Table 6A. Income and Cash Operating Summary; Barley, 1998 COUNTY: Pinal CROP: Barley AREA: Maricopa FARM: Pinal County 98 ACRES: 1.0 YIELD: 4,900.0 Lb / Acre Item INCOME ⇒ Unit Grain Pound Page 25 WATER SOURCE: Central Arizona IRRIGATION SYSTEM: Flood Furrow PREVIOUS CROP: Cotton, Upland Quantity 4,900.00 Price/ Unit $0.06 CASH LAND PREPARATION AND GROWING EXPENSES (including sales tax) Paid Labor (including benefits) Tractor/Self Propelled Irrigation Chemicals and Custom Applications Fertilizer Farm Machinery and Vehicles Diesel Fuel Repairs and Maintenance TILLAGE: Conventional SOIL: Sandy-Loam DATE: 2/18/99 Budgeted /Acre $308.70 Total /Acre Your Farm Budget $308.70 ____________ 26.58 ____________ ____________ ____________ 67.47 ____________ ____________ 13.71 ____________ ____________ ____________ 96.00 ____________ 34.34 ____________ ____________ 9.18 17.40 67.47 4.80 8.90 Irrigation Water (excluding labor) Water Assessment (See Note Below) ** Other Purchased Inputs & Seed/Transplants 34.34 TOTAL CASH LAND PREPARATION AND GROWING EXPENSES -------------238.10 ____________ CASH HARVEST AND POST HARVEST EXPENSES Paid Labor (including benefits) Tractor/Self Propelled 0.20 Farm Machinery and Vehicles Diesel Fuel Repairs and Maintenance 0.14 0.25 Custom Harvest/Post Harvest TOTAL HARVEST AND POST HARVEST EXPENSE OPERATING OVERHEAD ⇒ PICKUP USE OPERATING INTEREST AT 10.0% 0.20 ____________ ____________ 0.39 ____________ ____________ ____________ 68.10 -------------68.70 ____________ 7.71 9.76 ____________ ____________ ============= TOTAL CASH OPERATING EXPENSES RETURNS OVER CASH OPERATING EXPENSES $324.26 ($15.56) ____________ =================== ____________ ____________ Notes: The above figures do not include ownership costs, see table B for detailed cost allocation. ** A water assessment charge of $19.80 per Acre is included as an ownership cost in Table B. ARIZONA COOPERATIVE EXTENSION Department of Ag and Resource Economics University of Arizona F 5 / 10 Table 6B. Allocations of Ownership Costs; Barley, 1998 COUNTY:Pinal CROP: Barley AREA: Maricopa FARM: Pinal County 98 WATER SOURCE: Central Arizona ACRES: 1.0 IRRIGATION SYSTEM: Flood Furrow YIELD: 4,900.0 Lb / Acre PREVIOUS CROP: Cotton, Upland Item TOTAL INCOME at Page 26 $0.06 / Lb TOTAL OPERATING EXPENSES RETURN OVER CASH OPERATING EXPENSES CASH OVERHEAD EXPENSES Taxes, Housing and Insurance, Farm Machinery General and Office Overhead (5.0% of Total Operating Exp.) General Farm Maintenance (3.0% of Total Operating Exp.) Total Cash Overhead Expenses Total Cash Operating and Overhead Cost RETURNS OVER CASH OPER. AND OVER. EXPENSES -- CASH COST BASIS ($/ACRE) -Income and Costs Net Returns $308.70 TILLAGE: Conventional SOIL: Sandy-Loam DATE: 2/18/99 -- TOTAL COST BASIS ($/ACRE) -Income and Costs Net Returns $308.70 $324.26 $324.26 ($15.56) 1.53 16.21 9.73 -------------27.47 ($15.56) 1.53 16.21 9.73 -------------27.47 351.73 351.73 ($43.03) CAPITAL ALLOCATIONS (100% Equity) Capital Replacement, Machinery and Vehicles Interest on Equity, Machinery and Vehicles ($43.03) 8.78 4.58 -------------13.36 Total Capital Allocations RETURNS TO LAND, CAPITAL, MANAGEMENT AND RISK --------------------------------> ($43.03) RETURNS TO LAND, MANAGEMENT AND RISK ---------------------------------------------------------------------------------------------> Land Cost / Ownership (100% Equity) Property Taxes ($447.00 X 16.0% X 0.169) Opportunity Interest on Land (100% X 6.0 X $447.00) Water Assessment 12.15 12.15 26.82 19.80 -------------58.77 19.80 -------------Total Land Costs 31.95 RETURNS TO CAPITAL, MANAGEMENT AND RISK ----------------------------------------> ($74.98) RETURNS TO MANAGEMENT AND RISK -----------------------------------------------------------------------------------------------------> Management Services (8% of Total Operation Expenses) TOTAL OWNERSHIP COST -------------59.42 25.94 -------------125.54 ============= ============= TOTAL COST $383.68 $449.80 RETURNS TO CAPITAL, MANAGEMENT AND RISK ----------------------------------------> ($74.98) RETURNS TO RISK (PROFITS) -----------------------------------------------------------------------------------------------------------------> BREAK-EVEN PRICE TO COVER OPERATING COST ( PER Lb ) BREAK-EVEN PRICE TO COVER OWNERSHIP COST BREAK-EVEN PRICE TO COVER TOTAL COST ($56.39) $0.07 $0.01 $0.08 ($115.16) ($141.10) $0.07 $0.03 $0.09 ARIZONA COOPERATIVE EXTENSION Department of Ag and Resource Economics University of Arizona F 5 / 10 Table 6C. Variable Operating Costs; Barley, 1998 COUNTY:Pinal CROP: Barley AREA: Maricopa No. First Month Operation 1 2 3 4 5 6 7 8 9 10 11 12 Nov Nov Nov Dec Dec Dec Feb Mar May May May Jun Page 27 FARM: Pinal County 98 ACRES: 1.0 YIELD: 4,900.0 Lb / Acre ---- Hours * ---Machine Labor Apply Fert/Ground Disk List Plant Buck Rows Irrigate Irrigate/Run Fertilizer Irrigate Prepare Ends Combine Harvest Haul, Custom 51 CW Disk Residue 51 CW Pickup Use30 Mi/Acre Operating Interest at 10.0 0.075 0.225 0.237 0.225 0.022 0.023 WATER SOURCE: Central Arizona IRRIGATION SYSTEM: Flood Furrow PREVIOUS CROP: Cotton, Upland ---- Operating Costs ($/ACRE *) Per Operation ---Fuel/Rps. Labor Cust/Serv. Materials Total 0.083 0.250 0.263 0.250 0.025 0.750 0.450 0.450 0.025 0.42 3.92 3.10 2.22 0.12 0.39 0.68 2.05 2.15 2.05 0.20 5.12 3.07 3.07 0.20 33.87 34.34 24.00 34.80 18.00 55.35 12.75 0.225 1.000 TILLAGE: Conventional SOIL: Sandy-Loam DATE: 2/18/99 0.250 3.92 7.71 2.05 Tot. Cash Expenses Times 34.97 5.97 5.26 38.61 0.32 29.12 37.87 21.07 0.60 55.35 12.75 5.97 1.0 1.0 1.0 1.0 1.0 1.0 2.0 2.0 1.0 1.0 1.0 1.0 34.97 5.97 5.26 38.61 0.32 29.12 75.74 42.14 0.60 55.35 12.75 5.97 7.71 9.76 9.76 Class G L L L G G G G H H H L ============= TOTAL CASH OPERATING EXPENSES (includes all times over): 324.26 T *NOTES: Machine and labor hours and operating cost are for one time over the designated acreage. The "Tot. Cash Expense" column and the "TOTAL CASH OPERATING EXPENSES" row include all operations, all times over. Classes are defined below. A water assessment charge of $19.80 per Acre is included as an ownership cost in Table B. OPERATING COST SUMMARY BY CLASS Land Preparation (L) 55.81 Growing (G) 182.29 Harvest (H) 68.70 Post Harvest (P) 0.00 Marketing (M) 0.00 Operating Overhead (O) 17.47 ============= Total (T) $324.26 SENSITIVITY OF THE NET REVENUES OVER TOTAL CASH EXPENSES ($/ACRE) Prices ⇒ - 25% - 10% Budgeted + 10% + 25% Yields $0.05 $0.06 $0.06 $0.07 $0.08 Break-even Price - 25% - 10% Budgeted + 10% + 25% 3,675.0 4,410.0 4,900.0 5,390.0 6,125.0 Break-even Yield -134.45 -110.03 -93.75 -77.47 -53.04 -99.73 -68.36 -47.44 -26.53 4.84 -76.57 -40.57 -16.57 7.43 43.43 -53.42 -12.79 14.30 41.38 82.02 -18.69 28.88 60.60 92.32 139.90 7,721.17 6,011.59 5,238.36 4,641.37 3,963.77 0.08 0.07 0.07 0.06 0.06 ARIZONA COOPERATIVE EXTENSION Department of Ag and Resource Economics University of Arizona F 5 / 10 Table 6D. Resource and Cash Flow Requirements; Barley, 1998 COUNTY:Pinal CROP: Barley AREA: Maricopa Month * Number Irrigations FARM: Pinal County 98 ACRES: 1.0 YIELD: 4,900.0 Lb / Acre Water Applied (inches) NOV P DEC P 0.4 JAN C 0.6 FEB C 1.0 MAR C 1.5 APR C 1.5 MAY C JUN C DEC C Pickup Use30 Mi/Acre Operating Interest at 10.0 Water Assessment Total % 5.0 Total Labor (Hrs) 3.2 4.8 6.0 9.0 9.0 Page 28 WATER SOURCE: Central Arizona IRRIGATION SYSTEM: Flood Furrow PREVIOUS CROP: Cotton, Upland -------------------------------------Purchased Fuel, Oil Water and Repairs 0.30 0.72 0.59 0.45 0.67 0.67 0.03 0.25 0.01 9.60 14.40 18.00 27.00 27.00 TILLAGE: Conventional SOIL: Sandy-Loam DATE: 2/18/99 Operating Costs ($/ACRE *) -------------------------------------Other Labor Chemicals Purchases Services Total 3.72 4.83 1.17 0.39 3.92 0.06 7.71 2.44 5.51 4.20 3.07 4.61 4.61 0.20 2.05 0.10 16.93 16.93 9.76 23.10 54.05 36.94 37.87 48.41 31.61 8.40 44.97 0.16 7.71 9.76 77.85 24.01 324.26 100.00 17.17 17.17 16.80 16.80 7.80 60.05 ** 32.0 3.70 TOTAL RESOURCE REQUIREMENTS ( per Acre) Total N 183.8 Total P 95.4 Total K 0.0 Total Labor 3.7 Total Water 32.0 EQUIPMENT REQUIREMENTS ( per Acre) Fertilizer Broadcaster, 0.08 Hr Offset Disk, 16.5' 0.47 Hr Tractor, 70 PTO HP, 0.32 Hr MATERIALS REQUIREMENT ( per Acre) 11-53-00, Dry 180.00 Lb Water, District 32.00 AI LABOR REQUIREMENT ( per Acre) Irrigators 2.55 Hr 96.00 29.61 21.81 6.73 26.79 8.26 67.47 20.81 34.34 10.59 TOTAL ENERGY REQUIREMENTS ( per Acre) Diesel Fuel 6.5 Gal Unleaded Gas 3.0 Gal All Direct Energy 1.3 M BTU Grain Drill, 14' Pickup Truck, 1/2 Ton Tractor, 125 PTO HP 82-00-00, Anhyd. Tractor 0.22 Hr 1.00 Hr 0.24 Hr 200.00 Lb Lister, 5 Bottom Rowbuck, 10' Tractor, 150 PTO HP Barley Sd, Cert 0.24 Hr 0.02 Hr 0.47 Hr 135.00 Lb 1.15 Hr *NOTE: P = Previous Year C = Current Year N = Next Year ** A water assessment charge of $19.80 per Acre is included as an ownership cost in Table B. ARIZONA COOPERATIVE EXTENSION Department of Ag and Resource Economics University of Arizona F 5 / 10 Table 6E. Schedule of Operations; Barley, 1998 COUNTY:Pinal CROP: Barley AREA: Maricopa First No.MonthTimes FARM: Pinal County 98 ACRES: 1.0 YIELD: 4,900.0 Lb / Acre Operation 1 2 3 4 5 6 7 Nov Nov Nov Dec Dec Dec Feb 1.0 1.0 1.0 1.0 1.0 1.0 2.0 Apply Fert/Ground Disk List Plant Buck Rows Irrigate Irrigate/Run Fertilizer 8 9 10 11 12 Mar May May May Jun 2.0 1.0 1.0 1.0 1.0 Irrigate Prepare Ends Combine Harvest Haul, Custom Disk Residue Pickup use 30 Mi/Ac Page 29 WATER SOURCE: Central Arizona IRRIGATION SYSTEM: Flood Furrow PREVIOUS CROP: Cotton, Upland Equipment/ Custom Oper HP Self-Prop./ Implement 70 Fertilizer Broadcaster, 150 Offset Disk, 16.5' 125 Lister, 5 Bottom 70 Grain Drill, 14' 70 Rowbuck, 10' 150 Offset Disk, 16.5' CST Combine Barley CST Haul Grain 150 Offset Disk, 16.5' Pickup Truck, 1/2 Ton Job Rate Acres/Hr 12.00 4.00 3.80 4.00 40.00 1.33 2.22 TILLAGE: Conventional SOIL: Sandy-Loam DATE: 2/18/99 ---------- Material Use and Cost ---------- Service Cost Name Appl. Rate $ / Unit $ / Unit 11-53-00, Dry 180.00 Lb 355.00 Tn Barley Sd, Cert 135.00 Lb Water, District Water, District 82-00-00, Anhyd. 2.22 Water, District 40.00 8.00 6.00 100.00 6.00 Labor Type Tractor Tractor Tractor Tractor Tractor Irrigators Irrigators 24.00 CW AI 36.00 AF AI 36.00 AF Lb 317.00 Tn AI 36.00 AF Irrigators Tractor 37.50 Ac 0.25 C 4.00 1.00 Tractor *NOTES: Machine times, labor times, and material rates are for one time over the designated acreage. ARIZONA COOPERATIVE EXTENSION Department of Ag and Resource Economics University of Arizona F 5 / 10