SECTION 00635 CERTIFICATE OF SUBSTANTIAL COMPLETION TO: POUDRE SCHOOL DISTRICT R-1 (OWNER) DATE OF SUBSTANTIAL COMPLETION: PROJECT OR SPECIFIED PART SHALL INCLUDE: PROJECT TITLE: Poudre High School Parking Lot Pavement Project LOCATION: Fort Collins, Colorado OWNER: Poudre School District R-1 CONTRACTOR: CONTRACT DATE: The Work performed under this contract has been inspected by authorized representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project (or specified part of the project, as indicated above) is hereby declared to be substantially completed on the above date. A tentative list of items to be completed or corrected is appended hereto. This list may not be exhaustive, and the failure to include an item on it does not alter the responsibility of the CONTRACTOR to complete all the Work in accordance with the Contract Documents. ENGINEER By: AUTHORIZED REPRESENTATIVE DATE The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to complete and correct the items on the tentative list within the time indicated. CONTRACTOR By: AUTHORIZED REPRESENTATIVE DATE The OWNER accepts the project or specified area of the project as substantially complete and will assume full possession of the project or specified area of the project at 12:01 a.m., on . The responsibility for heat, utilities, security, and insurance under the Contract Documents shall be as set forth under "Remarks" below. POUDRE SCHOOL DISTRICT R-1 OWNER By: AUTHORIZED REPRESENTATIVE DATE REMARKS: Section 00635 Page 1