: 7312.1 Page 1 of 2 FOREST SERVICE MANUAL GIFFORD PINCHOT NATIONAL FOREST (REGION 6) VANCOUVER, WA FSM 7300 – BUILDINGS AND OTHER STRUCTURES CHAPTER 10 – BUILDINGS AND RELATED FACILITIES Supplement No.: R6/Gifford Pinchot-7300-95-1 Effective Date: November 1, 1995 Duration: Effective until superseded or removed Approved: TED C. STUBBLEFIELD Date Approved: 11/01/1995 Forest Supervisor Posting Instructions: Supplements are numbered consecutively by Title and calendar year. Post by document name. Remove entire document and replace with this supplement. Retain this transmittal as the first page of this document. New Document(s): 7312.1 2 Pages Superseded Document(s): 7312.1 (GP Supp. No. 1)(7/70) 1 Page (Last supplement was GP Supp No. 1) Digest: Insert digest information here 7312.1 Updates Forest policy for maintaining site development plans and procedures for keeping “as-built” plans up to date. R6_GIFFORD_PINCHOT_SUPPLEMENT_7300-95-1 EFFECTIVE DATE: 11/01/1995 DURATION: Effective until superseded or removed 7312.1 Page 2 of 2 FSM 7300 – BUILDINGS AND OTHER STRUCTURES CHAPTER 10 – BUILDINGS AND RELATED FACILITIES 7312 - PLANNING 7312.1 - Plans. Site plans must be kept current to accurately portray buildings, utility systems, parking areas, etc., as constructed on the site. The following procedures will be followed in keeping the "as-built" plans up-to-date. 1. Each field unit shall maintain one set of site drawing prints which shall be designated as "current as-built". 2. Annually by December 1, "current as-built" prints shall be submitted to the Forest Supervisor for reprinting. If no changes have occurred, a memorandum to that effect will suffice. 3. Request for approval of changes on the site shall include a copy of the site plan with the proposed change clearly indicated. Example of proposals requiring approval are as follows: a. Additions, deletions, or changes in water and sewer systems, road systems, parking areas, and electrical services. b. Changes in clearing, grading, and drainage. c. Placement of additional structures. d. Changes of plant material on an approved landscape plan. After review, the site plan shall be returned to the unit with the designated action. If the proposal is approved and after work is completed, the unit shall accurately survey and draft the change on the "current as-built" print. Other changes on the site, not requiring approval, shall be accurately documented on the "current as-built" print by the unit as the changes occur and then submitted at the time of the annual update. 4. Appropriate surveying tools shall be used to gather field data for recording changes. Distances and elevations shall be measured from appropriate reference points.