SITE SELECTION CRITERIA FOR RESORT DEVELOPMENT AND A CASE STUDY IN NORTHERN NEW ENGLAND by Hormoz Lashkari Master of Business Administration Columbia University 1986 and Christopher Voutsinas Bachelor of Architecture McGill University 1986 SUBMITTED TO THE DEPARTMENTS OF ARCHITECTURE AND URBAN STUDIES AND PLANNING IN PARTIAL FULFILLMENT OF THE REQUIREMENTS OF THE DEGREE MASTER OF SCIENCE OF REAL ESTATE DEVELOPMENT MASSACHUSETTS INSTITUTE OF TECHNOLOGY SEPTEMBER 1990 Hormoz Lashkari, Christopher Voutsinas 1990 The Authors hereby grant to M.I.T. permission to reproduce and to distribute publicly copies of this thesis document in wole og )h part. Signature of the author H6rmoz Lashkari Department of Urban Studies and Planning September 1990 Signature of the author Christopher Voutsinas Department of Architecture September 1990 Certified by Ro hary Grimshaw Assistant Profe sor o5f Architecture Thesis Supervisor Accepted by ____________________ J Glorii Stzhuck Chairperson Interdepartmental Degree Program Real Estate Development M AACUS-,ISTTS INST 4TE OFTF (-EP 19 1990 LIBRARES Rot&C TABLE OF CONTENTS PART ONE Page I. INTRODUCTION A. B. II. Resort Types Development Team PREFEASIBILITY SITE EVALUATION FOR RESORT DEVELOPMENT A. Natural Amenities and Resources i. ii. 8 15 17 22 23 Orientation Natural Beauty iii. Views iv. Climate B. Physical Attributes and Constraints i. Present Utilization & Adaptability ii. Topography iii. iv. v. Drainage Soil Analysis Utilities 30 a. Sewage b. Water c. Electricity, Gas & Telephone vi. C. Natural Hazards Locational Attributes i. ii. iii. Community Attitude Proximity to activity Accessibility a. Automobile b. Other modes of transportation c. The site 53 Page III. SITE REQUIREMENTS FOR RECREATIONAL AMENITIES A. B. C. D. E. F. G. IV. 63 Golf Tennis Downhill Skiing Cross Country Skiing Marina and Boating Swimming Equestrian POST PREFEASIBILITY STEPS AND CONCLUSION 81 PART TWO Case Study 87 Site located at Danby Four Corners, Vermont. Application of site evaluation criteria and methodology developed in Part One. PART THREE Site Evaluation Checklist 142 PART FOUR Appendix One Table Table Table Table Table Table Table One : Two : Three: Four : Five : Six : Seven: 150 Soil Type Composition Soil Type Characteristics Water Usage Travel Reasons Issues of Access Activity Participation by Income Usage of Water Sources for Golf Courses Page Appendix Two 155 Soil Limitations Classification Appendix Three 156 Site Map Locational Context Map Regional Context Map Developable Areas Map Recreational Amenities Map Appendix Four 164 Existing Structures Bibliography 167 SITE SELECTION CRITERIA FOR RESORT DEVELOPMENT AND A CASE STUDY IN NORTHERN NEW ENGLAND by Hormoz Lashkari and Christopher Voutsinas Submitted to the Departments of Architecture and Urban Studies and Planning on July 29, 1990 in partial fulfillment of the requirements of the degree Master of Science in Real Estate Development at the Massachusetts Institute of Technology ABSTRACT This thesis will examine the site-specific determinants affecting the prefeasibility evaluation and selection of large tracts of raw land for destination resort development. These site-specific determinants are comprised of three categories; natural amenities and resources, physical attributes and constraints, and locational attributes. In Part one, the criteria used in the analysis of a site's physical and locational suitability for resort development is established. Part two, consists of a case analysis, used as an example of the application of these criteria, and Part three, provides a checklist to facilitate an objective and early evaluation of a site's physical attributes and constraints. While our thesis addresses site-specific issues relating to the physical and locational nature of a property, it should be emphasized that addressing these issues is only one component of a greater study required to determine the overall viability of a project. Market demand, financial feasibility, and the approvals process are all important issues that affect development feasibility. However, we believe that early on-site reconnaissance is critical to identifying a site's overall limitations and potential. Thesis Supervisor: Title : Rosemary Grimshaw Assistant Professor of Architecture ACKNOWLEDGEMENTS We would especially like to thank Rosemary Grimshaw for her assistance and guidance throughout the thesis process, Mo Freedman for his time and thoughtful comments, and Michael Wheeler and Vivian Leavy for their suggestions and editorial review. We would also like to thank Michael Horst, Rachel Roginsky (PKF), the executives of Marriott Hotels, Jim McLoughlin, and Joan Buckley for sharing their expertise. Further thanks to Lynn, for her informative tour of the site in Danby, Vermont, and John for providing additional site information. PART 1 7 I. INTRODUCTION & GENERAL CONSIDERATIONS examine the site-specific determinants This thesis will affecting the prefeasibility evaluation and selection of large of tracts raw of three comprised categories; attributes physical resources, the analysis of a site's resort determinants are natural amenities and constraints, and and In Part one, the locational attributes. in destination for site-specific These development. land criteria used physical and locational Part suitability for resort development is established. analysis, used as an example of two, consists of a case the application provides early of these criteria, a checklist evaluation of constraints. While to our thesis Part three, an objective and physical attributes and facilitate a site's and addresses site-specific issues relating to the physical and locational nature of a property, it should these issues is only one required determine to be emphasized that component of a the overall addressing greater study viability of a financial feasibility, and the Market demand, project. are all important issues approvals process development feasibility. on-site reconnaissance site's overall However, we believe that early is critical to limitations analysis prefeasibility that affect and identifying potential. issues of site-specific a A will establish vital facts, and can be accomplished at little risk and expense. Destination resorts are that provide a full short-term final array of services, destinations amenities, and recreational facilities for the pleasure traveler. are often located in and benefit attraction, amenities. As destination resorts well close proximity as to a from surrounding offering indoor provide outdoor They natural natural activities, recreational and leisure amenities that are either included as a part of the skiing), resort within an (eg. golf, tennis, easy commute (eg. national beaches, lakes). or located parks, landmarks, Hence, the site amenities and location are major factors that contribute to success. Traditionally, the key development have been landscape" (Phillips, fundamental elements an "artifact 1986: 5), of of resort location great and natural of Hawaii, and the Hotel Springs, Breakers, Palm activities The as well Hotel & Miami, and Country Club, Yet, development by the constraints of the is limited The considerations. as economic are examples Beach physical suitability, and nature, site, amenities recreational these The Lodge Doral at Pebble developed around of resorts The become and skiing, resorts. cornerstones for destination of Diego, and have recreational Only recently golf, boating, Colorado Broadmoor, Coronado, San del Beach. such as around existing built exclusively included, amenities natural (Gee, 1981: of Colorado the mountains Early resorts 40). Cod, the islands the beaches of Cape amenities such as built amenities, specifically golf and tennis. real estate investment. such development resort riskiest vehicles for is one of the Resort development The uncertainties surrounding are multi-dimensional. properties incur high front-end Developers of costs since recreational facilities are generally completed prior to the commencement of coupled with a long operations. These early costs payback period make resort projects very speculative ventures. In analyzing various resort developments, it becomes evident that a critical mass initial phase to resort. For Connecticut, facilitate the example, a 235 the buyers in the developers and Lakeridge, unit development of the about their keep of the and acres of state forest, built early stages were skeptical facilities marketability of acre planned resort, surrounded by 2000 amenities must be established in the promises Similarly, developers of Beaver project because ability to (Smart, 1981: deliver 113). Creek, a 1400 acre year round destination resort in Avon, Colorado believed that a critical mass was necessary before the become viable (Smart, 1981: 119). PGA National, a The developers of the 2340 acre planned resort Gardens, Florida offered amenities "establish home in project could immediately visible PGA National" (Phillips, in Palm Beach early on in order to benefits of choosing a 1986: 197). The great variety of recreational activities required of modern resorts has urged developers to employ innovative methods and strategies necessary in providing to offset the these amenities. upfront costs The experience in Beaver Creek, demonstrated that in the early years of operations, Other costs developments Generally, exceed have income (Smart, had resort development similar requires 1981: 119). experiences. a high equity a ten least and at investment, year time frame for resort in Sun investment return (Baltin, 1990). In River, a developing Sun the Oregon, River, problems in (Smart, 1981: developer faced to attempting 109). 3,370 acre provide financial facilities early were high, Although initial costs of these amenities was the existence severe essential in that they would add the necessary credibility to the project. In managing the resulting front-end debt, 2185 acres of the original 5555 acres were sold off to Service, reducing the timeframe of the to 7 years (Smart, Pointe, a 389 Indiana, all buyers of project from 15 Alternatively, 1981: 103). acre year the US Forest at The in Bloomington, round resort resort property were required to purchase golf course memberships in an attempt to reduce front-end has costs (Smart, been to open resort guests, but example, the 1981: 132). Another strategy recreational amenities to the general public golf and tennis amenities not only as well. to For in Beaver Creek were open to the general public during the first year of The 882 acre resort of operation (Phillips, 1986: 193). Harbour Ridge, in Stuart, Florida recreational amenities such as boat slips to nonresidents opened the use of all golf, tennis, and use of in the early years of 241). This strategy however, operation (Phillips, 1986: may successful, and been always not has result in animosity between resort guests or owners, and the local and Tennis Bath The Naples public. Florida found that mixing resort guests public proved to be the private Club in with the local task. a difficult Naples, seems that It promotion of members actively resisted the and sought to keep the resort the resort to the public, exclusive (Phillips, 1986: 214). As has demonstrated, been required and provide mass, critical is clearly amenities early, to need the a create multitude the of the financial a burden on success and overall feasibility of a resort development. While the developments are phased (Lawson, 1976: buildable 62). responsibility are over relatively long timeframes With environmental land, amenities stage of development, most resort provided in the early stringent recreational prerequisite and on the escalating land regulations, increased developer, and selection process has costs, more scarcity of infrastructure the site evaluation become more sophisticated and complex. The regulatory climate often mandates a very long planning and effective build-out period. For example, developers of the Longboat Key Club in Sarasota, Florida planning (Phillips, With Beaver of Creek, project was only 188). 1986: (Phillips, by 1985 complete percent 181). commenced in 1971, the while planning 20 1986: years ten after approvals development secured Similarly, the Naples Bath and Tennis Resort experienced period, and Boca West in Palm a 10 to 12 year build-out County experienced Beach a 10 period, year buildout following the approvals stage (Smart, 1981: 124). Resort development is highly consumer and behavior changes in vulnerable to preference (Smart, 1981: cycles, and have finite popularity Destination resorts 18). are affected by demographic trends, consumer tastes, and the addition 1981: 26). newer of Of course, areas such as Southern California pleasure travel leading resort a long have locations (Gee, elsewhere attractions South Florida and as history to and continue destinations (Gee, 1981: 23). popular reign as However, new locations are constantly emerging as did Hawaii, and Careful site selection, allowing more recently Mexico. for the potential development recreational activities, reduce the detrimental of a variety of can offer diversity, and thus effects of consumer changing behavior and preference. Resort Types Resorts can categories (Gee, winter resort, season generally 1981: classified 84); the summer the winter vacation resort resort. important be The need consideration to in classify site into resort, weather conditions, accessibility play and are resorts is analysis classification of a factors 43), and the array of amenities. The summer resort and determining resort (Lawson, benefits from beaches or mountains. Seasonal resort development, in particular close the 1976: proximity typically to The patrons, generally families, frequent this resort from Easter through labor day. amenities an since site potential, a major role in significant the and the four recreational activities differ by resort type. fluctuations, four provided include tennis, The golf, horseback riding, bicycling, hunting, fishing, swimming, boating, prime winter eastern and water example of resort is sports. a summer ideally Southern resort California is destination. located with geographic orientation for the a northern a The or most favorable downhill ski trails. and single through adults, frequent April. mobiling, skating, Examples of Vermont, and vacation southwestern winter the Single bulk of in this Phoenix, Scottsdale popular winter variability of squash a and market. resort type Stowe, southern or January senior citizens The most popular are golf, tennis, The winter desert climate of , and Tucson in Arizona make these The four season phenomenon, was created out pressures, technological and and The winter frequented from vacation destinations. inflationary transportation in the resort, a relatively modern of snow resorts include adults swimming and water sports. skiing, New Hampshire. is families from November tennis, situated location and March. activities is include indoor North Conway, resort comprise this resort Activities ice swimming. through Vacationers, generally finally the advances unreliability seasonal markets (Gee, 1981: 26). in and This resort is typically located in a mild climate and caters to all market groups. winter resort began four season operations amenities such events such Other resort Vail in Colorado, traditionally a as golf, as summer and tennis, and by offering by sponsoring music festivals (Gee, destinations that are popular include Las Vegas, Nevada, and Hawaii. 1981: 24). year round There is a host of issues associated with the seasonal resort. Hiring of personnel is a difficult task and has to accomplished be each season. Because of the temporary work, it is difficult to retain good personnel who typically need to work year round. season months, security may prove lack of personnel, Finally, with resorts 120 days may and During the off to be a problem, with absence of activities. the 90 - such as winter resorts, not provide adequate revenue to justify expenses, and amortize costs over a reasonable period. Development Team Resort development, requires the skills and professionals. coordinating when and The to the professionals and developer is a vast throughout developer assembles consultants areas array of responsible engage and experts remote process and required throughout the process. of consultants in expertise of this development whom Typically, particularly that work for determining the a process. team together of as The input of a variety may be solicited on issues ranging from market demand, to engineering, to amenities design and layout. With the expertise of a resort consultant, the site may be developed as a package, and a resort operator brought in the completed to manage resort operator may become a member a of the development specific have operators resort Alternately, in all phases of design and planning. team and involved Most property. planning requirements and guidelines that must be met inorder for them to to consider a property (number airport, room size, facilities of rooms, distance offered). Resort operators provide extensive knowledge of the market that is useful in the overall formation of the final product. From a site evaluation and planning standpoint, the land planner, who may come from a variety of disciplines such as architecture, landscape architecture, specialization (McMahon, planning central figure on this consist of: an ecologist assess the team. 1989: Further, or even a land is the the team may 345), (to evaluate the ecosystem and environmental development), a geologist or impact of any proposed soils engineer (to analyze the soils and test for hazardous materials on the site), civil engineers utilities, (to assess waste disposal, engineer (to assess the and plan for and water), earth moving, and a traffic impacts of development and plan for future access and road requirements) (McMahon, 1989: 345). of an interdisciplinary group of A team composed seasoned professional experts "sniff test" at very can provide a preliminary little time and expense (Freedman, controlling prefeasibility and hence 1990), critical to unnecessary front-end costs. Direction and guidance of the developer such team is required that a well coordinated, focussed process set out for the occurs. of the efficient, and Objectives and goals must be group and progress carefully monitored. The exchange of information and consistent communication is required amongst all the the members of the team. developers responsibility, team, to ensure the as the leader of It is this proper functioning and synergies of the group. The team need not be composed of a complete and permanent group of professionals from the onset, but may involve only key professionals the process continues. few skilled professionals may early on and Alternately, a core be created, evolve as group of a and outside consultants contracted to provide expertise and input to the group generally only as offer highly necessary. Outside specialized consultants expertise and continually required consultants allows for a smaller and more limiting conflicts and group, often of use The team. the within nor available be not otherwise may that knowledge manageable complex easing decisions. development sequential the Furthermore, and expertise development. A drawback may be skilled Sun but overall process, complex, was going to for the project skills and a of the the that was found it requiring specialized The initial overcome by be the development In Oregon, resort in planning process a lack of continuity in this may developer/manager. River of the at different stages varied input the necessitates 41) 1981: (Smart, process resort the of nature be very experience. an all encompassing reaction was to create development and operations team, but this quickly proved to be too expensive and time consuming. approach contractors specific altered was and to consultants price and a key a one of hired as specific The development with group, required purpose (Smart, at a 1981: 109). The use and input carefully controlled of consultants and limited must in order however, be to maximize the benefit and minimize Consultants should be used and address control or and group required. of consultants is Careful extremely the efficiency Consultants are not to be used in lieu of but , involved. problems. control costs and increase of the group. the costs to answer specific questions evaluate specific management important to the to Decision enhance the making group, authority when and lies with if the group. The planning group defining creates a the development the site, outlining the amenities and conceptual master potential and plan, limitations of locations and types of possible proposed built selecting the general image structures, and even and design standards of the resort that would be in keeping with the characteristics of the site (Gee, 1981: with the financial resort operator 47). This group will interface and marketing teams, as throughout the process to well as the maintain and ensure a coordinated and successful development effort. II. PREFEASIBILITY EVALUATION FOR RESORT DEVELOPMENT unique properties potential crucial to a growth. for ultimate prospects and of a evaluation and comparison Location and access are of alternatives. site's and fundamental characteristics a great bearing in site have resorts, the remote areas as destination In developing Rural sites, however, have a "complex internal identity" that is further influenced by factors that contribute to their "productive or 72). These factors aesthetic must be 1977: (Miles, appeal" evaluated identified and prior to even attempting to gauge suitability for resort issues method empirical sites may different issues establishing and with Prefeasibility and be developed, an comparison of and a implications site-specific issues physical framework, systematic analysis developmental broad categories. resources, for a and checklist of formulated. fall into These include natural attributes these By identifying 73). (Miles, 1977: development several amenities and constraints, and locational attributes. A. NATURAL AMENITIES AND RESOURCES credibility is to a large A project's image and overall degree dependent upon the amenity package that it offers (Phillips, 1986: 3). is particularly important in This remote locations, or in areas of emerging markets, where the resort relies on established amenities for prolonged success and viability (Phillips, 1986: 3). For example, Village in Equestre France is De Pampadour, a development with a located Correze, holiday village concept that provides a complete array of recreational amenities (eg. riding, hiking, tennis), as well as of social amenities, ranging sophisticated design small village, paths and buildings roads from bars to libraries. and plan create the nestled within the connect and secluded a full range a series ambience of a landscape. of A Small non-obtrusive compounds, creating a kind of village precinct (Lawson, 1976: 12). Amenities associated with two categories. inherent to of The first a site such as the landscape, views, destination resorts fall into are characteristics that are orientation, natural beauty and favorable climate; the to the site, often second category include improvements equestrian Amenities, 4). 1986: hiking trails, (Phillips, ski trails and paths, riding as such activities recreational for and man-made, both natural are used to attract interest and establish resort identity. At Otter Creek, Arkansas, a 550 acre residential resort community, by providing continuous events and functions, the developers were able to out of a natural amenities and resources of investigation thorough stage pre-development understanding of both dependent highly is of a should to lead constraints on given site. site the club a variety of The potential for 210). activities recreational racquet and swim small relatively (Phillips, 1986: create a social focal point and the A in the a good potentials, ultimately leading to a successful site plan. Orientation The orientation of a site, particularly if located in a mountainous region with greatly fluctuating slopes, will have a significant impact on the development and program of the site. One direct outcome is the amount of sunlight and presence of other climatic conditions, such as wind velocity. Favorable conditions will increase the usable season of a resort, and decrease construction and overall maintenance costs, thus potentially creating example, a over advantage a competitive northern or other For resorts. orientation northeastern is a winter resort, but may be desirable for ski slopes at An extended ski season a liability for a summer resort. and a higher percentage snow coverage on ski trails make this orientation ideal for ski resort development but less desirable for activities such as hiking. Natural Beauty The inherent natural beauty of the site is a major asset for resort development. Scenery, highly valued by society, is an amenity which has aesthetic value, and is unique to the site. aesthetic experiences diversity of No two are the same. topography, form intensive nature serves density. balance to A preserve space developer should and be wary prone to or may include color, as The recreational facilities and reduce successful development should environmental destination, These as lakes and ponds. of many open amenities and landscape well as natural amenities such land scenic ecological of creating pollution and overall maintain and forces. The an overdeveloped void of ambience (Gee, 1981: 38). Creative and pollution controls enhance the viability of Proper and careful site planning can effects of development, such as Tides Inn, Irvington, Virginia is with a marina that both congestion minimize 1981: careful Irresponsible demise of successful planning may use of the the resort. to the and are taking immediate environment lead to surroundings, A extent that thus environment (Gee, natural resources the site's and conserve unpleasant of the enhance the measures to designed to resort operators Increasingly, 39). a small resort on the pollution, and The environment. is sensitively natural aspects maintain the limit the adverse pollution, congestion, the physical of deterioration water, resorts in (Gee, 1981: 26). the long run and environmental and overdevelopment, to sensitivity innovative management, and beauty. an imbalanced to the destination it provides and ultimate resort is a pleasant atmosphere for its guests. Views The views from a specific site recreational activity. can be used to enhance a During the planning 26 phase, the developer can topography to recreational magnificent providing mundane utilize views maximize use. can facilities (eg. a be used that might swimming pool and may the the as site's of each presence a catalyst otherwise overlooking a be of for quite valley or as significant features of the strengthen Initially, a visual by experience example, linked to a water fall), resort the For views offered the resort's survey of the site means for identifying locations image. is an effective with superior views and their potential for value enhancement. The developer amenities of a development hotel may choose given project. strategically overlooking a valley, to site as a Consider located or utilize the focal the case the natural point of the of a resort a mountain cliff, beach. For on example, Tahara's Intercontinental Hotel and Resort in Tahiti, is designed with on guestrooms nestled in a ten different levels, terracing sloping hillside down towards the coast and offering spectacular views (Lawson, 1976: 67). Clearly, dramatic and unique views may lend image to a project and strengthen marketability. second approach the might encourage visitors site's attractions and natural a strong Yet, a to 'discover' resources such as site, the of amenities valleys lakes, trails, hidden be appropriate depending on an unobtrusive Either approach may allowing the environment. interaction with natural other and the development program and ultimately the target group's preferences. Varied terrain can be used to accommodate development by wonderful views providing Homestead, a 221 acre sensitive, preservation with the upon the purity natural and development of in Glen destination resort environmentally placed emphasis great of The especially was Michigan Arbor, preserving the landscape. of the natural quality the Thus, environment. built limiting views to and the same time while at natural environment, of the on the Using environment. clustered development, the majority of the site was left in original maximum form, and advantage of buildings wooded areas, were sited to and views take of Lake Michigan (Smart, 1981: 76). Climate The typical climate in a given area may make a site ideal for certain activities or developments, and dismal and inappropriate for other types of activities. There available data is readily on climatic conditions such as temperature, humidity, precipitation, cloudiness, sun such agencies Governmental 48). et al., speed and direction (Lynch path and wind the as 1984: National Oceanographic and Atmospheric Administration, as well as sources of information seasonality of the good are governments local (McLoughlin, 1990). Climate destination. the affect will particularly important. attempts to extend the season the spring turn For example, of resorts in the Rockies that the excessive rains have failed in the resort The reliability and duration of weather in is season the and runoffs in predominantly to landscape mud. Therefore, due to climatic conditions four season resort are not possible in the Rockies (Horst, 1990). climate may Furthermore, the the type of resort the season, but With a possible. of condominium to half the year development is severely limited hotels require an average about 70% not only development that is season that lasts only the likelihood of hotel in that in fact dictate be successful. resort development and successful (Horst, 1990). year round occupancy With is a 50% much more season, feasible potential for The monsoons, and hurricanes, resort season climatic is set not to unexpected seasons limit also blizzards as the Even when particular location. resort development of a the phenomenon such severe climatic severe overlap with occurrences can have an such as obvious dramatic impact. B. PHYSICAL ATTRIBUTES AND CONSTRAINTS A site's condition overall hydrology and soils, and qualities and wildlife, topography, plants water quality and availability, potential for utilities, and environmental Knowledge investigated. hazards such also vital conditions of need the to be history development potential natural of hurricanes is as earthquakes, floods, and to thoroughly as a resort destination (McMahan, 1989: 342). Present Utilization and Adaptability The present use adaptability significant for of a site, if resort environmental any, affects development constraints. and The the ease of may pose developer should be wary of present and past uses with deleterious effects on the environment. less affected by close proximity these issues used for problems that threaten the hazardous than sites to urban areas. traditionally erosion, Remote sites are generally ecological Yet, farming or even rural sites timber may present natural landscape, such as imbalance, materials and situated in toxic and the waste. presence Pesticides of and chemical fertilizers used in farming operations may pose potential peach hazards. orchards in arsenic residue the For the early nineteen in the soils (Freedman, planning stage, diligence, example, pesticides and the developer identify conditions, if any, and used thirties 1990). left During should perform adverse in due environmental formulate a strategy for coping with these complexities. A highly prove restrictive regulatory environment detrimental and Restrictions and costly time contemplating removal present use requirements. schemes may severely delays may of existing property because The for resort of presence may also development. occur when or altering stringent preservation of conservation modern restrict the development potential of a given site (Lawson, 1976: 54). For example, at the Florida, Islandside, planned a development, dredge and fill years necessary permits Resources and While from the Department of to zoning is ordinance Natural 1986: 185). to address issues or environmental impact not intended assessments, these are of An proceed with marina (Phillips, of the this thesis relating of Engineers. Environmental Regulation to the construction before required inorder to receive additional three years were the permits required over five Army Corps the U.S. being issued by marina and government agencies with of negotiation unit great significance and should be addressed in the early planning stages. Government regulation is meant to prevent the demolition of existing structures that are considered historic such as old resorts castles, have mills, farmhouses. around areas protected example, the the shell of creates a to used this and have advantage in Budapest is century baroque distinct resort concept and (Lawson, 1976: 28). successful by governmental regulation. Hilton Hotel a twelfth Many built For built within church, which a powerful image Topography The topography of a site has impacts on views, drainage, wind patterns, movement and gradients (McMahan, 1989: terrain, while develop. for roads 343). For providing excellent Flat terrain, may and pedestrian example, a views is steep costly to reduce the need for grading but may require a more complex infrastructure for sewage and drainage. The topography of a site may pose serious constraints on its use. For example, steep terrain with a high level of rain fall may suffer from erosion (AIREA, 1983: of the topography can soils located on 69). be However, effective use extremely beneficial in providing a buffer from adverse conditions such as winds or storms while providing the opportunity for favorable conditions such as fabulous views and unique settings. The micro-topography of a site can be appropriate resort image by concealing while the maintaining (Freedman, 1990). acre destination care was taken natural In developing to the built additions of the the Homestead, site a 221 resort in Glen Arbor, Michigan, great to preserve the natural setting with an environmentally sensitive program. able aspects useful in preserve the site in The developers were its original form by in such a way as clustering buildings and locating them especially tool, sought environment was a strong to be targeting when the essence of maintain the to used topography natural the site development such as the Homestead A (Smart, 1981: 76). that natural contours of advantage of the to take sales well-educated, the affluent market who value these qualities. The particular layout of distribution slopes, and the topography of the and hills, valleys the general conditions of affect the type and quality Downhill skiing, such as severity the of the terrain will of amenities to be offered. for example, has very specific slope and run requirements to be attractive to the user. Study of the potential locating topography is soil problems, sites for also useful in identifying water availability, favorable sewage disposal such and as kame terraces. Drainage The drainage pattern and array and types of rate of absorption dictate the use appropriate to the site. well-drained site has substantial advantages. A There are which affect the natural several factors First, the site. resulting from drainage rates, drainage a site considerably have higher Steeper sites generally impacts drainage. Second, soil of topography drainage of a of gravity. the forces on the significant influence types exert of characteristics The the site. rate of percolation, as well as the absolute potential amount of water affect silts that the soil is capable of absorbing directly While fine soils such as drainage. percolate poorly, sands excellent percolation rates. with high capacities drainage. site is percolation are The ideal array of and sites amount of rainfall importance. natural All high which drainage declines absorption require drainage rates. equal, with good on the Generally, thicker experienced in a region else possess vegetation that exists also an important element. vegetation leads to lower gravels The presence of soil types rates for and clays and the Finally, the is of prime effectiveness of increasing amounts of rainfall. There are several excess water, Results of caused by problems which which arise poor drainage surface water are associated from a poorly include flooding runoff, and with drained site. and erosion soil salinisation which is primarily 1983: 41). suitability site's well as for agricultural, stability and (Rycroft, the deteriorate conditions Both excess salts by caused development purposes. Drainage integral parts, and an outlet utilizes drains comprised generally are systems (Rycroft, 1983: 43). field system The The main excess water. to accumulate three main component component, a the field of system facilitates the flow of the accumulated water via for initiating the gravity, pumps may act as catalysts flow of water to the third component, is usually latter the absence of In to the outlet. ditches and channels the outlet. of water natural body a designated The such as a river or open sea (Rycroft, 1983: 44). helps control the water table, In rural areas, drainage offer better cultivation rates and enabling the site to provide better 125). Abuse of drainage, affects however, of for wetlands the ecosystem that affects wildlife use has been environments (Penning-Rowsell, directly may adversely affect wildlife population. the landscape's transformation (Penning-Rowsell, 1986: grazing grounds The drainage and arable land present in such as The latter 1986: 125). population, as well as diminishing the increasing natural beauty of the environmental landscape. regulation this With activity is being carefully restricted. Following an in-depth study of patterns and capabilities, should take into development. As the 1973: and 51). elaborate drainage disposes natural body modern wisdom more can (Unterman, to a (Unterman, 1973: conducts river or 46). by environmentally and other However, considers storm water management effective and a more be increased which collects, water, often of water system the divert accumulated rainfall to a system, of excess may mandate drainage efficiency magnitude of the size increases, for drainage Drainage drainage any proposed drainage system development engaging in grading to storm site's account the type and increased requirement extensive the to be a sound approach to drainage (Freedman, 1990). Storm water existing management techniques try to natural systems, such as rerouting drainage Storm water management drainage that recognizes is replicate the avoiding harmful conditions patterns and peak discharge. an the ecological approach role and importance to of wetlands, floodplains, and naturally occurring bodies of water. as Techniques channels natural using and ponds, retention areas such include creating storage Generally, storage areas. simulate naturally occurring to this approach slows down water movement, is less costly, that are results produces and greater of aesthetic value, and are unobtrusive to the environment. By assessing a site's topography, patterns drainage potential A effects of suitability the development, as environment. a conditions, and can determine engineer soils, and well geotechnical and scope impact on as its system that controls and development on current of the mitigates the environment can the natural then be established. Soil Analysis Soil conditions affect siting of facilities. bearing capacity and 1989: 343), encountered in and the usability of land and the Soil type and structure determine drainage characteristics (McMahan, impact construction. costs and difficulties In particular, the costs associated with providing complex foundation systems and earthwork, required of unstable soil conditions escalate rapidly (e.g. rock excavation, retaining walls, piles, caissons). Early in the process, using on-site soil conditions can be determined reconnaissance techniques, topographical features, interpreting geological till interpretation, and using available resources such as soil maps produced by the U.S. Geological Survey, information. Generally, be provide hired to a geotechnical this analysis. and condition is determined taken on site and test samples depths. must be necessary engineer would Exact soil type by test samples and borings analyzed in Systematic to provide laboratories. taken with varying Numerous locations and borings and test samples are taken on site usually at fifty foot intervals and at depths of at least 20 feet foundations Such or to thoroughness below the bottom of bedrock (Lynch et however, is only any anticipated al., 1984: required at 38). the latter stages of the planning process. There are three basic layers top soil, that is composed supports plant of soil. The first layer, of organic and mineral material and agricultural activity. The second layer, the soil, is mostly of mineral composition and lies below the level of most plant roots with little organic activity. The third 39 layer, source material for layer, lies second and is above bedrock directly of 1984: 35). little organic use (Lynch et al., Soil composition is determined by particle size and soil to one any categorizes composition basic differently to loading and and mix, of organic matter the presence in appendix Table two 1984: 36). are ten react The soil response to grading general composition, content, and There the aggregate response of several loading and water are al., water. appendix type that of soil engineering categories factors; size. by grain the in one Table category. sizes not exclusively belong 1984: 35) and do (Lynch et al., of grain a mixture of soils consist occurring naturally Most accordingly. classified is type water (Lynch et indicates the engineering applications of various soil types. are also Soils The texture of classified a soil quantities of sand, the soil make-up concluded texture. by the relative is determined the to be the agricultural Although not as important from view, it does of are present in silt, and clay that (AIREA, 1983: 64). classification is point of agriculturally by soil. an engineering give a good description When an intricate 40 the examined mixture of of the soil is several soil qualities of types, the are considered to or pockets predominate. The voids, and structure of the layers, clusters, empty is, the presence of soil, that desirable component the least slippage affect planes the stability, strength, and drainage characteristics of the land (Lynch surface et required to reach bedrock and ledges rock add (Lynch et with high foundations is The 38). depth or presence of large boulders construction to it becomes necessary to Often, either blasting or boulders and ledges by remove large surface 1984: considerably difficulties and costs. excavating al., al., 1984: 38). bearing capacity While the best and stability bedrock, the suitability of for the various soils differs considerably, and should be investigated. Utilities Since most resort isolated areas, services. developments often there sewage facilities, and telephone is particularly exists a lack water supply, crucial to any form resort development intense. adequate in rural or of adequate The availability of a suitable infrastructure for quite occur The of development, where usage availability and infrastructure electricity, gas and services rates are accessibility of will ultimately determine feasibility of the proposed development. a. Sewage The need to adequacy and availability the examine should a developer The development. any by faced condition sewage is water and waste dispose of of municipal sewer facilities in the immediate area, and if a new municipal district unavailable, determine whether can an on-site sewerage, either treatment the of disposal municipal sewage become plants necessary nonexistent areas, package sewage study hydrological is on-site sewage extent of treatment required. govern regulations and the rural in suitability for to determine disposal and quantify the Regional A necessary. a sewage allow for to Often effluent. is municipal septic system or installed must be plant of absence the In established. be the proper disposal of waste. An system would on-site septic scale, floor isolated analysis will whether required. or not dispersed projects. and a provide a A critical rough indication package treatment For example, for small be suitable plant a one hundred room as to would be hotel at an be required. package treatment plant would which a is Therefore, establishing the rough quantities mandatory. various components the assessing capital cost of twelve requirement of the development is a package treatment plant dollars per gallon of The the is about ten daily to service plant required (i.e. a necessary in required. system of sewage type of the and siting the pattern required, and of water treatment package which above day per gallons thousand fifteen at is set limit the example, In in Massachusets states regulate this limit, fact, some limit above this is the marginal Functionally, basis. a daily water on gallons of twenty thousand use over to be expected to plus ancillary activities could per day for water per person of 150 gallons of average consumption water 20,000 gallons/day would cost about 250,00 dollars). The primary function of the sewage treatment plant is to liquify and the resulting Often, purpose product can of irrigation, body of open sea. to the for the soil. In waste is released in a river or underground in a vast body of water such as the water stream, or diluted be utilized and returned other circumstances, the treated large a manageable form. purify crude waste into Underground such as a streams should be investigated for adequacy of dilution, in periods of (PIC, 1982: 2). Often due to the surface water source, of the effluent is Ideally, the low water flow inaccessibility of a and inadequate dilution, disposal limited to ground effluent can be water discharge. discharged through absorption fields into deep deposits of sand or gravel. In the past, acceptable sewage has levels by been successfully a variety of methods. popular form of sewage disposal tank, which is a water 1976: 142). This system The most has been via the septic tight chamber bacteria decompose sewage into treated to where anaerobic liquids and gases (Hall, incorporate a covered septic tank with either aeration over an open filter or through a land irrigation system (Lawson, 1976: 200). popular waste is tank, method for where the treatment of biological processes different from the septic tank. is propelled to pumped and tank. With the bottom are A second the aerobic altogether this system, air of an aerobic The air movement facilitates the decomposition of waste by organisms which require oxygen to decompose the waste (PIC, 1982: 4). the tank, This method mechanically aerates with settlement and recycling of the sludge prior to discharge of the effluent (Lawson, 1976: 200). When irrigation, the ground, in varying formations. accomplished by directing formed on ground oxidation, and lake, artificial an in a Hence, nearby may be facilities waste water is meet irrigation an area where these kinds of synergies 1979: private utilize the 315). treatment end-product to ability to create In fact, the needs. further allow to (Keller, require able to The soil, and is then used to golf course which resorts to for other purposes. chlorinated and pumped to it flows over rocky and sandy irrigate waste 142). 1978: in Santee, California, the For example, stored treated (Hall, may also be utilized treated waste irrigation may Surface the the laid below are pipes subsurface channels With with acceptable percolation rates. to a soil area of to lead the liquified product pipes have to be utilized be a system purposes, irrigation waste for purified the use to is the development of intent the enhances the overall integrity of the development plan, as well as reduces costs. The siting of treatment crucial. Great care potential sites estimated that the land for plants should waste be water in taken in for on-lot sewage is identifying treatment. in Pennsylvania, only twenty is suitable areas rural It is percent of disposal (PIC, 1982: 1). affect There exists the siting treated effluent rate ground five pipe centimeters which soil where the a percolation per hour (Keller, (Keller, between 1.2 and the that 15 construction 1979: 311). general guidelines. of 311). bedrock and to should be bottom 1979: meters slopes greater fluctuations ground water beneath equal layout seasonal the minimum field must (Keller, First, the Taking distance Finally, 2.5 meters absorption minimum of factors is discharged must have water. least variety A second criteria is an acceptable level of consideration, field issue. greater that 1979: 309). a the (Keller, the absorption 1979: percent may increasingly These conditions soil Third, the at 311). make the difficult are useful Exact requirements are as subject to government regulation and may vary from state to state. The failure generally or be ultimately waste associated results in water with treatment faulty poor soils, high water bedrock, and flooding or yield flood plains. siting is A near a Poor problem that can which drainage table, presence of steep topography the premature emergence of surface (e.g. siting, poor drainage. results from plants which often results of poor effluent onto the stream), before the ground soils naturally filter treat and chance to had a have the effluent. On soils, of the survey a reconnaissance, and site drainage patterns, and topography of a site will provide an sewage zones of highly quantities large present, so are soil permeable Ideally, large site. of a capacity the the assess exactly to information necessary provide study will geohydrology A constraints. and capabilities sewage of indication early of sewage effluent can be discharged. b. Water Availability and Quality Any of form or available, existing sources In assess water availability. of a local engineer water availability the use The water. of can be by tapped potentially the that is naturally and flow of water quantity, quality, affects land raw on intervention connection to needs to developer built areas the services used to In more remote areas, of groundwater favorability maps and open file information and quality. quickly determine available Geological Agency provides an early determination of United States effective means for the through the water availability. Significant amounts of water are routinely properties. The range of use, preparation, food recreation 197). cleaning and resort maintenance, pools swimming and other 1976: (Lawson, and irrigation facilities, by uses varies greatly; personal cooling, firefighting, utilized appendix shows an estimate of Table three in the water usage per person per day in hotels. Early analysis of water supply should quantity and quality of possible sources. connection to an existing private district, site. met The total by a are creation water requirements of a of the being planned, whether extension of a on the resort can be above sources. include whether public the These include and existing reserve capacity combination inquiry should district, address Further water extensions of the existing public supply are possible by the developer, and whether there exists a connection moratorium which development altogether In areas of In remote obtained (Freedman, 1990). proximity to supply of water through areas, existing development, the existing mains may be possible. however, from underground coral) through wells and may inhibit private supplies aquifers (limestone, can be chalk, bores; catchment surfaces that into drain storage tanks instances from cisterns; and (Lawson , of seawater the distillation rare and in A determination of the quality of available 1976: 197). water, particularly if natural on site sources are being It should be noted, considered, will affect usability. sources surface that of be easily affected by the type of may water contaminated. is greatly Water availability soil present, packed clay or and hard the three gallons of water water) allows for gallons per minute soil saturated of permeable the extraction per a well into for a household), whereas zone aquifer (a allows for silt) for example, two to extraction of minute (suitable an till (an impermeable a well into glacial hundred two over with much larger water supply requirements can be (suitable for a development). Even if the domestic met the availability of an adequate supply of fire water is necessary. This elevated storage capacity can be achieved through tanks, ponds, to provide two to the use of with the or reservoirs three thousand gallons of water per minute for approximately a two hour period. typical hotel would require 49 three to four A hundred of water in reserve thousand gallons fighting purposes. capacity for fire In the case of a storage tank system gallon of water be about one dollar per the cost would stored (Freedman, 1990). c. Electricity, The Gas & Telephone availability and needs to these utilities accessibility of be ascertained, and the obtaining these Typically, public municipal costs associated with should services evaluated. be sources are available but obtaining connections to them may be tedious, difficult, existing or Proximity to and costly. service lines is a definite advantage. access to these services of public safety. Installation and are governed by national codes that control their use and regulations programmed main Standards may in the interest by local also be set codes and utility companies (Lawson, 1976: 200). Providing utilities and services be economical, however, and potential services areas, long distances and on a limited scale may careful evaluation of available is necessary. In non-urban difficult terrain may need to be covered to link with necessary services, and may lead to a site that is for all economic and practical purposes unserviceable for resort use. For distribution facility, distance to a capacity available, critical are the costs voltage will is cable differ greatly. twenty Usable on the KVA to 375 to the useable running air The cost of thousand In most (Freedman, 1990). factors. step down required to about reserve may vary from 14 distribution voltage which KVA, and the phase, and depending 220/120, three voltage is voltage, the the distribution electrical service, dollars per mile instances, the capital costs incurred in providing electrical service are returned in the form of rate reductions in the first three to four years. With the current technology, problem even in telephone service is not a Natural gas is the most remote areas. not readily available, however portable gas tanks, or on site storage is feasible if required. can also necessary. provide an Diesel generators alternate source of energy if Natural Hazards The location of a site in an area historically linked to damage in constraint. land subsidence, River flooding form of flood the most frequently occurring substantial property results in and primarily hazard, severe earthquakes. landslides, avalanches and is perhaps a floods, include hazards Natural as prove may hazards natural industrial countries. Floods may occur following intense rainfall, or by accumulation of excess in the water form runoffs (Keller, of surface 1979: 108). earth surface exceeds its include the type of factors topography runoffs when the weight commonly occur Landslides most sheer strength. Important earth surface materials, Erosion and water. associated with contributes to significantly of the landslides, water and changes in water pressure are normally experienced prior Earthquakes comprise to landslides (Keller, 1979: 152). one of hazards, most nature's which not casualties but also emotional effects harm often to only and catastrophic result in destructive direct deaths and inflict long-term psychological and survivors. initiate hazards Secondary s-uch as earthquake floods and Human activity has increased the occurrence landslides. ways; the construction of large of earthquakes in three wastes in deep wells, reservoirs, disposition of liquid The site should be and underground nuclear explosions. and for occurrence historic any for investigated the presence earthquake on data active faults of any (Keller, 1978: 188). has not hazards there precautions the likelihood mitigate (earthquake and impact reduce may of harmful or events water management, design standards, control techniques). that natural technology, by today's been mastered certain are of most deterrence and the prevention While flood Therefore, sensitive site planning may help avoid the location of developments in high risk areas. C. LOCATIONAL ATTRIBUTES areas a have marketability resort may area great of a be stirred amenities and impact resort. as a the surrounding site and of the Locational attributes on the Interest result of ambience, whether success in a and particular the surrounding natural such as beaches and mountains, or created such as a town center. of the people nearby and Furthermore, the travel habits their of propensity particularly in the off where for a secondary market represent a travel to may resort destination In Mexico for example, season. represents a of December the month and when travel by lull in favorably offset by the fact Americans, however this is that Mexicans themselves choose to vacation in December at nearby resorts (Horst, 1990). Community Attitude is a Resort development Community of extreme community no attitude to growth sophistication environmental, and may essential to and from vary design, to sensitivity will issues development either Furthermore, growth. pro Community process. any proposed development is acceptance of success. long term vary depending on the location of the proposed development. Resort often development in terms of the community improved infrastructure, increased offers higher benefits to sales at local employment, and However, it may also cause inconvenience businesses. and unwelcome changes to the community such as greater congestion, pollution, and noise. development behavior has resort Caribbean as perceived friendliness considered to be one the of the most resident the Whereas, the community local a of decline destination. of of success unfriendly the to contributed a and Hostile and the planning the continued but phases, well. as resort not only attitude impacts Community is important attributes contributing to the appeal of a resort destination (Gee, 1981: Clearly, 33). addressed, and interest be local groups be community imperative that it is that community leaders and the development involved throughout process. Proximity to Activity The presence of existing nearby tourist attractions, and proximity enhances a to existing nodes site's potential, four in the appendix. of activity may as demonstrated greatly by table While this table is not exclusive to destination resort analysis, it does present a roster of reasons which document the rationale for travel. The market area of major destination resorts extensive, often national properties where the recreation and the is generated or international. dependence is is quite For resort on tourism, pleasure traveller, initial interest by the image presented of the surrounding area and its attractions; scenic, cultural, recreational facilities, historic metropolitan shopping, and beneficial are areas, (Gee, presence existence of areas of services and their marketability 1981: 8). behavior, namely Proximity of entertainment The usual may to nearby resort developments. in remote multiplicity enhance the to most located landmarks. major quality areas are Resorts that choose to activities in order and competitive parameters price and quality, may offer a to advantage of consumer fall second to the influences of area's image and surroundings (Lawson, 1976: 19). area considerably process, and developer. locate (eg. The selection of a site located in a favored In is affects of great consumer's advantage fact, many large resort in already to selection the resort developers only established recreation Four Seasons in Hawaii). Accessibility the destinations In selecting a site, the developer should ensure that an The success adequate level of accessibility is present. of resort development is critically affected by time and exotic destination, this invariably sites cases, such as In certain reduced demand. suffer from with an Inaccessible constraints. distance a major may not pose problem. For example, the Key Biscayne Hotel and Villas which is located in a crowding, Florida Keys There is a market which quite successful. has proved seeks a remote area of the the urban surroundings (Gee, reminiscent of escape from be ideal, yet inconvenience the for Access to (Smart, 1981: 37). than it experience and image is either ride seen as amenities and However, upon beauty are seen commuting overall of the part of the resort. for four hours in plane. of Aspen, Colorado is a less Aspen, one must generally first commuter should generally Nevertheless, the consumer compensated structures, and concrete pollution, traffic 1981: 9). void of in an environment destination located In order to reach fly to Denver, and then a bus, or fly in a tiny arrival the resulting as well worth the trip, compensating for any inconvenience (Horst, 1990). Construction costs are invariably higher with the inaccessible site. Not only is it important from a demand point of view, but the overall costs incurred and the availability of labor pool are Thus, if project may necessary, a improvements are significant affected. become logistically, as well as financially unfeasible. At Hassle Island in the Virgin Islands, where high rise of a construction was project and modular not physically and increasing 52,53). well as proposed as groupings, were prefabrication practical, construction, as creating compact methods for reducing cost the projects feasibility Cheaper land costs, condominium hotel and high density on the (Lawson, 1976: other hand, increased marketability due to the presence and conditions unique conditions climatic for windsurfing) may (eg. or of special great make the wind development feasible. a. Accessibility by car Access to is not and from principal arteries as critical traditional hotel for resort or motel and interchanges properties, developments. as with Nonetheless, such as airports, sea ports or train terminals is important. Of access course, to major proximity nodes and of ease transportation of access to major the overall decreasing travel cost pleasure traveller. by the and incurred and time Table five by a resort location a of attractiveness the increasing market of the will enhance interchanges in the appendix provides a checklist of important factors when analyzing road accessibility. of many households and the With the changing lifestyles getaway is weekend the professionals, a major metropolitan area not to be in to a destination location from of acceptable drive time exceed two to three hours The only exception to this rule seems 1990). (Freedman, increasing considers that the limit Industry standard popularity. young and families income double in increases a three to market where the New York four hour considered the norm. travel time is b. Accessibility to transportation nodes to Proximity major necessary links destination popular travellers, to in move facilities to national and that great for provides the international pleasure Cancun, and tourists. travellers people airport for European convenient distances air example, is Japanese and travel without a allows hesitation Of 1990). (Horst, airport of issues are concern location, distance from site, types of service available periods runways, facilities (gates, origin and destination of flights, of or the facilities, as a landing strips or For development. example, for private facilities pads may unique feature Sun River be of the with the was a critical 175 miles away, access principle market 1990). existing of helicopter as a operation), (Roginsky, expansion introduction of and incorporated feasible of schedules, airlines traffic or development Potential such volume and serviced, airport passenger/freight), (domestic/international, issue since ground transportation was quite inefficient. The airport at Sun River evolved into the project, where air part of an average river each week. of 300 In transportation has been each year, where by substantially increasing 1980s, a very important flew into sun Oregon commenced air small planes 1979, Air the early service to Sun River airport (Smart, 1981: 107). A favorable condition for many resorts is the ability of obtaining inexpensive fares the areas in which they success and the U.S. to convenient are located (eg. growth of the resort Virgin Islands, airports in Mexico). The industries in Hawaii, and Puerto Rico is directly attributable from less to the increased accessibility resulting more convenient air travel to expensive and these areas (Gee, 1981: 24). Proximity to port and rail facilities, as well as extent and quality of services offered provides a greater, more flexible access to a embarkation, disembarkation and modes various points of of and vacation fly-cruise-tour travel impact relative to relation in transportation the Links between the broader market. and combined packages determine of importance each transportation facility (Lawson, 1976: 39). c. Accessibility to the site The topography determine the of ease and dense weak soils, areas of a site a site. and its soil conditions will of accessibility. forestation may limit In remote slopes, Steep locations access to with severe changes in climate some modes of access may be available only during parts be snowed of the year. over, or high winds For example, roads may may limit visibility during parts of the year making access difficult. Many of the problems faced by difficult access to a site can be resolved using unique become special features (e.g. elevators, tunnels, design solutions or attractions to the that resort ferries, bridges...). The effects and difficulties encountered in providing access and meeting infrastructure requirements has a great impact on construction costs and the overall development program (Lawson, 1976: 23). The total experience in contributes to "arrival its overall sequence" travel to the point the modes of reaching a from 1990). the the point transportation, Access the Village the where and image. one The begins is continuous resort of the experiences (urban, scenic, foliage, time issues that affecting resort experience. setting, perception and of reaching the resort, considering encountered along the way zones) are resort destination accessibility (Horst, process that For example, can enhance when approaching Ouarzazate, located in impression is that ancient fortress (Lawson, 1976: 73). of a desert approaching an In FOR RECREATIONAL ACTIVITIES SITE REQUIREMENTS III. determining the the popularity of various More importantly, the target trends and of recent recreational activities. For example, a long and market should be investigated. course may not meet demanding championship quality golf the of needs a retired Alternatively, a amenities resort, the developer should be offered by a particular aware activities and scope of (Phillips, 1986:16). golf course may provide a person first rate world class image for a destination resort. this While issues, thesis the a development's appendix various integral feasibility. illustrates percentage by activities indicates that between an in selecting activities decision matrix evaluating are issues these on not dwell does income there is and various a strong market part demand of and ultimately Table six in participation income the groups. in It positive correlation participation, especially in activities which are expensive or have with private clubs in the addition, participation which in household Any turn is type and past (Phillips, 1986: 8). tends to increase positively linked leisure time amenity offered been affiliated by In with income, to education, (Phillips, 1986: a resort should be 8). evaluated financially to access risk and determine feasibility. discussion of site selection issues for A major recreational activities are outlined below. Golf The sport of golf is growing rapidly therefore is a prime in popularity and amenity to be offered. Additional benefits are the synergies that are create between the golf and other the resort. course courses open up surrounding aspects the terrain, lands cape possible, as well that of and offer may other as views upon the the course itself (Freedman, 1990). of Sun cost River beli eve of a golf that for course views to not have the been manicured lawns of Yet, the developers a seasonal can never Golf be resort, the amortized in a reasonable period by the income generated by the course. Hence, according to course should be them, sold land adjacent to augment to the income, and golf reduce capital costs (Smart, 1981: 110). While many 200 to situated on more than are courses golf hole 18 championship (AIREA, 1983: 300 acres 33), the minimum requirements are 110 acres, and ideally 160 acres not that a competitive and less than with be built Although (Smart, 1981: 29). the regulation golf course it is felt the time of be golfed in half 60 acres, and can hole been designed which utilize executive golf courses have 45 to recently, 18 More 86). (Gee, 1981: quality course could eighty to ninety acres (Freedman, 1990). golf course slopes and minimal reduce substantially investment, adequate improve A desirable development. gently rolling can is an important selection process The site drainage and a add topography, with grading requirements With costs. development flat element in be site can graded The character. to various contours should be assessed for suitability of fairways, greens and tees (Phillips, 1986: 41). A site that has minimal contours may necessitate excavation of ponds and deposit of fills 1981: 47). to enable positive drainage Typically, around 200,000 cubic (Smart, yards have to be moved with flat sites, and substantial filling, in 65 excess of 300,000 cubic yards would also be necessary to create interest, variety, 1981: 47) the existence add to the aesthetics on a given provide the and site is Analyzing vegetation also crucial. setting for disposition. and trees and pleasure derived from playing Yet, impression of otherwise be lacking. A wooded an impressive burden development distinct may of creeks, ponds course (AIREA, 1983: 33). but may drainage (Smart, (Freedman, 1990). In addition, on the and proper looking course, with high cost a wooded age and site can of clearing course gives the substance, which may Farmland, while already cleared, present substantial landscaping costs with trees which may take years to mature (Phillips, 1986: 43). Drainage is golf also vital course. A maintenance and to the prolonged success well-drained repair costs Adequate drainage prevents 34) and thus increases drainage problematic site and increases successfully construction costs number of play sites developed are reduces play time. standing water (AIREA, 1983: such floodplains, drainage channels, and been both of a as Although wetlands, dry steam beds have into invariably days. golf higher courses, (Phillips, 1986: 42). The preferably soils can be and muck content of often covered soils top soil note may they drainage, excellent and fertilization irrigation should be achieved and . often of Hence, of top suitable turf (Phillips, soil for a balance more expensive to and filling. an of transformation to 1986: 43). a specific site is a to add importation beds require layer the soils on costs. necessitate blasting adequate on provide soils substantially Rocky soils are gravel (Smart, 1981: It is important percolation high soils are development of rates, but facilitate while that are problem depending present a may which These 43). ponds (Phillips, 1986: 43). lakes and Existence found in layer of by one Clay soils develop Alluvial soils make excellent can their percolation to the high (Phillips, 1986: cost-effective 53). prohibitive because of organic material. regions coastal a Peat 21). (AIREA, 1983: pasture land well-maintained in found be may which loom, sandy soil, a suitable from benefit should also site a Hence, analyzing vital determinant in golf course development. A variety of grass are offered for golf courses. Each seed or stolon may be suitable for a given physical soil characteristics. planted from stolons, environments, are Hybrid Bermuda grasses, ideal in while seeded warm or grasses are or planted. Many times Emerald perennial ryegrasses Creeping blends tropical generally more suited to cooler climates (AIREA, 1983: 34). Penncross climate or Bentgrass On greens, are widely of Kentucky bluegrasses, and fescues are used on fairways, tees and roughs (AIREA, 1983: 34). Existence of an adequate water supply to the selection process. to 3.5 million (Smart, have been used on various the to satisfy pond for irrigations use. with a well water level depending on the slopes, lakes the from streams and rivers system is combined when be identified rivers and sites Water are often pumped into a periods week should Wells, streams, irrigation requirements. times, this A water source of 1.5 million gallons per 1981: 53). is also critical is low. Many system for Furthermore, pumping significant amounts of water can be costly and prohibitive. Potentially waste water treatment least a Utilizing significant portion effluent water may plants can provide at of not be this requirement. possible if the effluent project, (Phillips, 1986: 44). treated ponds to irrigate the being increasingly 1981: utilized 55). River, golf course 1981: golf course (Smart, concerns, for However, clean and the potential 110). method this is purposes irrigation potential that treated water is adequate of Sun collected in environmental rising in a be established has to developers effluent, utilized exist, in The stages of early available second source and a (Smart, not is quantities With In the absent. mass is critical problems do not considered totally for viral contamination exists. Contact of effluent water with humans should be avoided. in effluent water used climates the freezing of In colder irrigation may also present a problem (Freedman, 1990). water source has turned some Finally, lack of a natural developers into paying for water. Southern California, purchase water the supply million containing cannot (Phillips, demonstrates operator for irrigation quality of the water source 1986: the more that support 43). In some areas such as is required (Smart, 1981: is also important. 2000 parts of most Table seven in the percentage usage of The A water of salt needs the 55). to per grasses appendix various water sources for golf courses by region. Tennis Tennis has increased dramatically in popularity over the past two decades (Phillips, 1986: 82), and has posed as the main attraction for several resorts, similar to that of a golf course. While there are developing tennis no one acre drainage tennis courts percent would be the required terracing, retaining well-drained and 89). stable The to soil type avoid 60 feet by be designed on a Generally, location of (Smart, 1981: in are important A single court measures greater than 8 because of requirements as many as 6 courts may parcel. on slopes site courts, several issues in site selection. 120 feet, and strict more costly walls and should be increased costs associated with maintenance. Climate has a profound courts. In hot sunny additional implication for designing tennis environments, shade structures or landscaping should relief (Phillips, 1986: 88), require development be present to afford whereas colder climates may of indoor heated tennis courts for prolonged use. developer should be wary Primarily, the of wind velocity and amount of direct sun light present, help reduce wind velocity and utilizing wind screens to glare. In north-south exposure, sunlight from and Other 92). 1981: ambiance, and other related reduce amount of direct movement of the sun (Gee, to help the east-west with a courts are aligned addition, tennis criteria include of availability general aesthetics adequate land for clubhouse, snackbar facilities such as a and pro shop. Significant attention appropriate surfaces. types are and player example, clay rains while rate . A least 14 selecting to courts dry surface different preference affect level of this choice. relatively slowly other court surfaces dry at a after much faster In hot climates, the developer may select a court which remains cool, reduces glare heat (Phillips, 1986: 93). also a given be selection . Climate, available for maintenance For should major issue. and does not crack in The level of maintenance is Concrete courts are very durable and are essentially maintenance-free, and may be used in high traffic and usage areas. Player preference of the target market should also be investigated. retirees may prefer soft Har-Tru courts to For example, hard court surfaces, in and fact, resorts many offer several surfaces (Phillips, 1986: 93). Downhill skiing Although of questions addressed elsewhere accessibility have in this emphasized that ski resorts a three hour the drive from a metropolitan early operating take many it years of capacity or years fully should be which are located more than been successful in attracting in paper, been center have not regional and local skiers operation. even the Hence, reaching break-even point (Phillips, 1986: 122). may Preliminary planning for a downhill ski facility is more complex and costly than developer specialized with any should other recreational seek consultants wildlife biologists the and input experts, to avalanche determine feasibility of amenity. a ranging trackers in (Phillips, 1986: number 121). The of from order to Downhill skiing is successful only if the ski slopes meet certain stringent requirements. According consultant, to Ted there Farwell exist (Gee, 1981: numerous guidelines selection for downhill skiing. 94), in ski site A major vertical drop of 3000 - 4000 the West, feet in feet in combined with a be present, Northeast should and 1500 the North or Northeast exposure . A minimum of 200 inches of new snow per Slopes days. with In some cases, strong winds A of colder minimal also desirable and popular conditions are may excess snow would comprise for skiing sunny but nights snow (Phillips, 1986: 123). trigger avalanches and slides favorable climate average facilitate Conversely, 94). (Gee, 1981: making fahrenheit to 32 below temperatures with anticipated, be should season wind with skiers. can strip exposed slopes in a matter of hours (Phillips, 1986: 123). beginner, as level, which as the well slopes of percent. Expert skiers of 45 to 75 percent (Gee, intermediate largest part of 25 - 45 percent. slopes of the ski Beginner less that 25 1981: 94). considerations would water supply for include adequate snow making, support lodges, Soil types are also The the would demand challenging slopes Other enough to expert. gentler would utilize to satisfy desirable incorporates the market, requires skiers is slope gradient A varied and base lift terminals source of terrain large and parking. a significant factor in determining suitability. The developer should be wary of erosion, and implement mitigation measures (Phillips, 1986: 124). Cross Country Skiing Cross country skiing for the past has been on the rise several years. Factors contributing to this trend are accessibility, simplicity of relatively learning, inexpensive equipment, reasonable trail fees, absence of crowds and superior cardiovascular traditionally, cross country skiing an amenity as the already ones conditioning. Yet, has not been as key in discussed, all be done in a greater variety likelihood ,in that it can of locations and under less stringent conditions. Site requirements Facilities can different from its downhill counterpart. be developed on not faced with of sites, greater number natural snow. require less is a much are vastly country skiing for cross Furthermore, a myriad of and the developer regulatory measures because of minimal impacts to the environment (Phillips, 1986: 135). A number of resorts have responded to the recent popularity by establishing touring tracks through scenic forests, and charging trail fees. In addition, much lower development and operating costs are incurred, are both narrower, are unnecessary and trails as lifts less steep and more accessible. Marina & Boating Integral to marina development is proper site selection. The from strong is safe ideal site open usable body of water currents, with easy access to (Gee, 1981: different activity. depending boat on type sea deep For example, are requirements access Water 99). and winds, waves and recreational fishing requires a different set of conditions than sailing small boats. criteria for Site selection separated in categories, two onshore 151). 1986: (Phillips, criteria can be marina development and Onshore, offshore the site should have adequate usable land, approximately equal to However, in resort properties where the the water area. marina is integrated into onshore space acre body boats, of water can depending on 151). development is the adequate 1990). A one generally accommodate 25 to 65 may be required (Freedman, (Phillips, 1986: have the overall project much less boat size and An important element quality of the soil, bearing marina capacity. layout in marina which needs to Experts should be to consulted test in sedimentation existence the of erosion fills, prior initial phase to and actual development. offshore conditions Various First, water the be 8 feet, in low water facilities and high examined. seasonal and minimum Ideally, . Fluctuations in especially alarming with high water, may be damaged Furthermore, the marina should waves also be daily ascertained. water depth can be where and depth, should be fluctuations depth would should wind and flooded. be protected from strong velocity (Phillips, 1986: which can, at times, severely damage facilities. of experts should be 152), A host consulted prior to the development phase. Two key criteria for Marina planning fetch. Marinas potential possible. depending is should low, in Furthermore, on therefore the on small bodies major marinas) the size be located natural the of vessels on it where protected water the are, exposure and body depth of (2-3 feet for of water up to 8 feet (Freedman, 1990). niches may water, wave if vary and small boats on the ocean for Of course, increase with the depth requirement. the the costs orientation The prevailing winds the is another important will be handling, vessels facilitated. For should not have to when entering winds factor. With will be self cleaning and proper orientation the marina boating summer considering Marina of safer boating cross prevailing the marina or exiting and (Freedman, 1990). of the other amenities, As with many a marina presents with the overall resort. many synergies Marinas offer the opportunity for water side restaurants and wonderful scenic views of the marina itself. Swimming The outdoor pool is ideally situated on of land with limited winds, trees. are and absence of multitude of The latter controls insects and leaves which are undesired. or a sunny parcel The site should be flat, underground water. with minimum rock temperature quality and Water important consideration. Imaginative design environment adding can create interest 77 and a beach appeal to like the resort, as Water well as providing an added activities can be enhanced visual amenity. by features such as water slides, diving boards, and wave pools. Equestrian In order to accommodate equestrian distinct facilities with are required. stalls, turnout activities, several These paddocks, several rings, a dressage ring, an include barns outdoor riding indoor ring, and a series of cross country trails. According to competed in Dr. Joan the Championships US and Buckley, a National Collegiate the of held title Champion of the Northeast Region of equestrian centers guidelines in should equestrian example, the facility Equestrian Reserve follow While not always stringent, has certain turnout paddock, a parcel criteria. located on undulating terrain. However, horses. necessary to provide The outdoor riding For used for horses to be level and is broad facilities and a on, is not required trees Grand several to pasture of who the United States, order to provide better superior riding experience. each veterinarian can be the existence shaded areas for rings are often lighted and can to work required at but in size, vary least horses. the If the meters long, it can double for polo use. the outdoor rings should be ring one large latter is is 110 The surface of of dirt level and consist and sand, and can incorporate Jumping fences for various riding activities. The riding a formal is dressage ring ring used In addition specialized riding, competition, and shows. rings are necessary to exercise to the dressage, indoor the horses, for and are typically 20 meters by 60 meters. For cross country riding, a series of interconnected and groomed trails are ideal. variety. the For woods, added variety, trails may they where bending and turning. be least at create water, to of bodies and hills fairly can be interest and then lead into steep, gently Trails through wooded areas should five feet to four as small natural obstacles such fields with in grassy For example, trails may begin wide and clear of obstructions such as branches or any other interference. Hard packed dirt trails. cause provides the Rocks and injury to the rocky soils horses. difficulty, and should be best surface are dangerous Trails for these and may should vary in interconnected to provide for a variety of skill levels, and 79 riding times of one half hour should up to be routinely More three hours. solicited design experience, and form facilities equestrian to cater facilities particular target group. 80 detailed maximize to meet information experts, the who riding the resort's IV. POST PREFEASIBILITY STEPS AND CONCLUSION Post prefeasibility steps business plan, with a Armed and having completed the above prefeasibilty evaluation and determined the site's limitations and potential, the next step is to ascertain its overall favorable secured as This can be developer. possible, property by the often, conditional price for the This option should an agreed property at purchase the upon and cost, as the If achieved by obtaining an option owner to possible control of quickly from the the option. development. for resort exist, conditions be should suitability duration of be secured at the least of to minimize the amount the option, the developer at risk capital. Upon securing investment partner to reduce risk and 81 seeks an provide capital. is also the operator Often, this partner property, and and an experience, the the partner with A expertise. brings to project's both capital table track record enhances facilitates securing and credibility, and reputation, resort a solid established of the resort financing. The next step is to begin a detailed feasibility study, as well as market which addresses site-specific issues, demand, and the political approvals process. includes securing 'matter project. This of right' issues such as zoning, and the EPA. two years, ranging however, expense. soft costs a quarter in numerous over take as little as one to (engineering/legal to one million dollars. examples, ten Attempts should outlay, and necessary local, highway access, sewage treatment from take proposed approvals on a variety of This process can with described for the involves obtaining all state and federal permits and The latter years be made this and process involve to reduce minimize time delays throughout fees) As can great capital the entire process. Concurrent to obtaining permits, a development team (see page 17) is assembled, and preliminary planning begins. Once all necessary approvals and permits are in place, financing is secured, the property is acquired, and only then is final planning The above and design commenced. discussion presents a generalized two developments are the same. framework, in that no Congruencies do however, exists and broad procedural steps can be identified. Conclusion Part one and concerns which one specific issues many site identified the thesis has of this must address in the initial analysis and evaluation of a site for resort development. the various importance and impact of The issues will vary depending on the nature and location of What is the specific site. of critical concern for one For example, site may be of no consequence for another. in northern New great concern that England, when assessing development the predominate highly effluent conditions are the soil impermeable, extremely making difficult. the potential, in packed and is hard glacial till of disposal In Tucson, however, this is not of major consequence. of sewage Arizona, In Tucson, a critical issue is the existence of an adequate source of water supply. It should be reiterated that our specific issues is not of other concerns. thesis are concentration on site meant to discount the importance The considerations addressed in this only one component of would be required to determine the a resort development. market demand studies, we believe would lead that to site's potentials and issues that may hinder issues financial analysis, evaluation of site specific thesis, include and with political approvals process. an on-site prefeasibility issues, as described in our an early understanding of the constraints, identifying critical any development, even embarking on a full scale feasibility study. issues directly study that full feasibility of Other critical increasing importance, the However, a larger related to the physical prior to Unless the and locational nature of the site are addressed and fully understood at the onset, with a site one risks proceeding often that may be for at great expense all practical purposes unfeasible for any reasonable development. Keep in mind, the city of Fatupahr in Sikri,India. beautifully and western designed city, architecture, incorporating both was commissioned Jahan, the patron of the Taj Mahal. This eastern by Shah This wonderful city is now known occupied for supply. as "The only five Abandoned City" years due Fatupahr has stood in to a in that it was depleted water the desert for 500 years as a monument to poor infrastructure planning (Freedman, 1990). PART 2 86 I. INTRODUCTION The site development. road potential site's located in acre site for is located Four Corners, at Danby criteria apply the will outline a prefeasibility evaluation Danby, Vermont, and the CONSIDERATIONS to a 4800 part one developed in of thesis of the section This AND GENERAL low resort impact off Danby in southern Mountain Vermont. It comprises over 17 percent of the town of Danby (see Site Three), Map in Appendix Smokey House project, disadvantaged youth. and is in part a non-profit The property utilized by the organization for is owned outright by the Taconic Foundation, the custodian of the land. Danby, is a rural farm Vermont, between Its current being the community located the towns of Manchester population is just over major source of employment. in southern and Rutland. 1000, with farming A nearby marble quarry also serves as a source of livelihood for many of Danby's residents. Danby is a small, sedate town that typifies the images of rural experienced little growth and dairy economy, Vermont. has suffers from a stagnating distant location from major and tourist attractions, It ski centers and more recently increasingly unreliable climatic conditions . Introduction : Hotel and Amenities A preliminary property scope would of entail resort development the construction on of a conference center and recreational amenities. to Michael Horst, minimum of 150 a resort to 200 planner and rooms is economies of scale (Horst, 1990) provide a large enough for business meetings. and low intensity recommended. 70-75 percent and due factor. consultant, a for a small hotel, and accommodate guests the desire for low impact development, a 150 key hotel is Today, however, hotel properties require a occupancy ratio should occupancy break-even in order to break even, be noted that a high occupancy ratio may translate into ratio might were to be transformed into becomes a 70-75 required occupancy, during the winter months. this meet the to climatic variability, seasonality It hotel, According required to facility to Given this be possible percent a higher Achieving if Danby a downhill ski resort area, such as Stowe. In the absence a strong demand of the latter, creating would require some truly 'special' amenity or attraction (Horst, 1990). For example, a golf center created within a community which practices ecology may provide a spectacular setting for designer may be able to course which incorporates providing an takes the golf. A skilled golf course design a first-rate, low impact advantage natural excellent of the setting course environment, and resources, meshed with scenic amenities, and a challenging and perhaps even unorthodox configuration. A course nature the and, at that allows same time, one to creates discover a unique and superior golfing experience may provide the sought-after draw. While the Danby site aesthetically attractive, it is something 'special' characteristics alone is is visually and our opinion that unless created and promoted, will not justify nor these sustain the development of a resort. As with the site, any development, however, it amenities be revenues cost potentially effective, (Freedman, 1990). is important that incorporated on and not With this drain in the Danby projected mind, one amenity which seems to be vacation resorts centers the almost a necessity for winter is the conference help boost center. occupancy rates, off-season months and help Conference especially during offset the high fixed costs incurred by most resort properties. Front-end Costs In order to mitigate development team memberships for amenities practice strives must use may be would to the not any a strategy. developed to the be provide front-end costs, create of sold high public. desirable for First, recreational However, a something special the this resort and that exclusive. Furthermore, the local year round residents generally do not have the finances nor any interest to partake in the recreational amenities the surrounding exhibit an offered by the site. area's interest. vacation A second homes method Owners of may would however, entail selling-off a limited number of large parcels (e.g. acres) within the site. The purchasers the opportunity to with undivided interest in successful example of this Carolina. The latter would 100 provide own their own "kingdoms", the resort's amenities. A concept is in Melrose, South latter would also have 90 the advantage of being impact, a low third and imaginative partnership, where low is to method members a permanent preservation protecting the views, to A create a general land owners), (e.g. fee monthly contribute site, investment. front-end the reducing on the development, and the scope of any effectively limiting significantly use low intensity be used of the open and the natural for space, the thus environment (Horst, 1990), allowing for the year round participation by the partners in the outdoor activities. enjoyment of the Alternatively, landscape and if it is determined that front-end costs cannot be sufficiently offset, and a high occupancy ratio for a hotel cannot be sustained, an alternate product such as time-sharing or condominium hotel may need to be considered. II. SITE EVALUATION FOR RESORT DEVELOPMENT The description that follows prefeasibility investigation and physical and With this of the with compiling Further secondary solicitation consultants. feasibility of It investigation would of information, opinions, development is While such will be require and as the from the political equally, if not engineering constraints which the Most physical technically be overcome, although (Horst, development, along should be stressed that pose. site. early understanding issues expert more complex than any of the critical sources of resort may of on-site natural amenities, for resort identification an attributes preliminary analysis, an developed. site of the locational site's potential an is constraints can often at high expense 1990). we have not focused on the political issues, relevant sections of the Vermont Act 250, Vermont's Land Use and Development Law, have been utilized to establish broad parameters for "the capability and of the land to make reasonable minimize waste or It is development. use of support development.... the state's see that almost on the Danby jurisdiction of Act 250. Act 250, if evaluates resources and destruction of irreplaceable values". not difficult to sized project Act 250 any reasonable site, would fall under the A development would fall under it meets any one of the following criteria listed below. i: ii: iii: iv: v: vi: Several any improvements above the elevations of 2,500 feet. the construction of improvements for commercial or industrial purposes, or roads providing access on lands of one acre or more. In municipalities with both permanent zoning and subdivision bylaws, this jurisdiction shall apply if the tracts are more than ten acres. construction of housing.... with ten or more units.... within the radius of 5 miles. The drilling of a well for testing of a natural reservoir. Any exploration for fissionable source beyond the reconnaissance phase. any construction of improvements which shall be a substantial change from a pre-existing development. areas on the potentially favorable resort facilities site have been locations for the and amenities (see identified as development of Developable Areas Map in orientation, appropriate as such development, for qualities and conditions acceptable possess to determined been have locations these reconnaissance, site analysis and Upon preliminary Appendix Three). and accessibility, views, topography and acceptable soil qualities and drainage characteristics. A. NATURAL AMENITIES AND RESOURCES The mountain forests, 800 acres of are the site of major components 2500 acres 1400 acres of commercial agricultural land of forest and 19). (LandVest, 1989: and flatter regions of the site While some of the lower have been cleared for agricultural use and timber value, the upper mountain regions remain densely covered with vegetation and trees. Under Act 250, and minerals landscape state. "the products of the land under the land, are the productivity as well as beauty principal natural Preservation of of the streams and of the resources of the agricultural and the forest conservation land.... recreational opportunity afforded forests, and the stone of by the state's hills, lakes.... are matters of public good. Uses which threaten or significantly inhibit these resources should be permitted only when the public is clearly benefited thereby". Orientation The site is bounded by the slopes of Dorset Mountain to the South and Woodlawn mountain to the west, creating an inward looking, protected, and private central zone with a northeastern orientation. valley creates a focal The relatively flat lowland point and offers views to the north and northeast. The northeastern presents a orientation favorable condition for Yet, the site's openness to northern directions sunlight, which of the downhill slopes skiing. lowlands in the eastern and allows is mountain for desirable the for penetration of a of variety recreational amenities. Natural Beauty Rolling hills, slopes, and natural scenic valleys steep mountainous landscape, rich in and plateaus, ranges create gentle a diverse visual attractiveness and deer, bear, chipmunk, game of indigenous wildlife (e.g. natural quality and appeal of bird) further enhance the the property. on vegetation The remote attraction. major tourist brooks aesthetic value and provides a a retreat for the visitor, the tranquil and For the setting provides site throughout the and wildlife population. panorama, colorful of streams flow adds a site create potentially a which is and dense fall, the foliage During the the a springs, and a variety naturally occurring beaver dam), brooks (including of several The presence beauty. from the retreat everyday mundane urban life. The size of allows site the that environmental considerations. the size Danby site development the balances development, could easily in an for It low a ecological is our impact and opinion that accommodate a reasonable and harmonious unobtrusive manner, preserving the site's natural beauty. Views The site's serene views be utilized to create and multiple vantage points may amenities of superior quality and 96 appeal by offering outstanding landscape. create There is ample interesting nestled in views of the surrounding opportunity on the amenities either site to inconspicuously the landscape, or strategically located for dramatic impact. According to Act 250, "the and waters should not use and development of lands significantly recognized scenic resources.... may be imposed on detract form Accordingly, conditions development in order to control unreasonable and unnecessary adverse effects upon scenic resources". Climate The climate in the region ranges pleasantly warm days during however, snow unpredictable. coverage The from severe the summer. has latter been may pose cold to More recently, unreliable a significant constraint for winter recreational activities. variability in resort, climate impacts thus, affecting season resort. The high the seasonality its evolution to a and of the full four B. PHYSICAL ATTRIBUTES AND CONSTRAINTS Present Utilization & Adaptability Currently, which supports several the site uses These uses natural environment. the preserve low impact include corn fields, a dairy farm, logging activity, and the Smokey House project, a nonprofit organization which facilities for provides learning In addition, two disadvantaged youths. gravel pits exist on the property and the site do The current uses on are presently unused. not present any immediate environmental hazards. The improvements to the site are non-obtrusive in nature and maintain the rural image surrounding areas. of the landscape These include and the approximately thirty structures, ranging from old sheds to recently renovated are clustered residential buildings. The improvements in six areas around the site (Leggat McCall, 1989: 14). For the a location and improvements, improvements on refer to description Appendix the site are existing of the Four. a fraction of The present the site's potential. Any change to the current uses and existing improvements 98 on the site should maintain the A unique natural environment. whereby House) current the the integrity and appeal of uses opportunity exists (farming, logging, cottages), can (barns, silos, and improvements Smokey potentially become attractions of a destination resort. Topography The topography of the development opportunities. valleys may and uses, site The offers many steep slopes and gentle potentially host a multitude such as hiking, equestrian center. of activities cross country skiing, Elevations vary 1300 feet in the valley to unique or an from a low point of a high point of 3700 feet at Dorset peak. Slopes on the site range from near 0 to over 80 percent. The changing in a slopes, although at times consistent pattern highest points of the site. elevations present the and provide to the potential opportunity for discussed later in the Furthermore, the diversity of the topography and its aesthetic cross access The varying slopes and high establishing downhill skiing, as paper. dramatic, occur country qualities offer favorable skiing during the winter conditions for months, and equestrian activities during the off-season months. Drainage & Soil Analysis The development potential of the site as a whole, and in the siting particular, structures is of the various facilities determined by the type and of soils present, and their bearing capacity and drainage characteristics. Of the twenty four different soil types identified on the site , nine types seem to be prevalent in areas with favorable potential topography, describes the views, for development (i.e. access). following The main characteristics types. 100 of these acceptable table nine soil PREDOMINANT SOIL TYPE CHARACTERISTICS Macomber-Dutchess : A silt loam, consisting of Macomber, a moderately well-draining soil found on uplands, and Dutchess, a well-draining soil, formed in glacial till. Dutchess Flaggy glacial till. : A well-draining soil, formed in Georgia and Amenia : A fine sandy loam, consisting of two moderately well-draining soils found on uplands of the site, and formed in glacial till. Georgia and Amenia : A very stony fine sandy loam which is also a combination of two deep, moderately well-draining soils found on uplands, and formed in glacial till. Warwick and Quonset drainage characteristics, terraces, and deltas. A sandy found loam on with outwash excessive plains, Copake A gravelly loam, well to excessively draining, located on outwash plains, kanes, eskers, and moraines. Sago : A poorly draining soil formed of organic material, located under stratified sandy and loamy sediments on lake plains and river terraces. Stockbridge : A silt loam, well-draining, uplands and formed in glacial till. Houghtonville : A fine sandy and found in loamy glacial till. loam, found well-draining source: Smokey House/Taconic Foundation soil survey 101 on Society of Science Appendix Two. severe are described in slight have minor categorized as their intended use. potential for design, planning, having severe limitations affecting be overcome by proper and and limitations are of their Generally, soils Soils in the moderate category have greater limitations which may terms effective means provides an The three groupings; slight, moderate, and development. careful Soil terms of soils in suitability soil analyzing the developed by America, groups limitation and degrees of of system, classification A soil usability and Soils construction. questionable in at best complex and may require costly design and construction techniques in order to be used as development sites (Environmental Geology, 1979: 459). following is characteristics and The predominate soil a describes that table classification of each types, and potential uses. of the the It should be noted that soil characteristics vary depending on the slope of exhibiting the land. The areas development previously identified as potential the flatter slopes. 102 are all located on SOIL TYPES USE Small Building Septic Tank DrainAbsorption age Field Macomber moderate to severe, depth to bedrock, slope severe, depth to rock, slope deep to water slight to severe with slope Dutchess moderate to severe moderate, percs slowly depth to rock erodes easily Georgia moderate to severe, wetness severe, percs slowly, wetness percs slowly, frost action erodes easily Amenia moderate to severe, wetness severe, percs slowly, wetness percs slowly, frost action wet Quonset slight to severe, slope severe, poor filter deep to water slight to severe Copake slight to severe, slope severe, poor filter deep to water slope Sago severe, ponding severe, ponding ponding, subsides, frost severe Stockbridge slight to severe, slope severe, percs slowly deep to water slight to severe moderate to severe, percs slowly deep to water erodes easily Houghtonville slight to severe Path/ Trail source: Smokey House/Taconic Foundation Soil Survey 103 In a evaluating characteristics are vital to any significant project. of soils resulting compacted and a presence success of of high water complex technical of effluent soil England, the prolonged the the siting of improvements, separation New Due to the high impermeability from glacial till soils present in site densely table, these problems, in terms of the disposal of sewage, and from clean water sources. In accordance with Act 250, the district engineer would review the and assess their soil types installation of controls, and specifically, district facilities, pollution conservation prior to techniques. the issuance need to of a in "undue to these investigation by water or problems determine that would mandate by Act 250, and the local inspectors and engineers. 104 the and will air pollution". expert consultants, familiar restrictions imposed More permit, the "adequately support waste disposal" result solutions water commission would soils can not a waste disposal capacities for The further with the practices of Utilities a. Sewage The characteristics of the soils on site and suitability for septic economic tank absorption restrictions on "development which amounts of is responsible that may development. waste should demonstrated fields be some Under Act 250, for unique or large permitted available pose methods if it will can allow be the environment to satisfactorily assimilate the waste". However, all of the soils present are classified by the Soil Society of America as either moderate or severe for use as septic soils on tank the site limitations. absorption fields. classified These soils as There are having only are characterized no slight by slow percolation rates, poor filtering and wetness (see above table). Given the unavailability of poor condition of the soils and the a municipal sewage system, a private package treatment plant would be required to accommodate a reasonable rooms. size As indicated such a plant hotel development, upwards in part one, the are roughly $12 per gallon 105 of 150 capital costs of of daily water In order to determine the requirement (Freedman, 1990). of a package treatment economic feasibility cost reference in be evaluated must plant, the to the overall development cost. The remoteness of a the site allows plant away water could at development. scale small clean the site size of Furthermore, the accommodate and activities recreational treatment a location of unobtrusive of the many areas from supply. a minimum However, a comprehensive hydrological study would be required prior to siting a package soils for "adequately scrutinizes the disposal, plant. treatment the slope of the land Act 250, supporting waste its effects and on disposal of effluents, the availability of streams for effluents; and the applicable health and environmental conservation department regulations". In addition, the disposal of effluents "should of waste materials or not involve the injection any harmful or toxic substances into ground water and wells". b. Water Ground water is in abundant commodity does not seem to supply and lack of this be a limiting factor for any 106 proposed streams development. and brooks addition, fresh The provide easy several naturally water, development. and presence of a series of access to water. In occurring springs a potential At present, the attraction for provide resort water quality seems to be superb. Water conservation and of Act 250. conservation reduction of department the quality surface waters flowing through not devoted important elements The development should meet all "health and environmental regarding quality are to intensive of the regulation ground and and upon lands which are development, and which lands are: i. headwaters or watersheds characterized by steep slopes and shallow soils; or ii. drainage areas of 20 square miles or less; or iii. above 1500 feet elevation; or iv. watersheds of public water supplies designated by the Vermont department of health; or v. areas supplying significant amounts of recharge waters to aquifiers." c. Electricity, Gas & Telephone The site is presently serviced by usable electric power of 220/120, three phase voltage. of excess capacity to However, the existence accommodate future 107 development be should nearby of $20,000 the order cost in a high excess capacity, of absence the In investigated. per mile may be incurred. access to hook system is service has not is available. in in use site, and A rotary telephone but touchtone Danby area, the available. been made communications some pose up on the been installed lines have Telephone latter may The for limitations resort development. Natural Hazards not on the been identified any 250, "restrict development or of divert the riparian stream flow within or conditions have of under Act However, should not floods waters, and floodway a the public and welfare of owners during significantly increase or site. within health, safety endanger the or natural hazardous of any The presence flooding; and.... the peak discharge of downstream development". 108 from the not the river area of C. LOCATIONAL ATTRIBUTES has Danby over 30-40 minutes spillover economic effects of activities the attractions of the Danby Four from tourism have Appendix ski centers are located The closest surrounding areas. and from benefited and economies and diverse strong in Map Context greatly not Rutland between located Locational (see Manchester Three). is Corners Four Danby not and Corners, and the beneficial other significantly affected Danby's economy. Both Dorset and and established Manchester, areas, have where traditionally held summer homes. long many been rich families have The existence of this base, could potentially provide an upscale clientele for any activities envisioned on the site. Community Attitude While the community may benefit economically proposed development, the anti-development. used the cease Local site as hunting their community residents have grounds and are hunting activities, 109 as a from any attitude is traditionally reluctant to result of any development. Similarly, many present lifestyles, and may by seem enjoy their not want the latter changed there is In summary, any development. to a distinct conservationist and anti-growth sentiment in Danby. "the use and development of Furthermore, under Act 250, land and significantly outdoor Vermont, diminish the recreational value activities hunting, including not to such as way as waters should occur in and availability the to people hiking.... fishing, of of and other recreational activities". Proximity to activity For the southern Vermont. been attractions of ski areas are as Danby Four due to Danby's remote location, the However, region's tourism has south and southeast of Danby, mountains, with 1334 feet at the not appreciably nearby benefited Danby. and in Bromely, Mount Snow, Magic proximity are Stratton Several downhill in the same general region Corners. To the resorts have long downhill ski enthusiast, ski vertical Bromely, to 2003 feet Bromely Center has only mountain, Mountain, and drops ranging at Stratton. located 35 ski runs, the other 110 order of in from While Manchester resorts have at To the north and northeast, in order least 70 ski runs. of proximity are Okemo, with vertical drops feet at Killington, and Pico mountains, Pico, to 3175 of near 2000 feet at of ski runs Similarly, the number Killington. range from 35 at Pico, to 107 runs at Killington. For the cross country southeast east of of Danby enthusiast, Four Corners, Dorset, and the to the south Wild wings, Hilden Ski Touring and located Center, in Manchester offer groomed trails and lodging facilities. The most famous golf tournament in the area is the Stratton LPGA event, which has replaced the Volvo tennis tournament. The Stratton Mountain designed by Geoffrey Cornish, is a secluded instruction. 22 acre Golf Course, a 27 hole course, with site, expressly designed for golf The oldest course, however, is situated in the Dorset Field Club. Summer activities are plentiful in southern Vermont. Dorset, for performing season. example, the Theatre Festival various plays, and in is currently its fifteenth Other events are routinely held at Stratton; an International Jazz Festival has past 27 is In years, and the Stratton 111 been performing for the Arts festival displays Vermont handicrafts. southern Vermont Similarly, Manchester, in of Vermont Arts Center displays works all over accommodates tours from artists, as well as, the world. Nearby Rutland, the second the largest city in Vermont, represents a major regional commercial center, and benefits from its proximity to marble quarries, and the ski areas of Rutland offers night Pico and Killington. an array of activities, such as dining, sites historic theatre, museums, clubs, Like Manchester, and shopping. Accessibility the Assessing development overall requires City, Boston, and any understanding of Major Montreal. Regional Context metropolitan for regional resort the centers Approximate site's markets nearby metropolitan centers of these centers are 225, (see an accessibility. represented by market potential are New York distances to 210, and 190 miles, respectively Map in are Appendix Three). located at the acceptable drive time to a resort destination. a. Automobile 112 These limit of The subject site interstate is highways state highway readily accessible systems. 30 and federal It is by state located highway 7. and between Route 7 is a limited access highway that runs adjacent to the town of Danby. It is a relatively tedious and with the exception of views scenic and historic drive, Village may be the of Mt. Equinox. For a more Route 7-A through Manchester better choice. accessed by two town roads boring drive, The site can that run by the site. be These roads are currently unmarked and are accessible from the town of Danby on the eastern border. Danby Four Corners is a thirty minute drive to Rutland, and a fifteen minute drive to Manchester, along route 7. The town is located directly between two south interstate highways, 91 and 87. a major artery potential of has limited the Danby, particularly latter has helped nature of Danby preserve the Four Corners, major north- The distance from current development beyond route character and its 7. and The rural immediate surroundings (LandVest Report, 1990). b. Other modes of transportation The nearest commercial airport 113 is ninety minutes, or 70 miles from Danby Four Corners, and is located in Albany, New York. serve the regularly scheduled flights A wide array of is the maximum travel time dictates that ninety minutes a between acceptable limit. this problem commercial Four Corners at the to the site, therefore, is Accessibility by air less than ideal. a and major resort placing Danby airport (Marriott), standard industry Resort airport. Albany Marketing efforts can however overcome strong image based by promoting a on the location as exclusive and remote. does exist in Rutland, An airport facility been in operation for are no plans for the construction of a not feasible several years. but has not At present, there reopening of this facility. private landing strip on the site is wind shears, caused due to strong The by the geometry of the flanking mountains. Amtrak provides service to White River junction, Vermont miles west of Rutland. which is located thirty five bus, Vermont transit provides Montreal, to Manchester. By service from New York and Travellers from Boston are required to connect through Williamstown, Massachusetts, or Rutland, Vermont. 114 c. The site Although a series of existing logging roads and private trails have made many portions of the site accessible by automobile, hiking areas to The access to all potential. of the area. steep presence trails provide secluded limited the slopes access the numerous to the site. network south inaccessible by automobile. 115 more remote and and access the however, as having upper elevations the and through does, areas identified to footpaths Vehicular lower elevations existing The of valley provide development of the site, west is are and the largely III. The SITE REQUIREMENTS FOR RECREATIONAL AMENITIES Recreational illustrates Amenities potential amenities. in locations However, this investigation Map map following a is Appendix for recreational subject to more in-depth Three further study of the site's constraints. A. Golf Golf has recently benefited from a tremendous upsurge in popularity, and has continued to anchor resorts as the main attraction. an 18 hole golf course entails site, and typically covers Given the mandate of low impact a number of Yet, the development of a high impact use on the over 100 acres. development in keeping with the environment, a 'links' course can be developed, integrating attempt nature and to minimally golf. alter the 116 A 'links' course natural site. would Hence, only the tee areas remainder in would manicured, leaving condition. pristine Scotland, these be Originating courses have been quite are prevalent in Scottsdale and Tucson. in Carefree, Arizona latest world Spanish According to (Horst, the newest Desert Mountain fine example. today incorporate The is located in addition to Michael Horst, in successful and reknown 'links' type course Bay, as planned provides a the Pebble Beach. 25 percent of all courses environmental constraints 1990). B. Tennis With a site of this facilities will magnitude, the location not pose a of tennis problem. Criteria established in part one should be adhered to. C. Downhill Skiing Downhill skiing is perhaps the single biggest reason for pleasure travel during the frequent reside Vermont in constitutes ski Vermont. winter months. destinations, At the largest 27 percent, percentage of with Connecticut and Massachusetts 117 only New Of those who 16 York percent State Vermont skiers, at 22 percent and 16 percent, respectively (Vermont Business, 1988: 67 - 69). While downhill offered, it use of presents a development. accommodating from near even the for ski to such a percent, skiers. Vertical exist on the site, which are vertical drop of the northeast. have snowfall unpredictable and variable conditions. lead should avalanches 1500 feet However, recent in of high intensity eighty fluctuations possibility be regulatory hurdles most skilled required minimum facilities in to Danby site benefits from zero drops of 1500 to 2000 feet above the amenity difficult barrier for Nonetheless, the ranging superb high impact and an extremely may present a Furthermore, the the site. slopes is skiing to highly Finally, be the thoroughly investigated. D. Cross Country Skiing The aesthetic qualities and topographic diversity of the landscape present unique challenging trails. downhill skiing is opportunities for Cross country skiing, a low impact and conscious use of the landscape. a desirable amenity, scenic and contrary to environmentally Cross country skiing is particularly when offered 118 as part of a total While cross package. country skiing has become increasingly popular in recent years, it does not by itself reason to frequent situated is the provide pleasure a at great travelers with resort distance. an adequate location, especially Perhaps, a major availability of multiple locations if reason suitable for cross country skiing. E. Marina & Boating A definite disadvantage and limiting is the lack summertime of a lake or pond that water activities. however be artificially built. factor of the site can be utilized for Recreational ponds can The existence of natural bodies of water is preferred. F. Swimming With a site of this magnitude, the location of indoor and outdoor swimming facilities will not pose a problem. Criteria established in part one should be adhered to. The sites chosen for locating swimming, as well as tennis facilities, are flat, clear areas that are easily accessible. These locations offer 119 great views of the surrounding landscape. G. Equestrian Again, Danby the accommodate centers. Four all the Given the level for can be pleasant the easily of equestrian minimal infrastructure requirements they can be located in many areas outdoor/indoor rings, undulating terrain through can The variety of the landscape provides both grounds trails site facilities required of these facilities, of the site. Corners for turnout created woods, riding paddocks. from the to provide experience for as A well series of lowland valley an the as area, interesting and novice the and skilled rider. The site exhibits chosen all the relatively clear, for possible necessary flat to equestrian requirements. undulating field close proximity to wooded areas. 120 facilities It is a located in CONCLUSION in Southern Vermont consist of The two main attractions The former has long been the downhill skiing, and golf. reason for travel to single largest latter popularity, vacation from benefitted has and travelers. our In near a to continues Vermont, while the unprecedented increasingly opinion, Danby attract cannot compete with the nearby resorts of Stratton and Bromley, in skiing downhill resorts already facilities and a benefit from establishing downhill skiing in a competitive advantage, opt for the and diversity. The right a has a Corners to tremendous diverse planner may be able absolutely first-rate 'links' course. the quality will still for Danby Four site the possesses qualities niche, any Hence, first-rate environmentally conscious golf Certainly, create ski Danby would not present as ski enthusiasts an opportunity evolve into a to image as more established resort. There exists center. strong excellent facilities. destinations, and provide These amenities. competitive advantage topographical to create an However, in order and course or courses contemplated to attract ultimately a should be of golf enthusiasts from 121 scenic all over the immediate vicinity, whereas the the golf courses in addition of course would only compete with An average the country. be a major attraction for the area. courses in the area center, could prove to a nationally reknown course include the by designed Walter High quality golf Equinox golf 18 hole Travis, a and Geoffrey Cornish designed course at Stratton. 27 hole By adding a first rate 'links' golf course at Danby, one can offer diversity and create a synergy with the existing courses that would transform the However, mecca. national golf into a the region such of creation first-rate amenities would require substantial front-end capital. endeavor, and as such the Resort development is a risky site's representatives may be risk-averse, and generally Yet, pursue to unprepared current we associated expenses annual However, are desired revenues additional the utilize to activities, which yet critical mass for site require would create capital, there that believe opportunity development a costly the success. Therefore, 122 the offset land. with the does exist for low-impact minimal necessary developed within these parameters. to proposal. an investment attraction a strategy and is The status of current presents a property the rare opportunity for the Taconic Foundation to pursue one of the many outlined below unique strategies revenue, and First, the owned better utilize the resources Danby site is parcel presenting of undeveloped land an unusual development one of the concept. of the land. largest privately in opportunity to generate the northeast, for implementing Second, there currently a exists numerous structures on the site, which could be utilized in a development concept, Third, the Taconic such as those outlined later. Foundation holds the property debt-free, and is in a position to accept a lower return than that required by a leveraged owner, and can thus explore a more favorable financial structure. THE STRATEGY The development such as opportunities for the Danby site simultaneously constrained. are a large scale site, tremendous, yet Our analysis has identified many of the positive attributes, as well as shortcomings of the site. many Within the scope of its 4800 plus acreage, creative and possible. imaginative development As we have iterated, 123 schemes are there may be high costs associated schemes. many, if with implementing Yet, in our opinion, not all, low impact certain development the implementation of recreational amenities is feasible. As we have noted, the existence of some truly 'special' amenity is an absolute requirement for succeed as resort. Although a uniquely large, it portions are should be the this site Danby remembered that developable. The site to site is not all benefits from distinctive scenic resources, as well as a quaint 'rural Vermont' image. These qualities in themselves, however, are not sufficient to draw a critical mass to the site. In essence, a strong element should be present for a New Yorker, a Bostonian, or a Canadian to spend his vacation in Danby, Vermont. are closer access, Cleary, there are many resorts which to these metropolitan markets, and ultimately benefit from have better a long standing image, such as the Balsams Grand Resort, Canyon Ranch In The Berkshires, Samoset the Bethel Resort, and the Inn Topnotch strategy for the Danby Four strong amenity or & Bostonian or attraction, the which Canadian, 124 the Spa. the Hence, Corners site is to create a reason for the pleasure traveler, the Country Club, would provide a be it the New Yorker, to travel to this particular location. The next step is to develop a concept for impelementing this strategy. THE CONCEPT In developing a concept for consider the many built on the site. development create a this property improvements that are currently Incorporating scheme special these presents in minimizing costs. structures into a unique experience, maintaining the site's one should and a opportunity to essential in is natural character, and favorable The concept developed should take full advantage of these structures, and new construction should be used to interplay currently By using enhance, and existing amongst contribute to the these structures. the existing improvements, the overall impact of any development on the site is inherently limited. The question then becomes, Danby Four Corners site. facilities and developing a concept for the A 'concept' should incorporate amenities competitive advantage which and financial would provide viability. a While, we have not dwelled on the many market-driven issues, an understanding of the site and 125 its regional context unique entertaining necessitates development concepts, to attraction for entrepreneurial and create the necessary 'special' the site In keeping and its location. several innovative ideas for with the above parameters, the Danby property are discussed. Agricultural Research Center An research agricultural research and education facility that and conscious, of engages in promote to seek the and nature, are organizations These farming. environmentally understanding an aqua-culture, organic gardening, and activities such as experimental environmental center is effects an human of interaction with the environment. An is the excellent example New Alchemy non-profit organization, located Expert teachers range of topics waste treatment and farmers, and research, Seminars, conferences, integrated and offered by the Institute. 126 on a educate and consult and, water projects Current systems. covercrop in Falmouth, Cape Cod. food, energy such as Institute, a pest practical and entail management. training are a twelve acre site, comprised The center is situated on of experimental structures theme bio-shelter. Many including a exist on the site, 'super insulated' auditorium, ambient a and houses, green gardens, gardens, market organic fields, research temperature, both which naturally maintains in the winter and summer, where heat is generated internally, by lighting and body include a visitor facilities additional Alchemy's New temperature. conference store, and center, book space. The unique nature from not only the of the all over the world. a broad range of people and appeals to backgrounds. Amateur by the available. Cape to day activities visitors northeast, but The Institute attracted Institute attracts botanists specialized and scientists knowledge and Cod tourists are intrigued of the Institute and are expertise by the day often include a visit as part of their vacation plans. Why the Site Danby Four Corners endeavour. offers an ideal setting The large acreage 127 provides for such an a variety of environmental conditions and certainly more than enough space experimental farming, for research fields, ecological studies. research With careful planning, community could be established a cohesive on the site, day to day support providing intellectual, leisure, and For example, a young scientist could for its residents. and indulge live, work, actually and in the many natural amenities offered by the site. the existing structures can Many of the needs of such a community. silos, and sheds can scholars and scientists thirty number of barns, staff, as well as visiting can be housed in available bedrooms A readily be converted into research Permanent and study spaces. easily accommodate synergy can be created with on the site. the more than Further, a many of the current uses on the site, such as the farming and forestry activities. The Smokey House project can easily be incorporated into the educational and research activities of This synergy would allow the Smokey House expand its activities with the center. Benefits 128 the center. to grow, and Its contribution to such an to the Taconic Foundation. the Second, learning allow use of its land. the Smokey House to benefit potential be tremendous. Project can unique be to would simply endeavour essentially no cost can be implemented at This concept a and experience, educational activities for the youths Smokey any new House. Third, and renovations by the users the property. Finally, in a revenue exists to charged the the would provide a The center expenses and property taxes. of participating in structural improvements would enhance the value of potential for variety of ways. scientists multitude to generating A fee cover could be administrative Seminars, conferences, and tours of the facilities could generate a substantial sum for the Taconic could raised be leased to and crops, marketplace. Foundation. visitin produce The existing ig scholars. could be residences Organically sold in the Corporate and government sponsorship could be sought for the various projects and activities of the center. established Additionally, with a joint venture educational institutions Forestry or Agricultural Management. 129 could in be Botany, Artists' Village A unique concept masters of meet can be the arts and for extended bucolic setting periods of time in variety skilled of apprentices a tranquil to create inspired works on the site. utilizes his/her period of in a whereby a select group group would live and work skills developed of art. and This The apprentice, residency to enhance his/her of traditional arts and crafts. Some of the activities may include, painting, sculpture, ceramics, jewelry making, weaving and quilt making, woodworking, and boat and furniture building. In selecting the activities to issues are considered. master is important be First, the in that it attracts program. activity low impact, be of environment and ecology of produced Artists notoriety should have the be marketable, and through their to association and reknown artists' village. are as follow. 130 the interest and Second, the proposed the site. opportunity several reputation of lends credibility to the should offered, and respect the Finally, the work provide gain revenue. exposure with a and reputable Examples of this concept The Center, in Headlands Art seminars, lectures, and program', public the center for a Apprentices attend residence in 'artists include, offered Activities space. studio into artists the by converted being and are the site, situated on buildings are is Six former acre recreational area. located in a 15,000 military northern California, art exhibits. nine month period, and work under the direction of skilled masters. The seashore historic in northern on located Colony, Live/Work Artists' Olema a provides California, Olema residence and work space for 9 artists at a time. has effectively used the existing structures on the site to farmhouse, provide cottage water tower and utilized are and a living accommodations, renovated A requirements. space accommodate to renovated stable provides work space for the artists. Park, in Lewiston, New York, A third example is The Art Sculptors commonly referred to as the 'sculpture farm'. produce environmental landscape. utilized to Art Park livelihood to has to the attraction that where 131 in works attract tourism become an Lewiston, create the to the community and is Fundraising is tied effectively The and art tourists town. provides now visit specifically to see The Art Park. Why the Site art has been a long The relationship between nature and Pursuing these activities within a pastoral environment promotes creativity, and offers an standing tradition. outlet works for the of art. actual With artists' the Danby site could Four superior Corners site an be developed. The be used to provide both be sold could community on the buildings creating artists' emotions, living and work space for the artists. Benefits To generate income, through a network stores. Further, income from courses, of art artists' work galleries, and Taconic foundation the rent paid instruction fees the by the masters from tourism. other retail can expect and apprentices, from seminars, lectures, and revenue can and training In addition, the nine bedroom Herrick house can be transformed into a bed and breakfast country inn to accommodate visitors. The apprentices can also help renovate, expand, and maintain the current improvements, thus creating value. 132 Conference Center/Executive Retreat The combination of conference and center executive retreat is quickly gaining popularity, particularly with corporations exciting for environment specialized educational Corporate while strategy surrounding stimulating and formulation and their executives. training for executives attend the a provide to seeking meetings and landscape, conferences, and recreational amenities provide relief for leisure. Increasingly, to marketed the resorts national England for planners conventions, and business is are being meetings and providing the core demand. England's scenic attractions and Business has found New historic of New With the sites appealing. continued support and demand for New England meeting and convention space, the winter resorts of Vermont and the neighboring states, are evolving into summer destinations, providing a vast array of year round amenities. Several demand resorts in for the conference area are and meeting 133 benefiting from space located the in pleasant rural surroundings. mountanous terrain year round is a fall seasons, the slow spring and late In the resort that during the winter and attracts pleasure travellers both summer. by surrounded of recreational offers a vast array The Balsams activities. and New Hampshire, in located resort The Balsams, a 15,000 acre resort is marketed primarily as a conference and meeting recreational amenities provides center. It tennis, golf, skiing. A swimming, downhill second example is Club located in and the Bethel Inn Over sixty five Maine. cross as such country & Country percent of its revenue is generated from corporate and business demand. Amenities include a 6000 rooms inn, a 70 Another example, square foot conference center, and numerous recreational activities. the Samoset, a 230 in acre resort Rockport, Maine generates over forty five percent of its revenue from corporate meetings. Why the Site As we have secluded natural the absense surrounding area this setting, which lends as a premier meeting in indicated, already site offers itself perfectly place and executive retreat. of any recreational improvements, offers a multitude of 134 a Even the activities, and the site itself retreat and provides leisure. streams provide a pristine environment The many natural an added dimension for example, following meetings, the site for the natural amenities, activities such for springs and enjoyment. For executives could utilize and participate in as horseback riding, hiking, and cross country skiing. The current meeting inadequate, and the existing expansion. conference would have to be overnight space expanded. accommodations The existing a tranquil, quaint, stressed and would be Similarly, would require improvements, however, provide and relaxed setting for corporate executive, who the highly seeks a productive retreat and a pleasant change in surroundings. Benefits Clearly, a full scale conference facility would generate substantial income, investment and yet would require heavy marketing inorder to existing facilities. front-end compete with The front-end investment, however, would not necessarily be exhorbitant due to the current availability meeting space the site. of limited The existing stuctures on 135 and lodging the site on could easily be expanded and converted into additional meeting space, and overnight totally building new accommodations. would enhance the and pastoral image. A a season resort is property's rural essential for summer recreational amenities, three Vermont, a southern a season periods. during slow in and diversification, providing resort location the conference center would increase generating buffer revenue For by than incorporating faciliities, existing structures profitability Rather success. Winter and combined with conference and meeting facilities, would render the site profitable and provide revenue for the Taconic Foundation. War Games An activity with increasing popularity throughout the country is war games. In these games, two or more teams engage combat, in wilderness. simulated 'roughing' popular version games environment, in the The weapons utilize harmless paint pellets, to mark soldiers who have been shot. These it of the game have little where the facilities is viewed as The objective of a is to 'capture impact on wilderness and the the flag'. immediate lack of modern an amenity, contributing to the 136 of authenticity personally One combat. experienced the the of thrill of has authors partipating in these games, in the Laurentian Mountains, and can attest to the increasing interest in this activity. Why the Site The site, in its participants unique games. Danby The pristine grounds site is condition, for offers partaking enclosed by in the these mountainous terrain, creating an inward orientation, ideal for these games. As one of the largest privately held undeveloped parcel in the sense of varying ideal northeast, it remoteness, isolation, and topography and in that they provides an adventure. diverse natural create unparalleled The conditions are interest, and offer a challenging and realistic terrain. Benefits Danby Four Corners could these games, and benefit sponsorship. income the site and rental combat gear can be with sponsor of from fees associated from such Further, admission to fees for necessary substantial become a national relatively 137 used to generate little front-end The existing structures on the site can be expenditure. In activities. be particular, two or more their and residences can bare addition, In team headquarters. as rented participants the accommodate to used shacks, placed in varying locations throughout the site, are generally carried rented, since these games can be out during weekends, where a required. Other sources one or two night stay is include food of revenue and beverage, and technical instruction. SUMMARY The common theme among the four concepts discussed above is each that conscious use condones a reasonable present, At Foundation. debt-free, with administrative comprising the above Taconic uses, without front-end costs associated each case, the to revenue for the site the held is costs and property taxes generate adequate Foundation, advantage of effort of annual major portion would environmentally little requires and provides implement, an land, takes maximum of the structures, existing Taconic project expenses. The for the income incurring the normal with resort development. In improvement or concept 138 advocates expansion of the many structures on the property , thus creating long term value. and mutually beneficial role. can play an integral the artists' example, with skill its of residents, enthusiasm, and manpower, are the the disadvantaged committed benefit the project's image House would with reciprocated energy of For expertise and village, the remaining Furthermore, youth. House project concepts, the Smokey of these With most to Smokey and strengthen the Taconic Foundation's ties with the local community. The success of resort devlopment on this site is at best uncertain. costs may development, the high front-end With resort prove too development proceeds unjustified costly and through the many obstacles as the on the way to potentially becoming a destination resort. As we these hurdles could have discussed at great length, prove unsurmountable, and ultimately development. to questions within a the result in a failed These hurdles include, but are not limited of access, lack of a national reasonable commute, the approvals uncertain regulatory climate, airport process and and the anti-development sentiment prevalent in the Danby area. 139 As resort discussed, development endeavor, requiring significant risk high a upfront investment. In risk and limit the required order to reduce the project parcels capital expenditure, upfront is need to may be subdivided and sold individually, resulting in a smaller majestic property. less acres of represents one undeveloped parcels opportunity to in at oppportunity present the site's the largest privately the northeast best of a parcel of such limited. to preserve utilization into There the a land national 4800 owned region. participate in activities and recreationl amenities certainly At present, The enjoy the grandeur is exists a rare and transform the center; for the arts, agricultural research, conference/retreat, or even simply a home for the ever-increasing popular war games. We believe these advantages impacts. of the property, with fully utilize minimal the adverse Once implemented, these concepts would require little day to day generate creative concepts administrative support, and certainly a reasonable expenses, and risk adjusted return to provide additional retained the Taconic Foundation. 140 cover earnings for PART 3 141 Prefeasibility Checklist The prefeasibility follows provides site checklist evaluation the observer with an that instrument to be used on site to assess attributes and characteristics in a thoughtful and methodological the identification require further conditions which framework of manner. critical analysis, as issues, well should be explored. outlines the key elements prior to proceeding with any project. 142 It facilitates In which as would favorable addition, the to be evaluated, RESORT DEVELOPMENT PREFEASIBILITY SITE EVALUATION CHECKLIST and Date Time: Project Name : Site Location: A. NATURAL AMENITIES AND RESOURCES Orientation N Shade Sun Wind Exposure_ Natural Beauty Scenery: (diversity, variety, Natural Amenities: color) (desert, mountain, beach, lake, pond) Views Quality, Variety, and Key Locations: 143 RESORT DEVELOPMENT PREFEASIBILITY SITE EVALUATION CHECKLIST ..2 Climate Temperature, Precipitation, Humidity, and variability: B. PHYSICAL ATTRIBUTES AND CONSTRAINTS Present Utilization & Adaptibility Type and Impact: materials, (environmental conditions, hazardous regulations) Topography Highest Elevation Type and Variability: Lowest Elevation (flat, sloping, mountainous) Drainage Natural Patterns: (rainfall, rate of absorption, bodies of water, water table, topography) 144 RESORT DEVELOPMENT PREFEASIBILITY SITE EVALUATION CHECKLIST .. 3 Soil Analysis Type and Condition: (mix, texture, wetness, rockiness) Utilities a. Sewage Connection Moratorium Existing District_ Planned District Critical Floor Analysis: Extension (on site septic vs. package treatment at 15-20 thousand gallons/day) Surface Water Source: (capacity, flow, dilution rate) Ground Water Discharge: (sands, gravel, water table) 145 RESORT DEVELOPMENT PREFEASIBILITY SITE EVALUATION CHECKLIST b. ..4 Water Connection Moratorium Existing District Planned District Type and Estimated Uses: On-Site Sources: Extension (gallons/day, quality required) (aquifers, springs, catchment surfaces) Quality of Available Water: c. Electricity, Gas, Telephone Electric : Available Not Available- Programmed Gas : Available Not Available_ Programmed Telephone: Available Not Available Programmed Natural Hazards History: (type, frequency, severity, season) 146 RESORT DEVELOPMENT PREFEASIBILITY SITE EVALUATION CHECKLIST C. ..5 LOCATIONAL ATTRIBUTES Community Attitude Pro Growth No Growth Planning and Design: Unclear (sophistication, sensitivity) Key Groups and Leaders: Proximity to Activity Urban Suburban Rural Type and Character: (natural attraction, cultural, social, historic, image and quality) Accessibility a. Automobile Roads: (proximity, type, volume, condition) 147 RESORT DEVELOPMENT PREFEASIBILITY SITE EVALUATION CHECKLIST .. 6 Nearest Metropolitan Center: b. Other Transportation Nodes Airport: (location, service, facilities) Port and/or Rail: c. (name, distance, drivetime) (location, service, links) The Site Ease of Accessibility: Arrival Sequence: © (terrain, seasons) (type, quality, image) Hormoz Lashkari, Christopher Voutsinas 1990 148 PART 4 149 APPENDIX ONE : TABLE ONE TO TABLE SEVEN TABLE ONE : SOIL TYPE COMPOSITION GENERAL COMPOSITION DEFINITION Gravel particle size over 2mm in diameter Sand particle size of 0.05 to 2mm; grains are visible to the eye Silt particle size of 0.002 to 0.05mm; grains are not visible but can be distinguished by touch Clay particle size of less than 0.002mm; smooth and stiff when dry, plastic and sticky when wet source: Lynch et al., TABLE TWO : 1984: 379 SOIL TYPE CHARACTERISTICS SOIL CLASS ENGINEERING IMPLICATIONS Clean Gravel Dominant component is gravel with less that ten percent silt or clay; stable when loaded; reacts well under freezing; excellent for drainage; high bearing capacity Silty & Clayey Gravel Mostly gravel with more than ten percent silt or clay; generally stable when loaded; fair to good stability when frozen; questionable drainage characteristics; good bearing capacity 150 Clean Sands Mostly sand with less than 10% silt or clay; stable when loaded; reacts well under freezing; excellent for drainage; bearing capacity dependant on grading Silty and Clayey Sands Mostly sand with more than 10% silt or clay; fairly stable; questionable drainage and bearing capacity Nonplastic silts Inorganic silts or fine sands with a liquid limit of less than 50%; begin to flow like a liquid; fairly stable; poor drainage and bearing capacity Plastic silts Inorganic silts with a liquid limit over 50% ; poor stability, drainage, and bearing capacity Organic Silts Silts containing organic matter and a liquid limit under 50% ; poor stability, drainage, and bearing capacity Nonplastic Clays Inorganic clays with a liquid limit under 50% ; poor stability and bearing capacity, unusable for drainage Plastic & Organic Clays Clay or silt containing organic matter and a liquid limit over 50%; poor stability, unusable drainage and bearing capacity Peat and Muck Organic material; unstable, some drainage characteristics, unusable bearing capacity source: Lynch et al., 151 1984: 379-380,383 TABLE THREE : PER PERSON WATER USAGE QUANTITY USED PER PERSON/DAY Hotel Guest Resident Employees Non Resident Employees (1) 135 90 45 Source: Lawson, 1976: 197 TABLE FOUR : TRAVEL REASONS ACTIVITY NODE EXAMPLE Leisure sun seeking, sight seeing Recreation sailing, golf, skiing, climbing, riding, sports, spectator games, displays Culture interests in art, history, archeology and pageantry Religion ceremonies, pilgrimages, festivals Entertainment theatre, concert halls, opera, casinos, night clubs Convention conferences, conventions, assemblies, meetings Institutional visitors to institutions, hospitals and universities Business business and commercial travel, executive meetings Economic promotional shows, exhibitions and trade displays Medical health, dietary, spa and convalescence facilities Social visits by relatives, friends, societies, clubs Travel overnight lodging requirements source: 152 Lawson, 1976: 18 TABLE FIVE : ISSUES OF ACCESS ISSUES CONCERNS Highway Type Classification and Role Statutory Restrictions Positions of Intersections/Routes Relationship to Highway Distances from intersections Frontage length Visibility to traffic Possible hazards Visibility/access from other routes Traffic Volume Traffic flows Daily, weekend/weekday fluctuation Seasonal fluctuation Trends and speeds Traffic Type Short or long distance Business or leisure Major travel bus route Future Development Proposals/expansion plans of roads New links source: TABLE SIX : ACTIVITY Lawson, Bicycling Boating Golfing Jogging Skiing Swimming Tennis No partic. <$5 36 PARTICIPATION BY INCOME INCOME GROUP ACTIVITY 1976: $5-$15 (thousands) $15-$25 23 16 6 35 27 13 27 7 57 18 6 21 5 34 12 28 source: 153 GROUP $25-$50 41 39 20 33 13 68 22 4 >$50 42 43 27 37 21 72 37 3 Philips, 1986: 9 TABLE SEVEN : PERCENTAGE USAGE OF WATER SOURCES FOR GOLF COURSES SOURCE Lakes and Streams Wells Local potable water Effluent Water No Irrigation NE N.Cent 55.5 21.4 19.6 2.6 0.5 41.0 39.3 16.4 1.7 1.6 S 46.6 32.6 12.0 7.9 0.9 W 32.1 38.4 21.3 7.2 1.0 Nation 44.2 33.7 16.6 4.6 1.0 source: Phillips, 1986: 44 154 APPENDIX TWO: Limitations Soil Recreational Areas for Buildings in Degree of Limitation None to Slight : Well to moderately well-drained soils not subject to ponding or seepage. Over 1.2m to seasonal water table. Flooding : Not subject to flooding Slope 0% to 8% Rockiness : None Stoniness : None to few Depth to bedrock: 1.5 meters Wetness Moderate Wetness : Well & moderately well-drained soils subject to occasional ponding or seepage. Somewhat poorly drained not subject to ponding. Seasonal water table of 0.6 to 1.2 meters Flooding : Not subject to flooding Slope : 8% to 15% Rockiness : Few Stoniness : Moderate Depth to bedrock: 0.9 to 1.5 meters Severe Wetness : Somewhat poorly drained soils subject to ponding. Poorly and very poorly drained soils Flooding : Subject to flooding Slope : Over 15% Rockiness : Moderate to many : Moderate Stoniness Depth to bedrock: Less than 1.0 meters source: Environmental Geology, 1979: 155 464 APPENDIX THREE 156 The Site Danby Four Corners,VT one mile 157 r...-. 2t 3~~m Asa ItLf - ~ "" 4r I ig i~70 '" ' *t. Tundge -- ot A 3oal 12 140 fr I* si .. Plut ii e no Ce - Po so . r. 13' 4% SAWAnn s2 2 " 3. etW s O ET 3 91 gn 6 Woodo ot - un., 2 2 s -k 1 4~ 141srie caeA. - It nE E 0 30e a t 1 Nm ,. I Ie~ E:s r 30 . 0ag As Nnae Hough 1. @tn 2 iVae vill3 m TAON Me - WosHr PO son M- uner0n LoatoAl 3 d' cA--. to - 1 11 *iti3 3S-7 rt for 2 ArA A goAf 3 . Co . - 11 2 h" 9L a. a tl n 2 . 33 , 1 W--ood1s 1.H GRE Dnp .. Con 4a.. 41 -1 3 A-V r sMe .12 -%42- -1* "* k - Quce 0yd s ow dt N2 southFon.0 wes . a 1 s4 D-e aue1 " es f 9 .ot 315 1+ % A.w. 9 0 . .1; N a I- &.te t KM " ski= +u1 2 103 6 ,,. Ws 33 0 seenviite A, Miaoueii 1' o dH 2fd as i 106 1s2 * ,W-svn so k 6%4 C2 "'"o" '"11" 1P1 FOITewstH Hode f , 2 Plcow - boo 2- 22 9 I Gis0 L- .1 ATOis , 34 p2 North bdge Tw *2Rce Bethe ~~~~s 0~ 30 4 " 2 1. -ol ph C.".- -ne _oh a. do A3 a.s- :r o 10 - 32 e -th Ran 15 a r~ e Randolph - 2Soutnhrd i. .ibr wh .. A M ui s *""9e QA e~ '..~F..1. 10 - -- .. Fe - 40 W R - Context. 158 4 wAs&dinstA' 8 s . 2 e0 i 103 in nshend .A-e 35 Ai 3 3 Wa ."oc.g re l island PT MCMAUn Mtontauk EW YORK Regional Context 159 The Site Danby Four Corners,VT Developable Areas one mile 160 DEVELOPABLE AREAS SUMMARY Refer to the Developable Areas Map Area A : Corn field Present Use Predominate Soil: Dutchess Flaggy, Georgia/Amenia : Flat to moderately sloping Terrain : Mountain ridges to west, distant Views valleys to north/northeast : Immediate, off paved town road Access Area B Unused, old farm field Copake, Georgia/Amenia Flat, clear field Surrounding trees limit immediate view, distant views west and south : Direct, off hard packed road : Present Use Predominate Soil: : Terrain : Views Access Area C : Unused Present Use Predominate Soil: Georgia/Amenia : Flat, clear meadow Terrain : Good views, mountains to Views south and west : Off hard packed road Access Area D : Unused Present Use Predominate Soil: Copake, Georgia/Amenia : Gently to moderately sloping Terrain : Panoramic, distant lowland Views ranges to north and east : Direct, off hard packed road Access 161 Area E Present Use : Unused Predominate Soil: Georgia/Amenia Terrain : Clear, moderately sloping Views : North and northwest Access : Off hard packed road 162 / ~ /' '2 N ~'1~ The Site Danby Four Corners,VT Recreational A menities one mile 163 APPENDIX FOUR : Existing Structures The following is a description of the major structures (LandVest, which currently exist on the Danby site For the location of these structures, refer to 1989). map which follows. The Hilliard Compond The Hilliard compound houses the Smokey House Project, and administrative as its educational and serves following the of consists parcel The center. structures: The Hilliard House, is a two level structure which incorporates rooms for meetings and conferences. The first floor consists of a large kitchen, and the second floor accommodates a large open span meeting room with an outdoor deck. The Smokey House Office Building, a 2500 wood framed farmhouse, contains 2 large offices and a kitchen. square foot meeting rooms, Both, the Hilliard House and the office building are fully serviced, and have been recently renovated. Other improvements include a wood working shop, storage barns, a locker room, and a 1000 square foot sugar house. The Herrick Farm The Herrick Farm consists of a one and half story clapboard house with a footprint of 4700 square feet. The house incorporates a spacious living room, a large family room (with fireplace), nine bedrooms and a full bath. Aditional structures include a small one and half story building shell, two bay garage, several sheds and barns. The Bruce Dairy Farm The There are two residences located on this farm. with farmhouse, foot square first, consists of a 4000 living room, dining room, four bedrooms and two and half The second, an 1800 square foot farmhouse, baths. contains three bedrooms and one and half baths. These houses have many desireable features such as enclosed Other porches, and flagstone and hardwood floors. 164 structures include dairy and numerous other sheds. barns, silos, a horse barn, The Fiske Compound The Fiske property offers some of the best views of the valley, and consists of five structures. The main house contains over 1400 square feet of living space, four bedrooms, and a bathroom. Currently, it serves as the living quarters for the staff of the Smokey House Project. Other structures include a hay barn, Manure Bunker, silo, and storage barn. The Armstrong Property This property contains a one story ranch house, with a large living room, three bedrooms, and two baths. The exterior of the property is in poor condition. Other improvements include a garage. The McClellan Farm At approximately 2200 square feet, this wood framed McClellan house contains a large living room, five and an bathroom, a large kitchen, bedrooms, one attractive porch. Other structures include garage, a dairy barn, cow barn, and numerous sheds. The property offers outstanding views of the nearby mountains. The Log Cabin The log cabin, a 1200 square foot offers situated, and remotely outstanding views. quaint structure, is and both privacy The Foy Cottage This is a small extensive repair. one story structure, in need of The Currier Cottage Situated in a great location with excellent views, this elegant one story wood frame cottage features a masonary fireplace, bay windows, master bed and bath, and a loft to the studio apartment is adjacent A bedroom. exterior. a marble cottage, and features 165 Danby Four Corners ,VT The Site Existing Structures 1/2 mile 166 BIBLIOGRAPHY Aloi, G. Tourist Complexes. Milan, Italy: Ulrico Hoepli Editore Spa, 1980. American Institute of Real Estate Appraisels (AIREA). The Appraisel of Rural Property. U.S.A.: National Association of Realtors, 1983. Architectural Record. Motels, Hotels, Restaurants and Bars. U.S.A: F. W. Dodge Corporation, 1960. " Hotel Baltin, Bruce, Pannell Kerr Forster. Development" (Interview), March 1990. Benke, William. All About Land Investment. Mc Graw Hill, 1976. New York: Boutwell, Mary Lou, "Market Analysis of Residential Development Site at Wachusetts Mountain in Princeton, Massachusetts." Unpublished Master's Thesis, Massachusetts Institute of Technology, July 1987. Brauer, Henry G. and Kelsey, Karen, "A prototype for large site analysis: 1000 acres in Spotsylvania, VA. "Unpublished Master's Thesis, Massachusetts Institute of Technology. Sept 1987. Buckley, " Requirements for Equestrian DVM. Joan. Centers" (Interview), July 1990. Resorts of the Catskills. Evers, Alf et al. St. Martin Press, 1979. New York: "Site Freedman, Maurice, Principal, The Freedman Group. Selection Criteria for Resort Development" (Interview), June, July 1990. Gee, Chuck Y. Resort Development and Management: For East Operators, Developers and Investors. Lansing, Michigan: The Educational Institute of the American Hotel and Motel Association, 1981. 167 Hall, F. Water Installation and Drainage Systems. Lancaster, England: The Construction Press, 1978. Heuer, Karla L. Golf Courses : A Guide To Analysis and Valuation. Chicago, Illinois: American Institute of Real Estate Appraisers, 1980. Horst, Michael. "Site Selection Criteria for Resort Development", (interview), July 1990. Jones, Rees L. and Rando, Guy L. Golf Course Developments. Washington D.C.: Urban Land Institute, 1974. Keller, Edward A. Environmental Geology. E. Merrill Publishing, 1979. Ohio: Charles Keyes, Dale L. Land Development and the Natural Environment: Estimating Impacts. Washington, D.C.: Urban Land Institute, 1976. LandVest Report. Appraisal of Real Estate Owned by the Taconic Foundation. Boston, 1989. Laventhol and Horwath. Hotel/Motel Development. Washington D.C.: Urban Land Institute, 1984. Lawson, Fred. Hotels, Motels and Condominiums: Design, Planning and Maintenance. Boston, MA: Cahners Books International, Inc., 1976. Leggat McCall Report. The Taconic Foundation Lands. Boston, 1989. Lincoln Institute of Land Policy. Land Use Institute, Volume 2 8/85. Philadelphia, PA.: The American Law Institute, 1985. Lynch, Kevin and Hack, Gary. Site Planning. Cambridge, MA: The MIT Press, 1984. McCullough, Robert L. Boston College Environmental Affairs Law Review: Historic Preservation and Land Use Control at the State Level-Vermont's Act 250. Newton Centre, MA: Boston College Law School, Fall 1986. 168 McLoughlin, M.Eng. " Engineering Information Jim. Sources" (Interview), July 1990. McMahan, John. Property Development. Hill, 1989. U.S.A.: McGraw Recreational Land Miles, C.W.N. and Seabrook, W. Management. London, England: F.N. Spoon Limited, 1977. Penning-Rowsell, E.C. and D.J. Parker, and D.M.Harding, London, England: Floods and Drainage. Allen and Unwin Publishers, 1986. Rural Pennsylvania Intergovernmental Council (PIC). Wastewater Systems: Practical Alternatives for Small Communities in Pennsylvania. Pennsylvania: Pennsylvania Intergovernmental Council, 1982. Petersen, Margaret S. Water Resource Planning and Development. New Jersey: Prentice Hall, 1984. Phillips, Patrick L. Developing with Recreational Amenities: Golg, Tennis, Skiing and Marinas. Washington, D.C.: The Urban Land Institute, 1986. Portman, John and Barnett, Johnathan. The Architect as Developer. New York: McGraw Hill, 1976. Ragatz Richard L. Receational Properties. Richard L. Ragatz Inc., 1974. Oregon: Roginsky, Rachel. Principal, Pannell Kerr Forster. " Market Analysis Studies by PKF" (Interview), June 1990. Hotel Planning Rutes, Walter A. and Penner, Richard A. and Design. Great Britain: Architectural Press Ltd., London, 1985. Rycroft, David W. and Smedema, Lambert K. Land Drainage Planning and Design of Agricultural Drainage Ithaca, N.Y.: Cornell University Systems. Press, 1983. 169 International Schmid, Anne M. and Scoviak-Lerner, Mary. Hotel and Resort Design. New York: PBC International Inc., 1988. Smart, Eric J. Recreational Development Handbook. Washington, D.C.: Urban Land Institute, 1981. Swiacki, William A. "Market Analysis for Primary Home Recreationally Oriented Residential Development in Holden, Mass.", Unpublished Master's Thesis, Massachusetts Institue of Technology, July 1987. Untermann, Richard K. Grade Easy. McLean, Virginia: American Society of Landscape Architects Foundation, 1973. Warner, Dennis and Dajani, Jarir S. Water and Sewer Development in Rural America. U.S.A: D.C. Heath and Co., 1975. Wastewater (e.d.). Young, Edwin C. and Epp, Donald J. Management in Rural Communities: A Pennsylvania: Socio-Economic Perspective. Institute For Research on Land and Water Resources, 1977. (e.d.) Land Application of Wastewater Younos, T.M. Sludge by Task Committee on Land Application of Sludge. U.S.A.: American Socitey of Civil Engineers, 1987. 170