2409.22, 2001 Page 1 of 9 FOREST SERVICE HANDBOOK R9 - EASTERN REGION, MARK TWAIN NF ROLLA, MO FSH 2409.22 – TIMBER APPRAISAL HANDBOOK CHAPTER 200 – CURRENT APPRAISAL SCHEDULE Supplement No.: R9 Mark Twain 2001-3. Effective Date: September 6, 2001 Duration: Effective until superseded or removed Approved: RANDY MOORE Forest Supervisor Date Approved: 09/06/2001 Posting Instructions: Supplements are numbered consecutively by Handbook number and calendar year. Post by document name. Remove entire document and replace with this supplement. Retain this transmittal as the first page of this document. New Document(s): R9 Mark Twain 2001-3 9 Pages Superseded Document(s): R9 Mark Twain 2001-2 9 Pages Last supplement issued 2001-2 Digest: Insert digest information here Chapter 200 Page Code 200 updates the Current Appraisal Schedule R9 MARK TWAIN SUPPLEMENT 2001-3 EFFECTIVE DATE: 09-06-2001 DURATION: Effective until superseded or removed 2409.22, 2001 Page 2 of 9 FSH # - 2409.22 CHAPTER # 200 CURRENT APPRAISAL SCHEDULE CHAPTER 200 - CURRENT APPRAISAL SCHEDULE 210 - General. The Appraisal Module of the Eastern Region Timber Sale Process will be used to appraise timber using the Transaction Evidence System to establish advertised rates. The Appraisal Module has an individual price for each species and product. The representative prices shown here are only for general information. For example, Black Oak was chosen below to represent oak sawtimber prices, whereas, prices are often higher or lower for other species in the Appraisal Module. 211 - Base Period. Zones 1 & 2: 3rd Qtr. FY00 thru 2nd Qtr. FY01. Zone 3: 3rd Qtr. FY99 thru 2nd Qtr. FY01. Zone 4: 3rd Qtr. FY98 thru 2nd Qtr. FY01. 212 - Effective Date. September 6, 2001 213 - Special Instructions. Volumes - Since October 1, 1997, sawtimber and all other products are being appraised, advertised and sold in hundreds of cubic feet (Ccf) units. Sawtimber, boltwood, and post volumes are also being shown in thousand board feet (MBF) units, and small roundwood, pulpwood and cordwood volumes are also being shown in standard cord (Cd.) units for information purposes along with Ccf in sale prospectuses and advertisements. Cubic volumes are from the National Cruise Program. Conversion factors for incidental volumes not requiring the National Cruise Program are: SAWTIMBER 1 1 Ccf MBF = 0.60 MBF =1.667 Ccf PRODUCTS 1 1 1 Ccf MBF Cd = 0.633 MBF = 1.58 Ccf = 0.79 Ccf = 1.266 Cds = 2 Cds = 0.5 MBF R9 MARK TWAIN SUPPLEMENT 2001-3 EFFECTIVE DATE: 09-06-2001 DURATION: Effective until superseded or removed 2409.22, 2001 Page 3 of 9 FSH # - 2409.22 CHAPTER # 200 CURRENT APPRAISAL SCHEDULE 220 - TRANSACTION EVIDENCE APPRAISALS. Zone 1 - Doniphan/Eleven Point, Poplar Bluff (for commonly-sold species): Base Period Prices: (Line 6, R9-2400-17). B. Oak Sawtbr = $ 82.99/Ccf ($138.32/MBF) Pine Sawtbr = $70.00/Ccf ($116.67/MBF) Walnut Sawtbr = $223.77/Ccf ($373.02/MBF) Cedar Sawtbr = $17.10/Ccf ($28.50/MBF) Oak Post = $ 1.90/Ccf ($ 3.00/MBF) Pine Post = $ 3.57/Ccf ($ 5.64/MBF) Oak & Pine Pulpwood, Fuelwood, Miscellaneous Conv. Products = $ 1.90/Ccf ($ 1.50/Cd)* B. Oak Boltwd = $ 15.63/Ccf ($26.05/MBF) Pine Boltwd = $15.09/Ccf ($25.15/MBF) Personal Use Fuelwood - Minimum rate of $6.33/Ccf ($5.00/Cd)for fuelwood on the Charge Firewood Permit (R9-2400-5). *Except some Oak Pulpwood does not = $ 1.90/Ccf($1.50/Cd) Zone 2 - Houston/Rolla/Cedar Creek, Potosi/Fredericktown, Salem (for commonly-sold species): Base Period Prices: (Line 6, R9-2400-17). B. Oak Sawtbr = $ 87.89/Ccf ($146.48/MBF) Pine Sawtbr = $72.23/Ccf ($120.38/MBF) Walnut Sawtbr = $360.45/Ccf ($600.87/MBF) Cedar Sawtbr = $21.25/Ccf ($35.42/MBF) Oak Post = $ 1.90/Ccf ($ 3.00/MBF) Pine Post = $ 6.33/Ccf ($10.00/MBF) Oak & Pine Pulpwood, Fuelwood, Miscellaneous Conv. Products = $ 1.90/Ccf ($ 1.50/Cd) Hdwd Boltwood = $ 8.44/Ccf ($14.07/MBF) Pine Boltwd = $ 8.44/Ccf ($14.07/MBF) Personal Use Fuelwood - Minimum rate of $6.33/Ccf ($5.00/Cd)for fuelwood on the Charge Firewood Permit (R9-2400-5). Zone 3 - Ava/Cassville/Willow Springs (for commonly-sold species): Base Period Prices: (Line 6, R9-2400-17). B. Oak Sawtbr = $ 67.00/Ccf ($111.67/MBF) Pine Sawtbr = $52.05/Ccf ($86.75/MBF) Cedar Sawtbr = $ 17.10/Ccf ($ 28.50/MBF) Cedar Post = $ 1.90/Ccf ($ 3.00/MBF) Walnut Sawtbr = $223.77/Ccf ($373.02/MBF) Pine Post = $ 1.90/Ccf ($ 3.00/MBF) Oak Post = $ 1.90/Ccf ($ 3.00/MBF) Cedar Boltwd = $ 8.44/Ccf ($14.07/MBF) Oak & Pine Pulpwood, Fuelwood, Miscellaneous Conv. Products = $ 1.90/Ccf ($ 1.50/Cd) Hdwd Boltwd = $ 8.44/Ccf ($14.07/MBF) Pine Boltwd = $ 8.44/Ccf ($14.07/MBF) Personal Use Fuelwood - Minimum rate of $6.33/Ccf ($5.00/Cd)for fuelwood on the Charge Firewood Permit (R9-2400-5). R9 MARK TWAIN SUPPLEMENT 2001-3 EFFECTIVE DATE: 09-06-2001 DURATION: Effective until superseded or removed 2409.22, 2001 Page 4 of 9 FSH # - 2409.22 CHAPTER # 200 CURRENT APPRAISAL SCHEDULE Zone 4 - Forest-wide zone set up in the Appraisal Module for all products from seldom-sold species. 221 - Adjustments to Base Period Prices. 221.1 - Market Adjustments: (Line 7, R9-2400-17) - The following market adjustments may be made on any sale. A good review of local market conditions should be made to determine if any adjustments are needed. Significant overbidding on sales sold across the Forest or Zone may indicate the need for positive adjustments. Species Group Mixed Oak Sawtimber Other Hardwood Sawtimber (Boltwood) Pine Sawtimber Adj. Range + 20% + 20% + 20% 221.2 - Logging Adjustments: (Line 9 & 10, R9-2400-17). 1. Felling and Bucking: Reference FSH 2409.22, this MTNF Supplement, Page 5 of 9, Table 1, used for All Products on Mixed Product Sales. 2. Skidding: Reference FSH 2409.22, this MTNF Supplement, Page 6 of 9, Table 2, All Products on Mixed Product Sales. 3. To compute logging cost adjustments the total volume in Ccf must be used to obtain average volume per tree and per acre. 4. The maximum adjustment without the Regional Forester's approval is: Fell-Buck = $ 3.00/Ccf ($ 5.00/MBF) Skidding = $ 9.00/Ccf ($15.00/MBF) 221.3 - Risk Adjustments: (Line 38, R9-2400-17). The maximum risk adjustment, without S.O. approval will be: 1. Sawtimber - 10% 2. Post, Pulpwood & Boltwood - 5% Only the following type of risk adjustment will be considered: 1. Abnormal Risk: This includes unusual contract requirements like unusally high road construction costs, restrictive logging requirements, and highly defective timber. R9 MARK TWAIN SUPPLEMENT 2001-3 EFFECTIVE DATE: 09-06-2001 DURATION: Effective until superseded or removed 2409.22, 2001 Page 5 of 9 FSH # - 2409.22 CHAPTER # 200 CURRENT APPRAISAL SCHEDULE Table 1 Adjustment Costs ($/Ccf) for Fell-Buck Costs - All Products All Zones Percent Change from Forest average per Tree 1/ Vol Per Acre (Ccf) 2/ -60 -50 -49 -39 -38 -28 -27 -17 -16 -6 -5 +5 +6 +16 +17 +27 +28 +38 +39 +60 +61 +82 +83 +104 -61 0-1.5 1.6-2.5 2.6-3.5 3.6-4.5 4.6-5.5 5.6+ -8.11 -7.43 -7.15 -7.01 -6.88 -6.60 +105+ -4.13 -3.58 -3.44 -3.30 -3.30 -3.03 -2.89 -2.61 -2.48 -2.34 -2.20 -2.06 -2.20 -1.79 -1.65 -1.51 -1.38 -1.38 -1.38 -1.10 -0.96 -0.83 -0.83 -0.69 -1.10 -0.69 -0.55 -0.55 -0.41 -0.28 -0.55 -0.28 -0.14 -0.14 0 0 -0.41 -0.14 0 0 +0.14 +0.28 -0.14 +0.14 +0.28 +0.28 +0.41 +0.55 +0.14 +0.28 +0.41 +0.55 +0.55 +0.69 +0.41 +0.69 +0.83 +0.83 +0.96 +1.10 +0.83 +0.96 +1.10 +1.10 +1.24 +1.38 +1.10 +1.24 +1.38 +1.38 +1.38 +1.51 +1.24 +1.38 +1.51 +1.65 +1.65 +1.79 1/ Percent change = (Avg. Vol/Tree Sale - Avg. Vol/Tree Forest) x 100 (Avg. Vol/Tree Forest) Forest Average Volume per Tree = 0.172 Ccf (0.103 MBF) Sale Average Volume per Tree = 2/ Volume per Acre = Total Sale Volume (Ccf) Total No. Trees (ADP Printout)3/ Total Sale Volume (Ccf) Total Sale Acres to be Cut 3/ For point sample cruises computed by hand, total number trees can be computed by multiplying tally trees (by DBH class) by factors shown in TM Field Book, Page 1.4. Maximum amount of adjustment without the Regional Forester's approval is $3.00/Ccf ($5.00/MBF). R9 MARK TWAIN SUPPLEMENT 2001-3 EFFECTIVE DATE: 09-06-2001 DURATION: Effective until superseded or removed 2409.22, 2001 Page 6 of 9 FSH # - 2409.22 CHAPTER # 200 CURRENT APPRAISAL SCHEDULE Table 2 Adjustment Costs ($/Ccf) for Skidding - All Products All Zones Sale Volume per Acre (Ccf) Sale Slope 0-10 11-20 21-30 31-40 1.0 1.0-1.6 1.7-2.3 2.4-2.9 3.0-3.6 3.7-6.7 6.7 1.0 1.0-1.6 1.7-2.3 2.4-2.9 3.0-3.6 3.7-6.7 6.7 1.0 1.0-1.6 1.7-2.3 2.4-2.9 3.0-3.6 3.7-6.7 6.7 1.0 1.0-1.6 1.7-2.3 2.4-2.9 3.0-3.6 3.7-6.7 6.7 % Change from Forest Average Volume per Tree Forest Average Slope 0-10% -50 -50 +50 +150 +350 +50 +150 +350 +450 Forest Average Slope 11-20% -40 -40 +15 +185 +260 +15 +185 +260 +340 Forest Average Slope 21-30% -85 -85 -50 -15 +115 -50 -15 +115 +150 -6.40 -4.13 -3.09 -2.48 -2.27 -4.13 -2.06 -1.03 -0.41 0.00 -3.09 -1.24 -0.21 +0.41 +0.62 -2.68 -0.83 +0.21 +0.83 +1.24 2.48 -0.41 +0.41 +1.03 +1.46 -2.27 -0.21 +0.83 +1.25 +1.67 -2.06 0.00 +1.03 +1.46 +1.87 -8.54 -6.40 -5.62 -5.00 -4.58 -5.21 -3.33 -2.27 -1.87 -1.46 -4.37 -2.06 -1.25 -0.62 -0.41 -3.75 -1.67 -0.83 -0.21 +0.21 -3.33 -1.25 -0.41 +0.21 +0.62 -2.92 -1.03 0.00 +0.41 +0.83 -2.71 -0.83 +0.21 +0.62 +1.03 -12.08 -9.79 -8.96 -8.33 -7.92 - 7.50 -5.21 -4.37 -3.75 -3.54 - 5.83 -3.75 -2.92 -2.27 -2.06 - 5.00 -3.09 -2.06 -1.42 -1.25 - 4.37 -2.48 -1.42 -0.83 -0.41 - 3.75 -1.67 -0.83 -0.21 +0.21 - 3.54 -1.42 -0.62 0.00 +0.41 -17.29 -15.00 -14.16 -13.54 -13.12 -10.21 - 8.12 - 7.08 - 6.67 - 6.25 - 7.92 - 5.83 - 4.79 - 4.17 - 3.96 - 6.87 - 4.79 - 3.96 - 3.33 - 2.92 - 6.04 - 3.96 - 2.92 - 2.50 - 2.06 - 4.79 - 2.92 - 1.87 - 1.42 - 1.03 - 4.58 - 2.50 - 1.42 - 1.03 - 0.62 +450 +550 +550 +340 +410 +410 +150 +185 -2.06 +0.21 +0.83 +1.24 +1.67 +1.87 +2.06 -4.37 -1.42 -0.21 +0.41 +0.83 +1.03 +1.25 -7.71 -3.33 -1.87 -1.03 -0.21 +0.41 +0.62 -12.91 - 6.04 - 3.75 - 2.71 - 1.87 - 0.83 - 0.41 +185 -1.87 +0.21 +1.03 +1.46 +1.87 +2.06 +2.27 -4.13 -1.25 +0.21 +0.62 +1.03 +1.25 +1.42 -7.50 -3.09 -1.67 -0.83 0.00 +0.41 +0.83 -12.50 - 5.62 - 3.54 - 2.48 - 1.67 - 0.62 - 0.21 Maximum amount of adjustment, including adjustment for skidding distance, without Regional Forester's approval is $9.00/Ccf ($15.00/MBF). R9 MARK TWAIN SUPPLEMENT 2001-3 EFFECTIVE DATE: 09-06-2001 DURATION: Effective until superseded or removed 2409.22, 2001 Page 7 of 9 FSH # - 2409.22 CHAPTER # 200 CURRENT APPRAISAL SCHEDULE 221.4 - Base Period Haul Costs: (Line 12, R9-2400-17). Haul costs will be computed from Table 3, Page 9 of this MTNF Supplement. Minimum rate will be $10.13/Ccf ($8.00/Cord), and $10.50/Ccf ($17.50/MBF). Zone 1 - Doniphan/Eleven Point, Poplar Bluff: All Sawtimber & Boltwood All Posts Other Misc. Products $17.19/Ccf $13.06/Ccf $13.91/Ccf ($28.65/MBF) ($20.63/MBF) ($10.99/Cord) Zone 2 - Houston/Rolla Cedar Creek, Potosi/Fredericktown, Salem: All Sawtimber & Boltwood All Posts Other Misc. Products $17.66/Ccf $19.20/Ccf $17.00/Ccf ($29.43/MBF) ($32.00/MBF) ($13.43/Cord) Zone 3 - Ava/Cassville/Willow Springs: All Sawtimber & Boltwood All Posts Other Misc. Products $23.93/Ccf $13.06/Ccf $16.08/Ccf ($39.88/MBF) ($20.63/MBF) ($12.70/Cord) R9 MARK TWAIN SUPPLEMENT 2001-3 EFFECTIVE DATE: 09-06-2001 DURATION: Effective until superseded or removed 2409.22, 2001 Page 8 of 9 FSH # - 2409.22 CHAPTER # 200 CURRENT APPRAISAL SCHEDULE 221.5 - Base Period Road Maintenance Costs: (Line 15, R9-2400-17). See MTNF Supplement, FSH 2409.18 and FSH 7709.58, Ch. 1 for maintenance allowances. Zone 1 Small Roundwood: $0.58/Ccf ($0.46/Cd) Sawtimber: $0.58/Ccf ($0.97/MBF) Zone 2 Small Roundwood: $1.01/Ccf ($.80/Cd) Sawtimber: $1.01/Ccf ($1.68/MBF) Zone 3 Small Roundwood: $0.56/Ccf ($0.44/Cd) Sawtimber: $0.56/Ccf ($0.93/MBF) 221.6 - Base Period Contractual Costs: (Line 18, R9-2400-17). Zone 1 Small Roundwood: $4.20/Ccf ($3.32/Cd) Sawtimber: $4.20/Ccf ($7.00/MBF) Zone 2 Small Roundwood: $2.08/Ccf ($1.64/Cd) Sawtimber: $2.08/Ccf ($3.47/MBF) Zone 3 Small Roundwood: $3.87/Ccf ($3.06/Cd) Sawtimber: $3.87/Ccf ($6.45/MBF) Items included in the above costs are slash disposal, erosion control and cull tree treatment. 221.7 - Base Period Temporary Road Costs: (Line 21, R9-2400-17). Zone 1 Small Roundwood: $1.16/Ccf ($.92/Cd) Sawtimber: $1.16/Ccf ($1.93/MBF) Zone 2 Small Roundwood: $1.73/Ccf ($1.37/Cd) Sawtimber: $1.73/Ccf ($2.88/MBF) Zone 3 Small Roundwood: $1.28/Ccf ($1.01/Cd) Sawtimber: $1.28/Ccf ($2.13/MBF) 221.8 - Usually High (or low) costs with NO Average Base Costs: (Line 26, R9-2400-17). Example: Requiring purchaser to replace or install gates, fences or cattleguards on roads in range allotments. R9 MARK TWAIN SUPPLEMENT 2001-3 EFFECTIVE DATE: 09-06-2001 DURATION: Effective until superseded or removed 2409.22, 2001 Page 9 of 9 FSH # - 2409.22 CHAPTER # 200 CURRENT APPRAISAL SCHEDULE CHAPTER 200 - CURRENT APPRAISAL SCHEDULE Table 3 Hauling costs - ($/Ccf/Mile)1/ All Zones Forest Truck Class Av. Load (Ccf) A 3-5 B3/ 5-7 C 7-9 D 9-11 High Speed - 45 mph .30 .26 .28 .23 Class I - 35 mph .42 .35 .38 .32 Class II - 25 mph .60 .50 .56 .46 Class III - 16 mph .86 .76 .84 .70 Class IV - 8 mph 1.52 1.41 1.56 1.30 Class V - 4 mph 2.79 2.70 2.97 2.47 Standby, delay, load, unload 2.52 3.18 3.62 3.32 ROAD CLASS: TRUCK DESCRIPTION Truck Class: Body Type: A (B) C D Flat Bed 4x2 Single Axle Flat Bed 6x4 Tandem Axle Truck/Tractor 4 x 2 Single Axle w/Tandem Trailer Truck/Tractor 6 x 4 Tandem Axle w/Tandem Trailer 32,000 50,000 59,000 72,000 E Truck/Tractor 6 x 4 Tandem Axle w/Tandem 30-35' Trailer w/Addl. 15-20' Trailer 105,000 Gross Vehicle Weight 2/ 1/ Apply rates to one-way mileage. Rates are based on round trip average costs. 2/ Includes hydraulic loader. 3/ Average weight class on the Forest is considered to be Truck Class B. R9 MARK TWAIN SUPPLEMENT 2001-3 EFFECTIVE DATE: 09-06-2001 DURATION: Effective until superseded or removed FSH # - 2409.22 CHAPTER # 200 CURRENT APPRAISAL SCHEDULE 2409.22, 2001 Page 10 of 9