1269 REPORT To THE EXECUTIVE MAYOR CITY OF CAPE TOWN Iisimo SASEKAPA I STAD KAAPSTAD I Me 47/06/09 1 ITEM NUMBER: 2 UTILITY SERVICES 2009/2010 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLANS (SDBIPs) AND BUSINESS PLANS NUTSDIENSTE SE DIENSLEWERINGS- EN BEGROTINGSIMPLEMENTERINGSPLANNE (SDBIPs) EN SAKEPLANNE VIR 2009/2010 IINKONZO EZILUNCEDO-2009/201 0 KUNYE NEZICWANGCISO ZOKUMISELWA KWEBHAJETHI (SDBIPs) NEZICWANGCISO ZOSHISHINO The following amendments were proposed to Annexure "Au attached to the report: - on page 66 as per Annexure "Au attached to the report, the frequency for the indicator regarding the service rate of informal settlement for sanitation should be amended from quarterly to annually. - on page 67 as per Annexure "A" attached to the report, the frequency for the indicator regarding the service rate of informal settlement for water should be amended from quarterly to annually. 3 RECOMMENDATION FROM UTILITY SERVICES PORTFOLIO COMMITTEE HELD ON 01 JUNE 2009 RECOMMENDED that the Utility Services 2009/2010 Service Delivery and Budget Implementation Plans and Business Plans be supported together with the amendments. AANBEVELING VAN DIE VERGADERING VAN DIE PORTEFEULJEKOMITEE OOR NUTSDIENSTE GEHOU OP 01 JUNIE 2009 AANBEVEEL dat nutsdienste se dienslewerings- en begrotingsimplementeringsplanne en sakeplanne vir 2009/2010 tesame met die wysigings gesteun word. ISINDULULO SEKOMITI YEMICIMBI YEENKONZO EZILUNCEDO KWINTLANGANISO EYAYICHOTSHELWE NGOMHLA WE-01 JUNI2009 1270 KUNDULULWE ukuba makuxhaswe iziCwangciso zowama-2009/201 0 zokuNikezelwa kweeNkonzo nezokuMiselwa kweBhajethi neziCwangciso zoShishino kunye nezilungiso zabeCandelo leeNkonzo eziluncedo. 1271 REPORT To UTILITY SERVICES PORTFOLIO COMMITTEE MAYCO COUNCIL 1. ITEM NUMBER: 2. SUBJECT UTS 06/06/09 CITY OF CAPE TOWN IISIXEKO SASEKAPA STAO KAAPSTAO SUp;Jorl (LSU - 8340) UTILITY SERVICES 2009/2010 SERVICE DELIVERY AND IMPLEMENTATION PLANS (SDBIPs) AND BUSINESS PLANS 2. BUDGET ISIHLOKO IINKONZO EZILUNCEDO-2009/2010 KUNYE NEZICWANGCISO ZOKUMISELWA KWEBHAJETHI (SDBIPs) NEZICWANGCISO ZOSHISHINO 2. ONDERWERP NUTSDIENSTE SE DIENSLEWERINGSEN BEGROTINGSIMPLEMENTERINGSPLANNE (SDBIPs) EN SAKEPLANNE VIR 2009/2010 3. . PURPOSE To submit to the Utility Services Portfolio Committee for their consideration and recommendation, the 2009/2010 Directorate SDBIP information pack which contain the: • Directorate SDBI P • Departmental Business Plans - narrative; and • Departmental SDBIPs. These documents underpin the 2009/2010 Corporate SDBIP that will be submitted to the Executive Mayor for approval in terms of Section 53(1 )(c)(ii) and 69(3)(a) of Act No. 56 of 2003: Local Government: Municipal Finance Management Act (MFMA). FINAL US 09_10 DIR_DEPT SDBIP REPORT. doc [Template updated April2009j Page 1 of6 1272 4. STRATEGIC INTENT The SDBIP is a detailed plan for implementing the municipality's service delivery as outlined in the Integrated Development Plan (lOP) and budget It includes the service delivery targets and performance indicators for each quarter which should be linked to the performance agreements for senior management. The performance criteria contained in the SDBIP are designed to achieve Good Governance and Regulatory Reform, as well as facilitaling the accomplishment of Council's other strategic focus areas i.e. • • • • • • • 5. Shared Economic Growth and Development Sustainable Urban Infrastructure and Services Energy Efficiency for a Sustainable Future Public Transport Systems Integrated Human Settlements Safety and Security Health, Social and Community Development FOR DECISION BY Utility Services Portfolio Committee, Mayco and Council. 6. EXECUTIVE SUMMARY The 2009/2010 Directorate and Departments SDBIPs contain the objectives, indicators and quarterly targets by which progress will be measured during the 2009/2010 financial year. These are derived from the Integrated Development Plan of the City, which serves before Council on 27 May 2009, and are an elaboration of the Five Year Corporate Scorecard contained in the lOP. The Departmental Business Plans provides the narrative to understanding the SDBIPs. The purpose of this report is to submit the 2009/2010 Directorate's SDBIP information packs to the Utility Services Portfolio Committee for consideration and recommendation to the Executive Mayor. The Directorate SDBIP information pack is attached as Annexure A. The electronic versions will be placed on the city website at www.capetown.gov.za/idp after it has been noted by Council. FINAL US 09_10 DIR_DEPT SDBIP REPORT.doc [Template updated April 2009] Page 20f6 1273 7. 7. 7. RECOMMENDATIONS 7.1. That the Utility Services Portfolio Committee makes recommendation to the Executive Mayor on the contents of the 2009/2010 Directorate Service Delivery and Budget Implementation Plans and Business Plans. 7.2. That the Mayoral Committee approves the Utility Services 2009/2010 Directorate Service Delivery and Budget Implementation Plans and Business Plans. 7.3 That Council notes the Utility Services 2009/2010 Directorate Service Delivery and Budget Implementation Plans and Business Plans. ISINDULULO 7.1 Ukuba iKomiti yeMicimbi yeSebe leenkonzo eziluncedo yenze isindululo kuSodolophu weSigqeba ngokumalunga neziqulatho zoNikezelo IweeNkonzo lowama-2009/2010 kunye neziCwangciso zokuMiselwa kweBhajethi neziCwangciso zoShishino. 7.2 Ukuba iKomiti kaSodolophu/yoLawulo mayiphumeze iiNkonzo eziluncedo IweCandelo 10Lawulo lowama-2009/2010 neziCwangciso zokuMiselwa kweBhajethi kunye neziCwangciso zoShishino. 7.3 Ukuba iBhunga maliqaphele uNikezelo IweeNkonzo eziluncedo IweCandelo 10Lawulo lowama-2009/2010 neziCwangciso zokuMiselwa kweBhajethi kunye neziCwangciso zoShishino. AANBEVELING 7.1 Dat die portefeuljekomitee oor nutsdienste aanbevelings by die uitvoerende burgemeester maak oor die inhoud van die dienslewerings- en begrotingsimplementeringsplanne en sakeplanne van direktorate vir 2009/2010. 7.2 Dat die burgemeesterskomitee nutsdienste se dienslewerings- en begrotingsimplementeringsplanne en sakeplanne van direktorate vir 2009/2010 goedkeur. 7.3 Dat die raad kennis neem van nutsdienste se dienslewerings- en begrotingsimplementeringsplanne en sakeplanne van direktorate vir 2009/2010. FINAL US 09_10 DIR_DEPT SDBIP REPORT.doc [Template updated April 2009] Page 30f6 .. , 8. .. ,\0. 1274 DISCUSSION/CONTENTS 8.1. Constitutional and Policy Implications The process is driven by legislation. 8.2. Environmental implications Does your report result in any of the following: No t:8J Yes (if yes, please complete the section below by clicking on the relevant tick boxes) Loss of or negative impact on natural space and/or natural vegetation, rivers, vleis or wetlands? An increase in waste production or concentration, pollution or water usage? D Loss of or negative impact on the city's heritage, cultural and scenic resources? D D Development or any construction within 500m of the coastline? D Does your activity comply with the National Environmental Management Act (NEMA)? (mark by clicking on the tick box) Yes D No D Does your report complement and support the City's approved IMEP strategies? (if yes, please select from list below by clicking on the relevant tick box) Biodiversity Strategy and Biodiversity Network Environmental Education and Training Strategy Integrated Waste Management Strategy D D D Coastal Zone Management Strategy Heritage Management Strategy Invasive Species Strategy D D Energy and Climate Change Strategy Air Quality Management Plan D D Do the activities/actions arising from your report: (if yes, please select from list below by clicking on the relevant tick box) Enhance Cape Town's unique environmental assets? 8.3. D Negatively impact on Cape Town's unique environmental assets? D Legal Implications The process of preparing a Service Delivery and Budget implementation plans must inter alia, comply with: Section 53 (1 )(c)(ii) and 69(3)(a) of Act No. 53 of 2003: Local Government: Municipal Finance Management Act. FINAL US 09_10 DIR._DEPT SDBIP REPORT,doc [Template updated April 2009] Page 4 of6 1275 B.4. Staff Implications Does your report impact on staff resources or result in any additional staffing resources being required? B.S. No [8J Yes D Risk Implications Does this report and/or its recommendations expose the City to any risk? (Le. does it have any adverse influence on service delivery?) No [8J Yes B.S. D Other Services Consulted All relevant Directorates ANNEXURES Annexure A: Utility Services Directorate and Department 2009/2010 Service Delivery and Budget Implementation Plans and Departmental Business Plans FINAL US 09_10 DRDEPT SJBIP REPORT.doc [Template updated April 2009] Page 5 of6 1276 FOR FURTHER DETAILS CONTACT: ME CONTACT NUMBERS E-MAIL ADDRESS DIRECTORA TE FILE REF No SIGNATURE: DIRECTOR CONTACT ADDITIONAL PERSONS David Paulse (021) 400 1936 David. Paulse(JiJ.ca{)etown. qov.. za .. .. Utility Services SectlBPlan &SDBIP 200912010 Db aJ'o. __ 'Nqobi/e Damane Solid Waste Manag~e!'t SDBIP / SWM Sector Plan Jannie Wagener / Barry Coetzee Tel: (021) 4005236/(021) 400 2992 Email: Jannie. Wagener@.ca{2etown.gov.za / Barry. Coetzee(JiJ.ca{2etown. gov. za Water & Sanitation SDBIP / Water Serv Development Plan Masande Goniwe / Jaco De Bruyn Tel: (021) 590 1612/(021) 590 1424 Email: Masande. Goniwe@ca{2etown.gov.za / Jaco.deBruvn@ca{2etown.gov.za Electricity Services SDBJP and Business Plan Donovan Leeuwendaal (021) 446 1925 Email: Donovan. Leeuwendaal@caoetown.aov.za I Tel: i o t1Ji2----- LEGAL COMPLIANCE D REPORT COMPLIANT WITH THE PROVISIONS OF COUNCIL'S DELEGATIONS, POLICIES. BY-LAws AND ALL LEGISLATION RELATING TO THE MATTER UNDER CONSIDERATION. NON-COMPLIANT (Author to obtain signature before submission to Executive Support) COMMENT: DATE ~OR Comment: [Compulsory to Insert name] (Author to obtain signature before submission to Executive Support) FINAL US 09_10 DIR_DEPT SDBIP REPORT.doc [Template updated April 2009] Page 6of6 ... 1277 CITY OF CAPE TOWN ISIXEKO SA.SEKAPA ANNEXURE A I STAB KAAPSTAD THIS CITY WORKS FOR YOU 2009/2010 Service Delivery and Budget Implementation Plans and Business Plans Directorate: Utility Services 1278 SDBIP Information Pack Index 1. UTILITY SERVICES DIRECTORATE SDBIP 2. SOLID WASTE MANAGEMENT: 2.1 Departmental SDBIP 2.2 Solid Waste Management Sector Plan 3. WATER AND SANITATION: 3.1 Departmental SDBIP 3.2 Departmental Business Plan 4. ELECTRICITY SERVICES: 4.1 Departmental SDBIP 4.2 Departmental Business Plan ID 2009 I 2010 UTILITY SERVICES DIRECTORATE SDBIP ":,... -' Ii AUGNMENT TO lOP SFA 1 -'"c=.... ~i q i. ~! SOl SWM Elec W&S 0- SFA& Corporate Directorate Scorecard Objective No. Indicator No :Jo lA.4 .!E Objective Indicator (To include unit or measure) 1A. Create an enabling environment Number of job opportunities created (or the economy to grow and become through the expanded Public Works globally competitive. Programme (EPWP). to contribute to the reduction of poverty and TARGETS Baseline (08109 Target In brackets) Annual Target 2009/2010 Frequency New To be determined Quart 100% Electricity reinforcement completed Quart 30 Sept 2009 31 Dac 2009 General Comment 30 June 2010 31 March 2010 To be determined ro.bedetemlined r .. be determined To be delermlned unemployment Unit of measure' Number i<l~- r-sFAl f--5'0,- -----Sec DlrObj 1.8 1B Preparations for hosting the FIFA 2010 World Cup In Cape Town in accordance With FIFA's requirements and the City's deyelopmental objectives ". Adherence to the work stream 61.33% Electricity objectlves and programmes of the Reinforcement City's 2010 Business Plan Electricity completed Rc-inforcement project 1(J()OA. Electricity completed 100,¥> Elecf(icity reinforcement completed Quart 98.95% 99% 99.05% - -1)9.1% Quart 73.98% 76.16% 78.35% 80.5% 90% Electrici!y reinforcement reinforcement completed 100% Electrtclty reinforcement completed Unit of measure: % completion r-sF~ -;--- 2A.1 OirObl2.1 ruwlty ServIces W&S~ 2A. Universal access to basic services Percentage of households with access to basic levels of sanitation (NKPI) ~5%J 991% Nt Unit of measure % and number of - N1 Based on an updated tlOusenold count estlmaled at 902 278 (source SDI&GIS Oept analysis of StatsSA 2001 Census and the more recent 2007 Community Survey) HH's . 09110 target 894 157 HH's:(estimalet SFA 2 OifObj21 r---sF;;;;z- --'- Utility W&S Services 2A Universal access to basic services Percentage of Informal households with access to basic levelS of sanitation New 80.5% ~ N -.J Unit of measure: % and number of HH's - .~ DlfObj21 -uiiIitY t-W&S 2A UniVersal access to basic Services services Ratio-of Informal households per toilet :.c 6.2:1 [6.6:1J 6,8:1 Quart 6.6:1 6.4:1 6,2:1 .2 N/A 2 100% 100% I Unit of measure: Ratio -- -~ -SFA2 Oir Obj 2.1 W&S 2A. Universal access to basic services Service rate of Informal Settlement New B;::;;;;;;;;;aI'~ 2 NlA Target equates to 23-000 tOilets in Informal sett/ements by 30 June 2010 (142783 Informal HH), -- . sanitation Unit of measure number/WOO customers SFA 2 OlfObj21 2A2 Utility W&S Services 2A. Universal access to basic services ~, ""' "ay: of households w~h access to [100%J 100% Nl Quart 100% 100% . level of water (NKPI) Unit of measure; % and number of HH's .. - SFA 2 Oir ObJ 2.1 Utility C---WSS- Services 2A Universal access to baSIC services Percentage of Informal households New 100% Qu~ [11.7:1) 12.7.1 Quart New 2.8 Bi·Annual H1 . Based on an updated household count esllmated at 902 278 (source SDI&GIS Dept analySiS of StatsSA 2001 Census and the more recent 200; Community Survey) 09/10 target: 902278 HH's (estimate) .:'. 100% 100% 100% 100% 13.1:1 13.0;1 12.9:1 12.7:1 N/A 2.8 N/A 2.8 with access to basic level of water Unit Of measure: % and number of HH's SFA2 OJ[ Obj 2.1 WI',:S 2A Universal access to basic Ralio of informal households per tap . '. services Unit of measure: Ratio SFA 2 Olf Obj 2.1 , - -r-~ 2A Universal access to basic services Service rate of Infonnal Settlement water Unit or measure: numberJ1000 customers - - ITarget equates to 10 Soo.taps in informal settlements by 30 June 2010 (142 783 Informal HH) Rallo of 1 tap per 25 HH already exceeded. IE:] 2009 I 2010 UTILITY SERVICES OIRECTORATE SOBIP "ji.. ALIGNMENT TO lOP - c l~ ..cD. It:t! .. 0- -'" SFA& Corporate Scorecard Directorate Objectlve No. Indicator No SFA 2 Dir Obi 21 .. di' :is:;; ... f! c:Ie 2A_3 Utility Services Elee i ObJective 2A, Universal access to basic services Indicator (To Include unIt of measurel Percentage of households with access to b,,,ie levels of ElectriCIty (NKPI) TARGETS Baseline (08109 Annual Target Target in brackets) 200912010 [90_83%) 90.46% Nl Fl1IIquency 30 Sept 2008 31 Dec 2009 31 March 2010 30 June 2010 89.72% 89.97% 90.22% 90.46% Quart Unit of measure· % and number of _HH's General Comment Nl • Based an an updated household count estimated at 902 278 (souroe SDI&GIS Dept analysis of StatsSA 2001 Census and the more lecent 2007 Community Survey) 09/10 target: 771435 HH's (estimate· excludes non·electriflable HH's) Utihty" SFA 2 DirObj 2_1 r W&S Services 'LA Universal access to basic s?rvices Percontage of !nformal households wIth access to basic levels of electricity [60 87%J 62.43% Quart 61.12% 61.66% 62.10% 62.43% [3502J 3330 Quart 995 1890 2835 3330 [7011J 6506 Quart 1615 3318 5163 6506 [99%J 99%Nl Quart 99% 99% 99% 99% Unit of measure' % and number of HH's Elcc SFA? DirObJ 2_1 2A. Universal access to basiC services Number of subsidised connections (informal only) Unit of measure: Number r- SFA 2 DI[ ObJ 21 SFA 2 DirObj 21 -- Elee lA. Universal ac..cess to basic services 21',.4 Utility SWM 2ATlniversai access to basic services Services i Unit of measure. Numuer Percentage of households with access to basic levels of solid waste removal Unit of measure: % and number of Nl • Based on an updated household count estimated at 902 278 (source SDI&GIS Dept analYSIS of StatsSA 2001 Census and the more recent 2007 Commullily Survey) HH's .-- SFA 2 DirObj 2_1 Total number of subSidised connections. {informal and formal} 09/10 target 893 255 based on known HH's growth) --SWM 2A Universal access to baSIC services Percentage of informal settlements in the Cape Metropolitan area with an Integrated area cleaning and door to [99%] 99% Quart 99% ... . 99% 99% 99% <=> Unit of measure: % SWM 2A. Universal access to basic services Kilometres of (oad covered by Area Cleaning programme for Sandy Disadvantaged Formal Suburbs L I ...... N 00 door refuse collection service '--' SFA 2 DtrObj21 (estimate . [5372 KmJ 5372 kin 5372 kin 5372 km 5372 krn Quart <1.3 <1.3 <1.3 <1.3 27% Quart 21l3% 26.1% 265% 27% 188% Quart 18.8% 18.6% 18.7% lR8% (61 71.0 000 kI) (62 040 000 kl) 5312 km Quart «1.3) <1_3 [21.5%] [18.6%J The km distance will remain the same untll the budget is increased UnIt of measure' Kilometres Eiec- 2A- u-niversal access to bastc SFA 2 OirObj2.1 services - SAIFI (System Average Interruption Frequency Index): indicates how often the average customer connected experiences a sustained power interruption per annum Unit of measure: SAIFI Index SFA 2 Dir Obi 2.3 ?8.1 Utility W&S 2B. Conservation of natural resources W&S /8. Conservation of natural resources Services Percentage reduction in unconstrained water demand Unit of measure: % SF-A 2 Dir Obi 2.3 Percentage unaccounted for water Unit of measure' % (62 040 000 kl) (52 040 000 kl) . - . (61 ~O 000 kl) -- -- [I:J 2009/2010 UTILITY SERVICES DIRECTORATE SDBIP ALIGNMENT TO lOP ,,!.!t!.. is ~~ !! :! SFA 2 DlC Obj 2.3 282 SFA2 Dir Obj 2.3 28.4- SFA2 Dir Obj 2.3 28.5 Ia.£" ...S.ae SFA& Corporate Directorate Scorecard Objective No. Indicator No. .... ..a. ;3C TARGETS Baseline (08109 Target In braCkets) Annual Target 200912010 Frequency [83%J 87% [70%J 30 Sept 2009 31 Dec 2009 31 March 2010 30 June 2010 Quart 63% 84% 85% 87% 70% Annual NIA N/A N/A 70% [15%J 15.5% Quart 15.2% 15.3% 15.4% 15.5% [50% Complete] 55% Quart 45% 48% 52% 55% 5% 15% Quart 7,5% 10% 12,5% 15% General Comment G: c" Ut.lity Services , Objective indicator (To Include unit of measure) W&S 28. Conservation of natural resources Percentage compliance with 4 critical DWAF effluent standards (e·col. count, Ammonia content, Oxygen demanding substances, total suspe.nded solids) Unit of measure: % .....•. SDI [---SWM 2B Conservation of natura! resources Cleanliness of the City (Metropolltan Cle,nliness I Photographic index) SWM 26. Conservation of natural Percentage of airspace saved in retation to the vulume Of waste SDI cross-cutting indicator shared with Parks, Roads & Stmmwater, Housing Unit of measure· % Index . Utility Services resources - generated Unit of measure % -- SFA2 Dlr Obj 2.7 ·~W~ ~" .. - 2C. Effective management of City's Infrastruclure and Resources Percentage completIon of key prOjects to ensure augmentation Of bulk water resources: Desalinlsation Plant Unit of measure: % _. SFA 2 Dir Obi 2.7 SWM 2C Effective management of City's Infrastructure and Resources Phased percentage progress wrth the development of RogionallandflU sites SFA2 Drr Obj 2.8 2C.1 - SiA 3 air Obj 3.1 3A 1 Transp 2C Effective management of City's Services RdS & Storm Infrastructure and Resources Elec W&S SWM U1H.ty ~,i -". Phased completion of an integ.ated Infrastructure Asset Management Programme in respect of Transport, Roads & Stormwater, Electricity, Water, Sanitation and Solid Waste Management [75% completion of Electricity: established Asset Medium Voltage Management • Phases 2 & 3 register for Major Infrastructure depts.] Annual NIA NlA NlA Water & Sanrtation I Solid Waste Fleet • Phases 1, 2 & 3 ElectriCity: Medium. Voltage 'Pha~es 2 & 3 Waler& Sanitation Sewer Pump Stations • Phases 1,2&3 Sewer Pump Sfations • Phases 1, 2 & 3 . ....... - l':> 00 I-'- Solid Waste Fleet • Phases 1, 2 & 3 .. " Unit of measure Completion of , Phases 3A Reduction in energy consumption Re~duction of "10°/0 in energy In the Cape Metropol.!an Area below consumption" below projected projected unconstrained energy unconstrained energy consumption consumption =-····~-.c..,- .consumption" Ibelow projected unconstrained consumption [""" ,~ Reduction of "10% MaTntain reduction in energy of "10% In energy energy ~. the , Phase 1 Completed Asset Register Phasa2 Completed Evaluation Phase 3· Completed Condition Assessments Phase 4 Commence implementalron of lAMP Unit of measure GWh per the I o~ favourable RoD by 30/0612909. Unit of measure: % C-- These targets are based assumption that the Ministar will issu~ a Quart ~. 2880 5528 8094 10885 consumption" below projected unconstrained energy consumption Electlicrty Elechicity consumption target: consumption 10317 target: 10855 .... I ~ Page 30t5 ---~- fD 200912010 UTILITY SERVICES DIRECTORATE SDBIP 11 .. !If ALIGNMENT TO lOP -55" 02 SFA& Corporate Directorate Scorecard Objective No. Indicator No SFA 5 Dir Obj 5.5 58.2 SFAS SA 2 ... I! IHSS ..-1. 5 -;- ..gJ!.. .!g. Objective Indicator (To Include unit of measure) TARGETS Baseline (08109 Target in brackets) Annual Target 2009/2010 30 Sapt2OO9 5B. Dehvery of hoUSing opportunities Implementation of Informal SWM Elec W&S SR&L PMU SA Ensuring enhanced service delivery with efficient institutional arrangements SWM !:'Iee W&S SR&L PMU 8A Ensuring enhanced service delivery with efficient institutional arrangements SWM Elac W&S SR&1 PMU SA Ensuring enhanced service delivery with efficient Institutional arrangements SWM Elee W&S SR&L PMU BA Ensuring enhanced service delivery with efficient institutional arrangements Settlements Upgrade programme (UISP and EHP) 31 March 2010 31 Dec 2009 30 June 2010 . Q SWM Elee W&S General Comment Frequency [100% compliance with plan specifications] 100% compliance with plan speCifications Quart 100% compliance 100% compliance 100% compliance 100% compliance with plan with plan with plan with plan specifications specillcations speclflcations speclfleations 5 to S% overAll turnover Quart 5 10 8% overall tumo_ 5 to 8% overall turnover 5 to 8% overall rumover 5 to 8% overall Quart 8 to 12% within skiHed calegories 8 to 12% wilhin 8 to 12% within e to~12% within Unit of measure: % -- Sf'A 8 SFA 8 r--- SFA 8 r--sFA8 -CS es 8.A3 8AA CS 8AS- SA.e- es ~'Si5I Retention of Skills as measured by % staff turnover UnIt of measure, % Staff availability as measured by % absenteeism New - 8 to 12% within New skilled categories :s; 4 % average tor New skilled categories skHled categories NlA NlA 30% 60% 90% N/A NlA 31% Corporately (Directorate & Departmental targets wiilonly be available once the l:Urrent survey has been completed) 90% Quart 10% 31% Corporately (Directorale & Departmental targets will only be available once the current survey has been completed) Annual NlA 85% N2 Quart [90%J skilled categories NlA ,,; 4% average for the penod 1 July 2009 to 30 June 2010 the peliod 1 July 2009 to 30 June 2010 Unit of measure: % Percentage budget spent on implementation of WSP Annual turnover Unit of measure; % Porcentage improvement in the positive employee climate as per annual Culture Climate Survey Unit of measure: % swtvi- rsAEnSuring enhanced service Elec W&S delivery With efficient institutional arrangements C S C----SWM Elee W&S SR&L PMU 8A Ensuring enhanced service delivery wlfh efficient institutlonal arrangements Percentage of capital projects meeting ong.nal planned milestonns [28%) - 80%.=-N:o! ." 85% N2 85%N2 85%N2 85% N2 ,_. ..... l'.:) ex) l'.:) Capital Projects exceeding R200 N2 _ 000 Unit of measure: % SFA 8 8AJ I ~~' jmpro~ement in the tirne Baseline to be taken to notifications In terms of determined on the Corporate WOlks Management 30.6.09 process 12%-ffiduction In time taken to close notificattons {measured against the baseline) ~~Qualt 3% naductiorr on 200812009 baseline 1'\%. reduction on 200812009 9% reduction on 12% naduction in 200812009 lime laken to baSeline baseline dose notifications (measured agains the baseline) Unrt of measure: % SFA 8 SFA 8 -"Firl 88.3 Fin 8B.4 SWM Elee W&S SR&L 8B_~ Management of key financial areas such as income control, cash flow" Indigent support. alternative income opportunities, asset management and risk management SWM Elec W&S SR&L PMU 8B. Management of kny financial areas such as income control, cash fiow, indigent support, alternative income opportunities, asset management and risk management SWM Elec W&S 88. Management of key financial Percentage of Directorate's CapHal budgel spent (NKPI) 95% [96%J Quart SFAS SB.6 I Fin SWM !:'Iee W&S areas such as income control, cash flow. indigent support, alternative income opportunities, asset management and fisk management 88. Management of key financial areas such as income control, r.ashflow, indlgont support, alternative income opportunities, asset management and fisk 25% 45% 95% 95-100%ofYTD 95%-100% .... Unit of moasure" % Percentage of Directorate's operating budget spent [95-100% of YTD) 95-100% Quart 95·100% of YTD 95-100% Of YTD Unit of measure' % '. -- SFA8 10% Percentage expenditure on [95-100% of YTO] DIrectorate's operational maintenance budget --~-- 95-100% Quart 95'100% of YTD 95-100",(, of YTD 95-100% Of YTD 95%·100% 95% Quart 95%ofYTD 95%OfYTD 95%ofYTD 95% Unit of measure: % Revenue collected as a percentage of billed amount [96% of year to date] Unit of measure' % -- ~ Page 4 of 5 . ,- 0 2009/2010 UTILITY SERVICES DIRECTORATE SDBIP ALIGNMENT TO lOP .... Till!! -' SFA& Corporate Directorate Scorecard Objective No. Indicator No SFA 8 SFA8 86.7 ~ "Su ~ .. !! :SiS Audit .!~ :21: U "" .. r>:2l Objective Indicator (To Include unit of measure) "- SWM Eloc W&S SR&L PMU "JJ1" Eloc W&S SR&L PMU 8 B Management of key financ.al and governance areas such as income control. cash flow, indigent support, alternative income opportunltles, asset and risk management Percentage reduction in the number of recur ring findings emanating from Internal Audit TARGETS BaHIIne (08109 Target In bracketsl Annual Target 2009/2010 Frequency [60%] 70% [100% by 31 May 100% 30 Sept2009 31 Dec 2009 31 March 2010 30 June 2010 Quart 70% 70% 70% 70% Annual N/A N/A N/A 100% General Comment Unit of measure % 8 B Management of key financial and Percentage annual asset verification governance areas such a!; income process completed control, cash flow, indigent support, alternative income opportunities, Unit of measure' % asset and risk management 2009J -- -- ...... N c:x:> c,....:, Page 5 Of 5 !ill 2009/2010 SOLID WASTE MANAGEMENT DEPARTMENTAL SDBIP ALIGNMENT TO lOP TARGETS ~~ " siJ -" e SFA& Corporate Directorate Scorecard Objective No. Indicator No. SFA 1 QI Objectlve c- Indicator (To include unit of measure) :JO 1A.4 SDI 1A. Create an enabling environment for the economy to grow and become globally competitive, Number of job opportunities created through the expanded Public Works Programme (EPWP), to contribute to the reduction of poverty and unemployment Baseline (08/09 Target in brackets) New >u Annual Target (by June 2010) To be determined c QI General Comments ::J ! "- Quart 30 Sept 2009 31 Dec 2009 31 March 2010 30 June 2010 To be detennined To be determined To be determined To be detennined I I Unit of measure: Number i ~. SFA2 Dir Obj 2,1 2A.4 Utility 2A, Universal access to Services basic services Percentage of households with access to basic levels of solid waste removal [99%] 99% NI Quart 99% 99% 99% 99% Quart 99% 99% 99% 99% Unit of measure: % and number of HH's - SFA2 Dir Obj 21 Utility 2A, Universal access to Services basic services Percentage of informal settlements in the Cape Metropolitan area with an integrated area cleaning and door to door refuse collection service [99%J 99% NI - Based on an I updated household count estimated at 902 278 (source SDI&GIS Dept analysis of StatsSA 2001 Census and the more recent 2007 Community Survey) · ·· ...... - .: NJ '~ w;;;.. Unit of measure: % SFA2 Dir ObI 2,1 Utility 2A, Universal access to Services basic services SFA2 Dir Obj 2.1 2A. Universal access to basic services Kilometres of road covered by Area Cleaning programme for Sandy Disadvantaged Formal Suburbs No of additional drop-offs [5372 km] 5372 km Quart 5372km 5372km 5372km 5372km [2] To be determined Annual NIA NIA N/A To be detennined [70%] 70% Annual NIA NIA N/A 70% [15%J 15.5% Quart 15.2% 15.3% 15.4% 15.5% [1401 140 Annual N/A N/A NlA 140 The km distance will remain the same until the budget is increased. Unit of measure: Number SFA2 Dir Obj 2.3 2BA SDI 2B. Conservation of natural resources Cleanliness of the City (Metropolitan Cleanliness I Photographic index) Unit of measure: % Index SFA2 DirObj 2.3 2S-:S- -UtiiiiY 28. Conservation of Services natural resources Percentage of airspace saved in relation to the volume of waste generated SOl cross-cutting indicator shared with Parks, Roads & Stormwater, Housing Unit of measure % I- --- - SFA2 DirObj 2.3 28. Conservation of natural resources No. of schools incorporated into Waste Wise awareness programme for schools Unit of measure: Number - Page 1 of 5 0 2009/2010 SOLID WASTE MANAGEMENT DEPARTMENTAL SDBIP ALIGNMENT TO lOP TARGETS '0 GO 5f oS SFA& Corporate Directorate Scorecard Objective No. Indicator No. ... u ... f c- Objective Indicator (To Include unit of measure) ::JC >u Baseline (08/09 Target in brackets) Annual Target (by June 2010) c GO :l C" General Comments f "- 30 Sept 2009 31 Dec 2009 31 March 2010 30 June 2010 SFA2 Dir Ob) 2.7 2C. Effective management Phased percentage progress with the of City's Infrastructure and development of Regional Landfill sites Resources Unit of measure: % [50%] 15% Quart 7.5% 10% 12.5% 15% SFA2 Dir Obi 2.7 2C. Effective management Development of Transfer Stations: of City's Infrastructure and Tygerberg design Resources Unit of measure: % [80%] 100% Quart 55% 65% 80% 100% SFA 2 Dir Obi 2.l 2C. Effective management Development of Transfer Stations of City's Infrastructure and Oostenberg develop Resources Unit of measure: % [30%] 60% Quart 35.0% 40% 60.0% 60% 2C. Effective management Development of Transfer Stations' of City's Infrastructure and Helderberg Site Design Resources Unit of measure: % New 15% Quart 0% 5% 10% 15% ,.... ._. SFA2 Dir Obi 2.l SFA2 Dir Obi 2.7 _ SFA2 Dir Obi 2.7 2C. Effective management Provision of airspace to accommodate of City's Infrastructure and waste Resources Unit of measure: % [100%J 100% Quart 100% 100% 100% 100% 2C. Effective management Closure & remediation of landfills: of City's Infrastructure and Design (Faure, Gordons Bay, Table Resources View & Swartklip) [80%] 100% Quart 85% 90% 95% 100% 30% Quart 10% 20% 25% 30% Unit of measure: % ... _. _. 2C. Effective management Closure & remediation of landfills: of City's Infrastructure and Develop (Faure, Gardons Bay, Table Resources View & Swartklip) Unit of measure: % . .,, .. .- ...... ~ -_. I--SFA2 Dir Obj 2.7 These targets are based on the assumption that the Minister will issue a favourable RoD by 30/06/2009 [30%] 00 C..rt - 0 2009/2010 SOLID WASTE MANAGEMENT DEPARTMENTAL SDBIP ALIGNMENT TO IDP TARGETS is !1 I! SFA& Corporate Directorate Scorecard Objective No. Indicator No. SFA2 Dir Obj 2.B 2C.l oS ... u Objective ... e 1:- :::i c Indicator (To include unit of measure) Utility 2C. Effective management Phased completion of an integrated Services of City's Infrastructure and Infrastructure Asset Management Resources Programme in respect of Transport, Roads & Stormwater, Electricity, Water, Sanitation and Solid Waste Management Baseline (08109 Target in brackets) "" u Annual Target (by June 2010) [75% completion of established Asset Management register for Major Infrastructure depts.J Solid Waste Fleet • Phases 1, 2 & 3 I: 011 .. General Comments ::J r:I' "- "" 30 Sept 2009 31 Dec 2009 31 March 2010 30 June 2010 Annual N/A N/A NIA Solid Waste Fleet • Phases 1, 2 & 3 Phase 1: Compleled Asset Register Phase 2: Completed Evaluation Phase 3: Completed Condition Assessments Phase 4' Commence implementation of lAMP . Unit of measure: Completion of Phases - SFA5 Dir Obj 5.5 5B.2 IHSS 5B. Delivery of housing opportunities Implementation of Informal Settlements Upgrade programme (UISP and EHP) [100% compliance with plan specifications J 100% compliance with plan specifications Quart ..... 100% compliance 100% compliance 100% compliance 100% compliance with plan with plan with pl,m with plan speCifications specifications specifications specifications ~ t:X) c::n '. Unit of measure: % '- -- 0 604 Improve law SFA6 Dir Obj 604 enforcement (traffic policing, and general law enforcement) through more visible actions Percentage adherence to solid waste by-law enforcement precinct plan [100%J 10%·' '. Quart 30% 20% 25% Unit of measure: % I SFA 8 BA.2 es SA Ensuring enhanced service delivery with efficient institutional arrangements SFA 8 SFAB 8.A3 BAA ,f"'" CS CS SA Ensuring enhanced Retention of Skills as measured by % staff turnover Unit of measure: % Staff availability as measured by % absenteeism efficientd."," institutional "" arrangements Unit of measure: % SA Ensuring enhanced service delivery with Percentage budget spent on implementation of WSP arrangements Unit of measure: % _Jff<"'" 'o""wloo" This working methodology is changing so that the Officers will only be undertaking the plan for a percentage of the time in future. 30% , New 5 to B% overall turnover Quart 5 to 8% overall turnover 5 t08% overall turnover. 5 to 8% overall tumover 5108% overall turnover New 8 to 12% within skilled categories Quart 8 to 12% within B 1012% within ., S 1012% within '. 8 to 12% within skllledcategqries skilled categories skilled categories skilled categories New s 4% average Annual for the period 1 July 2009 to 30 June 2010 '. [90%] --- 90% ~- Page 3 of 5 ...... ~---- .... N/A N/A ·.··10",1.. , (or based on DirlDept. projected cash flow) 30% (or based on Dir/Depl. projected cash flow) 60% (or based on DirlDept. projected cash flow) , Quart - N/A - ~- ---~- s 4% average for the period 1 July 2009 to 30 June 2010 90% L_ Subject to finalisalion of the 09110 draft budget. - - -- -- - - - -... [ill 2009/2010 SOLID WASTE MANAGEMENT DEPARTMENTAL SDBIP ALIGNMENT TO lOP ..... .?j ~ "g .Btl SFA& Corporate Directorate Scorecard Objective No. Indicator No. SFAS 4> Objective '" ! c:- Indicator (To include unit of measure) ::Jc SA.S CS SA Ensuring enhanced service delivery with efficient institutional arrangements Baseline (08109 Target In brackets) --- 8A.6 SOl 8A Ensuring enhanced service delivery with efficient institutional arrangements CS 8A Ensuring enhanced ~~ r---sA.7 service delivery with efficient institutional arrangements Annual Target (by June 2010) .. c: General Comments :::I 1:1" I!! IL 30 Sept 2009 31 Dec 2009 31 March 2010 30 June 2010 31% Corporately (Directorate & Departmental targets will only be avai/able once the curren survey has been completed) S5% N2 Annual N/A N/A N/A 31% Corporately (Directorate & Departmental targets will only be available once the current survey has been completed) Quart 85% N2 B5%N2 Percentage improvement in the time SaselinetcitJe 12% reduction taken to close notifications in terms of detemnined on in time taken to the Corporate Works Management 30.6.09 close process notifications (measured Unit of measure: % against the baseline) Quart Percentage improvement in the positive employee climate as per annual Culture Climate Survey [28%] Unit of measure: % SFAS TARGETS ....0 Percentage of capital projects meeting original planned milestones -80% N2 B5% N2 85% N2 Capital Projects exceeding R200 000. N? _ Unit of measure: % 3% reduction on 200812009 baseline 6% reduction on 2008/2009 baseline 9% reduction on 200B/2009 baseline . 12% reduction in time taken to close notifications (measured agains the baseline) .. ..... f'-:I 00-.l - SFAB BB.3 ' f----SFA 8 SFA8 - , BBA Fin SS. Management of key Percentage of Department's Capital financial areas such as budget spent (NKPI) income control, cash How, indigent support, Unit of measure: % alternative income opportunities, asset management and risk management Fin [96%] 95% Quart Based on Dif/Dept. projected cash flow Based on Ok/Dept. projected cash flow Based on OirlDept. prOjected cash flow 95% 8B, Management of key Percentage of Department's operating financial areas such as budget spent income contrOl, cash flow, indigent support, Unit of measure: % alternative income opportunities, asset management and risk management [95-100% of YTD] 95·100% Quart 95-100% of YTO 95-100% of YTD 95-100% of YTD 95-100% 8B. Management of key financial areas such as income control, cash flow, indigent support, alternative Income opportunities, asset management and risk management [95·100% of YTD] 95·100% Quart 95-1000/. of YTD 95-100% of YTD 95-100% orYTD 95-100% - Percentage expenditure on Department's operational maintenance budget . Unit of measure. % - _ 0 .......... _.- 2009/2010 SOLID WASTE MANAGEMENT DEPARTMENTAL SDBIP ALIGNMENT TO lOP TARGETS "is .. f ...IS $I .., SFA& Corporate Directorate Scorecard Objective No. Indicator No. Objective ... f c- Indicator (To include unit of measure) :JQ Baseline (08/09 Target in brackets) Annual Target (by June 2010) i:i' c: .. General Comments ::s cr f IL 30 sept 2009 31 Dec 2009 31 March 2010 30 June 2010 I SFA8 B8.6 Fin 88. Management of key financial areas such as income control. cash flow, indigent support, alternative income opportunities. asset management and risk management r-" SFAB .- r-----sS.7 88.10 SFA8 '-- --.. Audit Fin 8 B Management of key financial and governance areas such as income control, cash flow, indigent support, alternative income opportunities, asset and risk management SW Revenue collected as a percentage of billed amount [96% of revenue to date] 95% Quart [95% of revenue to date] [95% of revenue to date] [95% of revenue to date) 95% [60%J 70% Quart 70% 70% 70% 70% Unit of measure: % Percentage reduction in the number of recurring findings emanating from Internal Audit . Unit of measure: % 8 B Management of key Percentage annual asset verification financial and governance process completed areas such as income control. cash flow, indigent Unit of measure: % support, alternative income opportunities, asset and [lsk management , [100% by 31 100% May 2009J Annual NIA N/A N/A 100% - ...... r-.,:) <:::X'J CIa - Page 5 of 5 2.2 ." 1289 City of Cape Town Solid Waste Management q~p! Waste Management Sector Plan 2009/10 Introduction The Waste Management Sector Plan for the City of Cape Town consists of operational and support strategies and an Integrated Waste Management (IWM) Plan that contains a schedule of projects and activities to give effect to the strategies, to manage and minimise waste and to ensure sustainable and affordable services. The initial draft IWM Plan was preceded by a thorough status quo assessment conducted by a team consisting of expert waste management consultants, Council staff and staff from the Western Cape Dept of Environment and Development Planning (D:EA&DP). It was put through an extensive series of public meetings in July and August 2004 as part of the statutory public participation process that determined public input and needs for the plan. This is the third review of the plan since the original was finalised and adopted by the Executive Mayoral Committee together with the Council's IWM Policy in May 2006 (resolution MC 08/05/06). It is herewith presented for inclusion in the Council's reviewed lOP for 2009/10, per Section 5 of the Municipal Systems Act (MSA). Principles and information about waste management, service standards and levels are contained in the IWM policy. The overarching policy objectives are to ensure basic waste management services, to minimise waste that is landfiUed or is illegally dumped, to conserve resources and the environment, and to reduce the human and environmental health, and socio-economic impacts of waste. Tariff information is contained in the Council's Tariff Schedule, which is reviewed and adopted by Council at the same time as the Integrated Development Plan (lOP). Council's draft IWM by-law for the regulation of waste management activities is aligned with the national imperatives, and was consulted on in the public realm in 2008. It was recommended to Council on 18 February 2009 and is currently being finalised for promulgation as part of the institutional and legal framework for waste management in the municipality, as defined by the National Waste Management Bill. National/Provincial Legislative Requirements The SA Constitution, Schedule 5B requires municipalities to provide cleaning and cleansing, waste collection and disposal services and related infrastructure. The National Waste Management Strategy, and the White Paper on Integrated Pollution and Waste Management for South Africa (informed by the statutory principles affecting environmental management and conservation), are the national policy and regulatory instruments that define an integrated waste management approach, focusing on waste minimisation and service delivery. The National Environmental Management: Waste Management Bill, No 39 of 2007 was approved by Parliament in November 2008 and is awaiting promulgation. It will become the framework legislation for the regulation of waste management activities in South Africa including in local authorities when Signed into law. 2.2 City of Cape Town Waste Management Sector Plan 2009.doc Page 1 of 14 1290 City of Cape Town Solid Waste Management Be'pt Waste ManagementSector Plan 200.9/10 The Local Government Municipal Systems Act, S.11 requires a Council to formulate policies for which the Integrated Waste Management Policy was developed in 2006. In terms of S.12 of the Waste Management Bill, a municipality must formulate an IWM Plan as a means of minimizing waste disposal, providing services, preserving and extending the use of landfill sites and protecting the health and the environment. The most important legislative requirements for these objectives are contained in the following statutes and national policies: 1. The SA Constitution (S.24: Right to a safe and healthy environment); 2. The National Envi'ronmental Management Act (Act 167 of 1998) (NEMA); 3. The Environment Conservation Act (ECA) (Act 73 of 1989, amended relevant sections not repealed yet); 4. National Environmental Management: Waste Management Bill, No 39 of 2007 - overarching waste management legislation once promulgated; 5. White Paper on Integrated Pollution and Waste Management for South Africa (Government Gazette 20978, 17 March 2000) - DEAT national waste management policy; 6. National Waste Management Strategy (DEAT, 1999); 7. The National Water Act (Act 36 of 1998); 8. The Hazardous Substances Act (Act 15 of 1973) & Regulations; 9. The National Health Act (Act 63 of 1977); 10. The Occupational Health and Safety Act (Act 85 of 1993) and Regulations; 11. The Road Traffic Act (Act 29 of 1989); 12. The Local Government Municipal Systems Act (Act 32 of 2000); 13. The Local Government Municipal Structures Act (Act 117 of 1998); 14. The Local Government Municipal Finance Management Act (Act 56 of 2003); 15. Local Agenda 21 (Sustainable Development principles at a local government level- SA is a signatory to the United Nation's Agenda 21). This Waste Management Sector Plan, incorporating the IWM Plan, is aimed at complying with statutory requirements for local government waste and environmental management (in particular Chapter 3 of NEMA), as well as achieving service delivery targets and maintaining standards that are defined in the Council's IWM Policy and Plan. The policy aligns waste management activities in Cape Town with current national, provincial and Council priorities. SOLID WASTE MANAGEMENT SECTOR: CITY OF CAPE TOWN Vision for Waste Management in Cape Town Compared with experiences in countries like New Zealand (a pioneer in waste minimisation since 1995) and many countries in Europe, it is likely to take ten years and longer to establish sustainable recycling as an integral part of the Cape Town, the regional and the national economy. Much national support and development is necessary, as waste minimisation and recycling activities are not limited to Cape Town and involve the processing and manufacturing sectors on a national scale. 2.2 _ City of Cape Town Waste Management Sector Plan 2009.doc Page 2 of 14 1291 City of Cape Town. Solid Waste Management'Dept _ _ _ _ _ _ _W_a_s_t_e_M_anagement Sector Plan 2009/1_0_ _ _ _ _ _ __ It will require a country-wide approach in terms of planning, infrastructure, facilities, incentives and disincentives to drive out economies of scale that will make this sustainable and economically viable. The pending legislation does provide for the formulation of Industry Waste Management Plans, the declaration of "priority waste", the submission of waste information and regulations that the Minister of DEAT has the power to make. These are key influences on achieving the long terms waste management vision and objectives set by the Dept. The long-term vision for the Cape Town waste management sector is • • • • • • to improve access to basic services for residents to as close to 100% as possible within the constraints of available funds and unplanned growth; to develop multiple integrated initiatives that will reduce waste and the associated impacts substantially as well as contribute to and support economic development; to generate other sources of funding for integrated waste management through Public-Private Partnerships within the Cape Town municipal area. to improve the income generated by the Council's waste services; to optimise the utilisation of the Council's resources and capital; and to regulate waste and the associated services that will ensure sustainability and prevent impact or harm to people and the environment. Synopsis of Situation Analysis of Waste Management in City of Cape Town Population Growth and Development Profiles: City of Cape Town The City of Cape Town's Solid Waste Management (SWM) Dept is the service authority and regulator of waste management activities in Cape Town, per the system of delegations and the municipality's executive powers conferred on it in law. It is also one of the providers of services in the metropolitan municipal area of approx 2 2400 km with approx 3.2 million people Waste management services are required by 909 391 households (2006 estimate), which are either provided directly by the Dept. or via a contracted~in services that includes community based contracts. Almost one-third of the population lives in approx. 222 informal settlements consisting of an estimated 190 000 households. The informal areas are where growth and demand for services occurs mostly on an unplanned basis. Current population growth averages between 1.6% and 2% p.a. Tourism to the greater Cape Town area is a key success factor for economic development. Projected figures almost double the current visitor numbers to Cape Town to 3 million per annum by 2010. The Council derives income by billing for services per its annually revised Tariff schedule, unless a household is deemed "indigent", based on a household income threshold. Services to indigent households are deemed "free basic services". 2.2 City of Cape Town Waste Management Sector Plan 2009.doc Page 3 of 14 1292 City of Cape Town "" Solid Waste Management Dept _ _~____ W_a_s_te_Management Sector Plan 2009/10_ _ _ _ _ _ __ Commerce is serviced by either the Sold Waste Management Dept or private sector companies, while the industrial sector, which also generates special and hazardous waste, is serviced exclusively by the private sector. Economic Development and Waste Growth Profiles Tourism growth to Cape Town is expected to increase from 1,7-million to 3-million by 2010 according to the tourism authorities and will have a significant impact on waste generation. Along with this, waste generation is expected to increase, but planning for the FIFATM 2010 event is aimed at leveraging the opportunity to implement several initiatives for the event and beyond aimed at mitigating waste and stimulating the recycling economy. The property development sector is another strong economic activity that contributes to waste generation. Demolition and construction rubble makes up an estimated 35% of the city's waste. Recovery for processing and reuse is fairly successful. A number of demolition companies operate mobile crushing/ processing plants, and the City also has a tender running for these activities at three sites to increase the diversion of this waste from landfill. Without minimisation or other effects such as the global economic crisis, the projected waste growth rate is approx 7% p.a., which is notably higher than the expected population growth. Waste minimisation partnerships that will provide alternate technology solutions that will improve environmental performance is a strategic focus in the medium to long-term. High-grade composting activities in the city are small scale in relation to the need. The SWM Dept decommissioned a mixed waste composting plant (Radnor) due to unsustainable operating conditions. This presents a potential partnership opportunity in future, and should receive priority attention, as it is estimated to make up approx 30% of the city's waste. A number of key industries and business sectors related to the production, consumption and processing of packaging materials in or near Cape Town feature prominently in terms of a city-wide recycling and waste reduction strategy that could link with provincial and national initiatives. One of two major glass manufacturing factories in SA is located in the city. The plastics industry has a scattered presence, and despite the lack of processing capacity for recycled materials, there are apparently plans by some companies in the plastics sector to establish a factory. The paper/cardboard industry has limited pulping capacity in Cape Town, but the major companies have infrastructure in place for some processing (mills), and the sorting and baling of different types of paper that is still needs to be shipped away for treatment and final processing. Currently there is a reasonably strong demand for recovered paper and cardboard due to fires in the plantations that affected raw material supplies. 2.2 City of Cape Town Waste Management Sector Plan 2009.doc Page 4 of 14 ~.,. 1293 City of Cape Town . '; , Solid Waste Management Dept ________ . Waste Management Sector Plan 2009/10 The metals industry is well represented by many small scrap metal dealers and some large processors. An unfortunate consequence of metals recovery is the unlawful recovery of especially copper and aluminium cable, and steel and cast iron street furniture that creates negative knock-on effects in the general economy and many times induces hazardous conditions. There is currently a lack of local capacity to deal with problem wastes such as tyres, household chemicals, e-waste (electronic, computer and white goods), etc. This often results in dumping practices with unnecessary cost and cleanup effort. It is anticipated that further alignment in the private and public waste management sector will be required once the IWM By-law and the new Act have been promulgated. Breaches of the terms and conditions of Council two refuse collection contracts that included separate collection of recyclables were experienced by the SWM Dept in 2007/08. This is symptomatic of further changes and turbulence that can be expected. It is also anticipated that the severe downturn in the economy will affect the plans and joint industry initiatives for waste minimisation. Quantities and waste type in the City of Cape Town A waste categorisation study was commissioned in 2007 to update the data generated for the draft IWM Plan in 2003/04. This entails evaluating the types of waste that are generated in defined areas. This data will be used in years to come to plan further initiatives and schedule services as part of creating efficiencies and improve the effectiveness of the City's waste management system. The split between waste from residential areas and industrial and commercial areas is approx 40:60. Analyses is complex for a variety of reasons, and will become more complex in future due to densification strategies and the nature of land use in central business districts, which are being developed more and more with a residential component in mind. Demolition and construction (or builder's) rubble and garden waste (greens) together constitute approx 65% of the total waste stream. Other significant fractions make up what is referred to as "packaging waste" that represents between 6% and 10%, while the remainder consists of a variety of organic waste, hazardous materials, e-waste, tyres sand, etc. Organic fractions tend to be higher in informal areas, whilst packaging waste is quite high in formal areas, especially in high income areas. In 2007/08, approx 2.1 million tonnes of general waste was landfilled in three permitted landfills in the municipal area. This was less than the projected growth figure that was achieved through various mechanisms that include the composting of garden greens, the crushing and reuse of builder's rubble, and diverting glass, paper, cardboard, certain plastics and cans from landfill, as well as a slowing economy. 2.2 City of Cape Town Waste Management Sector Plan 2009.doc Page 5 of 14 't-.1I 1294 City of Cape Town Solid Waste Management D~Pl Waste Management Sector Plan 2009/10 .. . ----------- The figure that constitutes an airspace saving due to waste being diverted for recovery to process, recycle and reuse, currently translates to approx 17.5% by volume of waste not being landfilled, which exceeds the target for 2011/12 that was set at 16.5%. The airspace saving achieved is approx 3% more than the previous year. This takes into account the complex dynamics of population growth and economic development (with major property development and tourism growth) over the past decade, which has slowed down waste generation due to the economic downturn. Persons not receiving Waste Management Services It is estimated that 99% of the 909 931 households in the city receive a weekly refuse collection service with occasional area cleaning as the basic service level defined in the IWM Policy, and per the available budget, resources, etc. The remaining 1% arises due to the unplanned growth of informal settlements. These newlyestablished households do, however, receive an emergency service that is temporary until the standard basic weekly door-to-door service can be implemented. Key Strategic Issues and Challenges in Cape Town In the short term, waste management and the imperative to minimise waste presents the following issues and challenges in the city: • • • • • • • • • • • The continued reduction of Basic Service backlogs (residential waste collection) through available funds that are impacted by unplanned population growth; The trend in waste generated that outstrips population growth by almost 5%; A solution is needed to service "backyarders" on a sustainable basis; Service provision during the FIFA 2010 event that will ensure minimal impact on normal services; Upsets in the commercial waste management sector due to current economic conditions that may put residential service delivery contracts at risk; Waste management infrastructure creation is inadequate for expanding services to prevent health and environmental degradation, due to the projected growth in the city and funding constraints; Capital required for upgrade and replacement of compactor fleet to improve equipment condition, availability and age (more than eight years average age); Integration of multiple activities where clustered waste management infrastructure is being developed, such as at new integrated transfer stations; The future replacement or the establishment of additional infrastructure will be hampered by the inadequate income generated from tariff or rates provisions; A longer delay in the issuing of a Record of Decision for the establishment of a new landfill to replace almost full landfills will have major impacts; Mitigation of landfill gas to reduce climate change and environmental impacts; 2.2 _ City of Cape Town Waste Management Sector Plan 2009.doc Page 6 of 14 t 295 City of Cape Town Solid Waste Management DeptWaste Management Sector Plan 2009/10 • • • • • • • External funding is required to reduce the onerous financial implications of implementing various waste minimisation initiatives per the IWM Plan, especially where there is private sector economic benefits; The development of strategic partnerships, both financial and non-financial, with business, industry and other sectors of society to commission large scale waste minimisation initiatives; Attention to detail regarding Conditions of Service for new tenders, and timeous, successful completion and adjudication of tenders, and the subsequent management of contracts; Remodeling of tariffs that wi" make allowances for future recycling incentives; The finalisation of an organisational structure below managerial level and the appointment of key staff at all levels is needed to reduce skills and capacity shortages, especially at supervisory level needed to instill the required discipline to improve service delivery and revenue levels; Streamlining of Council HR policies for shift work is needed to allow utilisation of staff and infrastructure where service and private sector needs require this; Completion of the Municipal Systems Act S.78 investigation and decisions regarding community partnerships and Public-Private Partnerships as alternate service mechanisms to aid job creation, local economic and SMME development, and to alleviate poverty, whilst improving general cleanliness conditions in the city. Solid Waste Management Dept's Strategy for Integrated Waste Management and Service Delivery The SWM Dept's overarching long-term integrated waste management strategy and support strategies are contained in detail in an IWM Plan activity schedule that sets out projects, activities and timelines. Together with the Sector Plan for, it is the implementation vehicle for the Council's IWM Policy. The key aim is to turn the traditional waste management and service delivery approach around to increase waste minimisation and reduce the socio-economic and environmental impacts. The strategiesl plans that make up the overarching IWM Strategy are summarised below, and provide an overview of various goals and objectives. 1) Service Authority Strategy: Institute measures that will enable the Council's waste management Service Authority roles and responsibilities when engaging alternate service provision mechanisms. 2) Municipal Area Waste Regulator Strategy: Institute measures that will enable the Council's waste management regulatory roles and responsibilities - completing and getting the By-law promulgated is the keyenabler. 3) Intergovernmental Strategy: Clarify roles and responsibilities of different spheres, engage DEAT regarding waste minimisation focus areas that need specific support at a national level and lobby National Treasury for increased funding for integrated waste management at the municipal level. Interact vigorously with the Green Scorpions to combat illegal activities involving waste. 2.2 _ City of Cape Town Waste Management Sector Plan 2009.doc Page 7 of 14 · """ 1296 City of Cape Town Solid Waste ManagementDEfpt·· Waste Management Sector Plan 2009/10 -------------------4) Lobbying Strategy: Lobby the relevant legislators for the necessary changes that must enable EPR, CP&SC, materials recovery and recycling. 5) Labour Utilisation Strategy: Create an acceptable, flexible staffing arrangement at strategic infrastructure facilities that will improve asset utilisation and reduce illegal dumping. 6) Service Delivery Strategy: Improve service levels to ensure equitable, effective and affordable services, focusing on containerisation (whee lie bins) in all formal residential areas where geography does not constrain this, and continue to provide an integrated, community-based collection and area cleaning service for all informal settlements (deemed national best practice). 7) 2010 Football World Cup Service Delivery Strategy: Roll out marked dual public litter bins for dry and wet waste separation purposes in the FIFA event footprint area and areas where the 2010 event is likely to have an impact, ensure that contracts for the hiring-in of services and equipment are structured and ready for tender in time well before the 2010 kick-off on 11 June 2010, prepare education and awareness material in conjunction with the media and communication plan. 8) Recycling and Waste Minimisation Strategy: Develop strategic PublicPrivate Partnerships specifically aimed at developing sustainable materials recovery and recycling industries that will add value to the economic growth objectives of the city and the region as well as minimise green house gasses (GHG's). 9) Stakeholder Communication, Education and Awareness Strategy: Prepare appropriate campaigns and materials to improve stakeholder attitudes and participation as a base for recycling, and educate people regarding best practical options. 10)Service Growth Strategy: Continue with community-based service provision to stimulate job growth, and generate private sector contracts that are not possible to service in growth areas via with the Council'S current resources. 11 )Law Enforcement Strategy: Implement the IWM by-law and ensure sufficient capacity is available to enforce the Council's waste management by-laws and national and provincial statutes applicable related to waste management. 12)Revenue Strategy: Implement contracts, monitoring and reporting measures, combined with billing and debt collection initiatives to improve cost recovery and revenue completeness. Implement weighbridge and information systems at landfills to improve revenue generated by landfill disposal fees. Complete tariff remodeling to improve sustainability of services. 13)Funding Strategy: Procure non-government funds and earmark revenue generated through the Council'S waste management activities to improve SWM sustainability and minimise future tariff increases. 14)Fixed Asset Strategy: Create the necessary bulk infrastructure (regional landfill site, transfer stations, community drop-offs) on a planned, informed basis to prevent a waste management crisis. 15) Infrastructure Asset Management Strategy: Develop Infrastructure Asset Management Plans for Solid Waste Management Dept, and capacitate the Department to implement and manage plans, with a focus on Fleet Management, as part of a corporate strategy resolved by the Executive Management Team. 2.2 City of Cape Town Waste Management Sector Plan 2009.doc Page 8 of 14 ·. City of Cape Town Solid Waste Management D&pt. . Waste Management Sector Plan 2009/10 1297 --------------------------- 16)Mobile Asset Strategy: Improve the Council's fleet age either through a combination of capital replacement and refurbishment programme, augmented by a full-maintenance leasing (FML) programme. 17)Management Information Strategy: Develop and implement systems, technology and procedures that will produce specific information on waste, resources and assets for improved decision-making, billing and revenue generation, integrated waste management planning and statutory reporting. 18)Performance Management Strategy: implement systems and manage and improve the Council's personnel and waste management service delivery performance, as well as the waste management sector performance through regular monitoring and evaluation. Strategic Programmes Goals & Objectives with Key Deliverablesl Outcomes Priorities and objectives are influenced by the strategic issues and challenges listed above. A summary of strategic programmes, projects and initiatives for waste minimisation and service delivery in the short to medium term is set out below. It includes capital and operational programmes adjusted according to the available budget. The activity details contained in the IWM Plan will be updated accordingly for the period starting 2009/10. The aim of the SWM Dept is to ensure the long-term sustainability through effective, efficient, economical and affordable waste management service delivery to the city's residents, and to regulate waste management activities across the waste spectrum in the City of Cape Town. a. Improve access to basic waste management services (cleaning, collection and disposal), minimise (reduce and divert) waste to landfill. b. Complete an IWM By-law for promulgation and implementation. c. Implement a Waste Information System. d. Key projects and initiatives: i. Construct and commission a new Northern region landfill site to provide landfill airspace for closed landfills by 2011/12 (more critical than a year ago since the delay caused by objections to the site after a Record of Decision was issued); ii. Rehabilitate old landfill sites (ongoing permit and MFMA requirements). iii. Establish 3 new integrated waste management facilities: 1. Oostenberg project started 2007/08 (two years till commisSioning); 2. Tygerberg, commences 2008/09 (three years till commissioning); 3. Helderberg commences 2009/10 (three years till commissioning). iv. Roll-out of two mini-MRF's (material recovery facilities) - a 2010 initiative; v. Implementing a split bin litter system in strategic areas - a 2010 initiative; vi. Continue with contract services via community-based organisations for integrated area cleaning and waste collection in informal areas; vii. Implement contracts for sandy areas clean-up programmes in disadvantaged communities via community-based organisations; viii. Continue to monitor and evaluate efficacy of a residential split-bag waste collection pilot project in 5 areas (130 000 households) that gives effect to the separation-at-source principle, already started in Aug 2007; 2.2 _ City of Cape Town Waste Management Sector Plan 2009.doc Page 9 of 14 12 9 City of Cape Town ~ Solid Waste Management·Dept •. Waste Management Sector Plan 2009/10 ix. Continue with public education and awareness programmes regarding waste management and waste minimisation (part of WasteWise project). x. Institute aggressive waste management, minimisation and re-use of demolition and construction rubble by facilitating the establishment of rubble crushing plants - contract already awarded and implemented at three sites, with more to come; xi. Complete a comprehensive MSA S.78(3) assessment into alternate service delivery mechanisms, particularly focused on changes to the Council's waste management system to incorporate large scale waste minimisation. xii. Establish an alternative-technology disposal facility by 2009/10; xiii. Implement a landfill gas mitigation project; xiv. Implement by-law once adopted and promulgated for enforcement; xv. Realign depots, staff and implement flexible working hours to achieve improved service efficiencies, to provide an equitable and predictable service, and to improve asset utilisation, access and use by the public; xvi. Establish an integrated infrastructure asset management programme for SWM fixed and movable assets, plant, equipment, infrastructure and superstructure to optimise asset use and service delivery, focusing on waste management fleet as a priority. Resources available to achieve planned Outcomes (next MTREF period) I'.:;:re. ·. ··R~our.".~,. '. ujred: I Capex 1 • Opex 1 I Staff2 ,::21i'.jitt2'6~j2 '2009l1d " . '.......~ "'>:'. ">;f[c;S<' ' . , .. _ _--i-_ _R_4_5_0_5_27_8_12-+-__ R_3_49_97_6_3_0_0-f--_~_R_36_3_274784 R1 468213508 R1 551 901 678. -1-7-73--+------n-/a I R1 641 911 975 n/a i : i I Critical Success Factors a. Adequate capacity for service delivery in terms of staffing, resource allocation, expenditure and procurement approvals; b. Realistic adjustment to tariffs for services provided to ensure that increasing capital and operating requirements can be funded sustainably; c. Accurate and complete billing; d. Management of all contracts to ensure performance and delivery; e. Public private partnerships or alternate funding mechanisms for alternate technologies to landfill to provide for growing capital and operational waste management needs and develop capacity to minimize waste to landfills. f. Legislation that can be used to enforce waste minimisation initiatives needed to meet policy and national targets. Financial figures per 2009/10 draft budget estimates (unapproved, not finalised) at 5.1 % parameter which may change due to future Council resolutions when adopting the final budget. Figure reflects actual staffing complement as at February 2009, and do not include critical vacancies or scarce skills shortages needed for service delivery. A marked drop of approx 500 staff who left the Council's service in the past year. 1 ~rowth, 2.2 City of Cape Town Waste Management Sector Plan 2009.doc Page 10 of 14 I." 1 . 1299 City of Cape TownSolid Waste Management Def!)t >-" . Waste Management Sector Plan 2009/10 Milestones, Targets and Key Performance Indicators, with benchmarks The Key Performance Indicators for waste management are contained in the Service Delivery Business Implementation Plans (SDBIP's) approved by Council for the next three-year MTREF period and 5-year term-of-office lOP starting 2007/08. The achievement and measuring of targets are in line with SDBIP's, and are reflected at the high level as follows: 1. Increase/maintain basic service access to 99% (impacted by city economic, planned and unplanned population growth); 2. Demand Management plan (waste minimisation): Improve landfill airspace savings above 16.5% by 2011/12; 3. Area cleanliness (as measured per a photometric index) to be increased to 67% on the photometric index (as benchmarked in the IWM Policy). 4. Implement capital projects per the approved schedule for three-year MTREF period starting 2009/10; 5. Promulgate a new City of Cape Town IWM By-law by June 2009 to align waste management law enforcement with national imperatives and repeal all previous by-laws (SWM Dept's contribution to the Council's law reform and assuming that the Waste Management Bill has been enacted); 6. Implement a Waste Information System by end-2009 (dependent on finalisation of the Western Cape Province DEA&DP and the national Dept of Environment and Tourism's system roll-out). PERFORMANCE AGAINST PLAN Per the milestones and targets set out above, the Solid waste Management Dept of the City of Cape Town has achieved the following during the past year: 1. Basic Services: 99% target achieved and maintained. 2. Area cleanliness: target of 67% achieved. 3. 4. Current airspace savings target for 2011/2012 has already been achieved17.48% achieved to date. 5. Landfills surveyed and ground water monitoring completed as per permit conditions. 6. Design of Oostenberg integrated waste management facility complete for construction, concept design being finalised for Tygerberg integrated waste management facility. 7. Rehabilitation of disused landfills continuing per schedule. 8. Landfill gas mitigation baseline and feasibility study completed by Central Energy Fund and report with recommendations submitted for Council approval to continue with implementation. 9. Community-based contracts in informal settlements implemented and being monitored (ongoing). 2.2 City of Cape Town Waste Management Sector Plan 2009.doc Page 11 of 14 130 t1 City of Cape Town Solid Waste Management Dept .. _ _ _ _ _ _ _ _W_a_s_t_e_M_a_n_a...-'g::;...e_m_e_n_t Sector Plan 2009110 jJ 10. Residential split bag pilot project: two tenders awarded to cover areas where previous contracts failed due to contractors reneging on contract - this is based on a successful system of employing previously unemployed persons. 11. Draft City of Cape Town Integrated Waste Management By-law taken through public participation process in 2008 - already recommended to Executive Mayoral Committee by Utility Services Portfolio Committee for adoption by Council and promulgation. 12. Council approval in terms of MSA S.78(2) to continue with a S.78(3) assessment of alternate service delivery mechanisms after completion of S. 78(1) status quo assessment and recommendation by consultant. 13. Planning for FIFA 2010 event waste management and minimisation amended in line with national LOC decisions and Executive Mayco resolutions regarding available budget. 14. Continued engagement with spheres of government and members of industry, especially the packaging industry, with the aim to increase infrastructure and provide job opportunities to improve the recovery of materials for recycling and reuse. 15. Successful completion of workshops with a variety of industrial and commercial sectors regarding waste minimisation. 16.IWEX website completed to provide a free exchange platform for recyclable materials. 17. Continued roll-out of weighbridge systems. Major Achievements of a Strategic Nature (Dec 2000 to Feb 2009) Prior to and since the adoption of an lWM Plan in 2006, the SWM Department has successfully completed a number of notable initiatives and projects to meet the objective of more efficient, effective, sustainable and economically viable waste management services. For 2007/08, the Dept expended almost 100% of its budget. • Tariffs, revenue: Revenue collection: Increased during 2007 to 100.95%; Bin audit project: Pilot phase in 2007 has already ensured significant correction of billing problems and addition of sites not on billing system that will have a marked effect on income levels; Tariff convergence: Adopted new tariff structure in 2002/03, duly amended every year since then. The uniform tariff structure defines the cost of a fully tariff-funded collections service according to afford ability criteria and service rebates. Further amendments will be aimed at discouraging the disposal of certain waste types as part of the waste minimisation strategy. • Sustainability, Waste Minimisation and Recycling: Cost modeling of the provisions and implications of the draft Integrated Waste Management By-law was completed by the Stellenbosch University Sustainability Institute with DANIDA funding. 2.2 _ City of Cape Town Waste Management Sector Plan 2009.doc Page 12 of 14 1301 City of Cape Town Solid Waste Management De'pt' Waste Management Sector Plan 2009/10 Key input on the Sustainability Institute's UNDP-funded report and modeling of waste management (Project title: Integrated Resources Management for Urban Development, UNF/UNFIP Project ID: UND-SAF03-303); Completion of Compact Fluorescent Light responsible disposal project in partnership with Eskom, the lighting industry and other role players, including a proposed implementation model and guidelines; Held second workshop on alternate technologies to landfill in 2007; Hosted the Cape Town Waste Minimisation Summit in April 2007 involving key industry sectors aimed at instituting recycling and minimisation partnerships; Established partnerships with major retailers for waste minimisation; Implementation of the "Think Twice" dual bag collection pilot project in five areas across the City for the diversion of recyclable waste - varying success and lessons learnt for future roll-outs; Free-of-charge disposal of builder's rubble at landfills (approx 826 999 tonnes that includes material set aside for capping purposes); Successful diversion from landfill and chipping and composting of most of the City's garden waste (2007/08 est. airspace saving approx 521 129 m3 , up from 483 000 m3 from the previous year); Commencement of a pilot project for the diversion, crushing and recyclingl reuse of demolition waste, with three sites coming on stream at Coastal Park, Bellville South and Gordon's Bay; Continued successes with the Waste Wise campaign - Festive Season campaign commended by the public media and political leadership; Opening of the Resource Centre at the Athlone Refuse Transfer Station in February 2009 that will be used for community and schools education and visitor communication purposes. Establishment of a Waste Exchange Website, currently being upgraded, and an Information Centre at the Civic Centre in the Cape Town CBD. • Standardisation of Services across Metro by e.g. - Once a week refuse collection throughout the year implemented for all areas, and basic levels of service maintained at 99% during 2007; Full implementation of a community-based integrated area cleaning and refuse collection system in informal areas; Ongoing phasing out of weekly skip services in informal areas - only provided as an emergency measure in newly-established settlements. Continued roll-out of containerisation plan for all formal households, with ongoing repairs and replacement implemented in 2006/07. Equitable garden refuse collection options and twenty community drop off sites successfully implemented across the City, each with an average captive area with a 7 km radius; Agreed standard compactor vehicle crew size: Driver plus 4 workers. 2,2 _ City of Cape Town Waste Management Sector Plan 2009.doc Page 13 of 14 J , ,~ City of Cape Town . .. . " Solid Waste Management'Dept 1 Waste Management Se~tor Plan 2009/10 ------------------------~------------------------------- 302 • Capital and Infrastructure Management: Record of Decision (RoD) received in 2007 from the MEC for D:EA&DP for a landfill site to be established between Atlantis and Duinefontein was appealed - being reviewed (February 2009); Successful applications to Western Cape Dept of Environment & Development Planning with RoD's for extensions of Bellville South, Coastal Park and Vissershok landfill sites; RoD's issued by DEA&DP for Oostenberg Refuse Transfer Station, Tygerberg Refuse Transfer Station, and Helderberg Refuse Transfer Station; Completion of Swartklip Transfer Station at the landfill, strategically located close to high-density communities. Continuation of rehabilitation of the full Brackenfell and Faure landfills. • Policy, Legal and Institutional Development: The City was awarded third place in the Cleanest Town (metropolitan municipality category) award in 2008, having won in 2003 and 2007 and coming second in 2005 in the biennial SA National competition organised by DEAT; Council approval for the establishment of an Internal Business Unit; Successful implementation of a top management structure for SWM that finalises the transformation from seven Administrations' management structures as one; Mayco adopted IWM Policy and Plan as part of 2006/07 lOP (MC08/05/06); Provided comment and input on the NEMA: Waste Management Bill (Bill 39 of 2007) prior to submission to Parliament; Draft City of Cape Town Integrated Waste Management completed and recommended to Council by the Utility Service Portfolio Committee in February 2009 (resolution UTS 08/02/09) Council resolution in terms of Municipal Systems Act S.78(2) regarding S.78(1) assessment recommending the appointment of a consultant to assess alternate service delivery mechanisms per S.78(3) (resolution MC23/04/08); FIFATM 2010 Football World Cup planning completed and budget approved by Council for integrated waste management services. 2.2 _ City of Cape Town Waste Management Sector Plan 2009.doc Page 14 of 14 0 2009/2010 WATER AND SANITATION DEPARTMENTAL SDBIP ALIGNMENT TO lOP I Corporate SFA& , Directorate Scorecard Objective No. Indicator No SFA 1 1AA SFA2 DirObj 2,1 2A.1 i.e 3 I! .9~ Objective Indicator (To include unit of measure) ... i!! 1:::i c SOl (08/09 1A. Create an enabling environment for the economy to grow and become globally competitive, Target in brackets) Number of job opportunities created through the expanded Public Works Programme (EPWP), to contribute to the reduction of poverty and unemployment TARGETS 6- Baseline Annual Target (by June 2010) I: 0> General Comments :::I e u. New To be determined Quart [975%] 99,1% '" Quart 30 Sept 2009 31 Dec 2009 31 March 2010 30 June 2010 To be determined To be determined To be determined To be determined Unit of measure: Number Utility 2A Universal access to Services basic services I Percentage of households with access to basic levels of sanitation (NKPI) - 98,95% 99% 99.05% 99.1% Unit of measure: % and number of HH's UWity 2A, Universal access to Services basic services Percentage of infOrmal households with access to basic levels 01 sanitation Based on an updated household count estimated at 902278 (source SDI&GIS Dept. analysiS of StatsSA 2001 Census and the more recent 2007 Community Survey) 09110 target 894 157 HH's Jestimate) ---- SFA2 Oir Obj 2,1 N1 New 80,5% Quart 73.98% 76,16% 78,35% 80.5% . Unit of measure: % and number of . . .- SFA2 Dir Obj 2,1 2A.'Uiilversal access to basic services SFA2 Dir Obj 2,1 Utility 2A, Universal access to Services basic services uiilj~ 2A.Uriiversal access to Services basic services SFA2 Dir Obj 2,1 Percentage of poor households with access to basic levels of sanitation (NKPI) Unit of measure: % Service rate of Informal Settlement sanitation Unit of measure: numberl1000 customers Raticlef informal househOlds per toilet ----~~-- 90% 91% 91,9% Quart N/A 2 N/A 2 Quart 6.8:1 6,6:1 6.4:1 6.2:1 Target equates to 23 000 toilets in informal settlements by 30 June 2010 (142 783 Informal H H), Quart 100% 100% 100% 100% Based on an updated household count estimated at 902 278 (source SDI&GIS Dept analysis of StatsSA 2001 Census and the more recent 2007 Community Survey) 91,9% Quart New 2 [6,6:1] 6.2:1 2A.2 Utility 2A, Universal access to Services basic services Percentage of households with access to basic level of water (NKPI) c;, ----- [100%] 100% N1 I ... ..- c - !2A Universal access to SFA2 DirObj 2,1 baSic services 09110 target: 902278 HH's (estimate) . . . . ._ . . . . . _ . , . - f. .. Percentage of poor households with access to basic level of water (NKPI) ..... c,..., Unit of measure: % and number of HH's . . . . __ . . ._ [100%] 100% Quart 100% 100% 100% 100% Unit of measure, % ._. ------ J_- ~ Unit of measure: Ratio -'SFA2 Dir Obj 2.1 " 89,1% [897%] - .- ._. Page 1 of 5 . . . . . ._. ---- ------ 0 2009/2010 WATER AND SANITATION DEPARTMENTAL SDBIP ALIGNMENT TO lOP Corporate SFA& Directorate Scorecard Objective No. Indicator No 'is .. 01 :9~ Objective ""I! c- ::::i c Utility 2A. Universal access to Services basic services SFA2 DirObj 2.1 Indicator (To include unit of measure) Percentage of Informal households with access to basic level of water TARGETS >0 U Baseline (08/09 Target in brackets) Annual Target (by June 2010) New .. c General Comments ::I C' I! IJ. 30 Sept 2009 31 Dec 2009 31 March 2010 30 June 2010 100% Quart 100% 100% 100% 100% [111:1J 12.7:1 Quart 13.1:1 13.0:1 12.9:1 12.7:1 New 2.B Quart N/A 2.B N/A 2.B [27.5%J 27% Quart 26.3% 26.1% 26.5% 27% [18.6%J 18.8% Quart 18.8% 18.6% lB.7% 18.8% Unit of measure: % and number of HH's Utility 2A. Universal access to Services basic services SFA2 DirObj 2.1 Ratio of informal households per tap ----------------- Unit of measure: Ratio •............ ·2A. Universal access to Services basic services SFA2 Dir Obj 2.1 Service rate of Informal Settlement water Target equates to 10 800 taps in informal settlements by 30 June 2010 (142 783 Informal HH) Ratio of 1 tap per 25 HH already exceeded . Unit of measure number/l000 customers SFA2 DirObj 2.3 2Bl Utility 2B. Conservation of Services natural resources Percentage reduction in unconstrained water demand . Unit of measure: % Percentage tJrlaccounied for water SFA2 Dir Obj 2.3 Utility 2B. Conservation of Services natural resources SFA 2 Dir Obj 2.5 2B~-C()nservation of natural resources Percentage drinking water compliance with SANS 241 Class 1 SFA2 Dir Obj 2.7 2C. Effective management of City's Infrastructure and Resources Percentage completion of key projects to ensure augmentation of bulk water resources: Desalinisation Plant SFA2 DirObj 2.7 2C. Effective management of City's Infrastructure and Resources Percentage completion of key projects to ensure augmentation of bulk water resources: TMG Aquifer SFA2 Dir Obj 2.7 2C. Effective management of City's Infrastructure and Resources Percentage vV" 'I-"~uv, of key wastewater treatment project. Fisantekraal new works - ,. "-'" Unit of measure: % (62 040 000 kl) (62 040 000 kl) (61 380 000 1<1) (61 710 000 kl) (62 040 000 kl) 96% Quart 98% 98% 98% 98% [50% Complete) 55% Quart 45% 48% 52% 55% [To be determined] 70% Quart 66% 67% 69% 70% (completion of Exploratory Phase) [39%J 90% Quart 62% 73% 80% 90% f---- [96%J Unit of measure: % ...... _-;-;- - _. . c:....J c:::::::> ..c------------ ! Init nf rnA"'''''''''' Of, Unit of measure: % Unit of measure: % Page 2 of 5 ...... 0 2009/2010 WATER AND SANITATION DEPARTMENTAL SDBIP ALIGNMENT TO lOP 'is .. I! ...I 0 SFA& Corporate Directorate Scorecard Objective No. Indicator No SFA2 DirObj 2,8 2C,1 ...S1l e c: .:::i Objective Indicator (To include unit of measure) 0 Utility 2C, Effective Services management of City's Infrastructure and Resources Phased completion of an integrated Infrastructure Asset Management Programme in respect of Transport, Roads & Stormwater, Electricity, Water, Sanitation and Solid Waste Management Baseline (08109 Target in brackets) ... TARGETS . !J Annual Target (by June 2010) c :=< General Comments c:r 1.1. f 30 Sept 2009 31 Dec 2009 31 March 2010 30 June 2010 Annual N/A N/A N/A Water & Sanitation Sewer Pump Stations • Phases 1, 2 & 3 WSDP 2009/10 WSDP 2010/11 "',A:nnual approved as part approved as of IDP, 2007/08 part of IDP, Annual Report 2008/09 Annual completed Report completed 100% [100% Quart compliance with compliance with plan plan specifications specifications] N/A NIA NIA WSDP 2010111 approved as part of IDP, 2008/09 Annual Report completed [75% completion of established Asset Management register for Major Infrastructure depts] Water & Sanitation Sewer Pump Stations • Phases 1, 2 & 3 Phase 1: Completed Asset Register Phase 2: Completed Evaluation Phase 3: Completed Condition Assessments Phase 4' Commence implementation of lAMP Unit of measure: Completion of Phases 2C, Effective management of City's Infrastructure and Resources SFA 2 Annual Review and development of Water Services Development Plan (Annual Report, WSDP) Unit of measure: Review SFA 5 DirObj 5,5 5B 2 IHSS 58 Delivery of housing opportunities Implementation of Informal Settlements Upgrade programme (UISP and EHP) : 100% compliance 100% compliance 100% compliance 100% compliance with plan with plan with plan with plan specificaUons specifications specifications specifications ----SFA 8 SFA8 8A2 8.A3 · .. c · - 8AA CS CS ... CS SA Ensuring enhanced service delivery With efficient institutional arrangements Retention of Skills as measured by % staff turnover 8A Ensuring enhanced service delivery with efficient institutional arrangements Staff availability as measured by % absenteeism 8A Ensuring enhanced service delivery with efficient institutional arrangements Percentage budget spent on implementation of WSP Unit of measure % 5 to 8% overall" turnover Quart 5 to 8% overall turnover New 8 to 12% within skilled categones Quart 8 to 12% within 8 to 12% within 8 to 12% within 8 to 12% within skilled categories skilled categories skilled catagories skilled categories New ,;4% average Annual for the period 1 July 2009 to 30 June 2010 [90%] 90% Unit of measure: % Page 3 of 5 Quart , ..... 'U1 New Unit of measure: % .., ~ C) Unit of measure: % SFA 8 .- ------------- 5 to 8% overall turnover 5 to 8% overall turnover 5 to 8% overall turnover ------------- N/A N/A N/A ,; 4% average for the period 1 July 2009 to 30 June 2010 10% (or based on Dir/Dept. prOjected cash flow) 30% (or based on DirlDept. projected cash flow) 60% (or based on DirlDept. projected cash flow) 90% ----------- - ...... '- 0 2009/2010 WATER AND SANITATION DEPARTMENTAL SDBIP ALIGNMENT TO lOP 1~"- Baseline (08/09 Target in brackets) Annual Target (by June 2010) Unit of measure: % [26%1 31 % Corporately (Directorate & Departmental targets will Only be available once the current survey has been completed) 8A Ensuring enhanced service delivery with efficient institutional arrangements Percentage of capital projects meeting original planned milestones 80% 8A Ensuring enhanced service delivery with efficient institutional arrangements Percentage improvement in the time Baseline to be taken to close notifications in terms of determined on the Corporate Works Management 30.6.09 process ...J 0,9 SFA8 Objective e ::;0 ~c - SFA& Corporate Directorate Scorecard Objective No. Indicator No 6A.5 CS BA Ensuring enhanced service delivery with efficient institutional arrangements Indicator (To include unit of measure) Percentage improvement in the positive employee climate as per annual Culture Climate Survey TARGETS ..,>-c G> General Comments :> CT E IL 30 Sept 2009 Annual Quart 31 Dec 2009 31 March 2010 30 June 2010 N/A N/A N/A 31 % Corporately (Directorate & Departmental targets will only be available once the current survey has been completed} 85%N2 85%N2 85% N2 ------- SFA8 SOl 8A.6 SFA8 CS 6A? N? 88.3 SFA 8 -Fin 6BA Fin . r- SFAS- r-- SFA8 --------- f-- 88.6 ------- Fin N2 Percentage of Department's Capital 8B_ Management of key budget spent (NKPI) financial areas such as income control, cash flow, Unit of measure: % indigent support, alternative income opportunities, asset management and risk management -r96 O/0]--- 12% reduction in time taken to close nobfications (measured against the baseline) -gsa,\, N2 !N2 Capital Projects exceeding R200 000. Quart 3% reduction on 2008/2009 baseline 6% reduction on 2008/2009 baseline Quart Based on DirlDept projected cash flow Based on Dir/Dept projected .cash now galor-eduction on 2008/2009 baseline 12% reduction in time taken to close. notifications (measured against the baseline) ---Based on 95% DirlDept projected cash flow -- .. ----------~ Quartely targets subject'to. flnalisation olthe :0911 0 draft ; budget ~ ~ I=:> .. 8B.Management of key Percentage of Department's operating budget spent financial areas such as income control, cash fiow, Unit of measure: % indigent support, alternative income opportunities, asset management and risk management [95-100% of YTDJ 95-100% 8EU-.iianagement of key Percentage-expenditu-re on financial areas such as Department's operational income control, cash flow, maintenance budget indigent support, [95-100% of Quart 95-100%ofYTO 95-100%oiYfD 95-100% of YTO 95-100% 95-100% Quart 95-100% ofYTD 95-100% of YTD 95-100% of YTO 95% 95% Quart [95% of revenue to date] -[950/. of revenue [95% of revenue 95% ------- ~ - ------- YTD] 8B. Management of key Revenue collected as a percentage of [96% of revenue to date] billed amount financial areas such as income control, cashflow, Unit of measure: % indigent support, alternative income opportunities, asset management and risk management ------- 85% Unit of measure: % Unit of measure: % SFA8 85% to date] to date] ---- ------- Page 4 of 5 ----------- [IT] 2009/2010 WATER AND SANITATION DEPARTMENTAL SDBIP ALIGNMENT TO IDP is SFA& Corporate Directorate Scorecard Objective No. Indicator No. oS Z~ c .- Annual Target (by June 2010) 88. Management of key % of water meters read on a monthly financial areas such as basis income control, cashflow, indigent support. alternative income oppcrtunities. asset management and risk management [87%] 88.7 . reduction in the number 8 8 Management of key financial and governance of recurring findings emanating from areas sU'ch as income Internal Audit control. cash flow, Unit of measure' % indigent support. alternative income opportunities, asset and risk management SFA8 89.10- 8 9 Management of key 'annualassetv""""dllVI financial and governance process completed areas such as income control, cash flow, Unit of measure: % indigent support, alternative income opportunities, asset and risk management Indicator (To include unit of measure) ::JCI SFA 8 SFA8 Objective Audit -~"" Fin TARGETS i:)' Baseline (08109 Target In brackets) .3t! Ii::J ~ u. 30 Sept 2009 31 Dec 2009 31 March 2010 30 June 2010 88% Quart 87% 87% 87% 88% [60%J 70% Quart 70% 70% 70% 70% [100% by 31 May 2009] 100% Annual NIA NlA NlA 100% General Comments - ........ c:....;) Q -.J Page 5 of 5 3.2 .- ...,. ,,1308 WATER SERVICES DEVELOPMENT PLAN FOR CITY OF CAPE TOWN 2009/10 - 2013/14 EXECUTIVE SUMMARY The guiding document for the service is the WSOP of which this is the Executive Summary and which is updated annually. It is a product of the current lOP process and will become a Sector Plan of the lOP 2009110 document. DRAFT 2 30 April 2009 " , 1309 C. EXECUTIVE SUMMARY Introd uction Water and Sanitation Services made significant progress since the formation of one City administration for Cape Town (CCT), but there are still critical challenges - the challenges have been summarised in figure 1, below. Institutional arrangements and strategies have been put in place to overcome the challenges and to meet key policy as well as legislative requirements. The National Strategic Framework for Water Services (September 2003), a critical policy document, sets-out the future approach to the provision of water services. TABLE 1: Water service provision targets for the City of Cape Town 1. All people are to have access to functioning basic watersuppl by 2008: Achieved in CCT in 2005/06 Performance Actuals Target Change OBJECTIVE Indicators 30-Jun-07 30-Jun-08 Actllal-to-taroet 3O-Jun-08 Year-(Jn-year (a) Access to basic level of water (i) % of households 100.0% 100,00/0 0.0% a.C% 100.0% 100'()'% (ii) %of poor households 100.0% 100.0% 0.0'% 0.0% - - 2. All people are to have access to functioning basic sanitation by 2010: CCT is aiming for 2012113 d ue the magintude of the requirement Perfonnance Actuals Targel OBJECTIVE 30-Jup-Q8 ndicators 30-Jun-07 30-Jun-08 (a) Access to basic levels of sanitation 0) % of households 971% 97.9% 97.5% L 89.7% (ii) % of poor households 87.1% 92.5% i (b). Informal households ratios 116,883 (il The number of informal households 116,863 (ii) HousehoidS-lo-working taos 129 11.5 129 i (iii) Households-Io-working lDilets 8.0 7.2 6.4 t 9061 1e,188 9,061 (iv: Actual numbe' of w:lr1<ing taos t 14,610 (VI Actual number of working toilels 18,280 16,234 i Change Year-(Jn-vear Actual-to-target -0.8% -O,41:/Q 6.2% 3.'% 12.4% 25.1% 12.4% 25.1% 12.6% 12.4% 12.4% 12.6% 3 Investment in water services infrastructure should total >0 75% of GOP Performance Actuals Target Change OBJECTIVE Indicators 30-Jun-07 30-Jun-oa 3(}.Jun·08 Year-01-year Actual-to-targel (a) Level of investment (i) CCT's GDP (R'bn) - at basic pflces (2(07) 198.50 219.26 360.60 1OC.O% (ii) Waler and San~aUon caDital expendijure (R'm) 588.70 -64.2% 0.75% 47.8% (iii) Capital investmenl as % of GDP 018% 027% 1 , Source. GOP f:gJres were provlded by lIle DeDartment of EconomIC De,elopmenc. The Departr:1en. of EconomiC Development sourced lIle numbers from Quantec's Western Cape Macro-economic Outlook Report Source: Water and Sanitation Services 2007/08 Departmental SDBIP; Department of Economic Development; Quantec (Western Cape Macro-economic outlook report) To ensure and to measure the level of progress, targets for the City of Cape Town were set - this are listed in table 1: • The target for providing access to basic water supply in the CCT was met in 2005/06; therefore access to basic water supply equals 100% - see TABLE 1 (1. All people are to have access to basic water supply services by 2008). • By 2010, about 70% of CCl's population had to have access to basic sanitation services, The latter target was exceeded - at 30 June 2008 92.5% of Cape Town's population has access to basic sanitation services (2007/08 Water & Sanitation Services 4th Quarter SOBIP Review) - see TABLE 1 (2. All people are to have access to basic sanitation services). • The target level for investment in Water and Sanitation infrastructure was fixed at 0.75% of the CCl's GOP per annum. In 2006107, Water and Sanitation's capital expenditure amounted to R360.6 million - this translated to 0.18% of 2 1310 GOP. Capital investment in the following year increasing to RS88.7 million, but at 0.27%, this was still significantly below target - see TABLE 1 (3. Investment of water services infrastructure). • The required institutional reform should be completed by 2013, with Water Services being managed and accounted for separately. Vision of Water and Sanitation Services To become a leader in the provision of equitable, sustainable, people-centred, affordable and credible water services to all. Critical challenges Cape Town Water Services faces a number of critical challenges, these have been clustered according to four categories (a) financial perspective, (b) customer perspective, (c) business processes (internal) and (d) learning perspective: FIGURE 1: Summary of Water & Sanitation's critical challenges in CCT Ila) Financial lIb) Customer Ii. Financial sustainabillty of the Slmice i::~~:Vide basic service expansion to meet il. Cost recovery iii High financial requirements iiI. High dett due to non·payment ii. Eradicate sanitation backlogs iiI. Proviae affordable service I Water and Sanitati on Services I(d l Learning/Growth Ii. Increase performance and efficiency (e) Business Process (Internal) , Achieve targets through intense WDM ii. Meet wastewater effluent standards iiI. Greywater run4f quality in informal setiaments I..-----liv. Provision of infraslJ'ucture to meet development growIh needs Y. Maintenance of infrastructure to ensure cootinued operation vi. Estatlish effectiverslilulional arrangemenl Notes: The following content has been clustered in terms of the section 13 of Water Services Act of 108 of 1997 Section 13N Financial Section 13{a). (e), (di. (e), (f). (h)(i-iv & vii): Internal Business Processes Section 13(b). (9), (i) Source: Water and Sanitation Services The strategies to face these challenges are dealt with under the following sections. 3 " , 1311 C.1 ESSENTIAL QUESTIONS C.1.1 What is the backlog of water services? The majority of Cape Town's population, both in formal and informal settlements, receives service levels that generally meet the National minimum standards as required by the Water Services Act 108 (of 1997). Only 886,940 of Cape Town's 902,279 households received basic sanitation services at 31 March 2009 (2008/09 Water & Sanitation Services SDBIP Review) - see TABLE C.1.1. Service against service to basic level sanitation Households Total Coverage Percentage of poor households with access to basic level sanitation Households Total Coverage Percentage of households with access to basic level water Households Total Covera e Ratio of informal households per tap Ratio of Informal households per toilet 97,5%: 98.3% 971%: 902,279 886,940 902,279 : 876,113: nJa 89,0%: 89.7% n!a n/a nla: nia: nJa n/a 100,0% 1000%: 100,0% , 89,7%: 100,0%: 902,279 902,279 902,279 : 902,279 902,279 : 902,279 ,, , nm: nm: nm nm 0,0%: 0,0% 11.9: 1 : 11.1:1 11.9:1 : 11.7:1 00%: -5,1% 7,2:1 : 5,7:1 6,8:1 : 6,6:1 -16,2%: -13.6% ,, ,, . , Source: Water and Sanitation Services 2008/09 Departmental SDBIP At 31 March 2009, 5,7 informal households shared one toilet - the ideal ratio is 5 informal households per toilet (a standard set by the City of Cape Town), The greater number of toilets provided during that period placed the actual ratio at 5,7: 1; this reduced the burden per toilet by 16.2% and 13.6% for periods ending 31 March 2009 and 30 June 2009. The growing density in many informal settlements constrains Water and Sanitation's ability to adequately provide further sanitation services. At 31 March 2009, 11.1 informal households shared a tap. The ideal ratio is 25 informal households per tap (a standard set by the City of Cape Town) - the 31 March 2009 figure reduced the burden per tap 5.1 % to the 30 June 2009 target in other words, fewer informal households share a tap. 4 C.1.2 ·',.' , . . !-.'. ~ ~ 1312 What is the status of supply to higher levels of service? Service levels to all formal developed areas are generally at the highest level of service: a flush toilet and water connection in-house or on-site. C1.3 Cost of eradicating backlogs To eradicate the sanitation backlog and influx in informal settlements the Informal Settlements programme was set-up - this programme is part of the housing development programme. TABLE C.1.3: The cost of eradicating backlogs by means of the Informal Settlements programme (a) Informal Settlement Programme (R'm) Water hh influx sustain Sanitation Backlog eradication Bucket replacement Hwsehold influx sustain TOTAL (R'm) Cumulative (R'm) 2007/8 2008/9 2009/10 2010/11 2011/12 2007-17 TOTAL 0.6 0.6 0.6 0.6 0.6 3.0 6.0 4.0 4.0 15,0 15.0 1 ,6 11.6 - 131.3 31.3 31.3 62.5 4.0 15.0 11.6 4.0 15.0 11.6 4.0 15.0 11.6 58.2 31.3 93.8 31.3 125.1 31.3 156.4 61.2 217.5 20.2 75.0 116.3 - 2175 (b) Cost of Basic Services for Informal Settlement Programme in (a) above (i) Informal Settlement Sanitation Backlog Informal households without basic sanitation Service Standards (hhlservice) No of new services needed unit cost of provision Total cost of se'Vice provision Years to provide 15,339 5 3,068 R 6,584 R 20,198,395 5 R 4,039,679 Total cost of new service provision (per annum) (ii) Basic Services For Informal Settlement Influx Water Sanitation 8,000 8,000 1,767 400 R 1,500 R 6,584 R 600,000 R 11,633,928 influx informal hh per annum No of services needed per annum Unit cost of provision Total cost of new service provision (per annum) Source: Water and Sanitation Services The cumulative cost of the informal settlements programme is R217.5 million. About 34.5% (or R75 million) of that will be directed to management of influx, 26.7% (R75 million) directed to the replacement of buckets, while 2.8% and 9.3% should go to water influx and sanitation backlog, respectively. This programme is funded through the City's Housing programme supported by National grants. Depending on the speed of implementing this programme, the informal settlement programme would need to respond to keep up. 5 1313 C1.4 What is the strategy to eradicate backlogs? The strategy has been to provide a very basic level of service such that 5 informal households share one toilet. At 31 March 2009, the number of informal households that share a toilet was reduced to 5.7 - this is a reduction of 16.2% from a target of 6.8 households. 2 Bucket system (Informal settlements) 3 Consumer installations: on-site dry or equivalent including VIP toilets, USD, composting system. 46,880 4 5 6 Consumer installations: Wet (Septic tank, digester or tanker desludge or effluent discharge to an oxidation pond etc or pitliners, chemical, container or ortal otties Discharge to sewer treatment works (intermediate or full waterborne) Total served (3+4+5) 500 69,570 785,396 855,466 7 otal (1 +2+6) 902,279 Source: Water and Sanitation Services (Informal Setdements): StrategiC Developmenllntonmalion Water and Sanitation Services aims for basic service level that meet the ratio of 5:1 per toilet, ideally opting for pour-flush, anaerobic or flush toilets. "Greenfields" housing projects are undertaken by the Housing Department to receive residents moved from land that cannot be developed. The City prescribes to "the water ladder" concept (as proposed in DWAF's "Strategic Framework for Water Services, September 2003"). So while the City's priority is to first provide an emergency level of service to all households in all settlements, it is also extending the coverage and density of services to the basic level. 6 ", J 1314 C1.5 What is the status of all water infrastructure? The existing infrastructure condition, particularly the sewer system, is decreasing due to under-provision for essential maintenance/ replacement of aging infrastructure over several years. Major pipe collapses have occurred over the past years where such pipes are in urgent need of extensive repair or even replacement. The replacement of the water and wastewater pipe network is about R1 million per kilometre. The replacement of 40 km of pipeline network per annum translates to R40 million. At the rate of R1 million per kilometre, replacing the water supply and wastewater pipe network of 10,400 and 9,000 kilometres (respectively) places the cost at R19.4 billion. The latter figure is almost equal to the replacement value (2007/08) of the water supply and wastewater reticulation network, which R18.8 billion (or 72% of entire infrastructure replacement value). TABLE C1.5: Capacit of wastewater treatment infrastructure Catchment 1: Capacity V1i Flow Catchment 1: Capacity vs Loadmg ~-------------------------, 0000X] T - = = = = - - - - - - - - - - - - - - - - - - l ---------1 800000 70 ----------.-------------.-- ~oo 600 OX] 1~~ I :< ":n , 500000 _. 400,000 - 3lXl,000 -- 200()(l:i - 3 Ix' +---.---,-...., j ~ ~ !~4(i ! DCaoaCltl' (pele-' ClLoadlnglpel1 700000 I IOGDOOn I TOTAL SCOnSO€"le BelN-ll,e t,r~---=:J II~ Kraalfonleln Scotlsoene TOTAL I' , I Capacity (Mlldily! Flow IMlldayl Caoac:ty Spare CapacdV{i'.! (COCHa/m',': Catctrnenl1 Catchmenl1 BeI:vlll~ 546 505 Kra~lionl('lr 175 192 $.::clisdene 12C 99 TOTA_ B41 79f "., LOO(llng (p~) Scollsclef\.l' 5919)3 159001 92727 591 OX 13JJ000 "'000 ~OTA~ 843754 78600:- 65113 17500 BellVille 212% lD,200 57'" 92813 ";r&lltDnlein SD~~c:apaclty D2% 22 ~"" 427% iJ% Source: Wastewater Services Existing infrastructure is tends to operate at peak level during periods of heightened demand. For example, the overloading of the wastewater treatment works in the Northern Development Wastewater Catchment (Catchment 1) is illustrated below (flows and loadings in 2007): The bulk water system in the northern areas is under stress during peak periods due to the rapid growth in that area. 7 1315 C.1.& Effective management ISO Certification The Bulk Water branch previously set the standard by achieving full ISO certification on ISO 9001 :2000 and thereafter maintaining it as certified by independent audits. Bulk Water failed to maintain the certification levels due to staff shortage. There is a certification study that is being implemented to prepare for and achieve ISO certification across the department. Scientific Services have embarked on a plan to achieve the ISO 17025 certification by 2010/11 - this is a legal requirement to ensure potable water quality. Standard Operating Procedures (SOP's) have been defined and a process of auditing and refinement has commenced. In the meantime, national Interlaboratory comparisons where the lab is consistently scoring in the top 5 ensures that standards are raised and maintained. This together with the ISO 14001 of Wastewater Treatment and the Risk Management programmes to be implemented will ensure that quality is assured and risks are minimised. The following areas are receiving focused attention; • Integration of Information Management Systems through a Business Warehouse • Automation control and monitoring of plants via Scada-telemetry • GIS geodatabase development for effective management and planning of the infrastructure • Water quality management through LlMS and SAP • Maintenance and life cycle of equipment. • Capacity building and training. • Automatic Metering Reading (AMR): the AMR Pilot installation on consumer meters is being finalised and will be ground-tested during 2009. 8 ' J . f .J 1316 C.2 WATER SERVICES BUSINESS ELEMENT SUMMARY C.2.1 Socio-economic profile Situation Assessment At present the population of the CCT is estimated at 3,5272,221 (Statistics South Africa Labour Force Survey 3rd quarter 2008). The City's population growth rate is expected to decline because of HIV/AIDS. It is estimated that the current growth rate of 2.6% will reduce to 1.2% by 2010. Approximately 30% of households (almost 1 million people) in Cape Town live in inadequate housing and depressed physical environments. Figure C.2.1: The Socio-Economic Status Index profile of Cape Town i=~'~~:U -T(SE~) 60% 50% 40% 30% 20% 10% : ! 1'1 :- I I,; i"; I I i n Ii ~ 0% '"'" 0 U s:'"'" Notes: % of EAU - % of economically active unemployed S,E.S - Socio-Economic Status Index % of economically active unemployed rJiPlai1-Khayel':sha 4516% Kifontein-Fase Bay 31,05% Eastern 26,85% Tygerberg 23,19% West Coast 22,11% "'able Ba, 22,67% Northern 19,26% So"them 13.43% TOTAL 29,38% ,... '" CD <l) 2i .....'" ., '" :z n II E co .<= £; 0 Q; => 0 (j') T (eau) Total ofunmproyed = 29,38% T SES Total S,E,S Socio·Economic Status Index (S,E.S) M/Plain-Khayelitsha 54,12% Kifontein-F'alse Bay 4043% Eastern 377~ % Tygerllerg 32,28% West Coast 30.22% Table Bay 29,67% Northerr 27,94% Southern TOTAL Source: Strategic Development Information and GIS Department Figure C.2.1 shows Cape Town's socia-economic status (S.E.S) index, a tool used to measure social and economic well-being. The S.E.S index measure incorporates the following indicators: (a) the % of households earnings less than R19,200 per annum (2001), (b) the % of adults (20+ years) with the highest educational level below matric, (c) the % of the economically active population that was employed, and (d) the % of the labour force employed in elementary/unskilled occupations. 9 .. ~1317 District F: Mitchells Plain/Khayelitsha has the highest score at the index level of 54.12, while District H: Southern has the lowest at 22.16. District F: Mitchell's Plain/Khayelitsha is the worst off compared to all the 'other districts. According to the Planning Districts Socio-Economic Analysis Report of 2007, programmes to change poor socio-economic status should focus on districts which are "worse off' in terms of the S.E.S index. Future trends strategic gaps and implementation strategies Strategic gaps: DWAF need to develop guidelines for the provision of water and sanitation in the informal settlements as the City currently developed their own guidelines. Water and Sanitation Services aims to provide an affordable service to poor households - mainly classified as those earning less than R19,200 per annum (or R1,600 per month). A free basic service is provided, in the form of the first 6 kflmonth water supply and the first 4,2kt of sewerage conveyance and treatment free of charge to all consumers per month. The City's Indigent policy allows for a R30 grant in account reduction per month to qualifying ratepayers. Approximately 248 000 formal households currently qualify based on a property value less than R199 000 (2006 General Valuation). The Water Demand Management Integrated Leaks Repair Project and the Fixit Project, initiated at the end of 2005 and rolled out on a phased basis since then, are major initiatives to ensure that these household plumbing leaks are minimized and therefore that the cost of these services is affordable for them. With the implementation of a new policy to install Water Management Devices on a prioritised basis, households defined as indigent now have a mechanism to prevent water consumption reaching unaffordable levels and also prevents leaks causing high water losses. In terms of the asset management strategy there will be increased costs and therefore higher tariffs in the short term but the strategy will ensure service affordability in the long term. 10 1318 C2.2 Service level profile Situation Assessment The City of Cape Town has 902 279 households; 785396 are on formal erven and 116 883 households on informal sites. According to the Water and Sanitation billing systems (SAP system), there are 604,248 registered water consumers. An additional 242 registered connections is classified as external consumer connections - this addition brings the total of registered consumer units to 604,490 (refer to TABLE C.2.2). TABLE C.2.2a: Demographics and Customer Profile 2007/8 3,572,221 902,279 Population Households Household categories Formal informal Total Bal,;I\!dIU dweller CCT Consumer units Commercial Government Industrial Miscellaneous School-Sportfields I Domestic Cluster I Domestic single residential I Departmental Cluster Mu:~ic:ipal Water 785,396 116.883 902.279 150,000 lQQl& 12.537 278 4,205 5,547 1,447 6,968 563,297 2,970 6,999 604,248 ernal consumer units I 242 604,490 .. Source: Water and SanitatIon Services - BIlling Department; Strategic Development Information and GIS Department Water supply services already cover 100% of the City's population, while 85.3% coverage was achieved by sanitation services at 31 December 2008. 11 ',I.} 1319 Future Trends and goals Residential consumer units The formal (783,396) households have either a metered water connection to the house or to a yard toilet with water tap (uncontrolled volume supply). The first 6 kilolitres per month are supplied at no charge (free basic). Informal areas, with 116,883 households, have communal standpipes and water is provided free. At 31 March 2009, out of the 902,279 households, 886,940 households received sanitation services - in other words, sanitation covered 98.30% of the City's households. Grey water management: a research study investigation by the CSI R, the City and DWAF is currently being undertaken to deal with grey water run-off on informal settlements. Public institutions and 'dry' industries; wet industries; industrial consumer units: all have connections on-site. Strategic gaps • • • Though the 2010 target for basic sanitation of 70% has been surpassed, there remains a gap to be covered in informal settlements Non-recovery of the operating costs of wastewater treatment in exces quality effluent above 1,000 mgt! (or effluents involving surcharges only) is a problem It is difficult to obtain information from SAP system as required by the DWAF guidelines Implementation strategies • Residential consumer units: Water & Sanitation's informal settlement programme, which is integral part of the housing development programme aim to eradicate the sanitation backlogs, among other things. 12 UJ C2.3 1320 Water resource profile Situation Assessment The Western Cape Water Supply System (WCWS) provides water the communities of greater Cape Town and other regions including Stellenbosch. At present the yield of the existing surface water sources is 526.9 million m3 per annum, while groundwater sources yield 6.64 million m3 per annum. FIGURE C.2.3: Surface water and underground water supply sources (DWAF and CCT owned) DWAF 3wned City a; Cape Town ('----------~~------~"\ Theewatersk loof Dam 219 ' Berg River Project 60 • Voelvlei Dam 105 • r ------------~------------~ Steenoras Land en "\ Palmiet Wemmershoek Dam 54 • (Upper & Lower) 4il • Lewis Gay Dam 185 • Zeezicht Dam 0.5 • De Villiers Jam ~ • 0.7% 79.9% Cape Flats,--- 18 , , Newlands10 18.8% 6,64'; __:_ 1.24% ~ 533,5 ......---------------~ The level of contribution from the various sources of water OWAF owned Mm' eeT owned Theewaters Ktoot Dam 219.0 Wemmershoek Dam Vaelvlei Dam 105 0 Steen bras (U pper & Lowe~ Palmie! River 22.5 Lewis Gay Dam Berg River Project 800 Land en Zeezicl1t Dam JeVilliers TOTAL Mm' 54.0 4il.O 1.9 0.5 Notes: •• Mm': Million cubic metres; ~ Mm' 16 5.0 TOTAL DWAF CCT UnderGround 6.6 79.9% As % 01 total Underground Albion Spnng Atlantis Cape Flats 'Jewla1ds 18.8% 1.2% • Atlantis has 44 boreholes; - • Not developed yet Source: Bulk Water; For calculations GOTO 3,11 (Excludes the Atlantis Aquifer, and Albion Springs, " Approximate % of total supply requirement and firm yield includes Agriculture and other Water Service Authorities). Surface water and ground sources The combined water resource yield of 533.5 Mm3/year includes contribution of 81 million m3 per year from the Berg River. At present the CCT obtains ±79% of its raw water requirements from DWAF owned surface water sources. CCT owned surface water sources contribute ±18.8%, while underground water sources amount to ±1.24% (see FIGURE C.2.3), Water and Sanitation services recorded a volume of 316 million m3 as water supplied to the end-user at the end of 2007108. The levels of the six major reservoirs stood at 97% of their storage capacity at 31 December 2008 - the volume stored amounted to 874.5 Mm 3 (Report to Utility Services Portfolio Committee - March 2009). 13 1321 Water returned to the resource: only the Westfleur Treatment Works at Atlantis returns effluent to the source from which it was extracted (groundwater). Quality of water The quality of treated water at the water treatment plants is strictly monitored on a 24-hour basis by the water treatment division. This is compliance with SANS 241/2005. The Scientific Services Branch conducts weekly visits to each Water Treatment Plant (WTP) to test the water. This includes an inspection of the process, the retrieval of various samples as well as analysis. TABLE C 2.. 3 Ofc0 Comp lance f or CI ass Ifor W at er 5 UPPIY R eservolrs Month Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08 Chemical % CLASS I 88 86 89 93 100 97 95 96 98 97 99 99 CLASSII 100 100 100 100 100 100 100 100 100 100 100 100 12 month rolling ave CLASS I 87 86 87 86 97 87 88 94 93 92 93 94 CLASSII 98 98 98 98 100 99 99 100 100 100 100 100 Micro % 100 100 100 99 100 100 98 99 100 99 100 100 Class I Chemical Requirement Micriobiological Requirement 95 95 95 95 95 95 95 95 95 95 95 95 99 99 99 99 99 99 99 99 99 99 99 99 Source: SCientific Services At reservoir level microbiological compliance stood at 99%, while chemical compliance Class 1 stood at 95%, at 30 June 2008 - in terms of SANS 241/2005 the quality of the water system is classified as excellent. Future Trends and Goals If the water requirement grows as projected for the High Water Requirement Curve, then the total requirement would increase to 560 million m3 per annum by 2011. The Berg Water Dam brings the whole system to a level of 533 million m3 per annum. The City's recorded requirement for water in 2007/08 was 316 million m3. The volume of water supplied to the City in 2007/08 was 25.8% below unconstrained demand levels. To ensure a sustainable future supply of water, the City initiated an "Integrated Water Resource Planning (IWRP) Study". Accordingly the City implemented Water Demand Management (WDM) measures. To support longterm planning water demand and supply is monitored to establish the timing for building a water scheme. One of the key projects to ensure augmentation of the bulk water resources is the Table Mountain Group (TMG) Aquifer and the Desalination Plant. By December 2008, 64% of the TMG Aquifer feasibility study was completed, while the Desalination Project will still be explored. 14 1322 Strategic gap analysis The Reconciliation Strategy Study identified studies that CCT had to undetake to ensure an adequate level of supply and that the schemes studied by DWAF can be implemented. The Study also identified interventions where very little data exists and where studies need to be carried out at reconnaissance level. Implementation strategies I Gap ! The Reconciliation Strategy Study identified studies that CCT needs to undertake to play their part in ensuring an adequate level of supply at all times I The Reconciliation Strategy Study identified studies that • CCT need to undertake in conjunctions with DWAF to play their part in ensuring an adequate level of supply at all times The Reconciliation Strategy Study identified studies that CCT need to undertake to ensure that schemes studied by i DWAF can be implemented I The Reconciliation Strategy Study identified interventions where very little data exists and I where studies need to be carried out a reconnaisance level Strategy Studies to be undertaken TMG Aquifer Feasibility Study Pilot Desalination Plant Newlands Aquifer Pre-feasibility Cape Flats Aquifer Feasibility Effluent re-use to Potable Standards Pre-feasibility Studies to be undertaken Pre-feasibility Study for the Raising of Steenbras Lowe Dam Lourens River Diversion Scheme Pre-feasibility, Upper Wit River Diversion Assess the capacity of the Voelvlei Pipeline Assess the cost implications of an additional pipeline from Voelvlei to CCT Studies at reconnaisance level to be undertaken: Steen bras Pumped Storage Intake Operation of Kleinplaas Dam Improve Operation of Atlantis Aquifer Water Trading 15 1323 C2.4 Water conservation and demand management Situation assessment Water Resource Management Interventions The availability of water resources for the City of Cape Town's growing needs is, among other things, a critical factor that drives Water Demand Management and Water Conservation. Water and Sanitation Services has all the resources required to provide water resources management interventions - which include: (a) reduction of nonrevenue water, (b) reduction of high pressure for residential consumers, (c) education programmes and (d) leak and meter repair programmes. Trends and goals Water Resource Management Interventions Unaccounted for water stood at a volume of 59,366 Mil in 2007/08 - this places the rand value of 2007/08 non-revenue water at R341.4 million (table C.2.4) TABLE C.2.4a: Non-revenue water Authonsed consumption (MI) 200617 2007/08 Billed Authorised Consumption 308,400 315.553 Billed Metered Billed Unmetered Revenue 2006/7 249.0 249.0 2007108 Water 256.6 256.6 UnbTlli;;:fAuthoMsed Consumotion - --- - - - - - - - - -- - - - - - - - -- -- Non6.0 6.0 revenue Unbilled Metered Un billed Un Metered Water -- 6.0 -- - S.O - Water losses (Mt) 200S17 53,400 17.3% 2007108 Apparent losses Illegal connections 59.366 18.8% Inaccuracies 200617 2007108 - Real losses Main leaks Reservoir leaks Service connection leaks 53,400 - -53,400 ~ 307.050 Average consumption charge (Rands) Revenue foregone (R'm) 59,366 - 59,366 59,366 5.75 341,356 11.2% Source: Bulk Water; Water and Sanitation Services - Billing Department To ensure future sustainability of water demand management, the City adopted an integrated approach to water demand management and water augmentation thus the "Integrated Water Resource Planning" (IWRP) Study. (GOTO 3.2a). The study investigated at pre-feasibility level various water demand initiatives along with water supply augmentation schemes. GOTO IWRP-STUDY.MK.doc 16 1324 In circumstance where water consumption is controlled, the expected outcome, as proposed by the Water Conservation 0Nc) and Water Demand Management (WDM) strategy, is deferment of the next augmentation scheme to 2029. (A full suite of the Reports detailing the various investigations carried out under the IWRP Study are available for scrutiny in the offices of the Bulk Water Branch of the City of Cape Town). In the last four years a number of successful WCMlDM projects were implemented, most notable projects were: • the Mfuleni and Protea Park Integrated Leak Repair Projects, • the Fixit Project. • the education campaigns, • treated effluent recycling, • and various pressure management projects with the most recent implemented being for Mitchell'S Plain. The focus on these projects has reduced non-revenue demand. In addition the tariffs for treated effluent re-use were rationalised to generate additional income. The targeted savings for this year are 19.5 Ml/day or 7.00 million m3 per annum, which is approximately 2% of the demand. Strategic gaps and goals TABLE C.. 2 4b Stra t eglc gaps Resources I I Inadequate financial resources Inadequate human resources to implement WCIWDM strategy I : Technical capacity and tools Ineffective management information and monitoring systems Inadequate demand measurement systems and tools I Lack of use of integrated water resource planning in decisionmaking Inadequate demand measurement systems and tools I I No detection programme in place to identify water leaks that they can be attended to before water burst Implementation Strategy Business Information and automation, monitoring projects: The Automated Meter Reading Pilot installation on consumer meters is being finalised and will be ground-tested during 2009. Decisions on future roll-out options City-wide will follow and be considered for future budgets. Advantages envisaged include: • synchronised simultaneous reading for an entire suburb • more reliable readings with far fewer estimations • the ability to analyse water balance and losses by small zones 17 I . C2.5 ",~ . 1325 Water services Infrastructure profile Situation assessment The book value of the water and sewer infrastructure stood at R2.6 billion at 30 June 2008. The current replacement value is placed at R26.1 billion about 10 times greater than book value. TABLE C.2.5: Infrastructure of Water and Sanitation Services at Book Value and ReJ)lacement cost lal WATER SYPPl Y INFRASTRUCTUR:: ;R'm~:lon) ill ca . va:~ FY~!IB Oarm 3. ReticYlatoo a ResE!!'VQ/n1 O~I$.'lara} i,s11,4 12' 1 8.0% 11)1).1)% 48.f;% 5E f% 65% RIW{Waler ImpOlmdment5 ~ Bulk Sooveyai'lc(l RetervOil'S DepotS {shared) V\'astewater Infrastructure WWTf6a!mentwO/Xt WsamWat6r Trm!1mer,: Sewe.rRetlcuJallOO t SBNer PUJi1:1l Stalions Consumers i;"' lhe City of Cape Town Bulk Ccnsumers D~otsishared) Total TOTAL Senoel arid 21% 18% Spcrt,hetdS 13% [)epamnent Cluste; Domestr~ clustEr" MlSce!:aneaus CO>T1mercia! & ImM,ira t5% ~biil(lC 6,()% • 21% 5.9% 140% NOf'l-Re-/enu& DerT'3I'lC 19,3% • DDtoost'c Full 46.0% Source: Water and Sanitation Services 2007108 Annual Financial Statements; Demand Management Strategy The water supply infrastructure has 12 dams, 13 water supply treatments works and a water supply reticulation network that is 10,400 kilometres long. There are 108 water pump stations, 138 water reservoirs and 21 depots. The wastewater infrastructure has 23 wastewater treatment works, a 9 000 kilometre sewer reticulation network, 377 sewer pump stations and 21 depots. Trends and goals The water supply and wastewater reticulation networks jointly account for 72% of the total replacement value. The water distribution networks experienced 6,080 bursts to water mains in 2007/08 compared to 4,116 in 2006/07. The Tygerberg area suffered the most with 1,432 (or 23.55% of 2007/08 total) bursts followed by the South Peninsula region at the level of 1,258 (or 20.69% of 2007/08 total), while the Helderberg region experienced the least at 11.53% of 2007/08 total. The operation and maintenance of the sewer networks improved significantly in 2007/08: • About 279 km of sewers were cleaned in 2007/08; this amount to an improvement of 81.17% compared to the previous year. • Sand traps were cleaned 2 509 times compared to 543 in 2006/07 an improvement of 362.06% The result was a decrease in the number of sewerage service interruptions 18 1326 Strategic gaps Previously maintenance of infrastructure was mostly reactive. This resulted in inadequate maintenance and replacement. There are areas where water and sewer infrastructure are severely stressed. The goal is to alleviate the overloading of infrastructure especially in growth areas; these include: • West Coast / Parklands development corridor • De Grendel / N7 development node • Northern development corridor • Bottelary development corridor • Fast-track housing projects (e.g. N2 Gateway) • Maccassar / AECI development node Implementation strategies The City has undertaken a programme to improve the replacement of water distribution network mains, especially in areas that experience a high incidence of bursts, such as the Tygerberg district. More importantly, Water and Sanitation Services is implementing an Asset Management Programme (AMP). This will ensure that: • Assets are maintained proactively rather than reactively, • The total asset lifecycle is managed to maximise life of asset, • Maintenance work is effectively coordinated, • Operational downtime is significantly reduced. The strategies for ensuring that wastewater treatment capacity is maintained include: • Integrate planning for new works and extensions with the other branches and ensure that additional wastewater treatment capacity is provided where needed at the right time, • Provide sufficient funding (EFF and MIG funds) to address the backlog in WWTW capacity and provide for growth. To ensure long term sustainability, Water and Sanitation Services is developing an Integrated Master Plan for completion by 2010. The objectives of the master planning process are: • To balance demand and capacity, all water and sanitation branches will use the same to ensure consistency, for example with the determination of growth rates in particular areas, • Infrastructure plans within Water and Sanitation Services are fully aligned, • To ensure that capital budgets for future years are mainly based on the master plans, and • The plan is kept up to date annually to ensure reliable planning based on it. The Data Integration Project (DIMS) is being piloted on behalf of DWAF. This will inegrate various data sources including SCADA logged measurements. This includes present real-time or summary information about the infrastructure or 19 1327 water and sanitation processes are being implemented and will be implemented by 2010. Simultaneous integration of the separate SCADA systems at treatment plants and the addition of the dispersed Reticulation system (including Pump Stations) onto SCADA will be implemented over the next few years. Integrated Master Planning The Integrated Master Planning project is being implemented in districts with the assistance of specialist consultants - this will cover the City by 2010. The system will be continually updated to provide better information on infrastructure capacity. This will enable better evaluation of development applications and City development strategies such a densification. This will also ensure that planning for the treatment systems is based on identical and consistent development assumptions and design parameters. Water Balance, logging of zone meters Automated logging of zone and bulk supply meters is being implemented on a phased basis to ensure input into water supply zones is consistently measured (and readings available). An added benefit of the Integrated Master Plan is the existence of an accurate and up-to-date historic record of consumption by erf that is used to derive water and sanitation demands. The first comprehensive dataset will be available in the middle of 2009. When this is combined with the defined pressure zone layout and readings from the bulk and zone meters, a water balance will be possible based on small zones. This will enable losses to be pinpointed and reduced or eliminated. 20 1328 C2.6 Water balance Situation assessment On the basis of water supply and billing figures, the distribution losses in the overall network in 2007/08 amounted to 18.8% of water supplied. TABLE C.2.Sa: The water balance MH;.!;eltaneous ~O 086 Industlai 9.604 Mumcipa. ~.~ 23(i,870 45% lt3% ;; Waierco11:act.; Other &II figure" tJ)% 4,517 4,149 :a% :H~ ~ '" ---"'" ;11,513 6% 04% IE~;:> ComlOfJx.laI DOMmcCIIIS!er Other l'IoliWial 2Il8Zil 14600 Municipal ~epa1Jrlenlal Worshp SnaTOOmelers -' 12,038 !illI 1l.3% TOTftL As % of billed wa~: VOlume 157,67~ 700% Source: Bulk Water; Water and Sanitation Services - Billing Department In the 2007/08 period a total volume of 315,553 Mi of bulk water was treated and of this, 92.4% (or 291,626 Mf) was supplied as potable water to external customers and reticulation. The 7.6% balance, which is 23,927 Mi, was accounted for as bulk water losses. Reticulation received 89.5% (or 261,122 Mf) of the 291,626 Mi supplied, while 10.5% (or 30,504 Mi) was directed to external customers. Reticulation losses were 13.6% (or 35,439 Mf) of the 261,122 Mi; the City's end-users received 225,683 Mf (or 86.4%). The water billing department, however, recorded 225,403 Mi, as the volume consumed for billing. The 12 month-moving average of unaccounted for water (UAW) for bulk and reticulation was 20.8% as at December 2008, this compares to 18.3% for December 2007. 21 ... - 1329 Future trends and goals The City has in principle adopted international best practice with respect to reporting on water balance and will stop reporting on UAW once more accurate data is available. TABLE C.2.6b: Distribution of water and effluent Coorrercial 9.3% ind~Slrlal JOrrestic f 58.6% 4.3% Other 05% Source: Water and Sanitation GovernmJel 4.2% 00% 1.6% Billing Department Strategic gap analysis The SABS 0306:1999 standard discourages the use of percentage losses to quantify water losses in the distribution network. The available information in TABLE C.2.6 is used to approximate the level of distribution losses on the City's network. Implementation strategies The methodology of determining distribution losses is currently being used for reporting purposes until the envisaged accurate water audit study is completed. Automated logging of zones and bulk supply meters are being implemented on a phased basis to ensure input into water supply zones. 22 .. , C2.7 1330 Water services institutional arrangements Situation assessment The new City of Cape Town and the Water and Sanitation Services entity was formed with the amalgamation of the Cape Metropolitan Council and the 6 metropolitan local councils in December 2000. TABLE C.2.7: Water Service Institutional Arrangements Department of Water Affairs (Regulator) ~ City Manager J Utility Sentices Directorate J r rCO''i.Si:Ulio.nal .9SiJO::Sib ..liI. '''. . ,fOJ ~ waler se(VJces p:~:}l/iS1On Water andAuthority Sanitation Service ---.1 i _ _........;8y_-law_'_ _ _ _ Cily of Cape Town { Oc-etaltona l resco::stbJM:v forwate:servtOOSf)roVfS!O~ ~ Bulk Water SeNice del!vef)! agreement Water and Sanitation Service Provider Waste Water Treatment Reticulation Bv-laws Scientific Services Financial & Commercia! '--_1--_ f t Water Sewerage Water Demand Management & Strategy Engineering & As...t Management <1--_-'---_-+ Support Services Consumer contracts Consumer C')arier Consumer Source: Water Demand Management Strategy On 28 November 2001 Council authorized Water and Sanitation Services to operate as fully-fledged and functional internal business unit in order to, ensure maximum independence and minimum constraints. Water and Sanitation Services (Processes and Systems): The department intends to achieve the ISO 9001 :2000 accreditation, by enhancing processes and systems. Bulk Water Branch: In December 2006 Bulk Water Branch successfully maintained its three-year ISO: 9001 :2000 Quality Management Systems (QMS) certification (2006-2009) during the triennial review audits by SABS. Bulk Water, however, failed to maintain the accreditation. Wastewater Treatment Branch: Has no accreditation (subject to certification study) Reticulation Branch: Has no accreditation (subject to certification study) 23 ~ ,. , 1331 Asset Management Services: Has no accreditation Risk Management: Work has started on an Integrated Risk Management Programme with the appointment of a Risk Manager and the development of a strategy. Safety: All procedures were reviewed and risks still need to be identified Future trends and goals Appointment of technical staff - engineers, scientists and IT Strategic gap analysis The City of Cape Town is currently undertaking the constitutional responsibility for water service provision (as the Water Services Authority (WSA)) as well as the operational responsibility (as the Water Service Provider (WSP)). The City is looking at separating the service authority and service provision function to establish a municipal entity. At the moment, there is no service delivery agreement in place. Implementation strategies Institutional reform: The City's strategic intent, aligned with the national agenda and as stated in the IDP: • is universal access to basic services; • and to achieve operational, financial and other efficiencies which will enhance equitable, affordable and effective service delivery and sustainable development. • Someone needs to be identified to undertake the role of Water Service Authority. Human resources: It is the City's strategic intent to develop and retain a skilled and motivated staff, by retraining managers, attending to remuneration levels, and inspiring staff. 24 .. ~ f' ,. 1332 C2.8 Customer service profile Situation assessment All the necessary infrastructure is in place to ensure an adequate quality of service to formal households customers. All customers receive water that is fully treated. There are mechanisms in place to attend to customer complaints and queries. Figure C2.8: The Socio-Economic Status Index profile of Cape Town r ~-····-···-··-- 100% ' I . Formal,87% c: 70% ~ 60% ~ .«l Formal,89% 1il '0 · ! ~ -' 30% 20% 10% Source: 2007 Customer Survey The general conclusions from the 2007 Customer Survey are: • Respondents living in formal residential areas are increasingly more satisfied than in the past. • Respondents living in informal residential areas are dissatisfied and this perception is increasing with time. However the numbers of somewhat satisfied respondents are also increasing in time. Future Trends and goals The goal is to ensure that the percentage of customers satisfied with the service continues to increase and reaches 95% within the next 5 years. Strategic gap analysis There is no consolidated information on response times to complaints and queries and to repairing water and sewer mains. No integrated information system, shortage of technical and engineering staff. 25 1333 Implementation strategies • • • • • Installation of controls for areas of extreme high or low pressures, The Education and Awareness Campaign will be improved to ensure there is an upward trend in the behaviour change in residential customers with respect to water consumptions reductions, and that all customers have a better knowledge of water efficient fittings, Establishment of a system to ensure that customer complaints are followed up,and Data integrated management system has been piloted on behalf of DWAF. Appointment of staff for critical vacancies. 26 C2.9 Financial profile Situation assessment Capital expenditure and sources Capital expenditure incurred during the year amounted to RS88.7 million Figure C2.9a: Water and Sanitation capital expenditure Capilal expenditure in 2007108 R588.7 Mil on Masl'lrpiann.ng Reliculalon 0.6% 0.9% OIher 1.4% MeBrs (Rep) VI'OM 3.4% InbrrTlili areas 5.1% 6.1% 7.9% WWTW 22.0% Source: Water and Sanitation Services - Capital Budgets Capital expenditure was financed from CRR, EFF and DC. Operating Costs and income In 2007/08 operating costs amounted to R2.79 billion. This amounted to operating costs per consumer of R4,614 per annum (or R384.S0 per month). TABLEC29 H·IstOriC ' 0 peratlng costs - Water an dS amtation '>+. ·ffi!OOO) '. / " , ' <i/ "::;\'·';r"~~?';,:.2;:.:·':'':';;~~·; 1 Puchase of bulk water 2+3 Production costs (raw water + treatment system) 4 Operating costs Salaries and wages Maintenance and repairs Depreciation 5 Finance charges 6 Other 7 Total costs Add Inter-Departmental Charges TO""ALCOSTS 8 Operating costs per consumer unit (Rands) Opex per consumer unit inciudin(J Inter-dept chames (Rands) ;,;:,'2O'05/O'6} i>':',20061Q71 171,191 . 263,488 157,719 126}03 117,239 868,954 1,705,294 905,127 2,610,421 2,821 4,318 229,695 273,702 206}93 142,208 117,444 551.030 1,520,872 1,020,672 2,541,544 2,516 4,204 Source: Water and Sanitation Services 2006/07 & 2007/08 Annual Financial Statements 27 .,,»" 201lk/0ll 227,535. 359,686 • 229,423 161,439 117,231 741,849 1,837,163 951,903 2,789,066 3,039 4,614 .... , ...... ~ 1335 Tariffs and Charges Figure c2.9b shows water and sanitation tariffs. On average the water supply tariffs increased by 9.2% in 2008/09. Figure C2.9b: Water and Sanitation tariffs WATE~ TARlFfS!Raflds) 2005/0& . ZOfJ6lQt" 2001108 2008109 O-B kt -+6·12 k~ +12-20 kt +20-40 kt +40-50 kt +50 kt Domestic cluster Commercial Industrial Schoolsisport Government Municipality Miscellaneous Mise (external) Bulk Tariff . SANITAT40NTARIfRS~dsl 0-4.2 kt +4.2-8.4 kt +8.4-14 kf 2.39 5.10 7.55 9.33 12.31 eer kt per kt perkt per kt per kt per kt perkt per kt perkl ~ .• ~'.' "'.? -. 2.56 3.05 3.33 5,46 7.10 6.50 8.08 9.63 10.52 9.98 11.90 12.99 13.17 15.70 17.14 n/a 5.47 6.52 7.12 5.45 5.83 6.52 7.59 5.45 5.83 6.52 7.59 481 5.15 6.14 6.70 5.17 5.53 6.59 7.20 4.81 6.14 5.15 6.70 5.17 5.53 6.59 7.20 618 6.61 7.88 8.60 1.98 2.21 2.37 2.59 .... '. '.".2005100;:": 2000/07: '2001'108" '20013109 +28-35 kt Domestic Cluster (>4.2 ktl ~er kt DepartmentallMunicipal per kt Industrial &Commercial eerkt ,i:: _; .\>._:~::_.:.~_;:" ~-1: ,:;;:~;' -TARIFRANAtYSISjRands}·.·· Overall average (Water + Sanitation) Year-oo-year growth Water average Year-on-year growth Sanitation average Year-on-year growth 1.60 3.90 1.68 4.10 nla nla 385 2.09 2.39 4.04 2.31 2.51 4.84 5.19 7,3% 6.18 6.2% 3,03 6.0% " 5.82 2.86 3.78 804 9.23 910 5.20 5.65 4.01 8.52 9.78 9.65 5.51 599 6.87 32.3% 7.29 17.9% 707 133.1% 7.49 9.1% 8.03 10.1% 7.49 6,0% , Source: Water and Sanitation - Billing Department The increase in sanitation tariffs was 6% during the same period. Free Basic water and sanitation The first 6 kilolitres of water supplied to all residential dwellings in the municipal area is free. There is no fixed charge. A R30 Indigent Grant (R20 prior to 2007/08 and applicable to sewerage) is applicable to the water tariff for qualifying households. The first 4.2 kilolitres of sewerage removed from all residential dwellings in the municipal area is free. The fixed charge does not apply to dwellings occupied by Indigent households. A R30 Indigent Grant (R20 prior to 2007/08 R20) is applicable to the water tariff for qualifying households. 28 " . 1336 Sales and income Water and Sanitation income is combined under C.2.9b TABLE C.2.9b: Income and Sales of Water and Sanitation Services 2007/08 ! 2,020,425,734 3,533,068,967 n/a n/a n/a n/a n/a n/a 3,129,905,235 588,700,000 3}18,605,235 9 10 11 12 13 ·185,536,268 Source: Water and Sanitation Services 2007/08 Annual Financial Statements Trends • Capital budget is expected steadily to reach R'I billion by 2010/11. • Operating budget should increases to be in line with MTREF • Annual tariffs increases to be in line with inflation (see TABLE C.2.9c, below) Strategic gaps Capital budget: obtain optimum level of funding to ensure that current and future infrastructure is in place. Operating budget: • capacity of operating budget to cater for backlogs in infrastructure maintenance • capacity of operating budget to achieve optimum levels of staff • to achieve acceptable levels of bad debts. 29 1337 Implementation strategies Capital budget: • Optimisation of Grant funding • Increase the eRR via income and expenditure interventions Operating budget: • Increased expenditure to be addressed via increased revenue • Ensure payment of current accounts Generally, the financial strategies include: • Bring tariff increases in line with inflation(a) water tariffs to increase by 10% in 2009/10 (across the board), (b) sanitation tariffs to increase at an average rate of 7% Figure C2.9c: Water tariffs :PROPOSED CURRENT TARIFFS 200812009 ~ARIFFS 200912010 Domestic Full R 0.00' 0-6 ,I R 0.00 Water that is used predomll'lantly for domestiC'I--""R;;-3,:,-.3",,3,..,:S",-1",2""kl=_ _ _ _ _+-_-2R->;3.'E66: purposes and supplied to single residen1ial,~"'R-;.-""'.l"'0tc+-;;12~--'2~0"'kl-----+---;::'-:R::-7.7.i:lal properties. R 10.52 +20 - 40kl R 11 57 R 12.99 +40 - 50kl R 1429 R 17.14 +50kl R 18.85 CommercIal - Water supplied to premises R 7.59 COmm lind R 8.35 predomina,1Uy of a commercIa! nature Industrial - Water which is used in manufactunng,' generating electricity, land-based transport, or any related purpose R 7.37 R 7.83 developments including singie title and 'title uni1s. M allowance or 6 KI per u~i! per at lero COSt \.lpon $ubmissiorl of affida .... its the number of uni~s National Government Departments and Munlcipat - Departmental use Yomeiess people shelters - Accrediteo Institut;c;r',S ,registered l;.'ith the CIty of Cape Town. R 0.000 - O.75kl!month/person !--R=-S."'70d-+"'O"".7s"'k""llm::"o:":nt:::-hl"'pe:C:rs::Co=-n--+--""""-;;c;' Vulnerab\e Groups {SJbsistence farming) - As defined in the Urban Agricufture Policy. No. corresponding free Sanitation Charge. NA 0-10 kI NA +101<1 ,MIsce!laneous - AI! conS\.lmers \Nhc do nel fall R 7.20 Misceltaneous iv.uhin me above categcnes R 8.50 Miscel:aneous External R 9A6 R 2.59 Source: Water and Sanitation • Billing Department Making adequate provision for the poor by maintaining a stepped tariff the free basic service. Ensuring that adequate cash reserves are maintained to cover legislated funds and provision cross~subsidising • 30 @D 2009/2010 ELECTRICITY SERVICES DEPARTMENTAL SDBIP ].s ALIGNMENT TO IDP <II to ..J ~ 0 Indicator (To include unit of measure) Objective o~ ~ u ... f SFA & Directorate Objective No. Corporate Scorecaro Indicator No. :JO SFA 1 1A.4 SOl 1A. Create an enabling environment for the economy 10 grow and become globally competitive. Number of job opportunities created through the expanded Public Works Programme (EPWP), to contribute to the reduction of poverty and unemployment SOl 1B. Preparations for hosting the FIFA 2010 Wond Cup in Cape Town in accordance wilh FIFA's requirements and the City's developmental objectives Adherence 10 the work stream objectives and programmes of the City's 2010 Rusiness Plan - Electricity Re-inforcement project 2A. Universal aCCess to basic services Percentage of households with access 10 basic levels of Electricity (NKPI) .. ..... TARGETS ~ Baseline (08/09 Target in brackets) Annual Target (by June 2010) New To be determined Quart 61.33% Electricity Reinforcement completed 100% Electricity reinforcement completed Annual NIA NIA NIA 100% Electricity reinforcement completed Quart 89.72% 89.97% 00.22% 90.46% c: :> General Comments fJ ~ 30 Sept 2009 31 Dec 2009 31 March 2010 30 June 2010 ! To be determined To be determined To be determined To be determined Unit of measure: Number SFA 1 oir Obj 1.8 SFA 2 oir Obj 2.1 ·~~~1B.l -2A.3 Unit of measure: % completion --.-~ Ulilily Services (90.83%J 90.46% N, Unit of measure: % and number of HH's N' Rased on an updated household counl estimated at 902 278 (source SDI&GIS Dept. analysis of StaisSA 2001 Census and the more recent 2007 Community Survey) 09110 target: 771 435 HH's (estimate - excludes nonalectrifiable HH's) .. - _ . SFA2 -~ 2A. Universal access to basic services Dir Obj 2.1 % Househotds earning less than Rl100 With access to basic levels of electriCity. (NKPI) [62.16%] 59.97% Ouart 58.71% 59.23% 59.00% 59.97% .. . Based on Inform~lh""."hnl£{ count of 150k . ~ \too.Ioo. c:,....., Unit of measure: % -~UtiIiIY~ SFA2 DIfObj 2.1 Services 211 Universal access to basic services Percentage of Informal households with access to basic levels of electricity - ~60.87%1 .. 62.43% Ouan 61.12% 61.66% 62.10"'{' ~ 62,43% 00 Unit of measure % and number of --~ .. , ' 2A. Universal access to basic services Number of subsidised connections. (informal only). SFA2 Dir Obj 21 2A. 'Universal access to basic services Total number of subsidised connections. (informal and formal). SFA 2 DirObj21 2A. Universal access to basic services % burning rate of all public and sir eet lights. 2A. Universal access to basic services Number of meetings with Key Customers. SFA 2 DIf Obj 2.1 (3502] 3330 Quan 995 1800 2835 3330 ~1J 6506 Quart 1615 3318 5163 6506 [90%] 93% Quart 92.5% 92.5% 92.5% 92.5% 4 Quart 1 2 3 4 Unit of measure: Number ~ I Unit of measure' Number -- Unit of measure: % _ . SFA2 Dir Obi 2.1 [4J Unit of measure' Number ~----- Page 1 of6 -- [£] 2009 J 2010 ELECTRICITY SERVICES DEPARTMENTAL SDBIP -ga ALIGNMENT TO lOP Baseline jt! 0 sn SFA & Directorate Objective No. Objective '" i! c .- Corporate Scorecard Indicator No. Indicator (To include unit of measure) :::;0 (08109 Target in brackets) Annual Target (by June 20101 TARGETS ..il' c "I!! General Comments <T "- 30 Sept 2009 31 Dec 2009 31 March 2010 30 June 2010 , SFA2 DirObj 2.1 2A Universal access to basic services SAIFI ( System Average Interuption Frequency Index), indicates how often the average customer connected experiences a sustained Interruption per annum. (Ratio) SFA2 Dir Obj 2.1 2A Universal access to Hv + MV SAlOl (System Average Inleruption Duration Index): [<1.3J <1.3 Quart <1.3 <1.3 <1.3 <1.3 New <2.7 Quart <2.7 <2.7 <2.7 <2.7 New <2.2 Quart <2.2 <2.2 <2.2 <2.2 New 97.5% Bj:annual N/A 91,5% N/A 97,5% Unit of measure: SAIF Index _. basic services Unit of measure: SAID Index c----- I . -_. SFA 2 Dir Obj 2.1 2A Universal access 10 basic services MV SAIDI (System Average Inleruplion Duration Index): indicates for how long the average cuslomer connected experiences a sustained inleruplion per annum. I-----sFA2 DirObj 2.1 2A Universal access to basic services Transformer availablilty HV. ··· Unit of measure: SAID Index Unit of measure, % -_.-. - -_. 2A Universal access to basic services SFA2 Dlr Obj 2.1 fransfor mer availablilty MV 97.5% New Bi-annual NIA 97,5% NIA 97.5% . I , ....... . ~ t..\.:I c::.c Unit of measure: % I ~ 2A. Universal access to basic services SFA 2 Dir Obj 2.1 % electricity purchases thaI are [9.3%] 9.3% Annual NlA NIA NIA 9.3% [loo%J 100% Annual N/A NIA NIA 100% N/A NlA unaccounted for in sales Unit of measure; % ~. 2A Universal access to basic services SFA2 Dir Obi 21 % compliance of eleclricity tariffs with NERSA guidelines and service delivery requirement. Unit of measure: % -_. SFA 2 Dir Obi 2.1 2A Universal access to basic services Implimenlation 01 ES Management Plan - Programme Custumer. New Review document Annual on Programme by 31 Oec 2009 Unit of measure: Milestone completion ~.- Page 2 of 6 Overall Sales and Review document customer service on Programme by blue print 31 Dec 2009 impacting on the reportlng structure of levels 4 & 5 for approval and implementation. Meeting NERSA tariff, D form, etc, submission reqUirements [ill 2009/2010 ELECTRICITY SERVICES DEPARTMENTAL SDBIP ii,$ ALIGNMENT TO lOP 0 0- SFA & Directorate Objective No. Corporate Scorecaro Indicator No. SFA2 Dir Obj 2.8 lC.l ...-" c·c Objective Indicator (To include unit of measure) ~ ::i Utility Services 2C. Effective management of City·s Infrastructure and Resources Phased completion of an integratod Infrastructure Asset Management Programme in respect of Transport. Roads & Stormwater. lolectricity, Water. Sanitalion and Solid Waste Management ,.. Baseline (08109 Target in brackets) ~I! Annual Target (by June 2010) (75% completion of Electricity: established Asset Medium Voltage Management • Phases 2 & 3 register for Major Infrastructure depts.] TARGETS ..""" General Comments <T ~ Il.. 30 Sept 2009 31 Cec 2009 31 March 2010 Annual N/A N/A N/A Quart 2880 5528 8094 30 June 2010 ElectricHy: Medium VoHage • Phases 2 & 3 Phase 1: Completed Assol Register Phase 2: Completed Evaluation Phase 3: Completed Condition Assessments Phase 4. Commence implementalion of lAMP Unil of measure: Completion of PhRses 3Al SFA 3 DirObj 3.1 1--.. ----S&P 3A Reduclion in energy c.onsumption in the Cape Metmpolitan Area below projected unconstrained energy consumption - - 311.1 SFA3 DirObj31 -- ~-. SFA 3 Dir Obj 3.1 S&P - 3A Reduction in energy consumption in the Cape Metropolitan Area below projected unconstrained energy consumption Implrlllc,ntalion of ES Management Plan CCTES Supply Area consumers electricily consumption against "10% Electricity Savings" target. (GWh per the System) [10317] 10885 10885 ,- Unit of measure: (GWh per the System) ceTEs Supply Area consumers electricity consumption against "10% Electricity Savings" target. 1934 [1756] Annual N/A N/A NlA 1934 - +-----. --- New Commissioning 0 injector sets. Installation of Smart meter Pilot completed. Quart Tender for injacto Tender for injector Commencement CommiSSioning of set advertised, set and smart of injector set Injector sets. RFP for smart meters replacement. Installation of meters to be adjudicated. Smart meter pilot Smart meter Pilot issued. installation completed. commenced. [50%] 50% Cluart 12.5 25 37.5 50 DWP PurChased, Total energy purchased. [13.2 GWh] 13.2 GWh Quart 2.82 6.41 10 13.2 Unit of measure: GWh Purchased 1---. -- SFA5 Oir Obj 5.5 -- --~--- 582 1----. ----IHSS 5B:-i5elivery of housing opportunities Implementation of Informal Settlements Upgrade programme (UISP and EHP) 8A Ensuring enhanced service delivery with efficient institutional arrangements Number of reporlable incidence ito S24 of OHS Act. [100% compliance 100% compliance with plan with plan specnications] specifications Quart 100% compliance 100% compliance 100% compliance 100% compliance with plan with plan with plan specifications specifications specificafions specifications wHh plan Unit of measure: % SFA8 New 0 Unitr of measure: Number , --- ~ ..... c::. Programme DSM Development of a Green 1% f purchased Green Energy Sold. f'nergy Market. Unit of measure: % Development of a Green Energy Markel. . ;.. ~ Unil of measure: (MW Maximum Demand) --- SFA3 DrrObj3.1 " ~ Unit of measure: Milestones SFA3 Dir Obi 3.1 10% L __ . Page 3 of 6 Quart 0 0 0 0 Replacemenf of the helderberg injector se\. Eskom smart pilot. AMR at main stations. (Ripple Infill in existing areas. Ripple new connections in existing areas. On hold) I£] 2009/2010 ELECTRICITY SERVICES DEPARTMENTAL SDBIP I , ~.! ALIGNMENT TO lOP ~f S~ SFA & Directorate Objective No. Corporate Scorecard Indicator No. Objective "'c:" .-0e ::::i SFA8 "~~ ~-~~ 8A Ensuring enhanced service delivery with efficient institutional arrangements Roll out of OHSAS 18001 Pilot TSS (Safety) 8A Ensuring enhanced service delivery with efficient institutional arrangements Retention of Skills as measured by % staff turnover Baseline (08109 Target in brackets) Annual Target (by June 2010) TARGETS General Comments IL 30 Sept 2009 31 Dec 2009 31 March 2010 30 June 2010 Initial Assessment Completed Quart OHSAS Systems Development and Implementation Finalised Internal Audit Protocol Developed. System Review Inifial Assessment Completed 5 to 8% overall turnover 8 to 12% within skilled categories Quart 5 to 8% overall turnover 8 to 12% wHhln skilled categories New Unit of measure: Phases Move to Programme ~-~ 8A2 SFA8 i-- Indicator (To include unit of measure) ,. u ".,.,. e'" CS New New Unit of measure: % Quart 5 to 8% overall lumover 8 to~12% within skilled categories 5 to 8% overall turnover turnover 8 to 12% wHhin 8 to 12% within skilled categories skilled categories 5 to 8% overall !----~~ SFA8 8A E:nsuling enhanced service delivery wilh efficient institutional No. of Departmental Appointments 8A Ensuring enhanced service delivery with efficient institutional arrangements St~aff availability as measured by % absenteeism ~-~ SFA8 8.A3 CS Unit of measure: Number New N,,,, 226 60 120 180 226 ~ 4% average for the period 1 July 2009 to 30 June 2010 Annual NlA NlA NIA ,,4% average for the period 1 July 2009 to 30 June 2010 90% Quart 10% (or based on DirlDept. projected cash flow) 30% (or based on DirlDep\. projected cash flow) 60% (or based on DirlDepl. projected cash 90% NlA NlA NIA R40m Unit of measure: % SFA8 SFA8 SA Ensuring enhanced service delivery with efficient institutional arrangements CS 8A.4 8A~En~su~ng enhanced service delivery with efficient institutional arrangements CS 8A5 Percentage budget spent on implementation of WSP (90%] Unit of measure: % Percentage improvemenl in the positive employee climate as per annual Culture Climate Survey {28%] l-~~ ~~-~~--~~ ~~,- 8A Ensuring enhanced service delivery with efficient institutional arrangements Communication sessions between management and staff~ (Number) 6 6 Quart 2 85% "2 Quart 85% 12% reduction in time taken to close notifications (measured against the baseline) Quart 3% neduction on 200812009 baseline 5 3 ..... 31 % Corporately (Directorate & Departmental targets will only be available once the current survey has been completed) ... .. W w;oia ...... 6 ~-~ SFA8 8A~6 SOl 8A Ensuring enhanced service delivery with efficient institutional arrangements Percentage of capitaf projects meeting original planned milestones SFA8 8A~7 CS SA Ensuring enhanced service delivery with efficient institutional arrangements Percentage improvement in the time Baseline to be taken to close notifications in terms of determined on 30.6.09 the Corporate Works Management process Unit of measure~ Unit of measure: '----~ Annual -, .. ,. flow) (Directorate & Departmental targets will only be available once the current survey has been completed) Unit of measure: SFA8 31 % Corporately Subject 10 finalisatlon of the 09/10 draft budget ~~~ 80% N2 N2 85% N. 85% N' 85% "2 % L_~~ ~-~ Page 4 of 6 6% reduction on 200812009 baseline 9% reduction on 200812009 baseline 12% neduclion in lime taken to close nutifications (measured against the baseline) N2 Capital Projects exceeding R200 OOO~ [ill I 2009 f 2010 ELECTRICITY SERVICES DEPARTMENTAL SDBIP ~! ALIGNMENT TO lOP 0 SFA & Directorate Objective No. Corporate Scorecard Indicator No. SFA 8 8B.3 I-- ~~ Fin SFA8 --- SFA8 - SFA8 (96%] ReFurbishment Expenditure on Capital 8B. Management of key Budget. (based on 95% target spend) financial areas such as income conlrol, cash flow, Unit of measure: Rands indigent support, alternative income opportunities, assel management and risk management [R149 m] Growth expenditure on Capital 813. Management of key Budget. (based on 95% target spend). financial areas such as income conlrol, cash flow, (Rand) indigent support, alternative income opportunities, asset nmnagement and risk management (R2n m] Indicator (To include unit of measure) Objective Percentage of Department's Capilal 8B. Management of key budget spent (NKPI) financial areas such as income control, cash flow, Unit of measure: % indigent support, alternative income opportunities, asset management and risk management . u c: General Comments ::J cr ! IJ.. 30 Sept 2009 31 Dec 2009 31 March 2010 30 June 2010 95% Quart 12% 32% 55% 95% R158 m Quart R27m R59m R 120m R 158m I --- SFA8 SFA8 Annual Target (by June 2010) SQ TARGETS ". Baseline (08/09 Target in brackets) ~e - 86.4' Fin '----uiiiity Services Quart R56m Rl58m R248m R483m . .. ~ ~ Percentage expenditure on [95·100% of YTD] Department's operational maintenance budget w;;::... N 95% Quart 25% 48% 70"fi, 95% 100% Quart 25% 50% 75% 100% R 87 in R 173m R260m R346m Unit of measure: % 8B, Management of key expenditure on operational maintenance budget. (based on 100% financial areas such as income control, cash ftow, target spend) (Rand) indigent support, alternative income opportunities, asset management and risk management ~ .. ., Percentage of Department's operaling [95-100%ofYTD] BB. Management of key budget spent financial areas such as income control, cash flow, Unit of measure: % indigent support, alternative lIlcome opportunities, asset management and risk management 8B. Management 01 key financial areas such as income control, cash ftow, indigenl support, alternative income opportunities, asset management and risk management R483m (R212 m] R346m - - Page 50f 6 [£] 2009/2010 ELECTRICITY SERVICES DEPARTMENTAL SDBIP 'liIs ALIGNMENT TO lOP ~e SFA & Directorate Objective No. Corporate Scorecard Indicator No. g~ '" ! c .:::i c SFA8 88.6 Fin SFA R -SFA8 '"----'" SFA8 88.7 - 88.10 Indicator (To include unit of measure) 88, Management of key financial areas such as income control, cashftow. indigent support, alternative income opportunities, asset management an(j risk management Revenue collected as a pel centage of billed amount 8BManagement of key financial amas such as income control, cashflow, indigent support, altern alive income opportunities, asset management and risk management % Revenue from Budgeted External Sales. TARGETS ~ Baseline (08109 Target in brackets) Annual Target (by June 2010) 98.5% ." c: General Comments cr ....e 30 Sept 2009 31 Dec 2009 31 March 2010 30 June 2010 975% Quart 97.5% 97.5% 97,5% 97.5% New 98% Quart 98% 98% 98% 98% New R581 m Qua'rt R 145 m R291 m R436m R 581m Unit of measure: % Unit of measure: % 88, Management of key financial areas such as income control, cashflow, indigent support. alternative income opportunities, asset management and risk management Contribution to Rates Accounl, 8 B Management of kfly financial and governance areas such as income control, cash flow, indigent SUppOit. alternative income oPPOItunities, asset and risk management Percentage reduction in the number of recunjng findings emanating from Internal Audit . Unit of measure: Rand ...... .... W "'"'-----' Audit ----- SFA8 Objective Fin [60%J 70% Quart 70% 70% 70% 70% ~ Uni! of measure: % Percentage annual asset verification 8 B Management of key financial and governance process completed areas such as income control, cash flow, indigent Unit 01 measure: % support, alternative Income opportunities, asset and risk management [100% by 31 May 2009) 100% Annual NIA N/A NlA 100% - Page 6 of 6 . , - 4.2 CITY OF CAPE TOWN UTiUTY SERVICES CITY OF CAPE TOWN ABSTRACT eny OF CAPE TOWN El ,ECrRICrTY SERVlCI ':s (CerES) l'.LECTRICITY SERVICE~ BUS1Nl'~~S DI{MT BUSINE~S PLAN PLAN The Business Plan should be read in the following context: Operational strategies have not been included in the Plan. Thesc strategies arc being developed and the impact on tbe Budget determined. The Business Plan will be updated with the result. 20()9~2012 A plan submittcJ in fulfllment of good 13USlt1CSS Practice Information and Data from relevant stakeholders was limited thus limiting the coverage scope of the ptan to the CCTES. Impact of EOIR will only be assessed in 12 to .~6 months. City of <. :apc Town The Integrated Development Plan (lOP) nfthe CoCT is lInder annual revision and might have an inlpact on the PIau} as part of this Business Plan IS aligned to such. Utility Scn'icE'::;; Directorate The 2009-2010 financial year will be the third year that a business plan has been prepared for CCTES. It is lUlderstood that this Business Plan is not complete but win be updated on a con.inuons basis as data) • infoonation and tile output from workshops, seminars and investigations become avai1able. "" II is understood that this docwnent is a review of CCTES objectives, plans and fiscal responsibilities. .... ... ~ w:::- ~ /\pproycd by --- ~--- Direct()r:- Electricity Scrvkcl' Dl I~ Rcncontre Figure t ELECTRICITY DISTRIBUTION SUPPLY AREAS Executive Overview 'Ihe cerES pro\;dcs electricity dis~ribucion services within the geob'T:lphJC area of dIe Cit}1 of Cape Town Supply Area Figure 1)< 'I he sen<ict's provided include: 1he provision oC electricity distriuution services referred to in sd1t:dulc 4, part B (JJ the Constitution. referred t't) in schedule 5~ part B of the Consti~ over the- next 5 years into the Tarifr and provide "11K provision tution. "nle relief to the rates account. conl1'o1 systems, of any other sen icc related to the abon~ o Cuslomcr satisfaction o Municipality sustainability and fmauci:u yiability o Protection of the right to access [[l'e and billing systems, \vorkshops, fC<Juircd to achieve Lhe key objectives stipu basic clccLridty Maintenance of gtfH'rnance integriry this busmes$ plan co\ ers dislributton $erYice~ ,tith1n the jurisdiction uf the detailed strategic detailed opemtional plans. It is \\,-ithin the context of the dvnanlir.:s menlloneJ above that for the next the fucus will be ~)fl the following areas: Unless indicated o Q G)cr Supply IIxca and Creatton of an imlepemjentiy sustninable and '\table entity ~Iaintena.nce of Municipal oblihtatton to current staff members w;;;. 'nH.~ maintenance- and impro\"ement of the "as-is" business. Enstt.rnncc of accountability and transparency of reporting standard of serd_ces the (NERSA) for the City of Cape Town mu.<;t 1ntct the rc<.]uirement~ as set out t1l the 'Ibe electricity distribuliun ,vas cho;-;en a,s tbe 1,''; l\laintaining the tlng-fcnced sen-icc status <iuo. fu<",,_ Undcr the NERSA licence, the stamlanls N RS047 .n,l NRS(l4R Ensuring sustained quality of supply< W1(lcrgOlng Enhancing customer sefvlce. CoCf.s Operational sen-ice- delivery, based on the spirit of "Bathn Pdc", on behalf of and particifYatcd Maint::timng cuupelation and relationship with other stakehulders Cost control management and sustained financial ,-iability, 111C ED I a number of imrnediale and medium tem:) thr~ats {nost of technical and specialist skills< <Illcso, together with a tricky dlsU1butiun networks and systems pose rcal risk$ to sustainable service ue}i,"cry in the medium term. ....... W con el~c- AcceierateJ training~ coaching and stills den~lopmel1t t()( our employees. 'lhe facing the EDllx)th now and in the future, changes the foundations traditional planning 'I11is ref.)u1red the cunsiticratlon of a number of aspects in dlC mnalgamation of preyious plans planning pn)(;ess to plan for sustainable success. t..h GLOSSARY Contents 08/09 Refer:; to the financial peliod lJuly 2008 to 30June 2m') 6 AMP As<et Management PI"" l\Jls$ion, Vision and Stakcholder~s 8 Fxpectatiol1s & Strategic Priorities 1Il Environment Anal}sis 14 Competitive Analr~il{ 18 cerES Quality of 2() ceO Central tlusincss District Cocr City of Cape Town i Council / MuniCIpality ccrES Cit)" of Cape -I 'own Electricity Sen-ice DME Department of Mine",ls and Energy EDI Electricity Distnblltlon Indust.ry Stratef,rlC i\1anagclnent EDIR Electricity Distribution Industry Restructuring Operational EE Employment Eqwty NERSA Corrective ACfion Plans. ERP Enterprise Resuurce Planning ASSt.'l l\fanageillent GT Ga~ Turhine Human Capital Deveiopment HSE Health, Sofel}' and Environment Energy Saying I HficICIlCY HV J ligb Voltage Electritication IDP ["tewaled Development Plan 2010 Soccer Workl Cup KPA Key performance areas Tariff Adjustment & Ilarmoruzat1on Plan. KPI Key pe-rformance indicaturs Risk t>lanagernent Plan .. ............... .... 56 LV LowVollag<' Performance lvlanagcmcIlt & G()rus MV i\kdillm Voltage Financial Plan 61 NERSA National Electricl!)C Regulatory Authority u(South Alfle3 NMD National M<Lul11wn Demand NRS National Rationalised Specification POI' Preriously Disadvantaged Person/ Individual RED Regional EleclTicilY Distnbuto( RTU Remote Terminal \Jnit SAl' Systems, Applicatiuns and Products ..... ..... ~ Q'".) " SCADA System Control ond Data Acqui.,illOn (1 P / f' r SDBIP Sernce Dcllt"(!ry and Budget Implementatiun Pn)grarrune MISSION, VISION AND VALUES SLA ScrYlce Level j\grcernel1t TREC Ttans i\leditcrranean Renewable Rnergy Coopemhon WCWorldCu!' 'n,cse il-fission, Vi,ion, Values and Strategic Goals de' eloped by and fi)r REI )1, remain applicable 10 the ccn,~", Mission "To eJlbaIU'C tlw liFt?,,';; 811 .uu/ drirt· our ecollolny J~.- prrwiditlg .<ltTurdahle f"lectrici~r and rcl:tted ...af" lUllJ S1J~<,"uinablc lllanuer il Vision "1"0 IC~fd lire' ,C;olltb AliicUll jOllf11tT towatdlt .. t/J(' {Jrm'i";iolJ re/;lted $(.t17·ce.~ tI ------. Values -To :let' fairly, prudently, rtiJic;rily il11d t:ollscienlioJJ.f;i}r }lJ('('t tlJe stalld;Jrd~ of!wund COIp(}r;ltt~ lfOH-rI1.UJCt". -To 8cn"C p;~SEiiOll;l(f'(F aud cllcrgt...tiG_Il1J' iwd to c_'H'cDclJce ill all a/'peets 0(1:11:;;10111('£ I"elation... ·To lea.d dec,:..i ..."c!)' w,d bt, hU1J1hk~ rClfardint{ our .~UCCC!';He,t; and re.,,'Hicnt ill the filce -To I'alut" le;lI11i1w a/Ill Ncck illnOnl.tion illg t.:'rt.:'atjl'J·~l·. h,.F n-TJ£kiog Ut"~\jb{1':. o fcllaDC'J1ge,<;. t ........ ~ ellco{J£';~l(j;~!{ res/wnt.-ib/t" e.\p/orilliol1 ~1J1d enlJ.lOlH·£- ~ -.....:l - To be l'Ol1JluiUeil (IJ the t.rallSfOEIIJ.1ti'OI' af 01lr ~'oat-~F, eCOflOJn.r ;111<1 011£ org:UJiLl:ltioll ill hOlh flu' work we do :UJd how We' do if. -To attract, and cOlnpaS!dOilillcly JJlanagc, gro·w }cHId respect if dil..'C-rsl.' and IHlclltcd ,",orJdVrcc. TII(' Strategic Goals Goal1 Reliability of Supply 'lbough: • Equitable sustained quality of supply • L.o\V('f • Optimum qu:~ljty asset mBintenance Goal2 cost of e.iectricit y distribution Protc~"tion of Lower Income Earners 'I11rough: ;, . . h 11 P fer 2 ,susta1nable electricity supply STAKEHULDER'S EXPECTATIONS & STRATFC;IC PRIORITIES lncrea!\ed infrastructure maintenance Affordable [,,,ife, Alignment with Guvemmcnl Development Plans Goal 3 Developing Human Capital Through: " Skll1s dCTdopment and on job coaching " Industry & cu::::tomcr km)\v-ledgc rraining " lligh pnfonnance st'Iyicc culture de'rdopmcnt Goal4 Sustained Financial Viability \vith Natioual, Provincial initiatin'$ to ensure optimal there arc SL'i: critical clement!': Accderated and Shared Growth-Suuth Af National StrateQ\, for Sustainable UC\,e!upfncnt Dc\-c!opmcnt Fratne\vork f('ed into and intluencc the 'lhe folkn'\ing diagram gkeg ru1 1Uu.'ltration of how the differenr 5lrategy nnd policy In!\lrumcnts are alif,'11ed. 'l'hnmgh: • Improved " t':nh;mced customer value .. Expanded rt'xenue Uppuftutlities • lncteast-u Assets Utilization C0!'t ;.;tructun:: Utlin" 1,.&1 ~,..ItIU hn,Mti'Jle .:... Goal 5 Merger and Transitiun .... ~ Through: • Proper and timeuus planning " Setting rclC\'al1t perfOf1nance imlicato(s " F\":1luating progress " i\1allagi:ng change .:x:> Goal 6 Branded Customer service 'through: • .. .. Equitabk tariff structure Excellent customer relationships Continuous :n-ailabjtity of supply ~~~~!.!.1~!1t nrategl,el i~_r.~~~e lpatial q~~~~ Although the national economic development economy and has ,..' age!' \~~~lY '111e '1hc drin~n; 'JXe bet~n:t'u to understandin $0Ctors TO\\'n economy In recent titne~ have been con$tl1Jct:i()11~ tourism, retail and tne City and l)t'oYlncc estend l}('lonu jllst these seCtoC5. ~Ihe spheres of government to ensurt' the nrevention. energy {XJlicy, nrotection of dCYdoped in support Stakeholder's Expectations and Strategic [>riorities ~ ~ ~ § ~:r " tIC ,S .~ ~ ~ :Ii c'C 8§ " E.=l,.S::1 "t 8 § ~ ~:gb~~ V.D..o ~ c.. c:: '"0 m g ~ :;; bO V ::! 0 \::! c.:I ~ .2 81jB-;:l ~':;;SB ~ ~ ~ ~ ~ " V ~u § u ~ ~ > 8c.. o" Pn)tcction of low-incotne consumers u 0 £"C:0 To ensure E co con5umers~ " the burdeu ~ d' .~ :§. g! gfi [3" ,g 'Sl;j \:i "~ OJ) b{J ,E ~o p: ~ -<l l) ..0 ~ i;:. 'r- ,",13g u.. '& ~ l3 ~p ,. 'g" ~ i3 ..0 >-< ~ i:.:.J '" ~ '"' ~ To ensure that the CCTES GHl oper,lte on a sustaiflt'u viding le\'els of scrvlce and In\l'.,'itmeflt in the sector, to to lo\ver costs and ensure financial viability, omies {;< "0.:: v i:;' To tllsurc that the (:CrES is able to pnwide secure employment (0 the employees, provide (he skills development and tmining required for a modern ultitributlOJ1 business. ~ o ~~ To ensure that CerES is able 10 attract. tram and rctain sufIicwl1t skilled staff to lneet operational H> quireulentf;, o -, '0 ." 'C -E a ,B ~ 'r, y~ cc ~U.J ~~ ~ "~ 5- u wo ~ v o to dcli\'l.:'r J~ fundamenlHI in the :lChien'mcnt of in turn the ach.ie\"ement o( National Government stratcgit:'s and plans. re:;ts on four strategic themes: Gro\ving the economy if} Creating Jobs 11 I i:! -5" '" ~ Q ~ -9 .;::., OJ) § " ~ Addressing challenges of the second econotny ~ v .£ co ::... . ~ &5 " Iutensifying the fight against poverty rcyie\ved annuall}'~ ;;e\"cll strategic focus :rreas h:wc becll proposed for the .Althuugh the CoCT's IDP achie\-ement for the 2020 \"ls10n; -"" "{j OJ) .~ :g < ~ ;:0 The (ofe business of ccn·:s and the '"' "-< .. Shared Economic Growth and Developfnent E [ecuic ...... ~ AligmDcnt with Stakeholders' Strategic Priorities v c... ' .-~ ..D ~ .~ G ., :: To ensure th<1t the Iransition related to EDIH 15 done within the context of a human reSuUICt~·;) stralegy ilnd an agreeu Social Plan, so that lhe interests of all affected by the re<lnd the arrangements are consistent \\"lth government policies toprotection, g: il -£ ~ viable basis" within the context of promore effectlye, efficient and lISC eColt- Development of labour and Human Resources Strategy and Social Plan '< '" t:; policy of the ,hould take affordability Financial viability ~ '-' sustainable ~lt'('tricit}' to luw--incoJ11e and well rcguhued structure ensure:.:: that support to such households is ptu\'ided for on an equitable anti long-term b3Sis. Jt is acceptt'd that indigent customerg \vtll be subsidi%cd in teans of the 1Iowever, this subsidization should not be to the dctf'1111cnt o( the Co( ~r and viability Into account. u ' ........:) ~ conSUfncrg in tht' j\fc. dtizens and businesses c:: 'C1 v.,S :..:J Reliable Service at Affordable Cost To E'nsun~ th,u the CerES meets the baslc [K"CUS and requirements tro - specifically to pro\:iuc for un.lyersal 7iCcess to reliable electricity supply to at affordable price, ' '/i meet shan:hokler expectations of an accesf;ible~ affordable. sustainable elnbodied in the !':nergy WhitE' P<lpC"r, are at\ foUoyvs: -E V :z: to <IS .r: u .5 ~~, The i:;:sues to be addressed by CCTES distribution of dectricity tu all citizen!'>. "~ c .§ V Sustain:lble Urban In6.astructure ill1d C b" P t f' r Sen ice~ i\lblk 'l'rmu-port Systenl$ ENVIRONMENT ANALYSIS Integrated Human Settlements Safety .nd Security FACTORS CHANGING THE MARKET DYNAMICS t leaJrh. Social and} lunuo (:apital Develnprnent Cu_tomers: Changing Attitudes and Behaviors to be driven by their search for "\'alue,f~ for seck the Ge~t c;"rnuinntion of service:", fcntures~ and with the flexibilitv that \\rill allow them to Cll"ltomii:e and . Good Governance and Rehit\brory Rerunl1 go:ds and. CCI'ES plan~ arc dcveloped in a tnanner will ensure maxlmlu11 contribution Providing hotl.'Ie:hold access to electricity; thus improving human deve:lopmcnt and settlement. pf()\;ding (:"lec~rificalion. stn'.'·et and public Hghting~ thus assisting in reducing crime to be more deccntraliE.etl amJ collaborauye in most org~7.at.i()lls of lhe furure, technology. Segmentation ba.<;eJ on industrr or size alor1e \\rill be less useful customers a..<; comp:lnit.·s cross traditional indll'itrj' and geographic boundaries, as a means of Srt1;)U bu;.;incsses be important in Ihe marketplace since these smaller companies: vI/ill increasingh, drive the gro\. . ih of dlC economy. ,t\tta.ining acccptabit" tjllality of supply, through a well ffi.<:tintaineJ and refurbished nel\Y\xk. i'.lamtging electricity net\x,I)rk infrastrucntrc, informed by an A1\IP which is currcntly under den;lop- ment EI~clricity (:rcatiun of joGs dllrl11g electrification nel\',;urk conslructiun~ through the empfoymellf of locaJ COt111llUnities. by rnaintalrung the t<uiffincrease \"ithin acceplable limits; Customers: Western Cape There are 784 954 con.,umers by CerES IS 580617. 'Ihe olher Town. tl1U~ lowering the co~t country but at the S;)rne time proYkung for a sustainable and stnble ~upply" euC()Uraging economic Supporting 2010 \VC tl:lfOttgh ~treflgtheni.ng the electricity distribution network. customers io the Ek'ctricity Supply )\1"ca of. and job creation the Cn(Ts IDP nlal as it i:- the basis for the objective that the city and reRion's These include: • HclenUon of existing capjtaJ~ attraction neVi capital inflows int() the regiun the city rulU rebricm~t; CLlH('nr and oe",," gn:m,;"th sectors to incrca..-;:e the specific markf't segrnents anti i.nvc!;tors to support s!..l$h1i.nable, year round gro\vth of "]:;1- linkages oct\vecn the first and 8ccond economie::; and increasing the flulllbcr of ecoupportunities of the pour and broadel.lllJ.,i:; economic participation of investment in waste~ inf011'nat1()n and COmilIUOtc.at!ons sectors, the city eC()1l(jmy ,md social ;md local economic dc\"t~lopmellt will be supported the City's procurement USIng l'ublic Works Programme as a anJ aligning \\lith ~t3te·O\vned Enterprises go\~ernmenL and creating City organization processes to nllow for acc~leratcd and acces~ible Jircct inthe city, '" "f>,~ ¥" 13 ..;;., ~ ft .. ), ..... ~ c:..rl c:::::> Embedded Gt'1lCral10n and Load Control in the CCTFS which assists \\.1tb lo:uJ management consists of: and devdopment of exist.ing businesBcs to strengthen the city'!,; eC()l1otnlC Steenbras Hydro Power Station" 160MW Strf,ngthen the kx:al area suda1~ cormnut1lty dcyei( )pment eCUI1UrlliC and rflviromnentnl loc,uion conditions for business ;uld ](oggebaai Gas Turbine Prioritizing skills de\'e!opmcnt bas:ed on the neeus of the local enmomy, to support cotninucd eco nDrJ'UC gnm·th and access to orportunitic~ Supporting the devek;prnent of <1 fa'Follfable cl1:lbl1f1g environment for indindurus and cotnmufllt:ics h) urg:lni:r.e them!ie.kes~ l;lke up opportllnitict' \vork lOw,u-ds prospeflty, 40MW Alhlone Gas Turbine = 36MW lA,ad Contrnl System 4,'\MW 111e Athkme Coru Fired PO\\"Cr Station hils cea:-ted generation and is currently being decoHllHlssIDncd, alternate dc- anu ydopmcnt plans for the sit(, arc being llH~e$tlg:1ted, '111e CoC'T hns a munher of intake point::;, \'(Iring from 132kV to 11 kV. Competitors: Targeting Critical Customer Segme"ts and Markets tllis period Not only is cornn,etillon arc onered bv \vorld-cbsti (;( )mpetitnrs at en,,,,,,eH t,ve will bt' the entry uf other encrgy pro'dders into number table tx:lo\\- sho\vs that during Workplace EnvlrOntnent: Renewed Focus on Employees tflCrea.'Hllgly competitiyc em ironment shouJd unJerNtand the need in the people they emp\ov, Sludies ha,c linked monitoring and both the Cus onr,U112ation to new heightR. ability to If;;urprise- and dehghe' of employees throughout the \\,ork-: for Energy consumed Consumers "nlC or DSM iniLiatt:s \vere rolled out in C'lpe Town to reduce the c-lectndty demand, One of the greatest challenges ccn~'i in the lle\:t few years \\11i to attract and retain yaJued employees. The tight labour rnarket \"ill ue c!';peclally challenging for of skiJJe.d te('hnical w(lrkers. 'nl(:~ tr<lditional l1H,)del \vorkplace loyalty, where workers remain \vith their for the entire career, has 1:x:cn chall~ng: for mogt some bJ-11<'. I;~mpluyees are shifting johs more otten ,mel trpically e:\l)ccl mure flexibility nnd dcveiop- QD:J~stk:: .Agriculture OMning orv'anufacturing • ColTlTE'rclal &]Transport As CerES i~ a department of the Cu<:::T it employee!';, motivate their 1t is and ~()[ dle (X:TES to understand the gto\vth drivcrs of the industries and residential customers ill order to protect its i11,,1fket share. i~ reliaJ1~ Cae,. on the dcn~lop conlpellsation policies that atUact high and retain them to provide stability and leauership. Salary and bene,· course. are a problem for CerES as they are for many orgJn:i;:;ation:;, 'nH:~ incentjves [or 1nnovatjon and risk must be balanced \vlth the more: tnlliitional \"alue of stability and the challenge of prodding \,ita] public sen-iccs in a large, complex oft,tanlZation. • General Some finns hayc :tchie\.ed success teCil1101ogy, outsOW"Clng~ workforce reductions, or other ini- Energy Supply Shortages and Security of Supply Tr:lJlllmissjon of electricity is pl1marily from the Nurth of the Country. Local generation conslSts of the f()llowing: Koebetg Nucle", Power Station Atlantis Gas Turbine true for tho::;c organizatiolls in the private and public sectorS that han:' had to fare crnployment and achieving financial sustainability. During thi:; time. the values of respect, to build the pnJtncrshlp uet"vecn bbour and managell1ent all, City must reinforce the mcss~e dlat change means oor"tortitrutv 18(JOI\IW lO()()MW I\losscl Bay 900MW Acacia Park = 11l0MW and cnrnnutrnel1t, Palmiet Hydro Power Station Dmpp Wind \"anTI = Legislation and Regulation 4{)OMW 'l1,e lack 3ppropnare legislation and or regulatory flamework ftif the rc:strncturing of the EDI creates uncertatruy to municipalities that are not ,v--ilhin the rnct(opf)litan tn rn::my \Viqs, "MW • p,1g<' 15 , ." ' Se ~ challenges and create ....... <:.A.,) C:..n ;-. C IJ (/ p! in l('nll~ of SCfYlcC ddin:ly' to contestable customers :l1ld r)Qses a risk on la., and \'ruuc of :lOluisirion of a..;:gcts to be amalgamated. f r -I COI\lPIITITIVE ANALYSIS SWOT Analysis A det,likd ~wot anaIY$i!" \vas conducted by RED1. 'nllS was updated Plallning ploce~~ in 20U 7 ,1nd \\:a,q enhanced bv the N (~RS;\ technic::l1 2006. [tern specifically related to l:mr,,[er Strength. order to turn the lc'vcr-age it's effixts cerES yision into has identified the strengths that \vill the dem~nds Hxtend existing customer base. hladequate but quaiitied hUfnan resourCe~" Good payment culture of exi.... ting customers" \\lell established corpoc<lte govem::mce structures, contr(JIs ::l.nd ,, sy$tem~, ....... Agtng but reliable net\\"ork infmstructurc:, ~ c.n Weaknesses ~ and instituting a ncw change the curren! need itTlp(o\~emC'nt to ensure is culture to ensure a fit ''-lith ne,,: success; ~tnltegies._ In addii10n lhe fl1HO\.dng ;1(ca~ EDllt Trarurormation change' that will be brought about due due to the lack of legislation and regulatoty frarnework governing the tr,Hlsfu(indu..;;try. ] . .ack of agreed twset valuation Inodd l()c the trailS fet' / sale of assets. Financial ring fence not fully operarionaJ in the CC:TES coer. j hi1~1 support ~ervlce c()s t!' to Conslraints ()It hmilinll, and resou.rc<:$. • 1Ylaintenance tactics dictated by lack of human resources_ Opportunities J.<'..conomi.es of scale c~sultit1g in 10\\>'1'[ intet'est fates \vhell funding is t1C'gotialt:tl. the Dt'n~lorment (.,' II Of! t t' r of uniform starl(brd~, prucedmes and pranices. RacionalizeJ cvnditions of service and pay parity (,,,,thin CtJCT context) cerES QlJMJTY OF SUPPLY ,\iternatiye energy sources (lirruted). Threats tluality electricity mC-eNR dlC rcguired Delayed trans (onnaliull dut' to delayed EDIK Hesistanct.: to change (;auseJ by uncertainty due license, dips. the delayed EDllt ~t-d Impact or prevalence of IIIV / AiDS on tht: workforce. The decline tn manufacturing trldustr), if1 Western Cape: tht" see tnt SlItller::; of electricity within Rl ,]) 1 bnumluies. its performance il1 terms (amongst to ctL<;l(lmCrs in the coer art'.\' To of supply ~tandards as set out in the NHRSA forced interruprions as well suppl:>' n)ltagc interruption ped()rrmmce statistics 'rile key performance indicators are: I;; numher one COrl- IntcfflJl)tlon Fregucncy Index (SAIFI). freql.Jency. of institutional know1cdgc and critical gkiUs. lnterrunuon Duration Index (SAlOl). duration in hours, ....... ~ ccn:~s records f()rced interruption perforn1at)ct" $ratistics in the f(lcm of Sr$tern~hnLLrs. sanctioned by NI ,:t{SA. estimates of Sl\lFI which indicates how frequently an ;werage cU';tomel vva....;; to (orceo outages and estimates of SAIDJ which jndicates how long the ,l\cer,'lge custom.er ,\<as interntDtcd forced uutages are pro\'idcd. 1he 111e C(::-n£s recorded an interruptiun freguency index helo\'I<' 1.45 oue to ff)rced distribUL10n network for the 2007 calendar yem. A r,raph of annuru til the graph providing the 12 month muving sum of these ir1d.tce~L SAlOl and SAiFl 1f.lIllCl<otIlIllCl<'lfil!g) .. Fag.;, 19: .' the MV (Medium Volt and S:\ID! indices is ~t W 'lh~ S,\1D1 SAID) and lIIV pins HV (Iligh Voltage) SAID!. 'Ihe llulk nen" tn-teed and m:ljor ('\'cnts arc i'Acluded in the SAIDt and should. be rf'ad as follO\\ s: 50 I' ( I f the sites monitored nation \viJe graph~ 011(': can easily judge that 50 of CerES ~itc~ experienced 2 7 or less X 1 dips, Luokdips in 2007, {l at the Of Electricity consumption growth in the CCTES Supply Area there hay" been different indicators used bv Fskom and the CerES due to different SCi\DA ,"stems of I1C\\,- SCAD;\ svslem a kev priori tv l:!iycn the age of the existing ~within of a Ilew SCADA system undet'\vay. A common tncthcldology based on intern3tiunal indicators, \\'hich is in place in Eskoffi, \viH be intr'c,duccd in the future. The condition the IIV and l\IV infrastructure l!'> un :lyerage not In 11 good $tlll<:~ due to histonc constraint$ on capital cxpcllditure ID)l"JOsed hy the CoCT's hased on affordabili1y limi!s modelled through the (\fediwn Term Rt'venue and Expenditure li'ramework The same is true: for the LV networks. '111is state of affairs h"5 rleceS:-;ltated asscssment and risk profiling of the nctwurk and the capital hudget has bCCH allocated accordingly, V()]t:Wc l)ip pr0t-,'1:ammes tn the Co(:1' should be iH1\V:lrUs. :\clua11..'T()Wlh "" for 2(X)7 lOR and a growth of 4.1 W:lS coer area of supply The exrx~riencim.~ 2.96" and the estllnarf' r;;; basf"d on a gro\vth of 4.1 <) fc;r 2008/09. I)e~ Actual and projected CoCT System Energy fidcm" is the llV indic:ttur compared to lhe ('~l:1;~wt#"l"i"ti;~ as 1'ro- 15,000 14,000 13.000 .c ~ !l (!) c 12.000 ....... 11,000 W coon 10,000 ~ 9,000 8,000 SItes Note: NRS 048 dip window categories: lhe table aboyf' defmes the dip catcgvcies in terms of dur;ttion, depth and the characteristic values of \'oltage per annum for (50(\,) of sites nation wide) per N RS 048-2, For example the above tnforrnation for comnarat1\.·c ':;., •.."'ji:fg~/(;iic~tr)skfii2'~ s.:cl --~------~------~~~ tr i cj Chapler (, Electricity consumption ill the CCTES Supply Area The (;raph helmv indicate the possibit· effrcts of the energy efficiency programmes in the Co!:'1' supply area for a broad categtJfY of customers Domestic and Commercial, The an~nu...>:e cU;[1surnption fOf Domestic consumers per month indicates a definite drop in the usage of eh,~ct.ricjty. this would most nrobablv be the ;1\varenC$ls of consumers to the power :-hoclages tn the COluItry. in terms of sa\-1.ng while Domestic 1 shows fThJCe (omH tl.x energ)' electrical cornponents. a sH~adv increase in the de[n~lnd fi;c en~ . of growth STRATEGIC MANM;EivIENT PLAN A three-year Strategic Managemclu Plan (SMP) was oC'\'eloped in 2007 and identifieJ dw fullo\vll1g areas of focus in tht> medium lerm tt) achie\"e the strategic goals. 'l11e maintenance ar'ld impf(WernCllr {)f the "as~is" business. Maintaining the ring- f('need sen-ict;" status qU(l. I :,nsuring sustained quaJity of supply. Enhancing custorner S~f\'LCC, Average C onsum plion kW h for 2004/2008 3.500 3.000 • Av~fage ElAverag.1005t2006 OAverag.200611007 200712008 Accelerated tfalning, coaching and stJJJs deyeloptl'1f>!H ;\ number ofprograms to "p"d and "''' detailed [(.If our etnployees_ the SMP at business, operational and (1lunan c41pitallcyel were d(,H~I51\-1P is revi{'\veu annually and the programs are t1l()flitored and IJfx.:1ateJ on a continuous Lasis. 2.500 ':; 2000 ~:/Il ~ 1.500 ~-. ,DOD 500 Maintaining C(x)pct"atioll and relatJOnSh1p Y1.1lh other stakeholder,o:;_ Cost control management ,Ull] sustained fill~J1cial viauility, 4.500 4.000 Operational sen-ice ddi,'cry, lx\.o:;ed on the spirit ofHBatho ]Jele" u _ .:;._ . F,t.~ 5. . .~. .~.'1 - Q,m""c IIHlgh) " .Ll ,,,,,L __-111 L__J o tim estit 2 (low) Com mercial S Power 1 (Hlg;) C attg ory C(l mm efC ia ISm a11 Pow" 1 (l,w) SMP Programs ....... W C..n U-t Program Lead· Objective Strategic Goals Sup. ' Customer Improve Cus· tomer SeIVice Components 2001-2008 I 2006·2009 I 2009~~Ol 0IiQiQ:2_0~.11.20121 L __...__:......._ _ _ _ _.-.,..._ _...:e;...r_ _-r-_ _ _p!:..o::..:rt.:.:e...:d:.......__ Goal 2: Protection of lower New'TOC ' I i , Income 'I Goal 3: Developing Human Capital Goal 6: Branded Customer I------=~___,:-::-__c_-_:_---'.--__:_-...L seIVlce . SAP and System ImJ):::ro;.;v:.::e:::m.:.:e::.n:::ls'-_---~ Project Man· ager: Customer Program i I I Change management and Culture r i I Vacancies and Training I Strategic Goals Supported Program Leader I Network Asset Man· agement Holistic man· agement of network assets Program Objective Demand Management Unlock energy and cost elficiencies I Manager: Infra- '[ Goal 1: Reliability of Supstructure ply ! I Program Lead· er I Strategic Goals Supported Con:m.onents 2007-2008 2008-2009, 2009-2010 ,2010-2011 ' 2011-2012j I Manager: Energy Supply Goal 1: Reliability of Supply Goal 4: Sustalned Financial Viabliity ' I I Load control 10 manage network constraint I I i I I , I Domestic TOU Pilot Green energy sales I \ I ! C and I TOU I ! Power I energy conservation program (customer interventions) Stakeholder and Customer Communication 2010 Pre •• ~" ,,~,,_,,~, I I ~ ! 9££~ ... ... * ~ I .1 oil ;.;-.;....,. Electricity Services " ¥aglC2l) j Strategic Goals Supported Program Leader Program Goal 2: Protection of Lower Income Eamers Goal 4: Sustained Financial Viability Goal 5: Merger and Transilion Strengthen Program Objective Program Lead- : er I Staff Manager: HR and Admin ! Strategic Goals Supported Co~onents 2007-2008 : 2008-2009 L I Goal 1: Reliability of Supply , Goal 3: Developing Human Capital I I 2009-2010 ' 2010-2011 ' 2011-2012 L L L Cons~ential va~Cies Staffing strategy Apprentice~--j I L , I I J I Succession plan Pre-empl~l training 1 J Bursaries I I Human Capital Development i Recuitment and Selection I Skills retention (artisan appolntment& I Program ! Objective Streamlining Recruitment L Program Leader Director Strateg ic Goals Supported ! J 2007-2008 2011-2012 Goal 1: Reliability of Supply 3: Developing Human Capital ---,--;~~~ lstJ · ....Electricity Services ': "" "P~<~g< :i;~, C/taplrr 7 OPER,\TIONAL PLAN -T -,------ The ()~rat.ional Plan is aligned to the City ()f Capt' Town's IDP strategic theme of Equitable and Efft'cti\"/:: SCfyice l'ian c()J1tains 51., Elcments~ mu:nely' '~l... j\cces$: to electricity sCr\'ice Network in frnstructun:: and dcyclopment EleclIiclty Distribution I SenKe '" --:l: N '" '" N ~ Street and Public lighting Customer s<"n-ict::: Ttading l'5 ----,-1 : "". .,- -'" "., CO ~'E Eg ~~ffi 0"1 ~~a. lZ._ § : g.:= 0° u_~ g: Q N ~~., .; ~ u.>o ~ .ffi 1i gf- ...o" Access to Elcctridty Service 15 n~f- . l ,- .! '" (j) ~ c w "I '!' _ c: ro E Q. 0;'0 0 .. t?1:: .~ '" ~ &. in Q. Cl CD M '"iiio ~ . .:- "- E 0. E 0 <I; ::. "fi Cl ~ ,. ~ (9 ... ' .,> . 'f; E o E l!! g> Ii '" ;;; .9 el 6 ~Q)§.!.>' ~~E~~ l3,):JE~Q) ~()8·g:g d~1il~ nll)'5 CL c E '" ",,,,., 0>",0> co,"'" roC..c«J~ uEVi fOf ~ar '!- V Developers ContributioTl t Private Sector is g1n:n in thf; > ~ ~ o .~ ro f, ~!I 0 '. g hel()w: --- 200512006 200612007 200712006 200812009 200912010 Budget R51,lm R66,9m R84,7m R 138,lm R 191,6m ..... ~ R46,8m R6l,5m R 51.7m - ~ Total R97,9m R 128,4m R l66,'!!!!,.. Rj1?,lm "1: "m • de\'clf:h2ctnttcalwn ph1l1. Developers Contribution & Private Sector- Actual and Budllet c ~ ? R 191,6m .:..Jl ex.> Network Infrastructure and Development ~ ;;·15 =u...-=:i '. u ';::;{Qr; ~ 01 > ;, The CCTES zlitltribution network j\j categorized into HV, MV ano LV net\\orks. An 18-year I1V deyd· maintained. There OlIC currently no. MV and LV de,-eloplllelll plans. altholJgh a medium term (5-l'car) development plan \villlJC de\'eloped as part of the {\sset Man'agel {lent plan. '" " l-.,g lps.~. ..., ~ <{ e (pu1!3; ~ " ~ E '"E-O" ~~~~ g;mc:~ iii expendj ture and budget "0 ., :t ~ .." <I) dectncity tien'lcc j$ achiered t.hrough the demand drin:n contIibutlons for non subsid17.ed housmg. Suhsidized housing i5 ~ ~ " E § ~i 0' "''"" ,~L ;\cces~ ~ geographical area of Cape Town a backlog exi,St~ in refurbishment of infra..<.;truc!urc. The cun:ent estimated backlog estimated by NERSA is R1.6 billion and it will be addre"ed O\'cr the term conlributing of as:::ets yalue towards the eradication of backlogs. lnch.Kkd in thl~ back log is an R326 tnillion for " ficarion. 'The backlog will be financed through internally generated funds ami externallonlls . c 0 ~ . ~~~I ·· !~ · ~, '" . E ~ c ~. ~ ~ < c c ~ ~ '" :~ ~~ e0._E "'ro ~~ me ~ E:': . " 0 ~ ..'" 0 "c ~ uJ The current infrastructure \\.ithin the geographical area of Cape Town needs to be refurbished and maintained to ensure thal the condition of the current n{.~tw()rks ;lnd infrastruclure improved to meet the business ano social challenges in elecLrifu.:ation in SOllth Alnca. Asset management plans need to be corn;olidated fat inlPicmentaciotl of prograllunes in the interinl, This plan wdl feed into and support the operatlng and capital budgets . [urbishmcm will be funded Electricity Distribution / Service Areas The Area is Jiviocd into three Distribution or Sen-lce Arf'ilB bMed on the number of substaLions_ Distribution Areas South, North and Ea;\t are sct"\jced triCt is responsible for the maintenance and safe operation of the MV four dlstricls us shown below, Each disnetwor~ and new customt:r connec- which i~ to eslabli$h one contact telephone nU1nbcr distributIon attached to thi::; one number, Electricity Operation Centre for the dispatch operational Juring the first quarter of 2009. riC:[(lt1 Thc existing four prepayment Town metropolitan area single \-ending: system IS planned to \- '1'0'-\<11'$ Call Centre Project place, the aim of a $e1ecll0n menu on <Ul automatic ronmbints l;vill he wrected to th< administrations in the '111e Minimum Standards and publishe" as ttl Ctlston1crg were spt:cifLCaciC:;n's cover a number of '11,<: stallJard documents. Electricity Supply supply (\\<b,lch includes issuing of S\.\;lcrung insu:uctions, Io;td control is done frOfTI two t~ontrol ceutre!' that coycr the CCrl'~C:; disttibution is being fe'p!aced hy a n~w system that \\lil! enhance sv:;rcm and ;ment \va,oq identified as an area of weakness in the and is due f()r completion in 2l~ II)! 111 C'.eneration '111c prm-ision of c1ccLricity generatiun sen-ices (hydroelectric pllrnped storage and OP('f1 cycle turbines ()CG',!)) to: Publie Lighting Puhlic LIghting i~ a dedicateu unit within CCrE..~ ;1nd rnaintains 265 000 IUtnin~Lfe~ Reduce bulk $upply costs from ESKOM by means of CUf1:\umer electricity demand "peak l(lpping:'~. Provide security and of supply WIth generating secyice!I to address electrichy network syslNn of a short term nature. j\rea. It opefatcs out (..If thn:e maiu depots 111 (;oo(h\"Ood~ Ndabeni and \Vvnbenz and depots based on the nUHtber nflumjnaircs be serviced once satellite Green Energy tlrc on the asset register of Chy Of Cape TO\\'11 Hoadl' d(>parlIncllt. \v1Uch has bf'ell under-funded for the last deLade. Maintenanc 'l'u\'vn Supply Area am} by Eskorn in the E,... kom Supply Area. 'Ilw ~omc 'wu:\ {IUlsourccJ to a l)riYate CUf1tract()r '1'1"1\1<: f()r rhe period 2005/06 000 luminaires in the ESKom electrical load is: in the order of 27 M\V and 107 2W~/09 For both supply awas, annum (2007/08), Fa<.:ilitllung: the increased generation and usJf:,'t' ~)f rcne\vable dCCtlical energy \vtthin the Energy and Climate Change Str:ltt:gy target to source ttY' n of energy from rencwabk' sources Street 'j he maj<)r current projf'ct is irnplemt'ncing business and of gf(~en creating a green electricity Inathet and sellitlg City from the Wind farm to yoluntary customers. crime and fall \\1r11111 lntegtatcd Iltunan Settiernellt strategic theme of a highly \ i,ible seD-icc that i~ yiewell as a primary $crviC(~ and function the City's the purchase storage and sale ht-tl1g purcilam::d by the Network Control Ihe uperations of the electrical distribution network and bulk suppty sources accoW'lt3ble safety of continuity of supply. in a specified geographical area and arcq"Jt<lblc sen-ice to custo1ncrs. Customer Services Ensure the 1his sl'Clion is responsible for custome( SeD1.Cct> anti cusKmler prepayment area of focus, thi~ f't'ction falls wtthin the scope (;f the Customer in accordance "1tl1 Occupational llealth anJ Safely art and ()pcral1ng services. Although not the only Safeguard electrical equipment from dat:nage hy continuous inonitoring loading of plant and nd\vork abn~Jrmalities, A new centralt:tcd Technical Operations Centre (roC) ',,-as cstabli..hed in 2007 ,,,'h a single 0800 22U 440 number. Currently dt'ctcicity rdated calls arc received from customers and works notifications arc generated for First Line ~' - ~ .... ~ C.J1 e.c Safeguard the continuity of (]uaiily electrical supply by sLbeduling plant outage retJuesls so as not [0 compromise supply. by ensuring ayaihbiliLY of adequate generating Econonuc operation and pl<nlt m: not to riolate the sites in nruct- tu ensure <.Jl1aht)' of supply and compbance \vllh N;~riunal regula~ (48) AnaJyzc PO\,>"!:'f powrr purchase agrt'ernel'lts, tl1anage bulk electricity accounlS~ points and projections" Key Pcrfonnance Areas: de1iyery and compile SCADA Sen;ces -[1,c pro\-iSlOn of process cnnlml c()nl1nuf1ication~ Ensure compliance to pertinent lc.gisbttOn. bt,mdarus, policic~ ilnd pn)cedur~s Reduce exposure, inJurics, eovll:onn1enttl irnpaets and los~es that occur n;; ;l result of a failure in the area of risk control ldennfy and evaluate Safety, Health and En\"1!Ol1tnernal risks fadng Electricity SefYlce:; Dcydop \ ar10lls (Isk control str;)tel~es based on Ril'k Profile Rescarch :and rccommend appropriatel:>J'stems of control i\lignmcllt of up(~raLional activIties \"ith Safelr~ Health and EnytronrnentaJ strategies, and conlputil1¥, facilities lo enable the ~;urerYision, cunLrol, :1ud Effecti,-c [{nil-out orOHSAS [ROO[ pilot proJect Im-estlgatc and report on majot incidcnts <U1d non-compliances (:uh'Y;ile an urganisatiunal EllS a\varcncss culture thn..)ugh ad'''ucac), Conduct L:lsk rdated hazard identification and risk 1SSCSSlnet1[S (I II It/') for all identified high risk 0pet:lnons bcilit.te the dmftillg of Written Sate WOlk Procedures (\\'S\'\lI"s) for identified high risk tasks of <I Designatiun specific i\ledical Sun:eillancc rrogr:1111 batH.x] on the outc-om\?$ uf tht l Iea1th acquisition of data from medium and I [V station~, gas tUfbint'.s and power stattons, "lhis includes Ihe c~ectJt1on of automatic generation cont1"ol algori!lUTIS utilising rcal tJme PO\H'f data \vithin S( :1\D/\ master ~tation eompmers Design and impleulent :1 :risk u:lfied ITItt.lic:11 :.:uneilJancc pn Jgcarnme Effcctiye ro11 "our of the SAP Fr IS Module (in collaboration 'vlth Business Infi)rmaho(l). to fC!,ttlbte the uutput of the City>~ generating plant. In addition spedalisco sofl\vare applicatiuns, mndclling the stare, reliability anJ luad pwyide a multitude of functions optimally ll1aHage d1C safely integrity and CCOflOJnr of p,l\\'cr network. ...... Electronic Security Support Services (ESSS) To manage all the processes nssociatcd \\I1lh electrunic that the a%ct:; and staff arc :;;ecllred and protected. Including for all the dcctricil;r buildmgs and ynrds~ so Proyidc :1 c.onslllt.1ncy serVh.::e for all security rdated 1S~lles. lrlstalLu101l and maintellance of nil related :seewlty dey tee;; ranging from building, perimt:'ter alarm s}'s~ (el11S to the $UPport of remote CCIV systems, and 1ts COI1Un1..lIllcations lo a mOl1Jtoring centre for rc~ponse. 1\ccc~s control system:-; Odler items, such ;:u; health and issues are supported, such the installation of emergency sirens and planning of evacuation roules buildings. Management (If time and attentiartc(' dedces. Assisting the city tu draw up and irnplement security tender~ for acceptable sfandards' to Ix enforced. measures arc done, to ensure the cOf)ltf1ueu supply of electricity to the consumer, in that and vandulislll i;;: prc\'cnled from all its sites- Environment, Health and Sakty (EHS) Eleetricit\, Senices is comrnitted to its operations in a manner that is \vithout undue risk to, the health and safety {:l its employees. \-islrol"s, public contractor$'; as \veH as, the ct1ytronment As palt of ~his (;ornmitment es established cenlral Occupational Health mel Safety dep::utm<:nt, within the 'l'edmical Supporl to provide a support service to operM1ons. ll)e services currently rendered are primarily that of OccupationalllYbrient'. in 3ccordance with the Objectives: Health and Safety~ Occupational MediCine and and ke)' pCfformant.'C areas: - ~ ~ c:::::> "P/t,. replacement exercise \\111 be the ba~e on whtch the ()UTAGE impro\-ing the reporting of the nehvot"k pcrfonnancc data. :a.lthough into account 8 Syslt.'1n of the Cner \vill be ba:.:ed, thus integration will need tu be taken ~ystcm NERSA CORIWC'f'IVE ACTION PLANS NERSA Teclmical Audit Electricity hiL" scored <lNccds fmprOVCflK"flt" in hfanagemeut as \vcU as in the cale.Q'l)f!es of all municipal utilities f()r these are<1S based 011 the The specific tim"u"" and Outage Manage-lncrtt m:lmh:rf'mFnt can be vle\'veu from a Humber or pefspecti'\ es \vhich \\;Jl il'npact on the ;md cfhcacy of perspectives are ne.nvurk dCS1gt1 philosophy, srrategic spares. 1n:a.i:ntcnat1ce \\lth ill Ll) and systems. allmvs fc)r the restoration of electricity s\vlfching of cIrcuits to rcsture sllpply. . ~n H1terrut)ll0n ..... Substations (where I IV is transfol'fnn.i the I I kV distribution HJ\t;:lAe) arc designed to have ~l. finn ('::1loadinf;,on that .stat1(!n~ ic either transformer can Cal'ry the full load in the C\'f"tH of a the bus sections in 1be maju! substations are specified cany the fulll(llld of the station. relation to tht' t'fjln.dt:ormer fault. ·lhe interc(lnnccting l\lV ue··fccdcrs can also he mcnt :\1 matH substations, All these mGL'>ures ensure ~ c.7') ....... to allc\"iatc load in the e\-ent of a the electri(,lty nehvork is point of vlc-w). of SCADA {SUpct"YlSory Col1l'rol & Data because of Ihe rLrm canac1t\' on lhe llkV systcfil, tv-'n,<>tt'MiOIl R'Il J Jrl Afeas North and Snllth IS not as is deeper to compens".lte ratio ttanSfomler:'=. multi-size fit for cable lerminatiuns and !'pares are checked for correctness and mOn1torefi on an annual basI;;;. Nc\v 'rfectivene;;s, fvfany a:placernent products have a lead time much (profitability of setting up a plant to manufacture a PeT"tillent findings with regru::d 10 pt:ocurcmcnt are dealt . Actual Maintenance (01)lS) are integrated "1tll oCADA systems for the management outages to han; been rare; on the main network up Ilntil the tatcst problems ,hould be '""olled and of 'he 11kV distribution system should be svstem \'vith a new system \v1th tht' Fskt 1m sy~tem \vruch would a110\\' Implementallon of an OrvIS (;;I not p<.lxt of the CU(t{"nt S{ ~.'\Dl\ 1)( considered for implementation once the lnSlallatioB of the new SCAD'" system is complete. 'Ihis E}~/iJj;~i¥r ;Set ~i<~tr " "Page 35, The Audit team found that the existing maintemU1ce strategy i~ based on sound well-established procedures. 1l00yever they also concluded that insuffi(',ient attention has been to the tnmntenancc and refurbishment of the existing nenvorks and despite the increasing rdi<1.nct' on the use due to skiUs short~Jt's, the maintenance is on average l2 months behind schedule and gro\'vtng. ..~ man-hours of iikiHcd \\'ork required to em:)' out the pcn(x:1ic check:- and repain; where needed (a;..; prescribed by c'iuipmt'11t mmlufacturers). 011(: of fur maIntenance, aitcrnath'e approaches to etluipment the successful yariations \\-a!') the conditiou-I ,'-'as indeed required of maintenance rathcr than a fu,;:ed timc ren:als the condition of a transformer. its condition it not normally carried out) repairs avoid CO'f'fosion of outer metallic sheaths Visuailrt::-pcctiOI1S and sal11pic check:- on maintenance records hI' the NER.I..\)\ audit team of af£1.irs, namely that the entire mainten-aHce progratllJl1C has fallen behind schedule and \"cried b'.lck to repairs 011 breakduwn rather than a prevent'311\'e maintenance procmlfilme. r~eri(Xis of prolonged power outages in due coursc. 111<': skills and reS(JUrccs minirnum lcvc)$. In order to combat the detcrioration of the O\Vl0g: to lack increasing thc deparLmenL has in the recent years embarked on a fwoces:s retraining) the address currenl ages nJ tlcccptah1c 1c\'c1s. One of the \val's tackJe skill shorlages har.; been l() ,-de\ ant equipment. It i~ not ideal~ but far better than not a commhanl to draw up specifications aimed at and results were SDcciftcd and the ptoces~ had 'Ihe on~rstated and it is in any e\'ent not dear what equipfilent in their opinion constitutes the tl) ha\"e heen determined ()11 the ba.sis of the equipment is the main detennining (actor \. .,th the maitH.ainabilitv t~chnok}pv) heing another. '111c three year system and doe~ not reclulIt an (<1Yallaf)UJtv the identi- dlx:."S constitute a significant backlog, Some of thc rtlofe pl'oblemat:1cal S"\vitchge-ar i.n thc i\tV difltrlbution installations are being addres8€:d bllt~ gent'ral~ n systematic progr:unme (tf rcplacing ageing equipment \VouJJ be bey(~nd the capahility of existing resources" a\"ailabIe capital set through City Or Cape Tnwn Medium Term Rcycoue A1though there ha~ been 3rt lHcrea.<1(' In the three-year EI'1" allocation frolll influenced by City ()f Cape Tm~n :tffnrdahility and pnorici.zauon. NRS048 "llle NERSA technical audit for the City of Capc TO\"11 .showeJ that the (:ity's reporting methods ror the technical indices on network performance were not up to st;moart!. of Supply "IDI PCIro con\"crt to the use of impleluentacion of the new SellD}\ pr()~ out the maintenance \York on the ap~ of success to date. Electricity S~;f\iccs is currently implementing an )\~set Care maintetlance tlloduk and procedures a.." required and is heing implemented in I ".Ieclrlcai Support Set1.1("cs with n vic\v den-·lop pra<..~tic;ll shurt term as Wf'1l as 111cdium :lnd long term maintenance such time that the :tbovc appro\'ed l'naintenance brcakdo\vn repairs over- shad()\,-:ing planned rnai.tltenancc the currem state certain catcg( Hles rc~ !cad to acceptable maintenance the by traitling (and deenu:d too s]mv and pO\\--er out- tC'JlY) is therefore po:,:sibly backlog. work urue~ standards. A r rhi:'j across the sen.-ice and in so doing misinteq>retation of thc performance indices, It is lo be e\ cnts that took place in Non:~lnber 2005, excluding load sbedding for 2W, being indices as repurted in the NERSA rep< ,rt only 22 hrs. .... ~ ~ have been de\'eloped. th~ corrent ~ituarion of l'.:I CORRECTIVE ACTION PLAN ~~ISSllC! Maintenance Bilcklog RESPONSE I\ud~ and accreditation of pilot site implementahon in Electrical Support Serw:es by category (HV, • Establi;,h Ihe imamal resources available to carry OUI ule work. • Delerm;ne tl., si1rnt lall of skills and re5QUrces. HR & PROCUREMENT Audit findings \\'1th reg.::trd to HR and procurement hj)\"c been t'et oul as oYet'at'ching findings in the NERSA Comparative Herort. Cape TO\\:r1 Electricity specific lindill!:~ rdate to In extremely enthusia.'1t1e atntuJe management team, -a fmc w{irk ethic that ensmt's a cohesl\'e teaJn effort J.od n number of manager~ ~ho\\ing Sigll1> of (",,<wme stres:-; due to d1e lack of staff, the momtoriU111 on recru.itment and tlle uIlcertainty of the df:w"loprncnt of REDONE. backlog \'I.-hich would reyuice a.nd in\'cstment items for infrastructure work arc 1]O\\."c\·er, drtualh" all of the }],e backk'g deri\"~d by the audit Although the City has embarked on a number proc(:>ssef; ruIncd at addressing skills shorlagC$ across the City, the is still not offering sufficiently pacbges to attract the "gbt scarce skills that Cape To\\" Elec!t1citv to Jduress many of the i!'!'>ucs by the :lUdiL .Also. there currently remains insufficient fu1H.ling in the hudgct to staff the department at the appropriate b·el. The specifically refers to lim1tations lil1ked to the IJrocurcment by the Gry at the tune and \\·hkh is fH) ~" "~. '"~v "_" rdates . p w 313 ~~ in term' or the I\WMA No56 of 2003, of whieh the Iq~"lated still Doses a risk in the procurement process. The City fl10t1thg to be the norm. I'll' the .tringenr syti:tem is nut consistent throughQut the contmcturs. 1n manl' ca,'«~t> smaller conuactors do not is maJc the information doc::> not flow duwn to the uperator. 'I1](~ system is being re\-ie\v('u and \\till be implemented meetings with larger contractors \"~lh the obJectin:' of re\" [ntruduced in an attempt to reduce damagt" though nwareness (rather than case of d<UIIagc). rcquu:emcnt or llMEFRAME II(enCB I July 2006 back 10 tile City AdVe!1i'ilng and IIllIng oJ 591 vacanCies wliich exist and are funded, SI10l1age oJ 5taH ...... Undetermined L. __ City wideJ:<e,allgnrn,ent and Par~ypl()CeS5eS (<;orpGate,drlven), <:.AJ c::r:> Other Cape To"'" Electricity Specific Findings Occupati(»lalllc'Uth and Other W appvintrncnts and cunnectlof')~ \'Vhile Cape Tm'" Electricity the RED ONE licencf'~ there was uncertainty \\ith to the ap~ the matter: \\I,]S refcrred the 1)e:partmcn [ the time~ the return of Ihe NERSA oPCrahfll! licence to the City in }mu:1ry and suhstant1allv \\<1thin the tast three team \\'3.5 established Directomte: Safety and Security ha~ COPP" therr. Illegal cunnections periodically (etnoyed by the Sen-icc to enSLU"C community safely, but remain ~1 probk1n. cables i:; becoming a major problctn and the contractor damage penalty Cape Electricity has some rime ago made higb lel'el A I size drawings dcplwng its HV circuits ;:n:ailable to make all flu/or "cxcavalon;" to make theln aWi!rC of the location of tl1t.~C circuits. 'lhet<c iuciude other departments of Council (Water, Roads, City Parks) \\ho in tbe p'''[ Im'e c",,,cd major d~ to undergrmmd Contractor has not been sen-ices. " ,1'.1gt:',3\), ~ hap t f 3. r '9 Alignment between Register PM to fWlctinnallocati(Jn$ r'U',,! Asset Insurance AS5Kr i\IANi\C;EMENT PLAN Key Perfonnance Indicators (KPI) Implementation of Strategic Allsct Management in C('''TES 4. As identified lhtough the RJsk Management ~mJ Strategic Management J>lans~ Asset /vi"",,,,,,,,,,,,,, 1\1V & LV nenvork, \vith fncu~ on MV structure LV Iletwock. 'Ihis \vill be implemented aClOS~ .ill 12 to mrl\{' forward as Bi~t those Districts behind schedule. OosLCnberg Di~tricllo be II..:;ed as a fl)(CrWlner is an apploach to de\'clt)r and maintain Ekctricity llct\\/ork infrastructure assets and eguipment to CllSUH: l\laintcnance Perronn;!"ce ;\nalyses (l\fi'A) ]lMELl\ 111('111('..1 \...nth 11 prim:lry focus on of Electricitv 3.ilSers and and arc linked to stt~ateb~c lna"ru<efnCrU ru-ld number of oreakJowlls Bet\vccll Accounting Stru-ldatds are driven by defined ser.-ict' Asse-t Value len.:l;.; :1m1 pcrf0rt1l.1.11Ce Scarce financial resources are properly allocated • Remaining Useful l\s>el Lile approach Ii' taken \vhcn detenrunlllg ;;isset and l,..'<Julprnent opef-ations, mal.1llenancl"', strategies, Managemcnt in CerES will as the main drJYf"r to Usc 'I he imnlcmcmatlOfl }·:5A containcd in !',\S55. 1M Master Data Management Ftu1ctlunallucat1oll structure anJ coding coooYcntion ,n,,'erm,n<'e ru-10 Je:;;ign documcnl¥1t10n (J\)a<;tcr Data Control) Cl,sorf,c,lti()rl of functiunal kx:atiotlf:: Rt:shnnsibilitv areas: and <lc1ual defined SAP roles: Re,.profiltng an.d loh.: Jcs1gn M,lll<1gemetit Data 2. ASSET LIFE CYCLE ~<kJi . . . ..... (Years) ,:', "2,' " Asset Life IV Tr:msfomlers HV Lines HV Cables '-'- .. IIV Substation Equil'rnent i 1V 'fran s formers CI'rans[ormefs and Iir)i-subs) MV Cables ,nd Lines MV ~ubstatio[ls Switch Gear .V Network Netwo(k i\hnagement (SCi\Di\, Load :ontrnL Quality of Supply) =()J'L"Ufner meters SAP Asset Management Plan for Distribution L and Mean Time To Rep,ur (l\rtTR) fdcmetrv 13uildint:ts -;cneratiorl Process Design PLl(~ 4>; XI'LE 4<> ...... 45/50 45 ~ 0':) 50 t+;;;. J) 15 Pr<p~id .10 C(cdit Meters () )() ,OCkil Works 10 Plant ;llld Ec]uipment Distribution Task Group Asset .\", ...'"'Nn.,, In;"' ..... ,"'.."l Asset 'nIt": rnechanism to be used to implement creation of a Distribution Task Group for the 'Ibe Distribution. Ta...;;.k group cOnsL.<;ls of: MaitltfH;1I1C<' and Op<;'rau( m Corrective Maintenance Pren..'11tath-e i\,laintcnancc Condition Ba.~cd Ma.intenanc(' • COflYennr • ERPPMTcam Hcfu(bishrnent • Work Clearance M;magtmcnt • GIS • ;1,;>;::, 50 0 50 50 \jiX~~th';H iS~i:,,'i~~f P*" 41 : Maintenance Phlnncrs (Districts) Business Infonnation .l\Ianap;tment principles is the ChapUt 'Ih{' Distributiun Ta~k Group \.yill be used for the implementation of asset rn~magement plan for the ivfV & I,V nCt\vork and \"ili be instrumental in the implementation of the Master Data management, 11{ocess D('sign~ llligml1cnt between regi>ters and Kl'I'g. Externa] Rt:soufces: 'I() be used to fast-track oata collection, purifymg data (classifIcation) and supplement shortage of skiUs. MV Network Asset Management Roll Out plan (Distribution) II) HUMAN CAPITAL DEVELOPMENT Pl.AN Thn.'e year Staffing Strategy 'nH.~ C( .Tl:"'" i~ working in the context of a local, mlilonal and international em-irunment y"here there is a technical skills that appt'ar~ to ha\'c been exacerbated (in South Afnca at by a. decrease in irrn~stmC'nt tn 110n. trMuing and deve[l )ptnCnl~ despite considerable access to capital nnd in face of C011stant pressures (If gn )\\" technology, poverty and uncmplc)ynlent. 'nus if; cornpounded \vithin the City of Tnv"T} by tt'n years of rIgid attrition, \vhich has hroughl staff nutnbers cknvll, but 1eft critical g:lpS. within our a;; the attrition \vas - I.e. the City did not u<:;~ the aHritiuo procc!:is to shift resources, but rather <ulo\ved a f>km,,. in wherever the yacanCJCS (}ccuued. ~Jbi~ meant that areas where the external market \Va;;; fanmrabk.· lost a higher percentage of :-:tuff lhllil the less competitiyc areas Electricity Distribution in C:.lpe'1'o\'\11 hal'> been on a path $ince the tIlid 1990':, and the skillfi atcd a short term cci$t~ in electricity distribution RecflIitmcnt dr-iYcs aft" takIng place m tl'H" context of fierce competiticn:1 at a lucal. national ~Jld tntt'lnat1onal and 3fe often (It the exp('ose of Odlf:r service pf(niders fe.£!, other smaller and Jess compecitiyt' loc31 autho.ritics) ratht:r than through absOrplioll of the wif'Jl)pluycd ot capacity buikliJlg. "11,c CerES h.s developed a Staffing Stf",egy to Illeet these der of 1').0 posts per year for the nex.t 3 years starting Trainirlg the creation Df new in the oras thr introduction an Arpremicc -. w c::r,:, Creation & Targeting of new posts for d,C 2IM)8/2(K)9 period. This is reflected armointments will be (nade as soon as New Posts Created as Phasing Occurs -- - - - - - . I Jan ?1J09 2 lolill 11 13 fi6 57 6, 27% 9Q 31% 42% 16 -~ 157 212 100% New posts for the 2009/20!O and 20W/201l yea" arc being identified during the subsequent yca!> !rased on sc"ice delivery priorities. Apprentice Training Project In order to address the imolooiale needs \\t'ithin Electriclt}' .scf\·lces :md to addu::.'ss the above issues ()f'l a sustunabk basis, an apprentitcshiv project has heen inUC)lh.1CCO to targe:t strntegic enhrineering areas. 'TIle (\VO vcar prolect will be mn tn-house to allow for to-house tr.nning skiJls dcY(:,loprnent \"\'ith 2 \"ith facilitators ,lnd a project lead~L apprentices too c:.n (he tirst b'fOl'P of electrical arusam by November 2010. A further 10 mechanical group that commenced in November ZOOS and will primarily be trained at a FET col· Chapter' J ENERG1" SAVIN(; / Ef'FICIENCY PLAN .'\ J..carner Technicians' Training prohlTfltn hilS also been establi~hed and ha~ comm~nced in 2009. Pr()vi~ion hlt$ been made to U"a1(1 10 leaner technicians for t the tields "\vhcft, ~car'ce skills exisL the completion of the rhcs-c students \vill be evalualed and if suitable, \"till he placed i.nto vacant technician posts \vhere such 'nl1s program v.:il1 run for the next 3 years until 201 L It i, erln.aged that the funding of the incentive grant!; from the National \"ill be part subSIdIzed l..'und fOf organizations ,\rho apprenticeship of ~ec\lring schemes. In accordance the City'S draft Energy and Climate Change strategy: Promote the use of renewable energy as follows: Market and ,ell at lea,t 60"'" of the l,'fcen ElecIlici!y to be f'ureh.,ed from Training & Skills Development 'l '5 or abon~ Due the teclmica1 nature of CCTES business, the :111m 15 for a staff compliment w1th all st~ff will be trained throUIlh the (in terms or the c{)cr ship prOhT'f:un 10 fill thi." le\'el 'nie Training C~~f1tre is accredited GO\E:Ul1nent SETA, An irutiatiyc also underway to encourage releY;'\!lt statT to ohtain the Cornpetency and to prepare for the of the pending lcg:i!>lation governing the engineering in South Africa. 11,c payment of Public Uscr Permits (prDP) fees on An employee orientation p(()~m is being developed which 15 aimed at ensllring that an new e.mployec5 have rh(' a\'/<lreness and skills becorning pruJuct1ve, This program v"ill be introduced \vithin the first gutlrter Similarly all current empl<'yees wiU also he streamed into this emplojree orientation prOl,:rram, thus ensuring \\-'{ H'kplace safety and compliance. ncceSSllrv cllC Darling Wind !'ann. Promote and facilitate the implementalion of other brbte scilc J...,rrid-connected rCfle\\;,lbJe generation .systcm~ \vher<.: practical \vith tht, EnYlronmental Resource 1VlfU1<l.2erncr'lt abrea~l of national -,mJ pro y illclJl tariffs, Cmbon credits and In partnership \\,-ith the Euvlrorlrnent:ll ResoLU-ce Management Dirccto!',Ht> promute: Energy Efficiency and Demand Side Management as follows: Establish and implement an Energy EffIciency (EE) and Demand Side Management (DSM) policy. Promote Eskorn'::; I~r'lerp;y Efficiency and Demand Side Manageluent prop;rrunmes to the City)s dectricity consumers. P((J\'ide an in hou:::e consultaney to other City Branches regarding EE 3nd DSIYl and rhe Eskom DSl'o.-1 program. Estahli~h and maintain all on-line EE and DSI'\f resource ."" ...... ~ 0") 0":1 , :p~45 h {( /' t e,. 1 Low Cost I Informal Housing ElectrifICation Projects: Connections completed per year ELECTIUI'ICATION PLI\N 14.000 12.000 10.000 "= 0 tl& tric,l C C .., 0 ._ _ .1' 6.000 =F.II1,ai 6,000 -Total 4.000 1\ dwt'ilcrs in fonnal arel:;. 2.000 Certain inform;:!! ,ueas ;:ue exeluded Jrum the electrifica.tion ,l.4,e,~~& ,,"i' ,<;" ,<If' ,'>' ,<s'~ ~ Owcllings are below the 50 yeo, (lood DwcllinbIS are in ro-ad\ ~ (1.,,".4 ~~~ (\~ ,,g.'" ,<iJl"'''''' ,"i~ fI,<5'#@fI,<§>"<> fL<S'fI,<5'#<:l"fi,<:l"fI,<§>(I.<:l" ~\ ,,\ roO' ;>.+' ~:\\ ;~~~###~~~~,##~~#~# «,,<:P ,df,"~ and pmvcr line fCscn"es Financial Year {JuIiJun) D\vellings: are on priYate property Electrification is an continue over the 'Ihc City Of Cape Towll', ID!' quantifies tbe human settlement cballcng<> and prm<ides a response through the following progranlllles: connections in 1I1(ormal ~uea.<; are: found in the portIon 01 the btelro Eskotn \vilI only ek'Ctrify \\iith fW1ding from the Department of l\linOME fWldill!'. WAS onlv to IOrmally pmdaimed townships< Wid, a electrification of in formal arf'3S which j to complete 3470 informal connections 10 2010/201 L ,\t thi., proCC$!'\ which f01l0\v5 on the creation of houses for the homeless and Accelerated and new housing Jen.~lopment (Fonnal hOURing) Area and illub:uate~ the increase in the dectrific<lt1oll of infofll"Wt hl)use-hokls post C:oCI' Electrificilri<m dtparunent. of Capc CJ..:j Area Based Urban Renewal (f'o'mal HOllSillg) therefore HOllsing delh ery 1..<; howcycr ~uhject to many forces slJch as, ecorlunUc house of suLsidies~ \,<111da1consttucLion costs, political interferences, conununity dynrunics. difficl.dties \vidl isrn and innl:sions. 1hcsc factors result in the number of completed houses behlg \'err difficult to forc(.~nsl with any degree of confidence which in tum affects the \ alue of the Grant funding fur which W{~ can apply. to lonR·tcrm. '1 he rigurc bckn.... indicates the number of dVl,.dling~; dcctrified since 101)") in th(.~ ....... [nfonnal Settlement UPhl1',Hle Progran1!ue T'tlWn Mt'trnnnl;t~n Stacisric~ 'fhere has been no indication to date of any allocation to the \Vcsterll ernment sonrcC's ft)r electrification infrastructure in line \\tid) 'President ity. or the Yision reauirement and deliverable:; tn lerrns llrllOusehokl conrlcctions are m Tahle b~are giycn in the foUo\ving The infurmal afe bU$ed on the iection of the in informal settlements to the end of the 3 rear electriflcation progr.urunc derived from the housing plan. < ~ Pftge4? ~ ~ c:::n -.2 PLANNED ELECTRICITY CONNECTIONS 1J.~~~ ~2010/2dll i ( .. ~-fAAII -> ~., li; ~M' \,,/ 1316 4316 5632 . Exlcrnal Gran.t. requirement .34 'rural requiremf'rlt Ekt/l1l't(y (Ollllrrlilmrpillllilt'd <lJlfijimriilll, rr.qffin!1Jlfllt «.vcr flrea) 'Il,c distribution of the projec:ts~ lS tndicated by the planned cunnection numbers l-'">ef area a.s shown helm,v ~ ....... <:J..:) ~ ex:> FREE BASIC ALTERNATIVE ENERGY households, in this regard. hy Gon::nmlents p:ru~ralIlmes V~tr10US sefyiccs with resne,ct to ergy 11) lOO). \\1th the aun to Department OF Minerals and En- the!! bastc energy need};. Ho\yever the programme fiuffcrs in most areas this the Dcpartrnrol realised the basic allcrnatlve en< need to SUPIXJrl indigent huuseholds that reside in un-electrified areas '\>"lth rehrard. the policy on Free Basic j\ltemat1ye Energy is intC"nded to proYkie iw.ligent households \...ith \vhere e1ectndty 1S not availahle. Since it is the local sphere of government that i~ tasked with discharging a sero;;icc) there is a need strike () balance between a oumher of factors including but not limited to: a.... aiJability of energy sources. nlloc:_Hed funding. 'TIle combirlauon of our tbree' current progratn.mcs natllely: National Electrification Programme, Ur~e Basic of the Department will go long way in imprO\·ing the and Free Bastc i\lternatiyc~ of life of the less fortunate under the Africans. R'1B" 49 ~ Chf1plrr Scope of Project 1) '(he of the is to ensurc a sufficient ami reliable supply uf electricity to the OlD and the nC'w and its '111erc is insufficient sparC" capacity at $Ut'TOl.LlHJing subst.H1ons and no space to extend them, hence a main substation at the nC\v stadium to provide the capacily i~ '[11(> 1111tial prop()sal for rClnfotef'ment of the to the CHI) proyicied for nvo 132 kV from the current intake point at ~Iont.ague Garden£ to s\v1.tching station. lb{s wOl..dd It'ave cost !,(Jrnc R (0387 (X)O more than the solution being implemented for future expansion. In ~ldditlnn, substantial upstream re1l1fofcemeDt costs would h;we bt"Tn Numeruus for network contiguration were studied in combination with I':skom and economical term solution meeting technical requirements \\tas selected lOIO SOCCER WORLD OJP OVERVIEW oyer the next 15 years tll the cates grm""Th from dcw·lopmcnt of V;1Crult the demand ,\1v1U exceed the total finn buildings by 2012 when reinfurcement will be r~quired. The Town CEO, including District (, antl Culemburg, indi~ dCflsification and upgt:<Rling/refurbisllInent of existing network of 2'15 MV A stadJum in Green pOJnt will .tlel an estimated .dditionalload of \0 MV A. Wiu, this atlditionalload MV A load from development stimulated by the 2010 we, in the of the stailium, the capacity of the existing network supplying the CIID will be exceeded by 2()()9, It essen~ t1;1) therefore proyide additiunal capaCity to meft the Project Budget lht"re are 4 components to the wOfk required, ~Olnc are requtred by 2010 and others are directly attributable to 2010 (See budget summary): Foreshore l'tahun: Rtinforcement of Rogge-baat 33 k V ment of Fore~hore kV $\vitch.ing statiun and rc-collfiguration of the been included in the apprf)t-ed 3 capital progr~m and compnl'c1> a D2 kV r~placing the eXIsting 20 }}j II lV (x)wc. to'Jnsfonners ",ith 50 transformers & a new 19 rand MV $"itchboard, '111f('e 80 MVA 1321,3.1 kV transformers 31 Roggebaai, have already ix'en replaced "ith two 90 MVl\ units as part uf thiS rrojocL Green Point rruun suhstatioJl does not h"Ye the: to supply the additional load; therefore a ne'.v main substation \,,-ill be requir(~d in the v-icinity of the ::;ladiu1TI. notified maximum denmnd at the intake point from Eskom must be lllcre:::k<;ed to provide the additiunal capacity required_ Location Reinforcement the supply to the CBO: Accelerated i:mpletIlCf1tatlon of reinfvrcenlcnt of lhe:' 132 h V supply into the Cape Town eBD and pH}yiston of additional capacity to !vfouillc Point maiu substation. "l\vo 132 kV unuerground cable circuits installed, capacity of the net\vork to Slipply the CBD in combination with network to posed will be increased to 500 MV A which will catc. adequately li)f in the CBD ;lnd Eskom's re(}lllrernents, Mouillc Point rnal.11 substation: E~ tabhslliIlcnt of a ne\v substation ~t the stadium 10 ~upply the 11('\\, Green Point stadiUtll and precinct and housing two 50 lvlV;\ 132/11 kV rO\\'Cf lrilnsfonners supplya MY s\\,itchboard, 'l1,e substation "ill he supplied ,~a 132 kV nndorground cables from I'ore~ switching station. Increased tr)take "Il,e notified maximum demand (NMD) at the Eskom mtakc pumt "ill be in NMI) of 86 MV;\ h", been requested, Esk~n \\ill deliver 'his at Tafclbaai substation. Of,!.is capacit)', Wl\lVA call be wllsidercJ (C. be ilife:t1y to 2()j() " 1>,W Sf -1 needs. e c tId.city .$ e rv ices .... ~ c::t::> ~ ~ (, II ..;.J "":<'! If pI f r ! I "'II!! ~ ,~; ~g~ TARIFF ,\DjUS']'I\lENT & I I;\IL\J()NIZATIUN PLAN <>10 ~ NE~S,\, on an annual basis calculates all t.ariff guideline incretse which is then sent to tnunicipal distributors as a gujde itl their Innff..;. This guidelme docs not preclude a disrnbutor [rom the legal obligation to am)lv 10 Hegu)ator for incfea:;e~ before implementation, \Vhcn detemlltllng the percentage increal1e were considered: Q N o '"arirr distributors (electricity purchases by muto supply end-tL~c customers); co~ts The economic outlook and inflation; The analysis of other muaictpal cost::; besides purchase costs such as operntlng and maintct1anc<--~ costs; Ta_riff rationalization \vithin a detn.arrated area and \\'1thin a H..ED boundary and; N ERSNs rcgulalory objecti\'cs, preVIOUS years' gUJdeitnes, mumctpalities were 'advlsed 10 start the- t,lriff rationalisation process witll1f1 the demarcated boundaric~. on condition thal customers arc not suojccted to \Try high increases alld that this is done on a re\-enUe neutral basis for lbe dlstributor. The around tariff rationalisation Within a future RED is an ongoing process ~nd it is foreseen that an strategy in thi,,, regard must be developed so lhat there is a common ut1dt'rslandin~ as to \vhat tanff rationalisation within a RED actually entails. To eIlS\1t"l~ taciCr ratiutlalizatron~ munjcipulities ha\'{~ been into the expected fUlure distribution 1I1dustry structure and benchmarks deve10ped for each grouping. grouping used currently is the six RED rl:'lUdcL One of the Tnain objectives of the F.1)1 restructuring is the developmf'llt foInd implementation of tanfts \vhich are reUectiye, This will be infonncd by " National Cost of Supply Snldy that will be done by N EH:iA that was to only be completed after the establishment and Iransfrr of CerES to REDt Once established, RI':L)1 will need to undertake a prolect to adlust .nd harmonise the tariffs within .ts borde", Ibrougb the de\'clopment of a tariff adllJSI~ ment and hannorusation plan_ The wagra.m below shows the t1ecesg~uy components that \voulJ fonn part of the taritf adjust111eut a1ld harmon.isation plan, g ...~ .:-: w g m ~ :5 ~ - -. ~ ~~C; '<t ~ '00, Until such time as CCTES is tran"ferred to RED 1, the following principle.s, \vhich are in the long term interests of lhe electricity consumer in South l\fnca, will infonn the annuallariff adjustment process: 1-0- «W >~ ., '"<: 'tl ~'.;::;: "0 .!! .S ~ e ~ ,,'tl ",:I CU = «;-c: o ElectricilY tariffs WIll, in the long I"rm, retlect as closely as possible the underlying costs of supply for the rna jority of the custorners. This will en,sure Ihat customers nlake ral.Ional decisions on electricity consumption. and that the correct lcyds of reSOurc('~ arc, over lune, dedicated to e1ec.tricity supply in South Africa. Conslderaljons of affordabtlity or elcctrlcity should be taken inm account) in both the short and Jongn-terms. Tariff ...... W -...J o adjustments will be tntfexiuced in a phased fiunner. ttl order lO gh-e customers the opportunity to respond and behu\'iuur accoroingly. Elcclrlcity supply to substantially low income households will need to be beld bdmv full cosl-reflective Je,-cls in the medium to long-ltrm, for social development reasons. 'I11i:; 1S cnticnl element of goycrnment policy, and the City \vill he placed undr! nn explicilrcgulatory obligatton to offer "eIecrricity lu,\lC: ,en-iccs support ttlrift~" to poor huuscholds; and lcvjc~ or cross-:mbsidies \vill be tmnsparent and the (:it)' sh()wd PIUlo1dc suffiCIent infor:rnation to customers m order that lhey may understand its purpose. {l Pf rr f:} RISK MANI\GEMFNT PLAN and related Good corporate governance uietates that a business should develop a l1sk l\ ftlsk management nrncess as indicated belo\y has been utilized to look gt I':"e()f anu to manage RA.t ~LillafJil!Jfnf C;-ldc A Risk assessment A lIdit. The result is review: was undertaken Risk Mattix sbo"TI RED1 and sunnlemcnted which is the Management Plan ...... High Voltage Distribution Network Infrastructure Plan On a fi~;k matrix. 'flu." likelihood to graph refers to tlle as h:-:ted. an impact and the scYeritv (If be1o\v. The numocrs on CW) -...l ........ ~~1 f"r._l>. i 1..-___ I~ D.....s..L;c.o., I I !: • ..I.~~ It FfrSt M'an~r Almos! ;;e,tuin lij1\Se- with $:t>~i.?"'1oh.~s to sh;:o;e. CCTES VanagE-rierl: K Ullely REJI Mo(l"",ate SMCl(<l! I Slaffi flIHq... RES 1 I Loss ofiM1illltional knowll!<fge St,i,O(,e q....J"t;,' hj~"f 'l"r1'act'ed ate3!i ,!. 'f1t:faat(lt'l meast.r'!!~. Gee" IiC tOrp:1P2t~ 1::o"Ocesses CCTES Impiernil"t ''1(1 ....te~e rnaI'!IJ'geff'"e'1t a"~ st(ccesslo"'l p.anr':lniJ ceTES M.?de-:~~ cCTES &. ar,J!Ysl'5 \"ano,~elTler~ H 0 Unllkcly 0 0 ~hlnii.~E'nel"~ Rare '~an,3:3erner:: REel /!IE"., ... L".. of Weal .k!IIslo I olh.. i!Id;&slries De.'.;i:i'oe ;;1:1'\d: ."rr~lef:'ient InsIgnificant Euffng ,~ud'. EE::1 C>iticalla,l:oi::IIrissJoes dIE 10 re-alianm....t Minot ¥:J"<i'~eMl!tr,: CC~'l\T~n}ciilio"'l & -:n9l~f",e,~ ,\i'lh !taH ti~.:I flJ5i.el'i1'.g 10e" ~l-;l!Ol'!;h,p ""it!'!' U.,l an Modefate MdjOf Cato'!ltrophk IMPACT I NOTE: AU projects should be illlplem~'lted before the rlsk ptatllflo exceeds:., ,noderate I Isk os Indk<'lted by "the solki Ih'e (CTES Van;;:3'E>nl!tl",~ ..... CSTES ~ ~pt;$a1tJb~~ D!~if:!1, i., NE~ SA CI)I'I'~"'1iv't- Ar:fQr P~:1n Var'lv~eJ:1e,",: Roggebaal Upgrad";,l 1 Atl'lione - PhilipPI Remfcrcemem Rosmead :\""enue Oa~c:ale Var;~''T,e!''l! , P"gt' 57 Tran~former Replac:..em£!'nt - Boslon: Replace 33 kV Cables: 6 Cenrurl Cit...' 17 2010 CSD Reinforcement 10 Parow Scutt. Upgrade ~9 S;:;am! lJpgllide AtlantiS Neutral Earth -Resistors 20 6ell';ille Soulh Ci~i Upgrade {Belhf1Re) 21 Retreat Remfcrop,ment Rosmead AVerJue Reinforcement 22 aTJ InlerlOckRilpiacement Kraartonteln Upgrade 23 1U;V Mclin Sub€~t;on &Nltch9t~fjr Replacement Booon: Tran5formfti Repklcemenl 24 HV 8w!tch{Jear Repiacement 10 Clov€illy 66 io:.V Gas C~lble Replaccrnt'lnt 25 11 kV tM.n Sut/staMn cirW't bre81<er rttplacemenl ~1 Kaeberg Rd Switch S:a.liOl'l Upg. Ph<lse l' 26 Gordons bJ.!j' NER 12 See POInt Ph~ 2 Tlarl1;iformer Replacement 27 lan~cl;o'Jfg 13 Cit>{ Upgrade ~ MOfltaQJC GArdens MS Upgrade 14 MUlZenberg - Phase '2 29 Cansol Glass 15 3!ssctmp Road -.J l'.:I C /r (1 pI i' r f 6 m. PERFORMAN(;E i\lJ\NAGEI\IEN'j' & GOALS Ntn ,~!~t'O"'$ WH\K.":>C!'!i ~~f,~lj.c:~ . pl;m Go,a!1 Go~8- R.liatD BrMlded 51JIIIlIY .. c......... l~C¢R MNPee pe:- Tcn1/'I S\fI$l;tts.e~ce;,"""':!'\i'I'\$"trm¢o'ltl\~l1S: Perfunnance b(~t\veel1 maI1agem~n \---. performance are" (KPA,) amI indicators (KPls) a$ set out in SDA ff) ensure: the :\ culture t\ culture +I.l,~ o~ p~!>ti ',oM.16 ~-i-~I'C~ s<'d :",iti°I':II1!'l'\~ A~!!~ ! 5316 ,5. f\.;,,¥'.If !Jw'itj ?! S~p~ T~ch~'C31 ~f".l"~I1lE-!115 'the tirst group rdates through tIle al1ntlal ~unicipal funded acuvities and ,,,ill be integrated process. These are: Cl.i'S:::rn~ Ser.·"'!~ t Snlt;m! P . ",pIC 'i~t·1"I I g""." S~,""c,·C;-- NCV."1I1stallations / connections per month against electrifjcation plan r,:;-"'''''R''O"",,,':--, ......-+---'--~I--_ Suh.idised connections per m(mth against electcificati()I1 plan ~c"~!i~t_~~~~~?;"111'I',,f!Cii~t "nte second gf()UP relates t() ongoing fUlal1Cial accountability and , .~.- --,.-,-".', --'_ _-1-_-'-_ _-'-_ _ _--'_ _'----1 be reported to municipalities on n {nondll}, ba- si~. Actual capital r111ancial performance against monthly budget Acntal operating financial performance against monthly budget R(''\-el1ue coUcctcd against hilling~ ..... Progress made \Vith ratlonali,ation of tariffs l\ctual bulk purchases Internal business KPI have been Departmental SJ .)HIPs. 'Ine,e are used dcctricily solJ as of the operational plan and contained in the Directorate and to monitor its internal buslI1es~. ~nlesc would coye!. aT-caS lcation Access / Sales & Resenue / Technical ~leas\lf'emCnl$ Street;1Od Public lighting Financial Business Efficiency I Iuman Resources Risk Coqx}rate Social hlyeSlinent seeks to map KPl's to strategic Auditor General! National crmmce ,,,ill be Jcn~l()ped and complit.:d to. -..l ~ Planning 'Ihe ~ re(lutre:ments of i.nstitu~ good corporate gm'· P:Jg<" s9 h tip / e terna] Financing Fund (EFF) U)r the capital budget as Indicated bekm..-. 'Inwen;>r. fin;mcial sust.ainability 1s dependant on rnaintaining and improving the C(lUf"ction of ::lccounts rccci\":lble. I l11c grant funding intended for electrifIcation FINANCIAL PLAN 'I ht: planned change is premised on the is baseJ on the histonc information and 'Ih< budget frame\vork that \l.t111 allow j:in:mce nl11ction to acid value to the operational reahty is illustf'.1ted belo\v: F:n.111Cid :£rt..:~:!tol~nt '3:t:f:l:t"'f! ::&.lr..;;:gE.tl1ff1t ---.. --+- Fl~l&g, Tu :-en-es. The ptlx:cs~ to mnn: strategy lo C;)H p22.r:...ning Fiu."\J'!.CLU & T t:.:1-'Sarr .'<,.;: rn"<.d~til~ c:'peJ.:.lti?n~ ---flo ---flo ~ PetiomuncE' :l!:magurtttt &00 --;.. :350 _7 « ·1s&...iICIon~ fwirY~..1 "UQ,,"PIilve1l1e1lQt!i ""'-Y i~ ---- 450 -,Nt """"""'~ . priorillzod? • Where de we Y:tvett? • WMt are ~ tal & have to be "pplied for at DME. The foUow1I1g graph indicates the actual arid the phrtned capitru ('xpenilltllre on the tnfrastLUclure to address n:furbishment and gro\vth, It is critically import.mt that a benchnuuk for the investment in refurbishment is eSl<lblished in accordance with international be,::;:t practice to ensure good quality of supply and excellent cllstorncr and delivery serdce. • Iiow.H'urlltOftls ....? • Whete are:wegomg? ht:~aY't1)' 200 150 ~nle resource allocation prioritisation i~ irnperath-e h) ensure d~ble arid sustainable financLll perfort1l1u.lC(>. '1llf' finariClaJ plan is cogll.iLi"-e of dle follO\\ting key co~t drivers: '0 2002/03 Bulk t"flcrg:y purchases I luman capital cost ltep-airs 211d 111a1ntenance I)epreci:tt1{)fl 2003/04 2004/05 2005/06 2006/07 Z007/08 ';:009/10 2010/11 201'1/12 .. Herewith are the dral1 capila! expenditure budgets and summarized income statement: Shared services and Surcharges 2008109 2009110 20101;-1- ~;2 Actua! f3udget Budgel Budget Rm Rm RIO Rm Rm -..l loftastructurc: Growth (Stengtehing f EJqJanslon) 236,5 402,0 410,7 435,3 .~ Infrastructure: Refurbishment 158,0 36,8 107,8 112,9 31,5 100,8 '~3,2 Eleclrlfit:41tion 249,8 160,7 33,0 31.0 185,7 '177,4 32,5 161,5 33,0 30,5 791,1 30,5 837,2 0,0 0,0 Call:lgory of Expenditure Key Assmnptions lJnlf:'ss othet\v1se stated, fwaneia! modelling \vill be based on the policies anti practices outlined bdo\v: The fr)lk)\\;tng structural ::lSsumplJOflS are made: Contribution to Rates Account - ba~is of calculation Current contribution Facilities, VehiCles, Equipment PubliC Lighting + grO\I,-th + Total CPIX. Infrastructure: FIFA 2010 Strengthening governance costF-. Depending on ruJj~"fcnc1ng costs must be set up for the fullowing areas; 134,7 Budgel 0,0 539,1 97,2 47,2 625,4 2007105 2001ll\l9 Actuaf Budget 2009110 Budyel Rm Rrn Rm Rm Rm 280,4 161,1 0,0 15,4 280,9 180,7 327,9 207,3 0,0 352,1 209,9 372,2 0,0 0,0 14,0 13,5 144,5 61,2 746,2 0,0 f'lUICtiOllS; Capital Budget Source at Funding External FinanCing Fund (EFF) - Loans Capda! Replacement Reserve - Revenue lnvestmentg C:\PFX ceiling on EFF set by City's Ct\PFX envelope is used, Caprtal Replacement Reserve - Ward Allocation:; Grants ,,,[)erltlll:ure Increases - Z(KI8/2(K)9 23,7°0 \0 Developers Conlriootions 2()09/Z01O Privale Sector· Consumer Connections Revenue . Bulk purchases: 40,(," Q 1hc 'nle 'l'o\-vn hAA been ::l~signetl an Aa2.7.<1 long-term credit indicate a ~t.rong capacity to repay long-tellTI liabilities. Total Ex- Pllgl',M ....... 20071\lS Capital Budget ----- 54.6 26,9 0.5 539,1 6.7 2010111 2011112 Budget Budget 220,1 34,9 105,4 31,7 123,3 12,0 136,0 68,3 75,2 80,3 4,1 5,5 625,4 746,2 6,0 791,1 837,2 6.5 W ELECTRICITY SERVICES DRAFT MACRO OPERATING REVENUE and EXPENDITURE BUDGETS - 2008/2009 to 2011/2012 200710B Subjective category Actual 2008109 Budgel Growth Rm Rm % 2009110 Budget Rm I I REVENUE Sales: E,dernal Sales. Internal Contnbution from Rales (Street lighting) Miscellaneous Income Other Total Revenue AFR 1~~~::~Ulion 10 R.les ITotal Expenditure Surplus I (DefiCit) to be funded ex accumulated surplus (3227) 13 1 6 (21) (125) (3504) 29,9% 631 99 33 330 23,7% 3605 3327 278 40,6%, 31,1% 64 10 230 268 436 199 220 34,2% 6124 402 94 13 209 90 26.1% -4.4% 30 295 129.1% 41,6% 914 914 0 2563 2563 0 37 0 203 216 327 142 37 49 74 231 244 397 180 166 4831 3595 /So, (1301 \l-/¢ I (5465)1 (4 209)1 30,4%1 (208) 59,0% (149)(15) (121) (4701) 510 Growth 33,9% 33,2% 14.4% 12,8% 21,3% 22,1% (60) 814 111 37 381 9,7'Yo 26,4% 26,4°/" 5639 27,5% 27,5% 20,5% 93 10 293 300 742 104 35 364 17,5% 4483 4205 278 29,8% 77 10 -0,5% i~:~~ ~~:~~ 262 263 461 210 267 26,80'/0 7288 10.0% 10,0;;1.) 11,7'% 29,8% 5,7% 5)% 7,4% 13.9 % 5,7% 5,7 0/<:1 5,7 % 22,1% 19,0% 5361 278 5,8% 5,8% 7,6% 20,9% 488 12,0% 5,8% 5,8%" 222 324 2;~~ 8711 19,5% (68) I ~I g ~i'~' i ~ ...a, ~rrrI1WaE~~i~B~~I~ ~i ;'(; c:~ (iJ ~, c' <> "=; (lj i!?1 .; ..... W -..J (..n ~ )J0 r