AWRP AMC Execution Plan Briefing 2 July 2002 OSC …… On The Line Agenda • Operations Event Timeline Update • IPR Schedule • Critical Events Timeline Update • Top Ten AWRP Actions / Issues • Resource Update • Strong Virginian & American Cormorant Download • YND Rock Drill • Summary 07/02/02 “The Force Behind the Force” 2 of 24 Operations Event Timeline JAN 1 FEB MAR APR HQDA Implementation Msg MAY JUN 8 Target YND Site Established YND Soil Analysis Embassy Approval 4 SV D/L 16 3 10 Hythe Branch Plan? 20 DA OPLAN Published (Draft) 6 AC D/L 8 Strong Virginian Decision 5 SEP 7 Release American Cormorant 3 AUG Force Protection (Draft) 7 2 JUL YND Opening Ceremony 12 HQDA OPORD / Movements Directive (Still Pending) ? DA Funding YND Rock Drill 9 CENTCOM Site Survey 20-26 07/02/02 “The Force Behind the Force” 7 Decision Points 10-11 3 of 24 Critical Events AWRP IPR / VTC Schedule (Updated as of 2 JUL 02) CEB-H Internal IPRs (weekly) start 12 FEB AMC CEG-A IPR (VTC) (Monthly 2nd week) 13 FEB DA AWRP IPR/Conference (Orlando, FL) 20 FEB FSC IPR (VTC) (Monthly 4th week) 27 FEB Working Group IPR at YND, Japan 12-15 MAR DA AWRP IPR (VTC) 21 MAR DA AWRP IPR at CEG-A 22-23 MAY ARCENT Contingency IPR at Fort McPherson 4-6 JUN • DA AWRP IPR (VTC) 2 JUL • DA AWRP IPR at YND 6-8 AUG • AWRP PACOM AAR / CENTCOM Planning (DC) 29 OCT 07/02/02 “The Force Behind the Force” 4 of 24 AWRP Critical Events – 2QFY02 AWRP MASTER EVENTS CALENDAR FY 2002 JAN WEEK 1 2 3 RESOURCES FEB 4 5 FY02 Spend Plan 6 7 MAR 8 9 10 11 12 13 DA Funding FE Design MIPR FACILITIES ID FE Requirements FE Design CONTRACTS Contracting C2 Decision Develop COSIS SOW PEOPLE Submitt TDA Develop PDs EQUIPMENT ID EQUIP Requirements EQUIP SPECs WATERCRAFT / GRD EQUIP TRANSFER DA / AMC / FORSCOM Watercraft Transfer MTG ID Watercraft / Ground EQUIP Storage Locations FORCE PROTECTION AT / FP Assessment PROCESSES & PROCEDURES 07/02/02 “The Force Behind the Force” ID MOA / ISA Requirements Survey(s) - CCTV - Lighting - Barrier Draft MOA USARPAC / AMC 5 of 24 AWRP Critical Events – 3QFY02 AWRP MASTER EVENTS CALENDAR FY 2002 APR WEEK 14 15 MAY 16 17 18 19 20 JUN 21 22 23 24 25 26 RESOURCES USARJ / CEB-H MIPRs OSC MIPR (COSIS) 78th SIG BN MIPR 28 Jun FACILITIES Project Installation / Construction Environmental Review FE Design CONTRACTS Submit FE PR&Cs Finalize GFP/CFP PEOPLE FE Project Solicitation Period Issue Synopsis IGCE Issue RFP Develop COSIS SOW Load Bearing Study Pre Prop YND Bidder visit Amend RFP 14 Jun Conf 21 Jun COSIS Solicitation Period Submitt RPAs Publish Job Annoucements LNO on-site EQUIPMENT Finalize CTA Procure CTA / GFP EQUIP SPECs WATERCRAFT / GRD EQUIP TRANSFER Draft AMC / FORSCOM EQUIP Transfer MOA ST 901 / 909 FORCE PROTECTION Survey(s) - CCTV - Lighting - Barrier PROCESSES & PROCEDURES Procure AT/FP EQUIP (Barriers, etc) MLC Guard Recruitment (5) Draft MOA USARPAC / AMC Draft ISA 17th ASG / CEG-A Draft ISA 78th SIG BN / CEB-H 07/02/02 “The Force Behind the Force” Final 78th SIG ISA 24 Jun 6 of 24 AWRP Critical Events – 4QFY02 AWRP MASTER EVENTS CALENDAR FY 2002 JUL WEEK 27 28 Contractor on-site 26 Aug AUG 29 30 31 32 33 34 SEP 35 36 37 38 39 RESOURCES Temp MLC MIPR 11 Jul FACILITIES Project Installation / Construction YND Opening Ceremony 12 Sep Enviromental Review (19Jul) Load Bearing Study (Preliminary 2 Aug - Final 30 Aug) CONTRACTS COSIS Solicitation Proposals Due (rev) 25 Jul COSIS Contract Evaluations (26 Jul-13 Sep) SSA Decision Evaluation 16-20 Sep COSIS Contract Award (rev) 23 Sep YND Bidder Visit (2nd) 9 Jul PEOPLE Initiate Temp MLC Recruitment (12) 2 Jul Selection Panels TEMP MLC Selection Panels 16 Aug Procure CTA / GFP Install EQUIP EQUIPMENT WATERCRAFT / GRD EQUIP TRANSFER FORCE PROTECTION 3 x DACs on-site YND 16 Sep LCU 2013 / 2016 Arrive 22 Jul MLC Guard Recruit (5) MLCs Guards on-site YND 16 Jul PROCESSES & PROCEDURES Final MOA USARPAC / AMC 1 Jul Final 17th ASG ISA 1Jul 07/02/02 “The Force Behind the Force” S i t e R e a d y YND Complete 16 Aug Temp MLCs on-site YND 16 Sep S V A C A C D o w n l o a d D o w n l o a d D o w n l o a d SV DL 20-26 Aug AC DL 10-15 Sep 7 of 24 Top Ten AWRP Issues / Actions ISSUE # LEGEND RED 1 MOA (AMC / USARPAC) AMBER 2 17th ASG ISA AMBER 3 Equipment Procurement 4 COSIS Contract Award AMBER 5 YND Environmental Review AMBER 6 YND LOAD Bearing Study AMBER 7 DAC Selections AMBER 8 YND Rock Drill Planning GREEN 9 SV / AC Download Planning GREEN 10 Dredging / Soil analysis at Site 4 AMBER RED • Will not meet the final objective AMBER • May miss intermediate objective / event but will meet final objective GREEN • Will meet final objective 07/02/02 STATUS “The Force Behind the Force” 8 of 24 AWRP Funding Update REQ CEB Hythe APR Plan Actual 818.9 107.0 PACOM AWRP FY02 Spend Plan Roll-Up MAY JUN JUL AUG Plan Actual Plan Actual Plan Plan Actual Delta 31.3 45.1 11.3 349.9 142.5 84.3 187.2 133.9 53.3 6.4 0.0 67.1 44.1 23.0 357.1 142.1 2843.7 1035.5 1808.2 10.5 10.5 0.0 96.0 96.0 0.0 170.4 0.0 0.0 676.4 226.4 3204.5 0.0 1320.0 0.0 1884.5 30.5 30.5 13.6 13.6 23.0 0.0 2882.0 USARJ 3334.6 0.0 52.8 1097.0 946.0 1746.7 36.7 594.1 78th Signal 41.1 2.2 2.2 8.3 8.3 CORP Eng 96.0 176.8 1154.0 999.2 30.6 96.0 96.0 1910.8 144.0 Surplus Funds (as of 30 Jun 02): • $170.4K • $100K Power Design • $ 11K Fuel Boom • $ 4K Shelving • $ 55K Manpower 07/02/02 Plan 35.1 2955.5 170.4 7416.5 139.7 CUMULATIVE TOTAL THRU 2 JUL 91.3 OSC Excess TOTAL SEP Plan “The Force Behind the Force” 0.0 3856.6 0.0 0.0 UFRs (as of 30 Jun 02): • $ TBD - Potential Impacts of Load Bearing Study • $ TBD - Temp MLC Cost • $ 60K est. – SDT • $ TBD MTMC - $100K in program may be insufficient 9 of 24 Concept of Operation SV & AC Download Concept of Operation This is a 4 phase operation: • Phase 1 – Establish YND site • Began with the YND site survey in 4QFY01 and ends with actions complete to receive watercraft UICs on 16 AUG 02 • Phase 2 – SV download • Begins with the departure of the SV from CEB-H in JUL 02 and ends when all equipment is offloaded and positioned at YND and Sagami Army Depot in SEP 02 • Phase 3 – AC download • Begins with the departure of the AC from DG enroute to YND and ends when all equipment is offloaded and positioned at YND and Sagami Army Depot in SEP 02 • Phase 4 – Transition to End state • Begins with the DL of the SV and ends when all equipment is stored 07/02/02 in final locations; DH equipment is installed; COSIS contractor is onsite “The Force Behind the Force” 10 of 24 YND Rock Drill (6-8 Aug 02) Key Participants DA AMC • • • • • OSC / FSC (AT/FP; Ops) CEG-A (Ops) CEB-H (Lead)(Ops / OPP Leader) CEB-NEA (AWRDS) Stanley INC USARPAC • • • USARJ 17th ASG 35 S&S BN FORSCOM • 7th TC GRP MSC MTMC • 836th TC BN 07/02/02 “The Force Behind the Force” Key Rehearsal Events • • YND Site Prep SV DL • • • • • • • • • • AT/FP Berth WC lift Tug Spt Mooring RO/RO Container Ops Move to SAD • Preservation / Storage AC DL • • • • • • • • • AT/FP Tug Spt FLO/FLO Move to YND LO/LO Mooring Container Ops Move to SAD Preservation / Storage Transition to End state 11 of 24 Summary • 49 Days to SV download at YND • Key Events – HQDA AWRP IPR (including FSC YND Rock Drill) 6-8 AUG 02 • Must immediately resolve all issues potentially impacting DL and storage of watercraft IAW timeline • MOA / ISA • Equipment Procurement (DH; Mooring; Access Equip) • COSIS Contract Award CONTINUES TO BE A GOOD NEWS STORY Considerable effort to meet end state objectives by all commands 07/02/02 “The Force Behind the Force” 12 of 24 Back Up Charts 07/02/02 “The Force Behind the Force” 13 of 24 MOA (AMC / USARPAC) • Status • Issue. AMBER • MOA required for AMC mission at YND, Sagami Army Depot, and US Army Ammunition Depot/Akizuki • Discussion. • • Initial draft MOA developed during MAR 02 IPR at USARJ USARPAC provided signed MOA to HQAMC 12 Jun (significant revisions without staffing with AMC ) • FSC draft MOA complete (27 Jun) • Timeline’s MAY NOT meet requirements prior to personnel / equipment on-site • Recommendation. That the MOA accurately reflects current HQDA regulations and directives LEAD: USARPAC LEGEND RED POC: Mr. D.R. Brown, USARPAC Mr. Butch Boyett, AMC • Will not meet the final objective AMBER • May miss intermediate objective / event but will meet final objective GREEN • Will meet final objective 07/02/02 “The Force Behind the Force” 14 of 24 17th ASG ISA • Status • Issue. • • AMBER ISA completion dependent on MOA finalization and signature Discussion • • • Draft ISA developed between 17th ASG and AMC LNO Draft ISA being staffed through CEB-H/AMCCEG-A Timeline’s MAY NOT meet requirements prior to personnel / equipment on-site • Recommendation. That the MOA accurately reflects current HQDA regulations and directives LEAD: USARJ (17th ASG) POC: Mr. David Brown, 17th ASG Mr. J Kirby, AMCCEG-A LEGEND RED • Will not meet the final objective AMBER • May miss intermediate objective / event but will meet final objective GREEN • Will meet final objective 07/02/02 “The Force Behind the Force” 15 of 24 Equipment Procurement • Status • Issue. RED (once contracts awarded will move to AMBER) • Equipment to dehumidify, moor and gain access to prepositioned watercraft in forward storage at YND may not be procured prior to the arrival of the SV/AC • Discussion • • • • • • • Initial List of Specs/Dwgs provided Mar 02 Finalized List of Specs/Dwgs provided Apr 02 PR &C’s prepared and submitted to 374th Cont Squadron for procurement May 02 IBOP forms submitted for D/H and Fenders IBOP on D/H rejected by 374th CS All procurements pending – no contracts to date Lead times extended for most of this equipment • Recommendation. Continual pressure from HQ leadership required to ensure this equipment is procured prior to downloads • LEAD: USARJ / 374th Contracting SQRDN POC: LEGEND RED • Will not meet the final objective AMBER • May miss intermediate objective / event but will meet final objective GREEN • Will meet final objective 07/02/02 “The Force Behind the Force” 16 of 24 YND Environmental Review • Status • Issue. AMBER • An Environmental Review required to access impact of storing APS watercraft at YND • Discussion • • • Issue was addressed during AUG 01 site survey at YND and USARJ IPR in Mar 02 USARJ stated this was not an issue FSC required written verification to ensure watercraft storage, and COSIS operations, complies with existing environmental laws • No Valid EA/R available • USARJ determined ER is required for storage and supplemental ER for dredging • Recommendation. • Ensure ER for watercraft storage is kept separate from the SER for dredging. Amend COSIS contract if required based on final ER LEAD: USARPAC POC: LTC Cromby USARJ DCSEN LEGEND RED • Will not meet the final objective AMBER • May miss intermediate objective / event but will meet final objective GREEN • Will meet final objective 07/02/02 “The Force Behind the Force” 17 of 24 YND Load Bearing Study • • • • Status AMBER Issue. • USARJ requested a load bearing survey be initiated at YND to access impact of watercraft dry storage • Funding not identified Discussion. • Issue was addressed during site survey in Aug 01 and USARJ IPR in Mar 02 • USARJ did not identify this as a requirement • Last load bearing study carried out 15 years ago • Without study DPW cannot ensure that no damage will result from the storage of AWRP equipment • Land cradle have been design to reduce / eliminate potential problems • DA reprogrammed $. Contract funded and in execution. Recommendation. • CEB-H design land cradles to significantly reduce / eliminate load issues and develop alternate storage location COAs • USARJ expedite completion of load bearing study LEGEND RED •LEAD: Will not USARJ meet the final objective POC: P.Volkman 17th ASG,DPW FE AMBER • May miss intermediate objective / event but will meet final objective GREEN • Will meet final objective 07/02/02 “The Force Behind the Force” 18 of 24 COSIS Contract Award • Status • Issue; Award of COSIS contract extended to 23 Sep 02 • Discussion • • • • AMBER RFP issued May 02; revision issued 14 Jun 02 No contractor participation at site visit mid-Jun or Pre-Proposal Conference 21 Jun Contractors expressing interest but requesting additional time OSC contracting submitted revised dates of: • Proposal due date to 25 Jul • Conduct proposal evaluations 26 Jul - 13 Sep • Source Selection decision evaluation 16-20 Sep • Revised target award date is 23 Sep Recommendation. • Extend proposal due date to 25 Jul 02with contract award 23 Sep. Develop Temp MLC as bridge between download and contractor on-site date. LEAD: AMC(OSC) POC: Diane Brown, OSC Contracting LEGEND RED • Will not meet the final objective AMBER • May miss intermediate objective / event but will meet final objective GREEN • Will meet final objective 07/02/02 “The Force Behind the Force” 19 of 24 Dredging / Soil Analysis at Site 4 • Status • Issue Dredging at Site 4 Required for permanent mooring of 10 x LCU2000s • Discussion AMBER • • Site 4 dredging depth insufficient to store 10xLCU 2000’s Two soil analysis at site 4 are inclusive (insufficient number of samples and insufficient depth of samples) • Further testing will be required to meet dredging depth requirements • If dredging of site 4 cannot be completed, temporary location at site 3 may become permanent • Dredging is unfunded • Recommendation USARPAC expedite soil sampling / environmental actions necessary to program / fund / execute dredging LEAD: USARJ POC: Mr. Noah LEGEND RED • Will not meet the final objective AMBER • May miss intermediate objective / event but will meet final objective GREEN • Will meet final objective 07/02/02 “The Force Behind the Force” 20 of 24 DAC Selections • Status • Issue. • • AMBER Recruitment process for the 3 x DACs has extended beyond projected timelines Discussion • DAC management team consists of a Logistics Manager (GS13), Contract Specialist (GS12), and a QA Ship Surveyor (GS12) • Job descriptions, recruitment packages completed (30 day slip) • Selection lists contain adequate qualified applicants to fill positions • Selection panels on-going • Selections scheduled for NLT 16 Jul • Team projected on-site 16 Sep (60 day PCS) • Recommendation. • • Continue with adjusted schedule Maintain LNO and CEB-H personnel on-site LEAD: AMC (CEB-H) POC: LTC Liberg, CDR LEGEND RED • Will not meet the final objective AMBER • May miss intermediate objective / event but will meet final objective GREEN • Will meet final objective 07/02/02 “The Force Behind the Force” 21 of 24 YND Rock Drill • Status • Issue. • • • GREEN Developing YND Rock Drill Discussion • • • • Preliminary planning and training aid development on-going SV and AC OPORDs (draft) completed OPORD staffing on-going Final concept briefing 8 JUL Recommendation. • NA LEAD: AMC (CEB-H) POC: Tom Ferguson, CEB-H CEA Ivor Edwards, Operations LEGEND RED • Will not meet the final objective AMBER • May miss intermediate objective / event but will meet final objective GREEN • Will meet final objective 07/02/02 “The Force Behind the Force” 22 of 24 Strong Virginian / American Cormorant Download Planning • Status • Issue. • • • GREEN Development of SV and AC OPORDs for DL at YND Discussion • • • Draft OPORDs complete Staffing on-going Final OPORD to be published pending release of HQDA AWRP OPORD 2002-XX, Feb 02 Recommendation. • NA LEAD: AMC(CEB-H) POC: Tom Ferguson, CEB-H CEA Chris Gill, Operations LEGEND RED • Will not meet the final objective AMBER • May miss intermediate objective / event but will meet final objective GREEN • Will meet final objective 07/02/02 “The Force Behind the Force” 23 of 24