PROGRAM MANAGEMENT OFFICE SECURITY, JUSTICE, and the IRAQ NATIONAL DEFENSE FORCE CPT Brian Song, USA WELCOME TO IRAQ •• Introduction Introduction •• Security Security infrastructure infrastructure •• Justice/public Justice/public safety safety infrastructure infrastructure •• The The new new Iraq Iraq military military TURKEY TURKEY Dahuk Dahuk Tigris R. Bashur Arbil Tall Afar Mosul Irbil Sulaymaniyah Kirkuk Ninawa Dayr az Zawr At Tamim IRAN IRAN As Sulaymaniyah Salah ad Din SYRIA SYRIA Hamadan Euphrates R. Diyala Tikrit Samarra Al Qaim Baqubah Ar Ramadi Ar Rutbah Baghdad Fallujah Wasit Babil ORDAN JORDAN Al Hillah Karbala Al Anbar Karbala An Najaf Al Kufa Ad Diwaniyah Al Qadisiyah Al Kut Dezful Al Amarah Maysan As Samawah Ar’ar Ahvaz An Nasiriyah An Najaf Dhi Qar Al Basrah Az Zubayr SAUDI SAUDI ARABIA ARABIA Al Muthanna’ Rafha Safwan Al Basrah Umm Qasr Kuwait City KUWAIT KUWAIT INTRODUCTION •• Current Current construction construction climate climate •• The The U.S. U.S. emergency emergency supplement supplement •• The The security security sector sector •• The The justice/public justice/public safety safety sector sector •• The The military military sector sector •• Questions Questions THE CURRENT CONSTRUCTION CLIMATE •• Violent Violent deaths deaths in in Baghdad Baghdad –– Prewar: Prewar: 16 16 violent violent deaths/month deaths/month in in Baghdad Baghdad –– Aug. Aug. 2003: 2003: 872 872 violent violent deaths; deaths; 498 498 by by firearms firearms –– Sept. Sept. 2003: 2003: 667 667 violent violent deaths deaths 372 (Source: Baghdad Baghdad Morgue) Morgue) 372 by by firearms firearms (Source: •• No. No. of of Iraqi Iraqi security security forces forces vs. vs. no. no. required required –– Police: Police: 55, 55, 000 000 Iraqi Iraqi security security forces; forces; 75,000 75,000 required required –– Army: Army: 700 700 operating; operating; 40,000 40,000 required required (Source: (Source: CPA) CPA) •• Highly Highly educated educated and and highly highly motivated motivated workforce workforce •• “Booming” “Booming” cement cement industry industry U.S. EMERGENCY SUPPLEMENTAL • $18.6 billion USD for Iraqi reconstruction • $360 million USD for security –– Border Border patrol patrol stations stations –– Police Police stations stations • $848 million USD for justice/public safety –– Fire Fire stations stations –– Prisons Prisons –– Judicial Judicial security security –– Civil Civil defense defense corps corps –– Facilities Facilities protection protection services services • $745 million USD for military –– Iraq Iraq army army THE SECURITY SECTOR Borders •• Improvements Improvements to to buildings buildings are are needed needed at at 27 27 points points of of entry entry to to provide provide faster faster trade trade flow flow and and aa smooth smooth collection collection of of tariffs tariffs •• Ports Ports of of entry entry at at the the Baghdad, Baghdad, Basrah Basrah and and Mosul Mosul airports airports must must be be upgraded upgraded •• Two Two seaports, seaports, Al Al Basrah Basrah and and Um Um Qsar, Qsar, where where customs customs operations operations need need rehabilitation rehabilitation THE SECURITY SECTOR Borders •• There There are are an an estimated estimated 120 120 to to 150 150 border border police police posts posts along along the the 3345 3345 kilometer-long kilometer-long border border with with Saudi Saudi Arabia, Arabia, Jordan, Jordan, Syria, Syria, Kuwait, Kuwait, Iran, Iran, and and Turkey Turkey •• Minor Minor refurbishment refurbishment is is needed needed at at an an estimated estimated 245 245 Nationality Nationality Offices Offices throughout throughout the the country country •• A A new new immigration immigration headquarters headquarters building building will will be be constructed constructed in in Baghdad Baghdad THE SECURITY SECTOR Borders •• Between Between 20 20 and and 25 25 “Denial” “Denial” points points need need to to be be rehabilitated rehabilitated or or constructed constructed THE SECURITY SECTOR Borders •• The The existing existing border border police police headquarters headquarters and and customs customs police police headquarters headquarters in in Baghdad Baghdad need need major major renovations renovations •• Two Two training training facilities facilities in in the the range range of of 10,000 10,000 to to 12,000 12,000 square square feet feet are are expected expected to to be be built built in in Suleymaniyah Suleymaniyah and and Tahok Tahok or or Urbil Urbil PROPOSED BORDER PROJECT General General Scope Scope of of Work Work Replacement Replacement of/or: of/or: –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– Iron Iron doors doors Wood Wood doors doors Glass Glass for for windows windows with with screens screens Repair and paint interior Repair and paint interior walls walls Repair Repair and and replace replace sinks sinks and and fixtures fixtures Repair Repair and and replace replace toilets toilets and and fixtures fixtures Restoration of all piping to allow Restoration of all piping to allow plumbing plumbing and and water to flow in the facility water to flow in the facility Repair Repair and and replace replace showers showers Supply and replace Supply and replace florescent florescent lights lights Supply Supply and and replace replace 13 13 amp amp outlets outlets Supply Supply and and install install 36 36 line line distribution distribution boards boards Repair and replace plaster for walls Repair and replace plaster for walls Restoration Restoration of of all all air air conditioning conditioning and and heating heating Roofing work to cover entire square footage Roofing work to cover entire square footage of of the the fort fort 1ea 1ea 60 60 Kva Kva generator generator (440 (440 single single phase/50 phase/50 hertz hertz 1ea 1ea 500 500 gallon gallon fuel fuel tank tank 1ea 1ea 24,000 24,000 BTU BTU ECU ECU to to cool cool the the entire entire facility facility 1ea 3,000 gallon water tank 1ea 3,000 gallon water tank 1ea 1ea 5,000 5,000 gallon gallon sewage sewage storage storage tank tank PROPOSED BORDER PROJECT General General Scope Scope of of Work Work Replacement Replacement of/or: of/or: –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– Iron Iron doors doors Wood Wood doors doors Glass Glass for for windows windows with with screens screens Repair and paint interior Repair and paint interior walls walls Repair Repair and and replace replace sinks sinks and and fixtures fixtures Repair Repair and and replace replace toilets toilets and and fixtures fixtures Repair and replace showers Repair and replace showers Restoration Restoration of of all all piping piping to to allow allow plumbing plumbing and and water water to to flow flow in in the the facility facility Supply and replace florescent lights Supply and replace florescent lights Supply Supply and and replace replace 13 13 amp amp outlets outlets Supply and install 36 line distribution Supply and install 36 line distribution boards boards Repair and replace plaster for walls Repair and replace plaster for walls Masonry Masonry to to reconstruct reconstruct the the 22 back back walls walls Roofing work to cover entire square Roofing work to cover entire square footage footage of of the the fort fort Restoration Restoration of of air air conditioning conditioning and and heating heating 1ea 1ea 60 60 Kva Kva generator generator (440 (440 single single phase/50 phase/50 hertz hertz 1ea 500 gallon fuel tank 1ea 500 gallon fuel tank 1ea 1ea 24,000 24,000 BTU BTU ECU ECU to to cool cool the the entire entire facility facility 1ea 3,000 gallon water tank 1ea 3,000 gallon water tank 1ea 1ea 5,000 5,000 gallon gallon sewage sewage storage storage tank tank PROPOSED BORDER PROJECT General General Scope Scope of of Work Work Replacement Replacement of/or: of/or: –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– Iron Iron doors doors Wood Wood doors doors Glass for Glass forwindows windowswith withscreens screens Repair and paint interior Repair and paint interior walls walls Repair and replace sinks and Repair and replace sinks andfixtures fixtures Repair Repair and and replace replace toilets toilets and and fixtures fixtures Repair and replace showers Repair and replace showers Restoration Restoration of of all all piping piping to to allow allow plumbing plumbing and and water water to toflow flow in in the the facility facility Supply and replace florescent lights Supply and replace florescent lights Supply Supplyand andreplace replace13 13amp ampoutlets outlets Supply and install 36 line Supply and install 36 line distribution distribution boards boards Repair and replace plaster for walls Repair and replace plaster for walls Masonry Masonryto to reconstruct reconstruct the the 22 missing missing towers towers Roofing work to cover entire square footage Roofing work to cover entire square footage of of the the fort fort 1ea 60 Kva generator (440 single phase/50 hertz 1ea 60 Kva generator (440 single phase/50 hertz 1ea 1ea500 500gallon gallon fuel fueltank tank 1ea 24,000 BTU ECU 1ea 24,000 BTU ECUto tocool cool the the entire entire facility facility 1ea 1ea3,000 3,000gallon gallonwater watertank tank 1ea 1ea5,000 5,000gallon gallonsewage sewagestorage storagetank tank PROPOSED BORDER PROJECT General General Scope Scope of of Work Work Replacement Replacement of/or: of/or: –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– Iron Iron doors doors Wood Wood doors doors Glass for Glass forwindows windowswith withscreens screens Repair and paint interior Repair and paint interior walls walls Repair and replace sinks and Repair and replace sinks andfixtures fixtures Repair Repair and and replace replace toilets toilets and and fixtures fixtures Repair and replace showers Repair and replace showers Restoration Restoration of of all all piping piping to to allow allow plumbing plumbing and and water water to toflow flow in in the the facility facility Supply and replace florescent lights Supply and replace florescent lights Supply Supplyand andreplace replace13 13amp ampoutlets outlets Supply and install 36 line Supply and install 36 line distribution distribution boards boards Repair and replace plaster for walls Repair and replace plaster for walls Masonry Masonryto toreconstruct reconstructthe thedamaged damagedwalls wallsand andtowers towers Roofing work to cover entire square footage of the Roofing work to cover entire square footage of the fort fort Restoration of all air conditioning and heating Restoration of all air conditioning and heating 1ea 1ea60 60Kva Kvagenerator generator(440 (440single singlephase/50 phase/50hertz hertz 1ea 500 gallon fuel tank 1ea 500 gallon fuel tank 1ea 1ea24,000 24,000BTU BTUECU ECUto tocool cool the the entire entire facility facility 1ea 3,000 gallon water tank 1ea 3,000 gallon water tank 1ea 1ea5,000 5,000gallon gallonsewage sewagestorage storagetank tank PROPOSED BORDER PROJECT General General Scope Scope of of Work Work Replacement Replacement of/or: of/or: –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– –– Iron Iron doors doors Wood Wood doors doors Glass for Glass forwindows windowswith withscreens screens Repair and paint interior Repair and paint interior walls walls Repair and replace sinks and Repair and replace sinks andfixtures fixtures Repair Repair and and replace replace toilets toilets and and fixtures fixtures Restoration of all piping to allow Restoration of all piping to allow plumbing plumbing and and water water to toflow flow in in the the facility facility Repair Repairand andreplace replaceshowers showers Supply Supplyand and replace replace florescent florescent lights lights Supply and replace 13 amp outlets Supply and replace 13 amp outlets Supply Supplyand and install install 36 36 line line distribution distribution boards boards Repair and replace plaster for walls Repair and replace plaster for walls Restoration Restoration of of air air conditioning conditioning and and heating heating Roofing work to cover entire square Roofing work to cover entire square footage footage of of the the fort fort 1ea 60 Kva generator (440 single phase/50 hertz 1ea 60 Kva generator (440 single phase/50 hertz 1ea 1ea500 500gallon gallon fuel fueltank tank 1ea 24,000 BTU ECU 1ea 24,000 BTU ECUto tocool cool the the entire entire facility facility 1ea 1ea3,000 3,000gallon gallonwater watertank tank 1ea 1ea5,000 5,000gallon gallonsewage sewagestorage storagetank tank THE SECURITY SECTOR Police • An estimated 150 police stations throughout the country need upgrading and in some cases new construction is required • Buildings were heavily damaged in the looting and burning after the war. While some facilities have been rehabilitated, many need major work. • Force protection is a key issue as police buildings have been targets of terrorist attacks THE SECURITY SECTOR Police • Police stations • Construction of 20 to 24 police checkpoints on major streets and roads leading into the city • Rehabilitation of vehicle maintenance facilities • Construction of a fuel tank pad THE JUSTICE/PUBLIC SAFETY SECTOR Fire Facilities • Existing fire stations were damaged by looting • In the Baghdad area alone it is estimated that 96 new stations are needed. An estimated $71M is needed to bring the country up to an acceptable level of coverage THE JUSTICE/PUBLIC SAFETY SECTOR Fire Facilities • An estimated 179 fire stations throughout the country need to be rehabilitated • Facilities in Baghdad have been or are being upgraded • Over 200 new stations need to be built country-wide – – – 111 have been classified classified as as High High Priority 50 have been classified as Moderate Priority 43 have been classified as Low Priority THE JUSTICE/PUBLIC SAFETY SECTOR Fire Facilities • Construction of buildings is expected to be of concrete and tile block or other suitable materials as necessary THE JUSTICE/PUBLIC SAFETY SECTOR Fire Facilities • A national fire academy is planned in Baghdad • Provides training for firefighters throughout the country • Over 100,000 square feet of classroom, dormitory, equipment, vehicle, and similar space THE JUSTICE/PUBLIC SAFETY SECTOR Prisons • Current planning calls for the rehabilitation of existing prisons, conversion of other buildings to prisons or juvenile detention facilities • A new 3,500 to 4,000 bed correctional complex is planned • The new facility will contain juvenile, minimum, intermediate, and maximum security buildings at one location THE JUSTICE/PUBLIC SAFETY SECTOR Prisons • All areas of the country will have correctional facilities that range in size from 350 bed juvenile buildings through 500 to possibly 2000 bed adult complexes • The facilities should be considered “low-tech” THE JUSTICE/PUBLIC SAFETY SECTOR Prisons • Personnel rather than sophisticated electronic equipment • A standard of 25 square feet of living space will be provided for each inmate. Beds, showers, and sanitary facilities will be provided. THE JUSTICE/PUBLIC SAFETY SECTOR Courts • It is estimated that there are 130 to 150 court buildings throughout the country that need upgrading • Improvements range from provision of outside security to complete renovation to fully operational buildings THE JUSTICE/PUBLIC SAFETY SECTOR Courts • Several court buildings have been upgraded but may need additional work • Estimated cost to rehabilitate, relocate, or build new court facilities is $56 M THE JUSTICE/PUBLIC SAFETY SECTOR Courts • Before and After Refurbishment THE JUSTICE/PUBLIC SAFETY SECTOR Civil Defense • Existing buildings need rehabilitation and some new construction is anticipated to provide necessary services for the local communities • Between 100 and 150 buildings throughout the country will be involved THE JUSTICE/PUBLIC SAFETY SECTOR Civil Defense • More than $22 M is expected to be spent on civil defense facilities with the goal of constructing or renovating existing facility to provide at least one central civil defense building in the main “capital” city for each governorate • The present civil defense headquarters building in Baghdad needs rehabilitation and will serve as the central headquarters for the Iraqi Civil Defense THE JUSTICE/PUBLIC SAFETY SECTOR Facilities Protection • The Facilities Protection Service provides security at governmental buildings throughout the country • A headquarters building in Baghdad and operations centers in the 18 governorates are anticipated to be included in the supplemental funding • Estimated construction cost for the facilities is $4-5,000,000 THE MILITARY SECTOR Iraq’s Old Military THE MILITARY SECTOR • The Iraqi National Defense Force • New Iraqi Army • New Iraqi Navy • New Iraqi Air Force THE MILITARY SECTOR Iraqi National Defense Force •• Current Current plans plans call call for for aa new new Iraqi Iraqi Army Army of of 40,000 40,000 persons persons •• 27 27 battalions battalions (9 (9 brigades) brigades) of of motorized motorized infantry infantry –– Small Small naval naval battalion battalion for for coastal coastal defense defense –– Small Small air air force force with with aa few few rotary rotary and and fixed fixed wing wing aircraft aircraft –– Stand Stand up up by by end end of of September September 04 04 •• Sited Sited at at 18 18 locations locations from from north north to to south south THE MILITARY SECTOR Iraqi National Defense Force •• Current Current state state of of facilities facilities ranges ranges from from bad bad to to worse worse •• Caused Caused by: by: –– First First Gulf Gulf War War in in 1991 1991 –– Lack Lack of of maintenance maintenance –– Looting Looting –– Vandalism Vandalism THE MILITARY SECTOR Iraqi National Defense Force •• Scope Scope of of work work will will be be design-build design-build –– Currently Currently 27 27 identified identified Task Task Orders Orders –– Task Task Orders Orders expected expected to to range range from from $400K $400K to to $40M $40M •• Expect Expect the the full full range range of of design design and and construction construction activities activities starting starting with with site site clean clean up up •• Trash Trash outside outside •• Trash Trash inside inside THE MILITARY SECTOR Iraqi National Defense Force • Some facilities have survived in tact THE MILITARY SECTOR New Iraqi Army THE MILITARY SECTOR New Iraqi Army THE MILITARY SECTOR Iraqi National Defense Force • Others Will Need Extensive Repairs and Refurbishment THE MILITARY SECTOR Iraqi National Defense Force THE MILITARY SECTOR Iraqi National Defense Force THE MILITARY SECTOR Iraqi National Defense Force THE MILITARY SECTOR Iraqi National Defense Force THE MILITARY SECTOR New Iraqi Naval Facilities Naval Facilities at Port of Umm Qasr Port Layout Port / Garrison (Area II) Family Housing (Area IV) Port Expansion (Area III) Current Port Layout Perimeter Fence Repair and Extension (includes Gate) Storage Bldg Port HQ Warehouses Guard Shack Fire Station Ramp Lift Warehouse Lights and Power Poles Generator Building Utilities Phase I THE MILITARY SECTOR New Iraqi Facilities • General scope of work • New windows • New doors –– Electric Electric –– Plumbing Plumbing (Eastern (Eastern and and Western) Western) –– Air Air conditioning conditioning –– Lighting Lighting –– Barracks Barracks –– Dining Dining halls halls • Multi-purpose –– Offices Offices –– Classrooms Classrooms –– Community Community facilities facilities for for café, café, mosque, mosque, post post office, office, barber, barber, etc. etc. THE MILITARY SECTOR New Iraqi Facilities TADJI Location Available Area Logistics Support Area (INDF) nIA Air Component Area INDF Area Coalition Area 1st Battalion Area Requirements: LSA - CIF - DOL - CL I, III, IV, VI, VIII, IX Area Requirements: Garrison/Brigade HQ Area Requirements: - Battalion and Company HQ - Barracks for Bn (1000) - Officer / NCO Billets - Classroom Space - Motorpool Space (covered park for 100 veh) - Maintenance Space - Dining Facility - Aid Station - PX/Commissary Vending Area - MWR: Gym, Soccer Field, Theater - Shower and Shave Facilities - Toilets - Obstacle Course - PT Field (Soccer and MP) - Parade Field - Mosque - Fire Station Building (?) - Restaurant (Vendor Area) - Arms Room - Company Supply - Lecture Rooms (70 – 80pax) - Fenceline - Barbershop - Bank - Post Office QUESTIONS?