1.01 SECTION INCLUDES A.

advertisement
SECTION 01270
MEASUREMENT AND PAYMENT
PART 1
1.01
SECTION INCLUDES
A.
1.02
GENERAL
The work performed under this Agreement shall be paid for as described in Section
500, Article 5 based on the Bid Proposal and the Total Bid Price. All costs incurred
shall comply with the provisions of these Specifications and shall be included in the
Total Bid Price for the project. Except as may be otherwise stipulated, no material,
labor or equipment will be furnished by the OWNER. The following provides a
general listing of items of Work along with a brief summary of the work and
materials included. Refer to the Specifications and Drawings for additional
information and all requirements for each item of Work.
ITEMS OF WORK
1.
Mobilization
No unit measurement for payment will be made for any of the work, materials and
equipment required for mobilization. This work consists of the mobilization of
personnel, equipment and supplies at the project site in preparation for work on the
project. This item shall include the establishment of the CONTRACTOR’S offices,
buildings and other necessary facilities, and all other costs incurred or labor and
operations which must be performed prior to beginning the other items under the
Contract. This item shall also include temporary fencing around project work areas,
and any other fencing/security items as deemed necessary by the CONTRACTOR.
Removal of the CONTRACTOR’s equipment, supplies, excess materials, and
cleanup of the site are also included in this item.
2.
Traffic Control
No unit measurement for payment shall be made for any of the materials, work, and
equipment required. The payment shall be total compensation for all labor,
equipment, materials, maintenance, and all incidentals necessary to prepare,
implement, and maintain the approved Traffic Control Plan in accordance with the
Drawings and accepted Traffic Control Plan.
3.
Surveying
No unit measurement shall be made for this item. Work includes providing all
equipment, labor, and materials required to provide Surveying for construction of all
work items for the project including: Staking of horizontal and vertical alignments;
overlot grading; subgrade elevations; off-sets; temporary control points;
re-establishment of land monuments; and, all appurtenance features of the work.
4.
Remove Turf Sod
No unit measurement for payment shall be made for this item. The Total Bid Price
shall include all of the CONTRACTOR’s cost of whatsoever nature to complete the
turf sod removal: furnishing and transporting all materials, labor, and equipment;
Werner Elem.
01270-1
Measurement and Payment
excavation, removal disposal of sod; backfilling, grading and compacting; removal
and/or moving of sprinkler equipment; and, all other related and necessary materials,
work, and equipment required to perform the work in accordance with the Drawings
and Specifications.
5.
6.
Remove Concrete
Remove Asphalt Speed Humps
No unit measurement for payment shall be made for this item. The Total Bid Price
shall include full compensation for sawing, removing, hauling and disposal of such
items including existing cable/conduit, pipe, concrete, asphalt, and excavation and
subsequent backfill with suitable material associated with the removal of these items,
and all other work necessary to remove these items in accordance with the Drawings
and Specifications. Replacement of asphalt; curb, gutter and sidewalk; storm sewer
and pipe outside of the pay lines due to the CONTRACTOR’s failure to protect
existing, undisturbed materials shall not be paid for and shall be replaced at the
CONTRACTOR’s expense.
7.
Remove Asphalt Pavement
No unit measurement for payment shall be made for this item. The Total Bid Price
shall include full compensation for sawing, removing, hauling and disposal of such
items including existing cable/conduit, pipe, concrete, asphalt, and excavation and
subsequent backfill with suitable material associated with the removal of these items,
and all other work necessary to remove these items in accordance with the Drawings
and Specifications. Replacement of asphalt; curb, gutter and sidewalk; storm sewer
and pipe outside of the pay lines due to the CONTRACTOR’s failure to protect
existing, undisturbed materials shall not be paid for and shall be replaced at the
CONTRACTOR’s expense.
8.
Concrete Speed Humps
No unit measurement for payment shall be made for this item. No payment will be
made for items placed outside of the dimensions as shown on the Drawings unless
directed by the ENGINEER OWNER. The Total Bid Price shall include all of the
CONTRACTOR’s costs of whatsoever nature associated with Concrete Speed
Humps. The price bid shall include: furnishing and placing the concrete; forming;
furnishing and applying curing compounds; finishing the edging the concrete
surfaces; joints and joint materials; furnishing and compacting all materials required
for preparation of a stable subbase; backfilling; curb painting; and all other related
and necessary materials, work, and equipment required to construct the concrete curb
and gutter in accordance with the Drawings and Specifications. No payment shall be
made for replacement of materials damaged by the CONTRACTOR in his
operations.
9.
Vertical Curb and Gutter
No unit measurement for payment shall be made for this item. No payment will be
made for items placed outside of the dimensions as shown on the Drawings unless
directed by the ENGINEER OWNER. The Total Bid Price shall include all of the
CONTRACTOR’s costs of whatsoever nature associated with Vertical Curb and
Gutter. The price bid shall include: furnishing and placing the concrete; forming;
Werner Elem.
01270-2
Measurement and Payment
furnishing and applying curing compounds; finishing the edging the concrete
surfaces; joints and joint materials; furnishing and compacting all materials required
for preparation of a stable subbase; backfilling; curb painting; and all other related
and necessary materials, work, and equipment required to construct the concrete curb
and gutter in accordance with the Drawings and Specifications. No payment shall be
made for replacement of materials damaged by the CONTRACTOR in his
operations.
10.
11.
12.
Concrete Drain Pans (4-ft wide), Apron and Transition
Concrete Drain Pan (3.5-ft wide)
Concrete Drain Pan (6-ft wide), Apron and Ramp Transition
No unit measurement for payment shall be made for this item. No payment will be
made for items placed outside of the dimensions as shown on the Drawings unless
directed by the ENGINEER OWNER. The Total Bid Price shall include all of the
CONTRACTOR’s costs of whatsoever nature associated with Concrete Drain Pan,
Apron and Ramp Transition. The price bid shall include: furnishing and placing the
concrete; forming; furnishing coloring; furnishing expansion joints; furnishing and
applying the curing compounds; sawcutting existing concrete as required; sawcutting
control joints; finishing and edging the concrete surface; furnishing and compacting
all materials required for preparation of a stable subbase; backfilling; and, all other
related and necessary materials, work, and equipment required to construct the
concrete pan in accordance with the Drawings and Specifications.
13.
Concrete Sidewalk
No unit measurement for payment shall be made for this item. Payment will be made
as work progresses. No payment will be made for items placed outside of the
dimensions as shown on the Drawings unless directed by the ENGINEER OWNER.
The Total Bid Price shall include all of the CONTRACTOR’s costs of whatsoever
nature associated with Concrete Sidewalk. The price bid shall include: furnishing
and placing the concrete; forming; furnishing and applying curing compounds;
finishing the edging the concrete surfaces; joints and joint materials; furnishing and
compacting all materials required for preparation of a stable subbase; backfilling;
and, all other related and necessary materials, work, and equipment required to
construct the concrete flatwork in accordance with the Drawings and Specifications.
No measurement for payment shall be made for replacement of materials damaged
by the CONTRACTOR in his operations.
14.
Aggregate Base Course
No unit measurement for payment shall be made for this item. The Total Bid Price
shall include full compensation for furnishing all labor, materials, equipment, and
incidentals and for doing all work involved in Aggregate Base Course, complete-inplace, including supplying, placing and compacting aggregate base course at proper
moisture in accordance with the Drawings and Specifications or as otherwise
directed by the ENGINEER.
15.
Hot Bituminous Pavement-Grades S and SX (including striping)
No unit measurement for payment shall be made for this item. The Total Bid Price
shall include full compensation for furnishing all labor, materials, equipment, and
Werner Elem.
01270-3
Measurement and Payment
any other incidentals to Hot Bituminous Pavement-Grade S and SX in accordance
with the Contract Documents, complete-in-place; haul from the suppliers source;
placement of pavement to design dimensions; subgrade preparation, excavation and
embankment, including that required for Aggregate Base Course and Fly Ash
installation; placement; compaction; striping; striping on concrete pavement; and,
any other miscellaneous items and work shown or reasonably implied on the
Drawings and in the Specifications for this work, and elsewhere in the Contract
Documents.
16.
Fly Ash Stabilization
No unit measurement for payment shall be made for this item. The Lump Sum Bid
Price for Fly Ash Stabilization shall include full compensation for furnishing all
labor, materials, equipment, and incidentals and for placement, amendment,
compaction, and all incidental work involved in Fly Ash Stabilization complete-inplace, including supplying and placing this item in accordance with the Drawings
and Specifications or as otherwise directed by the ENGINEER OWNER.
17.
18.
Rock Socks
Straw Wattles
No unit measurement for payment shall be made for this item. The Total Bid Price
shall include all of the contractor’s costs of whatsoever nature required for
supplying, installing, maintaining, removing the erosion control BMPs (filters, rock
socks, wattles, etc.), and all other related and necessary materials, work, and
equipment required to install erosion control BMPs in accordance with the Drawings
and Specifications.
19.
Playground Equipment - Remove and Replace Basketball and Tetherball Poles
and Benches
No unit measurement for payment shall be made for this item. The Total Bid Price
shall include all of the CONTRACTOR’S costs of whatsoever nature. The bid price
shall include; removal, storage, excavation; backfill; concrete pole and bench leg
base; steel reinforcing; testing, asphalt patching and all other related and necessary
materials, work, and equipment required to remove and reinstall playground poles
and metal benches in accordance with the Drawings and Specifications. No
measurement for payment shall be made for the replacement of materials damaged
by the CONTRACTOR outside of this operation.
Existing basketball and tetherball posts shall be reinstalled to the same height to
rim and top, respectively, as they had at removal.
20.
Signage – Handicap Parking Signs
No unit measurement for payment shall be made for this item. The Total Bid Price
shall include all of the CONTRACTOR’s cost of whatsoever nature to complete the
sign installation including: furnishing and transporting all materials, labor, and
equipment; furnishing and installing new signs; backfilling and compaction topsoil
replacement; and, all other related and necessary materials, work, and equipment
required to perform the work in accordance with the Drawings and Specifications.
END OF SECTION
Werner Elem.
01270-4
Measurement and Payment
Download