DEVELOPMENT FEASIBILITY STUDY: 450 WESTERN AVENUE, BRIGHTON , MASSACHUSETTS by Mark H. Temkin Bachelor of Science in Civil Engineering Tufts University 1981 SUBMITTED TO THE DEPARTMENT OF ARCHITECTURE IN PARTIAL FULFILLMENT OF THE REQUIREMENTS OF THE DEGREE MASTER OF SCIENCE IN REAL ESTATE DEVELOPMENT AT THE MASSACHUSETTS INSTITUTE OF TECHNOLOGY SEPTEMBER, 1986 Mark H. Temkin 1986 The author hereby grants to M.I.T. permission to reproduce and to distribute publicly copies of this thesis document in whole or in part. Signature of the author Mark H. Temkin Department of Architecture August 15, 1986 Certified by Depa ent o Gary Hack Head of the Department Urban Studies and Planning Thesis Supefxvisor Accepted by James Interdepartmental Degree Progr S 0 . 98 1 McKellar Chairman n Real Estate Development I would like to acknowledge Gary Hack for his guidance in producing this thesis. His insightful analysis and constructive reviews resulted in a clearer understanding of the varied issues concerning the development of this site. In addition, I would also like to thank Don Klabin of the Klabin Organization for all of the time, energy and enthusiasm that he so willingly shared throughout the production of this thesis. 2 DEVELOPMENT FEASIBILITY STUDY FOR 450 WESTERN AVENUE, BRIGHTON, MASSACHUSETTS by Mark H. Temkin Submitted to the 1986 in partial degree of Master the Massachusetts Department of Architecture on August 15, fulfillment of the requirements for the of Science in Real Estate Development at Institute of Technology. ABSTRACT This thesis is a site specific development feasibility study for a 0.85 acre urban site located at 450 Western Avenue, in Brighton, Massachusetts. The owner of the site currently operates a wholesale electrical supply company at this location, and he has requested that the feasibility of developing a 35,000 square foot mixed-use facility be investigated. The initial development plan consists of warehouse and office space for the electrical supply company, as well as a 10,000 square foot soundstage for television and film production. In addition to this mixeduse structure, two other development alternatives are analyzed. A light industrial building and a first class office building are also considered for development potential. The soundstage facility would be developed specifically to suit the highly specialized needs of-one of Boston's largest soundstage operators. The development of such a highly specialized structure induces a large amount of development tenants would facility. investigated small, risk be into the project, as few alternative interested in renting such a large The Boston film to understand the production nature and industry health of is this specialized market. With a thorough understanding of the dynamics of this industry, the development risks associated with the mixed-use alternative can be better understood. The site at 450 Western Avenue is located within the Allston/Brighton Interim Planning Overlay District (IPOD), which further complicates the development of this parcel. Any future development which takes place at 450 Western Avenue will have to be compatible with the goals established for the IPOD. After considering the development risk associated with each of the the proposed development options, as well as the character of the surrounding area, the light industrial appears to be the most appropriate use Thesis Supervisor: Gary Hack Title: Head of the Department, 3 for this site. Department of Urban Studies and Planning TABLE OF CONTENTS PAGE NUMBER 1 TITLE PAGE ACKNOWLEDGEMENT 2 ABSTRACT 3 TABLE OF CONTENTS 4 INTRODUCTION 6 CHAPTER 1: SITE CHARACTERISTICS 11 Site Description Boston Zoning Procedures Interim Planning Overlay District CHAPTER 2: MASSACHUSETTS FILM INDUSTRY 25 Film Production Activity in Massachusetts Massachusetts Film Bureau Filmarts CHAPTER 3: MARKET CONSIDERATIONS 38 CHAPTER 4: DEVELOPMENT PROPOSALS 48 Mixed-Use Facility Light Manufacturing Use First Class Office Building CHAPTER 5: BROAD CONSIDERATIONS 58 Effect of IPOD Considerations for the Wahn Company NOTES 64 SELECTED BIBLIOGRAPHY 65 FIGURE 1 Project Locus 66 FIGURE 2 Site Plan 67 FIGURE 3 Massachusetts Film Production Revenue 1983-1894 68 FIGURE 4 Graph of Massachusetts Film Production Revenue 1980-1984 69 4 PAGE NUMBER FIGURE 5 Major Film Productions in Massachusetts 1977-1985 70 FIGURE 6 Soundstage Comparables 71 FIGURE 7 Allston/Brighton Office Comparables 72 FIGURE 8 Mixed-Use Financial Analysis 73 FIGURE 9 Manufacturing Financial Analysis 76 FIGURE 10 Office Building Financial Analysis 79 FIGURE 11 Summary of Development Alternatives 82 5 INTRODUCTION The options purpose for an of this paper industrial is to explore zoned 0.85 acre development site located at 450 Western Avenue, in Brighton, Massachusetts. The site is currently owned and occupied by the George H. Wahn Company, and is the electrical supply buisness. home of their wholesale Directly across Western Avenue is a 10,000 square foot sound stage used in the production of a national, soundstage is prime operated time by a television company called series. The Filmarts, and they have expressed interest in expanding their facilities. The Wahn Company is considering developing a new mixeduse structure needs, and on their the needs site to accommodate of Filmarts. both their An initial own architectural schematic design has been produced, soil borings have been taken, been and an obtained preliminary from an construction experienced cost general estimate has contractor for this proposed mixed-use facility. In addition development alternative to the alternatives is a light sound are stage investigated. manufacturing second is a class A office building. 6 proposal, two other The structure, and first the For each of the proposed options, the development and investment criteria of George primary development and Wahn must be considered. investment criteria The for this study are discussed below: 1. Increase the value of the site. The Wahn for the family past has twenty owned the land at two years, and 450 Western George Wahn Avenue believes that a new use would increase the value of site. 2. Provide space for George H. Wahn Company's operation. Wahn's primary criterion is that the George H. Wahn Company remain in the superior development accommodate Company, electrical the then supply option physical George is However, discovered space Wahn business. which requirements would consider if of a cannot the Wahn relocating his electric supply company to an alternate site. 3. Mitigate Project Risk. George Wahn structure, does and substantial not will portion want proceed of the to with project develop a development is speculative only pre-leased. if a George Wahn sees himself primarily as a businessman, and does not feel comfortable as a speculative real estate developer. 4. Obtain a satisfactory return on investment. The selected eleven Real development percent Estate New England first Advisors, Life year proposal total the real should return estate on have a capital. development minimum Copley arm of Insurance Company, often uses this measure 7 to determine the financial development project. Bill rate feasibility of a proposed For comparison, the one year Treasury of return is approximately six percent annually, as of July, 1986. The 450 Western Avenue site is located within Allston-Brighton Interim Planning Overlay District An the Boston zoning amendment drafted to by the Boston future development development which is is Redevelopment citizens advisory committee, for code the (IPOD). currently Authority being and a to define goals and objectives in this considered area. for this Any site future must be compatible with the objectives established for the IPOD. The development of a highly specific facility such as a soundstage makes this project unusual, and creates additional risks not often considered in the development of more traditional commercial structures. In the Boston area there are many users of general office space which might be prospective tenants manufacturing users in a might manufacturing structure. tenants new office be project, accommodated and in various a light However, there are relatively few which would be interested 10,000 square foot soundstage. in a "state of the art", If for any reason Wahn and Filmarts fail to reach an agreement concerning lease terms, or if Filmarts' business fails after occupying the space, a replacement tenant will be difficult to find. 8 On the structure other results hand, the development in a building which is of a mixed-use 100 percent pre- leased prior to construction, as the George H. Wahn Company and Filmarts all of the would lease leasing risk the is entire removed facility. from the Virtually project, and attractive financing terms could therefore be arranged. addition, the soundstage facility could be In designed to allow easy conversion to a manufacturing use if required at some later The date. high, columnless manufacturing heavy spaces space of if floor capacities and large, the soundstage would make ideal the soundstage operation was discontinued. After considering the Wahn, the area, investment objectives of George present market conditions in the Allston-Brighton and the risks associated alternative, it appears structure is the best development The appropriate most industrial type of as use use for which if with the light choice this site would each be for development manufacturing this parcel. seems to be an designed to be compatible with the adjacent residential neighborhood. Such a facility will satisfy the space requirements Company, producing year and also tenants. return on provide space From an investment capital exceeding expected. 9 for of the Wahn additional income- standpoint, a eleven percent first can be The first chapter characteristics Boston. of industry Filmarts considerations discussed analysis this zoning The second chapter production role and of in in each Chapter for the three considers procedures in the the that of Three. and industry. the three Chapter proposals Four under considers Various an of film the market alternatives is site City assesses the health of the Massachusetts, within for paper are economic consideration. The final chapter addresses several broad issues raised by this proposed development. 10 CHAPTER ONE: This chapter characteristics abutters, and describes of the site Interim the general physical including existing use, access, geotechnical concerning the current Brighton SITE CHARACTERISTICS considerations. A discussion zoning requirements and the Allston- Planning Overlay District is also included. Site Description 450 located Figure in the 1. Avenue, by Western The is a 0.85 acre industrial site Brighton neighborhood of Boston as shown in site is bounded on the north by Western on the south by Abby Road and on the east and west adjacent site Avenue structures. consists of the Approximately existing 60 George percent H. Wahn of the Company warehouse, which is a one story masonry structure measuring 110 feet composed by 150 of surface feet. The remainder parking of facilities the for site the is Wahn Company. There topography. is no Grade vegetation elevations on the range site, and from +23 very little feet Boston City Base at Western Avenue to +27 at Abby Road. This area of Western Avenue can best be described as a confusing hodgepodge of used car dealers, existing uses. Auto repair shops, storage facilities, single 11 family homes, and convenience Avenue. Caldor A stores large line strip this shopping portion center department store and a Star of Western consisting of a Market grocery store is located approximately one half mile east of the Wahn site. The noise, general feeling one congestion gets and neglect. in this area is one of It will be difficult for a single, small development project to reduce this hodgepodge feeling when parking lots, the and cannot change but site is auto surrounded body the character materials, uses, in this area. buffer and elements which can be This taverns, small project improved standard for future The use of high quality building zones between landscaping small of the neighborhood by itself, it may be able to set an development shops. by along residential Western incorporated and Avenue into industrial are this several project to make this area of Allston-Brighton more appealing. Access Western direct the access Avenue to Massachusetts only five minutes district is a is an arterial Soldiers Field Turnpike. Road, site, minute which Memorial Cambridge's from the fifteen street while provides Drive and Harvard Square Boston's financial drive. The Mass is Pike provides easy access to routes 128 and 495, which are major interstate highways which circumscribe area. 12 the greater Boston Two routes Massachusetts travel front of down the Bay Western site. transportation to Transit Authority Avenue These Cambridge, and stop buses (MBTA) bus directly provide in public Brighton and Watertown. The bus can be used to connect to the MBTA rapid transit subway system in Harvard Square, which provides access to points throughout metropolitan Boston. One of this site's advantages is the fact that it is strategically located and provides convenient car access to the various business centers and around Boston. benefit Users of the from the ability to interstate highways in and future facility utilize public will also transportation to get to and from their workplace. Existing Use The H.Wahn site Company, companies has is currently one the in the Boston area. been providing contractors in electrical products. utilized oldest George electrical supply Since 1915, the Wahn Company industry, Mr. family been located at by the municipalities, the New England area with a generation of his has of being George H. Wahn and full range is the third to run the company, and the 450 Western Avenue for the past of firm twenty two years. The existing square feet. space, and building totals approximately 15,000 Three thousand square feet is used for office the remainder is 13 storage and warehouse space. The paved area of the site by the Wahn employees work or Company, in the take is as larger than what there firm, and most public are is required currently employees transportation. ninteen either Only one walk to truck dock is required by the Wahn Company at present. Currently the are satisfied with moved manually basic metal adequate, a new this through shelving. and no future industrial receiving, in building option simple warehouse, The office is and office selected, are stored areas are on are is anticipated. If the shipping, requirements structure. it Materials storage constucted, inexpensive is the Wahn Company and expansion space and an of structure. the building storage accommodated find space requirements should be If can the be office fairly easy to inexpensive off-site warehouse space to meet the needs of the Wahn Company. Utilities site The storm sewer, can all be is well drain, easily serviced gas and located in with all electric Western utilities. service Avenue, Water, connections as shown in Figure 2. Abutters A closer look at the abutters of the Wahn site reveals the diversity Brighton area. which is found The north of the 14 throughout site is the Allston- bounded by Western a Avenue, arterial heavily road. fifty foot park both sides Cars which often results much congestion. large warehouse another warehouse Company. the Across Western Avenue and abutting of lane avenue, in a restriction of vehicular flow and causes directly on two wide, traveled office the facilities. existing owned are several To the east, Wahn Company structure the Shuman Construction by is One of the tenants of the Shuman structure is the collision damaged cars. To the south of the site lies a residential units. consisting Abby Road, Shop, repairs Auto neighborhood Body which Massachusetts of two is which directly behind the Wahn site. the "Stadium shares a a Pub", common ten small and a family cul-de-sac, rental terminates To the west of the site is 2,000 foot wide three square "right foot of way" tavern which with the Wahn Company. There has been little development portion of Western Avenue recently. been renovated along structures do not as these buildings large asphalt Soldiers activity in this Several buildings have Field Road, but these improve the character of Western Avenue, address Soldiers Field Road, and create parking lots frontage. 15 along the Western Avenue A new building was recently constructed at 460 Western Avenue, across the street from the Wahn site, however a showroom which and service facility the strengthens further for used foreign automobile-repair it is cars, context prevalent in this portion of Western Avenue. Geotechnical Considerations Haley of firm The has Massachusetts, investigation geotechnical The borings test five of consisted and soil subsurface of the site, and submitted a report 1986. 15, April geotechnical thorough the determine groundwater conditions on a Cambridge, of Inc. Aldrich, conducted to investigation & one and machine excavated test pit. The soil profile is composed of approximately three feet of fill, overlaying a seven to twelve foot thick layer of sand. dense stratum of occasional less stiff Below Boston seams with of this layer Blue Clay, silt or depth. One a of sand. boring clay marine stiff fine sand natural went The to is a with clay becomes a depth of seventy feet, and this clay layer was still not penetrated. Observed groundwater levels were noted to be some ten feet below the surface of the ground. This relatively high groundwater level must be taken into consideration in both the design and construction of the proposed project. 16 designed, carefully support monitored a earth lateral system and dewatering system is recommended by the addition in will groundwater of control Good suggested. is points well or pumps sump to lagging pile/wood soldier A consultant. geotechnical system and installed table, water the below required is excavation If necessary be to reduce the risk of settlement of adjacent structures. supported can be Care must be taken to bearing on the natural sand or clay. subgrade the that assure footings or mats, concrete by reinforced and undisturbed is structure future that the & Aldrich recommends Haley has adequate strength and bearing capacity. Boston Zoning Review Procedures All new construction, including extensions and changes to regulations into the of various zoning is divided the and business, M-1 the between and (restricted manufacturing) district R-.8 district cuts directly through the Wahn family residential) (multi- residential, boundary The districts. industrial of categories the city The Boston. City of to subject are structures existing parcel. Zoning review is initiated by a request for a building applicant permit. The building permit (ISD) of application the for to City the of must an submit Services Inspectional Boston. compliance with 17 ISD the application then zoning for a Department inspects code. If the the application complies, then a permit is issued. If however, ISD determines that the plans do not comply with the code, is letter then a refusal A prefiling review is anywhere from two days to two weeks. is ISD of the Plans Examination section of a member meeting with this expediting of a method as recommended for this frame The time issued. zoning review phase. If determines ISD plans the that do not meet the Building and Zoning Code, the developer has the alternative of seeking a variance. a variance, an to secure In order applicant must demonstrate that special circumstances exist the make which different property and that these differences, district, in others from such as lot size, the lot or topography create an unnecessary hardship for the shape owner of the property. According very planner, Relief few of "as completely right" have been in parking the Allston-Brighton requirements, successfully been have projects development (BRA) Authority Redevelopment Boston on-site from limitations a to achieved and done area. height by developers in the past, and similar variances may be necessary to make this project financially feasible. The request for a variance will add a minimum of four months to the development the developer staff and schedule, and will require that be willing to work with both the BRA design various neighborhood groups. The Allston- Brighton community groups are well known for being visible 18 and vocal concerning and community, will any type certainly of development an active take in role their in any variance proceedings. Current Zoning Regulations Eighty percent currently zoned allowable Floor twenty multi of M-1, 0.8. of the 450 Western Restricted Area percent family of Ratio the site site Manufacturing, (FAR) is Avenue of The 1.0. zoned R-.8, residences and apartments with is an remaining which allows with a maximum FAR Due to the residential neighborhood bordering the south of the site, a thirty foot buffer zone is required in the M-1 zone. A major zoning consideration Planning Overlay District (IPOD) which is is the Interim presently being drafted for the entire Allston-Brighton area. A description of the IPOD and its possible effects are discussed below. Interim Planning and Overlay District (IPOD) The by current Chapter there 665 Boston of the Zoning Code Enabling and Acts of were adopted 1956. Although have been several amendments made, these changes did not reflect any kind of comprehensive, In Maps November, creation community of 1984, the IPOD concerns the Zoning mechanism regarding inappropriate zoning. 19 city-wide analysis. Commission as a direct outdated approved response and the to perhaps The Authority Boston Redevelopment governmental office which is (BRA), with charged the quasi- planning and redevelopment of Boston, recognizes that the zoning code is outdated, code and is perhaps necessary. an overhaul The BRA neighborhood character of appropriate way rezone to of also Boston, the current recognizes and will feels be zoning the unique that the most neighborhood by neighborhood. The Allston-Brighton IPOD is a method for the community to become actively involved with the planning and zoning of their neighborhood, and to draft a set of goals and objectives for future development in the area. The IPOD is not created as a way to stop development. The The Dorchester. as it IPOD first covers Planning and a was for the Allston-Brighton larger area, and Port-Norfolk IPOD is will include Zoning Advisory Committee twenty one community members. Flynn and more of ambitious, the first (PZAC) comprised of The Allston-Brighton IPOD is seen by the BRA as a prototype follow, and Mayor section for other neighborhoods to his administration have given their full suport to assure that this IPOD is a success. Development projects that are year IPOD Applicants change in period for must adhere to a building permit, occupancy permit proposed during the following change (which are the two process: in use permit not exempt under or the IPOD regulations) will have to receive an "Interim Planning Permit" from the Board of 20 Appeal before the Inspection developer must go to the Board of Appeal for the be a public is development project ninety days up to of end to hearing If is the with Board of Appeals in fact objectives, a permit will the proposed of objectives the consistent the finds that the with the If the be issued. and there period, if determine requested community of ninety day the consistent overlay district. proposed be the At BRA review. will will there permit, If a permit. requested issue the can Department Services IPOD Board decides that the project does not address the needs and concerns of the community, then the request is denied. Allston-Brighton Profile The Allston-Brighton and Boston, downtown west of and identifiable is neighborhood is neighborhoods, one along with by the bounded Newton to the that manner Charlestown, Allston-Brighton Charles River on the north, the town of west, Brookline south. the to distinct Boston's of Dorchester, Chinatown, and the South End. is located and the disrupts Commonwealth town of boundary Boston's Avenue is to Brookline the the such in only direct a link that Allston-Brighton has with the rest of the city. 1980, In neighborhood 65,000 the in the the was Boston, with a population or persons/acre. residents, population while Allston-Brighton of 22.5 Allston-Brighton percentage change 21 for the most populous of approximately From 1970 increased entire 3.6 city to 1980 percent, of Boston only was four of an increase the Allston-Brighton Therefore, area was percent. one of tenths at growing a rate nine times that of the city as a whole. Allston-Brighton grew in the early 1900's as a street car of line" "green the Authority Transit Bay and Brighton, in Avenue Commonwealth The automobile. private Massachusetts the down runs still of independent suburb abandoned trolley tracks can still be observed on Brighton and Avenue Street. Washington and homes availability, retail to Due this streetcar built were establishments close together, and few provisions were made for off-street cars parked on major added traffic, vehicular Increased parking. roads connector has led double to serious to traffic congestion. Traffic and parking are now two of the of developer the and community, impact which problems primary the Allston-Brighton this parcel must be prepared to address these issues of community concern. Neighborhood History the As Back Bay and Square Kenmore of areas Boston began to be filled in the late 1800's, the street car lines were being The area. extended result was that were built in developments portions of Brighton. near the packing towards west, Wahn site, operations high the the Allston-Brighton residential quality, southern and western However closer to the Charles River, stockyards, were built. 22 slaughterhouses As the nation and meat grew and were introduced, rail cars expanded west, and refrigerated the Brighton stockyards declined in importance. the In of parts example prime The together. some overall an commercial and of this effect of result such as uses, of lack this can be a as planning, body shops auto is Avenue Western Allston-Brighton. the of noxious various in and of zoning and planning can still be observed original lack many residential, mixed being uses industrial in in resulted and plan, were lacked Development homes. residential cases stockyards warehouses, plants, industrial with replaced failing the 1900's, early found adjacent to single family residences. In 1986 further restrict the flow of shops are the body auto both on parking cars and of sides use, predominate chain disrepair do comfortable structures the further not adds and an for make cars environment. Many Western Avenue along exterior fences, link of their to the buildings feeling of in have although some The large asphalt states of pleasing or various the owners done little Green the of to visually appealing, neglect. and lots car esthetically of Avenue Western Used traffic. retail and residential uses are present. lots, of one is Vehicular traffic is almost always congestion and neglect. heavy, Avenue Western of character the make which spaces trees are virtually non-existent in this urban location. 23 and factors, many residents of this Despite these negative area development potential Western for there that feel Allston-Brighton of Avenue. As is rent future rates for commercial space continues to climb in downtown Boston, some firms alternative location. good access to public Brighton look to to Boston Proximity Brighton the Massachusetts Turnpike, transportation, an to beginning are attractive and low location industrial users. 24 and as an Cambridge, access to MBTA rent levels may for office or make light THE MASSACHUSETTS FILM INDUSTRY CHAPTER TWO: Based on preliminary discussions between the George H. film production Boston based Wahn Company and Filmarts, a company, Wahn is considering the development of a new mixeduse structure at include an would 450 highly the meet to soundstage elaborate structure new The Avenue. Western specific needs of Filmarts, as well as warehouse and office space for the Wahn Company. film The type the production work series needed activity of attracting like a a to art" large accommodate Filmarts "state of and York New scale, major in Boston are considered which would be facility Film to Boston which support to a length feature and cater primarily to industrial clients. small, the in Massachusetts The Most of the present soundstages soundstage. would industry. is Massachusetts in industry successful television film and is been has Bureau growing and healthy production Los Angeles style users. the For such a Wahn Company to highly specific use consider structure, development the it is of important to understand the nature and structure of the film industry in Boston. All development projects have construction, is built and to suit leasing risks. Filmarts, the must also be considered. 25 inherent financing, a soundstage However, risk of if the film industry of composed and films, feature commercials, films, industrial segments: distinct several is Massachusetts in industry production film The The rentals. equipment relative growth and health of this industry is discussed in A chapter. this and competition, on reliance their the their Filmarts, concerning discussion of production a weekly prime time television program, is also included. Film and Video Production in Massachusetts firms Massachusetts the film and educational the industry. and greater in industry visible and highly only are the actually are one Commercial, state. the productions aspect of industrial, backbone of Increased demand, new filmmaking techniques filmmaking creativity have all helped to fuel Below is Boston film industry. of the growth film films length feature prestigious, in a wide variety of Although activities. production the engage a short description of each of the major film production segments. Industrial and Educational This makers public sector in of source largest films, training communications film for large Approximately one half of the $43 million worth falls video of income of includes and relation work and internal production state the Massachusetts, companies. of is work generated into this equipment sector. is by the The rapidly 26 film industry in the ease and accessibility replacing film in this segment of the market. Industrial and educational films are require location shooting, the production do often they staff is not small, inexpensive as compared to commercial is and the equipment as produce to inexpensive relatively production. Commercials Commercials and national not grew to $8.0 and 1983, in figure does This television local by produced million $5.5 in 1984. million commercials include about generated consumption both local for houses production by local stations for their own use. is There a in community commercials for in Boston New and reflection film market 1984. really of is one York, the the turn do for to York New more of national growth of this Jeneski's many per much out work fact that Advertisements Boston are make the amount of money you have to can intense a clients that to York. New to Productions", going to alternatives shoot to easier travel notes house, commercials, and that "for spend than "Duck Boston's production commercials looking of it finds now rather Boston in Jeneski Loretta which Boston, advertising successful and very talented in dollar caliber."1 segment of the firm grew 100% national, European Japanese accounts have recently been filmed in the state. Feature Films 27 A in and budget, Large companies from Hollywood people segment. technical of outside are usually type this movies, Approximately local as well expertise and services their as production length market this from benefit facilities and as companies, production Local full pilots. in 1984 in spent was million $6.1 for television and series television to work production outside by primarily done is Massachusetts film production in the state of feature utilized by the Hollywood productions. There small are also many production companies local in the Boston area. These Boston film producers are able to the yet inexpensive, produce to area the in neighborhoods of flavor and diversity the of advantage take films. powerful Equipment Sales and Rentals activity of feature more smallest required, film production the length equipment films rental and and on $2 million for about and accounted state, production the of segment is directly tied to The activity in this segment in 1984. As the in industry the the is This industry in general. location shooting support services will is also grow. A large portion of film lucrative niche rental Massachusetts of production for the Filmarts revenue is due and this is equipment, firm. and New England 28 As film continues production to to the a very within grow, Filmarts the from benefit will rental for demand increased equipment. As in shown production is production commercial but Masssachusetts, in revenue all of half educational and industrial nearly for accounts production 3, Figure growing faster than any other segment. film and television production revenue dropped Feature in slightly large this but 1984, number of location be noted that should television production past years. five in correction in occur future the spikes, segement and 1984, have from similar film feature film and steadily over the by followed be assumed a to inherent these television and a healthy overall shown feature despite However, years. 1983. can spikes It in was 1983 in exceptionally shot growing been spurt the to productions revenue has The due is production growth rate of 14% per year over the past five years. 4 Figure Massachusetts The 1984. production shows overall the industry film and health the vitality exhibited is industry for pattern growth of by years the the 1980 for the through Massachusetts average annual growth rate of 22 percent during that time. 2 Massachusetts Film Bureau Los top two Angeles and New York film production areas production costs in those 29 have traditionally of the country. two centers been the However, as continue to many television and film production companies are escalate, those leaving has Massachusetts to cities do of advantage taken in work their areas. other by situation this Film creating a government agency called the Massachusetts Bureau to state. According spending attract and has Massachusetts in bureau, film the to in film production encourage increased production film 25 the percent each year since 1980, and reached $43 million in 1984. The provide Massachusetts assistance every phase of and film, Production post production (MFB) is and cable video film production. "Massachusetts production to Film Bureau committed to In its glossy Manual" services in companies 150 page pre-production, are individual and company profiles are included. listed, and In order to assist and expedite film production in the state, the film bureau also provides the following services free of charge to producers: o Assist in location selection o Permit acquisition o Liason between state agencies and production companies o Assist in negotiations with local union officials o Arrange for police to provide traffic control o Arrange accommodations for scouting crew and production personnel o Provide a MFB representative to work with production company during location filming. 30 order to convince would enrich their Michael Governor Angeles to dinner at continues to keep governor has recruited production A state. the comfortable Hollywood. the limelight, a cameo appearance Elsewhere", in produced in Los was that Dukakis popular Boston. in time prime the Angeles, the as the set is weekly NBC an Elsewhere", which gala Garden with in Los to Brothers Warner state series, style Bistro the "St. go to Hollywood convince to television Hills Beverly MFB actually is series was made show "St. Dukakis the by was Although Hire" for Massachusetts television For posh the orchestrated "Spenser: S. pitch location filming on that Brothers Warner In to the Boston area. television series film and length feature the MFB is to attract primary function of The drama Boston industry still benefits, as the weekly show acts in effect, as a free commercial for the state. "Runaway Production" term The fact their that work "runaway many Los to production" used to describe production companies Angeles other is locations due to the the are taking spiraling costs associated with film projects, and the fact that filmmaking is in other locations. The often easier industry that a non-polluting into cities, While a local economy. now have New York, Texas can pump millions of dollars Virtually film bureaus and 31 film production is to every and some film production. attract Colorado state, are the leaders in Hollywood, from away production film attracting the Massachusetts Film Bureau is also among the most successful kind. agencies of its it finding and in in chose to shoot "real people a shoot around pool casting was Boston in that they real situations, approved by the ad Harmony allowed were and were not to limited according unions",3 now Los Worker" that reason a segments of American The Boston. are shoot. to shot several the making companies Boston to to "Salute Beer Budweiser campaign to come to economical based Harmony Productions Angeles a production and of costs increased the for related production Hollywood the commercial, or film reason one is unions of strength The to Thomas Tyson of Harmony. One of the many services of the the Massachusetts Film local with union officials and also local the the Alviani, unions. Secretary and Dukakis in arranging meetings with to provide assistance is Bureau film With assist the is bureau cooperation from the Boston union Such is still union cooperation of influence Economic of in the negotiations Affairs get to able Governor Joseph extensive leaders. is a recent occurrence. fighting a reputation D. Boston of having difficult unions due to an incident involving the Teamsters union during the filming million of "The Brink's production, Job" directed movie by in 1978. Academy This Award $12 winner William Friedkin and produced by Dino DeLaurentis, resulted 32 in for terms prison 25 in diversity of Local Teamsters of two members Boston for racketeering charges. radius within a greens, town New England Boston. of engineers high-tech and workers mill outside attract Harmony Films was able to find authentic production crews. fishermen, a has further which locations and scenery also Massachusetts of state The fifteen mile rolling farmland, vibrant urban activity, and the Atlantic wide a provide Ocean four The filmmakers. the to contribute also seasons for backdrops natural of variety variety of the natural and manmade environment. 5 is a schedule of television or feature Figure A major Los Angeles production shot on location in Boston. such company Warner Brothers, Pictures, with at involved Studios was Paramount or Columbia Artists, MGM/United as films least one project per year since 1977. Although only six major projects took place in 1985, detective during location in a a around and believes sixteen Boston. impact entirely schedule, Massachusetts The on the on Film "Spenser" will have that the production of tremendously positive economic health and of the Boston film production market. visibility For pilot week twelve shot which Hire", time prime network ABC the was "Spenser:For series episodes Bureau them of one in Boston during Brothers when example, a twenty employed 345 "Spenser" two local 33 day shot the period people two first in through 1985, hour Warner eighty five was Brothers the of assistance able to get cooperation extensive Warner Bureau, Film Massachusetts the With period. week four that in vendors separate local from unions, state and local agencies, and private owners. Filmarts of One Massachusetts Hire" Filmarts soundstage. Hollywood scale the owner has a "Spenser:For Filmarts been has the located at soundstage of work production International, Ltd., Production largest beneficiaries largest the New England's of foot square 10,000 Field Soldiers 1380 Road, directly across from the Wahn site. According to of Commonwealth personal not sound stages clients. are There other 6 stages in as and facilites are much smaller, and are primarily rely stage sound acknowledged sound for television productions. Figure stage space major the Filmarts was always Boston, but the suitable is "Which posed facility. major around was Boston?" in facility the interviews with various Boston production people, question the of course the During Massachusetts. the in listed soundstages eight are there Manual, the Massachusetts Film Bureau Production shows the on Most of the commercial summary of industrial comparable in the Boston and New York areas. 34 and other sound 1978 In the to equipment at facility About Field Soldiers in space rent now companies production and lights 1980 into a ten separate Filmarts the goal Filmarts' Road. grip In industry. film film production center. and soundstage production film manufacturing building light a converted Filmarts a cameras, England New as founded rented primarily which company was Filmarts to is a total production center for Boston's film industry. offer While the is soundstage facility, Filmarts the major attraction of this to operate an active equipment continues rental business from the Soldiers Field Road location. Warner client for For June through in a very of terms important and income sixteen week shooting schedule, Warner the have will is "Spenser" both Filmarts, visibility. Brothers and Brothers the entire November. sound Instead of stage having occupied a from series of small clients doing three and five day shoots, Filmarts now has the relative stability of a single long term tenant. In brings addition, notoriety "Spenser" landing brings a major improving just to the as the "Spenser" and Commonwealth same notoriety client such as Warner Warner Brothers of Massachusetts, to Filmarts. Brothers, Filmarts By is its reputation in the national film industry and proving that Boston has the facilities and technical talent to produce top quality feature 35 films. and in local then show, weekly the vitality of the segments production commercial cancelled to the "Spenser". Due of success Boston, if ABC-TV facility. In to diversify buisness helps addition, the equipment rental industrial production small would actively book the soundstage companies the upon dependent entirely not is Filmarts of strength financial the officials, Filmarts to According the Filmarts operation. area, Boston Greater the largest does have be may Filmarts While it facility large other two the in competitors, both affiliated with area television stations. Studio 5 Productions, which is a subsidiary of Channel 5 in Boston, began its Studio 5 facility is 10,000 square feet, as 5,600 square Filmarts. at feet operation in November of However, and expertise studio greater and to the Boston corporate and one of can the take advantage reputation. Boston of Channel market after Channel has the technical 5's 5 decided to open this that determining industrial production. advanced 5 local televison facilities could not support most The opposed to the Studio advantage of being affiliated with a major station, 1985. the the demand for Although Studio 5 is production studios in the northeast, their focus to date has been on cable television productions, production. television The studio conferences and limits their size commercial ability to compete with Filmarts for a weekly televison series type of 36 be can it although work, production for competitive very corporate and commercial work. affiliate Boston the WGBH, two soundstages independent film and commercial major a of expertise technical Like producers. soundstage WGBH the Broadcasting Public the which they actively market to System, has Productions, of also can television Studio 5 the offer production company. film The healthy been with growing, and rapid enjoying production growth. in successful The industry all of segments feature the industry Film Bureau Massachusetts attracting is Massachusetts in length has and films television series to Boston, which is the type of activity needed to support a major of the soundstages current primarily Productions, to industrial and WGBH are soundstage facility. in Boston are clients, the only small Filmarts, local firms accommodate large scale, Los Angeles style users. 37 While most and cater Studio which 5 can MARKET CONSIDERATIONS CHAPTER 3: be to designed is proposed soundstage The finest the The design requirements of facility of its kind in Boston. the soundstage are very specialized, and result in a costly be lease the space, the Wahn Company will to left holding an proposed soundstage is so specialized, and why the discuss not This chapter will use. with a unique structure, expensive decides Filmarts reason, any for If, structure. offer alternative uses for consideration. The initial architectural design includes two isolated concrete foundation slabs to prevent transmission of noise and vibration into the studio, as well as twelve inch thick interior masonry The control. to column open, structure must spans, and the free a supporting accommodate these design criteria, resulting per pounds is structure lighting heavy of 200 acoustic stage also requires ninety feet of The capability weighing interior interior sound partitions alone are estimated $400,000. cost for walls partition grid. To long span steel trusses are foot linear have the required. efficient, acoustically The although very expensive. The typical Boston soundstage is much smaller in size, and is usually a renovation manufacturing facility. usually about fifteen an of old warehouse or The clear height to the ceiling is feet, which 38 is adequate for filming and vibrations from street do not a problem in simply extensive converted warehouse the of structure the to renovations and undertake to required capital the have Sound companies sound the as for sometimes traffic are facilities, renovated these inadequate work. production film feature television is but work, industrial and commercials space. The proposed stage will give Filmarts the chance to design the construction costs, into The proposed studio may higher rent levels for the tenant. be be translated in turn must which large to lead will criteria specialized these However, requirements. exact their fit to studio very expensive from a tenant's perspective, although it will unquestionably be the finest facility of its kind. It area is that estimated current at space built at a the net, for the Road. One of the is to determine if the structure can largest considerations be Field Soldiers 1380 in foot, square per of eight to ten dollars now paying is Filmarts be can which cost into translated an affordable rent for Filmarts. A second consideration this type unlikely that fact that currently in is the only user which would Boston Filmarts in the is of large, is there specialized scale, 10,000 the healthy another full Boston. Despite square 20 It is highly work to support space. production enough foot percent be interested soundstage in growth of annual the film production industry in Boston, and the 125 percent growth in the past five years, 39 only a small percentage of The that work requires the use of such a major soundstage. if soundstage would be Filmarts agreed to long percent pre- arranged, thus could be financing terms leased, attractive commit as a 100 virtually building the With tenant. the construction of Wahn to proceed with the only way for reducing Wahn's development risk. requirements, physical stringent with Along Filmarts will also bring stringent schedule requirements which must be to For Hire." to be so the full for time in would Construction to have is income "Spenser: new soundstage would have the coordinated for schedule production Construction of closely completed week sixteen the due Filmarts' of portion large A accommodated. that of season start be facility could the in immediately the for work. "Spenser" to order shooting 1987 soundstage operating schedule. At present, only schematic design work has been completed, and no is more the have start 1987 permits have likely, and acquired. been allow would for A spring a summer 1988 opening. Hire" is another For Hire" show is a ratings. If success guaranteed. now, favorite popular how long the that be success of consideration The cannot determine the market major thought. considerable televison on reliance Filmarts' of "Spenser: which warrants a Although there is prime-time "Spenser: no cancellation would is cancelled have on the 40 by ABC-TV, the to way show will continue to enjoy its "Spenser" For high impact financial strength of in financial the consider carefully must Wahn advantageous. clearly is Brothers Warner as such client stable financially term, long a cancellation, "Spenser's" of event the in soundstage the of utilization full result will term users short that confident is management Filmarts While considered. carefully be must Filmarts of strength Filmarts, because if Filmarts goes bankrupt, then Wahn will be tenant replacement a and service, debt large facility with specialized highly new, a with left a be will difficult to find. Manufacturing Use Due to Wahn's reliance on a single tenant with limited building the be converted high The of manufacturing use. an in limiting his the deal, items as would be may be or the If structure manner economical for industrial downside risk ideal for prohibitive. height be ideal for be can effective footings years and rents then Wahn will use, of double a and designed be out of if Filmarts either backs fails after several independent large that the so use. and will soundstage the competitive be will requirements loading floor it can easily industrial or manufacturing light into to consider for Wahn soundstage in such a manner that requirements built wise may be it strength, financial occupancy. Such foundation slabs vibration isolation, although the costs If Filmarts 41 could agree to a less then structure, costly less therefore and sophisticated Wahn will be limiting his development risk considerably. the film production feature televison and The be described on can relies area which Filmarts Boston in market as a market of spikes--short peaks followed by sharp, rapid Historically, the commercial declines. has and present an alternate office class first a soundstage, a to consideration television may determine As unacceptable. is risk total the that the of Wahn project, a development of risk spikes industry are added to the ever film production feature the when However risk. inherent Every real estate project has cyclical trend. a more estate market real building should also be considered. Office Market building While with associated buildings there possibility, that developing there two in this area of Boston. one office "Harvardview", Steet, Lincoln 1985, leased. The second half mile east of the Wahn parcel. square 92,000 a quarter mile south of the Wahn site. late risk Western class first is One on use of type only are considerable is a square foot structure located at 230 Western Avenue, 50,000 about a present At Avenue. 214 is parcel Wahn the building on office class first a and 214 by mid Lincoln is 1986 Street, about one- Harvardview opened in approximately completed approximately 92 percent vacant. 42 building is in 75 early percent 1986 is good benefit of Harvard Square access of whose in this area neglect a general is and there users, for office few amenities feeling There clearly not a visually attractive area. location is are Avenue Western the Boston, Downtown and to and proximity Pike Mass the to the enjoy does location Avenue Western a Although is predominant use auto body shops, used car lots and storage facilities. constructed estate real Harvardview was of the Caruso firm which claims that Harvardview created had previously existed. none of owners the represents leasing where market Harvardview Joseph Avenue. Western 230 at perception, locational this Despite office an Although originally projected at twenty to twenty three dollars per most foot, square were leases the of eighteen at signed dollars. Lincoln Street can be 214 does but not five square feet rented, of was offered for which construction is and sale has has building office story foot, Pike. the to have direct access square building seen from the Mass Turnpike, currently immediately severely The 92,000 had 7,000 The sale. for upon completion hindered leasing the progress of the building. An office user who is considering the Allston-Brighton area is a esthetically little is price insensitive. personal enthusiastic sensitive client about user, If an contact at reducing 43 his and must office this be user virtually has very place of business, overhead costs, and at the same time wants a Boston address, location may be ideal. the of home space office a for a courier firm which does a Such then a prospective Western Avenue tenants might be temporary employment agency, service, or the office considerable amount office for any type of of telephone sales work. One of the difficulties with the Allston-Brighton area is that office users considering that location will also be looking at space two markets Brighton, might be they are office markets benefits. estate in Newton and Although these slightly more expensive than Allston- also more with established virtually the and recognizable same locational Dennis Finnigan of Hunneman, Inc., brokerage considering location, Cambridge. a firm, has noted Allston-Brighton most tenants choose that when location the a Boston real a and Cambridge tenant a Cambridge location, if the rent rate in Cambridge is slightly higher. current little, softening of the Cambridge market, is there even With the is now if any difference between the rent rates in Allston- Brighton as compared to Cambridge. Concerning advantage to Cambridge. by Authority locating In Massachusetts served vehicular the "Red the and Kendall Line" system. there is Allston-Brighton addition, Avenue subway in access, of the This 44 virtually as Cambridge Square are to a compared to markets of both directly Massachusetts access no Bay Transit rapid transit the by enjoyed advantage tangible significant a is line Cambridge office users. Figure square so is with over 15,000 office market Allston-Brighton The space. of feet buildings large for Allston-Brighton area in firms brokerage few major limited at present that the in rate 66% vacancy a currently is there 7, in shown As bleak. is market Allston-Brighton current the to rise, the Boston vacancy rate also continues and market, Cambridge the in softening general a is there While town keep statistics on the area. building at site is 1.0. FAR allowable not are parcels adjacent If current the that fact the is this office proposed a concerning consideration Another acquired, or if a variance is not sought, then the building be must size to approximately could be obtained variance a If limited floor area greater or height, would which then feet. square 30,000 an of economics the more allow office building may begin to become more attractive. The was items four the of the months most building to and through go important a building which is zoning the variances the height restriction of sixty for variances in obtaining successful variance which was feet seven different and code, thirty five Western Avenue 230 located at Harvardview project it took procedure. granted only One was of that feet was waived, and high was constructed. It should be noted that like the Wahn site, 230 Western Avenue is adjacent to a residential neighborhood. 45 locate an office to project would be associated with this risk financial his limit to Wahn for way One There tenant who would be a joint venture equity partner. f irms are many rather owners, the Boston area in Since the tenant both equity and stability to the project. in tenant of a the in the development meet have, to Wahn for partner building, Wahn risk associated By identity. will will be a become removing with an office a to addition in who space special the corporate a venture joint future to might with building distinctive bringing they that requirements financing joint venture partner benefits the designed facility a having partners venture joint likely In addition, consider. by be might a Computer related or financial service at attractive terms. firms space, office provide to inclined be lender would prospective the of virtually all pre-leasing be would If tenant would bring then the found, could be such a tenant to become space. office their of renters, than anxious who are much project in the Allston-Brighton area. Each of manufacturing, and However office light alternatives--soundstage, three the use, have inherent risk. project to the office building appear the soundstage and be considerably more risky than the light manufacturing use. The building of a soundstage may be attractive, as the project start will of be virtually construction. uncertainty concerning a prior 100% pre-leased However, major 46 there tenant is to the considerable which relies on the be will which of needs the suit would which structure of this expensive less a developing by building Some to locate. any tenant substitute a specialized the will be difficult reduced be can business, utilize to able characteristics risk of out goes Filmarts reason, for If, series. television single a of production Filmarts, at and the same time be easily adaptable to a manufacturing use Filmarts decides can it longer no the with associated be if project. The this site also contains a had the sense into office square feet of space space to will the noted that these of eastern end Harvard Square does The existed. School It risk. themselves to be The "pioneers" they have developed an office use where none previously it must be on building of element large Harvardview developers consider in office class first a of development conversion market not appear as in and late offer Mass Pike than if George Wahn Barrett the additional two projects are Western Avenue, and the an bring of 1986. However located at the better does 30,000 the access to Wahn site. is willing to assume the risk of developing an office building in a market where the strength of the market is doubtful. 47 DEVELOPMENT PROPOSALS CHAPTER FOUR: facility consisting office space. manufacturing industrial/light space an third The building. and be will proposal second The mixed-use a warehouse soundstage, a of is first The chapter. this in considered be will proposals development separate Three proposal will be for a first class office building. Copley Estate Real the Advisors, estate real development arm of New England Life Insurance Company, uses a first hurdle For Bill year rate return when comparison, on reviewing the present for projects yield 6 percent. approximately is of capital total 11 percent their as a portfolio. on a one year Treasury By using this measure, one can quickly discover the merit of a particular proposal without getting into a sophisticated after tax analysis. If the project has an 11 percent return in the first year, before tax, then the return will only improve with time, and after tax considerations are taken into account. Each of the three alternatives will this first year rate of return measure. Mixed-use structure 48 be analyzed using The facility consisting mixed-use story, space office for Filmarts a of two foot, square 35,000 a is proposal first and soundstage as well as warehouse and office space for the Wahn Company. The 8,335 a foot sound studio, and 12,000 square feet of office square The Wahn Company will space for Filmarts or other tenants. space as well as 3,000 have 8,000 square feet of warehouse feet of office space. square Due consideration. by Filmarts, and the four to as loading bays required on- loading bay for Wahn, one additional parking surface truck design major a are requirements Parking site have will facility foot square 35,000 required the by code zoning be accommodated. cannot One design alternative utilized a below grade structured An initial arrangement. parking provided by a national cost premium of construction company This cost included reflected a this below grade $1.25 million to provide structure. parking feasibility cost estimate sheeting, shoring and bracing, as well as dewatering and excavation costs. Faced with this large options. several raised to first The to accommodate meet the zoning premium cost, the developer floor of the structure parking; an off-site requirements might be could be parking facility acquired; variance from the parking requirement could be sought. 49 has or a The zoning code allows off-site parking, provided that it 1,200 within is which have been lots. In addition, feet the of as identified due parcel. to There potential parcels off-site parking amount small the two are of traffic which will be generated by this project, a variance may be a possibility. the variance Appeals Both the alternative hearing and off-site will will require add and parking alternative a Zoning months several Board of to the development schedule. Shown below are the major assumptions used in first mixed-use proposal: Building Gross Area...........35,000 square feet Hard Cost..................$100/square foot Soft Cost..................20% of Hard Cost Total Development Cost (exclusive of land) $4,500,000 Long Term Debt..30 yr term, 10.5% 100% interest of development costs Vacancy rate............................... 5% Contract Rent Rate.........$22/square foot Real Estate Tax......................$2/ft Land Contribution..................$500,000 Off-site Parking Allowance........$100,000 50 this As first shown year in economic the return analysis capital on is in 8, Figure 11.7% for the the base assumptions, which exceeds the hurdle rate of 11%. for foot square 8 paying present their to location 10 per dollars 1380 at Soldiers Wahn between on preliminary discussions Based Road. Field is Filmarts Currently and Filmarts it appears very unlikely that Filmarts will be to willing their double rent current for even overhead, more advanced facilities. The (DCR) rent $22/sf of 1.18, the rent rate which yields a is fairly coverage debt conservative ratio figure. If then the DCR falls to 1.06. lowered to $20/sf, is a At $18/sf, the debt service can no longer be covered by the net project income. A sensitivity performed project varies as cost rent shown analysis of first in 8, which Figure 11% rate the $12/sf, of return owner and land), would of absorbing a result. would receive a at total the varies the was time same project was built, and If a $3,000,000 rates. if Filmarts was capable a of (exclusive return year rent cost of At a rent if 11% return $16/sf, rate the of total development cost was $2,000,000. A $2,000,000 rent the project comparable to (exclusive Filmarts' of land) present would show an adequate return to the owner. of $12/sf, first year the DCR return would would be a be 51 conservative 11%. would quarters, make and At a rent rate 1.27, However, and the significant the construction hard For a cost. construction $100/sf a current of Filmarts result project, $2,000,000 be have to would costs the present criteria to meet the requirements design in at as required, be would redesign significantly reduced to $45/sf. In order to the rent Filmarts, by Filmarts nor a If Company. be paid by the George H. Wahn can it redesign drastic that such undertaken, is then the rent rate to $45/sf, costs are reduced the project is office space rent, and cannot be to first class comparable the rent rate This on captital. $22/sf the provide to and coverage debt year return first required paid the satisfy to range in be to have would level of requirements design the accommodate reasonable $12/sf. becomes a more Warehouse/Light Industrial Scenario building. industrial will structure studio, costs and will be parking proposal are simpler estimated fifty dollars first proposal, a site much than per similar The to financial the first previous hard square $100,000 allowance is lot. the included assumptions and As in film the for an offfor are below: Building Gross Area................35,000 sf Hard Cost............................$50/sf 52 of construction foot. proposal, type this of the that warehouse/light a for construction The is it be is proposal second The this shown Soft Cost..................20% of Hard Cost Total Development Cost (exclusive of land)......$2,300,000 Long Term Debt...30 yr term, 10.5% interest 100% of development costs Vacancy rate..............................5% Contract Rent Rate...................$13/sf Real Estate Tax.......................$2/sf Land Contribution..................$500,000 Off-site Parking Allowance.........$100,000 Assuming a rental rental as shown is achieved, an 11.4% in Figure debt the then $10/sf, to slips rate $13/sf results, return year first rate of If the not be by 9. can covered by net operating income. on Based McCall Leggat, real estate and Waltham square included Avenue August and areas This 1985 market survey conducted a Boston based, full service the Brighton, Newton, Werner, brokerage foot. physical an firm, from range characteristics location, this four variation large in the study. in rents and to twelve is due location per dollars to the various of facilities For a new facility, with a Western proposed R&D facility should achieve the higher end of the rent spectrum. shown As Figure in the analysis sensitivity included in 9, if the total development cost (exclusive of land) increases to $3,000,000, then 53 a $16/sf rent rate adequate and ratio, reduced the the satisfy still and the then $2,000,000, to $11/sf to reduced be could rent be can costs development year however, If return. first coverage debt conservative a have to required be would return and debt coverage requirements. use space This type site. this of provide the the Brighton the in remain also would and Company, Wahn Company could remove much of addition, the In area. structure would to desire Wahn's George satisfy appropriate Wahn the of requirements a most be to of Avenue, Western of context seems use manufacturing light site the Considering of the facility for its own the project risk by leasing 30% use. is paying space in Company Since must it However the be may $11/sf, it relocate his less that noted be $5/sf than new at for manufacturing current space. facility will be for Wahn to advantageous financially operation to less its Wahn the present expensive quarters, and rent the new building at a higher rate to other users. First Class Office Building The class alternative third office building, $100/sf, and Financing terms options. a total remain is a 29,000 construction hard with development the same square as cost in the of first costs of $3,580,000. previous A gross rent rate of $25/sf is assumed. 54 foot two The used were assumptions following office this in building alternative: Building Gross Area................29,000 sf Hard Cost...........................$100/sf Soft Cost...................20% of Hard Cost Development Total Cost (exclusive of land)......$6,100,000 interest Long Term Debt...30 yr term, 10.5% 100% of development costs Vacancy rate.............................5% Gross Rent Rate......................$25/sf Real Estate Tax & Op Expenses.........$5/sf Land Contribution..................$500,000 Off-site Parking Allowance.........$100,000 As year first return of rate in analysis economic the in shown 11.3% is 10, Figure base the for the assumptions, which exceeds the hurdle rate of 11%. However, has not Lincoln vacant. yet noted as been Street earlier, established is being Harvardview class the in this at offered originally hoped area A office of $15/sf, to get market 214 Boston. and is 92% in the low twenties for their space, but signed most of their deals the eighteen dollar range. the Allston-Brighton market Based on current market demand, cannot in the near future. 55 in attract $25/sf tenants In 10. Figure in included is level rent If the 1.18. is DCR no then the project debt can $22/sf, to from $25/sf drops the case, base the and alternative, this for performed was varied rate rent market the as ratio coverage debt the of sensitivity the measured which analysis An longer be covered by the net operating income. sensitivity the measured project total the sensitivity second A year first the of (exclusive return as both the rent and land) the if that revealed analysis This varied. costs of which performed was analysis the of scope project could be reduced to $3,000,000, then a rent rate of could $22/sf be 29,000 this eighty of cost square foot building would have a construction first class office work, could be indicated all including building, constructed has area the Boston in tenant approximately for major A foot. square per dollars six contractor general costs, soft for percent 20 Assuming 1.18. conservative fairly a be DCR would the criteria, these With 11.2% owner would the return to be charged, and the that a finish eighty five dollars per square foot. There class it office rates Rent the A is in considerable building at the low this first year return criteria is unlikely Brighton, when that tenants alternatives of 11 will such 56 time will twenties in risk market be as be in developing Western necessary percent. willing Newton, Avenue. to meet At this to a locate Cambridge time in and locations attractive more offer Waltham and amenities at the same level of rent. the In addition, It their with the move, initial Figure 11 is discussed. highest return, both identical and rates manufacturing this Class A office for difficult very Wahn the and warehouse space office as However, the costs associated well comparison a The as any and the $22/sf George manufacturing of facility return, contains the of soundstage however the Filmarts office as have to Wahn Company would in increase rent factored into the analysis. options the be needs are very basic. would have to be for not should locate acceptable Company to H. present operation under relocate their scenario. George proposal development generates H. Wahn Company. scenarios the the is prohibitive rent rate have substantially While virtually development compared to an office use for this site. 57 three less of a risk as CHAPTER 5: final chapter will attempt to discuss some of the This for The effect of the Interim Planning Overlay this site. Wahn Company the for methods and District development future a with involved considerations broader BROAD CONSIDERATIONS the reduce to project risk will be considered. Effect of Interim Planning Overlay District making When effect the of select, to alternative the consider carefully must one development which to as decision the (IPOD), Interim Planning Overlay District and the concerns and objectives of the community. IPOD The community by the By October by the the IPOD by with the the and how the for quality and Code. of the of BRA and groups. Wahn be affected the and leaders At the as establishments, and traffic and parking concerns were raised. 58 an issues PZAC, retail become conversations community the Committee. George uses will informal zoning staff housing, Zoning proposed conducting meeting Advisory drafted be will Allston-Brighton organizational affordable IPOD process of being drafted Zoning and Building investigate meetings of Planning the 1986, to amendment should is currently in the such its location on Western Avenue does for a residential As use. it appropriate not make proposed development long as the the context plan provides a use which is compatible within of the support lend will groups community truck activity to perhaps then residents, adjacent the disturb would which will not create early morning and residents, facility will Allston-Brighton for jobs accessible easily provide industrial that a new light can demonstrate George Wahn if fact, In site. at this new structure to a opposition be much community should not area, there the and industrial, for primarily zoned is site Wahn The the proposed project. soundstage the Although prohibitive proposal may have rent rates at present, if the studio could be redesigned so could expect Bureau support full the this concerning rent, the afford could Filmarts that the of developer the Film Massachusetts fact, In project. then the MFB has already taken an active role in lobbying for the support of the which influence to feature MFB may convince importance films MFB Massachusetts of the Department, by the Since Commonwealth production studio music a proposed being is Productions. the of development of is the a be the to BRA and glamourous, and exercise the new soundstage. 59 division a Commerce able of Giosia Robert is Dorchester in Global of the Development considerable community groups of The production of quiet, non-polluting industry by welcomed be should and area, the for the Allston-Brighton neighborhood. Methods for Wahn to Reduce the Development Risk Wahn the discussed, proposals three the of each In Company has limited its risk by not investing any cash into the the contribution of The project. been Wahn Company has limited to the value of the land. The Filmarts proposal stage sound committed as was Wahn the and Filmarts With construction. start of Company as to the prior a tenant if considered should only be tenants, the structure would be 100 percent pre-leased, and would remove much of the development risk in this project. film the Although production in industry If soundstages. it would speculative not large this which of a Class A amount of development portion premier to feasible terms, lease term long concerning soundstage build a pre- as a venture. Development a be come to a cannot and Wahn Filmarts large additional for demand great agreement construction then a be to is a there does not healthy and rapidly growing market segment, appear Boston Charles River office space. risk, of Western Avenue Allston-Brighton enjoys office building also contains better will location. vehicular as ever unlikely that is it be considered Soldiers access and Field views has more potential to be developed Pre-leasing would 60 help to of into reduce the Road, the prime leasing conditions, market on current based but considerably, risk it is doubtful that such pre-leasing could occur. option The is the manufacturing/industrial proposal, since such a risk pre-lease to able be Company would Wahn the addition, in the area. present use be consistent with the use would In development overall least the has which approximately 30 percent of the facility for its own use. the If then structure, be could Filmarts this debt makes project the accommodated a perhaps the be to the Company, Wahn best facility would generate level rent the return, of rate highest cover the mixed-use Although alternative. H. appears proposal manufacturing light George the of objectives development varied the considering after conclusion, In necessary to infeasible. alternative a with expensive less could facility soundstage be developed. manufacturing The varied the By which will value of site is the constructing a new, of value Wahn. and objectives development the replace the the of George first present land will increase. best will proposal satisfy Wahn. Increasing of objective income producing neglected the George facility structure, the Through thoughtful design use of materials, the new structure may also encourage renovation of adjacent commercial and residential properties, thereby improving the character of the area. 61 this George Wahn would prefer parcel provide a feels Wahn George would alternative manufacturing the requirement. this satisfy Wahn Company electrical the for space and business, supply that any new development on strong committment to his long term employees, many of whom either on rely or walk in located his both maintain can Wahn at business his locating By Boston. George Avenue, Western A is also preferred, as the company has always Boston address been work. to get to transportation public 450 valued employees and a Boston business address. of Mitigation that both the office the and proposal is evident is it While risk manufacturing light pre-leased percent risk. project the twenty five the In addition, will is it that rent needed to achieved be doubtful at this be 30 reducing thereby Company, foot per square proposal office the dollar Wahn to could use manufacturing/industrial The of for the office return, additional risk must be recognized project. rates similar generate proposal objective. third the project the support location at this point in time. final Wahn's acceptable rate manufacturing of 11 development of return alternative percent for the on investment be exceeds first is objective the an achieved. The hurdle rate capital. The initial year return that on project will have a positive before tax cash flow beginning with the increase first with stabilized time. Long year, term 62 and can benefits to be expected of appreciation will also improve the investment project. 63 performance of this NOTES 1 "Lights, Camera, Money.", Boston Globe, 21 April 1985, Boston Globe Magazine, p. 77. 2 The Economics of Film and Video Production in Massachusetts, Butterfield Communications Group, March, 1984. p. 9. 3 Alex Boston," Beam,"Hollywood's New Star: The Streets of Businessweek, September 30, 1985. p. 40. 64 SELECTED BIBLIOGRAPHY Beam, Alex. "Hollywood's New Star: The Streets of Boston,"Businessweek, September 30, 1985, p. 40 Boston Redevelopment Authority. AllstonBrighton/District Profile and Proposed 1979-1981 Neighborhood Improvement Program, 1979. Boston Redevelopment Authority. Allston-Brighton Interim Planning Overlay District Discussion Workbook, Draft Copy, November, 1985. Boston Redevelopment Authority. Development Review Procedures, 1985. Boston Redevelopment Authority. Zoning Procedures- Boston Approval Process, 1984. Butterfield Communications Group. The Economics of Film and Video Production in Massachusetts, March 1985. Film Investment Symposium '86 notes. Gilbane Building Company. Preliminary Conceptual Estimate, 450 Western Avenue, May 12, 1986. Haley & Aldrich, Inc. Report on Geotechnical Investigations and Foundation Recommendations for Proposed Film Studio, Brighton, Massachusetts, April, 1986. Leggat, McCall & Werner. Letter to George H. Wahn. August 21, 1985. Boston Globe, Boston Globe "Lights, Camera, Money.", Magazine, April 21, 1985. Massachusetts Film Bureau Production Manual. "Office Space Directory", New England Real Estate Directory, Summer, 1986. 65 ,.4 r4 \.0 \.0 FIGURE 2 SITE PLAN &H a egy . is WESTERN o - st Ri: 23 12 (POJEC? Koco maN I 3 :V 12 20 (e1coo s (Ecao 1l 77 4Y ' J * -,.0.. - ELECTRIC 'a AVENUE 60' WIDE PUOLIC) .. . te* Ejp jnR I0 a ;37 06 '0 CROSS CUT A *ES CORNER OF KELLYCOAT 0 -- -O 1)- ~%*1*~~ 2. * PTOdAvIVA1MLL - 44-02-00 E 25 1913 75 * 1(OWa . "s450-454 WESTERN AVE. $4.0C 19iF ~- I4*sagy jot IL53.0 (aPo) I STORY MA SONRYS TRUCTURE '2 CURLEAREA 37109:3a Ft ( .5 was 8 N IL 53.0 (PoAW) NOLO1.7 (Row)i MAIL FUD 29 5 23170 1.40.7y towc) 5.0 (am0F) NL. - i - Jt - k ND aJI 230 27.s6 - a-I ~ T EXIS ~ 40 2-IM .u' 3 27.3 TOP OF U~W. rfou, gse 2 2 *tu'24.s 9 2'SOON 2 2.: . SILL 2, . (O)34 -:s or ;= fls7 - 5U C.C. 2".6 o av(ENr 25 49' 50 a?2 27 ac ) 7I -xX .. Za. l2 -IEO ns ./.4 / ir L a 30.1 E. 62--4 1-14 L a32.9'4' a C2 a24453- 7 -15-0 tL 224 U 27.04'4- R s 6 - .75,a S 34-25-45 L 41. 31 #p * 4)'t0 67 10 20 40 so Figure 3 Film Production Revenue By Production Segment In Millions of Dollars Percent 1983 Segame n tt Seame Industrials $16.0 1984 Chanqe $20.0 25% Commercial $5.5 $8.0 45% Features and TV $7.5 $6.1 -19% Documentary $4.0 $5.0 25% Equipment $1.6 $1.9 13% Other $ .9 $2.0 122% $43.0 21% Total $35.5 (Source: The Economics of Film and Video Production in Massachusetts) 68 FIGURE 4 SCHEDULE OF MAJOR FILM AND TELEVISION PROJECTS FILMED ON LOCATION IN MASSACHUSETTS Year # of Projects MGM/UA COLUMBIA 1977 4 x 1978 4 x 1979 10 1980 8 x x 1981 16 x x 1982 14 1983 10 1984 8 1985 6 PARAMOUNT WARNER x x x x x x x (source:Film Investment Symposium '86) 69 FIGURE 5 Revenue of Mass. Filrm Industry 1980-1984 By Prod uA.tion Sejment 4-5 Other Equipement 4-0 Documentary z 30 Features/TV C -- j 0 -J 25 Commercials 20 S 15 10 Industrials 5 0 1980 1981 1982 YEARS 1983 1984 FIGURE 6 SOUNDSTAGE COMPARABLES Height to Area Dimensions Name of Soundstage Light Grid (ft) (ft) (sf) BOSTON 110 X 90 10,000 17 100 X 60 6,000 18 90 X 60 5,600 26 50 X 50 2,500 14 50 X 50 2,400 15 Videocom 40 X 60 2,400 12 Boston Gaffers 35 X 50 1,750 12 Boston Post Productions 35 X 35 1,225 13 Cinema Graphics 28 X 34 952 16 Heliotrope Studios 27 X 16 432 13 217 x 120 26,000 40 Filmarts WGBH (Stage A) 5 Channel Television Prod. Services WGBH (Stage B) NEW YORK Kaufman Astoria (Main Stage) Kaufman Astoria (Stage G) 134 x 90 12,000 31 Kaufman Astoria (Stage H) 134 x 90 12,000 31 94 x 75 7,050 33 (Stage A) 84 x 76 6,384 16 Silver Cup (Stage B) 65 x 42 2,730 36 Cup (Stage C) 62 x 37 2,294 12 Camera Mart Silver Cup Silver 71 FIGURE 7 OFFICE BUILDING COMPARABLES #fl Rent Building avail vac rent (sf) (%) ($/sf) (sf) Harvardview 5 50,000 12,000 24% 20 gross 214 Lincoln St. 4 96,000 96,000 100% 15 gross 25 Travis Street 4 30,000 30,000 100% 18 gross 108 Lincoln St. 6 23,000 1,600 7% 15 net 150 Lincoln St. 6 30,000 0% 12 186 Lincoln St. 9 70,000 6,000 9% 10.5 net 210 Lincoln St. 9 63,000 3,300 5% 15 net 40 Soldiers Field Pl 1 15,000 0 0 15 gross 1320 Soldiers Field Rd 1 18,000 18,000 100% 1380 Soldiers Field Rd 2 45,000 12,000 27% 18 net 1550 Soldiers Field Rd 1 29,000 25,000 86% 14 gross Field Rd 3 32,000 2,200 7% 16 gross 1660 Soldiers Field Rd 2 50,000 6,700 13% 1616 Soldiers 0 N/A 14 net 13 Total Number of Buildings Total Square Footage 322,000 sf Total Vacant Space 212,800 sf 66% Overall Vacancy Level (Source: New England Real Estate Directory) 72 FIGURE MIXED-USE 8 FINANCIAL ANALYSIS 73 MIXED-USE PROFORMA FINANCING GENERAL INFORMATION LAND SQ.FT BLDG SQ. FT(GROSS) BLDG NET RENTABLE FAR PARKING STALLS HARD CONST. COST 37,109 sf 35,000 29,750 1 35 $100 Ift PERM: AMOUT RATE TERM ANORT. FDS $100,000 OFF SITE PARKING ALLOW $3,500,000 HARD CONST COST 20% $700,000 SOFT COST @ 201 TOTAL DEV COSTS RENT RATE (S/FT) RE TAX ($/FT) LAND CONTRIBUTION $4,300,000 22 2 $500,000 1987 GROSS REVENUE 654,500 -VACANCY 0 5% 32,725 -RE TAX 59,500 NOI BEFORE DEBT SERVICE 562,275 DEBT SERVICE 475,272 CASH FLOW AFTER DEBT SERV 87,003 TOTAL CASH FLOW BEFORE TAX 87,003 11.7% RETURN ON CAPITAL NET INCOME/(TOTAL DEV COST+LAND) 74 $4,300,000 10.51 30 yr 15 yr $475,272 MIXED-USE PROFORMA SENSITIVITY ANALYSIS VARY RENT AND OBSERVE EFFECT ON BTCF, DCR, ROR ROR DCR DEV COST BTCF +D43/D45 +D51 +D43 +D23 $449,225 0.95 18$4,300,000 1.06 $505,750 20 $4,300,000 1.18 $562,275 22 $4,300,000 1.30 $618,800 24 $4,300,000 1.42 $675,325 26 $4,300,000 1.54 $731,850 28 $4,300,000 1.66 $788,375 30 $4,300,000 R E N T 9.4% 10.5% 11.7% 12.9% 14.1% 15.2% 16.4% VARY RENT AND TOTAL DEV COST; OBSERVE EFFECT ON ROR +D51 R E N T DEV COSTS $2,000,000 $3,000,000 $4,000,000 $5,000,000 4% 6% 51 9% 10 5% 6% 8% 11% 12 7% 8% 10% 15% 15 8% 13% 10% 18% 18 9% 11% 14% 20% 20 10% 16% 12% 22% 22 14% 11% 18% 25% 24 VARY RENT AND TOTAL DEV COST; OBSERVE EFFECT ON DCR +D43/D45 R E N T DEVELOPMENT COST $2,000,000 $3,000,000 $4,000,000 $5,000,000 $5,500,000 0.37 0.40 0.67 0.50 1.01 10 0.46 0.51 0.84 0.63 1.27 12 0.55 0.76 0.61 1.01 14 1.52 0.71 0.65 0.89 1.18 16 1.78 0.74 0.81 1.35 1.02 2.03 18 0.83 1.14 0.92 1.53 20 2.29 0.92 1.70 1.27 1.02 22 2.54 1.02 1.12 1.87 1.40 2.80 24 75 FIGURE 9 LIGHT MANUFACTURING FINANCIAL ANALYSIS 76 LIGHT MANUFACTURING PROFORMA FINANCING GENERAL INFORMATION 37,109 sf 35,000 29,750 1 35 $50 /ft LAND SQ.FT BLDG SQ. FT(GROSS) BLDG NET RENTABLE FAR PARKING STALLS HARD CONST. COST PERM: AMOUT RATE TERM AMORT. $2,200,000 10.5% 30 15 FDS OFF SITE PARKING ALLOW HARD CONST COST SOFT COST @ 201 $243,163 $100,000 $1,750,000 201 $350,000 TOTAL DEV COSTS RENT RATE ($IFT) $2,200,000 13 RE TAX($/FT) LAND CONTRIBUTION 2 $500,000 1 1987 GROSS REVENUE 386,750 -VACANCY @ 5% 19,338 -RE TAX 59,500 NOI BEFORE DEBT SERVICE 307,913 DEBT SERVICE 243,163 CASH FLOW AFTER DEBT SERV 64,750 TOTAL CASH FLOW BEFORE TAX 64,750 RETURN ON CAPITAL NOI/(TOTAL DEV. COST+LAND) 11.4% 77 LIGHT MANUFACTURING PROFORMA SENSITIVITY ANALYSIS VARY RENT AND OBSERVE EFFECT ON BTCF, DCR, ROR ROR BTCF DCR DEV COST +D36/D38 +D45 +D42 +D20 0.92 ($20,038) 10 $2,200,000 1.03 $8,225 11 $2,200,000 1.15 $36,487 12 $2,200,000 1.27 $64,750 13 $2,200,000 1.38 $93,012 14 $2,200,000 1.50 $121,275 15 $2,200,000 1.85 $206,062 18 $2,200,000 R E N T 8.3% 9.3% 10.4% 11.4% 12.5% 13.5% 16.6% VARY RENT AND DEV COST, OBSERVE EFFECT ONROR +D45 R E N T DEV COST $2,000,000 $2,500,000 $3,000,000 $3,500,000 $4,000,000 5.6% 5.0% 6.4% 7.4% 8.9% 10 6.3% 5.6% 7.2% 8.4% 10.1% 11 7.0% 6.2% 8.0% 9.3% 12 11.2% 6.8% 7.7% 8.8% 10.3% 13 12.3% 7.5% 8.4% 9.6% 13.4% 11.2% 14 8.1% 9.1% 10.4% 12.1% 15 14.6% 8.7% 9.8% 11.2% 15.7% 13.1% 16 VARY RENT AND DEV COST, OBSERVE EFFECT ONDCR DCR +D36/D38 R E N T 10 11 12 13 14 15 16 $2,000,000 $2,500,000 0.81 1.01 0.91 1.14 1.01 1.27 1.11 1.39 1.22 1.52 1.32 1.65 1.42 1.78 DEV COST $3,000,000 $3,500,000 $4,000,000 0.50 0.58 0.67 0.65 0.57 0.76 0.63 0.72 0.84 0.70 0.80 0.93 0.76 0.87 1.01 0.82 0.94 1.10 0.89 1.02 1.18 78 FIGURE 10 OFFICE BUILDING FINANCIAL ANALYSIS 79 OFFICE BUILDING PROFORMA FINANCING GENERAL INFORMATION LAND SQ.FT BLDG SQ. FT(GROSS) BLDG NET RENTABLE FAR PARKING STALLS HARD CONST. COST 29,000 sf 29,000 24,650 1.0 100 $100 /ft $100,000 OFF SITE PARKING ALLOW. $2,900,000 HARD CONST COST 20% $580,000 SOFT COST @ 201 TOTAL DEV COSTS RENT RATE ($/FT) RE TAX AND OP EXP.($/FT) LAND CONTRIBUTION PERM: AMOUT RATE TERM AMORT. FDS $3,580,000 25 5 $500,000 1987 GROSS REVENUE 616,250 -VACANCY @ 5% 30,813 -RE TAX AND OP EX 123,250 NOI BEFORE DEBT SERVICE 462,188 DEBT SERVICE 395,692 CASH FLOW AFTER DEBT SERV 66,496 TOTAL CASH FLOW BEFORE TAX 66,496 RETURN ON CAPITAL NOI/(TOTAL DEV. COST+LAND) 11.31 80 $3,580,000 10.51 30 15 $395,692 OFFICE BUILDING PROFORNA SENSITIVITY ANALYSIS VARY RENT RATE; OBSERVVE EFFECT ON BTCF, DCR, ROR 20 22 24 26 28 30 R E N T ROR DCR BTCF DEV COST +D43 +D34/D36 +D40 +D18 0.87 ($50,592) $3,580,000 0.99 ($3,757) $3,580,000 1.11 $43,078 $3,580,000 1.23 $89,913 $3,580,000 1.35 $136,748 $3,580,000 1.46 $183,583 $3,580,000 8.5% 9.6% 10.8% 11.9% 13.1% 14.21 VARY RENT AND DEV COST; OBSERVE EFFECT ON ROR +D43 R E N T 20 22 24 26 28 30 DEV COST $2,500,000 $3,000,000 $3,500,000 $4,000,000 7.7% 8.6% 9.9% 11.5% 8.7% 9.8% 11.2% 13.1% 9.8% 11.0% 12.5% 14.6% 10.8% 12.1% 13.9% 16.2% 11.8% 13.3% 15.2% 17.7% 12.9% 14.5% 16.6% 19.3% VARY RENT AND DEV COST; OBSERVE EFFECT ON DCR +D34/D36 R E N T 20 22 24 26 28 30 DEV COST $2,500,000 $3,000,000 $3,500,000 $4,000,000 0.78 0.89 1.04 1.25 0.89 1.01 1.18 1.42 0.99 1.13 1.32 1.59 1.10 1.26 1.46 1.76 1.20 1.38 1.61 1.93 1.31 1.50 1.75 2.10 81 FIGURE 11 DEVELOPMENT ALTERNATIVES Mixed-use Office 35,000 35,000 29,000 $4,300,000 $2,200,000 $3,580,000 Gross Area(sf) Project Cost Manufacturing Rent Level($/sf) Rate of Return Debt Coverage Ratio 13 22 11.4% 11.7% 1.27 1.18 82 25 11.3% 1.17