NC Alpha Overview

advertisement
NC Alpha INSIGHT
®
Overview
The NC Alpha provides the low-clog performance of
a field erected splash-fill tower with the convenience
and value of the factory assembled NC cooling tower.
Primary Benefits
•
•
•
•
nhanced Low-Clog Performance — for dirty
E
water applications
Faster Turnaround — up to 50% lead time
reduction and quick quotes helps to fit outage
schedules
Lower Installation Costs — up to 80% cost
reduction
Low Maintenance Costs — typical of an NC
FILM FILL
Low-Clog Performance:
• Splash fill allows for better low-clog performance
minimizing fill replacement frequency, downtime
costs and other expenses relative to film fill
• Heavy 235 galvanized or stainless steel structures
are stronger, lighter and more fire resistant
compared to pressure-treated wood towers
Faster Turnaround:
• Shorter quoting time than field erected towers
• Significantly reduced lead times compared to
field erected towers
• Improved ability to fit installation into an outage
schedule reducing downtime costs
Lower Installation Cost:
• Easy-fit maintenance options for quick installation
• Total installation time reduced by 80%
• Factory assembly provides one shipment with
minimal lay down area requirements
• Integral collection basin eliminates the cost
for a concrete basin
more
THERMAL PERFORMANCE
Benefit Detail
100%
SPLASH FILL
60%
GOOD
BEST
CLOG RESISTANCE
NC Alpha
field erected
Quoting
1-2 hours
5-7 days
Lead Time
8 weeks*
16 weeks
NC Alpha
field erected
2-3 days
2-3 weeks
1
6+
1 x Tower
3 x Tower
*starting July 1, 2010
Installation Time
Shipments
Lay Down Area
NC Alpha INSIGHT
Benefit Detail
Low Maintenance:
• Gear drive standard — 5 year no-hassle operation
• Optional stainless steel cold water basin
completely factory welded and leak free
• A full line of Marley controls and VFD options
are available for superior energy management
and complete tower energy control
• Rigorous structural review to minimize tower
vibration, even with use of a VFD
• Assembled with as much as 71% recycled
content
No-Hassle System 5 Geareducer®
Annual Maintenance
$624
$2,380
5 Year Maintenance
$4,270
$11,900
example savings
Common Applications
Features
•
•
•
•
•
•
•
•
•
articulate carry over — often found in steel
P
mills and cement plants
Pulp carry over — typical in the paper
industry and food processing where vacuum
pumps or barometric condensers are used
Ethylene glycol content
Geothermal applications
Salt water applications
Petrochemical applications
Phosphoric acid applications
Fluorine applications
GPM Range
290 to 2700 GPM per cell
•
•
•
•
•
•
•
•
•
•
belt drive
$7,630
ighest thermal performance low-clog
H
PVC splash fill offered by Marley
Crossflow design, vertical air discharge
Non-corrosive stainless or galvanized
steel structure
Induced draft — single fan per cell
Factory assembled — easy installation
Low sound fan, standard
Marley System 5 Geareducer
Optional welded stainless steel water
collection basin
VFD — allows maximum efficiency
Belt drive available on all models up to 60hp
Marley coupling specifically designed for
variable torque VFD applications
7401 WEST 129 STREET | OVERLAND PARK, KANSAS 66213 UNITED STATES | 913 664 7400 | spxcooling@spx.com | spxcooling.com
Contact your Marley Sales Representative at spxcooling.com/en/sales/
In the interest of technological progress, all products are subject to design and/or material change without notice.
©2011 SPX Cooling Technologies, Inc. | Printed in USA
IN-NCA-10
Download