-basehousingentitlements. September2004 PageNo.4 97 I I i DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST Section 801 Leasing This program is helping to reduce our CONUS family housing deficit at baseswhere Air Force families are seriously affected by housing shortagesand high housing costs. In FY 1984, Congress authorized the testing of a new leasing program for U.S. installations in P.L. 98-115, Section 801. Nine housing communities were constructed. Later events have prompted the closure of March AFB, CA and the leaseswere terminated. The FY06 budget reflects the termination of300 leases at Eielson AFB, AK in August 2006. The current inventory of801leases is shown in Exhibit FH4B. Domestic and Foreign Leasing:(other than Section 80 I ) The Air Force supports independentduty personnelresiding in high cost rental areassuchas Los Angeles and Boston. This supportis provided since housing within BAH rates is extremely limited. ~, Foreign leasesare primarily provided at A viano, Lakenheath,Spangdahlem,Singapore,and the Central Command area of responsibility. Areas under Central Command are provided leasesto support accompaniedAir Force memberswhere military family housing is not available. Leasesare provided for membersin other overseaslocations in which the Deptartmentof StateInternational Cooperative Administrative Support Services (ICASS) program administersthe .leasewith the Air Force providing appropriatefunding. September2004 --- Page No.4 98 DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST RECONCILIATION OF INCREASESAND DECREASES EXHIBIT OP-5 Leasing ($ in Thousands) 1. FY 2005 President'sBudget $119,908 2. CongressionalAdjustments: None 3. FY 2005 AppropriatedAmount: 4. Supplementals: None 5. PriceGrowth: None 6. FunctionalProgramTransfers: None 7. ProgramIncreases: None 8. ProgramDecreases: None 9. FY 2005 CurrentEstimate 10. $119,908 $119,908 PriceGrowth: a. Inflation (1.6%) $1,919 11. FunctionalProgramTransfer: None 12. ProgramIncreases: None a. Transferfrom AnotherAgency +$1,400 b. ForeignCurrencyFluctuationRateAdjustment 13. +$33,345 ProgramDecreases: a. Reductionof leasesat BuckleyAFB and OsanAB 14. -$1,665 FY 2006 BudgetRequest: $154,907 Analysisof ChanQesin Leasing The attachedleasingchartsreflect changesto the programby locationsandtype of lease. These requirementsarea direct resultof changesto missionbeddownsand otherhousingneeds. The decline in value of the U.S. dollar comparedto othercountries'currencieshasresultedin the February2005 PageNo.4 ~- -- 99 DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST necessityof establishinga lower exchangerate consistentwith the downwardtrend of the dollar. This hastranslatedinto increasedleasingcosts,especiallysince91% of Air Forcenon-801leases are for military family housingoverseas. February2005 PageNo.5 00 DEPARTMENT MILITARY FISCAL ANALYSIS I LOCATION I HOUSING YEAR 2006 BUDGET OF LEASED UNITS (Other REQUEST than Section FY 04 LOCATION 801) FY 05 LEASE # UNITS DOMESTIC OF THE AIR FORCE FAMILY COST MONTHS ($000) FY 06 LEASE # UNITS MONTHS COST ($000) LEASE # UNITS COST MONTHS ($000) LEASFS Los Angeles, CA 18 216 $374 18 216 $374 18 216 $492 San Antonio, TX (A FRS) 86 1,032 $1,232 75 900 $1,082 86 1,032 $1,292 San Antonio, TX (AFOATS) 36 432 $513 36 432 $513 36 432 $515 San Antonio, TX (AFOATS)- Puerto Rico Denver, CO Denver, CO (High Cost) New Boston, NH 6 72 $108 6 72 $108 6 72 $110 75 900 $1,337 75 900 $1,337 56 672 $1,016 25 300 $520 25 300 $520 19 228 $402 2 24 $42 2 24 $42 2 24 $42 Alameda, CA 2 16 $31 1 12 $27 1 12 $30 Pinedale, WY 6 72 $72 6 72 $72 8 96 $98 3,064 4,229 2,928 4,075 Unassigned TOTAL DOMESTIC FOREIGN LEASES 3,077 3,333 3,089 3,333 3,101 3,333 2,784 3,997 LEASES Oslo, Norway 1 12 $37 1 12 $44 0 0 $0 Amman, 1 12 $27 1 12 $30 1 12 $49 5 60 $90 5 60 $91 5 60 $153 1 7 12 84 $35 $257 1 12 12 144 $39 $498 0 13 0 156 $0 $906 Cairo, Jordan Egypt Brussels, Belgium Doha, Qatar Manama, : 1 12 $32 1 12 $32 1 12 $53 Nairobi, Kenya Bahrain 1 12 $21 2 24 $46 2 24 $76 Dijbouti 0 0 $0 1 12 $29 1 12 $48 Asmara, Eritea 1 12 $14 1 12 $14 1 12 $24 Amman, Jordan $84 2 24 $34 3 36 $51 3 36 Muscat, Oman 0 0 $0 1 12 $25 1 12 $41 Islamabad, 1 12 $21 2 24 $43 2 24 $71 Pakistan Doha, Qatar 1 12 $35 3 36 $102 3 36 $168 Abu Dhabi, UAE 1 12 $50 1 12 $50 1 12 $82 Bangkok, 1 12 $24 1 12 $27 1 12 $49 4 48 $312 4 48 $370 4 48 $633 Thailand Chaing Mai, Thailand Classified Location 1 12 $30 1 12 $33 Classified Location 0 0 $0 0 0 $0 Osan, Korea Sembawang, Aviano, Singapore Italy 1 12 C $1,400 $2,408 199 2,388 $2,815 199 2,388 $2,889 100 1,200 117 1,404 $3,882 117 1,404 $3,944 117 1,404 $6,610 700 8,400 $13,717 701 8,412 $15,303 707 8,712 $25,413 Bonn, Germany 1 12 $18 1 12 $18 1 12 Izmir, Turkey 2 24 $56 1 12 $32 1 12 1,222 14,664 Lakenheath, Stavanger, UK Norway Paris, France Paris, France Spangdahlem, Germany Vienna, Austria Copenhagen, Denmark Sanaa,Yemen Unassigned TOTAL FOREIGN IGRAND TOTAL LEASES FH-4 February 2005 $59 C $21,470 1,222 14,664 $23,509 1,222 $31 $54 14,664 $38,818 1 12 $55 1 12 $57 1 12 $94 7 84 $361 6 72 $366 6 72 $622 2 24 $95 2 24 $95 2 24 $160 440 5,280 $4,544 440 5,280 $4,544 440 4,224 $7,496 1 12 $44 1 12 $54 1 12 $89 4 48 $168 4 48 $171 4 48 $287 1 12 $15 3 36 $60 3 36 $101 6,379 9,105 32,712 1112,438 1 35,776 48,260 I 6,366 9,105 52,4891112,438 32,868 1 35,796 I 52,566 6,460 9,105 56,641 II 12,438 30,912 1 33,696 86,079 I 90,0761 Page No. 501 - 0 -0) '" :I ,~ ~~ ~ I- ~ ~ ~ ~ ~~~~ ~ ~ ~ ~~N.~~N_~N.~~~~N_N.~ ~ ~ ~ ~ 0 ~NNN NNNNNN ~~~~~~ NNNN ~~~~ C/) 0) a) 0) N a) ~o~~ Lo.I O v~ o) "c O) ~ ~ ~ ~ ~ ~ ~~~~~~~~~~~~~~~ 00000 II," C/) I~Oz IO~ -' ~~ <D<D<D<D<D<DZ<D~<DZ<D<D<D<D NNN ~~~ Z 0 ~OON M ~~~ ~ ~~NVa) ~N~~~ <D t/,~ WI- N~O~v<D~O~a)VNNO~ M~MO)~<DMM~<DVMO~NN ~~~~~M~~v~~~~~~<D ~ ~ ~~ ~ ~~ N'" ~~ ,.: C/) 0 CI'" I- C/) w ::> (t 0 0 9zw C/)::> I- '«ow ~ <-' W ~>::> 0 ~ g!XI -~ O ~<D IZ>N W(t(t ""0 Lo. 0 ~~~ I-I-W (t:J> ~~-J ~ 0 Z Z "C ,=-J E ~ .- -;;; ,_"C . O)~ 0) ",0) .c ...~ ...0 0 0) '" 0) "'0) 0" ~ ~ ~ ~ M O .OO ~ ~ N- N. ~ ~ N- ~ ~ N- ~ N. N. ~ ~ <D<D<D<D<D<D<D<D<D<D<D<D<D<D<D -NNNNNNNNNNNNNNN ~NNN ~~~~~~~~~~~~~~~ <;!; ~ Z v C/) ~ 00 I.c' u- 0 >- w~ ~o w~ ~ ~ ~.- 0 I 0 ", 0--g ", ---'" ;;; ", ..~ -I ~OONM ~~Nva) 0 v (j: 0," -~ ~ Z <D~O~V~~~<Da)~N~OO~ ~~MO)v~MN~~MMM~~a) ~N~~o) ~~~~~M~~N~~~~~ ~~~ I- v 0) 0) ~ ~ ~ 0) 0) ~ 0) ~ 0) 0) 0) 0) 0) 0) ~ 0) ~ ~ ~ Z M O'OO <D<D<D<D<D<D<D<D<D<D<D<D<D<D -NNNNNNNNNNNNNN ~NNN ~~~~~~~~~~~~~~ "C 0) C/) ~ 0) 0) ~ ~ N. I-~ ff:J1C/) 0 0 0) 0 ;0: T o O) 0 I ~ ~ ~ ~ N N ~ N ~ N ~ ~ N N ~~ ~ ~ N N ~ N ~ ~ ~ ~ N N N ~ v <D ~ N ~ N N ~O) Q.'" ~~ v-"C>~"C ~~ ~« ~« Z O)a)~Nv ~N <D-JC/) o~W..~ ~ ~a)~NN ~~N 1-c/)0)~ ~ > 0 ~ D- 5 Lo.I-W -J ~ ~ M ~ Iii LL ~ ~ ~ 0 .~ 0... ,=.~ 'inU ~~ "'"C Z 0 Lo. >-., W~ C/) >< ~ ~ I- 0 -J -J .2 ui 0 ot="*o.8o I Z W c: U ~ 0) E 0 i=.8C)-~"iij C/)t=~~!XIw ~ ~~"'~~' 0 '" 0 o~ ..' U, "C .-0) 'in~ C/) ~ ~ ~O)'" "'>-~ ~U'" 0 ~ Cl~- ~0)8 .c'" uO)" >< '" ~ '" .--J > 0 00) Z O).D ~ :I C/) 0 ~ ... ~ .C § -, > ~ ",..~ ~ CD ~ o"""ocO?J~£Lo. -§zE -O)EcOO) .!!1:g OCE"'.-"'O)(ij:lEoo"'~o.D:=.' O N C/) «> D- .-n u-""',,' 0 ~ _LL.!!}.~ ~°ui'" w..,; g ~ .J- ZI-Cl-- « C/)-J Z '" .t: Co..Q ~ « 0 0 0 , "'" ~~""", 0) 0 .t::o:;"iij ."'cO°:lo ~ .-:" W .t: :I .8 I- 0 ::; .Ai 0 '0 CI -E. woO) In-~ ~E -J>~ ~ v I-~ 1n"C Q~5 w... I .WO) Lo. ~ 0 0 « 0 ~ ~ C/) ~ I- I- 0 I- 1n5: Om 0 O~ 0) U >< 0) '" -..~ (t"'O0) ~ E 1-'".-Q. In a: 0) j U 5 e -Q. 0 0) I- '" w 0) CI ~ l(t ~ z ... --a. ~ ~ w ~.c~ ~ ~ <-' ...m ~OC <-' -~ -..3 --- ~ "C "C 0) 0) ..I- ~ ~ i '" 00'" OO)"C Z 0 0 "C '" ..~ zLo.O) ~ CI .Ai 0 -0) ...'" ~w j U ... 0 ~ O)~.c .~ ... ~ ..0 .~ u.~ 0) '"~ .m j U ~ m:l.c -~ 5 0) 0) j ~ s B U ~ ON Z I- E ~ >"C -J~ Inc/)~",-C/)::> ~~::>~~ E ~~~Lo.~Z~o O)~.-WW W ~ C C/) ~ '" ~.~ ~ ;: 0 ~ ~ 0 « In 0 ::> 0) .t= 0) C)"C ~ ..:- >- -s ~::> ~ ~ 0 ~ ~ '" m -CI -m >- o..m ~~ ~ ~>-z~u- ~ 0) O)"~ "':: ..m "'~ m"C"Ct w>C/).. 0 W ~ -.;::. -J~~~Il:~~ ~ "C EO)o O E I-~ ~ "~W @"' E OOOw~ j ~ ...", ~O) 0 ~ ~ 0 Z o l- ~ C/) ~ w w >0 ~~ Lo.~>~ ~~1ii~~0~ I--C/)~ ~ 0 0 ~ 0 '" ~~ 0) 0) ~.c a) ~ .c > "Cm'" a) O "'.= "C 0) ~.~ ...U 0)", ~ <D 0 ~ 00) u5 o ~ C/) oc ~ ,- ~ Q. 0) m~ Uj ,~ "C m m ~ ~ U ~ Q." 0 D- 'in > :c.c v 0 ~ ~ ~m >U 0) ~ 0) -0 ClO ~'" N~ON~~~~Mv~~M~~~ 0 N m 0)0) 0... N N~~N~<D~~~v~~~~OM > ~ -~ m 0) ~ 0 ~> ~O)~.. O)~ -0 ~Oz IO::> 0) 0) ",.. m ~ 0) Ic/)1," ~ ~ e 0)Q."~~ .~ m ~~ j", ~ '" ~ ~ 0»<0) '" >- ~.c C/) "'- ""c mO) 0» ~ I- .-CI 0~ ~~ ,Q ~ ~ N ~ ~ ~ ~ ~ v ~ ~ M ~ ~ 1;; 0 0 ~C~ ~~ ~w -~ Z 0::> U> U ~ 0 ~o UU>N ~ 0 O)a)~Nv ~N II-~ -I C !Q .~ ~ U>... ...10"<-'.cL1. :i:Q) L1..c Lo. ~~~~~~~~~~~~~~~ O)O)~O)~O)~O)~O)~O)~O)~ . ~ai ...~ Q. '" O)~O)~ '" "C O)~ 0 .."C Q.uj o 0 ~ .= (j: ~ O ~ C >-'"0) ~ 0) > "C -~II-O) ~ ---~ (t U> ~ CI 's:. ,= 0 0 w 0 0 'Q."C 0) ~O) :lU E~ ~ ~ N m "'- E ...''" :I '5" '" a) 0 <D 0) ~ ~ E '" ...~ ~ a) ~~~N~~O~~VO~M~~M 0 0 ~ "C v v M 0).. ~ ~ "C '" ~ m.~ ~ 502 IIn . (/J '-O o f-.. ~ ~ MOOOOO'-OOOO '-OONOO\ONII") ""NOOMMMOM 11")11")0 M'-O o 11")0\11") M" .-" or:: ' ~ .~ (/J Of-.. '""-" o(/J r: ""U '-OII")NOOO .-'-0 II") N O\OM\OOIl")N'1" N' N' N' '1"' ~~ ~~ ~ r11")' r-' '-OO\ r'1" '1"' ~~ '1"' ~ r-0r'-0 ~ N M' '-0 '-0 N M" '-0 w f- U) w ()c: U) ~:)f- « o wI"" I>-O f--l:) U-~CD o«~ W c: w ", f-CW C:-l>«--l (L~« W () ~ II")~ r~ Z ~5 MOOOOO'-OOOO '-OONOO\ONII") .-N 00 M M -(/J ~f-.. OIl")r-Nr-OIl")'1" 0\0 -« «~ ~ -" ~U-RJ ~~~ 0 c:C: w 0 ", "" zw a U- - () c: 0 U->- '-0 0, M MO\'1"O\NMNO\ ~ ..:: If-U)-" ~ ", U-",,(/) o ,~ '-~. r:o -,.., ~~ N """"N U ""O.'1"~'1" r- 1I")00r-0'1" N ~~ '1" '1" \0 '1" ~ '1" ~ 11")11")0 M'-OO 00, 0\, 00" M.-II") ~ r- '-0" '-0" ~ Oz-o -t: f- U) ro Z:)(/) wO ~ ~I.2:. f->-fC:-lE. ~~~ ~~~ ~-o~ za) -Z U) :)- o ~t; >-W (/J '1"f-.. ez rz5 ~ 0 RJ >- ~ U- o~S ~~~ M o 00 o o \0 00 o '-OONOO\ONII") .-NOOMM\OO"M .-M.-II") ~~~~~~~~ G~G~g~~g ~ 0 O~O(/J<~~< ~ ~ 00~0\0\~0\~0\ 11")\0""""0\ ;-; ~ (/J(/J~~(/J(/J<~ ~ro~ ~~gz~~g~ II") II") o M'-OO 00,0\"00" ~ 0\ ~ ~ < z Z -lU) ~ « U- ~(/J Of-.. . ~ MOOOOO\O~O '-OONOO\oNII") 11")11")0 M'-OO '-N~MM\OO,M 00"0\"00, 0 M.-II") Z ~ ~ § ~ ~, ~~~ ~ <I:~ ~, ~ f-.. ~<' ~ ~~~~~'~~~' 3 'C)<~~ ~::§~ ;:::o.e~> 0'P-.f-.. @~~ ~<':@~ ~ ~ aJj.~ ~o;:::pS.~~~ ~O~~f-..~~U ~J5~ S'§ ~ ~ ~ 8 ",e ~~~ ~ "\3 ~ "'~ ~~ SO 503 This Page Intentionally Left Blank 504 HOUSING PRIV A TIZA TI 0 N DEPARTMENT OF THE AIR FORCE MILn'ARY FAMll..Y HOUSING FISCAL YEAR 2006 BUDGET REQUEST HOUSING PRN ATIZATION Prof!Iam (in Thousands) FY 2006 Program $36,437 FY 2005 Program $39,104 Overview: The Air Force has, to date, awarded 12 projects and has 30 additional projects scheduled through FY06 that will privatize 31,546 end stateunits. Although the Air Force has acceleratedits privatization effort our pace has not been on track to meet the FY07 goal. As a result, we are embarking on an effort to award groups of installations as one project, which will provide economies of scale while accelerating the privatization effort. We plan to award a total of 50 projects before the end of FY07. Status of Awarded Projects: Location (Cityand State) SanAntonio, Abilene, TX TX Award Date Total # of privatizedunits Type of Deal (debt,equity) Construction Status Est Construction Complete Warner Robins,GA Anchorage, AK Dayton,OH Aug-98 Sep-OO Sep-OO Mar-01 Aug-02 420 402 670 828 1536 Debt WI Guarantee Complete Debt WI Guarantee Complete Debt WI Guarantee Debt WI Guarantee Complete Debt Complete 52% complete; Construction Underwa Nov-01 Sep-02 Jun-02 Sep-03 Aug-06 February 2005 Page No.5 - 05 DEPARTMENT OF THE AIR FORCE MILffARYFAMILYHOUSING FISCAL YEAR 2006 BUDGET REQUEST (City and State) Albuquerque, NM Cocoa Beach, FL Valdosta, GA Little Rock, AR Aurora, CO Award Date Apr-03 Oct-03 Feb-04 Jul-04 Aug-04 Total # of privatized units 1,078 552 606 1,200 351 Debt Debt Type of Deal (debt, equity) Debt WI Guarantee Equity Debt Construction Status Demolition and Construction Underwa Construction underwa Construction underwa Construction underwa Construction underwa Jun-06 Apr-05 Feb-10 Aug-10 Mar-06 Anchorage, AK Boston, MA Sep-04 Oct-04 1,194 784 Est Construction Complete Location (City and State) Award Date Total # of privatized units Type of Deal (debt, equity) Debt WI Guarantee Construction Status Demolition and, Construction Underwa February 2005 Debt Construction underwa PageNo.5 0 6 l DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST Projects Included in FY06 Bud(!etReQuest: NOTE: Details on the FY06 Privatizationprojectsareprovidedin the Family Housing Post Acquisition sectionof this submission I February2005 PageNo. 507 .-- -- DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST RECONCILIATION OF INCREASESAND DECREASES EXHIBIT OP-5 HousingPrivatization: This programprovidesfor all MFH O&M fundedcostsrelatedto privatization. The Air Forcepursuesprivatizationventuresto transferoperationand maintenanceresponsibilityto the private sectorwherecosteffective. Acceleratedrevitalization of housingassetsis the biggestbenefitfrom privatization. ($ in Thousands) 1. FY 2005President'sBudget: $39,104 2. Congressional Adjustments: None 3. FY 2005AppropriatedAmount: 4. Supplementals: None 5. PriceGrowth: None 6. FunctionalProgramTransfers: None 7. ProgramIncreases: None 8. ProgramDecreases: None 9. FY 2005 CurrentEstimate 10. $ $39,104 PriceGrowth: a. Inflation (1.6%) +$626 11. FunctionalProgramTransfer: None 12. ProgramIncreases: None 13. ProgramDecreases: 14. b. Reducedprogramrequirements -$3,293 FY 2006 BudgetRequest: $36,437 February2005 PageNo.5 08 DEPARTMENT OF THE AIR FORCE MILITARY FAMIL Y HOUSING FISCAL YEAR 2006 BUDGET REQUEST ExecutiveSummary: The Air Forcerequests$36,437Kin the FY06 BudgetRequestfor HousingPrivatization. These fundsarerequiredfor Air Force Centerfor EnvironmentalExcellence(AFCEE), MAJCOMs and installationsto execute50 privatizationinitiatives identified in the Family HousingMasterPlan or currentlyundergoinga privatizationfeasibility study. The fundsareprogrammedfor 1) project conceptdevelopment,2) requestfor proposaldevelopmentand projectsolicitation, 3) project constructionoversightfor local andfederalcodecompliance,4) portfolio management, and 5) MAJCOM andbasespecific projectmanagement support. Typically, $3.5M is requiredduring the life of the projectto executeeachprivatization initiative. This includes$1.3M in consultantfeesand environmentalstudiesrequiredfor initial conceptdevelopment($225K), andRFPdevelopment,solicitationand award($1.1M). The remaining$2.2M per projectis for constructionoversightat the installation($900K), yearlyinhousemanpowerexpensesat AFCEE ($120K),the dedicatedmanpowerexpensesat the bases andMAJCOMs ($1.1M), andportfolio management services($50K). ReQuested Detail: Conce~tDeveloument: AFCEEusesfive privatizationsupportcontractors(PSCs),14civilian, threemilitary and sevencontractin-houseprogrammanagersto team with MAJCOM andbase personnelto "design" a privatizationprojectconceptthat identifiesand analyzesthe project resourcesavailableor neededto producean economicallyfeasibleproject. Additionally, Air Staff review, oversight,andguidanceis requiredthroughoutthe process.Basedon the current executionschedule,we have $39.104Mprogrammedin FY05 for continuingthe currentinitiative of 42 privatizationprojectscurrentlyin progressandprojectionsfrom the currentfeasibility study. For 5 FY06 projectsaddedby Family HousingMasterPlan,we haveprogrammed $1.125M. Solicitation: AFCEE, usingPSCsand their in-houseprojectteam(engineers,lawyers,financial managersand acquisitionpersonnel),work with the MAJCOMs and installationsto developand issueprojectsolicitations. Thesedeveloperresponsesare thenevaluatedthrougha two-step process.First, the numberof submittingdevelopersis narrowedbaseduponan evaluationof qualificationsto no morethan five. The remainingcontractorsthenprovide a detailedtechnical andfinancial proposal. Theseproposalsareevaluatedanda contractawardis made. We have programmed$5.5M in FY06 for 5 projectsthatwill be in the solicitationstagein this fiscal year. ConstructionInsuection/Oversight:Oncea dealis awarded,MAJCOMs andinstallations provide supervisionand inspectionoversightof the developer'sconstruction. The Air Forceand February2005 PageNo.5 09 DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST DoD havea vestedinterestin theseprivatizationprojects(loans,loan guarantees, land leases) andthe oversightensuresthe Air Forcereceivestop-qualityhousingfor military membersthat complieswith stateandlocal constructioncodes. AFCEE assiststhe MAJCOMs and eachbase to provide constructionoversightasthe contractoraccomplisheshousingconstructionor revitalization. We haveprogrammed$14.91Min FY06 for direct SIOH for the 15 projectsthat will be in this stageduringthis fiscal yearand $1.1M for AFCEE and Air Staff supportof 14 positions. Portfolio ManalZement:Long-termproject oversightis keyto ensuringthe Air Forcecontinuesto receivequality housingfrom the privatizationcontractors.The Air Forcehasselectedan industryleaderin this field to assistAFCEE's four personnelandthe installationsby providing on-goingprogramoversightfor the lengthof the initiatives --generally 50 years. In this capacity, the portfolio manageroverseesthe financial andmanagerialaspectsof the dealto ensureloan paymentsaremet, escrowand lockbox accountsareestablishedand funded,and management is providing quality serviceto our members.This oversightidentifies anyprojectsthat are in difficulty and implementscorrectivemeasuresto precludeprojectfailure. We haveprogrammed $5.94M in FY06 to accomplishthis essentialoversight. As the programmaturesandmore projectsare awardedthis costwill grow as developmentcostsfall. Base/MAJCOMPOCs: Executinga housingprivatizationinitiative is manpowerintensiveyet MAJCOMs andbaseshavenot beenallocatedadditionalmanpower.To date,existing staffs have beenoverburdenedbecauseof the needto continueexistinghousingoperationsworkload while providing supportto the developmentof the privatizationinitiatives. A centralpoint of contactis neededat eachinstallationto coordinateall activitiesassociatedwith the privatization effort from the beginningof conceptdevelopmentthroughconstructionandmoving service membersand their families into the units. Largeprojectsor joint ventureswith anothermilitary servicewill requirean additionalpositionto supportthe expectedcoordinationand correlation workload. Onebase-levelmanpowerpositionis programmedspanningthe time from two years beforeprojectawarduntil constructioncompletionfor eachprojectunder1,000units andtwo for anyproject over 1,000units or projectsthat involve morethanone service. Also, one position has beenprogrammedfor eachof the MAJCOMs until their projectsareawarded.$1.2Mhas beenprogrammedin FY06 for 40 positions. February2005 PageNo. 510 I~ g,,- 5 J: "'~ ~ ~a:,,"- ", NN "-"- O mEo O a: oa: E -'~ e Et "- e ~o w ~ ~ "' z ~~~o CC t> Z Z ,", ~ ~ e-,-, ~ww ~>"-~~ J:~~J:~~ EE U :J u In'",. ~:J~ -c ~ow wJ:~ J: >- C ~..J:J u. ~ In ~~g Z >w~~ w C cccc "'"'"'"'"'"' ~~~~ EE NN ~ EoE z z 0 00 0 00 00 00"- 0 00"-0 a: 00 ~ w w ~ a: ~ a: ~ 0 ~ ~ 8 "-> o~o> 0"cc EEEE EE ~~ z z 0 00 z z 0 00 00 00 00 0000 0000 C"- coa:~ ~~ 0 ZOO a:a:>oow~ ~ w ~ ~~ ;:) ;:) ~ w -' ~ a: Z ~ Z z m m -a: < ~ 8 F ~ :J :J iE iE~ 8 ~ ~>oo(!)(!);:);:)o>oo ~,,-~~wWJ:J:~"-~~ 00 cc ='- cccc ",",",Q) ~~ ~~~~s~~~~~s ot> cc---cc OOCCCoo '-= "'"'"'='- e"'e 1~8§ eeee ~§~§ ee §§ ~~ 88 eeee~~eee~~ §~§~88~~§88 """ ~~ ~>~ "'~'" ~~~~ ~~~'" ~~ ~~ ~~ "" ~~~o~~~~~ "-"- "-"-"- ,,-,,-,,-,,-,,-,,-,,-,,-,,-,,-,,-I~,,-,,-,,-,,-,,-~,,- ~~~ ~~gg OO~ woooo~ a: w w~ 5 a: a: ~ (!) 8 8 ~ ~»o ~"-"-~ cccc "'"'"'"' EEEEt>oEEEot> ee §§ ~ ~ ~ ~ EEEE ~~~~ eeee ~§~§ NNNN"""""""S'" ~ NNNN ~~~~ "-"-"-"- m II .~ -"' g-g .-" "cO ".~ 0 ~ ~~o~ CI ~~ w .S (II S ~ ~~~g ,, 5'":"": 0 ft -NCD "'OOO~N ~ 0 J: ~ u: J:"-"-"- ~s~ o~ ~ .~ ~-..J a.~ U"-"- 0000 > -OI 0000 w w~ a: a: -' 8 8 E =»e coc c"'="' ~"- " $,,-,,- 500 w ~ ~< ~ ~ EE <ee z00 z ~ OOOO~0 0000. cc ",Q) ~~"- N ~~~ ~ ~ ~~>- G) ~a:m ~.~~ > ~ J: > !2 8 E ~>e a: W 00-, ~~ >N'" mO~ > ~ WU", ~OO ~WE ~~~ eee §I§~ ~ "' oo a: ~ -x B ccc Q)",~ EEE ~ee §~ ~~a Ozw "' ~ ~ ~ ~ ~ ~ ~ !.100-00 ~~wz cc "'"' w~ "-"' J: ~ .c'0~co~~ 0 ~ ~I~ E ~I'C ~ ~~ ~ 5 "' ~8m~~~ Q)CD~O ""~' ~o.o "!"!"!'":~~ """Nw", ~oo10 'i' ~~~ "!~o o " "'~ ~. CD"'.., -"ai" ~ ,- O ,~O!~ "'N"; ~.o~ ~~~go ..,'":c.j..;"! "'0 ~,'" ~.~~. ~~~o~~~~~~8N ~~~~ Q)~o c:i"~~o.o Q)CDO ..No O '~"!"!"':::::~-:N"!~"! ...:'":"":"! No"~'" 'i' ~ 'i' Co x W ~ ~~ o~ u~" "'- (/)-0 -'0 "'u '"Q) 0 0 .0 '" '": ." '"' " ~ 0 ~ Q) " '" '" -" CD O:J '"0 '" '" 0 0 0 Q) '"' ~ '" c:i '" 0 0 0 CD '"' ~ '"' ~ '" Q) NO... ---Q) co f'- 0 0 CD 0 '" '"' ~ 0 ~ Q) ~... N '" ... N 0 '" '" '" 0 g <0 0 W Q) ~"'" "'.. 00';: --f'"C;:) C ~ CD '" ~ CD .~ '" " " ~ ~ ~ Q) N '" ~ 0 CD N '" ~ ~ N ~ w z "'" '" '" ~-- CD . N N W "C ~"' ..'" > ";: 0 C;:) -Q) CD '" ~ 0 0 Q)" '" ~ ,- ...'" '" -- N CD N u N ~ N ti ,!!. e ~ -"- J: ~ -~ ~ -"- .!! ...0 -C ~ -w ~ ~ J: < (k: z.,; I 0 -~ -~ m ".,; ai c.,; ,2 I ~ ---, -.,; J: ~ z ~ ai "- ;:) Z ~ o m ".,; 0 00 (k: U 00 Z ~ .,; ~ W ~ ~.,; J: -.U ~ -' w - u ~ J: ~ I <.9 ~ -' "- z-"0 iig .,; -' Z z -' I ;:) ""- u 0 (k:"; w > 0 C - C -w tD -"-.,; ~ ~ Z -~ --~ -~ -tD N J: ~ X ~ "- -m- tD "C ,,-".,;~ z(k: -;:) ~ z ~ ~ -'m (!)-' Wa: W ~ ;:) ~ ;:) J: .,; -' m (!) U ~ ~ ~ Q) ~ C -,~.. C "-0 ~> ..." 0 , 0 , '" 0 , Co ~ .c 00 0 "- Q) U "' '" 0 .c 8 .>- Q) "- '" .0 m ~ .." C "" -, '" 0 '" 0 '" 0 C -, -:; -, -:; -, 8 .. OJ " < 8 OJ " < 'C ~ 512 -"--- Z 0 --::>-«z ~ CJ) u~5 CJ)~~ w~~ -w[!:WI-CJ)oo[!: Z 0 I- ~CJ)~ u5!!2 g ~~ CJ) w 0 1.~~~EE33~EE ew>-eeww>-ee ~OJu.u.u.ZZ~u.u. --~cc-cc~cooocooc ~~UUU~UU~ ~~~222~22~ t=:'eeiOiOiOeiOiOe ,0. 0. ~ C C " C ~" 'E E 0 0 0 eo 0 e -_uuu_uu- "'Iv w u ~"a Ozw LL in ~:;)I-c :n w ::> ~ <ow w:I:" :I: >- C >-NNM~-N--'" Qj~~~~~~~~~ .g>u.u.u.u.u.u.~~u. " GI > .~ o~ ..."'" ~ U I-u.~ .~ ~E"1"1ggM~~~~ I- ~5~~u;o..-,,?0~ ~~ < ~ fu -J < 0 :I: C ~ i.: ...<0 ~MOO"'~~<O- g' ,- -J ~~ ~~ 0 "-WCJ)~U ~co ~Z~[!:[!:lt:It:[!:~5 W ~ z >OZ ~w ZOJ~~ > ~~ !!2«z«w[!:z [!:~>g~ «~>-co ~««~~ 00 05~~~~~~WE uoo~~~o>-lt:e 001-1-1-1-1-1-u.~u. ~~~~~[!:~ ~::>:I:>-o<o «~001-1-u.1- ---c--c--~ccoc~occc ~~~U~~U~~~ ~~~2~~2~~~ ccc~~c c ~~~~~~ ~~~~~~ eeeiOeeiOeee 0. 0.'" C "'" c E E'e --_u_- ~ 0 z eeeeee 0. ~ 0. 0. ~ n" 0 e'E8 E E e 0. :55 OJ Z ~~~~~ ce" !~~G 'S:i;,;,u ~ ««Zo~~~.~~l- 00< ..,. oooo>:I:~I~~u.o«oo~::>u. ~~~~~~5 It:ooo«oo 1-1-1-1->1-1- ~~EEEEEEEEEEEE ««eeeeeeeeeeee OJOJu.u.u.u.u.u.u.u.u.u.u.u. ~ ~ c~ccc~~ 0000000 UUUUUUU 222S222 c-c o~o U~U 2~S E 8008800 e 0. 0. E e E e E E G~ ffi~~ ..~ W iOiOiOcoiOiOiO C C C C ~ C C uu uu w =8 ~$w ",v,. --cc~ ~~~ ~~~ iOe'" ~ 0. C 8 c c ffi ~.1:~ eee "'" E 0 e'e _u --- """"'O-~g~-N ~~~~~>->->-~~ u.u.~u.u.u.u.u.u.u. "'...'" ~~~~~~ u.u.u.u.u.u. ~ u. ~~"""'" ~~>->-~~~ u.u.u.u.u.u.u. N""" ~~~ u.u.~ _o-O-~~~.N MO~O...~O 0 ~~<O8~~~ m~MM--"'O~--"'MM ';!~~~~"1~~ro:~ ~~ro:~~oo:U:;: ~ 0. E """~ ~~~ u.u.~ I u. Q. W It:->- U~~~ ZU~~ It: -co C"g .2 " u.~CXJ 0 <0 to ffi>-~ W OJ ~ ~~< It:o~o '-= .~ ~ I--J:;) I- It:ZON oZ II) ~., "'--;9<o"'~'9'9'1"- -0'::0--;'::9 ro:~U:;:ro:~"!'": ~~~~~~~u:;:~~~~~~ 0 ~":"I'9~";o,? "'~"'MOOOOO-OOO'" ~ U I~ w .,~~ I "C 0... Uoo~'" 0 0 § ~ --~ ~ '" ~ -'" ~ m '" m N ~ ~ '"N M. -~ '"0 "'- 0 ...MN_m... <O"' N-~ '" (0 ~"'.m > --' ~ , co.," ';0 0 0 <0 0 0 ~ 0 MoO '" "1 ...(0 ' N Q) 0 ~ 0 0 0 ~ 0 0 0 ~ 0 0 Q) ~ ~ '" M IoU W ., ~!J OO~ "C~ ~ (O<OOM NN-"""~m (0 Q) '" 0 ro '" ~ ~ Q) N Q) g 0 '" -m 'c '" Q) ...Q) N ~ N '. <0 Q) ~ ~ N W "C ~'" .,.. --~ ~~ >~"'0 U U .,..: '- u z -0 ~ 0 ~--' :;! .u.= OJ g .!! -« ~ co E. .OJ [I] ~ ~ « w --' !!2 ~ ~ W Z W [I] -." u. « ::: 0 u 00 OJ u. « ..~u." ~rn««e «~O--,G ffi ~ oow~~u:! ::>~~01-:I: I-~~ZW :;!~w>-~ ~:l:100 ~ I- ~ > ~ « « U- ~ rn ai . ~ ~. ~ c 0 ~ rn ..; .U u. u. u. « 0 u. ..: 0 [I] u. « ~ G [!: « W ~ U [!: < u. [!: 0 :I: U U ~ !!2 > ..: [!: I- ~ Z W 0 Z « ~ 00 ~ [!: « OJ ~ rn -- > ., 10 0 ~ 00 "" ..~ '~OO 10 '" '" 0 ..!. ~ 00 '" '" '" (0 (0 <0 U 0 0 Z ., 0 0« 0..: 0. «..: 9> 0 00000 ,).c.c.c.c (0 ~ 0- >. ~ ~ , ,? a: 513 --- O~ 'eE~ 11: I- wZ a: mO wC/)Z~ ~~~~~ z Z ~ J: ~ >->-w~W ~U -~~~11:~0c/) .=~J:11: >~J:c/)1- ~ ."uOO > ~ ~ C/) ' O z~O E E E E E I.e~~eeeee ~.J~u.u.u.u.u. EEEEo:EE ...,.,.,0.,., EEEE'UEE ~ ~~~~2~~ ,:: eeee~ee 1-0 11:11: :)~C/) ~~~5 =~w~ oJ:z.JI-~~1- <~w~owwo :):)1- c/)c/)o J:1-1-~1-u.u.I-O~~ Eo:EEo: E EEEEEEEE EEE EE ~~~~~~~~ eeeeeeee ~~~ eee ~~ ee .,.2.,."g., EUEEo 0 EE ~~~~~~w~ ~~~~~~~~ ~~ ~~ u. U ::) u.u.u.u.u.u.u.u. ~~~~~g~~gg~~~~ eeeee~~e~~eeee ~w~ ~~~ ~~ w ~"'~"' ~~~~~~~~~~~a~~ u.u.u. u.u. u.u.u.u.u.u.u.u.u.u.u.~u.u. ~~~~ .,., EE ~~ ee u.u. " > m Ozw 11.-"" In'" ~::)I-c <ow ~ IV .~ -w w:I:O :I: >- C I--J::) g-g .-" -; <0 (D 1-11.0 .-0 ~ -..~ ~ ~ ~w~~"'~a ,"E~~~-"'.O N -u. );- 0".0 '.o-i::'~ ...~~~... ~~"' ~ ' ", "-;-' ", ' w~~"'~o~---", w .J §~ ~ ~ ~ ~:;;! EEEEEo:o:EO:o:EEEE .,., .,.,.,.,."g,g."g,g.,.,.,., EE EEEEEooEooEEEE m 00 11:1- ~ § ~I~ § § § § § § ~ ~ § §I~ ~ §I~ 8 81~8 8 §:~I~~ """ a~~oa C ~ooo 11:1-1-1- -~ § ~ e ~u.u.~~ ~« I- I- W ~::i>- ~oo~o~~oOww -J ~~ .,.,.,.,.,.,.,., EEEEEEEE ~g~~~ e~ee~ .,.,., EEE ~ E ~~~~~~~~ Z>-N w -JI1:I1:~~~O -J-J-J Z -Jc/)~ Uffi" E O»m I1:~~~~~~oooz~11: :)~ C/)C/)OOO~~~ m C/) C) u. ' .mOw w ~ ~ z U .J m ~w J: ~ 0 J:J:J:z~~ d~--I1:~"O ~ o:w ~ ~ E E E E W -10 11.~ "0 w ~~~ u.u.m ~ ~ ~ C/)u.u.u.u. >-"'~~~~~~ ~aaaaaaa GO ~ >-"000"0 '" C/)~~~~~ -~omwwm > -J -J Z ~ I- I- m J:eeee I- ~oa ~zz~ 0 w -J $: -J -J §I~ ~ ~ 8 ~I~ I~8 ~ ~ 8 ..~ ~ 0 .-11: 1-.!211: EU:) ..-guzz ~~~~~~~g ~ ~ g~~gm""~~ ~~~ a.-. ~~~ _0- ~re m", ~om~~~~~a~ ~ ~"!",mww"'~"',,:m -i mc;c;-'ddlrid odd .om ":""Iric;-id.oIri-i",m"'W-' '" ,.,,_. -."', g 18"'~ wa ",!- Ww "" ~~ "" ,~"',"'_"'--",~~.",~ ~-g~ ~ ., .-U 0 :I: I~ W ~ u: ..- "0 ~~... 0:;:o~ g'"= ~ '"= 0 ~ 0 '"~ ~'"~ 0"" 0 0"" ~ ...a ~m ~0 '"0"" N N ~ ..., ~ 0 ~ 0 0 ~m ~... 0 ffi ~ ~ 0w ~ w ..., ~ '" '" ~ ..., "'... ..>- ~ ~ g ~ ~ M ..., ~O:"". -::> 0 --~ "! ~ ..0..., ~""'" ~ d wU W .. ~ ~~ 0: ~::> ~,- _0: "'. w 0) ~ N w 0 ~ ",ww~~om '" ,aa-a",to 0 w"".-~~.N ... ~ ~ "".,; W "0 NO)"" ~ ~ 0 ~ ~ M ~ o)~~G..O """~-m"'t') ~'" -~"""N -~ ...~ 0 ~..; a U w m 0 U ~ U '5~ 5 ~ = S '" .: ~ u -C/) E ~ ~ 0 Z ~ -J m ~ $: ~ J: ~ ~ m ~ z ~ 0 -J 6 J: ~ « ~ ~ z 0 ~ ~ > « 8 m~ z g 11: W ~ a- 0 -0 ~ N ~ 0 ~ ~ U 11: 0 u. Q; « ~ ~ ~~ ~ ~ ~ U -~ J: ~ ~ C/)~ N -~_m~~~~_~~ mu. -mmmO-;. ~~~~~~~e ~gl1:~~~~o m-J~~~6~u ~~C/)OSoz~ 30w:)~z~« '00~~~~>~ uO 11: u. " ~ ~ ~ « ~ ~ m 0 11: W I'- E ~ ~ ~ ~ ~ I- :) .. ~ 0 0: W ~ co >. m 0 ,~ ~ a ~ ...,..., 0 0 woo'" 0 ~ ~ ~ .J..J..J. """ W , OJ OJ « W , C) " « W 0 " 0. ~ ~ OJ ".. W a c u ~ ~ 0 ' >~ "" > '., a- 514 I-~ (/) e~ ..0 "'u u ~ .~ ~ ~.~ c ,§~ ~~:I~\::: 515 ".. -e a. ! ..to >- w U W ::> It: ~ a Ozw u.UjIt: w:I: :I:>-c I-=~ v .c ft u.~(.Q 0<0 I- u. Z>-N WIt:It: 0 ~«I- W It:~>- I- <~-I a.~< W C '; :;= It: ::> I- :;ow "0 ~ GI .~ U (/) u: -'" C 0 "0 c :;= ~ :s o~ :;= ~ "'" .-~ e- ~ Q: ~5 .-U c ~ ..< ~ 0 :I: ;c: W CI"OE "O~ u"''" OOh W .. '"~fJ.c "O=» ~ W ..>'fJ "0 > c ~ =» . iLL "O.. c "0= c ...> u '" ...~.. ~ '",w .§ j -'" ". -~E",xc Ii .. '""0 ~.-'" 1S a.e --., '" E -~ ~ cwC .,-'" (!)~E°ti -ffil~l~ ~ s .3aa..,1S "0 z m ~ ." C~,"o.c '"-., ~ "'.!!-"8 CC-c" ~,,~,".c ., 10 0 -"Ec~~ "we>E '" .: C :c "'0-0 '"., °mmmm~ - C 0 .."""'C ~ .-=NNNN- ~ Do "~'s!a", U ~ <~NM"'. This Page Intentionally Left Blank 516 i i DEBT PAYMENTS : i i ! J 1 DEPARTMENT OF THE AIR FORCE MILITARY FAMILY HOUSING FISCAL YEAR 2006 BUDGET REQUEST DEBT PAYMENT Program (in Thousands) FY 2006Program$1 FY 2005Program$38 Purpose and ScoQe The Debt Paymentprogramcontinuesin nameonly, asthe lastof the Capehartand Wherry mortgageswere liquidatedin FY 89. This programcoverspaymentof Servicemen'sMortgage InsurancePremiumsto the FederalHousingAdministration(FHA) for mortgagesassumedby active military personnelprior to FY 1980. The HousingAct of 1954,Section124,Public Law 560, 83rd Congress,Servicemen's Mortgage InsurancePremiums,aided in providing homesfor membersof the Armed Forcesof the United Statesand their families with FHA mortgageinsurance.To be eligible for the benefit,members hadto be on active duty and owntheproperty. This programwas discontinuedthroughPublic Law 93-130(Military ConstructionAppropriationAct, 1980),which allowedcoverageonly on mortgagesexisting prior to FY1980. As membershaveretired or sold the houses,the amount neededto continuefundingpremiumson thosemortgageshascontinuedto slowly decreaseamd is adjustedfor inflation. Therehasbeenno paymentto the FHA sinceAugust2002, whenthe Air Forcereimbursedthe FHA for 2 policies. Consequentlythe fundingprogramwasreducedto a nominal amountin FY05, retaining only enoughfundingto supportthe two members.The programfor FY 2006 is alsoa nominal amount,asfollows: Fiscal Year 2006 2005 February2005 Number 2 2 Avera!!e Pavment/Yr $.5 $.5 Amount ($000) $1 $1 PageNo. 517 I This Page Intentionally Left Blank 518 FOREIGN CURRENCY EXCHANGE DATA ..c."...~~. m~~ W 1O000)0-q-NIO0~ 1'-0NNOO('o~~ C~CD(V)~NI'-I'-(v)N ~...,.-Ct"i~N-~N""'-~ .C0)0 .in U).~... ..-Q) => ~ '-.- W < 0 0 < N ~ => LL.GO OZW u.-~ ~U)..of" -=>'-""'<OW:I:I/) :I: 1ft C W G Z ~ U :I:>-§ w:x u.~CD 0<0 UO z.c .-0 Z W '-::!m W N,.,C ~ ~ < < W ~:J><~-J ~ ~ (V) M ~ .". , > -C u (,O-q-O-q-1'-1O1O1'0)~00)(v)1O~~ -C~ O)(V)O)(V)ONO)IO ~CI/)r--.:~'o;I";~~~ ,.-~ OCUQ)I'-~IOI'-~ 0)0 c"iU N CDQ.U~ ~ ~ Q. <W >< >-~ u. >~ XC ~ ~ .".g-C ~ 0 ffi W"'" -q- -q10 ~ ~ 0)01'-0~0CX)-q-0) CDO)~N~~NNCD .-~O)~~o)CDI'-cx)~ C 0)0 LL. .-.C ~ .". U)'~ => -.'- :J~> .".g-C ~ ~8 < W C U U) W ~ -0 0 N iL ~ ~ .-CD ~ --~ ~CX) CX) ~ N(v)NCDCD ~ ~ ~ -q- ~ Q) U z ~ Q. ~ ~ (V) 0) ~ ~ .". (,O-q-O-q-1'-1O1O1'o)~Oo)NIO~~ -CQ) O)(V)O)(V)ONO)IO Q) g' I/) r--.: ~ '0;1";~ ~ ~cu$I'-~IOI'-N c Q.U~ CU q-- ~ 0)0 N ~ (,0~ Q.>< <W >- u -Q) ~t: C Q) Q)I- "0 CeCC~CCU§ -JU~UJ>-~O>-.Jc.. 0 ~ e ~ Q) e E E 0 ~ ~I-ro ~ ~ 0 C Q) g .: ro"C 0 E 0 () Q)~ g C I- .- >.o~ roQ) E 0 0. o.croroJ::Q)"Coro~0)-~2cu I0. c: ~ 0 ro 0 C .-0 >. ~ uOUJ-,Z(J)(J)'-=>,- I~ ~ .-C 0 519 This Page Intentionally Left Blank 520