WATER SERVICES DEVELOPMENT PLAN FOR CITY OF CAPE TOWN 2008/09 – 2012/13 (Status: Draft 2a) Link to the 2007/08 WSDP on the Internet: GOTO Link to the 2007/08 Executive Summary Link to 2007/08 Presentation GOTO 1b Link to the 2005/06 Annual Report GOTO 2 Link to the 2006/07 WSDP Link to the 2006/7 Executive Summary Link to the 2004 WSDP Review Link to the 2001 WSDP 18 April 2008 Amanzi Obom Consulting cc Registration Number: 2006/099058/23 VAT Number: 4040238984 7 Forth Road, Rondebosch, Cape Town 7700 Tel & Fax: +27 21 685 6426 Email: johnframe@telkomsa.net TABLE OF CONTENTS CITY OF CAPE TOWN WATER SERVICES DEVELOPMENT PLAN 2008/09 TO 2012/13 ITEM DESCRIPTION PAGE ABBREVIATIONS AND DEFINITIONS .......................................................................................... xvii KEY TERMS ................................................................................................................................. xviii PREFACE ....................................................................................................................................... xix A. INTRODUCTION: STRATEGIC PERSPECTIVE AND METHODOLOGY .................. 1 A.1 GENERAL .................................................................................................................. 1 A.2 ROADMAP OF PLANNING FRAMEWORK................................................................ 2 A.3 STRATEGIC ANALYSIS AND METHODOLOGY ....................................................... 2 A.4 IDP METHODOLOGY ................................................................................................ 4 A.5 PROGRAM INTERACTION AND DATA EXCHANGE .............................................. 10 B. ADMINISTRATION .................................................................................................. 11 B.1 NAME OF WSA ....................................................................................................... 11 B.2 STATUS OF THE WDSDP ...................................................................................... 11 B.3 WSDP DRAFT TEAM .............................................................................................. 11 B.3.1 Water services authority ........................................................................................... 11 B.3.2 Consultants .............................................................................................................. 15 B.4 PROCESS FOLLOWED .......................................................................................... 15 B.5 COMMENTS ............................................................................................................ 15 B.6 ADOPTION RECORD .............................................................................................. 16 B.7 WSDP COORDINATOR(S) ...................................................................................... 16 B.8 PROJECT MANAGEMENT UNIT ............................................................................. 16 B.9 DWAF Asset Transfer .............................................................................................. 16 B.10 General .................................................................................................................... 16 C. EXECUTIVE SUMMARY .......................................................................................... 17 C.1 ESSENTIAL QUESTIONS ....................................................................................... 18 C.1.1 What is backlog........................................................................................................ 18 C1.2 What is the status of supply to higher levels of service? .......................................... 18 TABLE OF CONTENTS ITEM DESCRIPTION PAGE C.1.3 Cost of eradicating backlogs .................................................................................... 19 C.1.4 What is the strategy to eradicate backlogs? ............................................................. 19 C.1.5 What is the status of all water infrastructure............................................................. 20 C.1.6 Effective management ............................................................................................. 21 C.2 WATER SERVICES BUSINESS ELEMENT SUMMARY .......................................... 21 C.2.1 Socio-economic profile ............................................................................................. 21 C.2.2 Service level profile .................................................................................................. 23 C.2.3 Water resource profile .............................................................................................. 24 C.2.4 Water conservation and demand management ........................................................ 30 C.2.5 Water services infrastructures profile ....................................................................... 33 C.2.6 Water balance .......................................................................................................... 44 C.2.7 Water services institutional arrangements ................................................................ 44 C.2.8 Customer service profile........................................................................................... 45 C.2.9 Financial profile ........................................................................................................ 47 Summary of Strategic Gaps and Strategies ............................................................. 50 D. BACKGROUND TO THE AREA .............................................................................. 59 D.1 LOCATION............................................................................................................... 59 D.2 WATER SERVICES AUTHORITY PERSPECTIVE .................................................. 60 D.3 PHYSICAL PERSPECTIVE...................................................................................... 60 D.3.1 Topography .............................................................................................................. 61 D.3.2 Climate ..................................................................................................................... 61 D.3.3 Natural Environment................................................................................................. 61 D.3.4 Main infrastructure development .............................................................................. 63 ii TABLE OF CONTENTS ITEM DESCRIPTION ................................................................................................... PAGE D.4 DEMOGRAPHIC PERSPECTIVE ............................................................................ 66 D.4.1 Economics ............................................................................................................... 66 D.4.2 Social ....................................................................................................................... 67 D.5 REGIONAL PERSPECTIVE ..................................................................................... 69 E. IDP AND WSDP GOALS AND INTEGRATION ........................................................ 71 E.1 IDP PRIORITY ISSUES RELATED TO WATER SERVICES ................................... 71 E.2 SUSTAINABLE WATER SERVICES SUB-GOALS .................................................. 75 E.3 INTEGRATED WATER RESOURCE MANAGEMENT SUB-GOALS ....................... 75 E.4 EFFICIENT AND EFFECTIVE WATER SERVICES INSTITUTIONAL ARRANGEMENTS SUB-GOALS ............................................................................. 75 F WATER SERVICES BUSINESS ELEMENTS .......................................................... 77 F.1 SOCIO-ECONOMIC PROFILE................................................................................. 77 F.1.1 Demographics .......................................................................................................... 77 F.1.1.1 Situation assessment (demographics) ..................................................................... 77 F.1.1.1.1 Current consumer profile .......................................................................................... 77 F.1.1.1.2 Poor household definition ......................................................................................... 78 F.1.1.1.3 Present population and projected population growth rates ....................................... 78 F.1.1.1.4 Demographic trends and migration patterns............................................................. 79 F.1.1.1.5 Age and gender profile ............................................................................................. 79 F.1.1.2 Future trends and goals (demographics) .................................................................. 80 F.1.1.2.1 Consumer profile ...................................................................................................... 80 F.1.1.2.2 Population and projected population growth rates .................................................... 80 F.1.1.2.3 Demographic trends and migration patterns............................................................. 80 F.1.1.2.4 Age and gender profile ............................................................................................. 81 F.1.1.3 Strategic gap analysis (demographics) .................................................................... 81 F.1.1.4 Implementation strategies (demographics)............................................................... 81 iii TABLE OF CONTENTS ITEM DESCRIPTION PAGE F.1.2 HEALTH ................................................................................................................... 82 F.1.2.1 Situation assessment (health) .................................................................................. 82 F.1.2.1.1 Health profile ............................................................................................................ 82 F.1.2.2 Future trends and goals (health) .............................................................................. 84 F.1.2.2.1 Health profile ............................................................................................................ 84 F.1.2.3 Strategic gap analysis (health) ................................................................................. 84 F.1.2.4 Implementation strategies (health) ........................................................................... 84 F.1.3 EMPLOYMENT AND INCOME................................................................................. 85 F.1.3.1 Situation assessment (employment and income) ..................................................... 85 F.1.3.1.1 Employment profile .................................................................................................. 85 F.1.3.1.2 Household income ................................................................................................... 85 F.1.3.2 Future trends and goals (employment and income) ................................................. 86 F.1.3.2.1 Employment profile .................................................................................................. 86 F.1.3.2.2 Household income ................................................................................................... 86 F.1.3.3 Strategic gap analysis (employment and income) .................................................... 86 F.1.3.4 Implementation strategies (employment and income) .............................................. 86 F.1.4 ECONOMICS ........................................................................................................... 87 F.1.4.1 Situation assessment (economics) ........................................................................... 87 F.1.4.1.1 Economic sectors, GGP contribution and employment............................................. 87 F.1.4.1.2 Economic trends ...................................................................................................... 89 F.1.4.2 Future trends and goals (economics) ....................................................................... 89 F.1.4.2.1 Economic sectors, GGP contribution and employment............................................. 89 F.1.4.2.2 Economic trends ...................................................................................................... 90 F.1.4.3 Strategic gap analysis (economics) .......................................................................... 90 F.1.4.4 Implementation and strategies ................................................................................. 90 F.2 SERVICE LEVEL PROFILE ..................................................................................... 91 F.2.1 Residential consumer units ...................................................................................... 91 iv TABLE OF CONTENTS ITEM DESCRIPTION PAGE F.2.1.1 Situation assessment (residential consumer units) ................................................... 92 F.2.1.1.1 Residential consumer units for water ....................................................................... 93 F.2.1.1.2 Residential consumer units for sanitation ................................................................. 94 F.2.1.2 Future trends and goals (residential and consumer units) ........................................ 98 F.2.1.2.1 Residential consumer units for water ....................................................................... 98 F.2.1.2.2 Residential consumer units for sanitation ................................................................. 98 F.2.1.3 Strategic gap analysis (residential consumer units) .................................................. 99 F.2.1.4 Implementation strategies (residential consumer units) ............................................ 99 F.2.2 Public institutions and ‘dry’ industries ..................................................................... 100 F.2.2.1 Situation assessment (public institutions and ‘dry’ industries) ................................ 100 F.2.2.2 Future trends and goals (public institutions and ‘dry’ industries) ............................. 100 F.2.2.3 Strategic gap analysis (public institutions and ‘dry’ industries) ............................... 100 F.2.2.4 Implementation strategies (public institutions and ‘dry’ industries) ......................... 100 F.2.3 Wet industries ........................................................................................................ 100 F.2.3.1 Situation assessment (wet industries) .................................................................... 100 F.2.3.1.1 Wet industries: urban and rural .............................................................................. 100 F.2.3.2 Future trends and goals (wet industries) ................................................................ 100 F.2.3.2.1 Wet industries: urban and rural .............................................................................. 100 F.2.3.3 Strategic gap analysis (wet industries) ................................................................... 100 F.2.3.4 Implementations strategies (wet industries) ........................................................... 100 F.2.4 ‘Raw’ water consumers .......................................................................................... 101 F.2.4.1 Situation assessment (‘raw’ water consumers) ....................................................... 101 F.2.4.2 Future trends and goals (‘raw’ water consumers) ................................................... 101 F.2.4.3 Strategic gap analysis ‘Raw’ water consumers: urban and rural ............................. 101 v TABLE OF CONTENTS ITEM DESCRIPTION PAGE F.2.4.4 Implementation strategies (‘raw water consumers’) ................................................ 101 F.2.5 Industrial consumer units ....................................................................................... 101 F.2.5.1 Situation assessment (industrial consumer units) ................................................... 101 F.2.5.1.1 Industrial consumer units for sanitation .................................................................. 101 F.2.5.2 Future trends and goals (industrial consumer units) ............................................... 103 F.2.5.2.1 Industrial consumer units for sanitation .................................................................. 103 F.2.5.3 Strategic gap analysis (industrial consumer units) .................................................. 103 F.2.5.4 Implementation strategies (industrial consumer units) ............................................ 104 F.2.6 Industries and their permitted effluent releases ...................................................... 104 F.2.6.1 Situation assessment (industries and their permitted effluent releases) ................ 104 F.2.6.1.1 Industries and their permitted effluent releases ...................................................... 104 F.2.6.2 Future trends and goals (industries and their permitted effluent releases) ............. 107 F.2.6.2.1 Industries and their permitted effluent releases ...................................................... 107 F.2.6.3 Strategic gap analysis (industries and their permitted effluent releases) ................ 107 F.2.6.4 Implementation strategies (industries and their permitted effluent releases) .......... 107 F.3 WATER RESOURCE PROFILE ............................................................................. 108 F.3.1 Water source ......................................................................................................... 108 F.3.1.1 Situation assessment ............................................................................................. 108 F.3.1.1.1 Surface water sources ........................................................................................... 108 F.3.1.1.2 Groundwater sources – aquifer characteristics ...................................................... 110 F.3.1.1.3 Groundwater monitoring ......................................................................................... 111 F.3.1.1.4 External sources (where the WSA purchases water from others): ......................... 111 F.3.1.1.5 Water returned to resources .................................................................................. 111 F.3.1.2 Future trends and goals (water source) .................................................................. 111 F.3.1.2.1 Surface water source ............................................................................................. 115 F.3.1.2.2 Groundwater sources-aquifer characteristics ......................................................... 115 F.3.1.2.3 Groundwater monitoring ......................................................................................... 116 vi TABLE OF CONTENTS ITEM DESCRIPTION PAGE F.3.1.2.4 External sources (where the WSA purchases water from others) .......................... 116 F.3.1.2.5 Water returned to resources .................................................................................. 116 F.3.1.3 Strategic gap analysis (water source) .................................................................... 117 F.3.1.3.1 Implementation strategies (water source)............................................................... 117 F.3.2 Water quality .......................................................................................................... 119 F.3.2.1 Situation assessment (water quality) ...................................................................... 119 F.3.2.1.1 Quality of water taken from source: urban .............................................................. 119 F.3.2.1.2 Quality of water taken from source: rural ................................................................ 121 F.3.2.1.3 Reporting on quality of water from source: urban and rural .................................... 121 F.3.2.1.4 Quality of water returned to the resource: urban .................................................... 121 F.3.2.1.5 Quality of water returned to the resource: rural ...................................................... 127 F.3.2.1.6 Pollution contingency measures ............................................................................. 127 F.3.2.2 Future trends and goals (water quality) .................................................................. 128 F.3.2.2.1 Quality of water taken from source: urban .............................................................. 128 F.3.2.2.2 Quality of water taken from source: rural ................................................................ 128 F.3.2.2.3 Report on quality of water taken from source: urban and rural ............................... 128 F.3.2.2.4 Quality of water returned to the resource: urban .................................................... 128 F.3.2.2.5 Quality of water returned to the resource: rural ...................................................... 128 F.3.2.2.6 Pollution contingency measures ............................................................................. 128 F.3.2.2.7 Strategic gap analysis (water quality) ..................................................................... 128 F.3.2.2.8 Implementation strategies (water quality) ............................................................... 129 F.3.3 Waterborne Sanitation ........................................................................................... 130 vii TABLE OF CONTENTS ITEM DESCRIPTION PAGE F.4 WATER CONSERVATION / DEMAND MANAGEMENT (WC/WDM) ..................... 131 F.4.1 Water resource management interventions ............................................................ 137 F.4.1.1 Situation assessment (water resource management interventions) ........................ 137 F.4.1.1.1 Targets for reducing unaccounted for water and water inefficiencies: urban .......... 139 F.4.1.1.2 Reducing high pressures for residential consumers: urban .................................... 139 F.4.1.1.3 Reducing high pressures for residential consumers: rural ...................................... 139 F.4.1.1.4 Consumer / end-use demand management: public information and education programmes ........................................................................................................... 139 F.4.1.1.5 Leak and meter repair programme: urban .............................................................. 140 F.4.1.1.6 Leak and meter repair programme: rural ................................................................ 140 F.4.1.1.7 Working for water programme................................................................................ 140 F.4.1.1.8 Treated Effluent ..................................................................................................... 141 F.4.1.2 Future trends and goals (water resource management interventions) .................... 141 F.4.1.2.1 Targets for reducing unaccounted for water and water inefficiencies: urban .......... 141 F.4.1.2.2 Leak reducing high pressures for residential consumers: urban ............................. 141 F.4.1.2.3 Reducing high pressures for residential consumers: rural ...................................... 142 F.4.1.2.4 Consumer / end-use demand management: public information and education programmes ........................................................................................................... 142 F.4.1.2.5 Leak and meter repair programmes: urban ............................................................ 142 F.4.1.2.6 Leak and meter repair programmes: rural .............................................................. 142 F.4.1.2.7 Working for water programme................................................................................ 143 F.4.1.3 Strategic gap analysis (water resource management interventions) ....................... 143 F.4.1.4 Implementation strategies (water resource management interventions) ................. 143 F.5 WATER SERVICES INFRASTRUCTURE PROFILE.............................................. 155 F.5.1. Water services infrastructure ................................................................................. 155 F.5.1.1 Situation assessment (water services infrastructure) ............................................. 158 F.5.1.1.1 Existing infrastructure ............................................................................................. 158 viii TABLE OF CONTENTS ITEM DESCRIPTION PAGE F.5.1.1.2 Brief functional description of existing main infrastructure components (urban and rural) .................................................................................................... 158 F.5.1.1.3 Existing groundwater infrastructure ........................................................................ 158 F.5.1.1.4 Existing surface water infrastructure ...................................................................... 159 F.5.1.1.5 Existing water treatment works infrastructure ......................................................... 162 F.5.1.1.6 Existing pump stations infrastructure ...................................................................... 163 F.5.1.1.7 Existing bulk pipeline infrastructure ........................................................................ 165 F.5.1.1.8 Existing reservoir infrastructure .............................................................................. 165 F.5.1.1.9 Existing reticulation infrastructure (by supply zone) ................................................ 166 F.5.1.1.12 Schemes to be transferred: water .......................................................................... 181 F.5.1.1.13 Schemes to be transferred: sanitation .................................................................... 181 F.5.1.1.14 Schemes to be rehabilitated ................................................................................... 181 F.5.1.2 Future trends and goals (water services infrastructure) .......................................... 181 F.5.1.2.1 New infrastructure to be built .................................................................................. 182 F.5.1.2.2 Future internal and connector infrastructure ........................................................... 183 F.5.1.2.3 Future bulk supply infrastructure ............................................................................ 186 F.5.1.2.4 Future bulk sanitation infrastructure ....................................................................... 188 F.5.1.3 Strategic gap analysis ............................................................................................ 197 F.5.1.4 Implementation strategies (water services infrastructure) ...................................... 198 F.6 WATER BALANCE ................................................................................................ 205 F.6.1 Water balance ........................................................................................................ 205 F.6.1.1 Situation assessment (water balance) ................................................................... 205 F.6.1.1.1 Amount of bulk water abstracted ........................................................................... 205 F.6.1.1.2 Amount of bulk water purchased from others ......................................................... 206 F.6.1.1.3 Water supply to consumers ................................................................................... 206 F.6.1.1.4 Total physical water losses..................................................................................... 206 F.6.1.1.5 Total effluent received at treatment works .............................................................. 206 ix TABLE OF CONTENTS ITEM DESCRIPTION PAGE F.6.1.2 Future trends and goals (water balance) ................................................................ 207 F.6.1.2.1 Amount of bulk water to be abstracted ................................................................... 207 F.6.1.2.2 Amount of bulk water to be purchased from other .................................................. 208 F.6.1.2.3 Water to be supplied to consumers: ...................................................................... 208 F.6.1.2.4 Total physical water losses..................................................................................... 208 F.6.1.2.5 Total influent received at treatment works .............................................................. 208 F.6.1.3 Strategic gap analysis (water balance) ................................................................... 208 F.6.1.4 Implementation strategies (water balance) ............................................................. 208 F.7 WATER SERVICES INSTITUTIONAL ARRANGEMENT PROFILE ....................... 209 F.7.1 Water services institutional arrangements .............................................................. 209 F.7.1.1 Situation assessment (water services institutional arrangements profile) ............... 209 F.7.1.1.1 WSA functions and outputs .................................................................................... 211 F.7.1.1.2 WSA capacity development ................................................................................... 212 F.7.1.1.3 Bylaws affecting water services.............................................................................. 213 F.7.1.1.4 Water services provides (retail water) .................................................................... 214 F.7.1.1.5 Water services providers (sanitation) .................................................................... 214 F.7.1.1.6 Water services providers (bulk water) ................................................................... 214 F.7.1.1.7 Water services providers (bulk sanitation) ............................................................. 214 F.7.1.1.8 Support services agents (water) ............................................................................ 214 F.7.1.1.9 Sanitation promotion agent: .................................................................................. 214 F.7.1.1.10 Support service contract : ...................................................................................... 214 F.7.1.1.12 WSP staffing levels: water ..................................................................................... 214 F.7.1.1.13 WSP staffing levels: sanitation .............................................................................. 215 F.7.1.1.14 WSP training programmes .................................................................................... 215 F.7.1.2 Future trends and goals (water services institutional arrangements) ...................... 215 F.7.1.2.1 Water services providers (retail water) .................................................................. 218 F.7.1.2.2 Water services providers (sanitation water) ........................................................... 218 x TABLE OF CONTENTS ITEM DESCRIPTION PAGE F.7.1.2.3 Water services providers (bulk water) ................................................................... 218 F.7.1.2.4 Water services providers (bulk sanitation) ............................................................. 218 F.7.1.2.5 Support services agent (water) .............................................................................. 218 F.7.1.2.6 Sanitation promotion agent ................................................................................... 219 F.7.1.3 Strategic gap analysis ............................................................................................ 219 F.7.1.4 Implementations strategies (water services institutional arrangements) ................. 219 F.8 CUSTOMER SERVICE PROFILE .......................................................................... 221 F.8.1 Customer service ................................................................................................... 221 F.8.1.1 Situation assessment (customer services) ............................................................. 221 F.8.1.1.1 Quality of service for water .................................................................................... 223 F.8.1.1.2 Attending to complaints for water .......................................................................... 224 F.8.1.1.3 Attending to complaints for sanitation .................................................................... 224 F.8.1.1.4 Education for basic water services ......................................................................... 227 F.8.1.1.5 Pollution awareness ............................................................................................... 228 F.8.1.2 Future trends and goals (customer services) ......................................................... 228 F.8.1.2.1 Quality of service for water: urban and rural ........................................................... 228 F.8.1.2.2 Attending to complaints for water: urban and rural ................................................. 228 F.8.1.2.3 Attending to complaints for sanitation: urban and rural ........................................... 228 F.8.1.2.4 Education for basic water services ......................................................................... 228 F.8.1.2.5 Pollution awareness ............................................................................................... 228 F.8.1.3 Strategic gap analysis (customer services) ............................................................ 228 F.8.1.4 Implementations strategies (customers services) ................................................... 229 F.9 FINANCIAL PROFILE ............................................................................................ 230 F.9.1 Capital funds .......................................................................................................... 233 F.9.1.1 Situation assessment (capital funds) ...................................................................... 233 F.9.1.1.1 Capital expenditure (budget): water (R Million) ....................................................... 233 F.9.1.1.2 Sources of capital income: water (R Million) ........................................................... 233 xi TABLE OF CONTENTS ITEM DESCRIPTION PAGE F.9.1.1.3 Sources of capital income: sanitation (R Million) .................................................... 234 F.9.1.2 Future trends and goals (capital funds) .................................................................. 234 F.9.1.2.1 Capital expenditure (budget): water ....................................................................... 234 F.9.1.2.2 Capital expenditure (budget): sanitation (R Million) ................................................ 234 F.9.1.2.3 Sources of capital income: water (R Million) ........................................................... 235 F.9.1.2.4 Sources of capital income: sanitation (R Million) .................................................... 235 F.9.1.3 Strategic gap analysis (capital funds) ..................................................................... 235 F.9.1.4 Implementation strategies (water services institutional arrangements) ................... 235 F.9.2 Operating cost and income .................................................................................... 235 F.9.2.1 Situation assessment (operating costs and income) .............................................. 235 F.9.2.1.1 Operating costs: water ........................................................................................... 237 F.9.2.1.2 Operating costs: sanitation ..................................................................................... 237 F.9.2.1.3 Operating income: subsidies .................................................................................. 237 F.9.2.1.4 Operating income: tariffs ........................................................................................ 237 F.9.2.2 Future trends and goals (operating cost and income) ............................................ 237 F.9.2.2.1 Operating costs: water ........................................................................................... 237 F.9.2.2.2 Operating costs: sanitation ..................................................................................... 238 F.9.2.2.3 Operating income: subsidies .................................................................................. 238 F.9.2.2.4 Operating income: tariff .......................................................................................... 238 F.9.2.3 Strategic gap analysis (operating cost and income) ............................................... 238 F.9.2.4 Implementation strategic (operating cost and income) ........................................... 238 F.9.3 Tariff and charges .................................................................................................. 239 F.9.3.1 Situation assessment (tariff and charges) .............................................................. 239 F.9.3.1.1 Fixed charges: residential (per month) for water .................................................... 239 F.9.3.1.2 Fixed charges: residential (per month) for sanitation .............................................. 239 F.9.3.1.3 Volume charges or other charge mechanisms: residential sanitation ..................... 240 F.9.3.1.4 Block tariffs: residential (R/k) for water ................................................................. 240 xii TABLE OF CONTENTS ITEM DESCRIPTION PAGE F.9.3.2 Future trends and goals (tariff and charges) .......................................................... 241 F.9.3.2.1 Fixed charges: residential (per month) for water .................................................... 241 F.9.3.2.2 Fixed charges: residential (per month) for sanitation .............................................. 241 F.9.3.2.3 Volume charges or other charge mechanisms: residential sanitation ..................... 241 F.9.3.2.4 Block tariffs: residential (R/k) for water ................................................................. 241 F.9.3.3 Strategic analysis (tariff and charges) .................................................................... 241 F.9.3.4 Implementation strategies (tariff and charges) ....................................................... 242 F.9.4 Free basic water..................................................................................................... 244 F.9.4.1 Situation assessment (free basic water) ................................................................. 244 F.9.4.1.1 Subsidy targeting approach for free basic water .................................................... 244 F.9.4.2 Future trends and goals (free basic water) ............................................................. 244 F.9.4.2.1 Subsidy targeting approach for free basic water .................................................... 244 F.9.4.3 Strategic gap analysis (free basic water) ................................................................ 245 F.9.4.4 Implementation strategies ...................................................................................... 245 F.9.5 Charges and block tariffs ....................................................................................... 245 F.9.5.1 Situation assessment (charges and block tariffs) ................................................... 245 F.9.5.1.1 Fixed charges and block tariffs ............................................................................... 246 F.9.5.1.2 Fixed charges and block tariffs: industrial for wastewater (per month) ................... 246 F.9.5.1.3 Fixed charges and block tariffs: commercial for wastewater (per k) ...................... 246 F.9.5.1.4 Fixed charges and block tariffs: commercial for wastewater (per month) ............... 246 F.9.5.1.5 Fixed charges and block tariffs: other for water ...................................................... 246 F.9.5.2 Future trends and goals (charges and block tariffs) ............................................... 247 F.9.5.2.1 Fixed charges and block tariffs: industrial for water ................................................ 247 F.9.5.2.2 Fixed charges and block tariffs: industrial for wastewater ...................................... 247 F.9.5.2.3 Fixed charges and block tariffs: commercial for water ............................................ 247 F.9.5.2.4 Fixed charges and block tariffs: commercial for wastewater................................... 247 F.9.5.3 Strategic gap analysis (charges and block tariffs) .................................................. 247 xiii TABLE OF CONTENTS ITEM DESCRIPTION PAGE F.9.5.4 Implementation strategies (charges and block tariffs) ............................................ 247 F.9.6 Income and sales ................................................................................................... 249 F.9.6.1 Situation assessment (income and sales) .............................................................. 249 F.9.6.1.1 Total income (and non-payment) and expenditure: water (R) ................................. 249 F.9.6.1.2 Total income (and non-payment) and expenditure: sanitation (R) .......................... 249 F.9.6.1.3 Sales arrangements ............................................................................................... 249 F.9.6.2 Future trends and goals (income and sales) .......................................................... 250 F.9.6.2.1 Total income (and non-payment) and expenditure: water ...................................... 250 F.9.6.2.2 Total income (and non-payment) and expenditure: sanitation ................................ 250 F.9.6.2.3 Sales arrangements ............................................................................................... 250 F.9.6.3 Strategic gap analysis (income and sales) ............................................................. 250 F.9.6.4 Implementation strategies (income and sales) ....................................................... 251 F.9.7 Metering and Billing Urban ..................................................................................... 251 F.9.7.1 Situation and assessment (metering and billing) .................................................... 251 F.9.7.1.1 Metering and billing: urban ..................................................................................... 251 F.9.7.1.2 Metering and billing: rural ....................................................................................... 252 F.9.7.2 Future trends and goals (metering and billing) ....................................................... 252 F.9.7.2.1 Metering and billing: urban ..................................................................................... 252 F.9.7.2.2 Metering and billing: rural ....................................................................................... 252 F.9.7.3 Strategic gap analysis (metering and billing) .......................................................... 252 F.9.7.4 Implementation and strategies (metering and billing) ............................................. 252 F.10 LIST OF PROJECTS ............................................................................................. 254 F.10.1 Projects .................................................................................................................. 254 F.10.2 Annual water and sanitation projects list ................................................................ 261 F.10.3 WSA sustainability project list ................................................................................ 261 F.10.4 Future trends and goals (projects) ......................................................................... 261 F.10.5 Strategic Gap Analysis ........................................................................................... 261 F.10.6 Implementation Strategies...................................................................................... 261 xiv TABLE OF CONTENTS ITEM DESCRIPTION PAGE F.11 KEY PERFORMANCE INDICATORS..................................................................... 262 F.11.1 Current Situation .................................................................................................... 262 F.11.2 Future targets......................................................................................................... 273 xv TABLE OF CONTENTS FIGURES 1. Figure D.1 Locality Plan 2. Figure D.3.1 Topography 3. Figure D.3.4a: Cape Town’s urban footprint: 1977 versus 2006 4. Figure D.3.4b Existing Land Use and Potential Future Development Areas 5. Figure 3, based on the above key socio-economic variables, illustrates the spatial variations in levels of living 6. Figure D.4.2: Households earning below Household Subsistence Level 7. Figure F.1.1.1.5 Age – Sex Distribution of Population 8. Figure F.1.4.1.2: Comparison of level of unemployment and GGP growth in Cape Town 9. The general percentage distribution of households with inadequate sanitation services correlate to a large extent with the location of informal settlements as determined through aerial and on-site surveys and depicted in Figure F.2.1.1.2a and 10. Figure F.2.1.1.2b. 11. Figure F.3.1.2a : Demand growth Projections versus Supply Available 12. The distribution of water demand is given in Figure F.3.1.2b below 13. Figure F.4a: Impact of past restrictions and WC/WDM 14. Figure F.4b: Impact of proposed WC/WDM 15. Figure F.5.1(a) : Main Components of Bulk Water Supply Infrastructure 16. Figure F.5.1 (b) Main components of Wastewater Treatment Infrastructure showing Catchments 17. Figure F.5.1.2.3 - Future Bulk Water Infrastructure Requirements xvi ABBREVIATIONS AND DEFINITIONS ABBREVIATIONS AND DEFINITIONS AADD BH CMA CU DWAF EIA GGP IDP incl. IWRP k M MIG n.a. N/A NBI NIS PS RES SALGA SDF SPA SSA SW UAW VIP WC/WDM WfW WRC WSA WSDP WSP WTW WWTW %/a Annual Average Daily Demand Borehole Catchment Management Authority Consumer Unit Department of Water Affairs and Forestry Environmental Impact Assessment Gross Geographic Product Integrated Development Plan included Integrated Water Resource Planning kilolitre Megalitre Municipal Infrastructure Grant not available Not Applicable National Benchmarking Initiative National Information Systems Pump Station Reservoir South African Local Government Association Spatial Development Framework Sanitation Promotion Agent Support Services Agent Surface Water Unaccounted Water Ventilated Improved Pit Latrine Water Conservation / Water Demand Management Working for Water Water Resource Commission Water Services Authority Water Services Development Plan Water Services Provider Water Treatment Works Wastewater Treatment Works Percentage per annum xvii KEY TERMS TERM Basic Water Supply Facility Basic Water Supply Service Basic Sanitation Facility Basic Sanitation Service IDP MIG WSA WSDP WSP INTERPRETATION The infrastructure necessary to supply 25 litres of potable water per person per day supplied within 200 metres of a household and with a minimum flow of 10 litres per minute (in the case of communal water points) or 6 000 litres of potable water supplied per formal connection per month (in the case of yard or house connections). The provision of a basic water supply facility, the sustainable operation of the facility (available for at least 350 days per year and not interrupted for more than 48 consecutive hours per incident) and the communication of good water-use, hygiene and related practices. The infrastructure necessary to provide a sanitation facility which is safe, reliable, private, protected from the weather and ventilated, keeps smells to the minimum, is easy to keep clean, minimises the risk of the spread of sanitation-related diseases by facilitating the appropriate control of disease carrying flies and pests, and enables safe and appropriate treatment and/or removal of human waste and wastewater in an environmentally sound manner. The provision of a basic sanitation facility which is easily accessible to a household, the sustainable operation of the facility, including the safe removal of human waste and wastewater from the premises where this is appropriate and necessary, and the communication of good sanitation, hygiene and related practices. A municipal plan as defined in the Municipal Systems Act. A conditional grant from national government to support investment in basic municipal infrastructure. A water services authority is any municipality that has the executive authority to provide water services within its area of jurisdiction in terms of the Municipal Structures Act 118 of 1998 or the ministerial authorisations made in terms of this Act. There can only be one water services authority in any specific area. Water services authority area boundaries cannot overlap. Water services authorities are metropolitan municipalities, district municipalities and authorised local municipalities. A plan for water and sanitation services in terms of the Water Services Act. A Water services provider is xviii Any person who has a contract with a water services authority or another water services provider to sell water to, and/or accept wastewater for the purpose of treatment from, that authority or provider (bulk water services provider); and / or Any person who has a contract with a water services authority to assume operational responsibility for providing water services to one or more consumers (end users) within a specific geographic area (retail water services provider); or A water services authority which provides either or both of the above services itself PREFACE PREFACE This report entails the 2008/09 to 2012/13 Water Services Development Plan for City of Cape Town. The City of Cape Town Water Services Development Plan was jointly undertaken and executed by the Water and Sanitation Department and Amanzi Obom Consulting. The 2008/09 to 20012/13 WSDP for the City of Cape Town (CCT) is presented for the second time in the format as required by the Department of Water Affairs and Forestry (version 10) GOTO 7 While the general format is followed not all the formats of the tables are followed. In order to make the document more relevant to managers CCT has rather followed the approach of presenting tables that are used by managers in day to day operations e.g. tables generated from the computer system SAP. This will help to ensure that the WSDP becomes a useful management tool. In addition, the Water and Sanitation Department is going through a process to “operationalise” the WSDP. This document has gone some of the way towards that goal. It is intended that future updates would continue this process. xix City of Cape Town WSDP 2008/09 to 2012/13 A. INTRODUCTION: STRATEGIC PERSPECTIVE AND METHODOLOGY A.1 GENERAL For the purpose of a WSDP from the Preparation Guideline GOTO Ex1. The 2008/09 WSDP for the City of Cape Town (CCT) is presented below in the latest format (version 10) as required by the Department of Water Affairs and Forestry. CCT developed their own format in their first WSDP in 2001 and this is the second version that follows the DWAF format. While the Chapter and section headings have been followed, not all the tables in version 10 have been incorporated. In a number of places tables have been adapted to conform to the format city officials already collect information. This should assist in later updates. The format has been adapted in places to improve the flow of the document. By making these adaptions it is hoped that there will be greater buy-in and the document become a useful planning tool. The report was compiled using information extracted from a variety of sources, The 2007/08 WSDP The 2006/07 Annual Report. the 2006/07 WSDP the 2005/06 annual report the 2006/07 IDP the 2007/08 IDP (Draft 15.03.07vx2.2.doc) the State of Cape Town 2006 Departmental SDBIP’s (Service Delivery Business Implementation Plans) and Performance Scorecards Information about the latest available Master Plans Historical and future capital and operating budgets various reports, Census 2006 Due to time and other constraints it has not always been possible to collect all the necessary information. Where there are gaps this issue has been highlighted. Historical information for previous financial years has been difficult to obtain in certain instances. Where historical information is provided it is not necessarily 100% accurate and should be used as a guide that identifies trends. This is particularly important in the case of financial information, which has not been extracted from the financial statements. It is a concern that there is a lack of capacity in certain areas to collect the necessary information. Officials are in many cases stretched and have to fit the WSDP into their busy schedules. Officials currently spend an enormous amount of time collecting information for senior management and politicians. 1 City of Cape Town WSDP 2008/09 to 2012/13 Much of this information is similar to what is required for the WSDP but in a different format and for different purposes. The more the general information gathering process can be streamlined with the WSDP needs taken into account the easier it will be to produce future updates. A.2 ROADMAP OF PLANNING FRAMEWORK The roadmap of the planning framework is outlined in the table in section A.4. For a diagram from the WSDP Preparation Guideline GOTO Ex2. A.3 STRATEGIC ANALYSIS AND METHODOLOGY For a diagram from the WSDP Preparation Guideline GOTO Ex3. The strategic analysis and planning process is outlined in flow chart below. This is an ongoing process and happens at both a “micro” and “macro” level of strategic planning. Situation Assessment Data is captured in terms of the various chapter headings of the Water Services Development Plan. These chapter headings identify the key components of the water services business. The data is analysed and the current state of the key components was identified. Set Goals and Objectives The national agenda as contained in the Water Services Act (Act 109 of 1997 GOTO A.1) and the Strategic Framework for Water Services (September 2003), and the City’s Integrated development Plan (IDP) informed the desired future state or vision for Cape Town Water Services. Goals and objectives are set From the current state and desired future state a strategic gap analysis is done and the challenges determined. The options to achieve these goals and objectives are identified The options are investigated and the constraints of each option identified The most suitable option is chosen and action steps to implement the option identified. The implementation of the strategy and action steps then follows. Monitoring KPIs and evaluating the effectiveness of the strategy is ongoing and included in the annual report. (Is the gap closing?) Gap closing? – continue with strategy. Gap not closing or is not closing sufficiently fast? – revise strategy Go through the cycle again. 2 City of Cape Town WSDP 2008/09 to 2012/13 National policies and legislation 1. Situation Assessment Current State Status Quo Current Situation Gap Desired Vision / Future State National Vision Challenge s IDP/ City Vision WSDP / WS Vision 3. What are the options to close the gap? (Strategic gap analysis) 4. Investigate the options, identify constraints 8. Monitor KPIs and evaluate (Annual Report) 5. Decide on the Strategy 7. Implement 6. Decide on action steps City of Cape Town WSDP 2008/09 to 2012/13 A.4 IDP METHODOLOGY For a diagram from the WSDP Preparation Guideline GOTO Ex4 The Process of developing the WSDP is fully integrated into the IDP process and outlined in the table below. The WSDP is a sector plan of the IDP. For the direct Water and Sanitation Services Department and the Utilities Services Portfolio Committee’s involvement and input refer to the shaded sections. PROCESS AND DELIVERABLES NEEDED TOWARDS OBTAINING APPROVAL FOR THE CITY’S 5 YEAR PLAN Deliverable Meeting Process proposals towards the completion of the 5 year plan for the City EMT X S4+ X o Layout framework on the IDP document o Progress towards the completion of the IDP document o Deliverables needed towards 31 May 07 Workshop towards the preparation of proposals to EMT on: o Corporate Strategic Framework o Strategic choices o Operations Integration Model 4 Jan Feb Mar Apr May Jun City of Cape Town WSDP 2008/09 to 2012/13 Deliverable Meeting Meeting to discuss and agree on: EMT X IDP Office X o Corporate Strategic Framework o Strategic choices o Operations Integration Model o Draft Corporate Scorecard for the City Requests for information (Statutory compliance, DPLG and Provincial Government requirements) to be submitted to the IDP office Jan Feb ED’s Alignment Task Group to review Part A and Part B and submitted to the IDP office IDP Office X ATG st Meeting with ODA on the completion of the 1 draft of the IDP document for discussion and consideration by EMT IDP Office X ODA EMT to review the Strategic choices, revised PART A (Objectives) and PART B (Programmes) X Mayco/Portfolio Committee Workshop where Mayco members will present their strategic positions/plan for their portfolios for discussion and consideration Updating of the narrative section of the Part A section of the IDP document X IDP Office C Haskins 5 X Mar Apr May Jun City of Cape Town WSDP 2008/09 to 2012/13 Deliverable Meeting Distribution of draft IDP document for discussion by EMT (Closing date) EMT Jan Feb X Secretariat Writing of the narrative section of the Part B section (Programmes) of the IDP document IDP Office X ATG st Completion of the 1 draft of the IDP document for discussion and consideration by EMT IDP Office X ODA Completion of the 1 consideration by EMT st draft of the Corporate Scorecard (KPI’s and targets) for X Meeting to discuss and agree on the draft IDP and Corporate Scorecard for discussion and work-shopping at the 14 Feb 07 Mayco Workshop EMT X Issue request to Executive Directors to complete:- ED’s X o Directorate Business Plans based on IDP objectives, KPI’s and programmes o Departmental Business Plans based on (And linked to) IDP and Directorate objectives, KPI’s and programmes o Directorate SDBIP’s and Performance Scorecards based on (And linked to) IDP objectives, KPI’s and programmes o Departmental SDBIP’s and Performance Scorecards based on (And linked to) IDP and Directorate objectives, KPI’s and programmes Distribution of draft IDP document for discussion by MAYCO (Closing date) Directors MAYCO Secretariat 6 X Mar Apr May Jun City of Cape Town WSDP 2008/09 to 2012/13 Deliverable Meeting Meeting Cllr Kinnahan, Cllr Walker on IDP public engagement requirements for the year. IDP, Planning Jan Feb Mar X Cllrs Workshop to discuss and agree on the draft IDP document MAYCO X Mayco workshop to conclude IDP document and corporate scorecard MAYCO X MTech meeting with Provincial Sector departments on the IDP document, Budget compilation and state of the city analysis document IDP X KMI Finance Governance Consider,discuss changes to the IDP document and recommend revised draft IDP to Mayco, Sub-Councils and Portfolio Committees EMT To discuss and comment on the Draft IDP document Portfolio X X Committees To discuss and comment on the Draft IDP document FOCOS X To discuss and comment on the Draft IDP document before Portfolio Committee and Sub-Council inputs MAYCO X To discuss and comment on the Draft IDP document SubCouncils X 7 Apr May Jun City of Cape Town WSDP 2008/09 to 2012/13 Deliverable Meeting To discuss and comment on the Draft IDP document after Portfolio Committee and SubCouncil inputs MAYCO X To consider and approve the IDP and Budget for public comment Council X Warning the public of engagement on the draft IDP and Budget Adverts X Jan Feb Mar Apr SC Mngrs & chairs Internal consultation on the IDP comment Email campaign Briefing to Line based Finance Managers Briefing to Line based Performance Managers Intranet publication Posters in all offices for awareness X Public Engagement for public comment on the draft IDP and budget: o Ward/Sub-Council meetings and workshops o Website Blog o SMS facility o Written comments and submissions o Sector and sectoral interests IDP Office 8 X X May Jun City of Cape Town WSDP 2008/09 to 2012/13 Deliverable Meeting Executive Directors to submit:- ED’s o Directorate Business Plans (Comprehensive and 2 page summary) based on IDP objectives, KPI’s and programmes o Departmental Business Plans (Comprehensive and 2 page summary) based on IDP and Directorate objectives, KPI’s and programmes o Directorate SDBIP’s and Performance Scorecards based on IDP objectives, KPI’s and programmes o Departmental SDBIP’s and Performance Scorecards based on IDP and Directorate objectives, KPI’s and programmes Jan Feb Mar Apr May X Directors X X X Business Plans to be submitted to the IDP office. Summaries will be included in addendum to the Comprehensive IDP document. Business Plans also to be submitted to Portfolio Committees and Executive Mayco Members for consideration. X SDBIP’s to be submitted to the IDP office for the finalization of the report to the Mayor. Also to be submitted to Portfolio Committees and Executive Mayco Members for consideration. Performance Scorecards (Directorate) submitted to the OPMS and HR offices for the compilation of performance agreements. Submission of business plans and SDBIP’s to portfolio committees: - Directorate - Departmental X Meeting to consider, comment and make recommendations to MAYCO on the final draft of the IDP document 9 EMT X X Jun City of Cape Town WSDP 2008/09 to 2012/13 Deliverable Meeting Meeting to consider, comment and make recommendations to MAYCO on the final draft of the IDP document FOCOS X Meeting to consider, comment and make recommendations to Executive Mayco Members on the directorate and departmental Business Plans and SDBIP’s Portfolio X Jan Feb Mar Apr May Jun Committees Meeting to consider, comment and make recommendations to MAYCO on the final draft of the IDP document Portfolio X Committees Meeting to consider, comment and make recommendations to Council on the final draft of the IDP document MAYCO X Meeting to consider and approve the final draft of the IDP document and Budgets Council X Advertisement to make the public aware that a summary of the IDP is available X Submit the approved IDP document to the MEC of Local Government and Housing in terms of statutory requirements X Submit the High-level SDBIP to the Mayor for approval X Mayor to approve the High level SDBIP X Submit high level SDBIP to Council for notification X A.5 PROGRAM INTERACTION AND DATA EXCHANGE For a diagram from the WSDP Preparation Guideline GOTO Ex5 The program interaction and data exchange is covered in the table under A.4 10 City of Cape Town WSDP 2008/09 to 2012/13 B. ADMINISTRATION For extract from Strategic Framework for Water Services (SFWW) GOTO Ex6 B.1 NAME OF WSA The Water Services Authority is the City of Cape Town. B.2 1. Name City of Cape Town 2. Address Civic Centre, Hertzhog Blvd, Cape Town STATUS OF THE WDSDP This WSDP is the fourth comprehensive WSDP of the CCT since 2002. Due to time constraints not all updates have been made. However, the most critical changes for the 2008/09 IDP process have been made. For explanation from the Preparation Guideline GOTO Ex7. B.3 WSDP DRAFTING TEAM B.3.1 Water services authority The WSDP was compiled by a team of City of Cape Town Staff led by Mr. Zolile Basholo (Manager: WDM & Strategy) and Mr. Jaco de Bruyn (Manager: Water Services Development Planning): WSA BUSINESS ELEMENT LIAISON ORGANOGRAM DATE: 2006/07 PROVINCE:Western Cape WSA:City of Cape Town PSP:City of Cape Town WSA LIAISON OFFICIALS WSDP Co-ordination WSA Liaison Person Jaco de Bruyn X Directorate Directorate: Water and X Sanitation Designation Head WSDP / Integrated Master Planning X Contact numbers (021) 590 1424 X Email jaco.debruyn@cape town.gov.za X IDP Coordination 11 City of Cape Town WSDP 2008/09 to 2012/13 WSA Liaison Person Martin Van Der Merve X Directorate Directorate: Executive Management Unit X Designation Director: IDP X Contact numbers (021) 400-1211 / 1335 X Email martin van der X merve@capetown.gov. za Business Element: Socio-Economic Profile WSA Liaison Person Craig Haskins (Demographics) Carol Wright X Directorate Strategy and Development Strategy and Development X Designation Head: Strategic Information Manager: Economic Information X Contact numbers (021) 400 2066 (021) 483 9023 X Email craig.haskins@capeto carol.wright@capetown X wn.gov.za .gov.za Business Element: Service Level Profile WSA Liaison Person Jaco de Bruyn Michael Page (Informal X Settlements) Directorate Directorate: Water and Directorate: Water and X Sanitation Sanitation Designation Head WSDP / Integrated Master Planning Acting Informal Settlements X Contact numbers (021) 590 1424 9021) 970 3019 X Email jaco.debruyn@cape town.gov.za michael.page@capeto X wn.gov.za Business Element: Water Resource Profile WSA Liaison Person Paul Rhode (Water Resources) Peter King (WWTWs) Mpharu Hloyi (LAB Tests) Julian Daniels (WC/WDM) Directorate Directorate: Water and Directorate: Water and Directorate: Water and Directorate: Water and x Sanitation Sanitation Sanitation Sanitation Designation Head: Planning - Bulk Water Head: Operations Support Manager: Scientific Services Head: Water Demand Management x Contact numbers (021) 487 2487 (021) 487 2603 (021) 684 1000 (021) 590 1601 x Email paul.rhode@capetown. peter.king@capetown. mpharu.hloyi@capetow julian.daniels@capeto gov.za gov.za n.gov.za wn.gov.za Business Element: Water Conservation / Water Demand Management Profile (WC/WDM) 12 x x City of Cape Town WSDP 2008/09 to 2012/13 WSA Liaison Person Julian Daniels X Directorate Directorate: Water and X Sanitation Designation Head: Water Demand Management X Contact numbers 590 1601 X Email julian.daniels@capeto wn.gov.za X Business Element: Water Services Infrastructure Profile WSA Liaison Person Jaco de Bruyn Paul Rhode (Bulk Water Planning) Alan Maxwell (WWTWs Planning) Sifiso Mdakane (Asset Management) Directorate Directorate: Water and Directorate: Water and Directorate: Water and Sanitation Sanitation Sanitation Directorate: Water and Sanitation Designation Head WSDP / Integrated Master Planning Head: Planning - Bulk Water Head: Develop & Infras. Planning Manager: Engineering & Asset Management Contact numbers (021) 590 1424 (021) 487 2487 (021) 487 2739 (021) 487 2455 Email jaco.debruyn@cape town.gov.za paul.rhode@capetown. alan.maxwell@capetow gov.za n.gov.za sifiso.madakane@cape town.gov.za jaco.debruyn@capetown.gov.za WSA Liaison Person Jaco de Bruyn Paul Rhode (Water Resources) Julian Daniels Directorate Directorate: Water and Directorate: Water and Directorate: Water and Directorate: Water and x Sanitation Sanitation Sanitation Sanitation Designation Head WSDP / Integrated Master Planning Head: Planning - Bulk Water Head: Water Demand Management Head:Customer and Meter Management x Contact numbers (021) 590 1424 (021) 487 2487 (021) 590 1601 (021) 400 3348 x Email jaco.debruyn@cape town.gov.za paul.rhode@capetown. julian.daniels@capeto gov.za wn.gov.za Business Element: Water Services Institutional Arrangements Profile WSA Liaison Person Danie Klopper X Directorate Directorate: Water and X Sanitation Designation Directorate: Policy, Strategy & Regulation X Contact numbers (021) 590 1488 X Email danie.klopper@capeto X wn.gov.za 13 Mogamat Nazeem Marlie (Consumer meters) x mogamat.marlie@cape x town.gov.za City of Cape Town WSDP 2008/09 to 2012/13 Business Element: Customer Services Profile WSA Liaison Person Danie Klopper Carina Crouse (Technical Operating Centre) Cathrine Wilson (WDM Mogamat Nazeem Awareness) Marlie Directorate Directorate: Water and Directorate: Water and Directorate: Water and Directorate: Water and Directorate: Water and Sanitation Sanitation Sanitation Sanitation Sanitation Designation Directorate: Policy, Strategy & Regulation Toc Centre Communications Officer Head: Customer and Meter Management Head: Water Demand Management Contact numbers (021) 590 1488 (021) 957 4759 (021) 761 0989 (021) 400 3348 (021) 590 1601 Email danie.klopper@capeto carina.crouse@capeto cathrine.wilson@capet mogamat.marlie@cape julian.daniels@capeto wn.gov.za wn.gov.za own.gov.za town.gov.za wn.gov.za Business element: Financial Profile WSA Liaison Person Jaco de Bruyn Bertus Saayman (Finance Manager for water) x Directorate Directorate: Water and Directorate: Water and x Sanitation Sanitation Designation Head WSDP / Integrated Master Planning Contact numbers (021) 590 1424 Email jaco.debruyn@cape town.gov.za x (021) 487 2668 x x Business Element: List of Projects WSA Liaison Person Jaco de Bruyn Bertus Saayman (Finance Manager for water) Directorate Directorate: Water and Directorate: Water and Directorate:Utility Sanitation Sanitation Services x Designation Head WSDP / Integrated Master Planning Director: Project Management Unit x Contact numbers (021) 590 1424 (021) 850 4180 x Email jaco.debruyn@cape town.gov.za (021) 487 2668 Wouter Loots (PMU) x wouter.loots@capetow x n.gov.za For spreadsheet GOTO B.3 14 Juliane Daniels City of Cape Town WSDP 2008/09 to 2012/13 B.3.2 B.4 Consultants Comp Chapter Name Designation Role Tel No email All All J Frame Director Project Leader 082 479 6398 Johnframe@telkomsa. net PROCESS FOLLOWED For legal requirements outlined in the Preparation Guideline GOTO Ex8. The process used to compile the WSDP was based on Section 14 to 18 of the Water Services Act (Act 108 of 1997) - GOTO A.1. The methodology adopted was to realign the 2006/07 WSDP to version 10 of “DWAF’s Guide Framework and Checklist for the Development of Water Service Development Plans” dated 2006 and then to update its content. The update takes into account the gaps in the previous WSDP, the IDP process as outlined under section A.4, the latest strategic thinking, the current status of issues affecting Water Services and updating old base information. From this document an Executive Summary (GOTO 1) was compiled. This Executive Summary was used as the Water Services sector plan in the IDP. This WSDP, as submitted to the DWAF and incorporated into the Cape Town IDP, will be available in three formats: - A CD with the full report with links to related studies, detail reports, policies and databases; - A website version without the links; (GOTO) - A printed version without the links. Information presented in this report has been included with the emphasis on the identification of issues effecting water and sanitation services provision. Integration with IDP The timeframes outlining the internal interaction with City officials and politicians and with the public is contained in the table under A.3. B.5 COMMENTS Components Interest Group Considerations Comments N/A N/A N/A N/A Comments will be received as part of the IDP process and will then be incorporated into the WSDP. 15 City of Cape Town WSDP 2008/09 to 2012/13 B.6 ADOPTION RECORD Components B.7 Action All Drafting of WSDP All Updating to final WSDP (2007/08) Approval reference Date WSDP COORDINATOR Name J de Bruyn Designation WSDP Manager Role Team Vice Captain Telephone No / E-mail 021 590 1424 jaco.debruyn@capetown.gov.za B.8 PROJECT MANAGEMENT UNIT The City’s MIG Project Management Unit co-ordinates the allocation and distribution of funds. Water and Sanitation Services’ projects are managed by the department. B.9 DWAF Asset Transfer There are no assets that need to be transferred from DWAF. B.10 General While the City does not have a separately approved Service Level Policy for Water and Sanitation the service level categories outlined under Service Level Profile (F2) have been incorporated into the WSDP since 2002. Free basic levels and indigent subsidies are clearly spelt out under F2. 16 City of Cape Town WSDP 2008/09 to 2012/13 C. EXECUTIVE SUMMARY WATER SERVICES DEVELOPMENT PLAN 2008/09 to 2012/13 Introduction While significant progress has been made since the 2006/07 WSDP Water and Sanitation Services in Cape Town continues to face critical challenges. These include eradicating the backlog of basic sanitation services, achieving the essential targets for reducing water demand, meeting the wastewater effluent standards and thereby reducing the impact on the water quality of urban rivers, asset management and ensuring that infrastructure is extended timeously to meet the development growth demands. Financial sustainability of the service is a particular challenge: ensuring full cost recovery and debt management at a fair tariff, and financing of capital investment. In order to optimally achieve this and thus meet key policy and legislative requirements, new and effective institutional arrangements and other strategies continue to be put in place. The national Strategic Framework for Water Services, Sept 2003, is a critical policy document setting out the future approach to the provision of water services. Of the national targets set, the most critical for Cape Town are: All people are to have access to functioning basic water supply by 2008 (achieved in CCT in 2005/06) All people are to have access to functioning basic sanitation by 2010 (CCT are aiming for 2012 due to the extent of the requirement and its unique constraints) Investment in water services infrastructure should total > 0,75% of GDP Institutional reform of regional water services providers to be completed by 2013, with Water Services managed and accounted for separately Annual reporting on key performance indicators to be started. The guiding document to date has been the WSDP of June 2006. The 2008/09 update, of which this is the Executive Summary, is a product of the current 2008/09 IDP process and will be a Sector Plan in that. Vision To become a leader in the provision of equitable, sustainable, people-centred, affordable and credible water services to all. Critical challenges Cape Town Water Services faces a number of critical challenges: a) b) Eradication of basic sanitation services backlog in a fast-track manner Meeting basic services expansion to meet the influx 17 City of Cape Town WSDP 2008/09 to 2012/13 c) d) e) f) g) h) i) j) k) l) m) Intensifying the Water Demand Management Strategy and achieving the targeted or better reduction Meeting the Wastewater effluent standards and reducing the impact on the water quality of rivers and water bodies Greywater runoff quality in informal settlements Timeous provision of infrastructure to meet development growth needs Maintenance of infrastructure to ensure continued operation High financial requirements High debt due to non-payment Financial sustainability of the service and cost recovery and debt management Affordability of the Service Increased performance and efficiency Establishing a new, more effective institutional arrangement The strategies to face these challenges are dealt with under the following sections. C.1 ESSENTIAL QUESTIONS C1.1 What is the backlog of water services? With the exception of the backlog in informal areas and the relatively small but un-serviced rural farm population service levels generally meet the National minimum standards as required by the Water Services Act 108 (of 1997). The backlog in basic water was effectively eradicated in 2005/06 when 35 000 informal households received basic water. While 13 905 informal households received access to basic sanitation and 4 290 and 2 892 received a full level of service through the provision of government subsidized housing and serviced sites respectively, the backlog remains at approximately 44 000 (at end of 2006/07). This remains a huge challenge given the high unit cost, lack of available land for Human Settlement to accelerate its formal housing provision and ground level / slope /access space constraints. The challenge then is to provide basic water and sanitation services to new citizens moving into informal areas beyond the emergency level of service and to eradicate the backlog of basic sanitation, targeted over the next 3 to 4 years. Many of these households in informal settlements share the available on-site facilities or rely on the availability of services from nearby established areas. The basic level of service is defined as suitable clean toilet types shared at less than 5 households/toilet and water taps closer than 200m and shared by less than 25 households/tap. C.1.2 What is the status of supply to higher levels of service? Service levels to all formal developed areas are generally at the highest level of service: a flush toilet and water connection in-house or on-site. 18 City of Cape Town WSDP 2008/09 to 2012/13 C1.3 Cost of eradicating backlogs In order to eradicate the backlog and to allow for the annual influx the Informal Settlements programme was estimated (in R mil) in the 2007/08 WSDP as below : Actual Budget Requirements 2008/09 18.1 34.5 2009/10 40.5 38.9 2010/11 17.0 45.7 2011/12 36.4 Water and Sanitation is in the process of securing more funding for this. In the 2006/07 financial year an amount of R8 million was spent on installing toilets in informal areas. The replacement of buckets has not commenced but will be completed by the deadline year undertaken. The total housing backlog is now estimated to be 267 000 (117 000 informal settlements and 150 000 backyard shacks). A possible programme to eradicate the backlog of the full level of service for water and sanitation over a 20 year period would require the following annual funding: PROVIDING FORMAL SERVICES FOR THE HOUSING DEVELOPMENT PROGRAMME Housing backlog eradication (20 years) Sustaining the influx TOTAL R143M R88M R231M This programme is funded through the City’s Housing programme. Depending on the speed of implementing this programme, the informal settlement programme would be changed to align the two. The eradication of backlogs is but one of the essential infrastructural requirements of the service. Refer to the 3 year capital budget under the financial section. C1.4 What is the strategy to eradicate backlogs? The strategy has been to provide a very basic (emergency) level of service as quickly as possible to about 95% of the approximately 195 informal settlements. The households that do not have access to basic sanitation have access to an emergency level. The emergency service is below the basic level of service in terms of household ratios/service point and includes certain unacceptable toilet types such as black buckets, of which 2,880 (revised upwards from the 2007/08 WSDP of 2 857) still need to be replaced. The City prescribes to “the water ladder” concept (as proposed in DWAF’s “Strategic Framework for Water Services, September 2003”). So while the City’s priority is to first provide an emergency level of service to all households in all settlements, it is also extending the coverage and density of services to the basic level. 19 City of Cape Town WSDP 2008/09 to 2012/13 Upgrading on an annual basis for informal areas on developable land is proceeding as funds are obtained. A basic service level is being aimed for (the standard being defined by the ratios mentioned above, ideally opting for pourflush, anearobic or flush toilets as appropriate). “Greenfields” housing projects are undertaken to receive residents moved from undevelopable land. Cape Town’s current plans are to eliminate the sanitation backlog by 2012 (behind the National target), but additional manpower resources are being sourced to accelerate implementation. C1.5 What is the status of all water infrastructure? Existing infrastructure is often stressed significantly during peak periods. The need for new infrastructure due to growth is also pressing. The limited financial situation in the City versus the high demand for new housing has created a scenario where it is a challenge for the City to maintain existing infrastructure and to provide the required bulk infrastructure for connection of new developments. For example, the overloading of the wastewater treatment works in Catchment 1 is illustrated below (flows and loadings as at 2007): Capacity/Flow (Ml/day) Catchment 1: Capacity vs Flow 90 80 70 60 50 40 30 20 10 0 Capacity (Ml/day) Flow (Ml/day) Bellville Kraaifontein Scottsdene Fisantekraal Total WWTW Catchment 1: Capacity vs Loading 900,000 Loading (pe) 800,000 700,000 600,000 500,000 Capacity (pe) 400,000 Loading (pe) 300,000 200,000 100,000 0 Bellville Kraaifontein Scottsdene WWTW 20 Fisantekraal Total City of Cape Town WSDP 2008/09 to 2012/13 The existing infrastructure, particularly the sewer system, is increasingly in a poor condition due to under-provision for essential maintenance and replacement of aging infrastructure over several years. Major pipe collapses have occurred over the past year where such pipes are in urgent need of extensive repair or even replacement. The bulk water system in the northern areas is under stress during peak periods due to the rapid growth in that area. C.1.6 Effective management ISO Certification The Bulk Water branch has previously set the standard by achieving full ISO certification on ISO 9001:2000 and thereafter maintaining it as certified by independent audits. Due to a minor issue which has been addressed this certification has now been lost but is hoped to be regained. An implementation plan to revitalise a drive for achieving certification in other branches is being considered. Scientific Services have embarked on a plan to achieve ISO 17025 certification by 2009, as legally required for ensuring potable water quality. Standard Operating Procedures (SOP’s) have been defined and a process of auditing and refinement has commenced. In the meantime, national Interlaboratory comparisons where the lab is consistently scoring in the top 5, are ensuring that standards are raised or maintained. This together with the ISO 14001 of Wastewater Treatment and the Risk Management programmes to be implemented will ensure that quality is assured and risks are minimised. The following areas are being receiving focused attention; Information Management Systems Integration of existing IT system through Business Warehouse Automation of plants via Scada- telemetry GIS development for effective management of our infrastructure Water quality management through LIMS and SAP Maintenance and life cycle of IT equipment. Capacity building and training. C.2 WATER SERVICES BUSINESS ELEMENT SUMMARY C2.1 Socio-economic profile The 2001 Census recorded the size of the metropolitan population at 2,9M people living in 759 765 households. The City’s 2008/09 Integrated Development Plan put the number of households at 884 000 (up from 847 000 in June 2006), with a population estimate of 3,3M. This, together with a future estimated HIVincidence rate of 5 % (i.e. one in every 20 people are estimated to be HIVinfected), could constrain future population growth even further, together with an expected reduction of rural immigration. 21 City of Cape Town WSDP 2008/09 to 2012/13 Cape Town faces rising development challenges. During the past decade poverty and unemployment have almost doubled, the housing backlog has more than doubled, drug-related crime has tripled, HIV prevalence has increased tenfold and public transport has deteriorated. This is despite significant economic growth (4% annual increase in GGP), improvements in the provision of basic services (water, waste, electricity) and rising tourist numbers. Decades of distorted development in the city has manifested in highly skewed distribution of income and wealth. In Cape Town there is a trend towards rising poverty (from 25% in 1996 to 38% of households living below or marginally above the household poverty line in 2005). This raises the issue of affordability of the service. Affordability of the Service A free basic service is provided, in the form of the first 6 kl/month water supply and first 4,2kl of sewerage conveyance and treatment free of charge to all consumers per month. The City’s Indigent policy allows for a R30 grant in account reduction/month to qualifying ratepayers. Approximately 248 000 formal households currently qualify based on a property value less than R199 000 (2006 General Valuation). The lower steps of the water and sewer tariffs, and the no fixed water and sewer charge and R30 grant for property values less than R199 000 are mechanisms to ensure that water and sanitation is affordable to the poor and indigent. Under conditions of no plumbing leaks, they would consume a relatively low quantity of water. With the free basic and the R30 Indigent Grant indigent households can consume 10.29Kl per month of water and dispose of 7.20 Kl of sewer without charge. The Integrated Leaks Repair Project and the Fixit Project, initiated at the end of 2005, are major initiatives to ensure that these household plumbing leaks are minimized and therefore that the cost of these services is affordable for them. With the implementation of a new policy to install Water Management Devices on a prioritised basis households defined as indigent now have a mechanism to prevent water consumption being above what is affordable. Affordability of the service as a whole will be viewed over the long term. Costs can be reduced in the short term but to the detriment of the maintenance of assets and replacement of aging infrastructure and to an effective WDM Strategy resulting in higher tariffs in the longer term. Higher than inflation increases in tariffs will be required to ensure the sustainability of the service. However, through the mechanisms of free basic tariffs, R30 Indigent Grant and the step tariff (increased tariff for higher usage), the installation of Water Management Devices where appropriate, the sourcing of Grant funding and mechanisms to lower the cost of capital, tariffs will be affordable to the various socio-economic groupings, the poor in particular. The water conservation and demand management strategy, besides being necessary due to the Western Cape being a water scarce region, will also 22 City of Cape Town WSDP 2008/09 to 2012/13 reduce the cost of the service in the long term by postponing new resource and bulk infrastructure schemes. Reductions in water consumption in the higher steps will result in the need for upward adjustments in the tariff steps but, on their own, will not result in an increase in the average water and sewer bill to the consumer. In terms of the asset management strategy there will be increased costs and therefore higher tariffs in the short term but the strategy will ensure service affordability in the long term. The Financial and Institutional Strategy will result in improved performance of the Water Services Provider and therefore should result in a reduction in unit costs. The City’s Credit Control and Debt Management policy (GOTO 9.8) has been revised, is being augmented by concerted efforts of Water Services to manage debt and ensure income due is received. C2.2 Service level profile There are currently a total of 642,456 formally registered customers in the City with full level of service. This customer base is broken down as follows: Customer Type Total Commercial 12,379 Government 221 Industrial 4,099 Miscellaneous 5,554 Schools-Sportsfields 1,440 Domestic Cluster 6,755 Domestic single residential 602,681 Departmental Cluster 2,903 Municipal Water 6,424 Total 642,456 The figure reported in the 2006/07 WSDP has been revised down from 656,800 as there were errors in the previous data. Customers living in backyard shacks number about 150 000 (2005 figure). There are an estimated 117 000 households in informal settlements, 767 000 households in formal areas with a full level of service. The total number of households is therefore 884 000. 117 000 customers in informal settlements receive a basic level of service for water and while 73 000 receive a basic level of sanitation. All receive an emergency level. 23 City of Cape Town WSDP 2008/09 to 2012/13 Grey Water in Informal Settlements Conveyance of grey water, which has been a problem in informal settlements, is receiving attention for health and amenity reasons. A Pilot project run in Khayelitsha has not yielded the expected results and further attention will be paid to this issue. C2.3 Water resource profile Surface water represents 521,5 Mm3/year, or 97,5% of the total yield. The City currently obtains 75 to 80% of its raw water requirements from DWAF and the remainder from its own sources. Approximately 15% of the raw water requirements are obtained from sources within the CMA. 3 Groundwater resources make up 6,64 Mm /year yield, representing only 1,24% of the total yield. The construction of the R1.5 billion Berg Water Project, which includes the Berg River Dam, the first in SA to comply with the guidelines of the United Nations World Commission on Dams, is nearing completion. .The BWP has increased the yield of the Western Cape Water Supply System by 81 Mm3/year. To reduce over-exposure to climate change and the potential decrease in system yield due to environmental reserve requirements, the strategy is to diversify water resources to lessen the dependence on surface water schemes. Schemes to be pursued under this strategy are Table Mountain Group Aquifer, other ground water schemes, desalination, and treated wastewater effluent reuse. The Reconciliation Strategy Study, conducted by the Department of Water Affairs and Forestry and the City of Cape Town, was completed and approved in June 2007. The objective of the study was to put a strategy in place which would ensure the reconciliation of the future requirement for and supply of water from the Western Cape Water Supply System. A Strategy Steering Committee has been formed to make recommendations, on an annual basis, on long term planning activities required to ensure reconciliation of requirement and available supply in the WCWSS area. In other words, it will be this committee’s responsibility to monitor and understand demand growth so that planning for the next scheme takes place timeously to ensure that the level of assurance of supply remain adequate at all times. This is required because the actual growth in demand will determine when the next scheme needs to be built. The scenarios indicate that this could be anywhere between 2011 (no WC/WDM) and 2019 (Comprehensive WC/WDM). The growth in demand depends on the following: The actual unconstrained water demand which depends on the growth in the city, and The effectiveness of the WC&DM Strategy. 24 City of Cape Town WSDP 2008/09 to 2012/13 The available supply depends on: The effects of climate change, and The implementation of ecological reserves for existing schemes. The need to monitor the growth in demand arises from the uncertainty around these parameters and the 7 year horizon from planning to implementation of a scheme. In order to ensure that both DWAF and the City of Cape Town are in a “state of readiness” the City is implementing its WC&DM Strategy and various studies are being carried out at the appropriate level. The historical and Projected Total Water Demand from the WCWSS is shown in the graph below: This includes the demand from agriculture and other smaller municipalities. Wastewater effluent and the impact on the water quality of rivers and water bodies Certain Wastewater Treatment Plants do not comply with DWAF effluent standards due to an historical lack of funding which resulted in a lack of maintenance of infrastructure, and lack of sufficient investment in the replacement of aging infrastructure and in new infrastructure. (New infrastructure is required over time to increase the treatment capacity as the City grows.) Where investment in new and replacement has taken place, benefits are notable from the improved works. This in turn improves the re-use potential of wastewater effluent. The increase in flows and loadings to the wastewater treatment works since 2008 is given in the graphs below: 25 City of Cape Town WSDP 2008/09 to 2012/13 Flow (Ml/day) Wastewater Treatment Works Average Dry Weather Flow 580 560 540 520 500 480 460 440 420 400 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 Year 5,500,000 5,000,000 4,500,000 4,000,000 3,500,000 3,000,000 Ju ne 19 9 N ov 8 19 Ap 98 r1 9 Se 9 9 p1 9 Fe 99 b2 00 Ju 0 l2 00 D ec 0 20 0 M ay 0 20 O 01 ct 20 01 M ar 20 Au 02 g2 0 J a 02 n2 J u 003 ne 20 03 N ov 20 Ap 03 r2 0 Se 0 4 p2 0 Fe 04 b2 00 Ju 5 l2 00 D ec 5 20 0 M ay 5 20 O 06 ct 20 06 M ar 20 Au 07 g2 00 7 Population Equivalents (pe) 12 Month Moving Average Loading on WWTWs Month.Year The wastewater treatment works capital upgrading programme (refer to “C2.5 Water Services Infrastructure”) is providing capacity for development and improved performance for a higher quality effluent. Providing that adequate funds continue to be made available, wastewater effluent quality will be totally compliant with current DWAF standards (1984 standards) by 2012. The mean compliance was approximately 81.3% as at June 2007 up from 76% as at December 2006, and 71 % as at December 2000, with 83% being the target for 2008/09 and 95% for June 2012. The mean % compliance is arithmetic mean of (Suspended Solids + Chem Ox Demand + Ammonia + E Coli). The Nitrate is excluded as a poorly performing works has a low nitrate which would improve % compliance whereas the "real" compliance is actually worse and ortho-Phosphate is not included as very few works have to comply with the future P standard. Operational and maintenance problems also result in non-compliance of treated effluent. For example, the tripping of the activated sludge pump at Kraaifontein led to the loss of a significant amount of sludge from the reactor. As a result nitrification ceased and took time to re-establish. At Bellville the mixed liquor 26 City of Cape Town WSDP 2008/09 to 2012/13 rose resulting in higher oxygen demand. This affected nitrification. Recent power outages due to Eskom supply constraints have also compounded the problem. The compliance with the standard are measured weekly as indicated in the graphs for Athlone below: Athlone: TSS weekly samles 40 TSS in mg/l 35 30 25 TSS 20 1984 STD 15 10 5 2007/12/03 2007/11/03 2007/10/03 2007/09/03 2007/08/03 2007/07/03 2007/06/03 2007/05/03 2007/04/03 2007/03/03 2007/02/03 2007/01/03 0 Date Athlone: COD weekly samles 160 120 100 COD 80 1984 STD 60 40 20 Date 27 2007/12/03 2007/11/03 2007/10/03 2007/09/03 2007/08/03 2007/07/03 2007/06/03 2007/05/03 2007/04/03 2007/03/03 2007/02/03 0 2007/01/03 COD in mg/l 140 City of Cape Town WSDP 2008/09 to 2012/13 Athlone: NH3 weekly samles 35.0 NH3 in mgN/l 30.0 25.0 20.0 NH3 15.0 1984 STD 10.0 5.0 2007/12/03 2007/11/03 2007/10/03 2007/09/03 2007/08/03 2007/07/03 2007/06/03 2007/05/03 2007/04/03 2007/03/03 2007/02/03 2007/01/03 0.0 Date In order to achieve the targets all roleplayers will be mobilised with the Wastewater Treatment driving the process. The branches that the branch depends on (internal and external to Water and Sanitation) to achieve the targets for compliance are given in the table below: Branch Issues Engineering and Asset Management Services Repairs and Maintenance of assets. (Breakdowns in one part of the process will affect the quality of the effluent) Process Control equipment. Water Demand Management and Strategy Estimated future loadings on works (currently being done by the WWT branch) By-laws may need to be tightened up to improve enforcement of industrial effluent and pollution and to create incentives for industries to improve the quality of their discharges. Water Pollution Control Illegal discharges at night and seasonally Monitoring and enforcement of industrial effluent discharges. Database of all industrial effluent dischargers (currently only 289). There is a need to determine a more effective process to get them onto the database. Reticulation Stormwater ingress into the sewer system causing peak high peak flows especially in winter. Night soil disposal. Finance Sufficient capital and operating funds. 28 City of Cape Town WSDP 2008/09 to 2012/13 Branch Issues Procurement Ensuring that the necessary materials and parts are supplied on time. Ensuring maintenance contracts are functioning well. Human Resources Maintaining workforce a with competent the and optimum skilled capacity including skills retention, skills development, etc. Electricity (Eskom) Power outages at WWTWs potentially causing poor quality effluent. The indicators will be used to identify problem areas and identify where strategies need to be put in place to overcome obstacles. For example, since procurement delays cause equipment to be out of order for longer than acceptable periods, Procurement will be engaged to assist with streamlining the process. Some of the areas that Wastewater Treatment Branch are focusing but will be tightened up are: Plant Management and Operator skills and competencies, Process optimisation, and Improved monitoring and operational control. In general, the next four or five years will see a peaking of the upgrading requirements for essential wastewater treatment and it is anticipated that adequate funding will be made available to undertake the necessary improvements, maintain effective service delivery and minimise the impact on the environment. A Water Quality Plan, which will be linked to the WWTW Master Plan, the Asset Management Plan and an Operational Improvement Plan, will be drawn up to ensure that there are sustained improvements in treated effluent quality. Stormwater runoff from polluted sources (industrial dumping and settlements in catchments) often cause more severe pollution of water bodies than the treated effluent does. A working arrangement has been set up with Catchment Management to ensure the impact of sewerage overflows or effluent problems is minimised and does not worsen the environmental health further. 29 City of Cape Town WSDP 2008/09 to 2012/13 C2.4 Water conservation and demand management The annual water consumption (total bulk water treated) by month is given in the graph below: Annual Consumption by Month 350 340 mil m3 per annum 330 320 310 300 290 280 10% Restrictions 270 260 20% Restrictions 10% Restrictions Month Ja n0 M 1 ay -0 Se 1 p0 Ja 1 n02 M ay -0 Se 2 p0 Ja 2 n0 M 3 ay -0 Se 3 p0 Ja 3 n04 M ay -0 Se 4 p0 Ja 4 n05 M ay -0 Se 5 p0 Ja 5 n06 M ay -0 Se 6 p0 Ja 6 n07 M ay -0 Se 7 p0 Ja 7 n0 M 8 ay -0 Se 8 p08 250 From this the effect of water restrictions can be seen. From the graph below it can be seen that the growth rate peaked at 9.5% in November 2006 (due to the low base) but has now reduced to 2.9% per annum as at December 2007. Further reductions in the annual growth rate are required as part of the WC&DM Strategy. Annual Growth in Demand by Month 12.0% 10.0% 6.0% 4.0% 2.0% 0.0% Ja n0 M 1 ay -0 Se 1 p0 Ja 1 n02 M ay -0 Se 2 p0 Ja 2 n03 M ay -0 Se 3 p0 Ja 3 n04 M ay -0 Se 4 p0 Ja 4 n05 M ay -0 Se 5 p0 Ja 5 n06 M ay -0 Se 6 p0 Ja 6 n07 M ay -0 Se 7 p0 Ja 7 n08 M ay -0 Se 8 p08 Growth Percentage 8.0% -2.0% -4.0% -6.0% -8.0% 10 % Restrictions -10.0% -12.0% 20% Restrictions 10% Restrictions -14.0% Month 30 City of Cape Town WSDP 2008/09 to 2012/13 The City’s approach to water demand management is based on three broad principles: water is a strategic, precious and scarce resource; there should be no wastage of water; and all water used should be measured and accounted for. A comprehensive ten-year WC/WDM strategy was approved by Mayco in May 2007. The framework of action of the strategy is divided into an enabling section and an implementation section. The implementation goals are as follows: Goal A: CCT must by 2010 reduce and maintain the non-revenue water to below 15% of the total average demand and within accepted international benchmarks. Goal B: Water wastage by consumers should be reduced and maintained to below 2% of the total demand by 2012 and most consumers should achieve acceptable water efficiency benchmarks by 2016. Policy E: Reduce the projected potable water demand by 20% by the year 2012 and conserve Cape Town’s Water Supply. (Planning for future water and sewer infrastructure is currently based on the City achieving this goal). The enabling goals defined in the strategy are as follows: Goal C: CCT must by 2009 ensure and maintain ongoing effective management systems and implement Integrated Water Resource Planning in all decisions regarding water resources augmentation, bulk infrastructure development and water efficiency projects. Goal D: CCT must adopt WC/WDM as one of the key water service delivery strategies, and must give priority to its implementation and ensure an ongoing adequate enabling environment. The two most critical components of the implementation of the WC/WDM strategy are the reduction of the water losses and the re-use of treated effluent water as an additional resource. During the last three years a number of successful WC/WDM projects have been implemented, most notable projects were the Mfuleni and Protea Park Integrated Leak Repair Projects, the Fixit Project, the education campaigns, treated effluent recycling and various pressure management projects. The focus on these projects has reduced non-revenue demand. In addition the tariffs for treated effluent re-use are being rationalised and should result in additional income. The additional income is intended to be ring-fenced for use on WC/DM projects. The capital budget as outlined in the WC&DM Strategy and compared with actual budget is outlined in the table below: 31 City of Cape Town WSDP 2008/09 to 2012/13 Year 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 TOTAL Operating Strategy Actual R 19.58 R20.00 R 40.42 R 57.13 R 54.69 R 52.62 R 26.87 R 18.77 R 16.14 R 15.94 R 15.84 R 317.99 Capital Strategy Actual R 27.17 R30.00 R 56.08 R 79.26 R 75.88 R 73.00 R 37.28 R 26.04 R 22.39 R 22.11 R 21.98 R 441.20 The savings and cumulative savings that are projected to result from the WC&DM Strategy are shown below: Projected Water Savings per annum Savings in ML/day 60 50 40 30 20 10 0 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2015/16 2016/17 Year Projected Cumulative Water Savings per annum Savings in ML/day 350 300 250 200 150 100 50 0 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 Year The targeted savings for this year are 18.7 Ml/day or 6.84 million m3 per annum, which is approximately 2% of the demand. 32 City of Cape Town WSDP 2008/09 to 2012/13 Demand is currently 25.5% below the unconstrained water demand. This is better than the DWAF requirement of 20%. However, there is concern that despite the increase in water demand management projects as a result of additional funding, the underlying growth remained high at 2.9% as at December 2007. The trends will continue to be monitored and remedial action taken as appropriate in accordance with the Reconciliation Strategy. CCT Demand Projections Bulk Supplied (million cubic metres) 1200 Existing Supply Supply incl. BWP Unconstrained Low Water Demand 1000 Actual 2007/08 IDP 800 600 400 200 Year C2.5 Water services Infrastructure profile The replacement value of the water and sewer infrastructure, determined in May 2003 (escalated by 6% pa to 2007) as part of the Section 78(1) evaluation, was about R22.1 Billion, with 70% being the water and sewer pipe networks, made up as follows: Replacement Value (R mil) Water Supply Infrastructure Dams and catchments 1,177 Treatment Works 1,289 Water Reticulation 10,192 Water Pump Stations 396 Reservoirs 1,601 Depots (shared) 38 Sub Total 14,693 Wastewater Infrastructure 33 2037 2035 2033 2031 2029 2027 2025 2023 2021 2019 2017 2015 2013 2011 2009 2007 2005 2003 2001 1999 1997 1995 1993 1991 0 City of Cape Town WSDP 2008/09 to 2012/13 Water Supply Infrastructure Replacement Value (R mil) WW treatment works 1,793 Sewer Reticulation 5,251 Sewer Pump Stations 359 Depots (shared) Sub Total Total 38 7,440 22,132 Existing Infrastructure Previously maintenance of infrastructure was mostly reactive. This resulted in inadequate maintenance and replacement. With an investment of R22.1 billion in infrastructure assets it is apparent that proper maintenance of these assets over their life cycles can reduce the cost of ownership and will also ensure that treated effluent targets are met. Water and Sanitation Services is implementing an AmiP (Asset Management Improvement Programme) and the SAP Plant Maintenance Module, and this situation is gradually being turned around. The stages of AmiP are: Stage 1: Improvement Strategy Development Stage 2: Basic Asset Register Stage 3: Basic Asset Management Stage 4: Improved Maintenance Management Stage 5: Introduce Advanced Asset Management Techniques Stage 6: System Optimization The improvement process will ensure Assets are maintained proactively rather than reactively, The total asset lifecycle is managed and as a result the life of the asset is maximised, and Maintenance work is effectively coordinated. This approach will ensure that costs and therefore tariffs are minimised in the long term and unwanted operational failure is significantly reduced. This improvement process is being driven through the Reliability Engineering which was established in March 2004. Reliability Engineering is essentially a central hub where all maintenance- and asset-related information is recorded, analysed and stored while maintenance schedules, budgets and contractors are managed and proper work execution ensured. Work requests are called in and logged onto an asset management software system. These requests, along with preventative maintenance work, are then assigned to staff. (The process for the maintenance of assets is outlined below). Asset histories are built up, providing valuable data for future procurement decisions. The centralisation of maintenance enforces tight adherence to service level agreements and affords the CCT improved control and negotiating power 34 City of Cape Town WSDP 2008/09 to 2012/13 when dealing with service providers. Reliability Engineering also ensures compliance with statutory requirements and safety, health and environmental regulations. 35 City of Cape Town WSDP 2008/09 to 2012/13 36 City of Cape Town WSDP 2008/09 to 2012/13 The Reliability Engineering site, captures and records all required work as well as preventative maintenance schedules, generating reports including details of failure analysis. The Reliability Engineering procedure is designed to ensure work is planned to effectively utilise resources and ensure all necessary spares are available to conduct maintenance work. Through a series of workshops, work planning and control procedures and policies are developed and implemented. Reliability Engineering is integrated with the SAP ERP system and the Work Scheduler/Planner decides whether identified work needs to be part of a maintenance plan or a reactive job. The water and sewer reticulation network makes up R15.4 (approximately 70%) of the total R22.1 billion replacement value. In terms of minimizing the long term costs of owning the assets, therefore, the replacement programme for these networks is very significant. Therefore condition records of the networks need to be dramatically improved. Meticulous records of burst mains and blockages, on a Metro basis, has been introduced and maintained since June 2006. The Technical Operations Centre (TOC) is keeping statistics which are presented monthly. The TOC systems are work in progress, but progress is being made with IT and ERP on the portal systems. The indicator used to track the integrity of a water network is the number of bursts per 100 km per annum. An example of records from the Water Branch of the former CT Administration shows that the number of bursts per 100 km on a 12 month moving has deteriorated from approximately 6 to 14 in the last 20 years due to a reduction in the number of kilometers of pipeline replaced per annum. This needs to be addressed. Bursts per 100 km pa (m oving 12 m onth average) 18 Bursts per 100 km pa 16 14 12 10 8 6 4 2 Year to From such records, investigations and tools such a CCTV cameras for sewer pipes, a comprehensive pipe replacement programme will be developed which will need adequate funding and staffing to ensure success. 37 Sep200 Jan2007 Sep200 May200 Jan2005 Sep200 May200 Jan2003 Sep200 May200 Jan2001 Sep199 May200 Jan1999 Sep199 May199 Jan1997 Sep199 May199 Jan1995 Sep199 May199 May199 Jan1993 Sep199 Jan1991 Sep198 May199 Jan1989 Sep198 May198 Jan1987 0 City of Cape Town WSDP 2008/09 to 2012/13 It is likely that the Asset Management Improvement Programme (AmiP) will identify that in the short term more funds will need to be allocated to maintenance of infrastructure and replacement of aging infrastructure. However, it will ensure that in the long term costs and therefore tariffs are minimized. (Previously costs and tariffs were reduced but this results in higher costs and tariffs in the long term) While the department has generally achieved Stage 3 (Basic Asset Management), there are bottleneck in the asset management process. This has resulted because Reliability Engineering is critically short of skilled staff. Critical posts will be filled to get the programme back on track. In addition, the temporary outsourcing of particular functions is being investigated. Besides the filling of critical posts, the urgent tasks that required additional capacity are : All gaps in Equipment data to be identified and put on SAP Master Data, All gaps in Equipment without Maintenance Plans to be identified and put onto SAP Master Data, Ensure all critical proactive works order are generated on SAP, Rationalise the number of Maintenance Plans where possible, Ensure all proactive orders are generated, Improve the procurement process to ensure that all the tools and materials required for pro-active work is received timeously, Complete all works orders either using internal staff or outsourced maintenance teams. All completed Works Orders to be captured timeously without build up in a backlog, Re-instate monitoring systems and indicators such as the ratio of proactive to reactive maintenance. The following activities are planned once the basics are being done: Improved work planning where the Planner, Supervisor and Procurement plan maintenance work together, Work scheduling and then improved work scheduling where there is a closer co-ordination with the operational staff. Currently, pro-active jobs are generated for the month and work is done in accordance with the daily needs rather than a planned schedule. A planned schedule enables more effective utilization of resources. Another current gap is the determining of the catalogue of the notification. This enables one to determine which parts in a piece of equipment are continuously failing and thereby take effective remedial action. There is also a skills shortage on the operational side. Tenders are being prepared for the maintenance of critical equipment (belt presses, centrifuges, pumps and gearboxes). Currently the maintenance of lifting equipment and pressure vessels is outsourced. 38 City of Cape Town WSDP 2008/09 to 2012/13 As in the case of treated wastewater effluent quality indicators will be used to identify where there are gaps and strategies will be devised to close the gaps. Planning for new and upgrading/replacement of aging infrastructure Growth areas To alleviate the problem of overloading of infrastructure in the growth areas of the City a process under the leadership of the Corporate Development Directorate was started to address the situation in a multi-disciplinary way. A partnership approach with developers was started to ensure that development could continue. Development contributions are determined and agreed for each node or Corridor to fund some of the required infrastructure. There are still a number of challenges, and implementation and capacity constraints in the City. The areas where water and sewer infrastructure are severely stressed and are in need of significant upgrades include: West Coast / Parklands development corridor De Grendel / N7 development node Northern development corridor Bottelary development corridor Fast-track housing projects (e.g. N2 Gateway) Maccassar / AECI development node Wastewater Treatment Works The strategies for ensuring that wastewater treatment capacity is sufficient are: Integrate planning for new works and extensions with the other branches and ensure that additional wastewater treatment capacity is provided where needed at the right time, Provide sufficient funding (EFF and MIG funds) to address the backlog in WWTW capacity and provide for growth. In the north eastern areas of the City (Catchment 1) and the Blaauberg areas (Catchment 4) the lack of capacity resulted in development being slowed. The plans for each catchment are detailed below: Catchment 1 The total of all the wastewater treatment works in Catchment 1 are currently near their design capacities as shown in the graph below: 39 City of Cape Town WSDP 2008/09 to 2012/13 CATCHMENT 1: TOTAL FLOW Bellville, Kraaifontein, Scottsdene & Fisantekraal 120 y = 0.1852x - 164.02 y = 0.218x - 199.16 110 100 90 Fisantekraal 24 Ml/d 80 Ml/d 70 60 Kraaifontein extension 50 Scotsdene ext 5 Ml/day 40 30 ANNUAL RATE OF GROWTH: total flow = 3.5% dry w eather flow = 3.3% 20 10 Daily flow Dry weather flow Linear (Daily flow) Linear (Dry weather flow) Jul-2020 Jul-2019 Jul-2018 Jul-2017 Jul-2016 Jul-2015 Jul-2014 Jul-2013 Jul-2012 Jul-2011 Jul-2010 Jul-2009 Jul-2008 Jul-2007 Jul-2006 Jul-2005 Jul-2004 Jul-2003 Jul-2002 Jul-2001 Jul-2000 Jul-1999 Jul-1998 Jul-1997 0 design ADWF To overcome the capacity constraints the construction of the Scotsdene extension of 5 Ml/day and phase 1 of the Fisantekraal works of 24 Ml/day are planned. The capacity extension at the Scottsdene WWTW is expected to commence in May 2008 and be complete by early 2010. Agreement on the purchase of land for the new wastewater treatment works at Fisantekraal has been concluded and consultants have been appointed and are busy with the design. Construction will commence around mid 2008 with the expected commissioning by mid 2010. The preliminary upgrading of Bellville WWTW to improve the quality of effluent should be substantially complete by the end of 2008 and will be followed by a capacity extension to deal with on-going development in the catchment. Catchment 4 The Potsdam WWTW in Catchment 4 has recently been extended by 8 Ml/day with the new works scheduled to be fully operational by April 2008. This has provided sufficient capacity to allow the limitations on development in the Blaauwberg area to be relaxed. It will be extended by another 7 Ml/day by the end of June 2008. Due to the rapid growth in the area it is anticipated, an additional 20 ML/day will be required by June 2012. 40 City of Cape Town WSDP 2008/09 to 2012/13 DEADP accepted the scoping report for increasing the treatment capacity at either Melkbos or Potsdam WWTW to cater for growth in the area. Specialist environmental studies have been undertaken and the draft Environmental Impact Report will be presented to the public early in 2008. This will be followed by the submission of the report and recommendation to DEADP. The Zandvliet WWTW is currently being extended in capacity to accommodate the N2 Gateway project and other developments in the area. The new treatment process which utilises membrane technology, a first for Cape Town, is due to be completed by May 2008. The capital upgrading programme is not only providing capacity for development but also for improved performance for a higher quality effluent. Bulk Water To cater for the growth in demand in the northern areas there are plans and budgets for the implementation of the Northern Areas Bulk Water Augmentation Scheme. The phase of this scheme involving the implementation of a new water treatment plant and bulk reservoir is currently in its EIA phase. Revisions to the EIA and additional infrastructure to be covered in the EIA process has resulted in planned completion of the EIA and submission to the environmental authorities in May 2008. 41 City of Cape Town WSDP 2008/09 to 2012/13 The table of proposed wastewater treatment capacity extensions for the period of this plan is shown on the following page. Long Term Integrated Planning To ensure more effective long term integrated planning within Water and Sanitation Services, Consultants were appointed to identify what information exists and what the gaps in the current master plans are. The report for this was completed at the end of March 2008. A tender has soon be awarded to procure professional services to develop master plans where there are gaps and to update existing master plans. Loading on the infrastructure will be based on land use and will apply to all services. The objectives of the master planning process are: All services within Water and Sanitation use the same customer data with respect to existing flows/loadings and their expected growth rates in particular areas, Infrastructure plans within Water and Sanitation Services are fully aligned, Capital budgets for future years are mainly based on the master plans which are kept up to date, and Monitor where new infrastructure and identified replacement infrastructure is lagging due to inadequate funding. 42 City of Cape Town WSDP 2008/09 to 2012/13 Proposed Wastewater Treatment Capacity Extensions Existing Capacity as at Capacity Extensions by Capacity Extensions by Capacity Extensions by Capacity Extensions by Capacity Extensions by Capacity Extensions by Total proposed additional Total Capacity by 01-Jul-07 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 capacity by 2012/13 2012/13 Hydraulic Organic Hydraulic Organic Hydraulic Organic Hydraulic Organic Hydraulic Organic Hydraulic Organic Hydraulic Organic Hydraulic Organic Hydraulic (Ml/day) (pe's) (Ml/day) (pe's) (Ml/day) (pe's) (Ml/day) (pe's) (Ml/day) (pe's) (Ml/day) (pe's) (Ml/day) (pe's) (Ml/day) (pe's) (Ml/day) (pe's) Athlone 105 900,000 105.00 900,000 Bellville 54.6 581,182 69.60 740,842 Borcherds Quarry 33 360,000 33.00 360,000 Camps Bay 5.5 40,000 5.50 40,000 Cape Flats 200 1,810,000 200.00 1,810,000 Dover 0.01 0 0 0 Fisantekraal 15.00 24.00 159,660 218,160 15.00 24.00 159,660 Organic 218,160 0.01 0 24.00 218,160 Gordons Bay 3.1 13,909 3.10 13,909 Green Point 30 232,727 30.00 232,727 9.80 80,182 Hout Bay 9.8 80,182 Klipheuwel 0.07 455 Kraaifontein 17.5 159,091 Llandudno 0.28 1,591 0.28 1,591 57 370,500 57.00 370,500 Melbosstrand 5.4 24,545 25.40 217,045 Millers Point 0.06 600 0.06 600 45 480,000 45.00 480,000 0.03 300 0.03 300 1.2 6,800 1.20 6,800 Macassar Mitchells Plain Oudekraal Parow Philadelphia 0.07 455 0.07 20.00 192,500 20.00 0.086 0 Potsdam 40 385,000 Scottsdene 7.5 92,727 5 27,636 Wesfleur 14 152,727 Wildevoelvlei 14 86,000 Zandvliet 59 375,455 TOTALS 707 6,181,427 25.00 181,909 0.00 0 5.00 61,815 28.07 262,251 20.00 192,500 15.00 159,660 Cumulative Capacity 707 6,181,427 732.14 6,363,336 732.14 6,363,336 737.14 6,425,151 765.21 6,687,402 785.21 6,879,902 800.21 7,039,562 13.2% 13.9% 1.8% 1.9% Simons Town 7.00 67,375 5.00 61,815 4.00 18.00 43,636 114,534 total growth in capacity over 5 years average growth in capacity pa over 5 years 43 455 192,500 0.14 910 17.50 159,091 0.09 0 7.00 67,375 47.00 452,375 5.00 61,815 12.50 154,542 5.00 27,636 18.00 196,363 4.00 43,636 14.00 86,000 18.00 114,534 77.00 489,989 93.07 858,135 800.21 7,039,562 City of Cape Town WSDP 2008/09 to 2012/13 C2.6 Water balance The 12 month-moving average of unaccounted for water (UAW) for bulk and reticulation was 19.3% as at the end of June 2007. However, the City has adopted international best practice with respect to reporting on water balance and will stop reporting on UAW. Due to uncertainties in certain components of the water balance there are a wide range of possible values for the indicators for the reticulation system as shown in the table below: Range of Indicators Indicator Non-revenue Demand as a percentage of Min Rating Max Rating 17.3% Good 23.2% Poor 162 Good 228 Poor 2.7 Good 3.8 Poor system input Real losses - litres per connection per day Infrastructure Leakage index These indicators are for the period 1 May 2006 to 30 April 2007 A process is currently underway to narrow down the range of indicators. As at April 2007 the input into the reticulation system was estimated to be 268 mil m3 pa, the non-revenue demand 62 mil m3 pa and real losses 47 million m3 pa. The distribution of water demand is as follows: Type of usage 2005/6 2006/7 Domestic 56.9% 58.5% Domestic Cluster 7.0% Municipal 4.9% 7.7% 4.6% Commercial and Industrial 18.3% 17.8% Other 12.9% 11.4% C2.7 Water services institutional arrangements The City’s organisational structure, under revision since 2001, has predominantly reached finalisation, with new staff rapidly being appointed and current staff mostly having being placed. Internal optimisation of structure and process, inter-departmental coordination, integrated planning, as well as Employment Equity are being given high priority in conjunction with the placement process. Water and Sanitation has continued on a path to further optimise its organisational structure which is being implemented where and when possible, within given constraints. It is based on the optimal allocation of available staff, augmented by advanced information and operational technology. An additional staff budget of R116 million per annum from 2007/08 onwards to alleviate the critical staff shortages have been approved and budgeted for. Of 44 City of Cape Town WSDP 2008/09 to 2012/13 particular significance are the funds to appoint several Financial staff. Engineering staff is also being recruited. The key to addressing the challenges that Cape Town Water and Sanitation face and achieving Water Services’ vision and goals is to ensure that Water and Sanitation is structured financially and institutionally to achieve enhanced operational and financial performance. The decision to establish an appropriate service authority mechanism and the establishment of a Water Service Authority (WSA) and a Water services Provider (WSP) arrangement has experienced numerous obstacles. The decision to form an internal ring-fenced business unit dates back to November 2001 with the confirmation that WSA and WSP be established dating back to June 2004. The purpose of investigating Section 78 options and deciding on an appropriate model for the separation was to: Comply with national legislation. Bring effect to national and City’s strategic intent Comply with the Council resolution on the matter in June 2004 Ensure that water and sanitation services in the City are sustainable The current arrangement is that accountability for the financially ring-fenced internal branch acting as WSP rests with the Director: Water Services who is expected to deliver on the city’s strategic goals through the organizational structure to the Executive Director: Utility Services and the 3-year rolling business plan made up the WSDP and related documents such as the SDBIP and the Utility Services: BSC. The branch has set up a properly-staffed Financial section to focus on financial sustainability. Management is finding that this arrangement is working well and that introducing further measures such as a formal service-level agreement between the WSA and WSP is not a priority, with no apparent advantages. The City is also committed to developing alternative service delivery and infrastructure funding or investment mechanisms. Objective 7.2 under the Strategic Focus Area 7 “Good Governance and Regulatory Reform” from the 2007/08 IDP (Draft 15.03.07vx2.2) states “Enhance service delivery through exploring alternative service delivery mechanisms”. C2.8 Customer service profile All the necessary infrastructure is in place to ensure an adequate quality of service to formal households customers. All customers receive water that is fully treated. There are mechanisms in place to attend to customer complaints and queries. An annual customer survey is undertaken. The ratings from previous customer surveys are given in the table below: 45 City of Cape Town WSDP 2008/09 to 2012/13 Percentage of customers satisfied with the service 2002/03 85% 2003/04 82% 2004/05 83% 2005/06 87% 2006/07 89% However, in informal areas there is a completely different picture as shown in the table below: 2002/03 Percentage of customers satisfied with the service 2003/04 72% 2004/05 45% 2005/06 37% 2006/07 47% The general conclusions from the 2007 Customer Survey are: Respondents living in formal residential areas are increasingly more satisfied than in the past. Respondents living in informal residential areas are dissatisfied and this perception is increasing with time. However the numbers of somewhat satisfied respondents are also increasing in time. Overall respondents are satisfied with the taste, colour, smell, texture, pressure and quality of water at their disposal. However a number of formal residential respondents complained about the low water pressure and a number of informal residential respondents complained about very high water pressure. In the business sector, there is an upward trend in the change in behaviour to conserve water. There is no change from 2006 in the formal residential areas. Across all the types of surveys, there is a lack of knowledge about water efficient fittings. A small number of respondents from all the different areas have boreholes which are mainly used as supplementary source to water the garden. In direct contact with the Department of Water and Sanitation Services employees, most respondents found them courteous but a significant number of respondents did not receive any follow-up from contact with the Department of Water and Sanitation Services. In the informal residential areas there is a need for basic sanitation hygiene services which are safe and hygienic. Most households share toilet facilities with 7 other households. A significant number of respondents from informal residential areas complain about unpleasant smells and health problems related to unhygienic sanitation services. A rising tariff scale could encourage businesses to conserve water. The actions that flow from the customer survey which will be taken are: Address pockets of low pressures in formal areas and high pressures in informal areas, The Education and Awareness Campaign will be improved to ensure there is an upward trend in the behaviour change in residential customers with respect to water consumptions reductions, and that all customers have a better knowledge of water efficient fittings, A system will be established to ensure that customer complaints are followed up, and The Hlonipa Amanzi Campaign in informal areas will be improved to ensure that the concerns of customers in informal areas are addressed. 46 City of Cape Town WSDP 2008/09 to 2012/13 C2.9 Financial profile The collection ratios have improved. Sanitation collection ratio has improved from 87% (05/06) to 92% (06/07) while Water has improved from 70% (05/06) to 85% (06/07). The outstanding Debt as at the end of October 2007 was R1.77b for Water and Sanitation. High debt reduces Water and Sanitation’s ability to afford the necessary capital programmes to maintain existing infrastructure and develop new infrastructure for the growth in the City. Water and Sanitation are currently busy with a number of interventions. Apart from the leaks project which focuses on reducing the consumption (and therefore monthly bill) and debt of low income households, the number of teams that performs the actual disconnections and reconnections are being increased, large meters with zero consumption are being replaced, properties with no sewerage charge are being identified, and new developments are being updated. The key financial strategies for CCT in the IDP, with Water and Sanitation’s approach in italics, are: Limiting salary costs to acceptable levels, taking into account the City’s new operating model and transferring savings to improve the maintenance of assets. Water and Sanitation have had to increase their staff due to critical shortages. However, strategies outlined above ensure that the service remains affordable; Reducing the dependency on cross-subsidisation from tariff-based services to within acceptable norms. As from 2007/08 the water tariff no longer cross subsidizes rates; Maintaining rate and tariff adjustments within national norms and guidelines, ensuring the national and local economy are not undermined. This has been achieved when compared to the other 5 metros, despite higher than inflation increases in tariffs necessitated by infrastructure needs; Making adequate provision for free basic services for the poor through an improvement of the indigent policy, to ensure that there is no further marginalisation of poorer communities or individuals through the entrenchment of the indigent policy. The step tariffs and relief to indigent households outlined above ensures that water and sanitation remains affordable; Preparing realistic income budgets with adequate provision for non-recovery to ensure the expenditure reflected for each year can be fully covered by cash receipts; (Being Done) Ensuring that adequate cash reserves are maintained to cover legislated funds and provisions. (Being Done) Implementing these financial strategies will go a long way to putting Water and sanitation Services on a sustainable path. 47 City of Cape Town WSDP 2008/09 to 2012/13 A summary of the overall 3-year capital requirement in Rand million for the service is detailed in the table below: Functional Area Bulk Water Reticulation Wastewater Treatment Water Demand Management EAMS Informal Settlements Meter Replacement Information Technology Technical Operation Centre Masterplanning TOTAL 2008/09 38.4 351.5 226.5 2009/10 149.5 293.6 228.0 2010/11 414.9 269.8 222.0 27.0 0.6 18.1 14.0 3.5 38.3 19.1 40.5 15.0 3.5 26.5 18.0 17.0 15.0 2.5 1.0 2.0 682.5 0.5 2.0 790.0 0.5 2.0 988.2 The funding arrangements for the three financial years (in R millions) is given in the table below: Funding MIG BICL EFF Total 2008/09 171.6 79.2 431.7 682.5 2009/10 137.5 0.0 652.5 790.0 2010/11 93.5 4.0 890.7 988.2 The allocation for MIG funding is based on approved amounts. It is anticipated that further funding will be approved as applications are made. This requires a significant increase in funding through EFF which historically has stood at approximately R160 mil. This has a significant impact of the operating budget through interest and depreciation charges. The high capital budget is required to ensure the sustainability of the service and tariffs have been adjusted to cater for these increases. The City recognises the urgent need to upgrade and extend infrastructure. This is highlighted under the IDP Strategic Focus Area “Sustainable Urban Infrastructure”. In order to ensure that this becomes a reality it is committed to “improve leveraging of available funds without compromising the Council’s ability to sustain service delivery” (part of the Public Infrastructure Investment Programme under the Objective 2.7 -Strategic Focus Area No. 2) Depending on the effect of an aggressive Water Demand management Strategy and a re-evaluation of the approach to treated effluent standards, the high capital requirement may be able to be reduced. The 3 year operating budget (in Rand Million) is as detailed below: ITEM Salaries, Wages and Allowance 2006/07 R mil 264 48 2007/08 R mil 431 2008/09 R mil 543 2009/10 R mil 592 2010/11 R mil 646 City of Cape Town WSDP 2008/09 to 2012/13 ITEM Employee Related Costs - Social Contribution General Expenses Contracted Services Repairs and Maintenance (Primary) Bad Debts Provision / Working Capital Reserve Collection Costs Bulk Purchases - Electricity Bulk Purchases - Water Bulk Purchases - Water Research Levy Indigent Relief Grants & Subsidies Paid Interest on External Loans Depreciation Transfer to / from Future Depreciation Fund Transfer to / from CRR Housing Funds FDR :Transfer Capital Receipts Operating G & D - Projects Internal Utilities Expenditure Bulk Charges Insurance Departmental Premiums: Assets Based Insurance Departmental Premiums: Remuneration Based Interest Paid Internal loans Trading Contribution to Rates Activity Based Costing - Operating Account Activity Based Costing - Recharges Repairs & Maintenance (Sec) Operating Grants and Donations Projects (Sec) Activity Based Costing - Capital Account Support Services Total Operating Expenditure % Increase in operating budget 2006/07 2007/08 2008/09 2009/10 2010/11 58 248 69 86 61 274 107 104 81 309 91 126 88 341 97 138 96 365 103 152 437 0 0 163 8 0 0 0 127 263 0 0 259 12 0 0 0 158 256 0 0 264 13 0 0 0 190 284 0 0 295 14 0 0 0 199 234 0 0 329 16 0 0 0 215 -36 15 1 148 0 21 782 -42 200 1 125 13 55 865 -63 91 1 172 15 61 942 -66 206 1 138 23 65 1,003 -71 100 1 94 23 69 1,068 11 11 11 12 13 2 117 90 4 123 0 5 142 0 5 60 0 5 296 0 -57 17 71 -139 10 159 -130 13 146 -138 14 155 -147 15 165 0 -10 106 2,739 0 -14 147 3,189 16.4% 0 -17 218 3,480 9.1% 0 -18 232 3,741 7.5% 0 -19 248 4,015 7.3% This is based on the following assumptions: City growth Inflation Water Demand growth 2.00% 6.50% 2.00% With the high financial requirements and the need to ensure the sustainability of the service, tariffs may need to increase above inflation over the next 3 - 5 years. As mentioned under “Institutional Arrangements”, the Water Services Provider will be structured in a way that enhances operational and financial performance. 49 City of Cape Town WSDP 2008/09 to 2012/13 Insert summarized Gaps and Strategies here when printing For spreadsheet GOTO 58 City of Cape Town WSDP 2008/09 to 2012/13 D. BACKGROUND TO THE AREA D.1 LOCATION The CCT is located in the Western Cape Province on the south-eastern corner of South Africa as indicated on Figure D.1../../../../../../../../ontvangs/Local Settings/Temp/Temporary Directory 1 for CT WSDP 0708_3 May 07_Draft 4.zip/Figure 2.1 Locality Plan.doc. The total 2 area is approximately 2 474 km and its coastline is 371 km long. Figure D.1 Locality Plan 59 City of Cape Town WSDP 2008/09 to 2012/13 60 City of Cape Town WSDP 2008/09 to 2012/13 D.2 WATER SERVICES AUTHORITY PERSPECTIVE The CCT, like the rest of South Africa, has undergone some significant changes in political structure over the last decade. Prior to 1994, the area consisted of a large number of smaller municipalities, or councils. The dominant municipality was the Cape Town City Council (CCC), which at the time also owned and operated the bulk water supply system. Outside of the CCC area, the bulk supply system and the secondary distribution systems of the various municipalities were separated, with metered bulk off-takes used by the CCC for billing purposes. Within the CCC area however, the bulk- and secondary systems were integrated, since all its consumers were billed directly. With the political changes in 1994, the smaller municipalities in the CMA were amalgamated into 6 Metropolitan Local Councils (MLC’s), with the Cape Metropolitan Council (CMC) as a regional local authority in charge of bulk services This prompted a separation of the bulk- and secondary systems in the old CCC area. In December 2000, the unified City of Cape Town (CCT) was formed, by the amalgamation of the six short-lived MLC’s and the former CMC. As at November 2005, the restructuring of the City including the Water and Sanitation Services Department is not yet complete with only positions down to level 4 having been filled. The Bulk Water Branch within the new CCT operates the bulk water supply system, and currently supplies water in bulk to the Reticulation Branch’s eight reticulation districts who in turn distribute the water to the end users. The number of districts may reduce from eight to four for operational efficiency. For plans of the 8 district and 4 region model GOTO D.1 and GOTO D.2. The eight districts are required to interact with 22 sub-councils from a political perspective to ensure co-ordination and integration at political level. The Drakenstein (including the towns of Paarl and Wellington) and Stellenbosch Municipalities located outside the CCT area, also purchase water in bulk from the CCT. Raw water is treated at water treatment plants which are operated by the Bulk Water Branch, from where it is distributed via a network of large diameter pipelines and reservoirs to the districts. The bulk networks are operated by the Bulk Water Branch up to the metered connection points of the eight districts. Downstream of the meters, the secondary distribution networks are operated by the respective districts. Wastewater collection and treatment is also carried out in-house, with the wastewater collection function falling under the Reticulation Branch, whilst treatment is undertaken by the Wastewater Treatment Branch. D.3 PHYSICAL PERSPECTIVE Information on the physical attributes of the area, the history, main features and attractions are presented on the CCT’s website (GOTO http://www.capetown.gov.za/home/profile.asp) 61 City of Cape Town WSDP 2008/09 to 2012/13 D.3.1 Topography The area consists of varying topography which includes flat plains, hills and mountains. High mountains are located fairly close to the sea; e.g. Table Mountain which exceeds 1 000 m in elevation. Other high mountains on the perimeter include the Hottentots-Holland, Helderberg, Stellenbosch, Jonkershoek, Franschhoek, Wemmershoek, Du Toits, Paarl, Slanghoek, Limiet and Elandskloof mountains. These mountains form an eastern perimeter of mountains around the CCT, as shown on Figure D.3.1. A major portion of the CCT consists of the area known as the Cape Flats, which has an elevation of between 20 and 45 m above sea level. This area is relatively low-lying and can be supplied via the bulk supply network from large reservoirs with top water levels at 110 m above sea level (ASL). The mountainside developments in Somerset-West, along Table Mountain and the Peninsula mountain range, as well as the hilly development in Durbanville, Brackenfell-north, and the Atlantis area are at elevations, which are too high to be supplied from the 110 m ASL reservoirs. Very few areas with water demand are located at elevations higher than 200 m ASL. The rivers in the CCT are relatively small. Some rivers worth mentioning are the Salt-, the Dieppe-, the Black-, the East-, Quills-, Moderate- and Lorenz rivers. The rivers which are utilised as water sources lie mostly outside of the CCT. These are the tributaries to the Berg River namely the Wolwekloof and Banhoek tributaries, Sonderend-, Palmiet-, Klein Berg- and Leeu rivers. Of these, the Berg River that flows in a northerly and later westerly direction, is by far the largest. D.3.2 Climate Cape Town has a mean annual rainfall of 515mm/annum and an average temperature of 16,7 C. The CMA is a winter rainfall area. The meteorological depressions that typically bring rain to this area during winter move past to the south of the area (and the land mass) during summer; resulting in long dry spells. It is during the dry summer that the water demands are highest, due to the higher temperatures and the fact that watering of gardens is the norm in almost all the residential areas. This contrast complicates the management of a bulk water supply system, as sufficient run-off needs to be stored during winter in order to meet the increased water demand in the hot and dry summer months. D.3.3 Natural Environment Cape Town is one of the most beautiful and diverse cities in the world. The city is located in a highly sensitive and vulnerable ecosystem is recognised as a global biodiversity hotspot and is fortunate to have a National park within its boundary. The environment is one of the strongest assets driving tourism and attracting skilled staff for the city’s economy. Finding the balance for sustainable development and improving quality of life remains the challenge. Growing consumption, pollution (air, water, waste) and the protection of the city’s biodiversity are key issues that must be addressed. Cape Town is located within the Cape Floral Region, which is geographically the smallest of the world’s six floral kingdoms, but supports the highest density of plant species. Over 9000 different plant species occur in the Cape Floral Region, 70% of which are endemic (i.e. are confined to this region). 62 City of Cape Town WSDP 2008/09 to 2012/13 Figure D.3.1 Topography 63 City of Cape Town WSDP 2008/09 to 2012/13 Cape Town supports 2500 plant species, thus within the Cape Floral Region it is considered an area of particularly high floral diversity (or a local “hotspot” within a global “hotspot”). This floral diversity relates to the steep environmental gradients, including altitudinal, geological and rainfall gradients; that have combined to create a large number of different habitats. Six national vegetation types are found only within the City Of Cape Town’s borders, and of these, five are classified as “Endangered” or “Critically Endangered”. These vegetation types support species that are unique to Cape Town and many of these are under threat from extinction, owing mainly to habitat destruction and invasion by alien plants. D.3.4 Main infrastructure development Cape Town grew by 40% in developed land area in the period 1985-2005. Compared to the period 1977 to 1988, when the city developed by an average of 701 hectares per year; the city is now developing at an average rate of 1232 hectares per year (almost double previous averages) reflecting the tremendous development boom the city is currently experiencing (figure D3.4a). Figure D.3.4a: Cape Town’s urban footprint: 1977 versus 2006 Source: City of Cape Town, 2002 64 City of Cape Town WSDP 2008/09 to 2012/13 Sprawl contributes to increasing commuting times as well as the loss of valuable agricultural land and areas with high biodiversity conservation potential (City of Cape Town, 2006d). Much of the recent growth has contributed to sprawl with relatively low density suburban residential development driving this process, although higher density, higher income residential development in the CBD has accelerated in the past few years. Concentration of populations in urban areas greatly reduces the unit cost of piped water, sewers, drains and roads. The use of environmentally friendly energy sources and transport can reduce these costs even further. The existing land use and potential future development areas are shown in Figure D.3.4b below. The major dams from which the CCT is supplied are situated outside (except for the Steenbras Upper and the Steenbras Lower Dams) the mountainous eastern perimeter of the area. The Theewaterskloof dam near Villiersdorp is the major water source of the CCT and forms part of a large inter-basin water transfer scheme that regulates the flow from the Sonderend-, Berg- and Eerste rivers. The Voëlvlei dam is the furthest north near Gouda and relies on diversion works in the Klein Berg, Leeu and 24 Rivers for its water supply. The Wemmershoek dam is situated in the mountains near Franschhoek and is supplied from various small rivers in the Wemmershoek mountains (e.g. Tierkloof- and Olifants rivers). The Steenbras Upper dam and Steenbras Lower dam are situated in the Hottentots-Holland mountain range near Gordon’s Bay, and serve a dual purpose of providing an upper reservoir for the Steenbras Pumped Storage Scheme and for supplying water for domestic/industrial use to the CMA. Other smaller dams include the dams on Table Mountain (Woodhead, De Villiers, Hely Hutchinson, Victoria and Alexandra) which are used to supply water to the southern suburbs and the Peninsula, and the dams at Simons Town (Kleinplaas and Lewis Gay) which provide water to the Peninsula. 65 City of Cape Town WSDP 2008/09 to 2012/13 Figure D.3.4b Existing Land Use and Potential Future Development Areas 66 City of Cape Town WSDP 2008/09 to 2012/13 D.4 DEMOGRAPHIC PERSPECTIVE For the State of Cape Town report dated 30 October 2006 GOTO D.3 and for socio-economic profile GOTO D.4 D.4.1 Economics Although economic growth rates have been increasing, which could have a more beneficial impact on employment levels, key indicators shows that fundamental changes to the development path of the city are being constrained by a number of trends which are reinforcing social and spatial segregation and inequalities in the city. This pattern has persisted for the past decade or more: Growth in the number of people living in informal settlements (23 000 families in 1993 to approximately 115 000 families in 2006) Increasing housing backlog (150 000 in 1998 to 265 000 in 2005). Some recent estimates, using alternative methodology/definitions than before, put the current backlog at 400 000 Rising unemployment (13% in 1997 to 23% of the labour force by 2004) Rising poverty (from 25% in 1996 to 38% of households living below or marginally above the household poverty line in 2005) Increasing HIV prevalence among women visiting public health clinics (from 1.2% in 1994 to 15.4% in 2004, based on Provincial antenatal statistics and following the same trajectory as the National trend) Increasing tuberculosis cases (from 13 870 in 1997 to 26 754 in 2005). The problem in the city is not the absence of economic growth, but the failure to harmonize economic and social development objectives, to ensure the benefits of economic progress reach the population as a whole, and to ensure the benefits of economic progress reach the population as a whole. Residents of suburbs in the city are characterized by major differences in housing quality, income, educational levels, access to services and work status. Figure D.4.1, based on the above key socio-economic variables, illustrates the spatial variations in levels of living. A high score indicates that a relatively large proportion of households are experiencing absolute poverty and have a large number of unemployed workers and employees with low educational qualifications earning low salaries in unskilled occupations (City of Cape Town 2006e). 67 City of Cape Town WSDP 2008/09 to 2012/13 Figure D4.1 D.4.2 Social Approximately 30% of households (almost 1 million people) in Cape Town live in inadequate housing and depressed physical environments. These areas are characterised by severe social and economic conditions, which manifest in high levels of poverty, unemployment, illiteracy, alcoholism, low health status and other deviant behaviour such as crime and delinquency. The low health status of residents of informal settlements, highlights the fact that this is the result of poor living conditions rather than the lack of health facilities. Cape Town’s informal settlement residents are only benefiting slightly from the current economic and social opportunity offered by the facilities and amenities present in the city. In short, there is clearly a need for the upgrading of the living conditions of these residents. Cape Town is faced with immense human and social development challenges over the long-term. This is due to decades of distorted development in the city manifested in highly-skewed distribution of income 68 City of Cape Town WSDP 2008/09 to 2012/13 and wealth. This is reflected in growing levels of absolute poverty, inadequate housing, poor health status (especially the impact of HIV/AIDS and TB becoming more evident) and the exclusion of certain segments of the population from full participation in the development of the city. Poverty One measure of poverty is the household subsistence level, below which households are unable to meet their basic needs for clothing, food, cleansing and transport. In Cape Town, the rise in poverty in clearly evident from Figure D.4.2 below, with 38% of households (involving approximately 1.2 million people) currently living in poverty. Intra-city inequalities are even more stark with the 20% worst off areas in the city having an unemployment rate of between 40%-58%, comprising 40% of the city’s population and 68% of the city’s unemployed (City of Cape Town, 2005d). In a recent study conducted in three informal settlements in the city, unemployment levels of 39.5% were recorded. The shocking reality of these statistics are borne out by the fact that 14.3% of households responded that they often went hungry and a further 39.4% of households sometimes went hungry (De La Harpe, 2005). Figure D.4.2: Households earning below Household Subsistence Level Source: Statistics South Africa, 1996, 2001, and 2005 HIV/AIDS The prevalence of HIV/AIDS in the city has been increasing steadily over the past few years - with the highest prevalence recorded in the areas of Nyanga and Khayelitsha. This is in line with international trends of higher HIV prevalence in less affluent areas. While the Cape Town average HIV/AIDS prevalence in pregnant women at 16% (2004) is well below the national average of 29.5%, (2004), the disease’s prevalence in these two areas is as high as or higher than the national average (City of Cape Town 2006a). The high prevalence on HIV/AIDS in informal areas in the city is explained by a range of factors. This includes poverty and unemployment which increases vulnerability to HIV, urbanisation resulting in social disintegration which increases risk-taking behaviour, inadequate services, sexual violence and rape, disempowerment of women, illiteracy and low levels of education (Bromfield, 2006). A key failing in the response to HIV/AIDS is that the problem has previously largely been defined within a health context with a primarily health sector driven response. At a grassroots level, limited resources are also often wasted due poor coordination, duplication of effort and plans that do not address local priorities. Based on the complex underlying factors driving the epidemic, it is clear that HIV/AIDS will not be impacted upon unless a 69 City of Cape Town WSDP 2008/09 to 2012/13 broader, coordinated, multi-sectoral approach to the epidemic is embraced (City of Cape Town, 2006i). Given the projection that 50% of the Cape Town’s population will remain younger than 31 years in the future (as can be seen from the population projection in section 4: ‘Cape Town’s Developmental Context’), there is a critical need for youth development strategies to be implemented to address future poverty, HIV/AIDS and unemployment and which relate to the social, economic and physical needs of the city’s young. D.5 REGIONAL PERSPECTIVE The City of Cape Town is the major economic hub of the Western Cape contributing 82% of the province’s GDP. It is bordered by the West Coast DM to the north, the Cape Winelands District Council to the North East and Overberg DM to the South East. Cities do not function in isolation, but form part of particular regions with a range of different stakeholders that influence their management. The key challenges for developing successful city-regions include securing balanced economic growth, appropriate governance systems to ensure effective cooperative decision-making, an entrepreneurial approach to facilitating investment, and the avoidance of competition between the cities and towns in the city-region system. This acknowledges that major development projects have to be coordinated effectively for the benefit of the city-region as a whole. An important aspect of this is ‘spatial coalitions’, which are meaningful partnerships with business, civil society and spheres of government, as valuable assets in fostering a competitive regionalism (South African Cities Network, 2006). Two key strategies impact on the broader Cape Town context; namely, the National Accelerated and Shared Growth Initiative for South Africa (ASGISA), and the Western Cape Growth and Development Strategy (PGDS). ASGISA is a national framework to support a range of key policy thrusts, including macro-economic policy refinement, strategic infrastructure provision, sector investment strategy, labour market skills, small business and governance. Provincially, the PGDS is a strategy for the Province to achieve shared growth and integrated development. It is the core alignment mechanism for the province and a coordination and implementation strategy driven by the Provincial Government Western Cape. The objectives of the PGDS are: Identify appropriate levers to shift developmental path Identify location of regional development motors of shared growth Commit the Provincial Government to strengthen its contribution to shared growth and development Design institutional architecture and reforms necessary for achieving shared growth and development Focus, align and harmonise the Provincial Government planning, budgeting and implementation Provide a framework for improved collaboration and coordination of all stakeholders in the Province around a shared growth and the development agenda. 70 City of Cape Town WSDP 2008/09 to 2012/13 Strategies at a metropolitan level should take cognisance of and be aligned to these higher level strategies such as ASGISA and the PGDS, whilst focusing on the particular local challenges (City of Cape Town, 2006b). 71 City of Cape Town WSDP 2008/09 to 2012/13 E. IDP AND WSDP GOALS AND INTEGRATION E.1 IDP PRIORITY ISSUES RELATED TO WATER SERVICES Strategic Focus Area Strategy / Objective Water Services Business Elements 10. List of Projects 9. Financial profile 8. Customer Service Profile 7. Water Services institutional arrangements Profile 6. Water balance 5. Water Services Infrastructure Profile 4. Water Conservation / Demand Management 3. Water Resource Profile 2. Service Level Profile 1. Socio - Economic Profile Page Numbers 1. SHARED ECONOMIC GROWTH AND DEVELOPMENT No direct Water Service’s objectives. However increased economic growth will require additional water and sanitation infrastructure and additional water resources. The Water Conservation and demand management strategy will become more important as a result. 1. X X X SUSTAINABLE URBAN INFRASTRUCTURE X X X Reduce service backlogs for infrastructure-related services in accordance with national objectives X X X 1.1 2. X Access to basic sanitation services to all by 2012 (IDP targeted to be relaxed) 1.2 Potable water services to all by 2008 (largely met) 1.3 Bucket system sanitation services eradicated in all formal settlements by 2007 (informal settlements cannot be met within current financial constraints) 2 Develop demand management programmes for water, electricity, waste and transport and reduce attendant pollutants X X X X X X 72 City of Cape Town WSDP 2008/09 to 2012/13 Strategic Focus Area Strategy / Objective Water Services Business Elements 10. List of Projects 9. Financial profile 8. Customer Service Profile 7. Water Services institutional arrangements Profile 6. Water balance 5. Water Services Infrastructure Profile 4. Water Conservation / Demand Management 3. Water Resource Profile 2. Service Level Profile 1. Socio - Economic Profile Page Numbers 2.1 Introduce incentives to reduce demand 2.2 Facilitate the introduction of sustainable technologies 2.3 Focus more strongly on water and electricity demand management and waste minimisation in order to reduce pollution levels and reduce capital investment requirements 2.4 Improve environmental awareness 3 1.1 1.2 Effective management of City’s Infrastructure and Resources X X X X Rehabilitation / replacement of failing water bulk infrastructure (minimum measured leakage) X Installation and commissioning of new water systems X X X X X X X X X X X 2.3 2 PUBLIC TRANSPORT SYSTEMS Rehabilitation of failing wastewater treatment bulk infrastructure 2.4 Rehabilitation / replacement of failing bulk infrastructure (or establishment and commissioning of new) No direct Water Services objectives 73 City of Cape Town WSDP 2008/09 to 2012/13 Strategic Focus Area Strategy / Objective Water Services Business Elements INTEGRATED HUMAN SETTLEMENTS 3 3 4. SAFETY AND SECURITY 5. ECONOMIC DEVELOPMENT 6 X X X X X X X X X X X X No direct link to Water Services objectives 1. Local Economic Development X 1. 2. Eradication of extreme poverty Access to community facilities X X SOCIAL AND HUMAN CAPITAL 1. 7. X GOOD GOVERNANCE AND REGULATORY REFORM 2. Optimising the development of our Organisation staff structure, strategies, policies and promote skills development. Enhance service delivery through exploring alternative service delivery mechanisms X 74 X X X X 10. List of Projects 2 3 Integrated Human Settlement Planning Land release and incremental housing Redressing the Housing Backlog Informal settlement upgrade 9. Financial profile 8. Customer Service Profile 7. Water Services institutional arrangements Profile 6. Water balance 5. Water Services Infrastructure Profile 4. Water Conservation / Demand Management 3. Water Resource Profile 2. Service Level Profile 1. Socio - Economic Profile Page Numbers 1 City of Cape Town WSDP 2008/09 to 2012/13 Strategic Focus Area Strategy / Objective Water Services Business Elements 4. 5. 6. 7. 8. Strategically utilise information technology, validated data bases and systems to support the transformation of public services to provide better and more efficient government and reporting structures X Improve the service culture and workplace ethics by accomplishing sound financial governance, improved accountability and transparency X X X Management of key financial areas such as income control, cash flow, indigent support, alternative income opportunities, asset management and risk management X Improve the regulatory environment (Bureaucratic red tape X Establishment of representative Ward Participatory Mechanisms X X Improvement of Community satisfaction X X 75 10. List of Projects 9. Financial profile 8. Customer Service Profile 7. Water Services institutional arrangements Profile 6. Water balance 5. Water Services Infrastructure Profile 4. Water Conservation / Demand Management 3. Water Resource Profile 2. Service Level Profile 1. Socio - Economic Profile Page Numbers 3. City of Cape Town WSDP 2008/09 to 2012/13 E.2 SUSTAINABLE WATER SERVICES SUB-GOALS The vision of Water and Sanitation Services in Cape Town is “To become a leader in the provision of equitable, sustainable, people-centred, affordable and credible water services to all”. EQUITABLE E.3 To ensure that access to a basic water supply to informal settlements is maintained To ensure access to a basic sanitation service to at least 70% of all informal settlements by 2010. INTEGRATED WATER RESOURCE MANAGEMENT SUB-GOALS SUSTAINABLE E.4 To ensure the availability and reliability of water resources at all times. To ensure that the water demand remains at least 20% below the unconstrained demand curve To ensure the supply of safe drinking water that meets quality standards at all times. To ensure the protection of the environment and that 90% of treated effluent is in compliance with current (1984) DWAF standards by 2010. EFFICIENT AND EFFECTIVE WATER SERVICES INSTITUTIONAL ARRANGEMENTS SUB-GOALS AFFORDABLE To establish fair tariff that ensures all residents have access to basic water and sanitation services, including indigent households. To ensure that tariffs are fair and in line with comparable organisations and cities. PEOPLE-CENTRED To ensure that we reach 80% satisfaction of all customers with the provision of basic water and sanitation services annually. To create an environment that develops and utilises the skills, competencies and innovation potential of all employees are developed and utilised to meet the objectives of the organisation. To create an enabling environment that ensures devolvement of meaningful relationships with all stakeholders. 76 City of Cape Town WSDP 2008/09 to 2012/13 CREDIBLE To ensure the implementation of international best management practices in the provision of water and sanitation services. To become the organisation as the preferred water services institution for all customers. 77 City of Cape Town WSDP 2008/09 to 2012/13 F WATER SERVICES BUSINESS ELEMENTS F.1 SOCIO-ECONOMIC PROFILE F.1.1 Demographics F.1.1.1 Situation Assessment (demographics) F.1.1.1.1 Current consumer profile The customer profile on SAP is: Customer Type Total Commercial 12,379 Government 221 Industrial 4,099 Miscellaneous 5,554 Schools-Sportsfields 1,440 Domestic Cluster 6,755 Domestic single residential 602,681 Departmental Cluster 2,903 Municipal Water 6,424 Total 642,456 There are currently approximately 8,000 formal serviced properties not billed. The housing backlog is as detailed in the table below: Informal settlements 117 000 Overcrowded housing stock and backyard shacks 150 000 TOTAL 267 000 Source: The challenge that the City faces is emphasized by the fact that the current backlog represents about a third of the total of 884 000 households in the City of Cape Town. According to the 2007/08 IDP (IDP Draft 15.03.07vx2.2.doc) the number of people living in informal settlements is growing (23 000 families in 1993 to 115 000 families in 2005 –an increase of approximately 7,700 per annum – GOTO 1.1c), overcrowding is increasing and household size is declining. These contribute to an increasing housing backlog (an increase from 150 000 in 1998 to approximately 300 000 in 2006). 78 City of Cape Town WSDP 2008/09 to 2012/13 Housing backlog compared to housing delivery 350000 350000 300000 300000 265000 265000 250000 245000 245000 221000 200000 200000 150000 150000 150000 100000 100000 50000 housing delivery Housing backlog (no. of dwelling units) 245000 240000 250000 300000 50000 4110 9729 1808 3469 0 0 1998 1999 2000 20012002 2003 2004 2005 2006 2007 2008 2009 2010 Source: Strategic Development Information & GIS using Housing Department data From 1996 to 2005 the number of households in Cape Town has increased from 651,972 to approximately 845,000. This represents a total increase of approximately 193,000 over the period or 21,500 per annum. F.1.1.1.2 Poor household definition A household is classified as indigent if the household’s earnings are less than or equal to R1,600 per month. This will be increased to R1,700 per month from 2007/08. In addition properties with a municipal value less than R88,000* (R50,000* before 2007/08) do not attract rates while those less than R199,000* (R100,000 before 2007/08) are eligible for a R30 Indigent Grant applicable to the water account. Before 2007/08 properties valued at less than R100,000* attract an Indigent Grant of R20 now linked to the sewerage account. * F.1.1.1.3 The municipal value of properties has increased by 3.8 times on average since the previous municipal valuation in 2000. The increase is significantly less in poorer areas. A direct comparison is not possible Present population and projected population growth rates The 2001 Census recorded the size of the metropolitan population at 2 893 251 people living in 759 765 households. By comparing this to the 1996 figure of 2 563 095, a growth rate of 2,6% per annum is found between 1996 and 2001. In 2005 the estimated population was 3 239 768 living in 845 000 households. The population previously projected for the Cape Metropolitan Area for 2001 was 3 154 238 (Dorrington, 1999). The actual census figure is therefore 79 City of Cape Town WSDP 2008/09 to 2012/13 8,27% lower than the projected population. Further analysis is needed to reconcile the actual census figure with the projected figure. F.1.1.1.4 Demographic trends and migration patterns The future customer profile for the City of Cape Town will be outlined by highlighting the main determining factors: Future population growth projections. Current housing backlog to upgrade informal settlements overcrowded housing stock to individually-serviced sites. and The Dorrington report: Projection of the Population of the Cape Metropolitan Area 1996-2031 (Dorrington, 2000), is a widely accepted source of growth statistics for the City of Cape Town. Findings of the report were updated per suburb by the CMC Spatial Planning Department in 2003 to take cognisance of the latest HIV/AIDS and migration trends. The table below provides a summarized overview of the expected Cape Town population growth for each of the previous MLC districts. Projected Population Growth for the City of Cape Town City of Cape Town Cape Town Tygerberg Blaauwberg South Peninsula Oostenberg Helderberg Total Avg Growth Pop 2001 Pop 2006 % 2001 - Pop 2016 2006 1,130,175 1,187,229 976,412 1,075,394 173,452 271,370 406,354 437,676 319,710 389,351 148,114 186,084 3,154,217 3,547,104 Avg Avg Growth % 2006 - Pop 2031 2016 1.0 2.0 11.3 1.5 4.4 5.1 1,253,867 1,174,194 374,080 481,640 470,436 243,517 2.5 3,997,734 Growth % 2016 2031 0.6 0.9 3.8 1.0 2.1 3.1 282,601 0.1 0.2 1.1 0.5 0.8 1.1 1.3 4,255,847 0.4 1,280,143 1,214,732 433,181 519,724 525,466 Compiled by the CMC Spatial Planning Department (revised by Water and Sanitation Services Department). For spreadsheet GOTO 1.1a. For updated population projections GOTO 1.1b Current migration patterns show a net inflow of people from rural areas stretching as far as the Eastern Cape. The influence of migration patterns adds an even pressure on the provision of housing in Cape Town. The Western Cape is currently a net receiving province in South Africa. It is estimated that on balance some 48 000 people enter the province each year. This represents an increase due to in-migration of more than one per cent of the total population. F.1.1.1.5 Age and gender profile The 2001 population pyramid Figure F.1.1.1.5 is showing a distribution reduction towards the younger age groups, highlighting a tapering in birth rates and future stabilization in population growth. 80 City of Cape Town WSDP 2008/09 to 2012/13 Figure F.1.1.1.5 Age – Sex Distribution of Population Compiled by Strategic Information, CCT, from Statistics SA Census data For more details on the socio-economic profile GOTO 1.2. This report, compiled by the Department of Strategic Information, “City of Cape Town: A Population Profile of the City of Cape Town August 2003”, includes statistics on age, gender, race, migration patterns, employment etc. F.1.1.2 Future trends and goals (demographics) F.1.1.2.1 Consumer profile There is no information as to how the consumer profile, other than residential will change over time. F.1.1.2.2 Population and projected population growth rates A future estimated HIV-incidence rate of 5% (i.e. one in every 20 people are estimated to be HIV-infected) together with an expected reduction of rural in migration could constrain future population growth even further than that shown in the table in F.1.1.4 F.1.1.2.3 Demographic trends and migration patterns The geographic location of highest growth is mainly determined by two factors: The active property market, driven by the favourable economic conditions and the emerging black middle class. This type of middle- to high-income development contributes to urban spread and is concentrated in the following areas: (on Figure D.3.4b under Chapter D.3). - northern portion of Durbanville; - north of Table View; - north of Kraaifontein; 81 City of Cape Town WSDP 2008/09 to 2012/13 - north-east of Strand; - west of Strand and Somerset West. State-funded large scale housing developments to alleviate overcrowded housing stock and relocate informal settlements from environmentally sensitive and unsafe areas. These developments are of an urban infill nature (close to urban opportunities for socio-economic upliftment) and mainly concentrated in: - Southern areas of Tygerberg; - South-western portion of Oostenberg. F.1.1.2.4 Age and gender profile The reduction in the younger age groups together with a future estimated HIV-incidence rate of 5% (i.e. one in every 20 people are estimated to be HIV-infected), could constrain future population growth even further, together with an expected reduction of rural in migration. F.1.1.3 Strategic gap analysis (demographics) The high growth in formal housing is putting a severe strain on the existing infrastructure particularly at the growth nodes. Investment in infrastructure over the last 10 years has not kept pace with this growth and the existing Bulk Infrastructure Contribution Levy (BICL) to fund connector infrastructure is not sufficient. Wastewater infrastructure is particularly stressed and developments have had to be stopped from time to time while upgrading and capacity extensions are completed. Housing delivery has not kept pace with the high growth in the informal areas. Should current trends be maintained it is anticipated that there will be an increasingly greater percentage of indigent over time. There is no information as to how the consumer profile, other than residential will change over time. A data clean up of the SAP system is required in order to establish the correct number of consumers in each category. There is currently no split between wet and dry industrial consumer units. F.1.1.4 Implementation strategies (demographics) Basic services There is currently an influx of some 7,700 households per annum into informal settlements. Ideally these households should be accommodated directly into housing provided by the state which would have on site water and sanitation. However this is not possible due to the huge (267,000) housing backlog. The strategy is therefore to provide emergency levels of service to all informal settlements and to move them up the “water ladder” over time, first to basic levels and then when they are accommodated in the state housing schemes to a full level of service. 82 City of Cape Town WSDP 2008/09 to 2012/13 Higher level, associated services and economic growth For the strategy to deal with the high growth areas refer to Chapter 5 Infrastructure. Effective resource management Current water demand growth predictions associated with population and economic growth predictions coupled with the implementation of the WC&DM Strategy means that a new water resource will be needed by 2014. By intensifying the WC&DM Strategy it is hoped that this can be postponed (Refer to F4). Increased emphasis on water demand management will reduce pressure on water infrastructure. Effective Management The customer profile is examined during the tariff exercise every year. As the number of indigent consumers increases the extent of cross subsidisation between the high and low users is increased. Work is required in the following areas: Clean up data on SAP system of the consumers in each category. Keep more accurate annual records and determine the trends in the consumer profile. Determine the split of wet to dry industrial consumer units. F.1.2 HEALTH F.1.2.1 Situation assessment (health) F.1.2.1.1 Health profile The graph below shows a growing number of new cases of TB being recorded in all areas in Cape Town over the period 2001 to 2004. The highest incidence is found in Khayelitsha and Nyanga. There are a number of factors which contribute to this high incidence of TB infection. The crowded, poorly ventilated conditions present within households in informal settlements, as well as the high density of the settlement itself, increases the likelihood of transmission of TB from one person to another. The damp and sometimes unsanitary conditions present in many informal settlements also provide an ideal breeding environment for the bacteria. The high rate of TB infection in informal and poor areas is of particular concern. TB is a treatable and curable disease if antibiotics are taken correctly – usually once a day for up to six months. However, many people in Khayelitsha, Nyanga, and other informal settlements lack access to proper medical care, and may be unable to receive treatment. Those who do receive treatment may be unable to return for follow-up care, an essential part of TB treatment, due to lack of transport or inflexible working hours. What is interesting to note is that Khayelitsha and Nyanga also show the highest HIV prevalence. It is well documented that people suffering from HIV/AIDS are more susceptible to diseases, and that people with weak or compromised immune systems are more likely to develop an active TB 83 City of Cape Town WSDP 2008/09 to 2012/13 infection. TB is in fact the leading cause of death amongst people infected with HIV/AIDS. TB Cases and Deaths 1600 1336 Number of Cases 25000 1274 20000 15000 13870 14970 15769 1101 18361 17244 20950 1344 22999 1351 24129 800 600 10000 367 1200 1000 666 400 327 5000 1400 200 0 0 1997 1998 1999 2000 2001 2002 2003 2004 HIV/AIDS prevalence The results below show the prevalence of HIV/AIDS in Cape Town for the period 2001 to 2003, as data for 2004 are not yet available. Prevalence reflects the proportion (persons per 100 000 population) of population infected with HIV/AIDS. Unfortunately, it is clear from the data that the prevalence of HIV/AIDS in Cape Town has been increasing steadily over the past few years. HIV/AIDS prevalence is highest in Nyanga and Khayelitsha. While HIV/AIDS prevalence in Cape Town (13.1%) is well below the national figure (27.9%), HIV/AIDS prevalence in Nyanga and Khayelitsha is as high as, or higher than the national prevalence. Nyanga and Khayelitsha are two areas in Cape Town which have a high poverty rate and are largely informal in nature. The high HIV prevalence in those areas may be explained by the fact that many residents are likely to be poor and uneducated, and may have had little in the way of HIV/AIDS prevention education. Access to health care and clinics is also poor, which is a two-fold problem. Firstly, people are less likely to be able to access free condoms dispensed by government clinics, which contributes to the high HIV/AIDS rate. Secondly, those living with HIV are less able to access medical care than those in wealthier areas, and so are likely to suffer from many complications before succumbing to the virus. This high HIV/AIDS rate in large parts of Cape Town is worrying for a number of reasons. Such a high number of sick people will place a burden on the already overstrained public health system. There are also far reaching social and economic consequences for the city, as the number of economically inactive child-headed (AIDS orphans) households increases and a large percentage of the economically active population becomes unable to work due to illness. The high level of HIV/AIDS prevalence in Cape Town is a serious public health issue which needs to be urgently addressed. 84 Number of Deaths 30000 City of Cape Town WSDP 2008/09 to 2012/13 HIV Prevalence (%) by Health District 30 2001 2002 27.9 28.1 27.2 2003 25 19.1 20 16.1 15 4.4 5 7.9 8.1 F.1.2.2 Future trends and goals (health) F.1.2.2.1 Health profile Tygerberg West Tygerberg East South Peninsula Oostenberg Nyanga Mitchells Plain Khayelitsha Helderberg Central Blaauwberg Athlone 0 South Africa (Total) 9.3 6.3 Cape Town (Total) 10 13.1 11.6 10.1 The incidence of HIV and TB is anticipated to increase. F.1.2.3 Strategic gap analysis (health) All heath facilities are provided with on site water and sanitation. There are no backlogs. While the population growth scenarios and hence future water demands and wastewater loadings factor in the impact of HIV/AIDS the impact needs to be monitored on an annual basis F.1.2.4 Implementation strategies (health) The City is in a position to provide all new health facilities with water and sanitation. The impact of HIV/AIDS on water demand and wastewater loadings is monitored as part of an ongoing process and adjustments to infrastructure requirements. 85 City of Cape Town WSDP 2008/09 to 2012/13 F.1.3 EMPLOYMENT AND INCOME F.1.3.1 Situation assessment (employment and income) F.1.3.1.1 Employment profile Unemployment rates have increased consistently from 1997 to 2003. In an effort to address the affordability of water and sanitation as basic services, free basic services have been implemented. Unemployment in Cape Town 25 23.2 20 19.7 19.8 2001 2002 18.0 16.5 15 15.0 13.3 10 5 0 1997 F.1.3.1.2 1998 1999 2000 2003 Household income Although the City of Cape Town has the highest average per-capita income in the country, the current high poverty levels is indicative of the inequality in income distribution. Approximately 33% of households are estimated to be earning incomes below the Household Subsistence Level (< R 1 600 per month). The graph below shows the income distribution amongst households in Cape Town. Over 17% of households earn less than R18 000 per annum, which amounts to R375 per person per month, or a little over R12 a day. Approximately two thirds of the population receive between R18 001 and R132 000 per annum. Slightly more than 18% earn over R132 000 per annum, amounting to R2750 per person per month, or a little over R90 a day. While income per capita may be a commonly used measure of wealth in an area, the distribution of income provides a more realistic measure. It shows that although the average (mean) household income in Cape Town may be R87 811 per yeari, many households actually bring in far less than this amount. 86 City of Cape Town WSDP 2008/09 to 2012/13 14 13.07 12.78 12 10.93 10.43 9.77 10 9.04 8.52 8.48 7.72 8 6.93 6 4 1.49 2 0.23 0.61 F.1.3.2 Future trends and goals (employment and income) F.1.3.2.1 Employment profile R360 001 or more R192 001 360 000 R132 001 R192 000 R96 001 R132 000 R27 001 R96 000 R54 001 R72 000 R42 001 R54 000 R30 001 R42 000 R18 001 R30 000 R12 001 R18 000 R6 001 R12 000 R2401 - R 6 000 R1 - R2 400 0 The percentage of the population that is unemployed has recently started to decrease. It is not known whether this trend will continue. The City has in its IDP prioritised economic growth and job creation. It has focused on effective service delivery in order to make Cape Town investorfriendly and capable of providing more jobs. It has set a goal to create at least 13,000 new jobs per annum. F.1.3.2.2 Household income With a turnaround in the percentage unemployed and the focus on economic development and job creation average household incomes should increase. However, this is not easy to predict and average incomes may in fact decrease. F.1.3.3 Strategic gap analysis (employment and income) The City’s free basic services and Indigent Policies caters for a proportion of the population not being able to afford water and sanitation services. It is not known how the proportion will change over time. Water leaks in private plumbing in poor areas renders water and sanitation unaffordable to residents in these areas. F.1.3.4 Implementation strategies (employment and income) The proportion of the population who cannot afford water and sanitation is examined each year during the budgeting and tariff setting process and tariffs are adjusted accordingly. Households that cannot afford to pay can register with the City as Indigent. Water Leaks on properties with a municipal value less than R199,000 (previous to 2007/08 R100,000) are being dealt with through the Integrated Water Leaks Repair and Fixit Projects. 87 City of Cape Town WSDP 2008/09 to 2012/13 F.1.4 ECONOMICS F.1.4.1 Situation assessment (economics) F.1.4.1.1 Economic sectors, GGP contribution and employment In 2005, Cape Town’s economy contributed about 11.1% (or R112.47 billion) to South Africa’s Gross Domestic Product (GDP). Between 1995 and 2004, the city contributed 15.9% of South Africa’s economic growth, and 82% of new provincial economic growth (or growth in new Gross Geographic Product) (South African Cities Network 2006). As the city constitutes the main portion of the provincial economy, the bulk of future growth will have to come from the city in order to boost the Province’s overall growth. It is therefore pertinent to examine Cape Town from a Provincial perspective. A salient feature of the Western Cape economy is the rapidly growing manufacturing and services industries, which along with agriculture, construction and government sectors constitute the main contributors to the regional Gross Domestic Product (GDPR). Amongst the largest employers are the government, internal trade and catering, manufacturing, agriculture and “other producers” (mainly domestic servants). Combined, these sectors account for more than 75% of the total regional employment opportunities in the Western Cape. The strong growth of services industries, such as transport and communication, financial and business services and internal trade and catering, has been responsible for the better performance of the Western Cape economy over the past five years. In contrast, the growth of the Western Cape manufacturing industry has been disappointing as real valueadded manufacturing grew at only 1.4% per annum between 1999 and 2003. The share of manufacturing in the regional GDP declined from 23% in 1995 to 19.9% in 2003. The decline in the sector’s formal employment contribution dropped from 21% in 1995 to 16% in 2003. In very capital-intensive sectors, such as basic chemicals and basic iron and steel, increased investment has coincided with large reductions in employment. The most dramatic development since 1995 is that there has been a decline in employment in the manufacturing and an increase in informal employment. The manufacturing sector has been overtaken from being the largest employer by general government services and community and social services - this being the major generator of formal sector employment - almost doubling in a decade. In the primary sector, the performance of agriculture, forestry and fishing in the Western Cape shows an average annual growth rate of only 1.9 % since 1995. However, recent developments show increased activity in fishing and Mari culture. Although the Western Cape economy out performed the South African economy in GDP or value-added terms, the growth in the tertiary services sector has not been creating jobs. This is a key risk factor as it jeopardizes the Western Cape’s chances of sharing economic benefits to a broader range of people and municipal areas. An important factor for local economic development is the trends in the Small Micro and Medium Enterprises (SMME sector), which contributes significantly 88 City of Cape Town WSDP 2008/09 to 2012/13 to overall employment. Established businesses within the Western Cape only constitutes 23 000, which in essence translates into 12% of businesses. In contrast there were around 336 000 owner-managers in the Western Cape in 2003, which translated into the starting or running of 189 000 businesses. Owner-manager and small businesses account for up to 40% of provincial employment. The Province’s four core sectors – agriculture, manufacturing, trade and financial and business services – are each well diversified, which reduces the risk of over-dependence on any single industry. A crucial dimension of the Western Cape is its coastal location and the opportunities that arise from it. These opportunities are not only in exports, but also in deepening international links around investment, technology and production networks. The challenges facing the Western Cape including the translation of opportunities into output growth and employment in relatively labour-intensive areas such as manufacturing. Lessons from industrializing countries and regions indicate that government plays a crucial role in strategic repositioning by anticipating future developments together with local economic stakeholders, and co-ordinating the actions of local institutions to meet the dynamic needs of the global customer. The challenges to job creation are made more acute due to a relatively young population with 85% of the population being 50 years or younger and 66% of the population being of working age (between 16 and 65 years old). The demand on job creation is further increased by the steady net in-migration of approximately 48,000 individuals (mostly young people) into the province each year. This is particularly prevalent in the southern coastal region right down to Cape Town. In an attempt to respond to the global and national economic trends, the Province has to focus on sector and industry specific opportunities. A key role includes facilitating SMME's and sector organization development, which will allow the Province to take full advantage of opportunities presented. In this regard that integrated planning demands that both provincial and municipal government works from shared baseline information, which will inform infrastructure investment decisions and local economic development strategies. Importantly, iKapa Elihlumayo and the associated provincial annual budgets cannot match resource allocations to satisfy all the development challenges within a reality of limited resources. It however plants the seeds for “shared growth” over time in the allocation mix that aligns to the social and economic goals of iKapa Elihlumayo. The IDP Needs Analysis will consider the National and Provincial context first. The economy of the City of Cape Town and surrounds, have shown a robust growth rate of about 3% since 1994. This exceeds the national average of 2.5% (Wesgro, 2005) for the same period. The economic growth rate for 2002 was 3,8% (IDP, 2005) and is expected to rise to around 4% in 2006. However, Cape Town’s economic growth needs to be accelerated even further to around 6-7% annually in order to reduce current unemployment levels. The biggest economic growth constraint is the low skills levels of the labour force. It is estimated that more than 60 % of adults do not have a matric qualification. (IDP, 2005) 89 City of Cape Town WSDP 2008/09 to 2012/13 In 2002, Cape Town contributed 12% to South Africa’s gross domestic product (GDP), which included R 91 billion in goods and services produced. This represents an annual growth rate of 2.8% in GDP since 2000 (Wesgro, 2005). F.1.4.1.2 Economic trends Currently, a key strength of the city’s economy is that it is relatively well diversified. However, in line with global trends, there has been a shift towards the services sector with the three sectors experiencing most growth recently being finance and business services, trade, catering and accommodation, transport and communication. The manufacturing and government services sectors both declined between 1995 and 2004. Manufacturing, which accounts for 19.4% of employment, is in decline. The services and real estate sectors have been the major drivers of growth with the city performing particularly well in an era of low national growth and a large post-democracy increase in tourism and agricultural exports. However, the improving national economic scenario over recent years has been driven by the strong global demand for resources, partly driven by rapid growth in China’s economy and has not had strong spin offs for the city’s economy. The relatively strong Rand has had negative impacts on the global competitiveness of the city’s major economic sectors. According to the Department of Trade and Industry (2002), 93% of Cape Town businesses are small, contributing approximately 50% of total output and 40% of total formal employment (City of Cape Town, 2006d). Figure F.1.4.1.2: Comparison of level of unemployment and GGP growth in Cape Town 35 140.0 30 98.4 82.3 82.4 86.1 120.0 94.5 90.3 100.0 20.9 20 23.6 22.7 19.7 15 108.0 20.8 20.6 80.0 60.0 16.5 15 10 13.3 40.0 5 20.0 0 0.0 1997 1998 1999 2000 2001 2002 2003 2004 2005 Source: Statistics South Africa, 2005 F.1.4.2 Future trends and goals (economics) F.1.4.2.1 Economic sectors, GGP contribution and employment Refer to F.1.4.1.2 90 GGP (R billions) % unempoyment 25 102.3 112.5 City of Cape Town WSDP 2008/09 to 2012/13 F.1.4.2.2 Economic trends Refer to F.1.4.1.2 F.1.4.3 Strategic gap analysis (economics) The water demand predictions factor in the projected economic growth. Future wastewater loading predictions are not integrated into this model. The City’s ability to keep pace with the need to upgrade and extend the water and wastewater infrastructure is currently under severe strain. Increased economic growth will further exacerbate this. F.1.4.4 Implementation and strategies The water demand and wastewater loading prediction models will be integrated. Water and Sanitation tariffs are to increase substantially over the next 5 year to ensure that the necessary infrastructure can be upgraded and extended. At the same time the WC/WDM Strategy will focus on reducing water demands. This will assist in postponing the implementation of new water resource schemes and reduce the hydraulic loading on wastewater treatment works. 91 City of Cape Town WSDP 2008/09 to 2012/13 F.2 SERVICE LEVEL PROFILE There are a total of approximately 656 800 formally registered customers in the City. This customer base is broken down as follows: Customer Type Commercial Government Industrial Miscellaneous Schools-Sportsfields Domestic Cluster Domestic single residential Departmental Cluster Municipal Water Total Total 12,379 221 4,099 5,554 1,440 6,755 602,681 2,903 6,424 642,456 The latest estimate is that there are 117 000 informal customers and 150 000 living in backyard shacks. For explanation in the Preparation Guideline of the need for a service level policy GOTO Ex9. F.2.1 Residential consumer units The table below defines the Service Level Categories as used by the City of Cape Town: Service Level Categories Category WATER Inadequate No access to basic water supply as defined below. (Water would generally be obtained at great difficulty from other residents supplied at an emergency, basic or full level of supply.) Emergency Partial access to basic water supply, as dictated by site-specific constraints (e.g., high dwelling densities). Basic n) The provision of taps/standpipes): potable water (usually through communal within 200 metres of a household; at a ratio of not more than 25 households per tap (based on 25 litres per person per day at a flow rate of 10 litres per minute); with an effectiveness of not more than 7 days interruption supply to any consumer per year; and o) the provision of appropriate education in respect of effective water use. Full House connection 92 City of Cape Town WSDP 2008/09 to 2012/13 Service Level Categories SANITATION Inadequate No access to sanitation as defined below. (Residents would either share with other residents, supplied at a basic or full level of supply, their sanitation facilities, or would provide for themselves – often through unhygienic means. In many instances these residents are being serviced by the CCT through the weekly removal of 20 litres open stercus “black bucket” containers, a service which is to be replaced.) Emergency Partial access to sanitation (more than 5 households per toilet), as dictated by site-specific constraints (e.g., high dwelling densities), Basic a) The provision of a shared toilet (at a ratio of not more than 5 families per toilet) which is safe, reliable, environmentally sound, easy to keep clean, provides privacy and protection against the weather, well ventilated, keeps smells to a minimum and prevents the entry and exit of flies and other disease-carrying pests; and b) the provision of appropriate health and hygiene education. Full On-site Waterborne, Septic Tank or French Drain F.2.1.1 Situation assessment (residential consumer units) The total number of formal and informal households is given below: Category 2007/08 WSDP 2008/09 WSDP Number of formal households (including backyard) 732 000* 769 000 Number of Informal households 115 000* 117 000 TOTAL NUMBER OF HOUSEHOLDS 847 000* 886 000 Number of backyard dwellers 150 000* 150 000* *2005 figures Backlogs A closer look at informal settlements indicates that there are still significant backlogs with respect to service delivery in informal settlements. The lack of services in the informal settlements and certain rural areas are mainly due to the following: the uncontrolled mushrooming of new settlements, and expansion and densification of existing settlements - all on unprepared or un-serviced land, consumers located in rural areas where there is no access to bulk water and sanitation services, 93 City of Cape Town WSDP 2008/09 to 2012/13 the typically very high dwelling densities in informal settlements (on average about 140 dwelling units per hectare) make it impossible in many instances to provide either services inside settlements or access into the settlement for operation and maintenance purposes (In these instances it would normally not be possible to provide services at an acceptable level.), the lack of willingness by some land owners to allow the provision of services on their land as they may not support or want to encourage the settling of informal residents on their land. The backlog in basic water was effectively eradicated in 2005/06 when 35 000 informal households received basic water. While 13 905 informal households received access to basic sanitation and 4,290 and 2,892 received a full level of service through the provision of government subsidized housing and serviced sites respectively, the backlog remains at approximately 44 000. This remains a huge challenge given the high unit cost, lack of available land for Human Settlement to accelerate its formal housing provision and ground level / slope /access space constraints. The challenge then is to provide basic water and sanitation services to new citizens moving into informal areas beyond the emergency level of service and to eradicate the backlog of basic sanitation, targeted over the next 4 to 5 years. Whilst most informal settlements have access to an emergency level of service, these services are not yet at an acceptable level for reasons mentioned above. The services are therefore shared by a large number of people, which in turn lead to a further lack of ownership, more misuse and vandalism requiring a higher than normal level of maintenance. The City’s priority is to first provide an emergency level of service to all households in all settlements, before extending the coverage and density of services to the basic level as soon as possible. This is in keeping with “the water ladder” concept as proposed in DWAF’s “Strategic Framework for Water Services, September 2003” (GOTO 2.1). F.2.1.1.1 Residential consumer units for water Service levels of existing formal developed and informal areas (excluding rural areas) generally meet the minimum standards as required by the Water Services Act 108 of 1997 (GOTO A.1). The minimum standards are a communal standpipe within 200-m walking distance (with a minimum supply rate of 25 litres per person per day at 10 litres per minute). Formal households have either a metered water connection to the house or to a yard toilet with water tap (uncontrolled volume supply). The first 6 kilolitres per month are supplied at no charge (free basic). Informal areas have communal standpipes and water is provided free. A recent study of indigent household demands in formal areas has shown that, provided they do not have plumbing leaks, it should be possible for these households to maintain their consumption at less than 10 kilolitres per month. With the R20 Indigent Grant allocated for sewerage this results in the free allocation to indigents being 10.695 Kl per month at 2006/07 tariffs. With the Indigent Grant increased to R30 from 1 July 07 and the tariff increases 94 City of Cape Town WSDP 2008/09 to 2012/13 the “free portion” is now 10.620 kl of water and 7.434 kl of sewerage per month. Controlled volume supply is being installed in an area of Atlantis as a pilot. The pilot aims to assist customers in ensuring that their water consumption generally remains within the free portion. Those that need more than the free portion and can afford it can apply for an additional allocation but it remains a controlled volume supply. Consumers with: 2007/08 WSDP 2008/09 WSDP 0 0 115,000 117,000 0 2,000 4. Uncontrolled volume supply 732,000 765,000 5. Total served 847,000 884,000 6. Total 847,000 884,000 1. None or inadequate 2. Communal water supply 3. Controlled volume supply F.2.1.1.2 Residential consumer units for sanitation Service levels of existing formal developed areas (excluding rural areas) generally meet the minimum standards as required by the Water Services Act 108 of 1997 (GOTO A.1) i.e. at least a ventilated improved pit latrine (VIP) or equivalent. The general percentage distribution of households with inadequate sanitation services correlate to a large extent with the location of informal settlements as determined through aerial and on-site surveys and depicted in Figure F.2.1.1.2a and Figure F.2.1.1.2b. 95 City of Cape Town WSDP 2008/09 to 2012/13 Figure F.2.1.1.2a: Location of Informal Areas 96 City of Cape Town WSDP 2008/09 to 2012/13 Figure 2.1.1.2b: Location of Informal Areas Near N2 Formal households generally have water-borne sewer connections with the first 4,2 kilolitres of sewerage conveyed at no charge (free basic) although households with a property value of greater than R100 000 used to pay a fixed charge dependent on the value of the property. This fixed charge will be discontinued from 1 July 2007. Indigent formal households are currently defined as those in properties valued at less than R100 000 . They do not pay the fixed charge for sewer. In addition they receive a monthly R20 Indigent Grant that is credited to their accounts. From 2007/08 the fixed charge for sanitation falls away for all properties and a R30 Indigent Grant is application to the water account for properties less than R199,000. (Refer to F.2.1.1.1 for “free portion” as a result) In the informal areas a shared toilet is provided. The level of service is considered emergency when it is not provided at the ratio of 1 toilet to 5 families. Sanitation is provided free to these areas. 97 City of Cape Town WSDP 2008/09 to 2012/13 Consumers with: 1. Number of households None or inadequate Emergency level waterborne i.e. less than 1 toilet between 5 for informal areas Bucket system 44,000 2,880 46,880 2. Consumer installations: on-site dry or equivalent including VIP toilets, USD, composting system. 500 3. Consumer installations: Wet (Septic tank, digester or tanker desludge or effluent discharge to an oxidation pond etc or pitliners, chemical, container or portal potties) 48,500 4. Discharge to sewer treatment works (intermediate or full waterborne) 788,120 5 Total served 837,120 6 Total 884,000 Assumption: total of 117,000 informal households. The estimate of the number of households served depends on the total number of toilets in service, the number of households served by a toilet and the total number of informal households. Both of these figures are by nature estimates and there are inaccuracies that arise in these estimates. The total number of toilets in service varies due to vandalism relocations operational difficulties in keeping track of the number of toilets Due to the fact that households either move independently, are relocated or are moved into formal housing the number of informal households at any point in time also has to be estimated. To complicate matters an emergency level of service has been implemented. In the areas where there is only an emergency level this means that all households are served but with more households per toilet than the basic level. The number of households without basic is calculated: 1 2 3 4 Total households in informal settlement Number of toilets in informal settlement Number of households served at basic level = 2 x 5 HH/toilet Backlog = 1 - 3 The backlog is stated in terms of number of households without basic sanitation. The backlog can also be stated as the number of toilets that need to be installed. 98 City of Cape Town WSDP 2008/09 to 2012/13 GPS surveys are done after toilets are installed in order to keep a record that can be plotted on GIS. F.2.1.1.3 Grey water management A pilot project is currently being undertaken to deal with grey water runoff in informal settlements. At this point in time the focus is on a storm water trench in Site C in Khayelitsha to establish the success and effect of an aerator on the grey/black water in the trench. While the initial results looked good it has now not yielded the intended results. Further investigation and testing is required. F2.1.1.4 Pit emptying and sludge disposal As there are no VIP toilets in the City this is not required. F.2.1.2 Future trends and goals (residential and consumer units) The current growth in formal households is approximately 13,600 per annum while the growth in informal households is approximately 7,700 per annum. F.2.1.2.1 Residential consumer units for water The goal is to provide at least basic water supply to annually meet the growth in informal areas to ensure that the backlog remains eradicated. Formal areas are funded by the development. F.2.1.2.2 Residential consumer units for sanitation The goal is to eradicate the sanitation backlog by 2012 (and if funds permit by 2010) and to annually meet the growth in informal areas to ensure that the backlog will be eradicated by the target date. Formal areas are funded by the development. F.2.1.2.3 Grey water management This will depend on the results of the analysis of the success and effect of an aerator on the grey/black water in a pilot trench in Site C in Khayelitsha. F.2.1.2.4 Pit emptying and sludge disposal This function will not be required as VIP toilets are generally not installed in the municipal area. F.2.1.2.5 Types of sanitation technology options The types of sanitation technology options other than convention water borne sewerage being used by the City in informal areas are: Pitlines Chemical Container Pour flush Dry sanitation Portal potties Bucket 99 City of Cape Town WSDP 2008/09 to 2012/13 VIP toilets are not suitable for most of the areas within the municipal area due to the sandy conditions and high water table. F.2.1.2.6 2010 target for basic sanitation The target is 70% coverage by 2010, with 100% coverage if funds permit otherwise 100% by 2012. F.2.1.3 Strategic gap analysis (residential consumer units) For explanation of minimum requirements from the SFWS GOTO Ex10. While emergency levels of service have been provided the backlog for basic sanitation remains high. There are insufficient funds to eradicate the sanitation backlog by 2010. The information on the number of Septic Tanks is not available. While it is generally accepted that farm dwellers are provided with water and sanitation this has not been quantified. F.2.1.4 Implementation strategies (residential consumer units) The backlog of basic water to informal areas has been eradicated. The City will continue to provide basic services required to keep pace with the influx and ensure that the backlog remains eradicated. The City will continue with its strategy of providing emergency levels of basic sanitation services to keep pace with the influx and to eradicate the backlog and replace the bucket system (excluding chemical toilets) by 2012. Should funds permit the backlog will be eradicated by 2010. The informal settlements programme giving costs in R million is given below Actual Budget Requirements 2008/09 18.1 34.5 2009/10 40.5 38.9 2010/11 17.0 45.7 2011/12 36.4 Water and Sanitation is in the process of securing more funding for this. R8 million was spent on eradicating the backlog in 2006/07. No buckets were replaced. As shown in the table above the program for bucket eradication commenced in 2007/08. This programme is integrated with the housing development programme. There is no longer a need to provide basic services when residents are moved into formal housing. Services are funded from the housing subsidy. However by way of illustration the funding required to service the services to formal properties is R130 million per year to eradicate the backlogs over 20 years and R80 million a year to keep pace with the influx. The backlogs and rate of influx will continue to be monitored and the strategy fine-tuned. 100 City of Cape Town WSDP 2008/09 to 2012/13 There is an ongoing programme to educate the newly urbanised population with respect to health and hygiene and water demand management. Sufficient funds have been allocated to the operation and maintenance of basic water and sanitation to informal areas and the costs are crosssubsidised through the tariffs. The number of Septic Tank that needs to be removed will be quantified and a programme and budget determined. Water and sanitation provision on farms will be investigated and reported on. F.2.2 Public institutions and ‘dry’ industries F.2.2.1 Situation assessment (public institutions and ‘dry’ industries) All public institutions and ‘dry’ industries have on site connections. F.2.2.2 Future trends and goals (public institutions and ‘dry’ industries) The Water and Sanitation Services Department will be able to cope with the demand for new services for this sector. F.2.2.3 Strategic gap analysis (public institutions and ‘dry’ industries) None F.2.2.4 Implementation strategies (public institutions and ‘dry’ industries) New services are provided as part of normal business operations. F.2.3 Wet industries F.2.3.1 Situation assessment (wet industries) All ‘wet’ industries have on site connections. F.2.3.2 Future trends and goals (wet industries) The Water and Sanitation Services Department will be able to cope with the demand for new services for this sector. F.2.3.3 Strategic gap analysis (wet industries) Database of all ‘wet’ industries required for water conservation and demand management purposes. F.2.3.4 Implementations strategies (wet industries) Identify top water consumers and identify which are ‘wet’ industries. The Water Conservation and Demand Management Strategy targets high water consumers. F.2.4 ‘Raw’ water consumers F.2.4.1 Situation assessment (‘raw’ water consumers) 101 City of Cape Town WSDP 2008/09 to 2012/13 The City has very few ‘raw’ water consumers. These are mainly farmers on the raw water pipelines that feed Faure and Blackheath Water Treatment Plants. On the Faure raw water pipeline there are raw water consumers/wine farmers who paid for an increase in the pipeline diameter to access this water that is supplied from DWAF. They are therefore not the City’s consumers, but they share the same infrastructure. Since they are outside the Cape Municipal area there is no obligation on the City as Water Service Authority to provide them with any water – potable or otherwise. On the Wemmershoek 1100 mm diameter raw water pipeline from Theewaterskloof there is at least one consumer that takes raw water from the line. This consumer is a Wemmershoek riparian who opted to draw water from the raw water pipeline rather than the riparian pipe network. More water is drawn than was obtained from DWAF and CCT are purely transporting it in the pipeline by a special agreement. Apart from the Wemmershoek riparian obligations, CCT have no other potable water obligations to the farmers in other local authority areas. F.2.4.2 Future trends and goals (‘raw’ water consumers) It is not anticipated that there will be many future raw water consumers. F.2.4.3 Strategic gap analysis ‘Raw’ water consumers: urban and rural There is no strategic gap. F.2.4.4 Implementation strategies (‘raw water consumers’) No implementation strategies are required. F.2.5 Industrial consumer units F.2.5.1 Situation assessment (industrial consumer units) F.2.5.1.1 Industrial consumer units for sanitation The industries and their current industrial effluent for that needs to be treated is given in the table below: INDUSTRY TYPE NUMBER MONTHLY WASTE MONTHLY TOTAL OF WATER (kl) SEWERAGE(kl) MONTHLY SERVICE EFFLUENT TO UNITS BE TREATED (kl) AIR-CONDITIONING BLEED-OFF 12 36,947.40 1,759.40 35,188.00 ANODISING 3 6,242.36 297.26 5,945.10 BAKERY 5 6,078.35 289.45 5,788.90 BEVERAGES 11 203,572.74 9,693.94 193,878.80 BOTTLING 1 1,060.50 50.50 1,010.00 BUILDING 1 978.60 46.60 932.00 102 City of Cape Town WSDP 2008/09 to 2012/13 INDUSTRY TYPE NUMBER MONTHLY WASTE MONTHLY TOTAL OF WATER (kl) SEWERAGE(kl) MONTHLY SERVICE EFFLUENT TO UNITS BE TREATED (kl) CHEMICALS 4 264.08 12.58 251.50 CONSTRUCTION 1 114.77 5.47 109.30 CONTAINER 1 290.64 13.84 276.80 COSMETICS 2 1,183.35 56.35 1,127.00 DAIRY 7 39,420.26 1,877.16 37,543.10 ENGINEERING 12 1,480.40 70.50 1,409.90 ENZIMES 1 2,210.78 105.28 2,105.50 FOOD 38 141,853.32 6,754.92 135,098.40 FOOD/FISH 12 26,752.95 1,273.95 25,479.00 FOOD/SPICE 2 944.16 44.96 899.20 FUEL 1 374.85 17.85 357.00 GALVANISING 3 1,293.60 61.60 1,232.00 GAS 1 420.00 20.00 400.00 LABORATORY 1 1,205.61 57.41 1,148.20 LAUNDRY 21 2,662.17 126.77 2,535.40 MEAT 7 18,476.12 879.82 17,596.30 METAL 14 16,083.38 765.88 15,317.50 MOTOR 5 774.48 36.88 737.60 PACKAGING 6 7,598.33 361.83 7,236.50 PAINT 3 215.78 10.28 205.50 PAPER 2 31,385.55 1,494.55 29,891.00 PHARMACEUT 2 2,323.13 110.63 2,212.50 PLATING 13 8,586.59 408.89 8,177.70 PRINTING 12 6,162.98 293.48 5,869.50 RADIATOR 3 505.16 24.06 481.10 RAGS 1 2,478.00 118.00 2,360.00 TANNERY 1 8,484.53 404.03 8,080.50 TEXTILE 40 156,872.21 7,470.11 149,402.10 TISSUE 2 77,712.29 3,700.59 74,011.70 103 City of Cape Town WSDP 2008/09 to 2012/13 INDUSTRY TYPE NUMBER MONTHLY WASTE MONTHLY TOTAL OF WATER (kl) SEWERAGE(kl) MONTHLY SERVICE EFFLUENT TO UNITS BE TREATED (kl) TRANSPORT 7 2,414.27 114.97 2,299.30 VEH/WASH 4 2,345.39 111.69 2,233.70 WINERY 3 1,198.05 57.05 1,141.00 265* 818,967.03 38,998.43 779,968.60 TOTAL For spreadsheet version GOTO 2.2 *This needs to be checked as other records indicate that there are 289. The total monthly industrial effluent that is treated is 780 Ml per month or 26 Ml per day. The operating costs of treatment plants, as well as the transportation costs from source to the treatment works, are recovered automatically via the sewerage charge for effluent up to a quality of 1000 mg/l as a percentage of the water consumed on site. Any non-recovery will be for excess quality effluent above 1000 mg/l (or effluents involving surcharges only). F.2.5.2 Future trends and goals (industrial consumer units) The most likely industries to be on the increase would be construction and allied industries In terms of the concrete suppliers and the food and catering industries. Increased production and water consumption in the construction industry need not result in an increase in industrial effluent discharge as the majority is re-cycled into the product. The food and catering industry expansion could result in increased discharge of fat, oil and grease with associated blockages if grease trap facilities are not adequately provided. The trend towards recycling of water at commercial vehicle wash-bays and waste minimisation will continue as the WC&DM Strategy intensifies. F.2.5.3 Strategic gap analysis (industrial consumer units) Non-recovery of the operating costs of wastewater treatment in excess quality effluent above 1000 mg/l (or effluents involving surcharges only) is a problem. Monitoring of polluters is currently inadequate due to capacity constraints. The information and permitting of existing dischargers is not up to date. F.2.5.4 Implementation strategies (industrial consumer units) The potential for increased discharge of fat, oil and grease from the food and catering industry expansion will be monitored as building plans are submitted to the City. Premises will be inspected for adequate grease trap facilities. 104 City of Cape Town WSDP 2008/09 to 2012/13 Planned inspections of the top water users and industrial areas will serve to locate where wastewater treatment costs are not being fully recovered. Top water consumers are currently being inspected. There will be prioritised inspection of the top polluters in each of the respective parameters of COD, Dissolved Solids (Conductivity), pH, Metals, Chlorides, Sulphates and Cyanides. New dischargers are picked up from plans scrutiny, but many plans are “spec” plans and do not indicate future activities and processes to be undertaken in the buildings and thus need to be inspected once tenants move in. Many tenants do not know they need to apply for permission to discharge effluent; It is a continuous inspection and education process especially in the new industrial/ commercial developments. Water and Sanitation Services are working closely with DEA&DP on Cleaner Production. 20 additional inspectors to provide more extensive inspection of the industrial and commercial areas have been budgeted for. F.2.6 Industries and their permitted effluent releases F.2.6.1 Situation assessment (industries and their permitted effluent releases) F.2.6.1.1 Industries and their permitted effluent releases The industries and their current permitted industrial effluent volume is given in the table below: Industry No. of Units Permitted Volume (Ml/year) AIR-CONDITIONING BLEED-OFF 12 422.26 ABATTOIR 1 54.1 BATTERY 1 0.2 BOTTLING 2 20 BEVERAGE 2 158 CATERING 1 0.75 ENGINEERING 1 0.05 ENZYME 1 18.8 FISH 1 0.01 FOOD 14 227 GALVANIZING 1 8.76 METAL 2 1.45 MILITARY 1 1.61 105 City of Cape Town WSDP 2008/09 to 2012/13 Industry No. of Units Permitted Volume (Ml/year) MINERAL OIL 1 0.46 PACKAGING 1 10.25 PAINT 1 2.25 PAPER 1 4.59 PHARMACEUTICAL 1 7.9 PLASTICS 1 37.7 POULTRY 1 150.89 TEXTILE 5 148.78 TRANSPORT 2 38.63 WINERY 1 0.67 WOOD 1 0.12 TOTAL 56 1315.23 For spreadsheet version GOTO 2.2 All the industries not in this table still need to be issued permits. The Prohibited Discharges into sewers is contained in the Wastewater and Industrial Effluent Bylaw (GOTO 2.3) and is outlined below: Section A: General 1. Temperature at point of entry 2. Electrical Conductivity at 25 °C 3. pH Value at 25 °C 4. Chemical Oxygen Demand Not less than Not to exceed 0 °C 40 °C 500 mS/m 5.5 12.0 5 000 mg/ℓ Section B: Chemical substances other than Heavy Metals – maximum concentrations 50 mℓ/ℓ 1. Settleable Solids (60 minutes) 2. Suspended Solids 1 000 mg/ℓ 3. Total dissolved solids at 105 °C 4 000 mg/ℓ 4. Chloride as Cℓ 1 500 mg/ℓ 106 City of Cape Town WSDP 2008/09 to 2012/13 Section B: Chemical substances other than Heavy Metals – maximum concentrations 5. Total sulphates as SO4 1 500 mg/ℓ 6. Total phosphates as P 25 mg/ℓ 7. Total cyanides as CN 20 mg/ℓ 8. Total sulphides as S 50 mg/ℓ 9. Total phenols as C6H5OH 50 mg/ℓ 10. Total sugars and starches as glucose 11. Oils, greases, waxes and fat 12. Sodium as Na 1 500 mg/ℓ 400 mg/ℓ 1 000 mg/ℓ Section C: Metals and inorganic content – maximum concentrations Group 1 1. Iron as Fe 50 mg/ℓ 2. Chromium as Cr 10 mg/ℓ 3. Copper as Cu 20 mg/ℓ 4. Zinc as Zn 30 mg/ℓ Total collective concentration of all metals in Group 1 shall not exceed 50 mg/ℓ Section C: Metals and inorganic content – maximum concentrations Group 2 5. Arsenic as As 5 mg/ℓ 6. Boron as B 5 mg/ℓ 7. Lead as Pb 5 mg/ℓ 8. Selenium as Se 5 mg/ℓ 9. Mercury as Hg 5 mg/ℓ 10. Titanium as Ti 5 mg/ℓ 107 City of Cape Town WSDP 2008/09 to 2012/13 Section C: Metals and inorganic content – maximum concentrations Group 2 11. Cadmium as Cd 5 mg/ℓ 12. Nickel as Ni 5 mg/ℓ Total collective concentration of all metals and inorganic constituents in Group 2 shall not exceed 20 mg/ℓ Section D: Prohibited radioactive materials Any radioactive wastes or isotopes of such nature or in such concentration as do not meet the requirements laid down by the Council for Nuclear Safety referred to in Section 24 of the Nuclear Energy Act (Act 92 of 1982) as amended. F.2.6.2 Future trends and goals (industries and their permitted effluent releases) The goal is to ensure that all industries that discharge industrial effluent are on the City’s database. F.2.6.3 Strategic gap analysis (industries and their permitted effluent releases) Many industrial premises that discharge industrial effluent have not got permits. In addition, the increase in the number of industries and their permitted effluent releases is currently not being tracked. F.2.6.4 Implementation strategies (industries and their permitted effluent releases) Visits to and education of consumers will be increased through the increased capacity of the inspectorate. All companies that require permits will be registered. 108 City of Cape Town WSDP 2008/09 to 2012/13 F.3 WATER RESOURCE PROFILE For an explanation from the Preparation Guideline of the Water Resource Profile GOTO Ex11. F.3.1 Water source F.3.1.1 Situation assessment One of the major issues facing CCT in the future is the task to reduce water demand through the implementation of water demand management initiatives in order to ensure a sustainable supply of water for the future. With the construction of the Berg River Project being completed in 2007 there is sufficient supply until 2015 provided that the CCT implement its WC&DM Program effectively. Two successive years of well below the long term average rainfall in 2003 and 2004 led to DWAF imposing restrictions on the users of water from the Western Cape Water System in October 2004 (20% reduction in water demand required in 2004/2005. Better rainfall in subsequent years, combined with the change in consumer behavior as a result of the imposition of restrictions and the successful implementation of various water demand management initiatives have decreased the need for restrictions prior to the completion of the Berg Water Project (A 10% reduction in demand was required in 2005/06 , 2006/07 and 2007/08). In order to understand the limitations of existing water resources a description of the existing water resources are herewith provided, where after details on future schemes/options will be discussed. For a more detailed description of the available existing water resources, possible future water resources, refer to the document entitled “Western Cape Reconciliation Strategy” GOTO 3.1d and presentation GOTO 3.1e. For a previous studies refer to the “Water Resources and Water Resource Planning” GOTO 3.1a. The Western Cape Reconciliation Strategy Study also dealt with the possible consequences of climate change and the issue of ecological reserves for all dams. F.3.1.1.1 Surface water sources Most of the water resources serving the CCT are stored in dams during the wet winter months in order to ensure a continuous water supply during the dry summer months. The CCT utilises water from various dams within the CMA and also from dams outside the CMA. Some of the dams are operated and controlled by the CCT, whilst the other dams are operated and controlled by the Department of Water Affairs and Forestry (DWAF). The CCT currently obtains approximately 70 to 75% of its raw water requirements from DWAF and the remainder from its own sources. Approximately 15% of the raw water requirements are obtained from sources within the CMA. The following dams and rivers are utilised as shown on the table below. 109 City of Cape Town WSDP 2008/09 to 2012/13 DAMS/RIVERS FIRM YIELD* APPROXIMATE % OWNED & CCT Registered OF TOTAL SUPPLY (1:50 YEAR) OPERATED BY Usage REQUIREMENTS** 3 Mm Major Sources % Mm 3 Theewaterskloof Dam/ DWAF Kleinplaas Dam DWAF 41.0% 219 Berg River Project DWAF 15.1% 80 80 Voëlvlei Dam DWAF 19.6% 105 70.5 Palmiet River DWAF 4.2% 22,5 22.5 Wemmershoek Dam CCT 10.1% 54 54 Steenbras Upper and Steenbras Lower Dam CCT 40 40 520.5 387 120 Total 7.5% 97.5% Approx. yields Minor Sources Simon’s Town: Lewis Gay Dam CCT 0,4% 1,85 1.85 CCT 0,1% 0,5 0.5 CCT 0.88% 4 4 98.7* 526.85 393.35* Kleinplaas Land en Zeezicht Dam (From Lourens River) Table Mountain: Woodhead Hely-Hutchinson De Villiers Dam Victoria Dam Alexandra Dam Grand Total For calculations GOTO 3.1f * Excludes the Atlantis Aquifer, and Albion Springs. ** Approximate % of total supply requirement and firm yield includes Agriculture and other Water Service Authorities. On an annual basis the usage from the various sources may vary. The Western Cape Water System (WCWS) is operated so as to minimise spillage 110 City of Cape Town WSDP 2008/09 to 2012/13 by placing a water demand on the dams that are most likely to spill during the wet winter period. The Berg Water Project The Berg Water Project, completed during 2007, comprises a dam on the farm Skuifraam, a supplemental scheme and ancillary works. The Department of Water Affairs and Forestry and its implementing agent TCTA constructed the dam. The City of Cape Town funded the construction through the operating charges from DWAF. The new dam has increase the assurance of supply to all water users and provides much needed additional storage capacity to the system of dams supplying the Cape Metropolitan Area. National Cabinet approved the implementation and financing of the Berg Water Project (BWP) on 30 April 2002. The Minister of Water Affairs and Forestry directed the Trans-Caledon Tunnel Authority (TCTA) to finance and implement the BWP in terms of Section 103(2)(b) of the National Water Act. (GOTO 3.1c) TCTA owns the land and infrastructure until the loans raised by TCTA have been redeemed, whereafter the land and infrastructure will revert back to the Department of Water Affairs and Forestry (DWAF). The users of the water are funding the BWP. Other users who are allocated water from the BWP pay a third party capital charge (for information GOTO 3.6), based on their water allocation and the CCT receive a credit from DWAF for this amount. It is important to note that the Department of Water Affairs and Forestry only approved the implementation of the Berg Water Project when they were satisfied that the City had made progress with respect to the implementation of water demand management (WDM). The construction of the Dam proceeded as a parallel process to the City implementing WDM. F.3.1.1.2 Groundwater sources – aquifer characteristics The four groundwater resources in the City of Cape Town (CCT) are summarised in the table below. The volume of groundwater abstracted by consumers residing in the urban peripheral areas that do not have access to bulk water services is unknown. Groundwater Resources Firm Yield (1:50 yr) Aquifer No. of Boreholes 3 Mm /year Albion Spring Not applicable Approx. 1.64 Atlantis Cape Flats 44 Not yet developed 5 18 Newlands Not yet developed 10 Total 6.64 111 % of Total Requirements 1.46% of total resources City of Cape Town WSDP 2008/09 to 2012/13 F.3.1.1.3 Groundwater monitoring Refer to F.3.2.1.4 for monitoring of the Atlantis Aquifer. F.3.1.1.4 External sources (where the WSA purchases water from others) External sources are identified under section F.3.1.1.1. F.3.1.1.5 Water returned to resources A schedule of WWTWs giving key data pertaining to the discharge of effluent returned to resources is given in the table under F.5.1.1.11. Relevant parameters are: Type of process Permit Volume Design Hydraulic Capacity (Ml/day) Present Hydraulic loading (Ml pa) Design Organic Capacity (COD Kg/day and population equivalents) Present Organic loading (COD Kg/day and population equivalents) Percentage capacity available for development Additional requirements within the next 5 years For graphs of historical and projected flows GOTO 3.1b For the quality of water returned to the resource refer to F.3.2.1.4 Only the Wesfleur Treatment Works at Atlantis returns effluent to the source from which it was extracted (groundwater). All other treatment works have exemptions (in terms of the 1956 Water Act – GOTO 3.1c) from this requirement. Other statistics concerning wastewater are: Approximately 31,0 Ml/d (5,9%) of wastewater is discharged directly via marine outfall sewers 53 000 tonnes/annum of dry sludge is estimated to be produced Treated effluent is re-used in accordance with the table below: Formal network distribution Private Supply Schemes Informal downstream re-use WWTW re-use TOTAL CURRENT RE-USE F.3.1.2 Peak daily summer re-use (ML/day) 56.9 14.5 10.5 15.6 97.5 % of current usage 58.4% 14.9% 10.8% 16.0% % of Daily Dry Weather Flow 13.1% 3.3% 2.4% 3.6% 18.5% Future trends and goals (water source) In order to determine what the future trends and goals for water sources are it is critical to determine what the future demands will be. 112 City of Cape Town WSDP 2008/09 to 2012/13 In 1998/99 the Department of Water Affairs and Forestry (DWAF) commissioned Ninham Shand together with sub-consultants Palmer Development Group (PDG) and the Institute of Futures Research (IFR) to analyse the past-, present- and future urban demand for water in the Cape Metropolitan Area. In order to better assess and understand current and future demand, this study was updated in 2003/2004 by the City of Cape Town. Based on the potential economic growth and population growth it is estimated that the unconstrained water demand growth in the City will vary between 2,7% and 3,7% per annum. The historic growth rate of the total bulk water supplied by the CCT between 1973 and 2000 was 3% to 4% per annum. In order to ensure a sustainable supply of water for the future, the CCT initiated an “Integrated Water Resource Planning (IWRP) Study” (GOTO 3.2a) to best assess how to manage its water demand. The results of the IWRP Study indicated that the CCT has to actively implement Water Demand Management (WDM) measures, whilst simultaneously investigating and implementing additional water augmentation schemes. The implementation of the WDM recommendations contained in the IWRP Study include inter alia pressure management, user educational, elimination of automatic flushing urinals, leakage repair, tariffs, metering and credit control. The CCT through its WDM strategy and programme has committed itself to the implementation of the recommendations emanating from the IWRP Study. The objective of the WDM Policy and Strategy is to reduce the projected demand for water by 20% by the year 2010. The CCT through its Water Services Development Plan (WSDP) has also committed itself to ensuring a sustainable supply of water for the future. Figure F.3.1.2a below shows the historic growth in water demand and the low water demand projection for the CCT. The low water demand projection ties in with the 20% reduction in water demand objective stated in the previous WDM Policy and Strategy. The IDP target line corresponds to the more comprehensive WC&DM Strategy. (Refer to F.4.1.3 for a discussion on which projection to use for water resource and infrastructure planning). The Reconciliation Strategy Study, conducted by the Department of Water Affairs and Forestry and the City of Cape Town, was completed and approved in June 2007. The objective of the study was to put a strategy in place which would ensure the reconciliation of the future requirement for and supply of water from the Western Cape Water Supply System. A Strategy Steering Committee has been formed to make recommendations, on an annual basis, on long term planning activities required to ensure reconciliation of requirement and available supply in the WCWSS area. In other words, it will be this committee’s responsibility to monitor and understand demand growth and supply constraints so that planning for the next scheme takes place timeously to ensure that the level of assurance of supply remain adequate at all times. This is required because the actual growth in demand will determine when the next scheme needs to be built. The scenarios indicate that this could be anywhere between 2011 (no WC/WDM) and 2019 (Comprehensive WC/WDM). The growth in demand depends on the following: The actual unconstrained water demand which depends on the growth in the city, and 113 City of Cape Town WSDP 2008/09 to 2012/13 The effectiveness of the WC&DM Strategy. The available supply depends on: The effects of climate change, and The implementation of ecological reserves for existing schemes. The need to monitor the growth in demand arises from the uncertainty around these parameters and the 7 year horizon from planning to implementation of a scheme. In order to ensure that both DWAF and the City of Cape Town are in a “state of readiness” the City is implementing its WC&DM Strategy and various studies are being carried out at the appropriate level. The historical and Projected Total Water Demand from the WCWSS is shown in the graph below: This includes the demand from agriculture and other smaller municipalities. 114 City of Cape Town WSDP 2008/09 to 2012/13 Figure F.3.1.2a: Demand growth Projections versus Supply Available (For spreadsheet calculations GOTO 3.2b and Demand Forecasting Model GOTO 3.2c) CCT Demand Projections Existing Supply Supply incl. BWP Unconstrained Low Water Demand Actual 2007/08 IDP WDM Strategy 600 500 400 300 200 100 2019 2017 2015 2013 2011 2009 2007 2005 2003 2001 1999 1997 1995 1993 0 1991 Bulk Supplied (million cubic metres) 700 Year The total bulk water supplied within the Cape Metropolitan Area for the financial year ending June 2007 was 308 million cubic metres. This includes Unaccounted-for-Water (UAW) and bulk losses in bulk pipelines as well as Water Services Authorities and other minor consumers outside its area of jurisdiction. For a summary of bulk water treated GOTO 3.3 The distribution of water demand is given in the table below: Category Commercial & Industrial Departmental Cluster Domestic Cluster Domestic Full Government Miscellaneous Municipal Schools and Sportsfields %age 14.6% 1.9% 5.5% 45.1% 1.6% 5.1% 2.6% 1.9% 115 Water Usage 2005/06 39,604,273 5,296,873 15,085,701 122,767,813 4,337,839 14,003,230 7,182,864 5,284,754 %age 14.0% 1.5% 6.0% 46.0% 1.8% 5.9% 2.1% 1.3% Water Usage 2006/07 39,935,953 4,292,063 17,158,456 130,999,103 5,191,773 16,687,710 5,910,749 3,588,272 City of Cape Town WSDP 2008/09 to 2012/13 Category Unbilled Non-Revenue Demand TOTAL %age 2.2% 19.3% 100% Water Usage 2005/06 6,000,000 52,390,255 271,953,601 %age 2.1% 19.3% 100.0% Water Usage 2006/07 6,000,000 55,093,872 284,857,952 The pie chart of the distribution of water demand is given in Figure F.3.1.2b below: Commercial & Industrial Departmental Cluster Domestic Cluster Domestic Full Government Miscellaneous Municipal Schools and Sportsfields Non-Revenue Demand For the spreadsheet of calculations GOTO 3.4a F.3.1.2.1 Surface water source Future surface water projects, including new dams sites, raising of existing dams and river diversion schemes are outlined in the DWAF Reconciliation Strategy. GOTO 3.1d F.3.1.2.2 Groundwater sources-aquifer characteristics The future ground water resources are shown in the table below: Firm Yield (1:50 yr) Aquifer No. of Boreholes 3 Mm /year Cape Flats Not yet developed 18 Newlands Not yet developed 10 TMG Not yet developed Not known at this stage % of Total Requirements The use of these groundwater resources is dealt with in the DWAF Reconciliation Strategy Study. 116 City of Cape Town WSDP 2008/09 to 2012/13 TMG Aquifer Feasibility and Pilot Study (For more information GOTO 3.4b) The TMG Aquifer Feasibility Study and Pilot Project was awarded to the TMG Aquifer Alliance (TMGA Alliance) by the Executive Committee of the City of Cape Town on the 23 April 2002. The primary objective of the Study is to determine the viability of the TMG aquifer as a potential future water resource for the City of Cape Town. An incremental and precautionary approach has been adopted in the Study as there is uncertainty regarding the potential environmental impacts of abstracting water from the aquifer. Due to the nature of the project, the Study was broken up into 4 discreet phases. This flexible approach allows for a significant amount of interaction with the City of Cape Town and enables the CCT to play a key role in the decision making process throughout the Study. Provision was made in the Project for the CCT to be able to terminate the project at the end of the Preliminary and Exploratory Phases and during the Pilot Phase of the Study should it become evident after reviewing the progress and the feasibility of the various phases that the desired outcomes will not be achieved. The Preliminary Phase concluded that, based on a regional desktop assessment of the Table Mountain Group Aquifer, the Aquifer would most likely be a viable water resource that could significantly augment the City’s current water resources in the future. An outcome of the Preliminary Phase was the identification of 26 potential target sites suitable for exploratory drilling to gain a better understanding of the properties of the aquifer. The Department of Environmental Affairs and Development Planning (DEA&DP), subsequent to considering an appeal against the application from the City, have issued a Record of Decision to allow the City to proceed with exploratory drilling. It is anticipated that the exploratory drilling phase will be completed by 2009. F.3.1.2.3 Groundwater monitoring No changes are expected to the ground water monitoring programme. F.3.1.2.4 External sources (where the WSA purchases water from others) The Berg Water Project, completed in 2007, will be owned and operated by the Department of Water Affairs and Forestry. Refer also to F.3.1.2.1 F.3.1.2.5 Water returned to resources The City through the IDP document has committed itself to ensuring compliance with DWAF effluent standards. It has set a target of 95% compliance with respect to 4 critical DWAF effluent standards (E-coli count, Ammonia content, Oxygen demanding substances, Total suspended solids) by 30 June 2012. Achieving this target is dependant on adequate funds for R&M, staffing requirements and infrastructural upgrades. 117 City of Cape Town WSDP 2008/09 to 2012/13 F.3.1.3 Strategic gap analysis (water source) Water Sources The next water resource scheme will be needed between 2011 and 2019. The timing depends on the demand growth, the success of the WC&DM Strategy, climate change, the implementation of an ecological reserve. Water returned to resources The Percentage compliance with respect to 4 critical DWAF effluent standards (E-coli count, Ammonia content, Oxygen demanding substances, Total suspended solids) remains unsatisfactory at 81%. Operational and maintenance problems also result in non-compliance of treated effluent. For example, the tripping of the activated sludge pump at Kraaifontein led to the loss of a significant amount of sludge from the reactor. As a result nitrification ceased and took time to re-establish. At Bellville the mixed liquor rose resulting in higher oxygen demand. This affected nitrification. Recent power outages due to Eskom supply constraints have also compounded the problem. F.3.1.3.1 Implementation strategies (water source) Water Sources The WC & DM strategy (Chapter F.4) is key to the water resource strategy and needs to be read in conjunction with the water source strategy hereunder. As part of the Reconciliation Strategy a “Strategy Steering Committee” has been formed to make recommendations, on an annual basis, on long term planning activities required to ensure reconciliation of requirement and available supply in the WCWSS area. In other words, it will be this committee’s responsibility to monitor and understand demand growth so that planning for the next scheme takes place timeously to ensure that the level of assurance of supply remain adequate at all times. This is required because the actual growth in demand balanced against factors such as climate change, the implementation of an ecological reserve, etc will determine when the next scheme needs to be built. The scenarios indicate that this could be anywhere between 2011 (no WC/WDM) and 2019 (Comprehensive WC/WDM). Actions to be undertaken by the City are contained in the Reconciliation Strategy documents and summarized in the table below: Gap Strategy The Reconciliation Strategy Study identified studies that CCT needs to undertake to play their part in ensuring an adequate level of supply at all times Studies to be undertaken TMG Aquifer Feasibility Study Pilot Desalination Plant Newlands Aquifer Pre-feasibility Cape Flats Aquifer Feasibility Effluent re-use to Potable Standards Pre-feasibility 118 City of Cape Town WSDP 2008/09 to 2012/13 Gap Strategy The Reconciliation Strategy Study identified studies that CCT need to undertake in conjunctions with DWAF to play their part in ensuring an adequate level of supply at all times The Reconciliation Strategy Study identified studies that CCT need to undertake to ensure that schemes studied by DWAF can be implemented The Reconciliation Strategy Study identified interventions where very little data exists and where studies need to be carried out a reconnaisance level Studies to be undertaken Pre-feasibility Study for the Raising of Steenbras Lowe Dam Lourens River Diversion Scheme Pre-feasibility Assess the capacity of the Voelvlei Pipeline Assess the cost implications of an additional pipeline from Voelvlei to CCT Studies at reconnaisance level to be undertaken: Steenbras Pumped Storage Intake Operation of Kleinplaas Dam Improve Operation of Atlantis Aquifer Water Trading Desalination Desalination (or desalting) is generally understood to be the removal of dissolved salts from seawater and in some cases from brackish waters of inland seas, highly mineralised groundwater and municipal wastewaters. Desalination with to-day’s technologies, however, can remove minerals and most biological or organic chemical compounds. A more appropriate term for desalination could be “de-mineralization” or “purification” of water. Advances in desalination technology over the last decade have meant that the cost of desalination has decreased significantly. It is currently estimated that the cost of water from a desalination plant would be in the order of R5 3 /m . The decreasing costs of desalination, together with the fact that desalination could provide a more environmentally-acceptable solution, could result in desalination being implemented prior to some of the conventional water resource schemes which have been identified. Given the abovementioned situation and the fact that the City has adopted a “conservative and precautionary” approach to water resource development, the City has taken a decision to further investigate desalination technologies and establish a pilot desalination plant well in advance to large scale desalination being required in order to be in a position to utilise the technology when required. GOTO 3.7 and GOTO 3.8 for reports on desalination. The V&A Waterfront has now decided that they have withdrawn their offer of being the site for a pilot desalination plant. It is still the City’s intention to proceed with the project and it is investigating other options. Water Returned to Resources There is an ongoing programme to upgrade and extend the Wastewater Treatment Works to increase their capacities and ensure that they comply with the 1984 DWAF Standards (refer to F.5 Infrastructure). In addition water returned to resources will reduce as more treated effluent projects are implemented as part of the WC/WDM Strategy. (Refer to F.4) 119 City of Cape Town WSDP 2008/09 to 2012/13 Both programmes need a significant amount of funds which the City is committed to ensuring becomes available as part of its financial strategy. Refer to Chapter 9 of Draft IDP. (GOTO 3.9) Other strategies that are in place but that are currently being tightened up that should reduce non-compliance due to operational issues are: Pro-active maintenance of all mechanical and electrical equipment as well as civil structures as part of the Asset Management Strategy, Process optimisation, and Improved monitoring and operational control. F.3.2 Water quality F.3.2.1 Situation assessment (water quality) The overview of the situation with respect to water quality is given in the table below: Resources available to perform function F.3.2.1.1 Budgets Bylaws Infrastructure Personnel 1 Quality of water taken from source: urban Yes NA Yes Yes 2 Quality of water taken from source: rural Yes NA Yes Yes 3 Reporting on quality of water taken from source: urban and rural Yes NA Yes Yes 4 Quality of water returned to source: urban Yes Yes Yes Yes 5 Quality of water returned to source: rural Yes Yes Yes Yes 6 Pollution contingency measures Yes Yes Yes Yes Quality of water taken from source: urban The overview of the situation with respect to water taken from source is given in the table below: At Source (WTPs) At Reservoir At Tap 1. Is water quality measured? (Yes/no) Yes Yes Yes 2. Do you monitor it yourself? (Yes/no) Yes Yes Yes 3. If no, who does? NA NA NA 4. Monitoring intervals (daily, weekly, monthly, quarterly, bi-annually, annually) Weekly Weekly Weekly 120 City of Cape Town WSDP 2008/09 to 2012/13 5. Are these results available in electronic format? (Yes/no) 6. % Time (days) within SANS 241 standards per year Microbiological compliance Chemical compliance Class 1 Yes Yes Yes 100%** 96%** 100%** 96%** 99%** 95%** ** Note: in terms of SANS 241/2005 the quality of the water system is classified as “Excellent”. Raw water quality DWAF does not guarantee the quality of the raw water abstracted from its dams. This may impact on the costs of treating the water. For example, the removal of tastes and odours from drinking water using activated carbon costs several million Rand per annum. Algae blooms are increasing problematic due to the increasing nutrient load into dams. Odour and toxin producing Cyanobacteria (blue green algae) remain a threat to raw water supplies. Blooms are monitored according to World Health Organisation protocols and water treatment processes are accordingly adjusted. This problem could escalate further in the future if it is not addressed. Treated water quality Weekly sampling is also undertaken jointly by the Health Department and Scientific Services. Samples are taken at various locations throughout the distribution network. The quality of treated water at the water treatment plants is strictly monitored/controlled on a 24-hour basis by the water treatment division and complies with SANS 241/2005 and other guidelines. The Scientific Services Branch conducts weekly visits to each WTP to test the water, inspect the process, retrieve various samples and analyse them. The results are then scrutinised, evaluated and compiled as a weekly report with comments. The WTP manager is given a copy of the results, one copy is sent to the Head of Bulk Water Operations and one is kept by Scientific Services. Composite sampling is carried out by the WTP on a weekly basis and these samples are also analysed by the Scientific Services Branch and a monthly report is generated. Non-compliance with the standards is reported on 24-hour basis to operational managers. Suitably experienced and qualified staff from the Water and Sanitation Services Department response immediately to operational problems and consumer complaints. For details on raw water quality and treated water quality refer to table entitled “Water Treatment Data” GOTO 3.10a. All water quality results are discussed by inter-disciplinary teams within the City at the monthly Water Quality Committee chaired by the Director: Water and Sanitation. 121 City of Cape Town WSDP 2008/09 to 2012/13 Implementation of Fluoridation Regulations In terms of Regulations No. R873, dated 8 September 2000, promulgated under the Health Act (Act 63 of 1977), all water services providers were required to ensure a fluoride concentration of 0.7 mg/l in potable water for the purposes of reducing dental caries. Fluoridation is complex, expensive and a potentially hazardous undertaking and requires the implementation of new infrastructure at an estimated cost of R18 million. The running cost of fluoridation is estimated at about R 8 million per annum. Skilled operators required to manage the fluoride concentration are currently inadequate, and the training of additional staff is required. Fluoridation of water supply has been put on hold after a national process of engagement with the various bodies concerned. New Regulations would be required in terms of the new Health Act (Act 61 of 2003). F.3.2.1.2 Quality of water taken from source: rural For table refer to F.3.2.1.1 F.3.2.1.3 Reporting on quality of water from source: urban and rural For explanation from the Preparation Guideline GOTO Ex12. The method of notification of consumers of water quality problems is outlined below: Method of Notification F.3.2.1.4 If quality of water does not comply, are urban residents notified? Yes Radio and newspapers for large areas Door to door if in specific area If quality of does not comply, are rural residents notified? Yes Radio and newspapers for large areas Door to door if in specific area Quality of water returned to the resource: urban The overview of the situation with respect to water returned source is given in the table below: In the return effluent In the Stormwater In the river 1. Is water quality measured? (Yes/no) Yes Yes Yes 2. Do you monitor it yourself? (Yes/no) Yes Yes Yes 3. If no, who does? NA NA NA 4. Monitoring intervals (daily, weekly, monthly, quarterly, bi-annually, annually) Weekly Weekly Weekly 5. Are these results available in electronic format? (Yes/no) Yes Yes Yes 122 City of Cape Town WSDP 2008/09 to 2012/13 6. For wastewater treatment works discharges to the water resource: % of time within the requirements of special or general standards (Regulation 991) 81% NA 37%** ** Increased monitoring and sampling required. Vleis and coastal areas comply 68% and 80% of the time respectively. Random tests are done to monitor illegal discharge of industrial effluent to the stormwater system in accordance with the Stormwater Bylaw. (GOTO 3.10b). Although it was previously an urgent requirement to adhere to the proposed 2010 standards, the implementation of these standards is currently being delayed by DWAF on the grounds that they are unaffordable. The City has been asked by DWAF to ensure that its WWTW comply with the 1984 Standards. However, each application for upgrading existing and building new WWTWs is being assessed on its merit and the reserve determination of the receiving water body. Providing there is sufficient funding the Water and Sanitation Services Department will ensure that 89% of treated effluent is in compliance with current DWAF standards (1984 standards) by 2010 and 95% by 2012. The current level of compliance is 81%. Scientific Services generates monthly, quarterly and annual aggregate assessments of compliance for each individual treatment works and an overall summary for all facilities. Graphical representation of these statistics gives a visual “dashboard” of compliance for the key constituents stipulated in the permit is given in the tables below. The years ending June 2006 and June 2007 are given below for comparative purposes. For a comprehensive spreadsheet of results at each wastewater treatment plant for the year 2006 GOTO 3.11a and for the year 2007 GOTO 3.11b. Final Effluent Quality Compliance with Standard (%) – June 2006 WORKS Susp Solids Chem Ox Demand Ammonia E Coli Athlone 98 98 98 0 Bellville 78 82 62 2 Borcherds Quarry 100 98 86 65 Cape Flats 49 47 49 83 Gordons Bay 100 98 96 93 Klipheuwel 96 60 38 89 Kraaifontein 98 92 76 89 Llandudno 96 98 96 42 Macassar 100 90 72 80 Melkbosstrand 100 100 100 94 123 City of Cape Town WSDP 2008/09 to 2012/13 WORKS Susp Solids Chem Ox Demand Ammonia E Coli Millers Point 69 29 76 95 Mitchells Plain 98 96 92 48 Oudekraal 79 67 85 81 Parow 86 72 88 66 Potsdam 86 26 20 26 Scottsdene 96 89 96 91 Simons Town 76 4 37 62 Wesfleur – Domestic 100 98 100 100 Wesfleur - Industrial 88 45 88 60 Wildevoelvlei 94 94 100 96 Zandvliet 98 100 92 98 MORE THAN 90% COMPLIANCE 75% - 90% COMPLIANCE LESS THAN 75% COMPLIANCE 124 City of Cape Town WSDP 2008/09 to 2012/13 Final Effluent Quality Compliance with Standard (%) - June 2007 MORE THAN 90% COMPLIANCE WORKS Susp Solids Chem Ox Demand Ammonia E Coli Athlone 98 100 98 0 Bellville 83 83 64 0 Borcherds Quarry 98 96 96 70 Cape Flats 46 48 77 85 Gordons Bay 100 98 100 98 Klipheuwel 96 58 64 76 Kraaifontein 98 84 84 98 Llandudno 92 96 94 62 Macassar 100 92 54 83 Melkbosstrand 100 100 100 89 Millers Point 50 14 100 46 Mitchells Plain 94 90 94 40 Oudekraal 59 49 78 100 Parow 94 72 88 66 Potsdam 87 42 42 21 Scottsdene 94 96 100 83 Simons Town 79 17 64 63 Wesfleur – Domestic 980 100 100 100 Wesfleur - Industrial 87 67 89 59 Wildevoelvlei 100 98 98 96 Zandvliet 96 98 64 94 75% - 90% COMPLIANCE LESS THAN 75% COMPLIANCE These final effluent quality compliance with standards is built up from weekly tests. An example of the results for a Athlone WWTW for 2007 is given below: 125 City of Cape Town WSDP 2008/09 to 2012/13 Athlone: TSS weekly samles 40 TSS in mg/l 35 30 25 TSS 20 1984 STD 15 10 5 2007/12/03 2007/11/03 2007/10/03 2007/09/03 2007/08/03 2007/07/03 2007/06/03 2007/05/03 2007/04/03 2007/03/03 2007/02/03 2007/01/03 0 Date Athlone: COD weekly samles 160 COD in mg/l 140 120 100 COD 80 1984 STD 60 40 20 2007/12/03 2007/11/03 2007/10/03 2007/09/03 2007/08/03 2007/07/03 2007/06/03 2007/05/03 2007/04/03 2007/03/03 2007/02/03 2007/01/03 0 Date Athlone: NH3 weekly samles 35.0 NH3 in mgN/l 30.0 25.0 20.0 NH3 15.0 1984 STD 10.0 5.0 2007/12/03 2007/11/03 2007/10/03 2007/09/03 2007/08/03 2007/07/03 2007/06/03 2007/05/03 2007/04/03 2007/03/03 2007/02/03 2007/01/03 0.0 Date Natural features such as rivers, wetlands and vleis form integral components of the stormwater management system with diverse ecological, aesthetic and recreational functions. Many have over the past decades been significantly altered or obliterated by canalisation, urban runoff induced erosion and 126 City of Cape Town WSDP 2008/09 to 2012/13 discharge of polluted waters. Apart from its primary drainage function, the stormwater system also conveys final effluents from inland wastewater treatment plants to the coastline. Activity associated with urban development, unless appropriately managed, impacts negatively on the water quality of receiving waters. This poses public health concerns and degrades the ecological health of the inland water bodies in particular. The Catchment, Stormwater and River Management Branch within the Roads & Stormwater Department is responsible for the routine monitoring of coastal and inland waters. Laboratory services are provided by the Water Services Department. Various parameters, which include the physical, chemical, biological and aesthetic properties of the water, are evaluated against the applicable South African Water Quality Guidelines. For results for the 2006 Hydrological year refer to Inland and Coastal Water Quality Report produced by CSRM (GOTO 3.12). In addition, under the umbrella of the national River Health Programme (http://www.csir.co.za/rhp/) the ecological health of the City’s rivers is assessed annually. During 2004, an Environmental Management System was established for the Potsdam Wastewater Treatment Works by the Environmental Planning Department. The development of further EMS projects have been postponed until each treatment works achieves compliance with effluent standards. Atlantis Aquifer An Environmental Management System (EMS) has been completed for the Atlantis Aquifer System, and an environmental consultant audits the EMS on an annual basis. In addition an environmental officer for the area was appointed in July 1999, to safeguard the environment, water supply infrastructure and to educate the public. The Council for Scientific and Industrial Research (CSIR) assist in monitoring water quality and aquifer levels on a regular basis. In terms of the National Water Act (1998) GOTO 3.1c, aquifers are protected. Silwerstroom Spring which arises on the edge of the Atlantis dunefield is an important component of the Atlantis Aquifer water supply scheme: good quality water from the spring is used to blend with aquifer water. Abstraction of water at the Silwerstroom weir results in drastic daily water level fluctuations which has had a negative impact on the ecological health of the system and may have contributed to the growth of filamentous algae in the pool upstream of the weir. This practice has however recently stopped due to clogging of pump equipment by algae. A consequence of this has been that the Silwerstroom Spring now overflows the weir and is permitted to flow down to the sea thus restoring some of the ecological functioning of the system. The spring is also unique since it supports a population of the endemic fish species, Galaxias zebratus (Cape galaxias). This Gondwanaland relic’s closest genetic family is located in South America! The Water and Sanitation Department and ecologists from Scientific Services and DWAF are seeking solutions which will alleviate algae growth, allow sustainable abstraction and leave sufficient flow for the system and the Galaxias population to remain healthy. 127 City of Cape Town WSDP 2008/09 to 2012/13 F.3.2.1.5 Quality of water returned to the resource: rural Refer to F.3.2.1.4 F.3.2.1.6 Pollution contingency measures For explanation from the Preparation Guideline GOTO Ex13. Effluent from industrial consumers generally is discharged into the sewage system and treated at the wastewater treatment works and is therefore not considered as a pollution threat. However, that which ends up in the stormwater system presents a real and serious threat. Containment of chemicals in storage and during transportation presents a definite risk to the stormwater system and hence the environment at large. The Water Pollution Control Inspectorate and Tradewaste Laboratory are equipped to monitor industrial effluents and provide assistance with containment during pollution incidents. The Wastewater Treatment Works’ status (For plans GOTO 3.13) with respect to pollution contingency measures is tabulated below: Resource Description Potential source of pollution Formal contingency Measure? Salt River Athlone WWTW Yes Kuils River Bellville WWTW Yes Salt River system Borcherds Quarry WWTW Yes False Bay Cape Flats WWTW Yes Atlantic Ocean Camps Bay Outfall Yes Sir Lowry’s Pass River Gordons Bay WWTW Yes Atlantis Ocean Green Point Outfall Yes Atlantic Ocean Hout Bay Outfall Yes Diep River Klipheuwel WWTW No Diep River system Kraaifontein WWTW Yes Atlantic Ocean Llandudno WWTW No Eerste River Macassar WWTW Yes Kleine Zoute River Melkbosstrand WWTW Yes False Bay Millers Point WWTW No False Bay Mitchells Plain WWTW Yes Atlantic Ocean Oudekraal WWTW No Salt River system Parow WWTW No Diep River Potsdam WWTW No Kuils River system Scottsdene WWTW Yes 128 City of Cape Town WSDP 2008/09 to 2012/13 Resource Description Potential source of pollution Formal contingency Measure? False Bay Simons Town No Atlantis Aquifer Wesfleur WWTW Yes Wildevoelvlei Vlei Wildevoelvlei WWTW Yes Kuils River Zandvliet WWTW Yes The word “system” indicates that the effluent is discharged into a tributary of this river F.3.2.2 Future trends and goals (water quality) F.3.2.2.1 Quality of water taken from source: urban Algae blooms and geosmin in the raw water is increasing problematic, specifically at Theewaterskloof, Voelvlei, Steenbras and Constantia Nek. Microbiological and chemical compliance to SANS 241/2005 of the drinking water is expected to remain in the “Excellent” category. Growth in the city will require increased monitoring in the new reticulation areas. F.3.2.2.2 Quality of water taken from source: rural Refer to F.3.2.2.1 F.3.2.2.3 Report on quality of water taken from source: urban and rural There are no changes expected to the reporting system. F.3.2.2.4 Quality of water returned to the resource: urban There have been some improvements in the quality of water returned to resource from upgraded WWTWs. However, significant investment is still required for the overall water quality to improve and achieve 89% and 95% compliance by 2010 and 2012 respectively in accordance with the IDP document. F.3.2.2.5 Quality of water returned to the resource: rural Refer to F.3.2.2.5 F.3.2.2.6 Pollution contingency measures Ensure that all WWTWs and sewer pumpstations have Pollution Contingency measures. F.3.2.2.7 Strategic gap analysis (water quality) There are a number of strategic gaps: Ineffective catchment management at dams resulting in algae blooms and geosmin problems. Monitoring of drinking water quality in new areas of the reticulation is falling behind. 129 City of Cape Town WSDP 2008/09 to 2012/13 The Program for upgrade and extension of Wastewater Treatment Works has fallen behind due to lack of funding in previous years. Overall effluent quality is still not to DWAF standards. Percentage compliance is 81% for treated effluent quality 37% in rivers 68% in coastal areas Lack of pro-active solutions to treated effluent quality issues that result from operational problems. Lack of community empowerment to ensure that the “polluters pays” principle is enforced. Some WWTWs and sewer pumpstations do not have pollution contingency measures. Lack of understanding by the community of the excellent drinking water quality Out of 289 industrial properties that are monitored for compliance with industrial effluent bylaw (GOTO 2.3) standards 25% are non-compliant. F.3.2.2.8 Implementation strategies (water quality) The following strategies have been or are in the process of being implemented: In order to at least stabilise and hopefully reduce the influx of nutrients and subsequent algae blooms, serious and urgent catchment management is required by the responsible authorities. Extend reticulation network water quality monitoring. Provide sufficient capital and human resources for upgrading and extending WWTWs Pro-actively address operational problems so as to avert treated effluent quality. Examine and resolve treated effluent quality monitoring issues. CMAs need to be established in the catchment areas and wastewater charge discharge system needs to be implemented. Identify source and non-source points of pollution and implement strategy. Establish Pollution Contingency measures where there are none. Water Quality awareness campaigns (e.g. Hlonipha Amanzi for WDM) Water and Wastewater bylaws awareness campaigns (Raising the Citizen’s Voice) Education of the consumer around the quality of drinking water in Cape Town. (e.g. improve consumer’s level of understanding of the excellent drinking water quality) Increase monitoring of industrial effluent discharging into WWTWs Non-compliant industrial effluents – identify the worst offenders, enforce payment of penalties and encourage waste minimisation principles. 130 City of Cape Town WSDP 2008/09 to 2012/13 F.3.3 Waterborne Sanitation F.3.3.1 Situation Assessment The majority of the properties in the Cape Town area are already served by waterborne sanitation. F.3.3.2 Future Trends and Goals The City plans to implement waterborne sanitation throughout the municipal area. In informal settlements this takes the form of shared facilities (refer to Service Level Profile in Chapter 2) while in formal areas it takes the form of a house connection. F.3.3.3 Strategic Gap Analysis The ability of the City to provide full waterborne sanitation to those in informal areas and in backyard shacks is linked to its ability to provide state housing through the national subsidy scheme or to place households on serviced sites. The ability of Water and Sanitation Services to provide households who currently have septic tanks is dependent on adequate finance being available. F.3.3.4 Implementation Strategies Waterborne sanitation is provided to all new formal residential properties. In the case of private developments it is the responsibility of the developer to provide all household connections while in the case of state housing it is funded through the housing subsidy. Water demand and water resource planning by the City has factored in the installation of waterborne sewerage for all formal and informal households. 131 City of Cape Town WSDP 2008/09 to 2012/13 F.4 WATER CONSERVATION / DEMAND MANAGEMENT (WC/WDM) For explanation from the Preparation Guideline GOTO Ex14. Water is a scarce resource in South Africa and also in Cape Town. For more than a century there have been periods of water restrictions restrictions (For Water Restrictions Bylaw GOTO 4.1) followed by the development of new schemes to expand the city’s water supply, usually through the building of a dam. Until 1995 the focus was primarily on managing the supply of water by developing new schemes to meet the growth in water demand. Cape Town is a large city of approximately 3,1 million people that is expected to consume increasingly more water, because of population and economic growth. The availability of water resources and adequate bulk water and wastewater infrastructure to meet the growing water demand in the City of Cape Town (CCT) is a limiting constraint to the social upliftment and economic prosperity of the city. As early as in 1995 City of Cape Town committed itself to a 10% saving on the historical demand growth of 4 % per annum. Various studies have also indicated that Water Demand Management and Water Conservation (WC/WDM) initiatives are the most feasible water augmentation options to meet the growing water demand for the city. In 2001 CCT developed a WC/WDM policy and strategy based on the outcome of the IWRP study. A number of WC/WDM projects were implemented and some of the projects such as the Khayelitsha Pressure management project were very successful and received wide recognition. The implementation of the strategy was however not sustainable and due to numerous institutional challenges the initial commitment and resources to WC/WDM were significantly reduced during 2003/2004 financial year and again during 2005/2006. The revised WC/WDM Strategy under F.4.1.4 seeks to overcome these challenges, build on experience gained and adapt to the city’s approach in light of current socio-political, environmental and urban management imperatives. Integrated Water Resource Planning The Integrated Water Resource Planning approach integrates critical planning criteria and activities into one systematic planning process. It involves the concurrent consideration of water supply and water demand management options. It is conducted using an open and participatory approach involving all stakeholders. IWRP also identifies and attempts to quantify the external costs and benefits and inherent uncertainties associated with each alternative. With the realisation that water demand management was becoming increasingly important in order to ensure future sustainability and affordability, the former Cape Metropolitan Council (CMC) decided to adopt an integrated approach to water demand management and water augmentation. Towards the end of 1999, the CMC initiated an “Integrated Water Resource Planning” (IWRP) Study. (GOTO 3.2a)../../../../../../../../George_/Local Settings/Temp/GOTO IWRP-STUDY.MK.doc The aim of the Studies was to investigate at pre-feasibility level various water demand management initiatives along with various water supply 132 City of Cape Town WSDP 2008/09 to 2012/13 augmentation schemes. Recommendations were to be made to the City of Cape Town (CCT) on where to focus their resources and attentions with the aim of meeting and managing the water demand within the Cape Metropolitan Area (CMA). The study considered the technical, institutional, socio-economic, environmental and financial aspects of the options using a multi-criteria decision making analysis. The results of the Studies indicated that a significant saving in water demand could be achieved through the implementation of certain water demand management initiatives. In comparison to the water supply options, certain water demand management initiatives would have a significantly lower implementation cost, could be implemented in a shorter time frame and were generally more environmentally and socially acceptable. A full suite of the Reports detailing the various investigations carried out under the IWRP Study are available for scrutiny in the offices of the Bulk Water Branch of the City of Cape Town. The need for WC/WDM The need for a WC/WDM at CCT is not limited to the immediate water resource shortages and includes the following: i. Reconciling supply and future demand. Various studies have clearly indicated that WC/WDM measures are the most feasible options for reconciling supply and future demand. ii. Financial viability of the Water Services. WC/WDM can contribute significantly to ensuring the financial viability of water service delivery in CCT in the following ways: Reducing the direct operating costs by reducing non-revenue demand Reducing the operating cost of revenue demand (not significant) Increasing income from consumers through more equitable tariffs Increasing income by capacitating non-paying consumers (reducing consumption to affordable levels) to pay for water Postponing capital infrastructure requirements iii. Water resource and environmental protection. Limiting water abstracted from rivers and also reducing the pollution discharged through the wastewater system can protect the environment. iv. Assist in alleviating the current problems of the wastewater system. The wastewater treatment in CCT is currently under severe stress due to lack of capacity. There are a number of treatment plants where hydraulic loading is the key constraint and WC/WDM can play a significant role in alleviating problems and reducing costs. Consequences of not implementing WC/WDM 133 City of Cape Town WSDP 2008/09 to 2012/13 The consequences of not implementing the entire WC/WDM strategy can be significant and will depend on the extent of implementation. Some of the important consequences are as follows: a. Premature development of the next water augmentation scheme at significant cost. b. The aim of achieving sustainable and affordable service delivery to lowincome areas could be threatened. c. The existing loss of income to Council will continue to increase. Current levels of loss of income could be as high as R 205 million per annum (20% of total demand at an average selling price of R3.5 /kl). d. The existing direct cost of distribution losses will continue to increase. Current financial losses due to distribution losses are estimated as R 15 million per annum. (Assuming 10% of total demand and R0.5 / kl) The role of WC/WDM in postponing a new water resource augmentation scheme Analysing the potential role of WC/WDM on the two possible future demand scenarios, a high water demand scenario and a low water demand scenario, illustrate that WC/WDM can postpone the need for further water resource augmentation scheme by a number of years. The figures below illustrate both the impact of previous WC/WDM initiatives and water restrictions and the estimated impact of the proposed strategy on future water demand requirements. Figure F.4a illustrates the existing demand and the water availability, (EEWE, including Berg river scheme). There are three high water requirement projections illustrated each starting at a different point on the existing curve. The figure clearly indicates that if we assume that the impact of the water restrictions is sustained and existing water consumers do not return to their previous habits, then a new water augmentation is required during 2013 (light blue line). If however we assume that existing consumer return to their previous habits prior to 1999, then the next water augmentation scheme would have been required in 2002. Figure F.4a: Impact of past restrictions and WC/WDM 134 City of Cape Town WSDP 2008/09 to 2012/13 Impact of restrictions on High Water Requirement 780 680 580 480 380 280 19 95 19 97 19 99 20 01 20 03 20 05 20 07 20 09 20 11 20 13 20 15 20 17 20 19 20 21 180 existing starting 1999 starting 2000 starting 2006 EEWE Figure F.4b illustrates the proposed impact of the W/WDM strategy assuming that existing consumers are not allowed to return to their previous water use behaviour. The diagram illustrates that with the proposed WC/WDM strategy the next water augmentation can be postponed until 2029. Figure F.4b: Impact of proposed WC/WDM 680 630 580 530 480 430 380 330 280 230 180 19 95 19 98 20 01 20 04 20 07 20 10 20 13 20 16 20 19 20 22 20 25 20 28 20 31 20 34 20 37 Million m^3 per annum Impact of proposed WDM - High Water Requirement Year EEWE Full WC/WDM existing no more WC/WDM There is no apparent reason why the demand of the existing consumers should be allowed to return to its previous levels. The WC/WDM strategy 135 City of Cape Town WSDP 2008/09 to 2012/13 should focus to ensure that current efficiency levels are maintained through the following measures: a. Capitalise on the consciousness and current consumer behaviour on water usage by increasing consumer awareness and providing further consumer assistance (i.e. water audits and handing out of low flow shower heads and hippo bags) b. Ensure the implementation of the WC/WDM strategy offsets any additional increase in demand by existing consumers. This can be achieved if the budget allocation for the strategy is approved. c. Enforce the new WC/WDM by-laws. Opportunity for reducing wastage and increasing efficiency Based on the 2004 demand analysis and from the various discussions with various key role players it is estimated that the implementation of WC/WDM can achieve the following savings: a. Reduction of water wastage from an estimated 148 Ml/day to 111 Ml/day. This included both reticulation leaks and plumbing leaks by consumers. b. Reduction of inefficient water usage from 210 Ml/day to 147 Ml/day c. Further treated effluent reuse of approximately 65 Ml/day d. Reduction in the normal natural growth rate due to new consumers by 25 % per annum. Reduce growth rate from 3% to 2%. (excluding reduction of existing water usage) It can therefore be concluded that the water demand can be reduced through WC/WDM by 323 Mlday (including 65.5 Ml/day from treated effluent re-use). The following table illustrates where the various opportunities exist within each sector. The savings achieved to date based on the 2004 demand are estimated as 21 Ml/day assuming a natural growth rate of 3.09% per annum. The savings achieved are a combination of the WDM interventions as well as the impact of the water restrictions. The activities and the target savings that can be achieved are illustrated in the table below: 136 City of Cape Town WSDP 2008/09 to 2012/13 Activities that will achieve the savings envisaged. Inefficiency component Max Saving % savings target Target Savings (Ml/day) 1 Reduction of UAW (leaks only) 93.0 60% 55.8 2 Inefficient water consumption in poor areas 52.2 75% 39.2 Activity to achieve saving · Comprehensive management programme Primary necessity reticulation · Financial sustainability of Council Comprehensive management programme · Financial sustainability of in poor communities Council · 3 4 5 Inefficient water consumption of business / industry Inefficient water consumption of domestic Recycling and alternative water resources Total 77.0 135.6 72.0 429.8 80% 75% 91% 61.6 111.5 65.3 . Behaviour change · Retro-fitting · Leak repair . Behaviour change · Retro-fitting · Leak repair · Effective tariff . Effluent recycling plants . Well and bore holes · rain harvesting · Unconventional resources 323.5 137 Affordability for consumer · Water consideration resource · Water considerations resource · Water considerations resource City of Cape Town WSDP 2008/09 to 2012/13 Water resource management interventions: Situation Assessment and Implementation progress to date In 2003/04 the daily average water demand was 850Ml per day. During the severe level 2 water restrictions of 2004/05 it dropped to 737Ml/day. Since partially relaxing the water restrictions while maintaining several Water Demand initiatives, it has climbed again to 796Ml per day in 2005/06 and 845 Ml per day in 2006/07. The variation results from many factors including people’s reaction to the variation in restriction levels, how much winter rains are received as well as the WDM projects and programmes undertaken. The 12 month water consumption by month is given in the table below: 12 month Water Consumption by Month 350 340 330 mil m3 per annum 320 310 300 290 280 270 260 20% Restrictions 10% Restrictions 250 Month Ja n0 M 1 ay -0 Se 1 p0 Ja 1 n02 M ay -0 Se 2 p0 Ja 2 n03 M ay -0 Se 3 p0 Ja 3 n04 M ay -0 Se 4 p0 Ja 4 n05 M ay -0 Se 5 p0 Ja 5 n06 M ay -0 Se 6 p0 Ja 6 n07 M ay -0 Se 7 p0 Ja 7 n08 M ay -0 Se 8 p08 F.4.1.1 The 12 month consumption by month is the annual consumption as at the end of each month. Since the seasonality is removed from the consumption figures one is able to have a better insight as to how the annual consumption is increasing month by month. The impact of restrictions and the lifting of restrictions can be clearly shown from this graph. From this the annual growth in demand can be determined on a month by month basis as shown in the graph below: 138 City of Cape Town WSDP 2008/09 to 2012/13 Annual Growth in Demand by Month 12.0% 10.0% 6.0% 4.0% 2.0% 0.0% Ja n0 M 1 ay -0 Se 1 p0 Ja 1 n0 M 2 ay -0 Se 2 p0 Ja 2 n0 M 3 ay -0 Se 3 p0 Ja 3 n0 M 4 ay -0 Se 4 p0 Ja 4 n0 M 5 ay -0 Se 5 p0 Ja 5 n0 M 6 ay -0 Se 6 p0 Ja 6 n0 M 7 ay -0 Se 7 p0 Ja 7 n0 M 8 ay -0 Se 8 p08 Growth Percentage 8.0% -2.0% -4.0% -6.0% -8.0% -10.0% -12.0% 20% Restrictions 10% Restrictions -14.0% Month This shows that the increase consumption peaked at 9.5% in November 2006, dropping to 4.7% in June 2007 and 2.9% in June 2007. Should this growth percentage stabilise as it appeared to do between the restrictions this should give a good idea of the underlying growth provided the results of the WC&DM implementation is factored out. The indicator that used to be used to track performance in reducing water demand is “% Reduction in actual demand below the predicted Unconstrained Water Demand Curve”, the latter being what demand would have been if demand patterns of 2001 were to continue unabated. The target us 20% by 2010. The reason this has been dropped is that the Water Demand Management section has no control over the growth in the City. However, it is included here for interest as the target is currently being exceeded, being at 25.5% Water Demand: Percentage below unconstrained demand 30.0% Percentage 25.0% 20.0% 15.0% 10.0% 5.0% 0.0% 2001 2002 2003 2004 2005 Year 139 2006 2007 actual % below unconstrained demand Target % City of Cape Town WSDP 2008/09 to 2012/13 The Water Demand Management Unit has initiated many projects with the intention of reducing the water demand. In addition, most of the maintenance activities of the Reticulation branch also have a Water Conservation/Water Demand Management impact, for example replacing a leaking water main. Reduction of non revenue demand and reticulation management F 4.1.1.1 Targets for reducing unaccounted for water and water inefficiencies The Unaccounted for Water (UAW) in the City stands currently at 19% or 151 Ml/day. (Refer to notes on UAW under Chapter F.6 Water Balance.) In 2004 the level of UaW was at 23.3 % or 186 Ml/day. The overall targeted savings for this component by 2010 is 55.8 Ml/day which will reduce the level of unaccounted for water to approximately 16.3 % of the total demand. F 4.1.1.2 Reducing high-pressures for residential consumers: urban It is estimated that the pressure reduction can reduce the overall water demand by 25.02 Ml/day. In the last financial year, two pressure management projects were completed, which reduce excess pressure in a supply zone, thereby reducing losses through any leaks: Mfuleni The average pressure in this township was reduced from 7 to 4 bar, generating a saving of 36 000 kl (R200 880) per month. The night flows were significantly reduced by more than 50%. The low project cost of R300 000 yields a very short payback period of only 2 months. Investigations are being done to further reduce the pressure at night, by means of time-modulated specialist controllers. Gugulethu Further savings can be obtained from the system installed, but current statistics indicate a saving in the region of 48 180kl (R 268 844) per month. The payback period is only 1 month. It is estimated that combined reductions in demand from the projects have already resulted in savings of approximately 2.5 Ml/day. F.4.1.1.3 Reducing high pressures for residential consumers: rural The City has a very small rural component and reducing pressures here will result in an insignificant water saving. Consumer / end-use demand management F4.1.1.4 Public information and education programmes Consumers have been made aware of the need to save water through a variety of means. Many shopping malls have been targeted in the Metro together with the Airwave media. Display stands have been set up at most events held around the City including during Local Government-, Water- and Sanitation Weeks. The awareness and education campaign ‘Hlonipha Amanzi” is run primarily in informal Settlements, the aim being to ensure that water is not wasted 140 City of Cape Town WSDP 2008/09 to 2012/13 through lack of knowledge, once fully serviced plots are provided. This is a proactive, enabling way of dealing with issues around wastage prior to them occurring. This campaign will be continued. F4.1.1.5 Leaks Projects The focus here was to fix leaks in domestic plumbing on private property. The following projects have been undertaken to date: F.4.1.1.6 Mfuleni Integrated Water Leaks Repair Project (2005/06) Protea Park Integrated Water Leaks Repair Project (2006/07) The FixIt Leak Repair Project (ongoing) Leak and meter repair programme: rural See urban. Water resource conservation F4.1.1.7 Working for water programme; Removal of Alien Vegetation The CCT has an ongoing programme for the removal of alien vegetation in the catchment areas of their dams. This programme will have the effect of increasing available run-off. The CCT also contributes towards the removal of alien vegetation in DWAF catchments through a catchment management charge. The City’s Integrated Aquatic Weed Control Programme aims to assist with management of alien aquatic weeds which occur in rivers, canals, wetlands, dams and treatment ponds. Depending on conditions prevailing in the target water body, mechanical, manual, chemical or biocontrol methods may be recommended. The national departments of Agriculture and DWAF have established regional aquatic weed management groups (the City of Cape Town is represented on the Western Cape Regional Aquatic Weeds group) which advocate this approach. Mechanical removal methods which are sometimes combined with litter or silt removal activities can be destructive to rivers or wetlands since habitats and sediments tend to be disturbed. Timing of such activities outside of bird and frog breeding seasons is important. Chemical control methods involve the use of herbicides which have been registered for use in water and which are intended for use on the target weed. Trained operators should be used and it is useful to provide information to the public or erect signage to help with alleviating potential concerns about spraying herbicides over aquatic ecosystems. Biocontrol agents are generally insects which are natural enemies of the alien plant species. Introduction of biocontrols onto host plants can result in moderate to complete control of the nuisance plant population. Biocontrol agents are available in South Africa for control of water hyacinth (Eichhornia crassipes), water lettuce (Pistia stratiotes), parrots feather (Myriophyllum aquaticum), South American water fern (Azolla filliculoides) and kariba weed (Salvinia molesta). An addendum to the Catchment, Stormwater and River Management’s River Maintenance Guidelines entitled “Decision Support Guide for the Control of Aquatic Weeds” is available and additional advice regarding integrated aquatic weed 141 City of Cape Town WSDP 2008/09 to 2012/13 control can be obtained from Scientific Services or Catchment, Stormwater and River Management. Non-conventional Resources F.4.1.1.8 Treated Effluent re-use Two thirds of the City’s water consumption ends up in more than 22 Wastewater Treatment Works across the City from where the final effluent is normally discharged back into the environment. The opportunity for re-using the treated effluent has not yet been fully exploited. Thus far, the majority of Golf Courses in the City are using treated effluent for irrigation purposes, as do parks and sport fields. A limited number of Industries are also benefiting from the lower tariff. The total existing average daily summer re-use as given in the “Treated Effluent Re-use Strategy April 2007” and updated with inclusion of the additional Potsdam Re-use Scheme (GOTO 4.5) is given in the table below: Formal network distribution Private Supply Schemes Informal downstream re-use WWTW re-use TOTAL CURRENT RE-USE Peak daily summer re-use 56.9 14.5 10.5 15.6 97.5 % of current usage 58.4% 14.9% 10.8% 16.0% % of Daily Dry Weather Flow 13.1% 3.3% 2.4% 3.6% 18.5% There still is an additional potential 62.3 ML/day to expand the use of treated effluent to more users now that Potsdam has been completed. The major extension of the Potsdam Treated Effluent Re-use scheme has been completed. It includes a new intake chamber, two new pump stations, a filtration plant, 4km of pipeline and a 40Ml storage reservoir. This scheme is able to re-use 17Ml/day (up from the original estimated potential 12.5Ml/day) of treated effluent, saving on the same amount of potable water use. It was constructed at a cost of R19,0M. F.4.1.2 Water resource management interventions: Future trends and goals Reduction of non revenue demand and reticulation management F4.1.2.1 Targets for reducing unaccounted for water and water inefficiencies: urban As the implementation of the WC/DM Strategy intensifies the assumptions will be tested and the targets reviewed either up or down depending on the accuracy of the current assumptions. District management areas will be implemented throughout the Council by installing additional district meters. Leak detection activities will be intensified and a dedicated team will soon be established. F.4.1.2.2 Leak reducing high pressures for residential consumers: urban Further projects will be implemented and it envisaged that pressure reducing valves will be installed in two more district management areas in the next 142 City of Cape Town WSDP 2008/09 to 2012/13 financial year. One of the areas will be target for pressure reduction will be the Atlantis (Protea Park). A city council assessment for pressure reduction opportunities will also be carried out. The target assumptions stated above will be tested and the targets reviewed either up or down depending on the accuracy of the current assumptions. F.4.1.2.3 Reducing high pressures for residential consumers: rural Refer to F.4.1.2.2 Consumer / end-use demand management F.4.1.2.4 Public information and education programmes The following programmes/projects will be continued: Water and Sanitation Weeks Media Campaign School education programme and water audits Shopping Mall Promotions The “Hlonipha Amanzi” Programme In addition, the following programmes are in the process of being launched: Bylaws awareness workshops Raising the Citizen’s Voice Top 100 consumers Establishment of consumer forums A project to introduce WC/WDM during the 2010 soccer world cup will also be initiated. F.4.1.2.5 Leak and meter repair programmes: urban The following initiatives are planned for over the next two years: Further comprehensive demand projects will be identified and rolled out over the next 5 years. Sanonsea and Wesbank are planned for 2007/08 while Delft is planned to start in 2007/08 and be complete in 2008/09. The Fix-It leak projects will continue in various areas. The Fix-It leak projects targets high consumers in low cost areas until such a time as a comprehensive demand project is implemented. A comprehensive debt management policy will begin to role out. Part of the debt management will be to introduce flow limiters (water demand management devices). The debt management policy will be implemented as part of the comprehensive demand management projects but also on an ad-hock basis for high consumers in low cost areas as part of the Fix-It leak initiative. F.4.1.2.6 Leak and meter repair programmes: rural Refer to F.4.1.2.5 143 City of Cape Town WSDP 2008/09 to 2012/13 Water resource conservation F.4.1.2.7 Working for water programme The Working for Water Programme will continue in its current state. F.4.1.3 Strategic Gap analysis (WRM interventions) For explanation from SFWS GOTO Ex15. The envisaged WC/WDM strategy for Cape Town is perhaps a lot more challenging and comprehensive than in most other cities in South Africa. An estimated budget of over more than R 759 million of the next 10 years is envisaged to achieve the full economic potential of WC/WDM. Monitoring the effectiveness of the strategy is critical as it will impact planning for the next water resource and infrastructure schemes. The most key strategic gaps in the implementation of a WC/WDM Strategy are: Resources Ensuing adequate financial resources Inadequate human resources to implement WC/WDM strategy Inadequate capacity to enforce by-laws Institutional Lack of political leadership (currently been addressed) WC/WDM Strategy is not a big enough priority within the City. Differences in opinion and views regarding the role of WC/WDM by various parties within Council and with other key stakeholders. Technical capacity and tools Ineffective management information and monitoring systems Inadequate demand measurement systems and tools. Lack of key performance areas and benchmarks on a district management level and in accordance with other key classification parameters. Lack of adequate research on consumer behaviour and understanding. Lack of use of integrated water resource planning in decision-making. External constraints Lack of adequate national water efficiency standards Other consumers in the Western Cape need to also embrace WC/WDM Availability of various water efficiency appliances and fittings in South Africa. F.4.1.4 Implementation Strategy: Implementation of long term WC/WDM strategy (For full document GOTO 4.2 and for Grey Water Guidelines GOTO 4.3) The WC/WDM Strategy (April 2007) was been developed to overcome the strategic gaps identified. The enabling objectives are seen to be as important as the implementation objectives. The Strategy was submitted to Council in 144 City of Cape Town WSDP 2008/09 to 2012/13 May 2007. The purpose of the WC/WDM strategy is to ensure the longterm balance between available water resources and water demand, to postpone the need for expensive capital infrastructure projects for as long as it is economically viable and to minimise water wastage. The results of the analysis indicate quite a significant potential for WC/WDM in postponing new water resource augmentation. The calculations however are based on a number of assumptions that need to be verified. In addition, and as mentioned previously, the envisaged WC/WDM strategy for Cape Town is perhaps a lot more challenging and comprehensive than in most other cities in South Africa. In the light of these factors, CCT commits to implementing and monitoring a comprehensive WC/WDM strategy. While it is acknowledged that WC/WDM is a critical component in the future planning of the Western Cape Water Supply System, the effectiveness of the implementation of the WC/WDM Strategy must be monitored and the timing of future interventions must be planned accordingly. This will ensure security of supply for the residents of Cape Town. The strategy developed is divided into Enabling objectives and Implementation objectives. The implementation objectives are sub-divided into two categories; “Water demand reduction objectives” and “water resource conservation objectives” Framework of action Based on the fundamental principles of WC/WDM as well as the policy adopted in the previous WC/WDM strategy by CCT, five goals have been identified and represent the overall policy. Goals, A,B and E relate to the implementation objectives that will result in the direct reduction of water demand. Thirteen implementation objectives have been developed under the various goals. These objectives are illustrated in the table below. Goal A: CCT must by 2010 reduce and maintain the non-revenue water to below 15% of the total average demand and within accepted international benchmarks. Goal B: Water wastage by consumers should be reduced and maintained to below 2% of the total demand by 2012 and most consumers should achieve acceptable water efficiency benchmarks by 2016. Goal E: Reduce the projected potable water demand by 20% by the year 2012 and conserve Cape Town’s Water Supply. 145 City of Cape Town WSDP 2008/09 to 2012/13 Implementation /Water Demand reduction objectives Policy Objective number Description Goal A A1 Reduce and maintain low levels of water losses through the reticulation system A2 Reduce and maintain low levels of non-revenue demand by consumers A3 Adopt and implement proactive O & M measures A4 Reduce and maintain low levels of billing and metering losses B1 Promote the efficient use of water to consumers and customers B2 Regulate and enforce the prevention of wastage of water B3 Ensure the efficient use of water in new connections and developments B4 Introduce more equitable tariffs and informative billing B5 Assist and capacitate consumers to be water efficient, including the introduction of leak repair and retrofitting projects B6 Reduce and maintain low levels of inefficient water use by Council (internal money) E1 Maximize the use of treated effluent E2 Promote alternative water resources and technologies E3 Conservation of existing water resources E4 Ensure the quality of treated effluent is of suitable standards Goal B Goal E The enabling goals defined in the strategy are as follows: Goal C: CCT must by 2009 ensure and maintain ongoing effective management systems and implement Integrated Water Resource Planning in all decisions regarding water resources augmentation, bulk infrastructure development and water efficiency projects. Goal D: CCT must adopt WC/WDM as one of the key water service delivery strategies, and must give priority to its implementation and ensure an ongoing adequate enabling environment. 146 City of Cape Town WSDP 2008/09 to 2012/13 Enabling WC/WDM objectives Goal C Goal D Objective number Description C1 Establish appropriate district management areas and monitor the unaccountable for water C2 Ensure adequate information and policies to support decision-making C3 Ensure all decisions are supported in terms of Integrated Resource Planning (IRP). C4 Monitor the impact of WC/WDM measures and KPI D1 Ensure adequate financial resources D2 Ensure adequate human resources and processes D3 Ensure adequate transparency, stakeholder buy in and commitment Summary of requirements The following table illustrates the budget requirements for the next ten years. Not all of these requirements have been incorporated into the 3 and 5-year budgets in this document. Total programme requirements for ten years 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 TOTAL Operating R 19.58 R 40.42 R 57.13 R 54.69 R 52.62 R 26.87 R 18.77 R 16.14 R 15.94 R 15.84 R 317.99 Capital R 27.17 R 56.08 R 79.26 R 75.88 R 73.00 R 37.28 R 26.04 R 22.39 R 22.11 R 21.98 R 441.20 Human Resource requirements (Funded from operating budget listed above) 3 Prin. Technicians 1 Snr. Foreman 10 Snr. Artisans 30 Artisans 40 Workers 10 CDW’s 24 Inspectors 147 Total R 46.75 R 96.50 R 136.39 R 130.58 R 125.62 R 64.16 R 44.82 R 38.53 R 38.05 R 37.82 R 759.19 City of Cape Town WSDP 2008/09 to 2012/13 Treated Effluent Re-use CCT has identified recycling of treated effluent as the most feasible option of alternative resources to conventional surface water resources. It forms an important part of the WC/DM Strategy (refer to Goal E). CCT had numerous existing treated effluent re-use schemes at various WasteWater Treatment Works (WWTW). The extent of existing re-use, potential for expansion and level of service was unknown due to the age of some of the networks and a lack of measurement equipment and control functions. Various studies were subsequently carried out by CCT during 2004/2005 to determine the feasibility of expanding the use of treated effluent and to determine the infrastructure requirements. The objectives of the studies were to investigate the current re-use schemes and the possibility of further extensions to the re-use of treated effluent that are economically viable. The studies looked at the following: Status of existing pump and pipeline schemes Quality of treated effluent being distributed Reporting on any supply problems currently experienced by end users Assessment of potential consumers for recycled water Investigation into the possible expansion of treated effluent distribution. The feasibility study was reviewed during 2006/2007 and the information contained in this revised strategy report reflects the most recent costs and potential savings. Three main programmes have been identified in order to achieve the objective of maximising treated effluent and are as follows: a) a. Installations and modifications to infrastructure b. Operations, maintenance and effective management of the treated effluent systems c. Consumer and financial management Installations and modifications to infrastructure The proposed extensions to the infrastructure will require approximately R202 million of capital costs as indicated below: 148 City of Cape Town WSDP 2008/09 to 2012/13 Waste Water Treatment Works (WWTW) Capital Cost Estimates (Rm) 2007 costs Development and Operating Cost (R/kl) @ 10% over 20 years (2007 Costs) Athlone R 41 R 2.42 Bellville R 40 R 2.29 - - Cape Flats R 32 R 2.55 Gordonsbay R 4 R 3.12 Kraaifontein R 2 R 1.83 Macassar R 13 R 1.48 Mitchells Plain R 14 R 2.52 Parow R 1 R 1.46 Potsdam R 13 R 2.42 Scottsdene R 9 R 3.11 Wesfleur (Atlantis) R 9 R 2.76 Wildevoelvlei R 11 R 2.47 Zandvliet R 13 R 2.92 - - Borcherds Quarry Marine Outfalls Total R 202 An immediate action plan was formulated to implement “quick-win” initiatives. The immediate action plan is illustrated in the table below. Potential effluent reuse figures are estimated annual averages. PLANT EFFLUENT REUSE Site Present Immediate Cost Long term Cost Total Ml/d Ml/d NPV(R/m) Ml/d Demand NPV(R/m) Athlone 2.911 0 0 14.787 41 17.698 Bellville 4.133 0.000 0 7.103 40 11.236 Cape flats 2.620 0.204 0 5.356 32 8.180 Gordons Bay 0.000 0.291 0 0.763 4 1.054 Kraaifontein 0.833 3.202 0.54 0.623 2 4.657 Macassar 2.038 0.000 0 4.949 13 6.986 Mitchells Plain 0.000 0.000 0 3.528 14 3.528 149 City of Cape Town WSDP 2008/09 to 2012/13 PLANT EFFLUENT REUSE Site Present Immediate Cost Long term Cost Total Ml/d Ml/d NPV(R/m) Ml/d Demand NPV(R/m) Parow 0.699 0.175 0.45 0.437 1 1.310 Potsdam 4.657 0.000 0 19.212 13 23.869 Scotsdene 0.116 3.202 2.5 1.182 9 4.500 Wesfleur 0.175 0.000 0 1.863 9 2.038 Wildevoelvlei 0.000 0.000 0 2.765 11 2.765 Zandvleit 0.291 0.000 0 2.329 13 2.620 18.473 7.073 3.49 64.895 202 90.441 Total The income that can be generated from the immediate action plan is estimated at R 5.2 million per annum. The proposed activities of this programme that need to be budgeted are indicated in ascending order of priority based on the allocations of the various modifications to the WWTW and reticulation infrastructure. E1.1.1 Implement immediate measures to upgrade existing works E1.1.2 Implementation of Macassar w/t proposals E1.1.3 Implementation of Athlone w/t proposals E1.1.4 Implementation of Bellville w/t proposals E1.1.5 Implementation of Cape Flats w/t proposals E1.1.6 Implementation of Wildevoelvlei w/t proposals E1.1.7 Implementation of Mitchells Plain w/t proposals E1.1.8 Implementation of Potsdam w/t proposals E1.1.9 Implementation of Kraaifontein w/t proposals E1.1.10 Implementation of Zandvliet w/t proposals E1.1.11 Implementation of Gordonbay w/t proposals E1.1.12 Implementation of Parow w/t proposals E1.1.13 Implementation of Scottsdene w/t proposals E1.1.14 Implementation of Wesfleur (Atlantis) w/t proposals E1.1.15 Review and update feasibility study b) Operations, maintenance and effective management of the treated effluent systems The recycled effluent treatment infrastructure requires a dedicated management approach to ensure it is adequately maintained and managed. Some of the operational functions will be done by the WWTW and the reticulation staff, but a specialised team is required to carry out certain maintenance, enhancements and monitoring functions. It is also necessary to install bulk meters and carry out water balances in the same way that a water balance is carried out with the water supply distribution system and implement quality control measures to assure consistency in the quality of effluent water supplied. c) Consumer and financial management The success of maximising the use of treated effluent largely depends on marketing it effectively to potential consumers and managing the revenue from sales effectively. 150 City of Cape Town WSDP 2008/09 to 2012/13 Strategy Summary Tables The main programmes for that will achieve most of the water savings are highlighted in the two tables that follow on the next two pages. The first table lists the potential savings with the year that those savings must be achieved, whilst the second table outlines the budget required to achieve those savings. The link between the programme and the objective is shown below: Objective number Programme A1.1 Pressure reduction A1.2 Establishment of leak detection task teams A2.1 Comprehensive water supply management projects in previously disadvantaged areas A2.2 Fix-it leak in low income areas A2.3 Implementation of debt management policy Objective A3 A3.2 Preventative maintenance Objective A4 A4.2 Meter management /replacement programme B1.1 Consumer awareness campaign B1.2 Consumer education campaign B1.3 School education B1.4 Special events B1.7 2010 Soccer World cup B2.2 enforcement of by-laws B5.1 Implement a plumbing retro –fit programme B5.4 Implement an on-going support programme for large consumers Objective E1 E1.1 Recycling of treated effluent infrastructure Objective E2 E2.1 Support working for water programme Objective C1 C1.1 Establish District management areas C2.1 Management Information System C2.2 Upgrading the telemetry system, remote communications (cell) Objective A1 Objective A2 Objective B1 Objective B2 Objective B5 Objective C2 151 City of Cape Town WSDP 2008/09 to 2012/13 Projected Water Savings for the main projects over the 10 Years 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 Pressure reduction 7.98 5.70 5.51 5.51 0.10 0.10 0.10 0.10 0.10 0.10 Establishment of leak detection task teams 0.43 0.43 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 Comprehensive water supply management projects in previously disadvantaged areas 0.47 3.65 7.13 7.14 7.19 4.92 1.74 0.35 0.35 0.35 Fix-it leak in low income areas 0.39 0.69 0.79 0.90 1.03 1.18 1.03 0.90 0.79 0.69 Implementation of debt management policy 0.47 0.54 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Preventative maintenance 0.25 0.57 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Meter management /replacement programme 0.14 0.57 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 Consumer awareness campaign 0.44 0.62 0.75 2.29 0.84 0.84 0.84 0.84 0.84 0.84 Consumer education campaign 0.00 1.20 1.20 1.05 1.05 0.93 0.93 0.93 0.93 0.93 School education 0.48 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Special events 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2010 Soccer World cup 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 enforcement of by-laws 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Implement a plumbing retro –fit programme 0.00 0.52 2.38 5.17 5.17 5.22 5.17 5.17 5.17 5.17 Implement an on-going support programme for large consumers 0.00 2.96 6.09 6.09 4.95 4.95 4.95 4.95 4.95 4.95 Recycling of treated effluent - infrastructure 7.42 10.74 15.86 14.85 16.12 0.00 0.00 0.00 0.00 0.00 Support working for water programme 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Establish District management areas 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Management Information System 0.25 5.07 5.07 0.51 0.51 0.51 0.51 0.51 0.51 0.51 Upgrading the telemetry system, remote communications (cell) 0.00 0.00 0.08 2.55 2.60 2.68 0.81 0.81 0.81 0.81 Total per Year 18.73 34.26 48.53 49.73 43.21 25.00 19.74 18.21 18.10 18.00 Cumulative Total 18.73 52.99 101.52 151.24 194.46 219.46 239.20 257.42 275.52 293.52 152 City of Cape Town WSDP 2008/09 to 2012/13 Budget for main projects for WC&DM for next10 Years (R'000s) 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 Pressure reduction 4,200 3,000 2,900 2,900 50 50 50 50 50 50 Establishment of leak detection task teams 1,400 1,400 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 Comprehensive water supply management projects in previously disadvantaged areas 2,000 15,700 30,620 30,676 30,879 21,142 7,485 1,485 1,485 1,485 Fix-it leak in low income areas 1,293 2,300 2,630 3,010 3,446 3,948 3,446 3,010 2,630 2,300 Implementation of debt management policy 1,920 2,220 3,640 3,640 3,640 3,640 3,640 3,640 3,640 3,640 300 700 1,150 1,150 1,150 1,150 1,150 1,150 1,150 1,150 Meter management /replacement programme 1,000 4,200 4,050 4,000 4,000 4,050 4,000 4,000 4,000 4,000 Consumer awareness campaign 1,410 2,010 2,410 7,350 2,710 2,710 2,710 2,710 2,710 2,710 0 2,040 2,040 1,790 1,790 1,590 1,590 1,590 1,590 1,590 1,150 2,300 2,300 2,300 2,300 2,300 2,300 2,300 2,300 2,300 745 845 895 945 995 1,045 1,095 1,145 1,145 1,145 2010 Soccer World cup 0 500 2,600 1,500 0 0 0 0 0 0 enforcement of by-laws 80 305 5 150 5 5 5 5 5 5 0 500 2,300 5,000 5,000 5,050 5,000 5,000 5,000 5,000 870 Preventative maintenance Consumer education campaign School education Special events Implement a plumbing retro –fit programme Implement an on-going support programme for large consumers Recycling of treated effluent - infrastructure Support working for water programme Establish District management areas Management Information System Upgrading the telemetry system, remote communications (cell) 0 520 1,070 1,070 870 870 870 870 870 23,490 34,000 50,200 47,000 51,000 0 0 0 0 0 0 950 950 950 950 950 950 950 950 950 1,600 1,500 1,500 0 0 0 0 0 0 0 500 10,000 10,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 0 0 200 6,400 6,530 6,730 2,030 2,030 2,030 2,030 Total per Year 41,088 84,990 122,460 121,831 117,315 57,230 38,321 31,935 31,555 31,225 Cumulative Total 41,088 126,078 248,538 370,369 487,683 544,913 583,235 615,169 646,724 677,950 153 City of Cape Town WSDP 2008/09 to 2012/13 Projected Water Savings per annum Savings in ML/day 60.00 50.00 40.00 30.00 20.00 10.00 0.00 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2015/16 2016/17 Year Projected Cumulative Water Savings per annum Savings in ML/day 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0.00 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 Year 154 City of Cape Town WSDP 2008/09 to 2012/13 The actual savings achieved per project and therefore programme will be tracked against the projected target to monitor whether the savings achieved line up with the targets in the strategy. This is critical not only from a management point of view but also for the planning of the next water resource scheme. 155 City of Cape Town WSDP 2008/09 to 2012/13 F.5 WATER SERVICES INFRASTRUCTURE PROFILE F.5.1. Water services infrastructure A summary of the existing water supply and wastewater infrastructure as well as the estimated replacement cost (excl. consumer connections) is provided in the table below: Water Supply Infrastructure Dams and catchments Replacement Value R mil* 932 Treatment Works 1 021 Water Reticulation 8 073 Water Pump Stations 314 1 268 Reservoirs Depots (shared) 30 Sub Total 11 638 Wastewater Infrastructure WW treatment works 1 420 Sewer Reticulation 4 159 Sewer Pump Stations 284 Depots (shared) 30 Sub Total 5 893 Total 17 531 *Based on June 2003 Rand Values For a full inventory of the main infrastructure refer to the infrastructure database dated June 2003 GOTO 5.1. A detailed description of the bulk system and internal systems is not pertinent to the identification of issues and performance indicators and is therefore not described in detail. For further information refer to the various Master Plans and the studies on the bulk systems: Bulk Water: “Computer Analysis and Master Plan for Bulk Water Supply System” Bulk Wastewater: “Strategic Evaluation of Bulk Wastewater” GOTO 5.2. Detailed reports are held at the offices of the Wastewater Treatment Branch. 156 City of Cape Town WSDP 2008/09 to 2012/13 Figure F.5.1(a) : Main Components of Bulk Water Supply Infrastructure 157 City of Cape Town WSDP 2008/09 to 2012/13 Figure F.5.1 (b) Main components of Wastewater Treatment Infrastructure showing Catchments 158 City of Cape Town WSDP 2008/09 to 2012/13 Figure F.5.1(a) and Figure F.5.1(b) shows the main components of existing bulk water and bulk wastewater infrastructure in the City of Cape Town (CCT). A Geographical Information System (GIS) and Geodatabase is on operation and maps the majority of the infrastructure along with related data. F.5.1.1 Situation assessment (water services infrastructure) F.5.1.1.1 Existing infrastructure The water supply infrastructure is historically and logically categorised into two groups, namely the Bulk water supply system and the internal distribution system (Reticulation). The former system is generally in good order with sufficient capacity to meet the current required demand. Water gravitates from the majority of the dams, located mainly outside of the Cape Metropolitan area, via a number of large diameter pipelines to the water treatment works and bulk storage reservoirs from where water is distributed directly, but also via internal service reservoirs to consumers via bulk connections to the Reticulation system. A number of pumping stations are also required to boost supply in the higher lying areas. For a more detailed description of the Bulk water supply infrastructure refer to a document entitled “Bulk Water Supply Infrastructure” GOTO 5.3a. The wastewater system, similar to the water system, consists of a bulk system and an internal Reticulation system. Tygerberg Hill forms the watershed, with wastewater draining towards the wastewater works, many of which are located next to the coast. The drainage areas and the location of pumping stations and wastewater works are indicated on Figure F.5.1(b). The Strategic Bulk Wastewater Study completed in June 1999 GOTO 5.2http://www.capetown.gov.za/en/Water/WaterservicesDevPlan/Documents/ WSDP_2008_2009/5_2_GOTO_Ch5_Strat_evaluation_of_bulk_wastewater. pdf is continuously used to assess performance of existing wastewater equipment, processes and management systems and identify where improvements are necessary for more effective performance. For a more detailed description of the bulk wastewater infrastructure refer to a document entitled “Bulk Wastewater Infrastructure” GOTO 5.4a F.5.1.1.2 Brief functional description of existing main infrastructure components (urban and rural) Refer to F.5.1.1.2 F.5.1.1.3 Existing groundwater infrastructure The following groundwater resources exist within the Cape Metropolitan Area. Albion Springs Atlantis Aquifer Cape Flats Aquifer Newlands Aquifer Only two of the abovementioned ground water resources are currently being exploited namely Albion springs and the Atlantis Aquifers. The Table Mountain Group Aquifer (TMG) falls outside the boundaries of the CMA. 159 City of Cape Town WSDP 2008/09 to 2012/13 Albion Springs Water from Albion Springs is treated with chlorine and lime and then pumped directly into the reticulation system of the City of Cape Town. Atlantis The Atlantis Supply Scheme comprises of two aquifers, one at Witzands and one at Silwerstroom. The number of boreholes and abstraction potential is listed below: AQUIFER NO. OF BOREHOLES ABSTRACTION POTENTIAL (APPROXIMATE) (MILLION m /a) Witzands 30 Silwerstroom 14 3 5 For a schematic of the scheme GOTO 5.5 The Altantis water supply scheme supplies the towns of Altantis and Mamre and is situated within the Blaauwberg area. F.5.1.1.4 Existing surface water infrastructure Only the major surface water infrastructure owned by CCT is included here. For further information on CCT (including the CCT’s smaller dams) and DWAF infrastructure GOTO 5.6 Component name Steenbras Lower Dam Steenbras Upper Dam Wemmershoek Dam Steenbras Steenbras Wemmershoek Dam safety registration? Yes Yes Yes % allocation of total consumption 8.8% for upper and lower 8.8% upper lower % of domestic allocation used 100% 100% 100% Yes Yes Yes Date of last dam safety inspection Jan 2002 Jan 2002 April 2006 Date of last water restriction 2004/05 2004/05 2004/05 Component ID Scheme name Operation Is the abstraction DWAF? registered with 160 for and 11.9% City of Cape Town WSDP 2008/09 to 2012/13 Component name Steenbras Lower Dam Steenbras Upper Dam Wemmershoek Dam Number of water restrictions in last 5 years 1 but ongoing 10% for WC&DM purposes 1 but ongoing 10% for WC&DM purposes 1 but ongoing 10% for WC&DM purposes Planned Planned Planned Are spare parts available? Yes Yes Yes Number of breakages / failures per year nil nil Nil Physical condition (in operation, poor, good) Good Good Good Cost of refurbishment required t.b.d. t.b.d. R12m Cost of required n/a n/a n/a Date Constructed 1921, raised 1928, raised 1954 1977 1957 Expected total lifespan 78 78 90 R183m R47m R470m Annual operating cost t.b.d. t.b.d. t.b.d. Annual maintenance cost t.b.d. t.b.d. t.b.d. 68,6 29,7 86 Full supply storage capacity (m ) 33.5 million 31.7 million 58,6 million Type of structure (dam, rim of river, abstraction) Dam Dam Dam 600 800 770 (SEF) 40 million Upper & Lower combined 54 million No No No Functionality Maintenance – demand, planned none, infrastructure infrequent, replacement Asset Assessment Estimated 2003) replacement value (Jan Type and Capacity Catchment area (km 2) 3 3 Spillway capacity (m / sec) Total annual annum) assured yield (m 3 / Can the dam capacity be increased? 161 City of Cape Town WSDP 2008/09 to 2012/13 Component name Steenbras Lower Dam Steenbras Upper Dam Wemmershoek Dam Capacity available for development (%) WC System at capacity WC System at capacity WC System at capacity Wemmerhoek Dam The Wemmershoek Dam was completed in 1957 and is owned and operated by the City of Cape Town. The dam is situated on the Wemmershoek River in 3 the mountains near Franschhoek and has a capacity of 58,6 Mm . The dam has a gravel and boulder embankment with a sloping clay core. The Wemmershoek Water Treatment Plant is situated at the base of the dam wall. Wemmershoek Dam has a yield of 51 Mm3/annum at 99% assurance of supply. When Wemmershoek Dam was constructed a compensation agreement involving an exchange of water rights for agricultural use, between Wemmershoek Dam and the RSE scheme was made and a 10 Mm3 annual release is made into the Berg River from the RSE Scheme in lieu of that from the Wemmershoek Dam. Table 3 in Annexure “A” in GOTO 5.6 sets out the main characteristics of the Wemmershoek Dam. Steenbras Upper and Lower Dams The construction of Steenbras Lower Dam was completed in 1921. In 1928 the dam wall was raised by 12,29 m and then raised again to its present 3 height. The capacity of Steenbras Lower Dam is 36,2 Mm . Steenbras Upper Dam was completed in 1977 and is situated 5 km upstream of Steenbras Lower Dam. Steenbras Upper Dam was constructed for a dual purpose of providing an upper reservoir for the City of Cape Town’s Steenbras Pumped Storage Scheme and for supplying water for domestic/industrial use to Cape Town. The capacity of Steenbras Upper Dam is 31,7 Mm3. Both Steenbras Upper and Lower Dams are owned and operated by the CCT. Steenbras Water Treatment Plant is situated on the Western side of the Hottentots Holland Mountains and receives its water via a 752 m long tunnel from Steenbras Lower Dam. Steenbras Upper Dam is also an integral part of the Palmiet Phase 1 system and stores water transferred via a canal from the Palmiet River. Table 4 in Annexure “A” in GOTO 5.6 sets out the main characteristics of Steenbras Upper and Lower Dams. The combined historic firm yield of both dams together is approximately 38 x 106 m3. Kleinplaas and Lewis Gay Dams Kleinplaas and Lewis Gay Dams are both situated on the Woel River and have storage capacities of 1,36 Mm3 and 0,18 Mm3 respectively. Water is also pumped into Kleinplaas Dam from the small Rawson Reservoir in the 162 City of Cape Town WSDP 2008/09 to 2012/13 adjacent Klawer River catchment. In 1996 the yield of the system was 3 estimated to be 1,85 Mm /annum at 96% assurance. The dams are owned by the CCT and water from the two dams is treated at Brooklands Water Treatment Plant. Table 5 in Annexure “A” in GOTO 5.6 sets out the main characteristics of the dam. Table Mountain Dams There are 5 dams utilised for water supply which are situated on the top of Table Mountain. All these dams are owned and operated by the CCT. Woodhead Dam and Hely-Hutchinson Dam The construction of Woodhead Dam was completed in 1897. The dam is on the Disa River and has a capacity of 0,955 Mm3. The dam is a stone faced structure of cement mortar, and rubble fill. Hely-Hutchinson Dam was completed in 1904. The dam also lies on the Disa River and acts as an extension to the Woodhead Dam. The dam has a capacity of 0,927 Mm3. The outlet works on the Woodhead Dam feeds the water back into the Disa Gorge en route to the Twelve Apostle tunnel. Both dams are owned by the CCT and their water is treated at Kloof Nek Water Treatment Plant. Table 5 in Annexure “A” GOTO 5.6 of sets out the main characteristics of the dams. De Villiers Dam, Victoria Dam and Alexandra Dam 3 The Victoria Dam was completed in 1895 and has a capacity of 0,128 Mm . Alexandra Dam was completed in 1903 and has a storage capacity of 0,126 Mm3. The De Villiers Dam was completed in 1910 and holds 0,243 Mm3 of water. All three dams are located on the Disa River, with water from Victoria Dam being discharged into the Alexandra Dam as the levels in that dam dropped, and from there into the De Villiers Dam. F.5.1.1.5 Existing water treatment works infrastructure There are 22 wastewater treatment works within CMA as tabulated below: NAME OF WASTEWATER TREATMENT CAPACITY (Ml/day) Cape Flats Wastewater Treatment Works 200.0 Athlone Wastewater Treatment Works 105.0 Zandvliet Wastewater Treatment Plant 55.0 Bellville Wastewater Treatment Plant 46.0 Mitchells Plain Wastewater Treatment Works 37.5 Macassar Wastewater Treatment Plant 34.0 Borcherd’s Quarry Wastewater Treatment Works 33.0 163 City of Cape Town WSDP 2008/09 to 2012/13 NAME OF WASTEWATER TREATMENT CAPACITY (Ml/day) Potsdam Wastewater Treatment Works 32.0 Wildevoëlvlei Wastewater Treatment Works 14.0 Wesfleur Wastewater Treatment Works 14.0 Kraaifontein Wastewater Treatment Plant 7.0 Simon’s Town Wastewater Treatment Works 5.0 Scottsdene Wastewater Treatment Plant 4.5 Gordon’s Bay Wastewater Treatment Plant 3.5 Melkbosstrand Wastewater Treatment Works 2.5 Parow Wastewater Treatment Plant 1.2 Llandudno Wastewater Treatment Works 0.5 Dover Wastewater Treatment Works 0.1 Philadelphia 0.08 Oudekraal Wastewater Treatment Works 0.03 Miller’s Point Wastewater Treatment Works 0.03 Klipheuwel 0.03 For spreadsheet GOTO 5.3b For a full description of bulk wastewater infrastructure GOTO 5.4a and for details of wastewater treatment works GOTO 5.4b F.5.1.1.6 Existing pump stations infrastructure The existing bulk water pump stations infrastructure is given below: PUMP STATIONS ATLANTIS NO. OF PUMPS FLOW PER PUMP UNIT (Mℓ/day) HEAD (m) RATED MOTOR POWER (kW) EACH Softening Plant Raw Water 3 8,4 50 55 Softening Plant Product Water 3 9,1 8 15 Witzands No. 1 3 7,8 120 185 Witzands No. 2 3 7,8 120 185 Witzands No. 3 2 8,6 71 160 Silverstroom No. 1 2 6,0 18,5 18 2 5,7 110 110 Weir Silverstroom No. 2 164 REMARKS City of Cape Town WSDP 2008/09 to 2012/13 PUMP STATIONS ATLANTIS NO. OF PUMPS FLOW PER PUMP UNIT (Mℓ/day) HEAD (m) RATED MOTOR POWER (kW) EACH Silverstroom No. 3 2 5,7 110 110 Silverstroom No. 4 2 5,7 110 110 Proposed Witzands “A” 3 14,4 166 410 Proposed Witzands “B: 3 13,9 240 575 PUMP STATIONS NO. OF PUMPS FLOW PER PUMP UNIT HEAD (m) RATED MOTOR POWER (kW) EACH 77,4 56 REMARKS REMARKS (Mℓ/DAY) Wynberg No. 1 1 4,3 1 4,3 Wynberg No. 2 1 23,0 8,40 330 Monterey 1 19,0 80,0 250 1 19,0 86,0 250 Pumping in parallel – 7,2 Mℓ/day Pumping in parallel – 21,1 Mℓ /day Garlandale 1 91,0 104,0 1 400 Kildare Road 1 65,4 43,6 400 1 65,4 87,2 400 Albion Spring 1 4,8 100,00 90 Newlands 535 1 50,0 50,0 373 Voëlvlei Low Lift 3 68,1 24,0 306 2 79,5 29,0 429 5 68,1 120,0 1 313 1 22,7 125,0 429 3 60-300 110 1 700 1 23 90 400 1 23 90 400 Voëlvlei High Lift Firlands 1 Wynberg No. 3 165 Variable speed motor Variable speed motor Pumping in series – 69,0 Mℓ/day Variable speed motor Variable speed motor Variable speed motor. Maximum 300 Mℓ /day with 3 pumps City of Cape Town WSDP 2008/09 to 2012/13 For a full description of bulk water and bulk wastewater pumpstations GOTO 5.3a and GOTO 5.4a For a full description of the water and sewer reticulation pump stations refer to the individual master plans. F.5.1.1.7 Existing bulk pipeline infrastructure For a description of bulk water and bulk wastewater infrastructure GOTO 5.3a and GOTO 5.4a. For a full description of the water and sewer reticulation pipelines refer to the individual master plans. F.5.1.1.8 Existing reservoir infrastructure The main characteristics of the CCT’s Bulk Water Service Reservoirs are listed in the table below: NO. SERVICE RESERVOIR CAPACITY @ FSL FSL DEPTH (Mℓ) (m) RL (m) 1 Blackheath Upper 48,20 174,50 7,28 2 Blackheath Lower 537,60 110,60 11,84 3 Constantia Nek 3,38 230,97 7,32 4 Monterey 23,35 189,06 6,39 5 Newlands Upper 132,60 138,20 7,63 6 Plattekloof 583,60 110,97 12,23 7 Tygerberg No. 1 33,44 110,57 7,64 8 Tygerberg No. 2 275,90 110,57 12,19 9 Wynberg No. 1 8,64 118,19 3,50 10 Faure 614,20 110,68 12,22 11 Glen Garry 149,20 140,20 6,88 12 Melkbos No. 1 20,00 100,00 11,75 13 Melkbos No. 2 20,00 100,00 11,75 14 Witzands (boreholes) 0,250 60,00 2,00 15 Pella No. 1 10,00 241,95 9,69 16 Pella No. 2 40,00 239,4 6,7 17 Hospital No. 1 10,00 193,50 8,2 18 Hospital No. 2 20,00 193,50 9,0 19 Midlands 10,00 175,00 9,08 20 Silwerstroom (boreholes) 1,00 25,52 5,82 166 City of Cape Town WSDP 2008/09 to 2012/13 For a description of the reservoirs GOTO 5.3a. For a full description of the water and sewer reticulation reservoirs refer to the individual master plans. F.5.1.1.9 Existing reticulation infrastructure (by supply zone) The main supply zone for the city is the 110 meter system. There are a number of other water supply zones to higher areas. The supply zones also correspond to the areas of the former pre-1997 local authorities. Recently there have been problems with the AC pipelines in Kraaifontien. It would appear that the reason for these reaching the end of their useful life is that these did not include slag. For a full description of the water and sewer reticulation infrastructure refer to the individual master plans. F.5.1.1.10 Existing Sanitation Infrastructure Stormwater Ingress into Sewers Stormwater ingress into sewers is one of the major problems facing Water and Sanitation Services in CCT. The ingress negatively impacts on the capacity of the conveyance system, as well as that of the wastewater works. The causes of the ingress can be summarized as follows: The sewerage network is aging and starts to fail. A big portion of the network was constructed with pitch fibre pipes, in conditions which are not suitable for this type of pipe material. The result is that the pipes will not reach their expected design lifespan. The pipes fail unpredictable and progressively which leads to groundwater ingress for years before the pipe finally fails completely. Only then does the problem become visible and can be repaired. In some catchments, glazed clay pipe was used. CCTV inspections have shown that root ingress into the joints is a problem. The biggest problem with the pipes is that the pipes fail at the ogee but don’t collapse. The failure creates a big opening for water to enter or exit and sand and roots to enter. Poorly constructed manholes leads to ingress through the joints. Where sewerage gasses are a problem, the mortar in the concrete has been dissolved which leads to leaking joints. Theft of manhole covers, especially in low-lying areas, leads to storm water ingress House-connections which are usually constructed by contractors are not completed with the correct materials or skill and lead to open joints. In some of the older areas, the storm water from the property cannot drain to the street. The result is a flooded back yard and proof was found that the consumers will lift the sewer manhole covers to drain the water away. A problem across the City is the connection of roof water down pipes to the sewerage system. 167 City of Cape Town WSDP 2008/09 to 2012/13 Replacing of stolen and broken covers is done on a routine basis and the replacement of pitch fibre replacement is approximately 25% complete. The silt problems in the Cape Flats sewers remains a problem because there is insufficient capacity in the one line to allow the other to be taken out of commission for a period. The Lourens River to MACASSAR WWTW sewer has reached the end of its useful life and collapses are a regular occurrence. There are also specific areas where infill and densification has resulted in capacity constraints. F.5.1.1.11 Existing sewerage treatment works infrastructure Financial investment into wastewater treatment infrastructure has been lacking historically due to the high demand on capital throughout the city and this is affecting essential maintenance and upgrading which results in further deterioration of the infrastructure or “asset stripping”. Where investment has taken place, benefits have been achieved through improved wastewater treatment processes, effluent quality, sludge management, effluent re-use and the creation of treatment capacity to cater for development in the City. This in turn improves the re-use potential of wastewater effluent. Although it was previously an urgent requirement to adhere to the proposed 2010 standards, the implementation of these standards is currently being delayed by DWAF and each application for upgrading is being assessed on its merit and the reserve determination of the receiving water body. Should the City be again required to implement the DWAF’s proposed 2010 standards, the capital requirements would have to be substantially increased. Furthermore all of the city’s 22 WWTWs would have to be upgraded to meet these requirements. Any increase in capital budget allocation for this purpose will impact the sanitation tariff. As a result of the lack of historical investment into wastewater treatment infrastructure the % compliance of Treated Effluent quality with DWAF standards is low at 81% (76% in December 2006) for the four critical operational parameters viz., COD,TSS,FSA and E.coli. Major sustained further investment is required to get to higher levels. Capital of R77,4M was spent on more than 14 Treatment Works during 2005/06 and R148 spent during 2006/07 as part of a significant 10 year programme ahead to deal with the requirements for improved effluent quality compliance as well as treatment capacity for the proposed development in the metropolitan area. Since 2004/05 the Wastewater Treatment Branch has experienced significant success in sludge-to-land/ composting as a means of beneficial sludge disposal. This project is an example of private-public partnership for mutual benefit and has led to soil enrichment of farming land as well as reduced the uptake of valuable space on landfill sites. This initiative is being carried out with the approval of DWAF. A schedule of the Wastewater Treatment Works outline key characteristics and other data is given in the following tables. The following abbreviations apply to the tables that follow: 168 City of Cape Town WSDP 2008/09 to 2012/13 AS = Activated Sludge; BF = Bio filters; RDU = Rotating Disc Unit; Ox Pond = Oxidation Ponds LA = Land application; Comp = composting to other = liquid sludge take to another treatment works for handling ind = industrial re-use; irrig = used for irrigation volume recycled is estimated no (GA) = covered by General Authorisation Wesfleur eff comp.: 1st fig = Dom, 2nd fig = Ind. GW recharge = groundwater recharge The statistics applicable to the existing wastewater treatment works and sewer outfalls are contained in the following tables. For the spreadsheet of these tables GOTO 5.7a 169 City of Cape Town WSDP 2008/09 to 2012/13 Athlone Bellville ATH Current owner Current operator Future owner / WSA (If applicable) Component name Component ID Camps Bay Cape Flats Dover Gordons Bay Green Point Hout Bay BEL Borcherds Quarry BOR CBY CAP DOV GOR GRN HBY CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT Scheme name Institutional status Future operator / WSP (If applicable) CoCT CoCT Date constructed 1920's 1950's Expected total lifespan >2020 >2020 CoCT CoCT CoCT CoCT CoCT CoCT CoCT 1973 1978 1960's 1984 1994 1985 1993 >2020 >2020 >2020 >2020 >2020 >2020 >2020 Asset assessment Estimated replacement value (based on R7 million/Ml) R700 M R350 M R210 M R35 M R1 400M R0.1M R25 M R210 M R63 M Annual operating cost (2006/2007 FY) R 11,276,656 R 11,525,248 R 9,666,195 R 140,210 R 24,974,971 R 69 R 1,845,472 R 869,925 R 361,144 Annual maintenance cost (2006/2007FY) R 4,138,360 R 3,331,724 R 4,937,821 R 488,000 R 5,453,176 R0 R 792,773 R 929,146 R 672,550 R 0.39 R 0.75 R 1.27 R 0.78 R 0.55 R 0.04 R 2.52 R 0.18 R 0.60 AS AS AS Sea Outfall AS Ox Pond AS Sea Outfall Sea Outfall 9.8 Cost per kl Type (process) & capacity Type of plant Design Capacity - Hydraulic Load (Ml/day) Present hydraulic loading (Annual daily average) How much capacity is still available for development? (%) 105 54.6 33 5.5 200 0.01 3.1 40 109.2 54.6 31.6 2.2 151.0 0.0 2.9 27.0 4.7 NIL 0.1 4.2 59.9 24.5 50.7 7.4 32.6 51.6 Design Capacity - Organic Load (COD kg/day) 99,000 63,930 39,600 4,400 199,100 - 1,530 25,600 8,820 Design Capacity - Organic Load - population equivalents 900,000 581,182 360,000 40,000 1,810,000 - 13,909 232,727 80,182 Present Organic loading - pe's (annual daily average) 782,717 561,047 400,000 19,903 1,164,078 - 16,400 175,000 32,762 How much capacity is still available for development? (%) 13.0 3.5 NIL 50.2 35.7 50.0 NIL 24.8 59.1 Mag + flume open flume open flume magnetic open flume none magnetic magnetic Magnetic Permitted effluent volume (Ml/annum) 73,000 14,691 12,045 2,000 91,250 - 1,290 10,950 3,600 Total volume of water received and treated per year (Ml) 39,841 19,915 11,539 804 55,103 2 1,048 9,841 1,731 Discharge volume (Ml/annum) 39,841 18,845 11,174 804 53,303 2 1,048 9,841 1,731 0 1,070 365 0 1,800 0 0 0 0 Inlet meter (type) Operation Volume of effuent recycled (Ml/annum) Applications of recycled effluent (i.e. irrigation, mining, etc) Operating hours per day (manned hours per day) Discharge into (description of source) - ind + irrig irrig - irrig - - - - 24 24 24 0 24 0 8 0 8 river river river sea sea evap. river sea Sea 170 City of Cape Town WSDP 2008/09 to 2012/13 Component name Does raw wastewater contain industrial effluent? Industrial Effluent control (by whom) Solid waste disposal - grit& screenings (m³/annum) How is sludge dewatered Sludge produced (m³/annum) Solids content of sludge as removed offsite (%) Annual mass on dry basis (Tons) Is sludge used beneficially? If so how How often is water quality monitored? (state frequency) What laboratory is used? Is stormwater infiltration an operating problem (yes/no) Athlone Bellville Borcherds Quarry yes Camps Bay Cape Flats Dover Gordons Bay Green Point Hout Bay yes yes no yes no no no Yes own staff own staff own staff own staff own staff - own staff own staff own staff 2,500 1,200 3,100 150 2,200 - 300 300 150 beds, to other mech mech - mech - beds - - 11,000 37,857 15,294 - 7,580 - 375 - - 40 14 17 - 95 - 40 - - 4,400 5,300 2,600 - 7,200 - 150 - - some, LA LA Comp + LA - fuel - LA - - weekly weekly weekly weekly weekly never weekly weekly Weekly own own own own own - own own Own no yes no no no no yes no No 933B 476B 1457B 1527B 1504B NONE 2097B 1474B 2070B Legislative requirements DWAF Permit Number Date of issue 09/03/1981 11/10/1979 17/01/1991 24/06/1992 19/02/1992 - 18/10/2001 24/05/1991 01/09/2000 Still valid (yes/no) valid vol exceeded valid valid valid - expired valid Expired Has licence ito National Water Act been applied for. yes yes yes yes yes no (GA) yes yes Yes Compliance with Suspended Solids Standard 98.1 82.7 98.1 N/A 46.2 N/A 100.0 N/A N/A Compliance with Chemical Oxygen Demand Standard 100.0 82.7 96.2 N/A 48.1 N/A 98.0 N/A N/A Compliance with Ammonia Standard 98.1 63.5 96.2 N/A 76.9 N/A 100.0 N/A N/A Compliance with E Coli Standard 0.0 0.0 69.9 N/A 85.1 N/A 97.8 N/A N/A Describe the physical condition (in operation, poor, good) fair to good fair to good fair to good good reasonable good good reasonable Good How well is the infrastructure maintained? reasonable reasonable reasonable good reasonable good good reasonable Good Are spare parts readily available? (Yes/No) yes yes yes yes yes N/A yes most yes Yes Number of breakages / failures per year >10 >10 >10 <10 >10 nil <10 >10 <10 digesters nil mat. Ponds nil digesters nil nil fine screens Nil inlet screens belt press, centrifuge nil nil nil fine screens Nil odour control Nil no No Effluent Quality (Fin Year 2006/2007) Functionality What needs to be refurbished? (cost) What needs to be replaced? (cost) What additional processes are required Does the works need to be extended within 5 years? sludge dewatering maturation ponds, disinfection disinfection nil nil nil sludge mechanical dewatering no yes no no no no yes 171 City of Cape Town WSDP 2008/09 to 2012/13 Component name Klipheuwel Kraaifontein Llandudno Macassar Melbosstrand Millers Point Mitchells Plain Oudekraal Parow KLI KRA LLA MAC MEL MIL MIT OUD PAR Current owner CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT Current operator CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT Future owner / WSA (If applicable) CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT Future operator / WSP (If applicable) CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT CoCT Component ID Scheme name Institutional status Asset assessment Date constructed 2000 1971 1973 1978 1977 1996 1976 1996 1976 Expected total lifespan >2020 >2020 >2020 >2020 >2020 >2020 >2020 >2020 >2020 Estimated replacement value (based on R7 million/Ml) R1 M R10 M R1 M R100 M R2 M R350 M R40 M R1 M R315 M Annual operating cost (2006/2007 FY) R 135,941 R 4,774,774 R 287,262 R 7,111,712 R 656,163 R 11,740 R 12,323,863 R0 R 123,573 Annual maintenance cost (2006/2007FY) R 72,546 R 2,029,992 R 865,593 R 2,171,329 R 656,163 R 49,231 R 7,357,317 R 24,463 R 315,075 R 8.34 R 0.93 R 8.73 R 0.70 R 1.16 R 2.77 R 1.65 R 2.22 R 1.16 Type of plant RDU AS + BF RDU AS AS RDU AS RDU AS Design Capacity - Hydraulic Load (Ml/day) 0.07 17.5 0.28 57 5.4 0.06 45 0.03 1.2 Present hydraulic loading (Annual daily average) 0.1 20.1 0.4 36.2 3.1 0.1 32.7 0.0 1.0 How much capacity is still available for development? (%) NIL NIL -29.2 36.4 42.6 NIL 27.4 NIL 13.9 Design Capacity - Organic Load (COD kg/day) 50 17,500 175 40,755 2,700 66 52,800 33 748 Design Capacity - Organic Load - population equivalents 455 159,091 1,591 370,500 24,545 600 480,000 300 6,800 Present Organic loading - pe's (annual daily average) 750 125,415 1,036 236,382 15,753 600 392,895 300 7,092 How much capacity is still available for development? (%) NIL 21.2 34.9 36.2 35.8 NIL 18.1 NIL NIL Open flume open flume magnetic open flume open flume none open flume none open flume Cost per kl Type (process) & capacity Inlet meter (type) Operation Permitted effluent volume (Ml/annum) - 2,810 114 13,280 5,475 - 9,024 1.26 438 Total volume of water received and treated per year (Ml) 25 7,319 132 13,224 1,132 22 11,921 11 377 Discharge volume (Ml/annum) 25 6,819 132 12,931 274 22 11,921 11 12 172 City of Cape Town WSDP 2008/09 to 2012/13 Component name Klipheuwel Kraaifontein Llandudno Macassar Melbosstrand Millers Point Mitchells Plain Oudekraal Parow Volume of effuent recycled (Ml/annum) 0 500 0 293 858 0 0 0 365 Applications of recycled effluent (i.e. irrigation, mining, etc) 0 irrig - irrig irrig - - - irrig Operating hours per day (manned hours per day) Discharge into (description of source) Does raw wastewater contain industrial effluent? Industrial Effluent control (by whom) Solid waste disposal - grit& screenings (m³/annum) 0 24 0 24 8 0 24 0 8 evap no river no sea no river no river no sea no sea no Sea No stormwater no - own staff - - - - - - - - 620 25 300 300 - 2,000 - 50 to other mech to other mech beds to other mech/beds to other to other Sludge produced (m³/annum) - 5,000 - 20,357 375 - 9,300 - - Solids content of sludge as removed offsite (%) 1 16 1 14 40 1 17/40 1 0.5 - How is sludge dewatered Annual mass on dry basis (Tons) - 800 - 2,850 150 - 2,600 - Is sludge used beneficially? If so how - composting - LA LA - some LA - - weekly weekly weekly weekly weekly weekly weekly weekly weekly own own own own own own own Own own no yes no no no no no No no How often is water quality monitored? (state frequency) What laboratory is used? Is stormwater infiltration an operating problem (yes/no) Legislative requirements DWAF Permit Number Date of issue Still valid (yes/no) letter 459B 494B 904B 2026B NONE 934B 1682B 456B 01/11/1999 06/03/2001 08/05/1984 02/11/1988 20/01/2000 - 09/03/1981 29/07/1996 12/03/1987 ? vol exceeded valid valid valid - vol exceeded valid valid no (GA) in progress no (GA) yes yes no (GA) yes no (GA) no (GA) Compliance with Suspended Solids Standard 95.8 98.0 92.0 100.0 100.0 73.9 94.2 76.9 94.2 Compliance with Chemical Oxygen Demand Standard 62.5 84.3 96.0 92.3 100.0 30.4 90.4 69.2 86.5 Compliance with Ammonia Standard 12.5 84.3 94.0 53.8 100.0 47.8 94.2 92.3 76.9 Compliance with E Coli Standard 90.5 97.8 62.2 83.0 88.9 100.0 40.4 59.1 83.3 Describe the physical condition (in operation, poor, good) good fair to good good fair good good fair good good How well is the infrastructure maintained? good reasonable good reasonable good good reasonable good good Are spare parts readily available? (Yes/No) yes yes yes most yes yes yes most yes Yes most yes Number of breakages / failures per year <10 >10 <10 >10 <10 <10 >10 <10 nil PST's nil aerators nil nil inlet works Nil <10 civil structures Has licence ito National Water Act been applied for. Effluent Quality (Fin Year 2006/2007) Functionality What needs to be refurbished? (cost) 173 City of Cape Town WSDP 2008/09 to 2012/13 Component name Klipheuwel Kraaifontein Llandudno Macassar Melbosstrand Millers Point Mitchells Plain Oudekraal Parow nil sludge dewatering Nil aerators What needs to be replaced? (cost) nil inlet works nil inlet screens nil What additional processes are required nil Nil nil nil nil nil disinfection nil Nil yes Yes no no yes yes no no Yes Philadelphia Potsdam Scottsdene Simons Town Wesfleur Wildevoelvlei Zandvliet PHI POT SCO SI, WES WIL ZAN Current owner CoCT CoCT CoCT CoCT CoCT CoCT CoCT Current operator CoCT CoCT CoCT CoCT CoCT CoCT WSSSA Future owner / WSA (If applicable) CoCT CoCT CoCT CoCT CoCT CoCT CoCT Future operator / WSP (If applicable) CoCT CoCT CoCT CoCT CoCT CoCT WSSSA 1996 1957 1976 1970 1978 1976 1989 Does the works need to be extended within 5 years? Component name Component ID Scheme name Institutional status Asset assessment Date constructed Expected total lifespan >2020 >2020 >2020 >2020 >2020 >2020 >2020 Estimated replacement value (based on R7 million/Ml) R0.5 M R250 M R84 M R35 M R100 M R100 M R420 M R0 R 10,014,748 R 3,458,747 R 1,056,994 R 2,809,249 R 3,642,717 R 18,172,559 Annual operating cost (2006/2007 FY) Annual maintenance cost (2006/2007FY) Cost per kl R0 R 4,208,423 R 915,825 R 1,881,255 R 2,160,091 R 1,264,498 R 45,124 R 0.00 R 1.05 R 1.29 R 3.03 R 1.38 R 1.31 R 0.92 Ox Pond AS + BF AS BF AS AS AS Type (process) & capacity Type of plant Design Capacity - Hydraulic Load (Ml/day) 0.086 40 12 5 14 14 59 Present hydraulic loading (Annual daily average) 0.1 37.0 9.3 2.7 9.8 10.3 54.2 How much capacity is still available for development? (%) 14.0 7.5 22.9 46.9 29.8 26.5 8.2 Design Capacity - Organic Load (COD kg/day) - 33,600 10,200 3,040 16,800 9,460 41,300 Design Capacity - Organic Load - population equivalents - 385,000 92,727 27,636 152,727 86,000 375,455 174 City of Cape Town WSDP 2008/09 to 2012/13 Component name Philadelphia Potsdam Scottsdene Simons Town Wesfleur Wildevoelvlei Zandvliet - 385,000 68,417 12,710 87,713 73,615 336,341 How much capacity is still available for development? (%) 10.0 NIL 26.2 54.0 42.6 14.4 10.4 Inlet meter (type) none open flume open flume open flume open flume open flume open flume Present Organic loading - pe's (annual daily average) Operation Permitted effluent volume (Ml/annum) - 14,700 2,140 730 2,372 2,555 16,790 Total volume of water received and treated per year (Ml) 27 13,511 3,379 969 3,589 3,757 19,771 Discharge volume (Ml/annum) 27 8,873 3,014 969 12 3,757 19,771 Volume of effuent recycled (Ml/annum) 0 4,638 365 0 3,577 0 0 Applications of recycled effluent (i.e. irrigation, mining, etc) - ind + irrig irrig - GW recharge - - Operating hours per day (manned hours per day) 0 24 24 8 8 8 24 evaporation no river yes river no sea no GW recharge yes vlei no river no - - own staff - 3,000 Discharge into (description of source) Does raw wastewater contain industrial effluent? Industrial Effluent control (by whom) - own staff Solid waste disposal - grit& screenings (m³/annum) - 1,000 300 150 300 300 How is sludge dewatered - mech beds beds beds mech mech Sludge produced (m³/annum) - 27,800 2,050 200 2,500 5,700 37,200 Solids content of sludge as removed offsite (%) - 18 40 40 40 14 14 Annual mass on dry basis (Tons) - 5,000 820 75 1,000 800 5,200 Is sludge used beneficially? If so how How often is water quality monitored? (state frequency) What laboratory is used? Is stormwater infiltration an operating problem (yes/no) - composting LA no LA composting LA never weekly weekly weekly weekly weekly weekly - own own own own own own no no no no no no no Legislative requirements DWAF Permit Number NONE 2076B 1616B 372B 777B 754B 1507B Date of issue - 09/05/2000 20/01/1995 13/09/1983 01/03/1979 25/08/1978 30/04/1992 Still valid (yes/no) - expired vol exceeded vol exceeded vol exceeded vol exceeded vol exceeded no (GA) yes yes in progress yes yes yes Compliance with Suspended Solids Standard no effluent 86.7 94.2 78.8 98.1 / 86.5 100.0 96.2 Compliance with Chemical Oxygen Demand Standard no effluent 42.2 96.0 17.3 100 / 67.3 98.1 98.1 Compliance with Ammonia Standard no effluent 42.2 100.0 63.5 100 / 88.5 98.1 63.5 Compliance with E Coli Standard no effluent 21.1 83.0 63.0 100 / 59.1 95.8 93.5 Has licence ito National Water Act been applied for. Effluent Quality (Fin Year 2006/2007) 175 City of Cape Town WSDP 2008/09 to 2012/13 Component name Philadelphia Potsdam Scottsdene Simons Town Wesfleur Wildevoelvlei Zandvliet Describe the physical condition (in operation, poor, good) good fair to good fair fair good good good How well is the infrastructure maintained? good reasonable fair fair reasonable good good Are spare parts readily available? (Yes/No) N/A most yes yes most yes yes yes yes Number of breakages / failures per year NIL >10 <10 <10 >10 <10 <10 What needs to be refurbished? (cost) nil bio-filters reactors Sed tanks inlet mech's nil nil screens nil nil nil being extended Functionality What needs to be replaced? (cost) What additional processes are required nil inlet works inlet works bio-filter medium pump to emergency pond replace bioFilter with A/S. sludge mechanical dewatering recycle pumping system extra maturation ponds nil yes at present yes no yes yes Does the works need to be extended within 5 years? 176 City of Cape Town WSDP 2008/09 to 2012/13 Capacities versus flow/load for WWTWs Catchment 1 Capacity/Flow (Ml/day) Catchment 1: Capacity vs Flow 90 80 70 60 50 40 30 20 10 0 Capacity Flow Bellville Kraaifontein Scottsdene Fisantekraal Total WWTW Catchment 1: Capacity vs Loading 900000 Loading (pe) 800000 700000 600000 500000 Capacity 400000 Loading 300000 200000 100000 0 Bellville Kraaifontein Scottsdene Fisantekraal Total WWTW While catchment 1 still has hydraulic and organic capacity, Kraaifontein’s flows are above capacity and Belville is at the organic capacity. The catchment has very little spare capacity. Hydraulic Organic Bellville Kraaifontein Scottsdene Capacity (Ml/day) 54.6 17.5 12 84.1 Flow (Ml/day) 50.5 19.2 9.9 79.6 4.1% -1.7% 2.1% 5.4% Spare cap % Capacity (COD kg/day) Fisantekraal Total 65,113 17,500 10,200 92,813 Capacity (pe) 591,936 159,091 92,727 843,755 Loading (pe) 591,000 130,000 65,000 786,000 Spare cap % 0.2% 18.3% 29.9% 6.8% 177 City of Cape Town WSDP 2008/09 to 2012/13 Catchment 2 Capacity/Flow (Ml/day) Catchment 2: Capacity vs Flow 400 350 300 250 200 150 100 50 0 Capacity Flow Athlone Borcherds Quarry Cape Flats Parow Total WWTW Catchment 2: Capacity vs Loading 3500000 Loading (pe) 3000000 2500000 2000000 Capacity 1500000 Loading 1000000 500000 0 Athlone Borcherds Quarry Cape Flats Parow Total WWTW While the catchment has spare hydraulic and organic capacity, Athlone is near its limit for both and Bocherds Quarry is at capacity hydraulically and overloaded organically. The Cape Flats Sewer which allows the transfer of sewer flows has silting problems. Hydraulic Capacity (Ml/day) Flow (Ml/day) Organic Spare cap % Capacity (COD kg/day) Athlone Borcherds Quarry Cape Flats Parow Total 105.0 33.0 200.0 1.2 339.2 99.5 32.1 146.9 0.9 279.4 5.5% 0.9% 53.1% 0.3% 17.6% 99,000 35,970 181,000 748 316,718 Capacity (pe) 900,000 327,000 1,645,455 6,800 2,879,255 Loading (pe) 800,000 380,000 1,200,000 7,400 2,387,400 Spare cap % 11.1% -16.2% 27.1% -8.8% 17.1% 178 City of Cape Town WSDP 2008/09 to 2012/13 Catchment 3 Capacity/Flow (Ml/day) Catchment 3: Capacity vs Flow 140 120 100 80 Capacity 60 Flow 40 20 0 Gordons Bay Macassar Zandvliet Total WWTW Catchment 3: Capacity vs Loading 700000 Loading (pe) 600000 500000 400000 Capacity 300000 Loading 200000 100000 0 Gordons Bay M acassar Zandvliet Total WWTW The catchment is overloaded organically but has spare capacity hydraulically. Gordon’s Bay is at its hydraulic capacity and overloaded organically, Macassar is near its organic capacity and Zandvliet is near its hydraulic capacity and is overloaded organically. Hydraulic Capacity (Ml/day) Flow (Ml/day) Organic Spare cap % Capacity (COD kg/day) Gordons Bay Macassar Zandvliet Total 3.1 57.0 59.0 119.1 2.8 30.4 56.1 89.3 0.3% 26.6% 2.9% 25.0% 1,484 26,460 37,180 65,124 Capacity (pe) 13,491 240,545 338,000 592,036 Loading (pe) 17,000 220,000 400,000 637,000 Spare cap % -26.0% 8.5% -18.3% -7.6% 179 City of Cape Town WSDP 2008/09 to 2012/13 Catchment 4 Capacity/Flow (Ml/day) Catchment 4: Capacity vs Flow 50 40 30 Capacity (Ml/day) 20 Flow (Ml/day) 10 0 Melbosstrand Potsdam Total WWTW Catchment 4: Capacity vs Loading 450,000 Loading (pe) 400,000 350,000 300,000 250,000 Capacity (pe) 200,000 Loading (pe) 150,000 100,000 50,000 0 M elbosstrand Potsdam Total WWTW Catchment 4 has both hydraulic and organic capacity. Melbosstrand Hydraulic Organic Potsdam Total 45.4 Capacity (Ml/day) 5.4 40 Flow (Ml/day) 3.2 35.9 39.1 2.2% 4.1% 13.9% Spare cap % Capacity (COD kg/day) 2,700 35,000 37,700 Capacity (pe) 24,545 385,000 409,545 Loading (pe) 15,000 350,000 365,000 Spare cap % 38.9% 9.1% 10.9% Potsdam WWTW: The second phase upgrading to increase the treatment capacity from 40 to 47 Ml/day will be commissioned before the end of the 2007/08 Financial Year. The previous extension to 40 Ml/day allowed the housing development in the Blaauwberg area to resume, following the earlier restrictions imposed. 180 City of Cape Town WSDP 2008/09 to 2012/13 Catchment 5 Capacity/Flow (Ml/day) Catchment 5: Capacity vs Flow 20.0 15.0 Capacity (Ml/day) 10.0 Flow (Ml/day) 5.0 0.0 Simons Tow n Wildevoelvlei Total WWTW Catchment 5: Capacity vs Loading 120,000 Loading (pe) 100,000 80,000 Capacity (pe) 60,000 Loading (pe) 40,000 20,000 0 Simons Town Wildevoelvlei Total WWTW The WWTWs and the catchment have spare capacity hydraulically and organically. Hydraulic Organic Simons Town Wildevoelvlei Total Capacity (Ml/day) 5.0 14.0 19.0 Flow (Ml/day) 2.3 9.5 11.8 2.7% 4.5% 37.9% 3,040 9,450 12,490 Capacity (pe) 27,636 85,909 113,545 Loading (pe) 13,000 68,000 81,000 Spare cap % 53.0% 20.8% 28.7% Spare cap % Capacity (COD kg/day) 181 City of Cape Town WSDP 2008/09 to 2012/13 F.5.1.1.12 Schemes to be transferred: water There are no water schemes to be transferred. F.5.1.1.13 Schemes to be transferred: sanitation There are no sanitation schemes to be transferred. F.5.1.1.14 Schemes to be rehabilitated Many of the components of the exiting wastewater treatment works need to be rehabilitated or upgraded while at the same time the works require extension. The following wastewater schemes are in the process of being rehabilitated and or extended: Scottsdene WWTW: The installation of new mechanical screens and grit removal facilities commenced at the inlet works and will be completed during the 2007/08 financial year. Mitchells Plain WWTW: The installation of an additional sludge dewatering belt press continued, together with the replacement of aeration pipework in four biological reactors, and mixers in the equalisation basins. R9 M was spent. Operational performance. With regards the operation of the wastewater treatment works, a progressive improvement in effluent quality is being achieved. The overall compliance with chemical and bacteriological parameters in the 2006/07 is 81,3% which compares with 75,5% for 2005/06. This is a result of the capital upgrading programme and improved operational control. The target for compliance is a minimum of 95% in June 2012. F.5.1.2 Future trends and goals (water services infrastructure) Draft 15.03.07vx2.2 of the IDP states: “Strategic Focus Area 2: Sustainable Urban Infrastructure and Services A small percentage of the city’s increasing population does not have access to basic services. Increasingly-stressed infrastructure is impairing sustainable service delivery, social development and economic growth in Cape Town. The reality is that all the infrastructure requirements cannot be met simultaneously, given the limitations of the current budget and the financing models. The City’s objectives include related to Water and Sanitation include: 182 City of Cape Town WSDP 2008/09 to 2012/13 2.1 Reduce backlogs in line with national objectives for basic services. 2.2 Large or bulk infrastructure programmes that are essential must receive priority. 2.3 Develop an integrated programme approach to infrastructure and service planning and budgeting. 2.4 Develop demand management programmes for water, electricity, waste and transport and reduce attendant pollutants. F.5.1.2.1 New infrastructure to be built The infrastructure to be built is contained in the Bulk Water, Wastewater Treatment and Reticulation master plans. The status of the Reticulation master plans is shown in the following table: Area Date Consultant Water Sewerage Bellville 01 May 2004 GLS Khayelitsha 01 June 1999 Liebenberg Stander X Durbanville 01 November 2003 KV3 X Tygerberg: South Area 01 April 2001 GLS X Tygerberg: West Area 01 September 2000 GLS X 01 June 2000 GLS X Helderberg 01 December 2000 GLS Blaauwberg 01 March 2000 GLS X Oostenberg 01 May 2002 GLS X Oostenberg 01 May 2004 GLS Tygerberg: Central Area For spreadsheet GOTO Remarks X X X Awaiting Updated planning for 2006 master Awaiting Updated planning for 2006 master 5.7b To ensure more effective long term integrated planning within Water and Sanitation Services, Consultants were appointed to identify what information exists and what the gaps in the current master plans are. The report for this is due at the end of February 2008. A tender has recently been advertised to procure professional services to develop master plans where there are gaps and to update existing master plans. Loading on the infrastructure will be based on land use and apply to all services. The objectives of the master planning process are: All services within Water and Sanitation use the same customer data with respect to existing flows/loadings and their expected growth rates in particular areas, 183 City of Cape Town WSDP 2008/09 to 2012/13 Infrastructure plans within Water and Sanitation Services are fully aligned, Capital budgets for future years are mainly based on the master plans which are kept up to date, and Monitor where new infrastructure and identified replacement infrastructure is lagging due to inadequate funding. A summary of new infrastructure to be built is contained in the sections F.5.1.2.2, F5.1.2.3 and F.5.1.2.4. For diagram of priority investment GOTO 5.7c F.5.1.2.2 Future internal and connector infrastructure The growth rate of the City is driving the need for new infrastructure. However, over the last few years the financial situation and priorities of the City of Cape Town has created a scenario where it is not in a position to timeously provide the required bulk pipeline infrastructure. During 2004, mostly at the insistence of the Water Services and Transport Directorates, a City-wide Economic Development project process was started to address the situation. A key element of this current initiative is a partnership approach with developers, to ensure that development can continue. Development contributions from the developers are determined and agreed on for each Development Node or Corridor and which funds can be used to provide the required infrastructure. The development areas are described below. West Coast/Parklands development corridor This is one of the fastest growing areas in the City of Cape Town. The Services Master Plan for this area is updated on a regular basis through a Bureau system. Apart from the normal reticulated infrastructure internal to the development parcels, a number of larger pipes are required. Water A 1000mm diameter main feeder from a new connection on the bulk Voëlvlei pipeline will be constructed within the next year or so, leading to 1 or 2 new reservoirs as described under Bulk Water. General upgrades and extension of networks will continue, to match parcel development. Sewer The biggest constraint for development was wastewater treatment capacity at Potsdam WWTW. The commissioning of the additional 7 Ml/day at Potsdam WWTW will be completed before the end of the 2007/8 Financial Year. Additional capacity in the Blaauwberg area of 20 Ml/day will be required by 2013. An EIA is underway to review the Potsdam/Melkbos waste water treatment strategy. Depending on the outcome Potsdam could be increased to more than 47Ml/day or a new works have to be constructed at Melkbos. Pumping waste water to Melkbos will be costly. 184 City of Cape Town WSDP 2008/09 to 2012/13 De Grendel / N7 development corridor This area is one of the latest development corridor additions. The area is on the East of the N7 between Plattekloof Township and Contermanskloof. The installations of services for the first two of four phases are practically complete. The Developer is selling serviced land to sub-developers for further development and building of houses. Water A reservoir is needed but will be constructed closer to the time when the corridor is fully developed. For the interim the water will be boosted and the same booster installation will be used to pump water to the future reservoir. Water is supplied from the Voëlvlei system. Sewer The sewer master plan required a south western and north western bulk sewer to Potsdam for the corridor. Negotiations with the land owners have led to an upsized south western bulk sewer crossing the N7. The south western bulk sewer is more economical than the alternative and will be able to serve the whole corridor. Northern development corridor All economic development in this corridor has been stopped, due to waste water treatment capacity not being available. This area north and north-east of Durbanville and Kraaifontein is in desperate need of infrastructure in order to continue with development. Water The Master Plan for this area was implemented over the last few years. Two reservoirs will need replacement in future. The new supply system from the Voëlvlei pipe is already in operation. The latest update of the master plan has suggested a number of improvements to optimise the pressure zones and to reduce the volume of water supplied by booster installations. Most of the optimisations are within existing developments which will be costly to council and will be attempted as and when budget permits. Sewer The sewer main and Fisantekraal WWTW is planned to be operational by 2010/11. Bottelary development corridor This area between Brackenfell and Kuilsriver along the Bottelary Road was one of the first identified nodes. 185 City of Cape Town WSDP 2008/09 to 2012/13 Water A reservoir, feeder main and new bulk connection will be constructed as part of the new development. Apart from the normal reticulation required as per the Master Plan, a number of bulk connections will be required. The bulk connections will be made as and when required Sewer The Master Plan for this area is up-to-date and indicates that major infrastructure is required. A new bulk sewer, a new bulk pump station and upgrading of the Bellville WWTW will be required. Developments in the area are stopped due to treatment capacity problems at Bellville WWTW. Scoping for the EIA process to upgrade Bellville WWTW has started. Macassar / AECI development corridor The development of this area has already been delayed due to a lack of infrastructure. The area is vast and major infrastructure is required. Water The Master Plan for this area is updated on a regular basis to ensure that required infrastructure is identified timeously. In general, the water reticulation can cater for this area. Sewer Major infrastructure is required to provide capacity for the proposed development as well as backlog capacity for existing areas already approved. The construction of the new sewer across AECI property to Macassar is planned to be completed by 2008/2009 financial year. It will replace the badly corroded sewer and it will serve the whole Helderberg basin. The new sewer will release the development potential of the AECI site as well as Sir Lowrey’s Pass and Gordons Bay Fast-track, In-fill housing projects and growth The City’s priority N2 Gateway housing project opens up a number of places where new infrastructure is required. The development in Delft where more than 9 000 houses need to be built has highlighted the need for a new bulk sewer to serve the entire catchment. The proposed development at Wingfield will require the completion of the final phase of the Northern area sewer to Langa Pump Station. The Ysterplaat proposed development will require bulk infrastructure to the Athlone WWTW. Densification and redevelopment of the Cape Town CBD and others require the updating of master plans and verification of available capacities in the water and sewerage system. 186 City of Cape Town WSDP 2008/09 to 2012/13 Commercial and Industrial growth require in existing area’s requires further infrastructure upgrading. F.5.1.2.3 Future bulk supply infrastructure Planning of the bulk water distribution (refer to Computer Model Analysis and Master Plan for Bulk Water Supply System, dated March 2001 and updated in January 2005 held by the Bulk Water Branch) system has been based on a future AADD of 1350 Ml/d. Conceptual planning of bulk water supply infrastructure has however been carried out up to an AADD of 1850 Ml/d. The timing of the bulk water infrastructure required is dependent on the growth in water demand and the effectiveness of the WDM strategy being implemented. Bulk Water Planning Investigations The planning and development of major water resource schemes, like the Berg Water Project, is usually complemented by the planning and development of additional bulk water supply infrastructure needed to convey the raw water to water treatment plants, the treatment of the raw water into potable water and then the conveyance and bulk storage of the treated water. The former CMC appointed specialist consultants in 1998 to conduct a Bulk Water Supply Master Plan (and development of a computer model) for the City. The objectives of the Study were to: optimize the operation of the existing bulk water supply system assist with the maximization of existing and future water resources assist in making optimal decisions when constraints on the bulk water supply system necessitate operational changes to assist in the planning and optimization of future capital works The Bulk Water Master Plan identified that a new Water Treatment Plant (WTP) and associated bulk water pipelines and bulk reservoirs would have to be constructed within the next 7 years in order to meet the demand of water. The new water treatment plant would be linked to the Berg River Dam currently under construction. A new WTP abstracting water from the Berg River Dam will reduce the reliance, which the City currently places on the RSE Tunnel System, and thereby increase security of supply. The WTP would also: directly supply the rapidly growing northern areas of the City; cater for the growing demands of the Drakenstein and Stellenbosch Municipalities; and increase the flexibility in the operation of the bulk water supply system. In 2003, the Bulk Water Branch initiated an environmental process as part of a feasibility study (including route selection and location of infrastructure) to ensure timeous development of a new 500 ml/d Water Treatment Plant (WTP), 300 Ml bulk water supply reservoirs and associated pipe work in order to meet the future growth in water demand for the City. It is anticipated that the full Environmental Impact Assessment phase of the environmental process will be completed during 2007. 187 City of Cape Town WSDP 2008/09 to 2012/13 Should the new WTP and associated infrastructure not be constructed timeously, water restrictions would have to be imposed in the dry summer months in order to ensure that the peak water demand does not exceed the CCT’s available WTP capacity. Areas that are being considered for the location of the new treatment works are Klapmuts, Muldersvlei and Joostenburg Vlakte. Additional bulk water reservoirs are required in the Blaauwberg area (Contermanskloof Reservoir) and in the Helderberg area (Steenbras Bulk Reservoir). Additional bulk water supply infrastructure may also be required in order to boost bulk water supply to Houtbay. Timing, Phasing and Cost of the new Infrastructure The timing and phasing of the construction of the new bulk water supply infrastructure would be dependent on the growth in peak week water demand in the area served by the bulk water supply infrastructure as well as factors such as security of supply. It is proposed that the infrastructure be phased in, in such a way so that it can be utilised as part of the bulk water supply system upon completion and commissioning. It is currently estimated that a 300 Ml bulk water supply reservoir (and associated interlinking pipe work) will be required to provide balancing storage on the Wemmershoek pipeline by the end of 2010. The completion of the proposed water treatment plant will be required by the end of 2011, with the remainder of the bulk water supply infrastructure connecting the proposed WTP to the proposed Spes Bona Transfer Reservoir and the existing Glen Garry Reservoir being required shortly after this point in time. The cost of the new water treatment plant and associated bulk reservoirs and bulk pipelines (including the Voëlvlei to Glen Garry Transfer Scheme) is in the order of R1.4 billion. Should the imposition of water restrictions and the implementation of the water demand management strategy change consumer behaviour with regards to water consumption, the implementation date of the new water treatment plant will have to be revised accordingly. This will however have to be monitored on an annual basis. A Schematic layout description of required bulk water supply infrastructure is given in Figure F.5.1.2.3 Future Bulk Infrastructure Requirements It must be noted that the description, phasing and costing of the bulk water supply infrastructure described in all the text above is provisional and is also subject to the outcomes of various further planning initiatives. F.5.1.2.4 Future bulk sanitation infrastructure The Bulk Infrastructure Programme has been updated in the form of a Master Plan which summarises the sewage infrastructure requirements to meet future growth. GOTO 5.8 for 3 and GOTO 5.9 for 7 year program. For a spreadsheet outlining WWTPs with excess capacities and those with deficit capacities and their potential rationalisation GOTO 5.9a. 188 City of Cape Town WSDP 2008/09 to 2012/13 Figure F.5.1.2.3 - Future Bulk Water Infrastructure Requirements 189 City of Cape Town WSDP 2008/09 to 2012/13 Strategic Bulk Wastewater Study The Strategic Bulk Wastewater Study (1999) (GOTO 5.2) assessed the performance of existing wastewater infrastructure, processes and management systems and identified where improvements were necessary for more effective performance. In addition the development predicted to take place in the CMA over the next 20 years, identified the need for facilities to be extended or new ones to be put in place. This study formed the basis of the more recent 10 Year Master Plan. The Wastewater Treatment Branch’s Master Plan was compiled as an easy reference document giving general information on issues in the Branch, the comprehensive Bulk Wastewater Strategic Study organizational structures and flow predictions. The document reflects the latest statistical information and includes a 3 year and 7 year capital programme (total of 10 years) which is based on prioritizations to achieve improved compliance of effluent quality and/ or increased treatment capacity to keep pace with development. The Master Plan is a living document which will be updated on a regular basis as priorities change and issues emerge which influence strategic plans. It is a useful tool especially with regards to flow predictions and capital improvement intentions and will serve the Branch well as a basic planning document. The highlights of the 10-year master plan with interim strategies to deal with overloading are given below with the wastewater treatment plants grouped in catchments. Catchment 1: Bellville, Kraaifontein, Scottsdene & Fisantekraal This is a very high growth area of the City with development applications outpacing the ability to provide additional wastewater treatment capacity. Bellville is the most overloaded WWTW and as a result, the effluent is largely non-compliant with standards. Kraaifontein and Scottsdene WWTW are at capacity and the proposed first phase of Fisantekraal WWTW (an intended 25 Ml/day) will only be constructed by 2010. An interim strategy to relieve the overload situation and allow limited development to take place is to divert some of the flow from the Bellville WWTW to Zandvliet WWTW. This appears possible for the next few years due to the slow pace of the N2 Gateway project. Once Fisantekraal WWTW is operational, some of the wastewater flow from the catchment areas of Bellville and Kraaifontein will be diverted to the new works, creating capacity at Bellville and Kraaifontein WWTW on a permanent basis. Authority has been granted by the Department of Environmental Affairs and Development Planning to extend Bellville and Scottsdene WWTW and to construct the proposed Fisantekraal WWTW. During 2006/07 land was purchased for the proposed wastewater treatment works and tenders were invited for the appointment of consultants for the design and contract administration of the first phase (24 Ml/day) of this regional facility. The Bellville WWTW improvements will be undertaken in two phases: (a) a preliminary upgrading (maturation ponds, UV disinfection, additional sludge dewatering equipment and hopper storage of the sludge cake) to address improvement of the existing plant performance and to reach effluent compliance standards. (b) A capacity extension. 190 City of Cape Town WSDP 2008/09 to 2012/13 Proposed Capacity Extensions (Hydraulic Rating in Ml/day) 2007/07/01 Bellville 54.6 Kraaifontein 17.5 Scottsdene 7.5 Fisantekraal 0.0 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 15.0 5.0 24.0 Cap / add cap Cumulative Capacity 79.6 79.6 79.6 Loading 83.9 88.1 5.0 24.0 15.0 79.6 84.6 108.6 108.6 123.6 92.5 97.1 102.0 107.1 112.4 There is no capacity for growth until the extension is completed at Scotdene and a new WWTWs is completed a Fisantekraal. Cumulative Capacity Catchment 1 Hydraulic Loading versus Capacity Loading 140.0 120.0 ML/day 100.0 80.0 60.0 40.0 20.0 0.0 2007/07/01 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 Year Catchment 2: Athlone, Cape Flats, Borcherds Quarry and Parow Cape Flats WWTW has adequate capacity but requires improvements to certain critical structures. Parow is a small treatment facility the effluent from which is used for irrigation of the Parow Golf course. Borcherds Quarry is approaching capacity and a decision will need to be taken in the course of the next 5 years or so, whether to extend this works or by-pass the additional flow generated in the catchment to Athlone WWTW. Athlone WWTW has some spare capacity but needs mechanical sludge dewatering, effluent disinfection and odour control. There are no capacity extensions planned in this catchment. It is anticipated that within the next 6 -10 years additional capacity will have to be provided to deal with development in the catchment. There are currently contracts being implemented to remove the silt from Cape Flats Sewers 1 and 2. This is critical as it enables flow to be diverted to Cape Flats. Without this the other WWTWs in the catchment are overloaded. 191 City of Cape Town WSDP 2008/09 to 2012/13 Cumulative Capacity Catchment Hydraulic Loading versus Capacity Loading 400 350 ML/day 300 250 200 150 100 50 0 2007/07/01 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 Year The figure above shows that the WWTWs in catchment have sufficient capacity until 2012/13 at an annual growth rate of 3%. Catchment 3: Macassar, Zandvliet and Gordon's Bay Zandvliet WWTW: Construction of the 18 Ml/day capacity extension complete with the installation of the membrane filtration equipment will be completed during 2007/08. This technology will be a first for the City’s wastewater treatment and will produce a high quality effluent, very suitable for effluent reuse. This capacity extension will accommodate the N2 Gateway development. Gordon's Bay is a further high growth area of the City and the WWTW serving this area is almost at capacity. Rather than extending the treatment works, which would mean purchase of privately owned land, new development will be accommodated by means of a proposed relief sewer which will connect to the Lourens River pump station and then onwards via a new reticulation system to Macassar WWTW where spare capacity is available. Macassar WWTW has spare capacity due to some of the wastewater inflow being diverted to the Zandvliet WWTW as part of the new bulk sewer installation to serve the N2 Gateway project. Proposed Capacity Extensions (Hydraulic Ratings in Ml/day) 2007/07/01 Gordons Bay 3.1 Macassar 57 Zandvliet Cap / add cap Cumulative Capacity Loading 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 59 18 119.1 18 119.1 137.1 137.1 137.1 137.1 137.1 137.1 93.3 98.9 104.8 111.1 117.8 124.9 132.3 192 City of Cape Town WSDP 2008/09 to 2012/13 Catchment 4: Melkbos and Potsdam The Potsdam WWTW will be extended to 47 Ml/day by the end of the 2007/08 financial year to accommodate housing development in the Blaauwberg area. Projected continuing development in the area requires additional wastewater treatment capacity by 2011/12. Proposed Hydraulic Capacity Extensions 2007/07/01 Melbosstrand Potsdam 2007/08 2008/09 2009/10 2010/11 5.4 2011/12 2012/13 20 40 7 Cap / add cap Cumulative Capacity 45.4 7 45.4 52.4 52.4 52.4 52.4 72.4 72.4 Loading 40.0 42.4 44.9 47.6 50.5 53.5 56.7 20 Catchment 5: Simon's Town and Wildevoelvlei Both of these treatment works currently have spare capacity. Development potential in the Kommetjie area is high and the Noordhoek area requires waterborne sewage to replace the current septic tank system. It is therefore anticipated that the Wildevoelvlei WWTW will need to be extended within the next 6 years or so. Catchment 6: Llandudno and Sea Outfalls There are no extensions required to the Llandudno WWTW. The sea outfall pumping stations at Hout Bay, Camps Bay and Green Point require upgrading of certain mechanical and electrical equipment. Due to the development in the catchment area of the Green Point outfall an application has been made to DWAF to increase the capacity to 40 Ml/day. For the 3-year capital programme and the remaining 7 year master plan GOTO 5.8 and GOTO 5.9 respectively. F.5.1.2.5 Asset Management Plan One of the important issues identified, as part of previous WSDPs was the lack of proper asset management strategy. This has inevitably lead to the deterioration of infrastructure and service provision. As a result of the lack of a proper asset management strategy, a project (GOTO 5.10 for Project Definition Report) was set up in 2003/04 to develop a Framework for a Strategic Municipal Asset Management Plan [AMP]. It encompasses stages one, two and three as listed below and forms the basis of a Basic Asset Management Plan [BAMP]. The implementation of stages 4, 5, and 6, will form the basis of a further project dependent upon the satisfactory progress of this project. Stage 1: Improvement Strategy Development Stage 2: Basic Asset Register Stage 3: Basic Asset Management Stage 4: Improved Maintenance Management Stage 5: Introduce Advanced Asset Management Techniques Stage 6: System Optimization 193 City of Cape Town WSDP 2008/09 to 2012/13 The Water and Sanitation Services is now focusing on growing its “asset management maturity” with the implementation of a strategic municipal asset management programme (SMAM), facilitated through Reliability Engineering (formerly Asset Care Centre or ACC) Reliability Engineering was being managed through a bureau arrangement with asset performance management specialist PRAGMA Africa from March 2004 but that contract has since been terminated. Reliability Engineering is now managed by Water and Sanitation staff. SMAM, which outlines ways of implementing asset management principles in municipal environments, was implemented at Cape Flats Wastewater Treatment works as a pilot project for Water and Sanitation Services. The programme requires the adoption of a continuous improvement process. For this the CCT bought PRAGMA’s asset management improvement programme (AMiP). An AMiP base line assessment was conducted to first establish a point of reference for future assessments. The analysis determined that the critical problem areas in the department included: a lack of asset management planning through uncontrolled and uncoordinated performance of maintenance work, a reactive rather than proactive approach to maintenance, and poor asset lifecycle management. Reliability Engineering was established to address these issues. Reliability Engineering is essentially a central hub where all maintenance- and assetrelated information is recorded, analysed and stored while maintenance schedules, budgets and contractors are managed and proper work execution ensured. Work requests are called in and logged onto an asset management software system. These requests, along with preventative maintenance work, are then assigned to staff. Asset histories are built up, providing valuable data for future procurement decisions. The centralisation of maintenance enforces tight adherence to service level agreements and affords the CCT improved control and negotiating power when dealing with service providers. Reliability Engineering also ensures compliance with statutory requirements and safety, health and environmental regulations. The Reliability Engineering site captures and records all required work as well as preventative maintenance schedules, generating reports including details of failure analysis. The Reliability Engineering procedure is designed to ensure work is planned to effectively utilise resources and ensure all necessary spares are available to conduct maintenance work. Through a series of workshops, work planning and control procedures and policies are developed and implemented. The implementation of Reliability Engineering has resulted in: improved productivity at the site and improved the proactive versus reactive maintenance ratios. improved planning and co-ordination consolidation and maximisation of shared best practices. 194 City of Cape Town WSDP 2008/09 to 2012/13 Reliability Engineering is integrated with the SAP ERP system and the Work Scheduler/Planner decides whether identified work needs to be part of a maintenance plan or a reactive job. In terms of stage 2 “Basic Asset Register” GOTO 5.11 for the latest information on “Asset Databases in Water Services – their State and Condition from an Infrastructure Asset Management Perspective.” A pilot programme was launched in March 2004 at Cape Flats Wastewater Treatment Works Mechanical Workshop. The success of the pilot saw the implementation of Reliability Engineering extended to cover the Wastewater Branch sites, together with the Bulk Water Branch and Reticulation. The Reliability Engineering is currently managing the maintenance programming aspects, which incorporates electrical and mechanical including pipeline infrastructure. It has developed a proper reliability engineering structure which will focus on CIP (Continuous Improvement Programme), this will enable water and Sanitation to be able to look beyond maintenance but to look at condition based maintenance which is critical for most of the rotating equipment. So Asset Management Maturity is still in the developmental stages and will take some time. While the branch has generally achieved Stage 3 (Basic Asset Management), there are still gaps in the equipment register and maintenance plans on SAP. This causes distortions in the assets management process. This has resulted because Reliability Engineering is critically short staffed. Critical posts will be filled to get the programme back on track. Urgent actions that are required are detailed under F.5.1.4 Implementation Strategies. Reticulation The overall condition of the water and wastewater reticulation pipe network has not yet been quantified on a Metro basis. In some former MLC areas, conditions of networks are known and these records need to be amalgamated in order to focus expenditure. Some networks are showing signs of weakness that require addressing. Records of burst mains and blockages, on a Metro basis, has been introduced and maintained. Burst main and blockage incidents are reported under the following topics: Street address of burst locality including locality sketch GIS code/SAP Asset Code Pipe details (size, type, lining, sheathing etc.) Ground conditions Details of fracture/blockage The condition of the reticulation network is in need of an immediate upgrade. Although not all the network is covered on the GIS, the Branch has an idea as to which areas are a priority based on the number of bursts or breakdowns that are being experienced on the mains. For statistics refer to GOTO 5.12 195 City of Cape Town WSDP 2008/09 to 2012/13 The indicator used to track the integrity of a water network is the number of bursts per 100 km per annum. An example of records from the Water Branch of the former CT Administration shows that the number of bursts per 100 km on a 12 month moving has deteriorated from approximately 6 to 14 in the last 20 years due to a reduction in the number of kilometers of pipeline replaced per annum. Bursts per 100 km pa (m oving 12 m onth average) 18 Bursts per 100 km pa 16 14 12 10 8 6 4 2 From such records, investigations and tools such a CCTV cameras for sewer pipes, a comprehensive pipe replacement programme will be developed which will need adequate funding and staffing to ensure success. CP (Cathodic Protection) is being looked at as a means to which extension of pipeline life will be improved, this will focus on mains that are made of carbonised steel and other related materials. Bulk Water Maintenance tactics have been completed. A hardcopy and a CD were provided to the City Of Cape Town by Pragma. WADMS: CDs were provided to the City Of Cape Town containing the following information: Asset class, asset type, asset description, cost centre, location, capitalization, GAMAP expected life, age of asset, replacement value, depreciation value and current book value. The areas that are covered are: Dams, depots, pump stations, reservoirs, sewer retic, water retic, water treatment plants and waste water treatment plants. Challenges: The A.M. module (Finance) and P.M. module (Engineering) are not linked as yet. The bar coding is at different hierarchy levels in these two modules. Wastewater Treatment Maintenance tactics have been completed. A hardcopy and a CD were provided to the City Of Cape Town by Pragma. 196 Sep200 Jan2007 Sep200 May200 May200 Year to Jan2005 Sep200 Jan2003 Sep200 May200 Jan2001 Sep199 May200 May199 Jan1999 Sep199 Jan1997 Sep199 May199 Jan1995 Sep199 May199 Jan1993 Sep199 May199 Jan1991 Sep198 May199 Jan1989 Sep198 May198 Jan1987 0 City of Cape Town WSDP 2008/09 to 2012/13 Attributes: An update has been done on the following asset types: - Pumps, motors and gearboxes. These above constitute 39% of waste water assets. Challenges: Name plates are missing in some assets. F.5.1.3 Strategic gap analysis Wastewater Infrastructure Financial investment into wastewater treatment infrastructure has been lacking historically due to the high demand on capital throughout the city and this is affecting essential maintenance and upgrading which results in further deterioration of the infrastructure or “asset stripping”. This tendency has reversed in recent years. It is critical to ensure that investment keeps up with the capital and operating requirements since the demand escalates at a much higher rate while the investment backlog grows. The lack of investment has resulted in effluent being below DWAF standards and a lack of treatment capacity in growth areas. The lack of capacity has resulted in development applications not being approved e.g. in the northern areas (Catchment 1: Bellville, Kraaifontein, Scottsdene & Fisantekraal) and the and Catchment 4: Melkbos and Potsdam. Operational issues related to poor effluent quality are being addressed but further effort is required. Staff reduction has continued over the past five years and increased use is made of consultants to implement capital improvements. Bulk Water Infrastructure A significant amount of capital investment in infrastructure is required in the northern growth areas to ensure that the northern growth areas have sufficient supply into the future and that the risk of imposing restrictions in the short to medium term is reduced. It is critical that sufficient funds be made available for the Northern areas Augmentation Scheme. It is important to note that this scheme will still be required even with an aggressive WC&DM Strategy as it is a growth are in the City. Reticulation Infrastructure Major funding is required to replace and extend the reticulation infrastructure especially in the growth areas. Asset Management For explanation on need for maintenance from SFWS GOTO Ex16. The maturity level is at stage 3 – Basic Asset Management. The gap relates to capacity and skills. Capacity is required to ensure that the status of being at Stage 3 is brought back on track as the loss of staff has resulted in backlogs. It is also important that the relevant skills are obtained if the Service wants to move to stage 4: Improved Maintenance Management 197 City of Cape Town WSDP 2008/09 to 2012/13 F.5.1.4 Implementation strategies (water services infrastructure) Strategy for Growth areas To alleviate the problem of overloading of infrastructure in the growth areas of the City a process under the leadership of the Corporate Development Directorate was started to address the situation in a multi-disciplinary way. A partnership approach with developers was started to ensure that development could continue. Development contributions are determined and agreed for each node or Corridor to fund some of the required infrastructure. There are still a number of challenges such as obtaining bridging finance, and implementation and capacity constraints in the City. The areas where water and sewer infrastructure are severely stressed and are in need of significant upgrades include: West Coast / Parklands development corridor De Grendel / N7 development node Northern development corridor Bottelary development corridor Fast-track housing projects (e.g. N2 Gateway) Maccassar / AECI development node Strategy for Wastewater Treatment Works The strategies for ensuring that wastewater treatment capacity is sufficient are: Integrate planning for new works and extensions with the other branches and ensure that additional wastewater treatment capacity is provided where needed at the right time, Provide sufficient funding (EFF and MIG funds) to address the backlog in WWTW capacity and provide for growth. The strategies that are in place but that are currently being tightened up that should reduce non-compliance due to operational issues are: Pro-active maintenance of all mechanical and electrical equipment as well as civil structures as part of the Asset Management Strategy, Process optimisation, and Improved monitoring and operational control. The plans for Catchments 1 and 4 where there are capacity backlogs are detailed below: Catchment 1 The total of all the wastewater treatment works in Catchment 1 are currently near their design capacities as shown in the graph below: 198 City of Cape Town WSDP 2008/09 to 2012/13 CATCHMENT 1: TOTAL FLOW Bellville, Kraaifontein, Scottsdene & Fisantekraal 120 y = 0.1852x - 164.02 y = 0.218x - 199.16 110 100 90 Fisantekraal 24 Ml/d 80 Ml/d 70 60 Kraaifontein extension 50 Scotsdene ext 5 Ml/day 40 30 ANNUAL RATE OF GROWTH: total flow = 3.5% dry w eather flow = 3.3% 20 10 Daily flow Dry weather flow Linear (Daily flow) Linear (Dry weather flow) design ADWF To overcome the capacity constraints it is planned to extend Scotsdene by 5 Ml/day and construct phase 1 of the Fisantekraal works (24 Ml/day) Agreement on the purchase of land for the new wastewater treatment works at Fisantekraal has been concluded and consultants have been appointed and are busy with the design. Construction will commence around mid 2008 with the expected commissioning by mid 2010. The upgrading of Bellville WWTW should be substantially complete by the end of 2008 and will be followed by a capacity extension to deal with on-going development in the catchment. Catchment 4 The Potsdam WWTW will be extended by another 7 Ml/day by the end of June 2008 to bring the capacity to 47 Ml/day. Due to the rapid growth in the area it is anticipated, an additional 20 ML/day will be required by June 2012. 199 Jul-2020 Jul-2019 Jul-2018 Jul-2017 Jul-2016 Jul-2015 Jul-2014 Jul-2013 Jul-2012 Jul-2011 Jul-2010 Jul-2009 Jul-2008 Jul-2007 Jul-2006 Jul-2005 Jul-2004 Jul-2003 Jul-2002 Jul-2001 Jul-2000 Jul-1999 Jul-1998 Jul-1997 0 City of Cape Town WSDP 2008/09 to 2012/13 DEADP accepted the scoping report for increasing the treatment capacity at either Melkbos or Potsdam WWTW to cater for growth in the area. Specialist environmental studies have been undertaken and the draft Environmental Impact Report will be presented to the public early in 2008. This will be followed by the submission of the report and recommendation to DEADP. The Zandvliet WWTW is currently being extended in capacity to accommodate the N2 Gateway project and other developments in the area. The new treatment process which utilises membrane technology, a first for Cape Town, is due to be completed by May 2008. The capital upgrading programme is not only providing capacity for development but also for improved performance for a higher quality effluent. The planned capacity extensions are detailed in the table on the following page. Strategy for Bulk Water Infrastructure To cater for the growth in demand in the northern areas there are plans and budgets for the implementation of the Northern Areas Bulk Water Augmentation Scheme. The phase of this scheme involving the implementation of a new water treatment plant and bulk reservoir is currently in its EIA phase. Revisions to the EIA and additional infrastructure to be covered in the EIA process has resulted in planned completion of the EIA and submission to the environmental authorities in May 2008. The table of proposed wastewater treatment capacity extensions for the period of this plan is shown on the following page. 200 City of Cape Town WSDP 2008/09 to 2012/13 Strategy for Long Term Integrated Planning To ensure more effective long term integrated planning within Water and Sanitation Services, Consultants were appointed to identify what information exists and what the gaps in the current master plans are. The report for this is due at the end of February 2008. A tender has recently been advertised to procure professional services to develop master plans where there are gaps and to update existing master plans. Loading on the infrastructure will be based on land use and apply to all services. The objectives of the master planning process are: All services within Water and Sanitation use the same customer data with respect to existing flows/loadings and their expected growth rates in particular areas, Infrastructure plans within Water and Sanitation Services are fully aligned, Capital budgets for future years are mainly based on the master plans which are kept up to date, and Monitor where new infrastructure and identified replacement infrastructure is lagging due to inadequate funding. Reference should be made to the Bulk Water, Wastewater Treatment and Reticulation Master Plans mentioned previously. For priority investment areas GOTO 5.7c. 201 City of Cape Town WSDP 2008/09 to 2012/13 Proposed Wastewater Treatment Capacity Extensions Existing Capacity as at Capacity Extensions by Capacity Extensions by Capacity Extensions by Capacity Extensions by Capacity Extensions by Capacity Extensions by Total proposed additional Total Capacity by 01-Jul-07 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 capacity by 2012/13 2012/13 Hydraulic Organic Hydraulic Organic Hydraulic Organic Hydraulic Organic Hydraulic Organic Hydraulic Organic Hydraulic Organic Hydraulic Organic Hydraulic (Ml/day) (pe's) (Ml/day) (pe's) (Ml/day) (pe's) (Ml/day) (pe's) (Ml/day) (pe's) (Ml/day) (pe's) (Ml/day) (pe's) (Ml/day) (pe's) (Ml/day) (pe's) Athlone 105 900,000 105.00 900,000 Bellville 54.6 581,182 69.60 740,842 Borcherds Quarry 33 360,000 33.00 360,000 Camps Bay 5.5 40,000 5.50 40,000 Cape Flats 200 1,810,000 200.00 1,810,000 Dover 0.01 0 0 0 Fisantekraal 15.00 24.00 159,660 218,160 15.00 24.00 159,660 Organic 218,160 0.01 0 24.00 218,160 Gordons Bay 3.1 13,909 3.10 13,909 Green Point 30 232,727 30.00 232,727 9.80 80,182 Hout Bay 9.8 80,182 Klipheuwel 0.07 455 Kraaifontein 17.5 159,091 Llandudno 0.28 1,591 0.28 1,591 57 370,500 57.00 370,500 Melbosstrand 5.4 24,545 25.40 217,045 Millers Point 0.06 600 0.06 600 45 480,000 45.00 480,000 0.03 300 0.03 300 1.2 6,800 1.20 6,800 Macassar Mitchells Plain Oudekraal Parow Philadelphia 0.07 455 0.07 20.00 192,500 20.00 0.086 0 Potsdam 40 385,000 Scottsdene 7.5 92,727 5 27,636 Wesfleur 14 152,727 Wildevoelvlei 14 86,000 Zandvliet 59 375,455 TOTALS 707 6,181,427 25.00 181,909 0.00 0 5.00 61,815 28.07 262,251 20.00 192,500 15.00 159,660 Cumulative Capacity 707 6,181,427 732.14 6,363,336 732.14 6,363,336 737.14 6,425,151 765.21 6,687,402 785.21 6,879,902 800.21 7,039,562 13.2% 13.9% 1.8% 1.9% Simons Town 7.00 67,375 5.00 61,815 4.00 18.00 43,636 114,534 total growth in capacity over 5 years average growth in capacity pa over 5 years 202 455 192,500 0.14 910 17.50 159,091 0.09 0 7.00 67,375 47.00 452,375 5.00 61,815 12.50 154,542 5.00 27,636 18.00 196,363 4.00 43,636 14.00 86,000 18.00 114,534 77.00 489,989 93.07 858,135 800.21 7,039,562 City of Cape Town WSDP 2008/09 to 2012/13 Strategy for Asset Management The strategy is to move the entire Water and Sanitation Services Department up the levels of maturity in accordance with the AmIP (Asset Management Improvement Plan). A Reliability Engineering structure which will focus on CIP (Continuous Improvement Programme) has been agreed on but now needs to be capacitated. Besides the filling of critical posts, the urgent actions that are required are: Ensure all proactive orders are generated and completed, All gaps in Equipment data to be identified and put on SAP Master Data, All gaps in Equipment without Maintenance Plans to be identified and put onto SAP Master Data, Rationalise the number of Maintenance Plans where possible, All completed Works Orders to be captured timeously without build up in a backlog, Improvement the procurement process to ensure that all the tools and materials required for pro-active work is received timeously, Re-instate monitoring systems and indicators such as the ratio of proactive to reactive maintenance. Once these issues have been addressed, the department will then be able to be in a position to do work scheduling and then improved work scheduling where there is a closer co-ordination with the operational staff. Currently, proactive jobs are generated for the month and work is done in accordance with the daily needs rather than a planned schedule. A planned schedule enables more effective utilization of resources. Another current gap is the determining of the catalogue of the notification. This enables one to determine which parts in a piece of equipment are continuously failing and thereby take effective remedial action. This will enable water and Sanitation to be able to look beyond maintenance to condition based maintenance which is critical for most of the rotating equipment. Strategy for Stormwater Ingress into Sewer Mains The elements of the Strategy are The network-related will be resolved by proactive maintenance. The consumer-related problems will be addressed by education programs, pamphlets and frequent inspections. It is not possible to adjust the plot levels if it was originally too low. In these areas the problem is not easy to resolve. Mid-block storm-water systems will to be investigated. No future developments will be allowed that cannot drain to street level. Where possible it will be beneficial to the sewerage system if no trees are planted directly above the pipe. In economical developments, the 203 City of Cape Town WSDP 2008/09 to 2012/13 sewerage pipes should be installed under the road and no mid-block sewers should be allowed. The major impediments to implementation are the lack of funding and capacity constraints. The Financial and Institutional strategies are therefore key to the Infrastructure strategy. Financial Strategy for infrastructure The by-product of the lack of wastewater treatment capacity causing development applications not to be approved is that the issue of the historical lack of funding has been highlighted. As a result more funding is being made available for wastewater and wastewater treatment. The Financial Strategy in the IDP (GOTO 3.9) is also key to ensuring that funding is available. Tariffs have been increased and will continue to be increased in real terms over the next 5 years to ensure that the necessary funding is available. 204 City of Cape Town WSDP 2008/09 to 2012/13 F.6 WATER BALANCE For explanation from the Preparation Guideline GOTO Ex17. F.6.1 Water balance F.6.1.1 Situation assessment (water balance) Unaccounted For Water and Non-Revenue Demand Unaccounted for Water, although still around 19%, is being focussed on through a phased plan of action. Currently this is not a true UAW because bulk and reticulation losses (see note below). Initial success has been to undertake improved monthly Water Balance calculations with the involvement of a Working Group of affected Branches. An audit of the large Bulk Water meters has highlighted areas for improvement and will be reviewed quarterly. Moreover, international best practice has moved away from UAW and percentages as it can be misleading. A water balance is usually categorised into the following: System Input (Former MLC meters) Authorised Consumption Billed Authorised Consumption Billed Metered Consumption Revenue Water Billed Unmetered Consumption Unbilled Authorised Consumption Unbilled Metered consumption Non-Revenue Water Unbilled Unmetered Consumption Water Losses Apparent Losses Illegal Connections Metering Inaccuracies Real Losses Mains Leaks Reservoir Overflows / Leaks Service Connection Leaks By using this methodology one is able to identify the real losses which can then be targeted for water demand management interventions. Real losses can be categorised into UARL – unrealisable annual real losses and CARL – calculated annual real losses. This methodology needs to be applied to Bulk and Reticulation separately. F.6.1.1.1 Amount of bulk water abstracted Bulk water is abstracted from DWAF and CCT dams which form part of the Western Cape System. In order to optimise the yield from the system water is 205 City of Cape Town WSDP 2008/09 to 2012/13 drawn from the dams that are spilling at any point in time. It is therefore not relevant to list the water abstracted from each dam. As mentioned above the losses in the bulk and reticulation systems need to be separately recorded. There are currently problems with some of the meters that supply the previous MLCs (Metropolitan Local Councils). This has resulted in inaccuracies in calculating the bulk and reticulation losses. In order to determine a water balance the amount of treated water from the water treatment works is recorded on a monthly basis to produce an annual figure. The amount of treated water supplied is given in the table below: 2001/02 3 (mil m ) 2002/03 3 (mil m ) 2003/04 3 (mil m ) 2004/05 3 (mil m ) 2005/06 3 (mil m ) 2006/07 3 (mil m ) 287.5 301.4 310.2 282.7 294.5 308.4 Total water treated For the source of these figures F.6.1.1.2 GOTO 6.1 Amount of bulk water purchased from others Refer to notes under F.6.1.1.2 F.6.1.1.3 Water supply to consumers : urban The water sold to consumers as extracted from the SAP system is given below: 2001/02 3 (mil m ) * 2002/03 3 (mil m ) * 2003/04 3 (mil m ) * 2004/05 3 (mil m ) 222.5 2005/06 3 (mil m ) 235.8 2006/07 3 (mil m ) 249.0 Unbilled metered and unbilled unmetered * * * 6.0 6.0 6.0 Total authorised * * * 228.5 241.8 255.0 Billed * SAP installed in August 2003. Figures before this are unreliable. For source of these figures GOTO 6.2 The 2004/05, 2005/06 and 2006/07 figures include 19.9, 22.5 and 23.5 (2006/07 is an estimate) mil m3 respectively sold to other municipalities and users. Due to an estimated authorised consumption for “unbilled metered” and “unbilled unmetered” of approximately 6 mil m3 the total authorised consumption in 2004/05, 2005/06 and 2006/07 is 228.8, 241.8 and 255 mil m3 respectively. F.6.1.1.3.1 Categorisation of residential uncontrolled volume supply The statistics for this are not currently available. F.6.1.1.4 Water supply to consumers : rural Included under urban 206 City of Cape Town WSDP 2008/09 to 2012/13 F.6.1.1.5 Total physical water losses The total losses given below include a portion of the bulk losses and all the reticulation losses. 2001/02 3 (mil m ) Total losses * 2002/03 3 (mil m ) * 2003/04 3 (mil m ) * 2004/05 3 (mil m ) 2005/06 3 (mil m ) 2006/07 3) (mil m 54.2 52.7 53.4 5.4 5.2 5.2 48.8 47.5 .482 17.0 17.0 17.0 Estimated Apparent losses Estimated Real losses Estimated UARL * * * * SAP installed in August 2003. Figures for consumer consumption before this are unreliable Currently a 12 month moving average is used to calculate the UAW which stands at 19.8%. F.6.1.1.6 Total effluent received at treatment works The total effluent received at the treatment works is given in the table below: Total (Ml) Inc / dec 2000/01 193 453 2001/02 192 083 2002/03 195 865 2003/04 196 214 2004/05 196 498 2005/06 198 891 2006/07 218 903 -0.7% +2.0% +0.2% +0.1% +1.2% +10.1 88.3% 84.3% 85.8% %age of water supply The relatively high proportion of effluent received at the treatment works to the water supplied can be attributed to the stormwater ingress. The average annual increase in total effluent received at the works over the period 2000/01 to 2005/06 was 0.6%. Over the same period the total water demand decreased by 0.2%. The low annual increase can be attributed to water demand management and water restrictions reducing the flow into the sewer network. However, the increase from 2005/06 to 2006/07 was 10.1% which corresponds to a 4.7% increase in water demand over the same period. For a table of monthly and annual flows since 1 July 1997 for each WWTW GOTO 6.3. F.6.1.1.6 Total returns to the Water Resource System The total returns to the water resource system are not currently recorded. F.6.1.2 Future trends and goals (water balance) F.6.1.2.1 Amount of bulk water to be abstracted The amount to be purchased from DWAF and CCT sources will be in line with the allocation of 213 million cubic metres per annum until the end of 2007. The additional allocation of 81 million cubic meters from the Berg Water River Dam will now be available. 207 City of Cape Town WSDP 2008/09 to 2012/13 For the demand growth projections versus supply available refer to Figure F.3.1.2a in Chapter F.3. It shows the unconstrained demand (3-4% pa growth) and the low water demand curve (2% pa growth). The comprehensive WC&DM Strategy aims to ensure that the demand remains at current levels beyond 2020. Due to the untested nature of the assumptions in the strategy resource and infrastructure planning is currently based on the low water demand curve. F.6.1.2.2 Amount of bulk water to be purchased from others The Western Cape System is a combination of CCT and DWAF owned dams. The abstractions from both are managed as a whole so as to maximise the yield from the system. F.6.1.2.3 Water to be supplied to consumers: The water supplied to consumers is expected to be at or below the low water demand curve less water losses. F.6.1.2.4 Total physical water losses The WC/WDM Strategy assumes that the total real losses will reduce from 47.5 to 27.2 over an 8 year period. F.6.1.2.5 Total influent received at treatment works It is difficult to predict with any certainty what the trends will be with respect to the total influent received at treatment works. The impact of ground water infiltration is also not quantified. F.6.1.3 Strategic gap analysis (water balance) Currently the meters from the water treatment works into the system are reliable. The meters from the bulk system feeding the reticulation system cannot be used with confidence because: Some meters are faulty The integrity of the reticulation feed zones may not be reliable as there may be inter-connections No information on ground water infiltration or the reasons why the total influent received at treatment works has reduced. Water losses calculations need to be refined based on more accurate zone information. F.6.1.4 Implementation strategies (water balance) Bulk and Reticulation UAW needs to be separated. For the division between bulk and reticulation systems: Repair or replace faulty meters. Check zones are discrete. Zone metering needs to be intensified. Refer to WC/WDM strategies. Improve water balance and water loss estimates by comprehensive zone metering and meter testing programs. 208 City of Cape Town WSDP 2008/09 to 2012/13 F.7 WATER SERVICES INSTITUTIONAL ARRANGEMENT PROFILE For explanation from the Preparation Guideline GOTO Ex18. F.7.1 Water services institutional arrangements F.7.1.1 Situation assessment (water services institutional arrangements profile) The new City of Cape Town and the Water and Sanitation Services entity was formed with the amalgamation of the Cape Metropolitan Council and the 6 metropolitan local councils in December 2000. On 28 November 2001 Council authorized Water and Sanitation Services to operate as fully-fledged and functional internal business unit in order to, ensure maximum independence and minimum constraints. During the establishment period, Council underwent political and strategic changes. As a result of these changes ODA, aloeCap and Africon were appointed between October 2003 and March 2004 using USAID funding. The appointment was to review the decisions taken and propose a way forward. This culminated in a report entitled “High level review of the project to establish internal business units for Electricity, Water and Sanitation and Solid Waste Management Services” (C07/06/04) dated 24 June 2004 which was adopted by Council in June 2004. The recommendations of this report were: The creation of an appropriate service authority mechanism for the City of Cape Town The establishment of a Water Services Authority (WSA) and Water Services Provider (WSP) arrangement. Current Institutional Arrangements and Organizational Structure The City’s organisational structure, under revision since 2001, has predominantly reached finalisation, with new staff rapidly being appointed and current staff mostly having being placed. Internal optimisation of structure and process, inter-departmental coordination, integrated planning, as well as Employment Equity are being given high priority in conjunction with the placement process. Water and Sanitation has continued on a path to further optimise its organisational structure which is being implemented where and when possible, within given constraints. It is based on the optimal allocation of available staff, augmented by advanced information and operational technology. An additional staff budget of R116 million per annum from 2007/08 onwards to alleviate the critical staff shortages has been approved and budgeted for. Of particular significance are the funds to appoint several Financial staff including accountants and staff focused on increasing income. Engineering staff is also being recruited. 209 City of Cape Town WSDP 2008/09 to 2012/13 Processes and Systems To enhance processes and systems and promote a world class status for the Water and Sanitation Services Department, it is intended that all branches achieve ISO 9001:2000 accreditation. The Progress of each branch is given below: Bulk Water Branch In December 2006 Bulk Water Branch successfully maintained its three-year ISO: 9001:2000 Quality Management Systems (QMS) certification (2006 2009) during the triennial review audits by SABS. The Branch was assessed and found to satisfy the requirements of ISO 9001:2000 QMS in respect of: The Management of Water Resources, and the Planning, Design, Development and Maintenance of the Infrastructure for the Catchment, Treatment, Storage and Conveyance for Bulk Water Supply excluding clause 7.5.4 Customer Property. The Branch has embarked on integrating ISO 9001:2000 QMS with other management systems, such as OHSAS 18001:1999 Occupational Health and Safety Management Systems (OHSMS), including Risk Management Systems, and ISO 14001:2004 Environmental Management Systems This alignment of the management system will help the Branch in the facilitation of Integrated Management Systems also known as SHREQ (Safety Health Risk Environment and Quality). The Branch implemented the OHSAS 18001:1999 (OHSMS) in 2004 and the certification is due by December 2008. The Environmental Management System (ISO 14001:2004) it is still in its development phase. Controlled Document Management System, ZIZO (Zoom In Zoom Out) software: In 2003 the Branch simultaneously took a decision to also introduce a multidisciplinary document control system that was paperless, user-friendly, flexible, self expandable to complement ISO 9001:2000 (QMS) and later ISO 18001:1999, and ISO 14001:2004 (EMS) (SHREQ) Wastewater Treatment Branch It is envisaged that ISO has progressed slower than expected. Planning commenced during 2002/2003 for the introduction of an Environmental Management System (EMS) at Potsdam Wastewater Treatment Works that will integrate treatment process requirements and operational control with environmental protection. Specialist consultants are assisting in this initiative which involves both operational and management staff. The EMS is based on best practice approach for such systems with ISO 14001 used as a guide. The EMS will be extended to incorporate the new sections of the Potsdam Works once constructed. The goal to complete EMS for Potsdam by 2004 has not yet been achieved, mainly due to the final effluent quality not meeting the license application conditions. It is planned to roll the system out to three additional treatment works per annum until all works are included. It is envisaged that ISO 9001:2000 will be implemented at all works during 2007/08. 210 City of Cape Town WSDP 2008/09 to 2012/13 Reticulation Branch The existing ISO Quality Management System certification at South Peninsula (SPA) Water Division is being maintained. Since 2001, some progress has been made with preparations for certification of the whole of Reticulation. It is envisaged that certification will be achieved over the next few years. Asset Management Services During the first quarter of 2004, the Electrical Engineering Maintenance workshop embarked upon obtaining the SABS standardization in order to benchmark them against an acceptable quality standard. During December 2004 the workshop was audited for ISO 9001 and at the same time pre-audited for ISO 14001 & 18001. During February 2005, ISO 9001 accreditation was achieved while 14001 & 18001 final audit took place in July 2005. Other Risk Management Work has started on an Integrated Risk Management Programme with the appointment of a Risk Manager and the development of a strategy. Safety An increase in Safety standards have been achieved mainly due to a focus on training and implementation of safety practice. No fatalities occurred for the 2005/06 financial year. About 10 % of all procedures were reviewed during the 2005/06 financial year but a lot of work remains on addressing the identified risks. As a number of engineering contractors working for Water and Sanitation Services have been contravening basic provisions of the OHSA, its management proved to be a challenge. Steps taken included ensuring the requirements are in the contract and are enforced by undertaking unexpected site checks. A structured programme of assistance to contractors to improve on safety is also being developed. During the 2005/06 financial year, 54 plants and 70 pump stations were inspected in order to ensure compliance with the OHSA act GOTO 9.7a. It was found that the majority of all the plants have improved steadily over the years and that all statutory requirements were met or exceeded. In general the older installations needed upgrading and this is being done on a phased priority basis. 211 City of Cape Town WSDP 2008/09 to 2012/13 WSA functions and outputs In order to fulfil the WSA roles and responsibilities the following major functions that need to be in place are addressed in the table below: (Y= Yes, N= No, I= insufficient / inadequate, NA= Not applicable) Generally only problem areas are highlighted. If no by when? Personnel Infrastructure Bylaws Resources available to perform the function Budget F.7.1.1.1 Policy Development Indigent Policy Y Free basic water policy (including equitable share) Y Free basic sanitation policy Y Procurement Policy Y Credit Control and debt Collection Policy (GOTO 9.8) Y I 2007/08 I 2007/08 I 2007/08 I 2007/08 Regulation and Tariffs Water Services bylaws with conditions as required by the Water Services Act Y Y Mechanisms to ensure compliance with bylaws N NA Tariff structure Y NA Tariffs promulgated Y NA Mechanisms to undertake project feasibility studies Y NA Criteria for prioritising projects Y NA Mechanisms to assess and approve project business plans Y NA I 2007/08 Mechanisms for selecting, contracting, managing and monitoring implementing agents Y NA I 2007/08 Mechanisms to monitor project implementation Y NA I 2007/08 Infrastructure development Water conservation and demand management 212 City of Cape Town WSDP 2008/09 to 2012/13 Personnel If no by when? Infrastructure Water conservation and demand management strategy I I 2007/08 NA I 2007/08 NA I 2007/08 Bylaws Budget Resources available to perform the function Y Performance management and monitoring Performance management systems Y NA Water Service monitoring and evaluation system Y NA WSDP information system I NA Mechanisms for stakeholder participation Y NA Mechanisms to monitor and report on WSDP implementation Y NA Criteria to select appropriate WSPs Y NA Mechanisms to contract, manage and monitor WSPs Y NA Mechanisms to approve WSP business plans Y NA WSA overall capacity I WSDP WSP institutional arrangements Sufficient staff and systems to fulfil all WSA functions Other (state) In summary the major issue is staff capacity constraints. F.7.1.1.2 WSA capacity development Integration or centralisation of several functions have delivered benefits of improved planning, efficiency and cost saving: Strategic and Master Planning; Benchmarking; Regulation of the new by-laws; Fleet maintenance; Electrical-/ Mechanical Maintenance. 213 City of Cape Town WSDP 2008/09 to 2012/13 Communication both internally and externally has improved with the development of a communication strategy, implemented via, inter alia: launching of various roadshows, events and ceremonies, communication with international cooperation partners and media releases. Water and Sanitation Services’ internal IT capability has streamlined through the acquisition and installation of various new systems such as infrastructure for the new LIMS software at Scientific Services, upgrades to SCADA and Telemetry at reservoirs and works or optimising connectivity such as by sharing the connection to Bellville Compost Plant of Solid Waste. The Department has developed version 7 of the Workplace Skills Plan. F.7.1.1.3 Bylaws affecting water services The bylaws affecting water services are listed in the table below: By-law Date promulgated Short Description Effect on Water Services Water 1 September 2006 To control and regulate water services in the City More effective management of the use of water and sanitation services by users Wastewater and Industrial Effluent (GOTO 2.3) 1 September 2006 To control and regulate sewerage and industrial effluent and discharges More effective management of the discharge of industrial effluent by users Credit Control and Debt Collection (GOTO 9.8) Update still in draft form. To give effect to the Council’s credit control and debt collection policy, its implementation and enforcement, as required by Section 98 of the Municipal Systems Act, 32 of 2000, and to give effect to the duty imposed by Section 96 of the Municipal Systems Act to collect all money that is due and payable to the Council. Water Services is more financially sustainable. By-law relating to Stormwater Management (GOTO 3.10b) 23 September 2005 To provide for the regulation of stormwater management and to regulate activities which may have a detrimental effect on the development, operation or maintenance of the stormwater system More effective management of the discharge of stormwater by users Treated Effluent In preparation To control and regulate the use of treated effluent in the City More effective management of the use of treated effluent by users (GOTO 7.1) (Existing policy dated June 2004) 214 City of Cape Town WSDP 2008/09 to 2012/13 F.7.1.1.4 Water services providers (retail water) The internal Water and Sanitation Department within the City of Cape Town is the retail water provider. F.7.1.1.5 Water services providers (sanitation) The internal Water and Sanitation Department within the City of Cape Town is the retail sanitation provider. F.7.1.1.6 Water services providers (bulk water) The internal Water and Sanitation Department within the City of Cape Town is the bulk water provider. The Department also provides bulk water to Drakenstein and Stellenboch F.7.1.1.7 Water services providers (bulk sanitation) The internal Water and Sanitation Department within the City of Cape Town is the bulk sanitation provider. F.7.1.1.8 Support services agents (water) The internal Water and Sanitation Department within the City of Cape Town provides some support functions while some are provided corporately by the City. F.7.1.1.9 Sanitation promotion agent: This function is provided in-house by the Water and Sanitation Department. The Health Department of the City also undertakes health and hygiene awareness programmes F.7.1.1.10 Support service contract: For explanation from the Preparation Guideline GOTO Ex19. The following functions have service contracts: Wastewater Treatment works at Zandvliet Meter reading in specific areas F.7.1.1.11 Water Services Institutions There are no public Water Services institutions that assist the City in its WSA functions. F7.1.1.12 WSP staffing levels: water The delay in the transformation process has had a significant effect on staff moral. There has also been a significant loss of staff as part of the City’s strategy to reduce the staff levels through natural attrition. The number of employees in Water and Sanitation Services is approximately 2,500. There is currently a process of finalising staff lists before the new appointments in 2007/08. 215 City of Cape Town WSDP 2008/09 to 2012/13 F.7.1.1.13 WSP staffing levels: sanitation By way of example of the critical issue of staff capacity the Wastewater Treatment Branch is highlighted. The Wastewater Treatment Branch staff levels have reduced from 449 in December 1997 to 279 in March 2007 – almost a 38% reduction. Staff losses as reported in June 2005 has continued. For this branch, significant losses have been experienced in the following groups: Table - Staff Losses in Wastewater Treatment Branch Group Professional Managers Controllers / Process Process Assistants December 1997 20 June 2005 March 2007 11 13 Percentage Decrease 35% 76 57 63 17% 136 95 72 47% In the last 2 years there has been an increase in the number of Process Controllers due to having taken over some Operators from the Athlone Power Station. They are experienced in operating mechanical and electrical equipment, but have no knowledge of wastewater treatment. There is an urgent need to attract, develop and retain skilled staff in Water and Sanitation Services. F.7.1.1.14 WSP training programmes During 2005/06 Version 7 of the Workplace Skills Plan was completed and general operating funds were re-prioritised to enable more appropriate training of staff than originally budgeted. The Pinelands Training Centre was also fully accredited by the ESETA (Energy Sector Education Authority). Accredited and Non-accredited Training Programmes For details of programmes 2002 /03 2003 /04 2004 /05 2005 /06 1,839 3,700 6,782 2,209 2006 /07 GOTO 7.2 Total person days F.7.1.2 Person Days Future trends and goals (water services institutional arrangements) Institutional Reform The national agenda is to set up public services (and tariff services in particular) in a manner that is both predictable in terms of availability and competitive in terms of pricing so that 216 City of Cape Town WSDP 2008/09 to 2012/13 There is a platform for economic growth and job creation. (well functioning city attracts investment etc) There is a platform to create opportunities for Black Economic Empowerment (BEE). There is a platform to enhance operational and financial performance which leads to sustainable funding for the service. This sustainable funding leads to sufficient (sustainable) infrastructure asset replacement and expansion. Sustainable water services delivery will enhance the municipality's ability to provide equitable and affordable water and sanitation services through cross-subsidization. The City’s strategic intent, aligned with the national agenda and as stated in the IDP, is universal access to basic services and to achieve operational, financial and other efficiencies which will enhance equitable, affordable and effective service delivery and sustainable development. There is a high priority for economic growth and job creation, and ensuring a sustainable city. Water Services’ institutional reform process is also guided by the Strategic Framework for Water Services (SFWS) dated September 2003. GOTO 7.3. For an extract from the SFWS on the institutional reform of water services provision GOTO 7.4. The objectives of the reform process are given in Table below: Reform Objectives (Strategic Framework for Water Services) The key objectives of reform are: Ensure the provision of an appropriate level of water services that are sustainable to all households in South Africa and to implement the free basic water and sanitation policies effectively and efficiently Improve the performance of water services providers Improve the financial viability and sustainability of the water services sector by significantly enhancing revenue collection (from those who use in excess of a basic service) and improving consumer management Improve the accountability of water services providers to water services authorities and to consumers Use existing capacity, skills and resources in the water services sector in an integrated and optimal way and to attract, develop and retain the necessary professional and technical skills, and improve employment and gender equity Improve the efficiency of water use so as to ensure the wise use of South Africa’s scarce water resources through appropriate demand management and conservation initiatives and Improve the regulation of water services providers to ensure technical and environmental standards are met, services are provided efficiently and services are appropriately priced. 217 City of Cape Town WSDP 2008/09 to 2012/13 The key determinant of Water and Sanitation’s institutional arrangements is the institutional arrangements of the City as a whole. An extract from the 2007/08 IDP (Draft 15.03.07vx2.2) is given below: of the IDP states: Strategic Focus Area 7 Good Governance and Regulatory Reform There is a short term, high priority need to stabilize the organisation and execute various institutional improvements to give effect to the IDP. The focus, therefore, is on an intensive effort to develop and sustain a better public administration as well as improving the regulatory environment to maximise the impact of public investment and service delivery on the development potential of Cape Town. The current level of performance of the City, mainly due to a lack of capacity, cumbersome red tape processes, a silo approach to the developmental challenges facing Cape Town and the absence of a high performance service delivery culture have a significant negative impact on public performance. The City will continue to align with and strengthen intergovernmental (including with state-owned enterprises) strategies, processes and programmes, including budgets, in order to maximise resources and support delivery and positively impact on efficiencies and sustainability. The City therefore intends to Stabilise the organisation develop and sustain a better public administration improving the regulatory environment With the aim of maximising the impact of public investment and service delivery on the development potential of Cape Town. The institutional objectives given in the IDP are: 7.1 Optimising the development of our Organisation staff structure, strategies, policies and promote skills development. 7.2 Enhance service delivery through exploring alternative service delivery mechanisms. 7.3 Strategically utilise information technology, validated data bases and systems to support the transformation of public services to provide better and more efficient government and reporting structures. 7.4 Improve the service culture and workplace ethics by accomplishing sound financial governance; improved accountability and transparency. 7.5 Management of key financial areas such as income control, cash flow, indigent support, alternative income opportunities, asset management and risk management. 7.6 Improve the regulatory environment through conducting policy and by-law review (Bureaucratic red tape). 7.7 Establishment of representative Ward Participatory Mechanisms 7.8 Improvement of community satisfaction 218 City of Cape Town WSDP 2008/09 to 2012/13 Human Resources Primary Objective The strategic provision, development and retention of a skilled-, motivated-, and economically-viable workforce for Water Services in the interests of the City of Cape Town, its residents and visitors, and aligned to the vision of the City. Secondary objective(s) Ensure staff is orientated towards learning thus establishing a sustainable skills base. Introduce a performance-driven culture by developing appropriate reward strategies. Ensure employment equity by appropriate training programmes and staff assessments. Ensure effective personnel administration as set out in the Just Administration Act. Facilitating business process engineering / redeployment of staff by combining emergency repair gangs and eliminating duplication of functions. Establish Wellness coordination for Occupational Risk Management initiatives, for example HIV/AIDS/ TB/ EAP programmes. Develop and maintain a skilled and motivated workforce by retraining managers, attending to remuneration levels, and inspiring staff. F.7.1.2.1 Water services providers (retail water) The trends and goals that apply to the how service, as outlined in F.7.1.2 applies to this. F.7.1.2.2 Water services providers (sanitation water) The trends and goals that apply to the how service, as outlined in F.7.1.2 applies to this. F.7.1.2.3 Water services providers (bulk water) The trends and goals that apply to the how service, as outlined in F.7.1.2 applies to this. F.7.1.2.4 Water services providers (bulk sanitation) The trends and goals that apply to the how service, as outlined in F.7.1.2 applies to this. F.7.1.2.5 Support services agent (water) The trends and goals that apply to the how service, as outlined in F.7.1.2 applies to this. 219 City of Cape Town WSDP 2008/09 to 2012/13 F.7.1.2.6 Sanitation promotion agent The trends and goals that apply to the how service, as outlined in F.7.1.2 applies to this. F.7.1.3 Strategic gap analysis Institutional Reform The decision to establish an appropriate service authority mechanism and the establishment of a Water Service Authority (WSA) and a Water services Provider (WSP) arrangement has experienced numerous obstacles. The decision to form an internal ring-fenced business unit dates back to November 2001 with the confirmation that WSA and WSP be established dating back to June 2004. The purpose of investigating Section 78 options and deciding on an appropriate model for the separation was to: Comply with national legislation. Bring effect to national and City’s strategic intent Comply with the Council resolution on the matter in June 2004 Ensure that water and sanitation services in the City are sustainable The current arrangement is that accountability for the financially ring-fenced internal branch acting as WSP rests with the Director: Water Services who is expected to deliver on the city’s strategic goals through the organizational structure to the Executive Director: Utility Services and the 3-year rolling business plan made up the WSDP and related documents such as the SDBIP and the Utility Services: BSC. The branch has set up a properly-staffed Financial section to focus on financial sustainability. Management is finding that this arrangement is working well and that introducing further measures such as a formal service-level agreement between the WSA and WSP is not a priority, with no apparent advantages. Human Resources The lack of staff capacity in key areas such as Finance, technical and project management is hampering delivery. Processes and Systems Processes and systems to support service delivery need improvement. F.7.1.4 Implementations strategies (water services institutional arrangements) Institutional Reform Strategy Establish an appropriate service authority mechanism and the establishment of a Water Service Authority (WSA) and a Water services Provider (WSP) arrangement in accordance with Council resolution. Date of implementation is still to be set. For the roles and definition of the WSA and WSP GOTO 7.6 220 City of Cape Town WSDP 2008/09 to 2012/13 Accountability for the entire service will rest with the Director: Water and Sanitation Services who will then be expected to deliver on the national and city strategic intent through a Service Provision Agreement (SPA) and a 3 year rolling business plan. Investigate alternative service delivery mechanisms. HR Strategy The HR Strategy includes: Budget for and fill key financial, technical and project management posts. The financial posts focus on income generation. Multi-skilling existing staff through learnerships and other Tertiary education, therefore full impact of replacement staff can largely be negated and resultant financial sustainable manpower costs. Increase Training programmes and reduce labour and support costs. Actively head hunt – Humanity Science and Technology students via Tertiary Educational Institutions, build partnerships to “groom” designated students for the Water Services sector, e.g. by job shadowing. Establishing Science designated groups. and Technology mentorships for in-house Utilisation of a small Nucleus of well trained multi-skilled contract staff to supplement manpower resources. Processes and Systems To enhance processes and systems and promote a world class status for the Water and Sanitation Services Department, it is intended that all branches achieve ISO 9001:2000 accreditation. 221 City of Cape Town WSDP 2008/09 to 2012/13 F.8 CUSTOMER SERVICE PROFILE For explanation from the Preparation Guideline GOTO Ex20 F.8.1 Customer service F.8.1.1 Situation assessment (customer services) Item Resources available to perform the function Budget Bylaws Infrastructure Personnel 1 Quality of service for water: urban Yes Yes Yes Yes 2 Quality of service for water: rural Yes Yes Yes Yes 3 Attending to complaints for water: urban Yes Yes Yes Yes 4 Attending to complaints for water: rural Yes Yes Yes Yes 5 Attending to complaints for water: urban Yes Yes Yes Yes 6 Attending to complaints for water: rural Yes Yes Yes Yes 7 Education for basic water services Yes Yes Yes Yes 8 Pollution Awareness Yes Yes Yes Yes While the budget, infrastructure and personnel are generally in place for this function, projects are ongoing to improve the performance of the function and to obtain consolidated statistics. The CCT is committed to providing efficient, uninterrupted and affordable services, which are clean and safe to all consumers. It plans to enhance this by extending the implementation of the ISO 9001 Quality Management System throughout Water and Sanitation Services. Customer/Consumer Charter Key elements of the extended implementation of ISO 9001 Quality Management System are: Communication including the Customer Charter and Opinion Surveys Revenue collection including data rectification, informative and accurate billing Quality management, which includes the improvement of service levels and the implementation of benchmarking, procedures and Audits The ISO 9001 Quality Management System will: assist integration of previous administrations 222 City of Cape Town WSDP 2008/09 to 2012/13 help ensure better customer service improve safety improve efficiency/production- lower costs facilitate performance management The Consumer (previously Customer) Charter was introduced as part of this process during 2001. For the latest copy GOTO 8.1. Consumer Surveys Since 2002, Water and Sanitation Services have been commissioning research on an annual basis, to discover what the needs and perceptions of the consumers of water were. The findings from the research are being used: as input to the ISO 9001:2000 certification auditing, helping to ensure that an acceptable level of service satisfaction is achieved and maintained to uncover needs not currently being addressed, especially informal areas to uncover needs among specific groups, such as business and commerce to prepare input for updating the Water Services Customer Charter to measure the level of satisfaction with the service Information is being gathered from a range of users in the CCT by a professional market research consultant. Samples taken are statistically representative of all the users, which implies that the findings are taken seriously. The following issues are mainly addressed: Perception of services received: drinking water, effluent water or sewer(sanitation) drainage Evaluation of services rendered when reporting problems or enquiring about water services Awareness of environmental initiatives, including water conservation or restrictions Effectiveness of marketing drives such as around Water Week Issues relating to payment and billing procedures for services Importance rating and evaluation of services supplied Demographics of the market Presentations on all the findings are given on the Cape Town website GOTO or the PDF document GOTO 8.2. For a report on the 2006 findings GOTO 8.3. Customer and Meter Management Strategy In terms of Chapter 9 Section 95 of the Local Government Municipal Systems Act 2000, the CCT is required to establish a Sound Customer and Revenue Management System. Over the years Local Government has had a wide variety of service policies, service practices and levels of resources in the previous seven Administrations. Water and Sanitation Services is committed to addressing these aspects within an integrated comprehensive Customer 223 City of Cape Town WSDP 2008/09 to 2012/13 and Meter Management Strategy for Water and Sanitation Services to ensure a focussed, effective and efficient service delivery on an equitable basis to all our communities across the City of Cape Town. The strategic issues, policies, objectives and initiatives of the Customer and Meter Management Section are herewith briefly discussed: Key Strategic Issues There are seven key strategic issues on which CCT is basing its customer and meter management strategy: F.8.1.1.1 An Effective Debt Management Process (refer to 9.6 Income and Sales) Meter Verification and Meter Accuracy (refer to 9.7 metering and billing) Meter Management and Billing (refer to 9.7 metering and billing) Meter Reading (refer to 9.7 metering and billing) 24/7 Technical Operation Centre (refer to F.8.1.1.3) Corporate Call Centre (refer to F.8.1.1.3) Customer Interaction (refer to F.8.1.1.7) Quality of service for water: urban The overview of the quality of service provided is given in the table below: Item Current* 1. Total no. of consumers 656 800 2. No. of consumers experiencing greater than 7 days interruption in supply per year Zero 3. No. of consumers receiving flow rate of less than 10 litres per minute Zero 4. Water quality: no chlorination Zero 5. Water quality: chlorinated Zero 6. Water quality: full treatment 656 800 *Information is not available for the previous years. The fourth annual detail independent survey of consumer perceptions of Water and Sanitation Services has been completed. 87% of consumers are satisfied with the service, a result up from 83% in 2004, with a significant upward swing from “Somewhat satisfied” to “Very satisfied”. Specific findings from this survey have been used to identify areas where service can be improved. The ratings from previous surveys are given in the table below: 224 City of Cape Town WSDP 2008/09 to 2012/13 Percentage of customers satisfied with the service F.8.1.1.2 2002/03 2003/04 2004/05 2005/06 > 80% > 80% 83% 87% Quality of Services for water: rural Refer to F.8.1.1.1 F.8.1.1.3 Attending to complaints for water: urban and rural The statistics with respect to attending to complaints is given below: Item 2005/06 1 Total number of consumer units 656,800 2 No. of complaints queries of quality of service within a year 28,912 3 % of complaints / queries 4.40% 4 % queries responded to within 24 hours 5 Number of major or visible leaks reported per annum * ** 6 % Major or visible leaks repaired within 48 hours after being reported * Event recording is not currently done at the TOC. The Districts are informed and enter the notification into SAP themselves. Statistics are therefore not available. ** These statistics are now being captured City wide and are available as from June 2006 * Technical Operation Centre (24hr Emergency Service) During 2004, Water and Sanitation Services set up a centralised Technical Operation Centre (Tel. 086 010 3054) to respond to all technical complaints and enquiries such as: Burst, leaking and damaged water and mains/leadings and meters Water taste and discoloration problems Low water pressure or interrupted supply Water restriction contravention reporting or advice It provides a one-number 24/7 customer interface and technical dispatch centre for all of Water and Sanitation Services functions as an after hours operational centre for a number of other services also. It has become a critical role player in the management process relating to events affecting 225 City of Cape Town WSDP 2008/09 to 2012/13 Water and Sanitation Services such as the Water Restrictions since 2004 as well as the electricity power outage schedules of 2006. Water restrictions are policed and monitored by Water Officers who not only respond to complaints but also pro-actively investigate suburbs where water wastage is detected. During the 2005/06 financial year, the TOC’s operation was bedded down and much improved. An average of 45 000 calls per month are taken with and an average call response time of 8 seconds and only 1% dropped. The following table is sent to the Portfolio Committee on a monthly basis to keep them informed of the call volumes and complaints/requests at the TOC: MONTH Mar CALL VOLUMES IN OUT TOTAL 16 901 14 043 30 944 Apr 20 303 18 327 38 630 4 2 496 3 850 1 490 7 840 May 18 983 19 162 38 145 1 2 194 3 825 1 388 7 408 Jun 22 016 20 587 42 603 2 2 844 4 113 1 192 8 151 Jul 21 255 19 042 40 297 0 2 501 3 367 936 6 804 Aug 23 313 23 701 47 014 0 2 768 4 801 1 000 8 569 Sep 20 260 18 388 38 648 0 3 398 5 035 658 9 091 Oct 22 146 19 656 41 802 0 4 199 5 089 777 10 065 Nov 24 749 21 055 45 804 0 4 836 5 320 1 007 11 163 Dec 23 643 20 124 43 767 0 4 814 5 844 839 11 497 Jan 07 23 323 19 802 43 125 0 5 109 5 509 916 11 534 Feb 07 20828 18980 39808 0 5114 5522 894 11530 Avg /month 21 477 19 406 40 882 1 3 540 4 659 1 041 9 241 TOTAL 257 720 232 867 490 587 17 42 480 55 905 12 488 110 890 Restrictions 10 COMPLAINTS / REQUESTS Water Sanitation Other 2 207 3 630 1 391 From this table the key complaints/requests statistics are given below: Area Total: Year to Feb 07 Monthly average 490 587 40 882 17 1 Water 42 480 3 540 Sanitation 55 905 4 659 Total incoming and outgoing calls Water restrictions 226 TOTAL 7 238 City of Cape Town WSDP 2008/09 to 2012/13 Area Total: Year to Feb 07 Monthly average Other 12 488 110 890 All calls are logged and responded to appropriately, becoming part of the Workflow process. All calls reaching the Corporate Call Centre but dealing with Water and Sanitation Services-related matters are re-routed to it. A number of pilot applications for new technology utilisation towards improved operational processes such as GIS, GPS and Vehicle tracking have been implemented. Corporate Call Centre A Corporate Call Centre (Tel 086 010 3089, Fax 086 010 3090, e-mail accounts@capetown.gov.za) has been established by the City, which receives most complaints and requests, also those in respect of water account queries. Any technical complaints or others related to water that cannot be dealt with by the Corporate Call Centre, is forwarded via an electronic notification to the Technical Operation Centre for action. F.8.1.1.3 Attending to complaints for sanitation: urban and rural The statistics with respect to attending to complaints is given below: Item 2005/06 1 Total number of consumer units 656,800 2 No. of complaints of quality of service within a year 45,310 3 % of complaints / queries 6.90% 4 No. of blockages reported per annum ** 5 % queries responded to within 24 hours * 6 % blockages repaired within 48 hours after being reported * * Event recording is not currently done at the TOC. The Districts are informed and enter the notification into SAP themselves. Statistics are therefore not available. ** These statistics are now being captured City wide and are available as from June 2006 Refer also to F.8.1.1.3 227 City of Cape Town WSDP 2008/09 to 2012/13 F.8.1.1.4 Education for basic water services Customer Interaction This function includes engaging the public and educating them in the awareness of Water Conservation, Water Pollution and Water Demand Management. It also deals with broad-impact citizen queries and correspondence as well as matters that are logged at the Corporate Call Centre but which require specialist investigations. Customer education, communication and liaison are accepted as key strategic issues and are being afforded a high priority in the new structure of Water and Sanitation Services. Water conservation, water pollution, water ingress and payment habits, among others, are all being addressed in a comprehensive and sustainable fashion. Hlonipha Amanzi (Respect Water) Programme In 2006/07 Water and Sanitation Services launched their “Hlonipha Amanzi” Programme. The programme covered 30 informal areas. The project was aimed at informing and educating informal communities on the basic services provided. The campaign promoted and encouraged community cooperation to better manage valuable resources such as water, to help keep the environment and themselves clean and to prevent the spread of diseases associated with an unhealthy environment. Through this it was hoped to build better communities. The objectives of the project were: Promotion of sustainable service delivery Promotion of improved management of existing resources Promotion of health and well-being of individuals Education on how to be responsible and create a safe, secure and hygienic community Making information/reporting lines more accessible It was a requirement of the project that the consultants employ individuals from each community, through a consultative process, for the duration of each set of workshops and to leave behind capacity-building skills. This project was unique to the Branch in that three consultants (each assigned different areas) worked closely with the project leaders to ensure that the same content, material and issues were taken to each area to provide the consistency required. This was important, as the intention is to continue to roll this project out to the remaining informal areas throughout the City of Cape Town until all informal areas have been covered. A series of workshops were held in each area. The workshops started off with an icebreaker to bring everyone together. This was then followed by the main body of the workshop running through topics on flipcharts which included: service delivery elements, vandalism, unhealthy environments, disease/germs and what the community can do to prevent this. The workshops culminated in washing of hands, tea/coffee and sandwiches for all and presentation of certificates for all attendees as well as a bucket, soap, and soap dispenser. The last workshop in each area also had lucky draws for small prizes, like retail store vouchers and food hampers. 228 City of Cape Town WSDP 2008/09 to 2012/13 Areas covered in this first phase included: Thabo Mbeki, Klipfontein, Area K, Kosovo, Samora Machel, Ekanni, Ekanni (Michells Plain), Morkel’s Cottages, Sir Lowry’s Pass, Solly’s Town, Siyahlala, Happy Rest, Silihluwe, Polile, Wag ‘n Bietjie, Cuban Heights, Rondevlei, Joe Slovo (zones 1, 2 & 3), Wallacedene, Happy Valley, Kalkfontein, Malawi, Red Hill, Vrygrond, Mxolisi Petani – Taiwan, Monwabisi Park, Mfuleni, Witsand, and Doornbach. Overall, the workshops have been very well received by the communities they served. The community members attending the workshops were very enthusiastic and some very valuable comments have been received, which will be utilised in the next round of workshops. F.8.1.1.5 Pollution awareness The Hlonipha Amanzi Programme covers pollution awareness in informal settlements. F.8.1.2 Future trends and goals (customer services) F.8.1.2.1 Quality of service for water: urban and rural For explanation from the Preparation Guideline GOTO Ex21. The goal is to ensure that the percentage of customers satisfied with the service continues to increase and reaches 95% within the next 5 years. F.8.1.2.2 Attending to complaints for water: urban and rural The goal is to ensure that all complaints / queries are routed through the TOC within the next two years and that consolidated statistics on response times and other indicators are available. F.8.1.2.3 Attending to complaints for sanitation: urban and rural Refer to F.8.1.2.3. F.8.1.2.4 Education for basic water services The goal is to extend the successful “Hlonipha Amanzi” programme to all currently existing informal areas by mid 2009. F.8.1.2.5 Pollution awareness The Hlonipha Amanzi Programme will continue to be used to raise awareness on pollution issues. F.8.1.2.6 Quality of health and hygiene education and awareness Refer to F.8.1.2.5 F.8.1.3 Strategic gap analysis (customer services) For explanation from the Preparation Guideline on targets GOTO Ex22. There is no consolidated information on response times to complaints and queries and to repairing water and sewer mains. The reasons are: 229 City of Cape Town WSDP 2008/09 to 2012/13 TOC does not currently do notifications on SAP and the information systems are not integrated. There is a huge backlog in closing of notifications. The lack of integration of the TOC and District processes also means that other statistics such as number of burst water mains and sewer blockages repaired have to be obtained from the Districts. It is not possible to get a consolidated report. The link between SAP and GIS is not in place. All informal areas have not been covered with education for basic water and sanitation services. F.8.1.4 Implementations strategies (customers services) In order to ensure that consolidated information is readily available from SAP the project for integrating the TOC and SAP processes have been raised to the level of a corporate project. It is envisaged that it will still take 12-14 months before the system is fully integrated. The link between SAP and GIS is planned to be in place by the end of 2007 More funding is required to improve the facilities at the TOC Centre The successful “Hlonipha Amanzi” Programme will be rolled out to the remaining informal settlements 230 City of Cape Town WSDP 2008/09 to 2012/13 F.9 FINANCIAL PROFILE For explanation from the Preparation Guideline GOTO Ex23. As part of the review of the WSDP, and in the context of important financial constraints on the City, Water and Sanitation Services commissioned a study in 2004/05 to undertake a financial assessment of its services. The high level purpose of the study was to assess an affordable and sustainable level of capital expenditure for Water and Sanitation Services and to determine the implications of this for future operations. For the Financial report from Palmer Development Group GOTO 9.1 (Draft 2 - dated 17 November 2005). The figures contained in this report were updated in November 2006. For an update of the model results dated November 2006 GOTO 9.2a and for the presentation GOTO 9.2b. The financial model was developed to allow the user to develop and choose from four capital expenditure scenarios, as follows: A “needs-based” capital programme based on information received directly from the water services officials; The “modelled” scenario which is based on unit costs (input) and demand (early model assumptions); This scenario is a “smooth” scenario and assumed no “lumpiness” in capital development. Although this is unrealistic, it nevertheless provides a useful basis for comparison with other scenarios at an indicative level. An ”affordable” scenario which can be input directly by the user. The Consultant assumed 25% of revenues as an affordable long-term capital spend. A “selected option” allowing the user to choose one of the three options for each of the major components of the system, viz. bulk water expansion, bulk water renewals, etc. The primary objectives of this study were to: To determine an indicative affordable and sustainable capital expenditure programme for the City of Cape Town Water and Sanitation Services; To determine the implications of the capital programme on: Financing (how funds are secured), The service (what can and cannot be done), and Tariffs (the impact on the customer); and To identify the key strategic issues facing the service in order to ensure Water and Sanitation Services were provided in a sustainable manner into the future. The conclusions of the report were that: An affordable long-term capital expenditure programme appears to be in the region of R500 million per annum (smoothed over time), though it is recognised that actual expenditure will be “lumpy”. 231 City of Cape Town WSDP 2008/09 to 2012/13 The implications of the capital expenditure programme were: Financing (how funds are secured), 1. Water services needs to secure an appropriate share of MIG funds 2. The current cost of capital for sanitation is too high and must be renegotiated with the Department of Finance in the City. 3. Water services should investigate project finance, especially for large discrete bulk water and wastewater investments. Some of the wastewater investment could be packages to make them more attractive. The service (what can and cannot be done), and Direct operating costs need to increase significantly in real terms over the next four years as a result of a need to increase maintenance costs and because of increasing bulk water costs. This is notwithstanding efficiency gains with respect to staff costs and general expenses. Tariffs (the impact on the customer); The average tariffs need increase in real terms annually. The report identified the key strategic issues facing the service in order to ensure Water and Sanitation Services are provided in a sustainable manner into the future: A sustainable capital programme must cater for three important elements simultaneously: (1) elimination of backlogs and provision for new demand (2) bulk expansion to cater for new demand, and (3) rehabilitation and replacement of existing infrastructure. At present there is an inadequate provision for depreciation of assets. This must change to ensure sustainability. Depreciation should encompass all assets, including grant funded assets and assets fully paid for. At present there is inadequate maintenance of infrastructure. Expenditure (and efficiency in spending) must increase significantly in real terms. It is not clear by how much without more detailed study. An adequate cash collection is critical to the business. This is not in the control of the business and failure to perform in this area could seriously jeopardise the business. In all of the scenarios modeled, there is a need to increase tariffs significantly in real terms to ensure sustainability. Much more attention needs to be given to the financial aspects of the business. It needs dedicated attention from a high level financial person adequately resourced with skilled staff such as cost accountants to improve the overall financial performance and efficiency of the business. Joburg Water, arguably the best performing 232 City of Cape Town WSDP 2008/09 to 2012/13 water services utility in the country, have about 40 staff dedicated to the finances of the business, under a senior Chief Financial Officer. The current tariff structure is in need of urgent reform. It is an inherently unstable tariff structure and places the Water and Sanitation Services business in potential financial jeopardy. For intercity comparison of GOTO 9.3 Much more attention needs to be given to data integrity (see separate report produced during the long-term water demand study for more detail). Further to the Palmer Development Group report the City has undertaken a range of measures to ensure that the finances of the City remain sustainable into the future. These are targeted towards the City achieving long-term financial viability and sustainability. The 2007/08 IDP lists the strategies that are being pursued: Reducing salary costs to acceptable levels, taking into account the City’s new operating model and transferring savings to improve the maintenance of assets. Water and Sanitation have had to increase their staff due to critical shortages. However, strategies outlined above ensure that the service remains affordable; Reducing the dependency on cross-subsidisation from tariff-based services to within acceptable norms. As from 2007/08 the water tariff no longer cross subsidizes rates; Maintaining rate and tariff adjustments within national norms and guidelines, ensuring the national and local economy are not undermined. Despite higher than inflation increases in tariffs necessitated by infrastructure needs the step tariffs and relief to Indigent households outlined above ensures that water and sanitation is affordable; Making adequate provision for free basic services for the poor, to ensure that there is no further marginalisation of poorer communities or individuals through the entrenchment of the indigent policy. The Water and Sanitation approach to affordability is outlined above; Preparing realistic income budgets with adequate provision for non-recovery to ensure the expenditure reflected for each year can be fully covered by cash receipts; (Being Done) Ensuring that adequate cash reserves are maintained to cover legislated funds and provisions. (Being Done) Some of the interventions in place, though not fully integrated, include: The consolidation of all legacy billing systems and implementation of a uniform rates and service structure for the City as a whole; the working of a single/integrated financial system (SAP), providing regular and timely reports to all stakeholders; constantly seeking out opportunities for external funding to supplement the City’s budget and reducing reliance on the City’s own funds for capital development; and regularly reviewing financial strategies and benchmarking against other organisations 233 City of Cape Town WSDP 2008/09 to 2012/13 F.9.1 Capital funds F.9.1.1 Situation assessment (capital funds) F.9.1.1.1 Capital expenditure (budget): water (R Million) The historical capital budget for water and sanitation is given in the table below: 2004/05 R mil 2005/06 R mil 2006/07 R mil 2007/08 R mil 0.1 10.1 0.0 31.3 13.0 27.3 17.8 77.8 156.0 278.3 307.6 404.1 SUPPORT SERVICES 0.0 4.0 0.0 3 SCIENTIFIC SERVICES 0.0 3.0 0.0 2.3 61.7 78.7 87.7 133 0.0 0.0 2.0 22.5 WATER METER REPLACEMENT ** ** ** 16.0 INFORMAL SETTLEMENTS ** ** ** 56.4 13.6 0.0 8.5 0.0 244.5 401.3 423.6 746.4 EAMS BULK WATER RETICULATION WASTE WATER WDM OTHER W & S SERVICE TOTAL For spreadsheet GOTO 9.4 ** Included elsewhere previously. F.9.1.1.2 Capital expenditure (budget): sanitation (R Million) Refer to F.9.1.1.2 F.9.1.1.3 Sources of capital income: water (R Million) The historical sources of capital funding for water and sanitation is given in the table below: 2005/06 R mil 2006/07 R mil AFF (now CRR) 55.4 62.0 BICL 22.6 53.0 CMIP 4.5 0.0 DWAF 1.7 0.3 161.6 152.1 EFF 234 City of Cape Town WSDP 2008/09 to 2012/13 MIG Other TOTAL 2005/06 R mil 2006/07 R mil 137.5 141.1 18.1 15.1 401.3 423.6 For spreadsheet GOTO 9.4. Historically EFF and MIG funding for water and sanitation have been approximately been R155 million and R140 million respectively. F.9.1.1.4 Sources of capital income: sanitation (R Million) Refer to F.9.1.1.4. F.9.1.2 Future trends and goals (capital funds) The backlog in basic services and in infrastructure development that has arisen over a number of years and the continued growth in the city particularly at specific growth nodes results in an extensive capital infrastructure programme being required. Water and Sanitation Services is committed to eradicating the backlogs and keeping pace with the growth while at the same time reducing the demand for water through its WC&DM Strategy. The projected capital expenditure (in R mil) for the next 3 years is: Functional Area Bulk Water Reticulation Wastewater Treatment Water Demand Management EAMS Informal Settlements Meter Replacement Information Technology Technical Operation Centre Masterplanning TOTAL 2008/09 R mil 38.4 351.5 226.5 2009/10 R mil 149.5 293.6 228.0 2010/11 R mil 414.9 269.8 222.0 27.0 0.6 18.1 14.0 3.5 38.3 19.1 40.5 15.0 3.5 26.5 18.0 17.0 15.0 2.5 1.0 2.0 682.5 0.5 2.0 790.0 0.5 2.0 988.2 GOTO 9.5 for more detail F.9.1.2.1 Capital expenditure (budget) : water See F.9.1.2 F.9.1.2.2 Capital expenditure (budget): sanitation (R Million) See F.9.1.2 235 City of Cape Town WSDP 2008/09 to 2012/13 F.9.1.2.3 Sources of capital income: water (R Million) The sources of capital income for water and sanitation are given below: Funding MIG BICL EFF Total 2008/09 171.6 79.2 431.7 682.5 2009/10 137.5 0.0 652.5 790.0 2010/11 93.5 4.0 890.7 988.2 MIG = Municipal Infrastructure Grant BICL= Bulk Infrastructure Contribution Levy EFF = External Financing Fund F.9.1.2.4 Sources of capital income: sanitation (R Million) See F.9.1.2.3 F.9.1.3 Strategic gap analysis (capital funds) For explanation from SFFWS GOTO Ex24 Obtaining sufficient capital for the infrastructure programme is a challenge. A reliable and steadily improving income stream is required. F.9.1.4 Implementation strategies (capital funds) The following strategies, in addition to the corporate strategies mentioned under F.9, have been developed to ensure that there is sufficient capital to meet the infrastructure challenges. They are: Optimisation of Grant funding. Increase of the CRR via gains made through interventions. Finding sustainable / affordable level of EFF funding via MTREF modelling. F.9.2 Operating cost and income F.9.2.1 Situation assessment (operating costs and income) The historical operating costs broken down into categories as reported through the SAP system are: 2003/04 R mil 2004/05 R mil 2005/06 R mil 2006/07 R mil Salaries Wages and Allowances 304.36 314.31 343.94 348.21 General Expenses - Other 190.14 182.00 234.30 251.58 Bulk Purchases 119.15 165.92 218.59 249.71 44.58 51.62 58.75 67.88 0.00 0.00 0.00 0.00 197.75 128.56 165.51 324.86 Contract Services Grants and Subsidies Bad Debts / Working Capital Reserve 236 City of Cape Town WSDP 2008/09 to 2012/13 2003/04 R mil 2004/05 R mil 2005/06 R mil 2006/07 R mil Repairs and Maintenance (primary) 64.86 68.21 89.17 77.06 Repairs and Maintenance (secondary) 77.89 124.97 137.13 116.20 0.00 114.28 125.28 129.47 110.91 129.22 122.88 110.40 3.82 148.64 190.08 147.41 43.02 42.75 44.48 48.24 664.51 645.58 687.02 735.11 8.78 9.78 10.60 11.82 Internal Contribution Expenditure 119.88 119.88 90.00 92.04 Activity Based Costs -74.59 -99.18 -108.07 -92.30 60.25 117.63 100.38 134.36 1,935.29 2,264.15 2,510.04 2,752.06 Depreciation Interest Internal Borrowings Transfers to&from Reserves/Appr Acct Internal Utilities Expenditure Bulk Charges Expenditure Insurance Departmental Expenditure Corporate Support Services Water and Sanitation Totals The nominal and real increases in the previous budgeted expenditure were as follows: Nominal Increases 2003/04 to 2004/05 17.0% 2004/05 to 2005/06 10.9% 2005/06 to 2006/07 9.6% 6.0% 6.0% 6.0% 11.0% 4.9% 3.6% Inflation Real Increase F.9.2.1.1 Operating costs: water See F.9.2.1 F.9.2.1.2 Operating costs: sanitation See F.9.2.1 F.9.2.1.3 Operating income: subsidies The Equitable share stands at R178.9 million for 2007/08 increasing at 5% per annum for the next 5 years. 237 City of Cape Town WSDP 2008/09 to 2012/13 F.9.2.1.4 Operating income: tariffs For explanation from the Preparation Guidline GOTO Ex25. Revised Water and Sanitation Tariff Policies are approved every year. For the 2007/08 policies GOTO 9.6. F.9.2.2 Future trends and goals (operating cost and income) F.9.2.2.1 Operating costs: water The City is expected to grow at 1.5% per annum for the next 5 years with inflation at 6.5%. While water demand has historically grown at between 3 and 4% per annum, Water and Sanitation Services is planning on the low water demand curve of 2% pa increase by continuing to implement the WC&DM Strategy. The purchase of bulk water is therefore expected to increase by inflation plus 2%. Costs in specific areas as highlighted under F.9.2.3 are expected to increase above 6.5% (inflation and city growth) due to current shortages and backlogs. The drive to reduce non-payment and bad debt will result in the reduction of the bad debt provision over time. The three year operating budget from 2008/09 onwards with 2006/07 and 2007/08 for water and sanitation broken and down into categories as reported through the SAP system are given in the table below: ITEM Salaries, Wages and Allowance Employee Related Costs - Social Contribution General Expenses Contracted Services Repairs and Maintenance (Primary) Bad Debts Provision / Working Capital Reserve Collection Costs Bulk Purchases - Electricity Bulk Purchases - Water Bulk Purchases - Water Research Levy Indigent Relief Grants & Subsidies Paid Interest on External Loans Depreciation Transfer to / from Future Depreciation Fund Transfer to / from CRR Housing Funds FDR :Transfer Capital Receipts Operating G & D - Projects Internal Utilities Expenditure Bulk Charges Insurance Departmental Premiums: Assets Based Insurance Departmental Premiums: Remuneration Based Interest Paid Internal loans Trading Contribution to Rates Activity Based Costing - Operating Account Activity Based Costing - Recharges Repairs & Maintenance (Sec) 238 2006/07 R mil 264 58 248 69 86 437 0 0 163 8 0 0 0 127 -36 15 1 148 0 21 782 11 2 117 90 -57 17 71 2007/08 R mil 431 61 274 107 104 263 0 0 259 12 0 0 0 158 -42 200 1 125 13 55 865 11 4 123 0 -139 10 159 2008/09 R mil 543 81 309 91 126 256 0 0 264 13 0 0 0 190 -63 91 1 172 15 61 942 11 5 142 0 -130 13 146 2009/10 R mil 592 88 341 97 138 284 0 0 295 14 0 0 0 199 -66 206 1 138 23 65 1,003 12 5 60 0 -138 14 155 2010/11 R mil 646 96 365 103 152 234 0 0 329 16 0 0 0 215 -71 100 1 94 23 69 1,068 13 5 296 0 -147 15 165 City of Cape Town WSDP 2008/09 to 2012/13 ITEM Operating Grants and Donations - Projects (Sec) Activity Based Costing - Capital Account Support Services Total Operating Expenditure % Increase in operating budget F.9.2.2.2 2006/07 0 -10 106 2,739 2007/08 0 -14 147 3,189 16.4% 2008/09 0 -17 218 3,480 9.1% 2009/10 0 -18 232 3,741 7.5% Operating costs: sanitation For trends on operating costs for sanitation refer to F.9.2.2.1 above. F.9.2.2.3 Operating income: subsidies The Equitable Share is projected to increase by inflation each year. F.9.2.2.4 Operating income : tariff The income from tariffs will be monitored over time to assess whether there is a need to change the tariff policies or structure. F.9.2.3 Strategic gap analysis (operating cost and income) On the expenditure budget there is insufficient budget provision in a number of areas which is impacting the effectiveness of the service. These are: Staff Maintenance of infrastructure Replacement of infrastructure There are cost pressures coming from the internal support services. Other gaps are: The capacity of the operating budget to cater for the backlogs in infrastructure maintenance and the operating impact of replacement and infrastructure development as a result of the growth in the city. Achieving acceptable levels of bad debts. F.9.2.4 Implementation strategic (operating cost and income) In order to close the gaps the following strategies will be implemented: Increase operating expenditure in key areas over 3 years in the following areas: Item Salaries, Wages and Allowance Repairs and Maintenance (Primary) Depreciation Transfer to / from Future Depreciation Fund Operating G & D – Projects Interest Paid Internal loans Activity Based Costing – Recharges Activity Based Costing - Capital Account Support Services 239 Increase pa 14.4% 13.3% 10.9% 19.3% 20.4% 33.9% 11.9% 12.1% 19.1% 2010/11 0 -19 248 4,015 7.3% City of Cape Town WSDP 2008/09 to 2012/13 Increased Expenditure need to be addressed via Increased Revenue. Affordable / Sustainable tariff levels to be obtained via MTREF Ensure payment of current accounts. Utilisation of R30 to assist indigent households with specific reference to water and sanitation. Implementation of water demand management devices to assist indigent households with water usage. Increase in capacity of water restriction teams. Very reasonable terms to pay outstanding debt. More focused approach current payments and top debtors. F.9.3 Tariff and charges F.9.3.1 Situation assessment (tariff and charges) The historical average tariff for water and sanitation/sewerage is: 2003/04 Average tariff (water & sanitation) Increase Restrictions 2004/05 2005/06 2006/07 5.47 6.56 6.71 7.22 No restrictions 19.9% 0% & 20% restrictions 2.2% 20% & 10% restrictions 7.7% 10% restrictions The increase from 2003/04 to 2004/05 was high due to the imposition of 20% restrictions while the subsequent year’s increase was low due to the reduction of the restrictions to 10%. During the same period the income from user charges increased on the budget (refer to section F.9.6.1) by: F.9.3.1.1 2004/05 2005/06 2006/07 8.8% 8.7% 7.1% Fixed charges: residential (per month) for water There are no fixed charges for water. F.9.3.1.2 Fixed charges: residential (per month) for sanitation There are no fixed charges. 240 City of Cape Town WSDP 2008/09 to 2012/13 F.9.3.1.3 Volume charges or other charge mechanisms: residential sanitation 2004 / 2005 2005 /2006 2006/ 2007 2007/ 2008** 0 – 4.2 0 0 0 0 +4.2 – 8.4 R1.52 R 1.60 R 1.68 R3.78 Domestic Full- Single residential properties. 70% of water consumption to a maximum of 28 Kl (pre 2006/07) and 35 (from 2007/08) of sewerage per month +8.4 – 14.0 R8.04 +8.4 – 28 R3.70 R 3.90 R 4.10 +14.0 – 28 R8.79 +28.0 - 35 R9.23 Domestic Cluster - Bulk metered flats, cluster developments. Including sectional and single title units. 90% of Water Consumption (* see note) R3.65 R 3.85 R 4.04 R9.10 An allowance of 4.2 kl per unit per month will be made available at zero cost upon submission of a signed affidavit stating the number of units supplied from that metered connection. **Note that the fixed charge was dropped from 2007/08. The sewerage tariff became fully volumetric. F.9.3.1.4 Block tariffs: residential (R/k) for water Block Domestic Full 0-6 2004/ 2005 0 Water that is used predominantly for domestic purposes and supplied to single residential properties. +6-12 R2.26 +6-12 R 2.39 R 2.56 R3.05 +12 – 20 R4.82 +12 – 20 R 5.10 R 5.46 R6.50 +20 – 40 R7.12 +20 – 40 R 7.55 R 8.08 R9.63 +40 – 60 R8.80 +40 – 50 R 9.33 R 9.98 R11.90 +60 R11.61 +50 R 12.31 R 13.17 R15.17 241 Block 0-6 2005/ 2006 0 2006/ 2007 0 2007/ 2008 0 City of Cape Town WSDP 2008/09 to 2012/13 Block Domestic Cluster – Bulk metered flats, cluster developments including single title and sectional title units. An allowance of 6 Kl per unit per month at zero cost upon submission of affidavits stating the number of units. 2004/ 2005 R4.82 Block F.9.3.2 Future trends and goals (tariff and charges) F.9.3.2.1 Fixed charges: residential (per month) for water 2005/ 2006 R 5.11 2006/ 2007 R 5.47 There are no plans to introduce fixed charges for water. F.9.3.2.2 Fixed charges: residential (per month) for sanitation The fixed charge for sanitation will be discontinued from 2007/08 onwards. F.9.3.2.3 Volume charges or other charge mechanisms: residential sanitation There are no plans to change the blocks in the sewerage tariff. F.9.3.2.4 Block tariffs: residential (R/k) for water There are no plans to change the blocks in the water tariff. The successful implementation of the WC & DM Strategy may necessitate a revision to the tariffs in the lower blocks. F.9.3.3 Strategic analysis (tariff and charges) For explanation from the Preparation Guideline GOTO Ex26. The tariffs are modelled every year and changes in consumption patterns are factored into the annual adjustments. Increasing expenditure will require increasing tariffs Reduction in water demand due to water demand management strategy may affect income received. Increasing expenditure will require increasing tariffs Reduction in water demand due to water demand management strategy may affect income received. No gap. Strategy is in place Request to increase the tariffs in line with MTREF modelling to meet increasing requirements. Monitor reduction in consumption and income and adjust tariffs accordingly Free basic water is provided to all. In addition Indigent households receive a credit of R30 pm on their water account. This enables them to use 10.62 Kl of water and dispose of 7.43 Kl of sewer for free. In addition, in order to reduce indigent households' water consumption, there is a program to repair plumbing leaks and install water management devices. 242 2007/ 2008 R6.95 City of Cape Town WSDP 2008/09 to 2012/13 F.9.3.4 Implementation strategies (tariff and charges) Implementation Strategies are outlined below: Request to increase the tariffs in line with MTREF modelling to meet increasing requirements. Monitor reduction in consumption and income and adjust tariffs accordingly The proposed domestic tariffs for water for 2008/09 are: TARIFFS FOR 2007/08 Domestic Full 0-6 0 PROPOSED TARIFFS PER KL VAT EXCLUSIVE 2008 / 2009 0-6 0 Water that is used predominantly for domestic purposes and supplied to single residential properties. +6-12 R 3.05 +6-12 R 3.33 +12 – 20 R 6.50 +12 – 20 R 7.10 +20 – 40 R 9.63 +20 – 40 R 10.52 +40 – 50 R 11.90 +40 – 50 R 12.99 +50 R 15.70 +50 R 17.14 R6.52 R 6.52 R 7.12 Domestic Cluster – Bulk metered flats, cluster developments including single title and sectional title units. An allowance of 6 Kl per unit per month at zero cost upon submission of affidavits stating the number of units. For the tariffs for 0%, 20% and 30% restrictions GOTO 9.7. The proposed domestic tariffs for sanitation for 2007/08 are: VOLUMETRIC TARIFFS Domestic FullSingle residential properties. 70% of water consumption to a maximum of 28 Kl of sewerage per month (70% of 40 Kl of water equals 28 Kl of sewerage) TARIFFS 2006 / 2007 PROPOSED TARIFFS 2007 / 2008 0 – 4.2 0 0 – 4.2 0 +4.2 – 8.4 R 3.78 +4.2 – 8.4 R 3.78 +8.4 – 14 R 8.04 +8.4 – 14 R 8.04 +14 – 28 R8.79 +14 – 28 R8.79 +28 - 35 R9.23 +28 - 35 R9.23 243 City of Cape Town WSDP 2008/09 to 2012/13 VOLUMETRIC TARIFFS TARIFFS 2006 / 2007 PROPOSED TARIFFS 2007 / 2008 R9.10 R 9.65 Domestic Cluster - Bulk metered flats, cluster developments. Including sectional and single title units. 90% of Water Consumption (* see note) An allowance of 4.2 kl per unit per month will be made available at zero cost upon submission of a signed affidavit stating the number of units supplied from that metered connection. * Important Note: The Director of Water and Sanitation may adjust the percentages as appropriate to the consumer. This is not applicable to the domestic full category. For the tariffs for 0%, 20% and 30% restrictions GOTO 9.7. There will be ongoing analysis of the changing water consumption and wastewater discharge patterns to ensure that income will be sufficient. In order to ensure that Water and Sanitation Services is able to meet the infrastructure and other challenges above inflation increases in the average tariff will be required as shown in the table below: Average Tariff (water and sanitation) Average Tariff (water) Average Tariff (sanitation) Average Tariff (water and sanitation) increase 2006/07 7.22 2007/08 7.61 2008/09 8.53 2009/10 9.25 2010/11 10.01 4.70 3.60 4.82 3.99 5.4% 5.45 4.40 12.1% 5.97 4.69 8.4% 6.53 4.97 8.2% Over the period income from user charges are projected to increase in accordance with the table below: 2007/08 4.6% 12.8% Service Charges (water) Service Charges (sanitation) 244 2008/09 15.3% 12.7% 2009/10 11.7% 8.5% 2010/11 11.5% 8.3% City of Cape Town WSDP 2008/09 to 2012/13 This assumes a city growth of 2.0% per annum, a 2% annual increase in water demand (low water demand curve), an inflation rate of 6.5% and that the 10% restriction will continue for the next 5 years. The reduction in revenue demand as a result of the WC&DM Strategy will result in higher increases in the average tariff although not a high average cost to the consumer. In other words the projected income from the user charges will remain the same but because of the lower water consumption the average tariff will increase. Based on a 0% annual increase in water demand the increases in the average tariff are as illustrated below: 2006/07 2007/08 2008/09 2009/10 2010/11 7.22 4.70 3.60 7.77 4.92 4.07 8.88 5.67 4.58 9.82 6.34 4.97 10.83 7.06 5.38 7.5% 14.3% 10.5% 10.4% Average Tariff (water and sanitation) Average Tariff (water) Average Tariff (sanitation) Average Tariff (water and sanitation) increase F.9.4 Free basic water F.9.4.1 Situation assessment (free basic) F.9.4.1.1 Subsidy targeting approach for free basic water The first 6 kilolitres of water supplied to all residential dwellings in the municipal area is free. There is no fixed charge. A R30 Indigent Grant (R20 prior to 2007/08 and applicable to sewerage) is applicable to the water tariff for qualifying households. This subsidy would be ineffective without the ongoing Integrated Leaks Repair and Fixit Projects aimed at repairing leaks, reducing consumption, reducing monthly bills and eliminating arrears of properties occupied by Indigent households. Refer to the Water Conservation and Demand Management Strategy. F.9.4.1.2 Subsidy targeting approach for free basic sanitation The first 4.2 kilolitres of sewerage removed from all residential dwellings in the municipal area is free. The fixed charge does not apply to dwellings occupied by Indigent households. A R30 Indigent Grant (R20 prior to 2007/08 R20) is applicable to the water tariff for qualifying households. The net result is that at 2008/09 tariffs an Indigent household can consume 10.29 kilolitres per month of water (with sewerage disposal assumed to be 70% of water consumption) without attracting any charges. F.9.4.2 Future trends and goals (free basic) F.9.4.2.1 Subsidy targeting approach for free basic water No changes to the existing structure are planned. The approach of free basic water to all may need to be revised in future. 245 City of Cape Town WSDP 2008/09 to 2012/13 F.9.4.2.2 Subsidy targeting approach for free basic sanitation No changes to the existing structure are planned. The approach of free basic sanitation to all may need to be revised in future. F.9.4.3 Strategic gap analysis (free basic) For explanation from the Preparation Guideline GOTO Ex27. While the tariff structure is aligned to the needs of the Indigent and a significant number of leak repairs have been done, leaking plumbing continues to result in higher water consumption and sewerage disposal and therefore higher and unaffordable charges. F.9.4.4 Implementation strategies The Integrated Water Leaks Repair and the Fixit Projects are addressing the high water consumption and sewerage disposal (refer to Water conservation and Demand Management). The Indigent Grant on top of free basic services will be monitored over time and changes made should it be necessary. F.9.5 Charges and block tariffs: Industrial and Commercial F.9.5.1 Situation assessment (charges and block tariffs) Water 2004/05 2005/06 2006/07 R 5.14 R 5.45 R5.83 / R4.54 R 4.81 R 5.15 Provincial R4.88 R 5.17 R 5.53 Municipal – Departmental use R4.54 R 4.81 R 5.15 Miscellaneous – All consumers who do not fall within the above categories. R4.88 R 5.17 R 5.53 Miscellaneous External - All consumers supplied outside the City of Cape Town. R5.83 R 6.18 R6.61 Bulk Tariff - Exclusive of the Water Research Commission Levy R1.77 R 1.98 R 2.21 Commercial – Water supplied to premises predominantly of a commercial nature Industrial - Water which is used in manufacturing, generating electricity, land-based transport, construction or any related purpose. Schools / Sport – Any educational activity sporting body Government Departments - National and Only for Bulk Supply to other Municipalities and for cost recovery from Water and Sanitation Services Reticulation of the City of Cape Town 246 City of Cape Town WSDP 2008/09 to 2012/13 Wastewater Industrial and Commercial - Schools, hospitals, Government: National / Provincial and any other – 95% of water consumption (* see note) Departmental - 95% of water (* see note) consumption excluding facilities not connected to the sewer system F.9.5.1.1 2004 / 05 2005 /06 R2.27 R 2.39 R 2.20 2006/07 R2.51 R 2.31 R2.09 Fixed charges and block tariffs: industrial for water (per month) There are no blocks in the tariff or fixed charges for water supplied to industrial properties. F.9.5.1.2 Fixed charges and block tariffs: industrial for wastewater (per month) There are no blocks in the tariff but there is a fixed charge for wastewater removed from industrial properties. F.9.5.1.3 Fixed charges and block tariffs: commercial for water (per k) As for Industrial. F.9.5.1.4 Fixed charges and block tariffs : commercial for wastewater (per month) As for Industrial. F.9.5.1.5 Fixed charges and block tariffs: other for water The other tariffs for water are: School / Sports Government Municipal Miscellaneous Miscellaneous external Bulk Tariff Water is charged at a one rate per Kl. There are no fixed charges. F.9.5.1.6 Fixed charges and block tariffs: other for wastewater Wastewater is charged at one rate per Kl discharged. The volume discharged is assumed to be 95% of the water consumed. The Director: Water and Sanitation can adjust the percentage based on measurements taken. There is a fixed charge for wastewater removed from “government and other” properties. The fixed charge is based on the value of the property and is charged on a “cents in the Rand” basis. The current (2006/07) cents in the rand is 0.2008. 247 City of Cape Town WSDP 2008/09 to 2012/13 F.9.5.2 Future trends and goals (charges and block tariffs) F.9.5.2.1 Fixed charges and block tariffs : industrial for water No changes to the structure are planned for the future. Above inflation increased can be expected in line with the average tariff. F.9.5.2.2 Fixed charges and block tariffs: industrial for wastewater The fixed charge based on the cents in the rand will be dropped from 1 July 2007. Above inflation increases for tariffs can be expected in line with the average tariff increases. F.9.5.2.3 Fixed charges and block tariffs: commercial for water No changes to the structure are planned for the future. Above inflation increased can be expected in line with the average tariff. F.9.5.2.4 Fixed charges and block tariffs: commercial for wastewater The fixed charge based on the cents in the rand will be dropped from 1 July 2007. Above inflation increases for tariffs can be expected in line with the average tariff. F.9.5.2.5 Fixed charges and block tariffs: other for water No changes to the structure are planned for the future. Above inflation increased can be expected in line with the average tariff. F.9.5.2.6 Fixed charges and block tariffs: other for sanitation The fixed charge based on the cents in the rand will be dropped from 1 July 2007. Above inflation increases for tariffs can be expected in line with the average tariff. F.9.5.3 Strategic gap analysis (charges and blocks tariffs) The current tariff modelling uses the historical water demand in the various categories in order to ensure that there is sufficient income. The successful implementation of WC & WDM Strategy will necessitate a revision of the tariffs. The tariffs are modelled every year and changes in consumption patterns are factored into the annual adjustments. F.9.5.4 Implementation strategies (charges and block tariffs) The average tariff for water and sanitation are projected to increase by above inflation annually. The proposed sanitation tariffs for Industrial, Commercial and departmental for 2007/08 are: 248 City of Cape Town WSDP 2008/09 to 2012/13 CURRENT TARIFFS 2007 / 2008 R 6.95 PROPOSED TARIFFS PER KL 2008 / 2009 VAT EXC R 7.59 Schools / Sport – Any educational activity / sporting body R 6.14 R 6.70 Government Departments R 6.59 R 7.20 Municipal – Departmental use R 6.14 R 6.70 Miscellaneous – All consumers who do not fall within the above categories. R 6.59 R 7.20 Miscellaneous External - All consumers supplied outside the City of Cape Town. R 7.88 R 8.60 Bulk Tariff - Exclusive of the Water Research Commission Levy R 2.37 R 2.59 Commercial – Water supplied to premises predominantly of a commercial nature Industrial - Water which is used in manufacturing, generating electricity, land-based transport, construction or any related purpose. - National and Provincial Only for Bulk Supply to other Municipalities and for cost recovery from Water Services Reticulation of the City of Cape Town For the tariffs for 0%, 20% and 30% restrictions GOTO 9.7. The proposed sanitation tariffs for Industrial, Commercial and departmental for 2007/08 are: VOLUMETRIC TARIFFS TARIFFS 2007 / 2008 PROPOSED TARIFFS 2008 / 2009 Industrial and Commercial - Schools, hospitals, Government: National / Provincial and any other – 95% of water consumption (* see note) R 5.65 R 5.99 Departmental - 95% of water (* see note) consumption excluding facilities not connected to the sewer system R 5.20 R 5.51 * Important Note: The Director of Water and Sanitation may adjust the percentages as appropriate to the consumer. This is not applicable to the domestic full category. For the tariffs for 0%, 20% and 30% restrictions GOTO 9.7. 249 City of Cape Town WSDP 2008/09 to 2012/13 F.9.6 Income and sales F.9.6.1 Situation assessment (income and sales) The historical budgeted income for water and sanitation broken down into the categories as reported on SAP is given below: 2003/04 R mil -1,276 User Charges for Services Service charges - water revenue from tariff billings Service charges - sanitation revenue from tariff billings Service charges - other Rental of facilities and equipment Interest earned - outstanding debtors Operating Grants and Subsidies Capital, Grants and Donations Grants & Subsidies (Conditional) Gain on disposal of property plant and equipment Other Income Internal Contributions Internal Utilities Revenue Bulk Charges Revenue Accumulative Surplus TOTAL Annual Increase 2004/05 R mil -1,388 2005/06 R mil -1,508 2006/07 R mil -1,052 -564 -1 0 0 -72 0 -52 -72 -101 -162 -31 0 -141 -148 0 -1 -2 0 -4 0 -8 -34 -709 124 -1,935 -699 0 -2,264 17.0% -744 -2 -2,510 10.9% -17 -34 -74 -782 -14 -2,859 13.9% Since GAMAP was introduced all municipalities have to budget for expected income and therefore add a provision for bad debt into the budget. A deficit would only then occur if the sales volumes were less than originally projected. F.9.6.1.1 Total income (and non-payment) and expenditure: water (R) Water and Sanitation income is combined under F.9.6.1 F.9.6.1.2 Total income (and non-payment) and expenditure: sanitation (R) Water and Sanitation income is combined under F.9.6.1 F.9.6.1.3 Sales arrangements The billing system is integrated with the SAP computer software. The Water and Sanitation bill is sent monthly with the rates and other services accounts. The City is divided into 20 billing areas / meter reading areas. Bills are sent out daily in order to cover the whole city in one month. Payment for municipal accounts can be easily made at any municipal office, through third party payments (supermarkets etc) and electronic funds transfers (EFTs) or stop orders through banks When insufficient payment is made by a customer the payment is not necessarily allocated to water even though payment may have resulted as a consequence of dis-connection / restricting the water supply. 250 City of Cape Town WSDP 2008/09 to 2012/13 The current credit control policy (GOTO 9.8) was developed during 2007/08. F.9.6.2 Future trends and goals (income and sales) F.9.6.2.1 Total income (and non-payment) and expenditure: water The future trends for water and sanitation income are shown in the table below: Service charges - water revenue from tariff billings Service charges - sanitation revenue from tariff billings Service charges - other Rental of facilities and equipment Interest earned - outstanding debtors Capital, Grants and Donations Grants & Subsidies (Conditional) Gain on disposal of property plant and equipment Other Income Internal Contributions Internal Utilities Revenue Bulk Charges Revenue Accumulative Surplus Total Operating Revenue % increase in Revenue 2006/07 2007/08 R mil R mil -1,052 -1,101 2008/09 R mil -1,269 2009/10 2010/11 R mil R mil -1,417 -1,580 -564 -637 -718 -778 -843 -31 0 -141 -69 0 -110 -68 0 -110 -73 0 -117 -77 0 -125 -148 0 -1 -125 -13 0 -172 -15 0 -138 -17 0 -94 -19 0 -17 -34 -74 -782 -14 -2,859 -13 -38 -111 -865 -107 -3,189 11.5% -13 -42 -106 -942 -26 -3,480 9.1% -14 -45 -113 -1,003 -26 -3,741 7.5% -14 -48 -120 -1,068 -26 -4,015 7.3% This assumes a city growth of 1.5% per annum, a 2% annual increase in water demand (low water demand curve), an inflation rate of 6.5% and that the 10% restriction will continue for the foreseeable future. F.9.6.2.2 Total income (and non-payment) and expenditure: sanitation Refer to F.9.6.2.1. F.9.6.2.3 Sales arrangements The Credit Control and Debt Management Policy (GOTO 9.8) was updated during the 2007/08 Financial Year. The City has plans to set up a customer internet portal on SAP. F.9.6.3 Strategic gap analysis (income and sales) For explanation from the Preparation Guideline GOTO Ex28. The gaps are: Many indigent households have huge municipal debt due to previous or ongoing water leaks on their property that discourages them from paying the current account. Capacity for disconnections /restrictions and reconnections 251 City of Cape Town WSDP 2008/09 to 2012/13 F.9.6.4 There is a gap between the number of properties being disconnected/restricted and those being reconnected. Implementation strategies (income and sales) All debt before September 2003 has been written-off. The focus of the leaks project is to assist such indigent households. These households are also encouraged to make arrangements (reasonable terms) with Council on arrears with the focus on getting the current accounts paid. Internal teams appointed to increase debt management actions. Tender being approved for further capacity via external contractors. Programme in place to regularly update these properties and to ensure inclusion in future debt processes. Programme to standardise the meters in the long term. Reports are being put in place to identify tampered meters and take corrective action. F.9.7 Metering and Billing Urban F.9.7.1 Situation and assessment (metering and F.9.7.1.1 Metering and billing: urban Meter Verification and Meter Accuracy The CCT is committed to ensure through its accredited Meter Verification Laboratory that each metered customer has the right and recourse to challenge the accuracy of its meter through a process as provided for in terms of the Trade Metrology Act and the SABS 1529-1:2003. Meter Management and Billing The CCT is committed to reading and billing all consumers monthly and has provided a line of communication for customers to lodge any queries in respect of their accounts through the Corporate Call Centre. Water and Sanitation Services deal with the management of the water meter, its accuracy and the preparation of the customers account before invoicing by the Corporate Finance Department. Meter Reading The CCT currently reads approximately 84% of the 642 456 water meters monthly, while the rest are estimated. There are major advantages to the customer in a read versus an estimated meter reading, among these paying for actual usage and greater confidence in the account figure. Continual estimating also results in reduced income for the service as the high consumption in summer months is smoothed by the lower winter consumption. There are currently approximately 20,000 (22,000 reported in 2007/08 WSDP) meters that have been repeatedly estimated for over a year due to meters not being accessible. 252 City of Cape Town WSDP 2008/09 to 2012/13 Consolidated monthly statistics on the following have been collected through the District Managers’ Operational report since June 2006: Meters installed Meters replaced Meters relocated / refixed Meters stolen Meter connections removed Leaking meters repaired Historical data will therefore be available from 2006/07. For an example of the District Managers’ Operational Report GOTO 9.9. F.9.7.1.2 Metering and billing: rural Refer to F.9.7.1.1 F.9.7.2 Future trends and goals (metering and billing) F.9.7.2.1 Metering and billing: urban Water and Sanitation Services has set a target to reduce the number of estimated readings to 10% by 2012 and to progressively eliminate estimating of those meters that have been estimated for over a year. It has also set a goal to reduce the number of meters being repeatedly estimated to zero by 2012. F.9.7.2.2 Metering and billing: rural Refer to F.9.7.2.2 F.9.7.3 Strategic gap analysis (metering and billing) There are a number of issues that need to be addressed: F.9.7.4 Estimated readings of meters above acceptable norm. Inaccurate readings of a number of meters. Outdated data on SAP from legacy systems. The existence of Unbilled Areas There is often a delay in loading the meters of new developments onto SAP. This results in customers not receiving a bill for some time and when they do they are not affordable. This is particularly prevalent in state housing schemes. Implementation and strategies (metering and billing) Increase of capacity via updated tenders for meter reading contract. Specific focus of problematic meters, e.g. covered by building rubble. Program to systematically move meters to the outside of the properties Programme in place to identify zero consumption meters as well as "inaccurate (low) reads" as part of meter replacement programme. 253 City of Cape Town WSDP 2008/09 to 2012/13 Set up a program to clean up customer data Incorporate the loading of meters into the process and ensure that Developer is billed in the interim period. 254 City of Cape Town WSDP 2008/09 to 2012/13 F.10 LIST OF PROJECTS F.10.1 Annual, WSA Sustainability and IDP Project Lists For explanation from the Preparation Guideline GOTO Ex29 The project list as provided from the SAP system is given in the table below: (Source: Water 2008/09 Capital Budget as at 18 September 2007). This is a comprehensive list of Projects which includes the sustainability list. The table lists the total cost of each project as well as the funding source. All the projects are for inclusion in the IDP. The infrastructure projects are listed in group in accordance with their investment reason i.e. new asset, enhancement asset and replacement of asset. Support Services projects are grouped together. 255 City of Cape Town WSDP 2008/09 to 2012/13 WBS Element Description Functional Area CGD 2008/09 CGD 2009/10 CGD 2010/11 EFF 2008/09 EFF 2009/10 EFF 2010/11 BICL 2008/09 BICL 2009/10 BICL 2010/11 Total ENHANCEMENT Athlone Wastewater Treatment Works Wastewater Treatment Melkbos Wastewater Treatment Works 26,000,000 27,000,000 13,000,000 15,000,000 81,000,000 Wastewater Treatment 1,000,000 20,000,000 50,000,000 71,000,000 Infrastructure Replacement Bulk Water 12,388,000 10,240,500 17,014,500 39,643,000 Scottsdene WWTWMIG Wastewater Treatment Cape Flats Wastewater Treatment Works Wastewater Treatment Informal Settlements : Sanitation Informal Settlements Sewer Network Emergencies 2,000,000 0 13,000,000 0 0 24,000,000 39,000,000 9,000,000 7,000,000 20,000,000 36,000,000 3,000,000 0 0 26,000,000 Reticulation 5,000,000 7,000,000 7,000,000 19,000,000 Borcherds Quarry WTW Wastewater Treatment 2,000,000 10,500,000 5,000,000 17,500,000 Potsdam Wastewater Treatment Wastewater Treatment 16,000,000 0 0 16,000,000 Monwabisi Pumpstation Reticulation Upgrade Wood Rd / Belgravia Sewer Reticulation Wallacedene New Sewer Upgrade Reticulation 1,650,000 2,000,000 0 Pich Fibre Replacement - M/Plain Reticulation 2,000,000 0 0 Rehab of Sewer Network (Citywide) 3,000,000 8,000,000 10,000,000 0 10,000,000 0 8,000,000 2,000,000 2,000,000 2,000,000 6,000,000 3,650,000 1,000,000 0 0 3,000,000 Reticulation 1,000,000 1,000,000 1,000,000 3,000,000 Pump Station Rehab ( Citywide) Reticulation 1,000,000 500,000 500,000 2,000,000 Remove midblock water network-Bishop Lav Reticulation 2,000,000 0 0 2,000,000 Reticulation 1,200,000 0 0 1,200,000 0 500,000 500,000 1,000,000 263,000 279,500 307,500 850,000 Bridgetown Sewer Pump station Informal Settlements Water Incremental Upgrade Extension of Bulk Pipeline Informal Settlements Bulk Water 256 City of Cape Town WSDP 2008/09 to 2012/13 WBS Element Description Functional Area CGD 2008/09 CGD 2009/10 CGD 2010/11 EFF 2008/09 EFF 2009/10 EFF 2010/11 BICL 2008/09 BICL 2009/10 BICL 2010/11 Total NEW Development of Additional Infrastructure Bulk Water 17,800,000 122,500,000 385,000,000 525,300,000 Cape Flats Collector Sewer Reticulation 5,235,000 70,000,000 70,000,000 145,235,000 Bellville Wastewater Treatment Works Wastewater Treatment 7,000,000 10,000,000 40,000,000 122,000,000 40,000,000 40,000,000 40,000,000 120,000,000 37,500,000 54,500,000 0 92,000,000 Northern Area Sewer Thornton Fisantekraal WWTWEFF Fisantekraal Main Sewer Wesfleur WWTW-EFF Helderberg / AECI Macassar system Water Meters Fisantekraal WWTWMIG Main Rd Upgrade M/Berg to Clovelly Rehab Replace Water Infrastructure 13,000,000 20,000,000 32,000,000 Reticulation Wastewater Treatment Reticulation Wastewater Treatment 30,660,547 0 0 0 10,000,000 15,000,000 Reticulation 5,000,000 0 0 Meters Wastewater Treatment 14,000,000 15,000,000 15,000,000 44,000,000 14,000,000 26,000,000 0 40,000,000 40,000,000 0 10,000,000 0 0 10,000,000 70,660,547 45,000,000 39,236,170 0 0 44,236,170 Reticulation 24,650,000 7,350,000 0 32,000,000 Reticulation 1,900,000 10,000,000 20,000,000 31,900,000 TMS Aquifer Deep Borehole Bulk Water 5,000,000 15,000,000 11,000,000 31,000,000 Potsdam WWTW-MIG Wastewater Treatment Durbanville Collectors Sewers Reticulation 1,000,000 6,000,000 18,000,000 25,000,000 Contermans Kloof Water mains Reticulation 11,000,000 10,000,000 0 21,000,000 Athlone treated effluent WDM 10,000,000 5,000,000 5,000,000 20,000,000 Rehabilitation of Sewer Network (Citywide) Reticulation Bellvile North Water Supply system Capeflats Treated Effluent (eastern & western) Installation of flowcontrol devices 30,000,000 7,500,000 0 5,000,000 0 30,000,000 5,000,000 Reticulation 17,500,000 8,000,000 8,000,000 0 16,000,000 WDM 0 5,500,000 10,000,000 15,500,000 WDM 5,000,000 5,330,000 5,000,000 15,330,000 257 City of Cape Town WSDP 2008/09 to 2012/13 WBS Element Description Functional Area Pump Station & Rising Main Du Noon Reticulation Pump Stn Rehab ( Citywide) Reticulation Replace Sewer Infrastructure D6 Reticulation Bellville Treated Effluent WDM Somerset West Bus. Park Main sewer Reticulation Bulk Sewer Connection MIG Informal Settlements 1,000,000 10,000,000 0 11,000,000 New Water Main MIG Informal Settlements 1,000,000 10,000,000 0 11,000,000 Protea Heights Water Sup Reticulation 7,000,000 3,000,000 0 10,000,000 Water Reticulation Replacement Reticulation 0 10,000,000 0 10,000,000 Aandrag Supply System Reticulation 700,000 700,000 4,000,000 Expansion of WWTW EFF Wastewater Treatment 3,000,000 6,000,000 0 9,000,000 Treated Effluent Inf Upgrade WDM 2,500,000 2,500,000 2,500,000 7,500,000 Upgrade Water Network District 6 Reticulation 3,500,000 4,000,000 0 7,500,000 Informal Settlements Water Informal Settlements Mitchells Plain WWTW Wastewater Treatment 0 2,000,000 5,000,000 7,000,000 Master Plan Sewer Upgrade Reticulation 800,000 1,000,000 5,000,000 6,800,000 Water Upgrades for Master Plan Reticulation 800,000 1,000,000 5,000,000 6,800,000 Reticulation 2,000,000 2,000,000 2,000,000 6,000,000 Informal Settlements 1,500,000 2,000,000 2,000,000 5,500,000 0 4,500,000 1,000,000 5,500,000 250,000 0 0 5,050,000 C/Flats II Cleaning of Pipeline Incremental Upgrade Areas - Standpipes MIG Macassar Treated Effluent Informal Settlements : Sand & Rag Trap CGD 2008/09 CGD 2009/10 CGD 2010/11 EFF 2008/09 800,000 3,500,000 1,000,000 5,000,000 3,000,000 2,800,000 2,000,000 EFF 2010/11 12,000,000 BICL 2008/09 BICL 2009/10 BICL 2010/11 2,000,000 13,500,000 3,000,000 4,000,000 6,000,000 13,000,000 0 10,000,000 2,500,000 12,500,000 6,450,000 0 5,000,000 11,450,000 3,000,000 0 258 Total 14,800,000 5,000,000 WDM Informal Settlements EFF 2009/10 0 0 4,000,000 9,400,000 7,000,000 City of Cape Town WSDP 2008/09 to 2012/13 WBS Element Description Functional Area N2 Gateway Delft Pressure Management WDM Wildevoelvlei WWTW Wastewater Treatment Gugulethu/Nyanga Sewer Investigation Reticulation CGD 2008/09 CGD 2009/10 CGD 2010/11 EFF 2008/09 EFF 2009/10 EFF 2010/11 BICL 2008/09 BICL 2009/10 BICL 2010/11 Total 2,500,000 2,500,000 0 5,000,000 0 0 5,000,000 5,000,000 750,000 500,000 500,000 4,250,000 Bulk Water 1,000,000 1,210,000 1,331,000 3,541,000 Reticulation 1,000,000 1,500,000 1,000,000 3,500,000 Reticulation 1,500,000 1,500,000 0 3,000,000 Install New Infrastructure D6 Reticulation 1,000,000 2,000,000 0 3,000,000 Macassar Wastewater Treatment Works Wastewater Treatment 0 3,000,000 0 3,000,000 Master Planning -CLF 15 Master Planning 1,000,000 1,000,000 1,000,000 3,000,000 Pitch Fibre Sewer Replacement Reticulation 1,500,000 1,500,000 0 3,000,000 Water Infrastructure Master Planning Master Planning 1,000,000 1,000,000 1,000,000 3,000,000 Belhar Pressure Management WDM 2,500,000 0 0 2,500,000 Langa Advanced Pressure Management WDM 0 2,500,000 0 2,500,000 Fish Hoek Outfall Sewer Reticulation 1,200,000 1,200,000 0 2,400,000 Construction of new water main Macassar Reticulation 2,000,000 0 0 2,000,000 Informal settlements sewer Installations Informal Settlements 2,000,000 0 0 2,000,000 Reticulation 1,000,000 1,000,000 0 2,000,000 WDM 1,000,000 500,000 500,000 2,000,000 WDM 2,000,000 0 0 2,000,000 Reticulation 1,587,000 0 0 1,587,000 Plant & Equipment Additional Small Plant & Equipment Blue Route Interceptor Sewer Installation of New Infrastructure PVR Controllers & Upgrades Strandfontein Pressure Management System De Gendel Reservior link Informal Settlement Proj - Standpipes - EFF Informal Settlements 0 0 1,000,000 1,500,000 1,500,000 0 259 1,500,000 City of Cape Town WSDP 2008/09 to 2012/13 WBS Element Description Functional Area CGD 2008/09 CGD 2009/10 CGD 2010/11 EFF 2008/09 EFF 2009/10 EFF 2010/11 BICL 2008/09 BICL 2009/10 BICL 2010/11 Mitchells Plain Pressure Management WDM 1,500,000 0 0 1,500,000 Basic Sanitation: Informal Settlements Informal Settlements 1,000,000 0 0 1,000,000 Replacement of Plant & Equipment- BW Bulk Water 200,000 220,000 242,000 662,000 Wallacedene New Sewer Upgrade Reticulation 500,000 0 0 500,000 Servitudes -CLF - 15 Y Bulk Water 50,000 50,000 50,000 150,000 Replace & Upgr Sew Netw Reticulation 16,000,000 16,000,000 16,000,000 48,000,000 Repl&Upgr Sew Pumps Citywide Reticulation 15,600,000 15,600,000 16,500,000 47,700,000 Reticulation 13,000,000 16,000,000 18,000,000 47,000,000 Wastewater Treatment 15,000,000 15,000,000 15,000,000 45,000,000 Wastewater Treatment 0 8,000,000 10,000,000 18,000,000 Rehab Outfall Sewers Pentz Sandrift m/qu Reticulation 8,000,000 8,000,000 0 16,000,000 Rehab of Water Network (Citywide) Reticulation Maitland Sewer at Valkenberg Rehab Reticulation 7,000,000 0 0 7,000,000 Rehab Liesbeeck Interceptor Sewer Reticulation 500,000 3,000,000 3,000,000 6,500,000 Replace Pitch Fibre Sewers District 2 Reticulation 2,000,000 0 3,000,000 5,000,000 Ruyterwacht Midblock Water Pipes Reticulation 1,000,000 4,000,000 0 5,000,000 Informal Incremental Areas Upgrade Informal Settlements 1,500,000 1,500,000 1,500,000 4,500,000 Lansdowne Riversdale Rd - Sewer Rehab Reticulation 1,000,000 1,000,000 1,000,000 3,000,000 Retreat Rising Main Rehab Reticulation Railway Pumpstation Upgrade Reticulation Total REPLACEMENT Replace & Upgrade Water Network Infrastructure Replace/Refurbish WWT Kraaifontein/Fisantekraa l 2,500,000 3,000,000 4,000,000 0 7,000,000 13,500,000 0 3,000,000 0 260 2,500,000 0 2,500,000 City of Cape Town WSDP 2008/09 to 2012/13 WBS Element Description Functional Area CGD 2008/09 CGD 2009/10 CGD 2010/11 EFF 2008/09 EFF 2009/10 EFF 2010/11 BICL 2008/09 BICL 2009/10 BICL 2010/11 Rehab Main Rd Green Point Sewer Reticulation 750,000 750,000 750,000 2,250,000 Replace Valves District 2 Reticulation 1,000,000 1,000,000 0 2,000,000 Voëlvlei : replace LLPS P Bulk Water 1,700,000 15,000 0 1,715,000 Replacement of Langa Sewer Reticulation 500,000 0 0 500,000 Infrastructure Replace/Refurbish Bulk Water 25,000 0 0 25,000 1,000,000 500,000 500,000 2,000,000 50,000 50,000 0 100,000 2,000,000 2,000,000 1,000,000 5,000,000 Total SUPPORT SERVICES TOC Infrastructure Development Tech Operational Centre Depot Rationalisation for transformation EAMS Furniture & Equipment Information Technology Mobile Generators Emergencies EAMS 0 1,000,000 0 1,000,000 Tools & Sundry Equipment EAMS 20,000 20,000 0 40,000 Replacement of Vehicles EAMS 0 17,500,000 18,000,000 35,500,000 IT Equipment Replacement Information Technology 1,500,000 1,500,000 1,500,000 4,500,000 Replacement of Plant & Equipment EAMS 500,000 500,000 0 1,000,000 431,668,000 652,515,000 890,695,000 TOTAL 171,610,547 137,500,000 93,500,000 261 79,236,170 0 4,000,000 2,460,724,717 City of Cape Town WSDP 2008/09 to 2012/13 10.2 Future Trends and Goals The City has accepted that the upgrade and extension of infrastructure is key to ensuring an efficient, effective and sustainable Water and Sanitation Service. All the projects necessary to achieve this end are likely to be approved by Council in future years. 10.3 Strategic Gap Analysis The project list will have to be adjusted to cater for the informal settlement projects. 10.4 Implementation Strategy The financial strategy is the key strategy that will ensure that the necessary projects are implemented. In implementing the comprehensive WC&DM Strategy the project list will need to be adjusted. Supply side projects will be re-examined. 262 City of Cape Town WSDP 2008/09 to 2012/13 F.11 Key Performance Indicators F.11.1 Situation Assessment The actual performance in the Utility Services Balanced Scorecard for the financial year 2006/07 is given in the table below: Period: 1 July 2006 to 30 June 2007. For spreadsheet GOTO 11.1 Indicator % of households with access to basic levels of water 1 % of households with access to basic levels of sanitation 1 % of households with access to basic levels of solid Waste Removal 1 % of households with access to basic levels of Electricity 1 Unit of Measure % % % % Baseline as at 30 June 2006 100% 95% 97% 89% Annual Target for 30 June 2007 Strategy/ Programme 100% Provision of basic water services in informal settlements, infrastructure serving low-cost housing developments 97% Provision of basic sanitation services in informal settlements, infrastructure serving low-cost housing developments 99% 90% Basic Service Provision Basic Service Provision 263 Target Actual 100% 97% 99% 90% Reasons for Variance Next Steps 100% Consistent performance despite significant growth in number of households in informal settlements. Maintain & better management(i.e.,contractor supervision & contract Management) 98% Consistent performance despite significant growth in number of households in informal settlements. Maintain & better management(i.e.,contractor supervision & contract Management) 99% Consistent performance despite significant growth in number of households in informal settlements. 91% Additional funding received from the City Manager/Mayor (extraordinary provision) City of Cape Town WSDP 2008/09 to 2012/13 Indicator % of households earning less than R1100 with access to basic levels of water 2 % of households earning less than R1100 with access to basic levels of sanitation 2 No. of Water Taps in informal settlements No. of Toilets in informal settlements Unit of Measure % % Number Number Baseline as at 30 June 2006 100% 86% 2262 taps installed 3410 toilets installed Annual Target for 30 June 2007 Strategy/ Programme 100% Provision of basic water services in informal settlements, infrastructure serving low-cost housing developments 86% Provision of basic sanitation services in informal settlements, infrastructure serving low-cost housing developments 938 taps installed (Ratio 17.4 : 1) 3490 toilets installed (Ratio 7.5 : 1) Provision of basic water services in informal settlements Provision of basic sanitation services in informal settlements 264 Target Actual Reasons for Variance Next Steps 100% Consistent performance despite significant growth in number of households in informal settlements. Maintain & better management(i.e.,contractor supervision & contract Management) 93% Consistent performance despite significant growth in number of households in informal settlements. Maintain & better management(i.e.,contractor supervision & contract Management) 12.6 : 1 Consistent water services provision despite significant growth in number of households in informal settlements. Maintain & better management(i.e.,contractor supervision & contract Management) 7.9 : 1 1. Increased density in most informal settlements. 2. Political tensions in certain areas where toilets were going to be installed prevented installation 3. Vandalization of toilets and problems with contractors resulted in increased maintenance expenditure. 1. Measures have been put in place to improve contract management. 2. Additional human and financial resources have been made available. 5-year budget plan for servicing all informal settlements must be sustained. 100% 86% 938 taps installed (Ratio 17.4 : 1) 3490 toilets installed (Ratio 7.5 : 1) City of Cape Town WSDP 2008/09 to 2012/13 Indicator Unit of Measure Baseline as at 30 June 2006 Annual Target for 30 June 2007 Strategy/ Programme Target Actual Reasons for Variance % implementation of key infrastructure projects synchronised to N2 Gateway requirements: Delft Sewer % Project 75% complete Project 100% completed N2 Gateway project (Delft WWTW) Project 100% completed Completed On target Project 12.5% completed 89% complete for commissioning (provided an Appeal by a contractor does not delay construction) % implementation of key infrastructure projects synchronised to N2 Gateway requirements: Zandvliet WWTW extension % reduction on unconstrained water demand curve through implementation of water demand programme % % 27.7% 29% N2 Gateway project (Zandvliet WWTW) Water Demand Management 265 89% complete 29% Next Steps 76% Lower expenditure is due to late delivery of stainless steel pipework by the mechanical contractor and a slowdown in progress of the civil works due to lack of skilled staff Civil work contracts to be completed in August and mechanical/electrical equipment installed and commissioned by November 2007 26% 1. The population and economic growth; as well as weather and consumer's changing water usage patterns after the lifting of 20% restrictions have impacted on the achievement of this indicator. 2. Jan - Feb 2007 was the hottest months over the last few years 3. There were Water Demand Management interventions to try to suppress the demand (includes water losses and non-revenue water) with varying success 4. Inadequate funding received in 2006/2007 to roll-out WDM Programmes Note: The City has exceeded the DWAF legal requirement of 20%. W&S have secured capital of R21 million in 2007/2008 to implement hard programmes eg. PRV's, installation of flow limiters and re-use of treated effluent, and to address soft issues through eg. awareness campaigns. City of Cape Town WSDP 2008/09 to 2012/13 Indicator Completion of key projects to ensure augmentation of bulk water resources: Desalinisation Plant Unit of Measure Milestone description Baseline as at 30 June 2006 Feasibility study completed. MOU drafted and commitment to sign Annual Target for 30 June 2007 Formal Agreement with V&A Waterfront signed. Strategy/ Programme Water supply augmentation/ Desalinisation Pilot project 266 Target Actual Reasons for Variance Next Steps To be determined V&A Waterfront will no longer proceed with the City of Cape Town with the Pilot Project, an alternative site will have to be Identified and Approved Pursue other options for siting Use one of the identified sites(Silwerstroom) City of Cape Town WSDP 2008/09 to 2012/13 Indicator % completion of key projects to ensure augmentation of bulk water resources: TMG Aquifer % completion of key projects to ensure augmentation of bulk water resources: Berg River Dam % unaccounted for water Unit of Measure Baseline as at 30 June 2006 Annual Target for 30 June 2007 Strategy/ Programme Target Actual Reasons for Variance Next Steps 48%, Monitoring Contract awarded. Exploratory drilling tender to be readvertised during 07/08. Explaratory drilling will commence in the 07/08 financial year. Start to drill in Dec 07 Ensure Project Performance 90% On target & Hands on approach Consistent engagements with DWAF & TCTA 19% System optimisation across the supply chain Rigorous approch to all metering systems % and milestone description Project 41% complete. Completion of prelimary phase and commencement of exploratory phase Project 60% complete. Completion of exploratory drilling (physical drilling) Water supply augmentation/TMG Aquifer Project Project 60% complete. Completion of exploratory drilling and evaluation of results. % and milestone description Project 63% complete with construction underway Monitoring at 90% completion by DWAF to ensure commisioning in 2007 Water supply augmentation/Berg River Water Project (Bulk water OPEX) Berg River Dam 90% complete 17.5% Bulk Meter verification project, Universal metering programme and ongoing meter (and pipe) replacement % 18.9% 267 18% City of Cape Town WSDP 2008/09 to 2012/13 Indicator Annual Target for 30 June 2007 Strategy/ Programme Target 76.0% Upgrading and expanding of Wastewater treatment infrastructure (all plants) 76% compliance with DWAF's effluent standards 81% Sustained increased capital funding for upgrading of the WWTP together with improved management systems 32% completion 47% completion Upgrading and expanding of Wastewater treatment and conveyance infrastructure (all plants) Potsdam WWTW (completion by 2008) Project 47% complete 58% Better Project Management Ensure Project Performance % and milestone description Tenders of consultants being adjudicated Project depends on capital funding. Present funding not sufficient to start project. If funding becomes available then potentially 5% Upgrading and expanding of Wastewater treatment and conveyance infrastructure (all plants) Fisantekraal WWTW (completion by 2008) Subject to funding: 5% Price for land purchase was lower than estimated. Detail design consultant to be appointed at the end of August 2007 after the appeal period milestone description Scoping studies submitted and approval obtained by DEA & DP Specialist studies completed for submission to DEADP and possible ROD Upgrading and expanding of Wastewater treatment & conveyance infrastructure (all plants) - Melkbos WWTW completed by 2007) Specialist studies completed for submission to DEADP and possible ROD Unit of Measure % treated wastewater parametres compliant with DWAF's effluent standards for safe and effective waste water treatment and conveyance through upgrading of WW Treatment works % % completion of key wastewater treatment project: Potsdam WWTW % and milestone description % completion of key wastewater treatment project completion: Fisantekraal new works % completion of key wastewater treatment projects: Melkbos WWTW Baseline as at 30 June 2006 73.9% 268 Actual Reasons for Variance 2% In Progress, to be submitted to DEADP in 3 months time In Progress, to be submitted to DEADP in 3 months time Next Steps City of Cape Town WSDP 2008/09 to 2012/13 Indicator Unit of Measure Baseline as at 30 June 2006 Annual Target for 30 June 2007 Strategy/ Programme Target Actual Internal customer Satisfaction measured in terms of Likert scale (1-5) Likert scale/index (1-5); Maximise New 3 Internal customer Satisfaction Survey Likert Scale - 3 Caesar Scullard to provide Number 300 (excluding work opportunities generated through Sicoca iKapa programme) 710 Align work programme on both Capital and Operating budget to achieve corporate EPWP targets 95% on 12 months rolling Unable to report due to nature of SAP reports Completed Completed No. of additional jobs created % actual collections against billing Development and implementation of a plan to optimise tariffs (within CPIX + %) for water and sanitation % 87.0% 95.0% Maximize income against billing Review and update Tariff optimisation plan reviewed and updated for 06/07 in respect of affordability and CPIX Tariff optimisation plan reviewed and updated for 07/08 in respect of affordability and CPIX Tariffs 269 71000% Garnett to provide Reasons for Variance Next Steps City of Cape Town WSDP 2008/09 to 2012/13 Indicator Unit of Measure Baseline as at 30 June 2006 Annual Target for 30 June 2007 Strategy/ Programme Target % items on GAMAP Compliant Register verified % 0.888 >90% Asset register >90% 95% of year to date 94% 95% - 100% of year to date 98% % expenditure on Capital Budget % 0.925 >95% Monthly monitoring of projects and monthly tracking of Capital spend against projected cash flow % expenditure on Operating Budget % 0.996 95% - 100% Ensure minimal variance on Operating budget expenditure to allocation % expenditure on operational maintenance budget % 0.973 >95% Maintainance & Upgrades New Utilities Asset Management Plan and implementation framework developed Development of a Utilities Infrastructure Asset Management Plan and Implementation Framework in compliance with MFMA and/or Corporate Asset Management Policy: – Water and Sanitation – Electricity – Solid Waste Management Number of SLAs drawn and monitored against key service areas at Directorate level Plan and Implementation framework Number New 3 Asset Management Plan and Implementation framework Business improvement agreements 270 Actual Reasons for Variance 100% 95% Utilities Asset Management Plan and implementation framework developed 300% 116% Reformulated as a Corporate Scorecard project (US & TR&S crosscutting project) 0% Could not be undertaken due to re-alignment of support services and pending determination of a model and service menu to support delivery Next Steps City of Cape Town WSDP 2008/09 to 2012/13 Indicator Unit of Measure Baseline as at 30 June 2006 Annual Target for 30 June 2007 City’s input provided to the national legislative processes related to waste management and waste minimisation Strategy/ Programme Target Actual Reasons for Variance Next Steps Strategic Planning and ByLaws Promulgated and implemented Integrated Waste Management By-law, City’s input provided to the national legislative processes related to waste management and waste minimisation Comments on National legislative processes related to waste management completed. IWM By-Laws in draft. Internal consultation stage completed. Change in process by Speakers' office (Feb07). Process also delayed with considerations for the NEMA Waste Management Bill's promulgation process to prevent discrepencies with CoCT SW By-law Report to Utility services Portfolio Committee then to speakers' office prior to public comment period and finalization 100% completion In progress Corporate Risk Management Framework Plan outstanding. Development and implementation of administrative and legal systems and instruments to regulate and ensure waste management and waste minimisation Phases for development and implementation of administrative and legal systems and instruments New Development and implementation of a Risk Management strategy and implementation plan to minimise service disruption 3 % development and implentation of plan New 100% Strategic Planning/Risk Register % implementation of WSP in line with plan % To be determined at end of 05/06 financial year 80% Implementation of WSP Promulgated and implemented Integrated Waste Management By-law 271 80% Maurietta to provide City of Cape Town WSDP 2008/09 to 2012/13 Indicator Unit of Measure Baseline as at 30 June 2006 Annual Target for 30 June 2007 Strategy/ Programme Target Actual % Implementation of EE Plan in line with the Corporate Strategy i.r.o. new appointments % New >98% Implementation of EE Plan >98% Maurietta to provide % compliance to performance management policy (including Lev 4 and below) % System and procedures implemented for IPM Lev 1-3 1 IPM System 272 100% 100% compliance with IPM System. Compliance with midyear review process i.t.o. policy. PM System extended only to those staff members who have the performance clause in employment contracts Reasons for Variance Next Steps Conclude 06/07 end of year assessments Give input into review of performance policy, process and systems City of Cape Town WSDP 2008/09 to 2012/13 Indicator Unit of Measure % improvement in the positive emloyee climate (using staff Satisfaction Survey, Likert 1-5 Scale) (Likert 1-5 Scale) Baseline as at 30 June 2006 New Annual Target for 30 June 2007 3 Strategy/ Programme Target Actual Employee survey Employee Survey conducted (Likert Scale - 3) Caesar Scullard to provide Reasons for Variance Next Steps 1 Legislated NKPI - quarterly reporting to include number of households receiving basic services in addition to percentage Legislated NKPI - quarterly reporting to include number of households receiving basic services in addition to percentage. Measure subject to the availability of an accurate estimate of households earning less than R1100 3 Subject to a Corporate Risk Management framework and implementation plan 2 The Director: Water and Sanitation also has its own Scorecard which expands on that of Utility Services in some respects. For spreadsheet (GOTO 11.2) For the past 2 years, Water and Sanitation has also been taking part in the National Benchmarking Initiative (NBI) driven by SALGA and bringing together DWAF, WRC as well as a wide range of Metros, Local Authorities and District Municipalities. The purpose is to drive a uniform set of indicators into the sector, based on the Basic Key Indicators made mandatory on all Water Service Providers in DWAF’s Framework, but also including specific indicators relevant to the Metro/Local/District sub-sectors. The process is a true Benchmarking process in that the results are compared at national conferences once a year, in order for the parties to learn from each other’s best practices. For spreadsheet (GOTO 11.3). 273 City of Cape Town WSDP 2008/09 to 2012/13 F 11.2 Future targets The City of Cape Town’s Corporate Scorecard for 2007-2012 in the IDP (GOTO 3.9) contains some Water and Sanitation targets, falling into the following categories: 2A Universal access to basic service (objectives 2.1) 2.1 Reduce backlogs in line with national objectives for basic services. 2B Conservation of natural resources (Objectives 2.2 – 2.5) 2.2 Develop demand management programmes for water, electricity, waste and transport and reduce attendant pollutants. 2.3 Reduce impact of flooding on community livelihoods and regional economies 2.4 Conserving biodiversity and improving quality living environments through greening, education and access Safeguard human health, protect natural aquatic environments, and improve and maintain recreational water quality. 2C Effective management of City’s Infrastructure and Resources (Objectives 2.6 – 2.7) 2.5 Large or bulk infrastructure programmes that are essential must receive priority. 2.6 Develop an integrated programme” approach to infrastructure and service planning and budgeting. 274 City of Cape Town WSDP 2008/09 to 2012/13 The targets with adjustments from the previous 2007/08 WSDP for Water and Sanitation are listed in the table below. For the complete spreadsheet (GOTO 11.4): Core Objective/Indicator Baseline 30.6.2007 Target 30.6.2008 Target 30.6.2009 Target 30.6.2010 2A.1 Percentage of households with access to basic levels of sanitation (NKPI) 97.9% 95% recalculated wrt updated City household stats and functional service points 97.5% 96% recalculated wrt updated City household stats and functional service points 97,5% 2A.2 Percentage of households with access to basic level of water (NKPI) 100% 100% 100% 100% 100% 100% Quarterly reports 2B.1Volume of water consumption in the City 308.4 million kl/a 309.1 million kl/a 309.6 million kl/a 309.3 million kl/a 308.8 million kl/a 308.2 million kl/a Dependant on the WC/WDM Strategy and associated budget. Natural growth rate of 2.7% assumed. 98,5% Target 30.6.2011 99,5% Target 30.6.2012 100% Evidence Quarterly reports 5-year plan to eradicate. Based on a total household count estimate of 883 933 Target based on natural growth projected total water treated for June 08 of 316.8 million kl/a Baseline based on actual total water treated at June 07 of 308.4 million kl/a 2B.1 Percentage reduction in unconstrained water demand 25.5% 27.4% 33% 36% 275 38% 40% Annual report City of Cape Town WSDP 2008/09 to 2012/13 Core Objective/Indicator Baseline 30.6.2007 2B.2 Percentage compliance with 4 critical DWAF effluent standards (E-coli count, Ammonia content, Oxygen demanding substances, Total suspended solids) 81% 2B.3 Percentage of recreational waters sampling points (i.e. bathing beaches, vleis, lagoons, etc) comply with applicable Department of Water Affairs standards 87% 2.C.1 Development and Implementation of a planned infrastructure maintenance programme iro Electricity, Sewerage, Water, Transport, Roads & Stormwater and Solid Waste disposal New Target 30.6.2008 79% 83% Target 30.6.2009 85% 86% Target 30.6.2010 90% 89% Target 30.6.2011 95% 92% Target 30.6.2012 98% 95% Evidence Annual report 5 year target amended to be more realistic and links directly to DWAF requirement of 95% 76% 78% 80% 82% 85% 89% 90% 92% 94% 95% Integrated Infrastructure Plan developed and approved 100% compliance with plan specifications for Year 1 100% compliance with plan specificatio ns for Year 2 100% compliance with plan specificatio ns for Year 3 100% compliance with plan specificatio ns for Year 4 276 Annual report Quarterly reports