BPA ANNUAL REPORT Executive Summary BPA Accomplishments 2009-10 New initiatives: • Out of a total of 17 new initiatives identified for 2009-10, 13 were fully completed, 2 were partially completed, and 2 were not completed. • Out of a total of 10 process improvement initiatives identified for 2009-10, 9 were fully completed and 1 was not completed. • Out of a total of 10 training and development initiatives identified for 2009-10, 9 were fully completed and 1 was partially completed. Budget: • The 2009-10 Annual Operating Budget total was $139,545,130 for UW-Stout. Salaries & fringe benefits totaled $85,151,933, which was 61% of the total operating budget. • $252,396 was allocated as base funding for university priorities in 2009-2010. • 1,357 (1550 in 2008-09) Budget transfers (excluding computer cost share BTs) were processed • 194 computers were purchased in 2009-10 for a total of $343,091 through the Computer Cost Share Program. • Completed Annual Operating Budget Book and Fiscal Year-End Budget Review Book Campus Planning: • 12 (28 in 09-10) space requests were processed • Significant number of capital projects in progress or completed: Harvey Hall Renovation – Phase I Theatre project; Hovlid Hall Renovation and Addition project; Memorial Student Center Renovation project; Fleming Hall Renovation project. The Campus Master Plan was approved. Institutional Planning: • Performance indicators updated and approved for FOCUS 2015. Analysis: • The following projects were completed in 2009-10: o 38 (22 in 08-09) Applied Research Center projects 1 o 14 external surveys o 379 (370 in 08-09) IR and grad student projects completed by BPA staff o 608 (309 in 08-09) projects completed by BPA and ARC students • • • For a total of 1039 projects 36,071 (67,331 in 07-08; 45,070 in 08-09) sheets were scanned. Implemented Alumni Follow-Up lean process - 100% of action items are completed. Obtained approval from Board for Regents for renewal of Access to Learning and Customized Instruction Policies • 5 (12 in 2008-09) policies were revised, implemented or eliminated • 7 policies are in the review process Quality • Developed a workflow process for updating AQIP data 2 2009-10 NEW Unit Goals for Budget, Planning and Analysis The Unit Goals for the BPA office are derived from the BPA Mission, Vision, Values & Goals available on the BPA website: www.uwstout.edu/bpa/aboutbpa.htm as well as the ASLS division focused initiatives Goals : General BPA office operations BPA Implementation Strategies: Backups: Each person identify one project to document and then review and share with assigned backup: • Annual timeline associated with retreat process • Fact Book • Segregated Fee Spreadsheets • Custom Scanning • Exit Survey • Budget spreadsheets • Lab mod process • Budget transfers Responsible: Achieved Outcome indicators : Goal ? Partially • All 8 projects documented and saved in the instructions folder • All 8 projects shared with backup Progress The exit survey was migrated to Qualtrics in Sept 09. Because of the planned migration, the process for conducting the analysis in Vovici was not done. This project will move forward to the July 2010 data analysis in Qualtrics. Custom scanning has a first draft on file documentation is complete Seg Fee documentation started Seg Fee documentation is complete -Meridith -Sally -Tammy -Susan -Wendy -Patty -George -Michelle Draft timeline for retreat process has been started. Timeline for retreat/planning process developed and in logs folder. Documentation for Fact Book started Documentation completed. Budget spreadsheet not started. – Documentation complete. George will be identifying new project to document Space management process for utilizing and assigning academic space was 3 selected for 2009-10. This project is in progress. Michelle Yes Implement discussion board concept to discuss projects, how results are used, provide feedback Michelle Yes • More discussion board comments are posted than what we have traditionally seen on the listening session message board • Conversion completed by December 31, 2009 Complete web conversion Administer the Annual and Biennial Operating Budget Processes Administer the Planning and Capital Budget Process Finish implementing ImageNow in Budget drawer Digital signatures fully implemented for budget transfer form HRS implementation Implement imaging in campus planning drawers (2) Digital signatures fully implemented for Space request form Patty No • All Budget documents scanned Patty and Michelle Yes Patty Yes • Budget transfers are only accepted in electronic format Implement HR portion of HRS All campus planning documents scanned Space request forms are only accepted in electronic format George No Yes George Budget transfer documentation is complete. The discussion board utilized was LinkedIn. Will be looking at a different method for this broader discussion board Decision made to post announcements/results on our main BPA webpage. There is an announcements section in our newly converted page. Hired STAR group to assist with conversion. Will be leaving information portal pages as is until decision is made as to if we are moving ahead with the information portal project. Will convert by the end of December, 2009 Website converted. Not started – Started going through folders to eliminate documents that don’t need to be scanned. Some documents have been imaged. Complete In Progress – still in progress, attended a session on training in Eau Claire. Drawers being set up. Drawers have been set up. Will review with Kristi and Sue Krings Two forms routed through ImageNow beginning in October. All forms are currently only accepted via electronic format. 4 Memorial Student Center Renovation Yes George Implement quality training certificate program Yes Wendy Quality Implement imaging in Quality drawer Yes Meridith Expand Applied Research center Yes Meridith Michelle Cori Revise enrollment model Perform Institutional and Student Research and Assessment A/E selection completed Begin design process Program is advertised Two sessions held Minimum of 30 attendees across the two sessions File structure set up Documents begin to be imaged Hire new 50% person At least 3 external clients Earn enough revenue to keep 50% person for 2010-11 Yes New model developed and implemented Sally Expand PolyDASHER Partially Wendy At least three new institutions join Kickoff meeting held mid-December Design meetings being held First session was on AQIP/Baldrige in November 2009. 24 attendees. Spring session scheduled for 4/21/10. Presentation planned for JPD. Presentation offered during JPD 2010. Second session was held 4/21/10 with 10 attendees. Fall session is currently being planned. AQIP/Baldrige folder set up and documents are being imaged. Workflow process for AQIP also developed. Cori Beskow hired. 3 external clients: UCRiverside. ETS Study. Research 2 Jobs. The ARC continues to grow, with 7 projects in 2007-08, 22 projects in 2008-09, and 38 projects anticipated for completion in 2009-10. Will be using Delaware model. ACE intern, Chandra Sekaran also reviewed model and provided recommendations. New enrollment model developed and implemented. Wentworth Institute of Technology, USF Polytechnic, have joined, SPSU has indicated they will join. Teleconference being set up for 2010. Teleconference was held in March 2010, and participants agreed to help with recruiting new members. PolyDASHER has been featured in an upcoming AIR publication and was used as a model by DePaul University. 5 Yes Implement Survey Clearinghouse- Phase I -Address master list concept for survey mailing lists -Address issue of how surveys that are done for “learning how to do research” are administered Meridith Information portal Yes Continue working with LIT on implementing information portal Meridith Implement Tableau for one project Wendy and Tammy Yes Program facts and figures project completed Clearinghouse committee has agreed on a concept. Concept presented to many groups. Proposal provided to Diane with July 1 as proposed implementation date. Presented to Issues. Will be working with STAR group for IT component of the project. Obtained approval to proceed. Software application will be completed by end of FY. BPA will begin loading own surveys to test software before rolling out. Committee members have been selected for implementation phase of project. Conversations being held with Omni resources. Proposal presented to Diane in November, 2009. Will post on Vendornet in January, 2010. Hired Omni. Initial kickoff meeting held. Goal to implement October 2010. In Progress. Initial reports shown for feedback. 6 Process Improvement Plan: • Implement “lean” for Alumni Follow Up Survey- Sally and IR team 100% percent of action items completed. 1st survey will go out in January. Survey deployed. Response rate 32% compared to approximately 35% last time. • Complete and sell focus group training module. Begin work on qualitative analysis module Focus group module will be sold through continuing education or ARC. Target launch date is being revised. Work on Qualitative module is underway. Module page has been developed on ARC website for information. • Implement ESURC efficiencies: o Graduate students responsible for putting surveys online Complete o Use canned Qualtrics reports Complete o Develop Qualtrics survey template Complete o Removal of grant-funded areas from list Complete o Maximum of 2 surveys per unit Complete • Implement scanner efficiencies: o Deliver scanner reports electronically instead of paper Implemented starting in Sept 2009 o Scan once per day at noon Scanning occurs once per day between noon and 1:00 o Graduate students responsible for doing scanning Schedule created for which students are doing scanning on which days • Implement listening session efficiencies: o Only paper handouts provided are response form Provided one paper handout, everything else online o All listening session notes typed on laptop and shown on computer screen Completed • Implement final version of checklist for finalizing reports IP – has been revised and is being revised again. New version implemented. • Migrate surveys on to Qualtrics and use canned reports where possible All surveys migrated to Qualtrics. • Eliminate usage of Vovici Vovivi eliminated Sept 30, 2009 • Utilize Brio report for Budget Availability Quarterly report – eliminate custom reporting Implemented. Also implemented for work study quarterly report. • Migrate two budget books to online only version Fiscal Year-End Budget review book completed and online. Annual Operating Budget Book complete & online. Achieved Goal Achieved Goal Achieved Goal Achieved Goal Achieved Goal Achieved Goal Achieved Goal Achieved Goal Achieved Goal 7 Training and Development Plan: • Achieved Goal Devote at least one staff meeting to diversity issues (Susan) and encourage participation in other diversity activities offered throughout the year Discussed Diversity articles at BPA office meeting in fall 2009. • Encourage and support (where fiscally possible) participation in workshops and training sessions, with a goal to pay for each staff member to attend one offcampus event (or on campus event, if preferred) per year. o Patty – Attended CACUBO Professional Development Workshop in St. Louis, Missouri – February 2010, attend UW-System Finance Training in May 2010 o Wendy – Presented at AIRUM, polytechnic summit, IPEDS workshop, IUPUI Assessment Institute, attended HLC annual meeting/ AQIP Colloquium in Chicago, SP2010; presented ARC poster. Will be copresenting at 2010 Polytechnic Summit. o Susan – VSA workshop, presented at AIRUM; presented ARC GHG poster at UMACS conference; presented at AIR conference in Chicago o Sally- AIRUM attended and presented at AIRUM o Meridith – Polytechnic summit, presented at Baldrige regional conference, UW System Finance Training o George – SCUP Will attend National Conference in July o Tammy- AIRUM, attended AIRUM in October o Michelle –UW System Finance Training in May o Cori- Attended AIRUM in October 2009 o Maureen – CommonSpot training, Qualtrics webinars, ImageNow training • Continue to use some BPA office meetings for professional development activities. Reviewed fiscal year-end budget review book and Master Plan. Achieved Goal • Achieved Goal • Achieved Goal • Continue to develop written procedures for critical procedures/responsibilities in order to help in cross-training others See item #1 in new initiatives. Working on additional documentation for working with the students. A document management system (DMS) has been created for BPA (including ARC). This will allow a central location, access to the latest revision and revision control, and reduce our time ‘finding’ written procedures. Continue to provide back-up training to other staff in the BPA office Wendy has access to CommonSpot ARC pages and all BPA pages, and is able to create new pages and make changes to existing pages. We also created a document, BPA400, BPA Backups to provide detailed information about each major process, location of the critical procedures, and the name of the back up. Continue membership and participation in appropriate professional organizations. Where fiscally possible, support participation in webinars, teleconference and Achieved Goal 8 other activities sponsored by professional organizations. Wendy is currently serving her final year on the AIRUM Steering Committee. The IR team members are AIRUM members. Meridith is a member of NACUBO and AIR. • Achieved Goal • Achieved Goal • Achieved Goal • Achieved Goal Provide job-specific skill development opportunities through representation on committees, as appropriate. Wendy continuing to serve as ASLS rep on professional development committee. Susan continuing to serve as ASLS rep on Senate. Tammy and Michelle represent BPA on ESURC. Maureen serving on ImageNow users group. Wendy is chair of the Survey Clearinghouse Committee. Michelle continues to serve on the ASLS Webmasters Group and the ASLS Business Managers group. Cori on the ASLS training and development committee. Continue to provide an orientation to new staff and student employees in BPA, using signed checklist - All supervisors Checklist is updated and reviewed by the IR group on an annual basis Checklist expanded and converted to welcome guide. Begin regional meetings of the System campus planners Not started – George will contact other regional campuses to see if there is interest in this Meeting held in March 2010. Another meeting will be held in October. Continue to encourage informal meetings among IR staff to discuss their IR projects and to collaborate on projects when appropriate. This would give IR team members opportunities to learn new skills from other team members. Susan and Wendy regularly discuss projects that each are working on in terms of survey construction and data analysis. Have discussed several common issues at IR team meetings. A recent collaboration on an ARC project resulted in several hours saved on database creation and identification of subjects. 9 2009-10 ONGOING Unit Goals for Budget, Planning and Analysis The Unit Goals for the BPA office are derived from the BPA Mission, Vision, Values & Goals available on the BPA website: www.uwstout.edu/bpa/aboutbpa.htm as well as the ASLS division focused initiatives Goals : Administer the Annual and Biennial Operating Budget Processes BPA Implementation Strategies: Responsible: Provide support and guidance on the Annual and Biennial Operating Budget process, which includes: • Processing budget transfers • Quarterly reports • Year-end account review • Auxiliary budget reserve report Patty Complete Annual Operating Budget Book Patty Respond to segregated fee audit recommendations Coordinate the development of auxiliary current and long-range budget plans and spreadsheets Import the Redbook budget to SFS Outcome indicators : Progress : • • Patty Patty Patty Budget transfers processed within 1 week of receipt in BPA office • Quarterly reports complete within 2 weeks of the end of the quarter • Spend down budgets to be as close to zero as possible • Complete auxiliary report in August Complete in September Presented to Deans/Directors meetings throughout the year Fall meeting held, web materials updated on budget section of website Tasks completed according to established timelines Budget imported • • First quarter reports completed within 2 weeks of end of quarter Completed Budget transfers processed every Friday Completed Auxiliary report completed in August 2009 - Completed Book completed in November. Completed Fall meeting held. Budget materials updated. - Completed Spreadsheets went out in December – Completed Completed in July - Completed 10 Reconcile budget to UW System Administer the Planning and Capital Budget Process Update the ATL allocations and the non-GPR allocations Maintain records for the computer cost share program Maintain database of FTE and import FTE information into the data warehouse Review, submit and revise the 6year campus physical development plan Address real estate/land acquisition requests Continue to keep campus informed on major capital projects Submit All Agency Project Request documents, maintenance issues worksheet, and major project information to System Facilitate lab mod process Patty Patty Perform Fiscal Analyses and Support Fiscal Policy Development Completed Spreadsheets updated ATL is completed. Non-GPR in progress – Both completed Records are up to date. Records are up to date. Nothing done yet – students will be working on this. Entered data through 2009. Added to student project log. Initial CPDP documents submitted on 12/7. Final CPDP submitted to UW System on May 5, 2010 Two inquiries and 0 properties purchased No properties acquired Website scheduled converted in December 2009 Continue to develop – Space Management overview included on web page Initial CPDP documents submitted on 12/7. Final CPDP submitted to UW System on May 5, 2010 Michelle Database kept up-to-date Patty George George Capital Plan submitted by System deadlines Number of property inquiries Number of properties purchased. Website revised by end of FY George Submitted by System timeline George George Provide financial analysis support for laptop program and associated per credit tuition Budget successfully reconciled Tammy Process follows established timeline Lab renewal plan incorporated into the process Tuition revenue budget v. actual collections Laptop program revenue v. laptop program costs Reports provided at laptop finance committee meetings Recommendations being forwarded to Provost in December. On schedule. Completed. Estimated # of laptops to order for fall 2009 using model and provided weekly laptop enrollment updates to committee. Provided fall 2010 enrollment and revenue projection for 2010-11. 11 Complete Fiscal-Year End Budget Review book Complete in November Year-End Budget Review was completed in October and online in early November. Performance indicators updated according to established timeline Performance indicators are up-to-date on the BPA website Performance indicators have been updated for 2015 and are in the process of being put online. Summer retreat held in July 2009. Most evaluation results exceeded the 2007 results. Ratings related to facilities were lower than 2007. Listening sessions held; 293 participants Budget forums will be held in Feb or Mar 2010. Two budget forums were held in Feb and Mar 2010 with a total of 94 participants. Tammy Keep performance indicators upto-date on the BPA website Michelle Support Institutional Planning Facilitate the summer retreat and retreat planning meetings for the Strategic Planning Group Meridith, Michelle Organize and facilitate 9 Meridith, university-wide listening sessions Michelle Organize and facilitate 2 budget forums Meridith, Michelle Perform Institutional and Student Research and Assessment Provide support and guidance to assessment of the laptop program, which includes: • Conduct 1 e-scholar survey • e-Scholar assessment council Revise Graduate Student Research Guidelines that describe services offered to students from the BPA office Update Common Data Set Evaluation results that meet or exceed the previous year At least 330 participants at listening sessions At least 85 participants at budget forums Wendy, Meridith The first draft of a report is complete within one month of when data collection ends or data is received Susan Revised guidelines included in graduate student packet by 9/1 Sally CDS updated on web Fall survey administered, data analysis in process. E-Scholar assessment council has not met this year. E-Scholar assessment council inactive. Completed fall e-Scholar survey report. Document revised and available online in August, 2009 Complete. CDS delayed due to not having CDR data Updates completed and on web. 12 Publish “did you know” article with each major institutional research report that is completed Provide support and guidance for assessment system in School of Education. Keep documentation up-to-date. IR team Susan Administer major surveys, and begin process of moving these surveys onto different online survey instrument: • Gen Ed Senior Level Assessment • Senior administrators report • Exit Interview • Week 1 Orientation • Alumni Follow up Number of articles published vs. number of reports complete Reports provided on timeline requested by SOE -Susan -Susan -Wendy -Sally -Tammy -Sally First draft of report complete within one month of data collection end or receipt of data from company 6 articles published in fall 2009. Five articles published in spring 2010. Provided a lot of data in preparation for DPI and NCATE site visit. Also held meeting to discuss plans for the future. Will be working with SOE and R&R to develop canned queries so that SOE can access needed data on their own. SOE will now be taking over this project – BPA will not be involved in the future. • Alumni Follow-Up program specific surveys have been moved to on-line. Currently administering surveys with analysis started on June 1st. • Exit interview survey migrated to Qualtrics, report in Vovici completed in 2009. • Gen Ed Senior Level Assessment will be moved to Qualtrics and be administered by Senates This became an ARC project, survey was administered, the data was analyzed and the report is completed. • Week 1 orientation not done this year • Senior administrators surveys were deployed by Senates online using Qualtrics in mid-May. 13 Develop and publish Fact Book and Quick Facts Sally Fact Book published in September Quick Facts published in November Sally Evaluations and reports complete according to established timelines Sally Show rates for following fall provided to Director of Enrollment Services by October IR team Response rates on all surveys is 50% or greater Tammy Report complete by early September Conduct evaluation of Student Access Fee: • Lab Survey • Supplemental Instruction • Co-ops • Develop show rates Continue to implement process to raise visibility of BPA surveys Develop Annual Teaching Workload report Complete scanning for course evaluations and tests, Quality of Life Survey, and placement tests Implement Qualtrics for online course evaluations Susan Cori/ Maureen All tasks completed according to timelines 5 departments join in 2009-10 Fact Book published in September. Quick Facts published in December, delayed due to not having CDR data. Info collected from Placement Office for co-ops. Lab survey conducted in Nov/Dec. Report completed in March. SI survey & usage data conducted and collected in December. Collected again in May. Usage data collected for Psych. & Chemistry tutor centers. Will be using these data for BOR renewal in Feb 2010 Obtained BOR approval for renewal Surveys being conducted for Accounting/MIS tutor and Chemistry tutor. Completed in December. Delayed because of not having CDR data. Have been added to web along with analysis page. Have not been able to achieve 50% response rate at all this year. Implementing survey clearinghouse to address the problem. Report completed in August, 2009 2009-10 report in progress Quality of Life Survey eliminated We anticipate 12 departments using Qualtrics for online course 14 Complete salary equity report Tammy Report complete in January Policies Update departmental staffing forms Continue to participate in external surveys and review which ones are appropriate to continue to participate in, and which ones can be eliminated Develop unclassified SPSS database Provide professional guidance to graduate students completing their research projects: • critique the survey instrument • create an Excel data entry template • advise/assist with statistical analysis Continue to implement the process for the review of UWStout policies Tammy Staffing forms complete and online by August Sally Number of external surveys complete Number of external surveys eliminated Sally Database complete by December Susan Graduate student projects complete within 3 weeks of receipt Meridith At least 2 policies revised per year Annual memo sent to policy owners requesting review of their policies evaluations in fall 2009. In Fall 2009, 10 departments used Qualtrics to complete course evaluations. In Spring 2010, 13 departments used Qualtrics to complete course evaluations. 2009-10 Salary equity report in progress. Report completed in February. Staffing forms were completed and online by August. 6 external surveys completed. New surveys received will not be completed. 14 surveys completed so far for the year. 2 new surveys received decided to not complete. Completed Continue to provide listed services within 3 week time frame Continue to provide listed services within 3 week time frame –for a total of 127 completed projects. EOAA finalized. IT policy – waiting for feedback from the Senates. Rate and Fee policy, and disability accommodation policy, and criminal background check policy in review process. Criminal background 15 check, Identity policy, IT Policy and Tobacco Free policy completed. All of the others listed above are still in the review process. ADFC also in review process. 16 17