Energy Efficiency Forum Colin Devenish April 2013 PRESENTATION OVERVIEW • Overview of Precinct • V&A projects • Tenant education & Case study • Achievements to date • New developments IT ALWAYS SEEMS IMPOSSIBLE UNTIL IT’S DONE Nelson Mandela “The historic docklands around the Victoria and Alfred Basins in Cape Town should be redeveloped as a mixed use area, focusing on tourism and residential development, and most importantly, retaining the working harbour in operation” – Burggraaf Committee 1987 THE V&A WATERFRONT – KEY FACTS Over 123 hectares (300 acres – or 80 rugby fields) Some 16,000 people work within Over 450 stores with 80 restaurants and eateries 10 hotels and a range of office, retail, industrial & residential buildings Over 23 million visitors per annum – most visited attraction The V&A Waterfront has undertaken energy saving projects in excess of R30 million, and these include: • Installation of lighting controls • Installation of energy efficient lighting and repositioning/relocating of light fittings • Upgraded Air Conditioning BMS • Installation of new chillers with higher COP’s, variable speed drives on pumps and motors • Replace Air handling Units & include economy cycle • Installation of meters and development of credible metering and billing systems OTHER INITIATIVES: • Benchmarked and identified areas requiring attention • Included targets in Staff Performance Contracts • Established Sustainability Committee and registered with Heritage Environmental Rating Programme – Achieved Gold Rating POWER FACTOR CORRECTION AND AIR CONDITIONING CONTROLS Installation of Power Factor Correction • Reduced Maximum Demand. • Weekly inspection of substations in order • to identify possible problems and installed remote • monitoring. • Spent R180k in 2008 – Payback ± 2 years. • Spent R80k in 2009 – Payback ± 3 years. Air Conditioning Controls • Changed operating times according to seasons and outside weather conditions. Immediate results of R50k/month. • Control of chilled water temperature – between 6 and 9 °C. Control chilled water temperature versus cooling and then reheating. • Currently installing additional controls: 3 year programme. LIGHTING AND CONTROL SYSTEM 3. Installed efficient lighting • Phase 1 - 2008: R3.2 million. Installation of energy efficient lighting and control system. Pay back period on 2008 tariffs – 20 months. • Phase 2: R2 426 263.93. Initial pay back period of 5.27 years. Installation of more efficient lighting as well as upgrading of lighting levels. • Installed / upgraded control system. Reduced maintenance costs – longer life lamps, bulk replacement with guarantees, no need to paint ceiling, etc. LIGHTING INITIATIVES Original 50W low voltage downlighter New 1W LED cone downlighter Before: After: • 3 x 50W low voltage downlighters • Total : 150W • Lamp life ± 1000 hours • 3 x 1W LED cone downlighters • Total : 3W • Lamp life of 50 000 hours Before and After light levels. Original 50W down lighter Original 2 x 13W compact fluorescents New 1W LED down lighter New 2 x 26W compact fluorescents 2009 = 513 Watt Before = 1 910 Watt New 2 x 26W compact fluorescents New 1 x 18 W LED 2013 = 213 Watt LIGHTING INITIATIVES 8.5 m = 150 W 8.5 m = 5-6 light fittings = 348 W LIGHTING INITIATIVES Before: 2 x 58W parking fittings = 15 fittings Total = 1 740 W After: 2 x 58W parking fittings = 8 fittings 7 fittings removed New load = 928 W AIR CONDITIONING Current Project – R15 Million – Completed November 2009 • Replace 4 x screw chillers with 2 x Centrifugal chillers - 25% saving in electricity • Part of normal end of life replacement • Improve controls and introduce more fresh air control • Moving from a constant volume to variable volume system – Variable speed drives on air handling units, Variable volume diffusers This is a first generation Chiller with a low co-efficient of performance (COP of 4). Installing new centrifugal Chillers with COP of 7. This has lead to significant electricity saving. ENERGY SAVING INITIATIVES Plant Room No. 1 Plant Room No. 2 • We had independent Chiller Plant Rooms • We are moving to a District Cooling philosophy • This will also lead to significant energy savings • Reduces overall redundancy and improves flexibility ENERGY SAVING INITIATIVES Cleaning of Filters and Coils of Air Handling Units: • Improves air flow • Reduces power • V&A now uses ISO 14001 rated chemicals and not harmful acids • Improves lifespan of equipment RESULTS OF INSTALLING NEW CHILLERS AND IMPROVED AIR CONDITIONING CONTROLS LIFTS & ESCALATORS ESCALATORS: Consumption of current escalators:12.4kW/h. Savings to be achieved with installation of 4 x new Schindler escalators to be installed in 2013: Schindler escalators 10,0 kW A saving of 4 608kwh/month @ 45c/kWh = R2 074/month or R24 883/year. UPGRADED / REPLACED 3 X LIFTS IN 2009 Replaced equipment due to end-of-life. Total consumption of 3 x lifts from 2nd lowest tenderer = 6kW/h vs. consumption of lowest tenderer being 17.1kW/h. Appointed 2nd lowest tenderer as cost difference resulted in 7 year payback based on electrical consumption and current increases. REPLACEMENT OF SEWAGE PUMPS Before: 48kw After: 37kw Before After 2 x 13 kW 2 x 9 kW 2 x 9 kW 2 x 7,5 kW 3 x 48 kW 3 x 37 kW 188 kW 144 kW T/A UMFA - UMFA WC BUSINESS TRUST CREDIBLE METERING SYSTEM Registration No: IT 113/2009 P O Box 13434, N1 City, 7463 61 Durmonte str, Durmonte, Western Cape Province, 7550 Tel: 021 9790800 (082 7854202) Fax: 086 611 4081 EMail: capetown@umfa.co.za Website: www.umfa.co.za Tenant Name: Building Victoria Wharf Acc No Units 147 Area 41259 103.00 Notes Vat Reg: Consumption Report June 2010 (32 days) CONSUMPTION REPORTS: • Provide consumption details • Trend of monthly costs • Consumption reports provided to Date 2010/06/21 Description Levy Electricity kWh Vat 6,463.27 Amount 904.86 7,368.12 all tenants Direct billing – “you use, you pay” Total Charges Meter Readings Cons 9778 8000 2000 0 Reading Period Supplier(s) Tariffs Charge p/u Basic Fee City of Cape Town E-SHC 0.62330 11.52000 7,368 6,600 4000 6,593 6000 8,373 100.00 7,931 1 6,790 9778 6,751 485612 7,368.12 10000 2010/06/21 7,881 % 7,368 475834 904.86 Tenant Rand Statistics Usage Fct 7,943 2010/05/20 (E)671 Current 6,463.27 6,847 Previous 6,326 Meter No Amount • CONSUMPTION IN KL – metering example TENANT EDUCATION • Tenant workshops on Energy Efficiency • Advise Tenants on various products, contractors and suppliers • Service providers / consultants undertake some work on risk • Undertake alterations / install new equipment when premises are upgraded • Increase direct billing and reduce common area operating expenses. People tend to behave differently when they are in control or can make the changes. TENANT EDUCATION 1. Update of tenant criteria document Before New Heat load 45w/m² Heat load 40w/m² Neon lighting for signage LED and fluorescent Halogens 50w with magnetic ballast LED or max 20w with electronic gear Metal Halide 70-150w LED or max 70w Metal Halide Geysers Heat pumps All other lighting control gear, magnetic All other lighting control gear, electronic 2. Review of tenant interior designs and advise them on cost effective and energy saving designs or alternate options WATERFRONT JEWELLERS – CASE STUDY Tenant Area size Average cons/ before energy savings Average cons/after energy savings kWh / m2 before kWh / m2 after Tenants implementing Energy Saving Uwe Koetter 29 1201 881.4 41 30 Lorraine Efune Jewellers 81 9056 2294 112 28 Jeweller XYZ 103 9511 92 48.8 Jeweller 123 130 7820 60 TOTAL CONSUMPTION IN kW CONSUMPTION 2008 – MARCH 2012 Energy (kWh) Usage Trend 74000,000.00 72587,835.60 72000,000.00 70000,000.00 69590,711.60 68000,000.00 66078,903.20 66000,000.00 64943,212.00 64000,000.00 62000,000.00 61326,386.00 60000,000.00 58000,000.00 56000,000.00 54000,000.00 April 2007-March 2008 April 2008 - March 2009 April 2009 - March 2010 April 2010- March 2011 April 2011 - March 2011 Saving of 11,261,449kWh or 15,5% using 2008/2009 as the base year OR an additional R5.6Million/year Cumulative saving of 25,415,004 kWh for the period April 2007 – March 2011 MAXIMUM DEMAND IN kVA 2008 – 2012 Average Monthly Maximum Demand (kVA) 14,000 12,000 12 247 kVA 11 519 kVA 11 455 kVA 10 957 kVA 10,000 8,000 6,000 4,000 2,000 - April 2008 - March 2009 April 2009 - March 2010 April 2010- March 2011 10.53% saving from 2008/9 to 2011/12 April 2011 - March 2012 THERE ARE A NUMBER OF ENVIRONMENTAL AWARENESS INITIATIVES PLANNED FOR THE NEXT FEW MONTHS: WE CELEBRATED EARTH HOUR ON 23 MARCH Energy Management is part of our Environmental program The Heritage standard addresses: • Purchasing and Procurement • Business Partnerships • Design and Construction • Transport and Vehicle Maintenance • Biodiversity Management • Communications and Marketing • Resource Management (Water, electricity, gas, waste, etc) • Community Involvement • Management Systems AWARDS RECEIVED Environmental Heritage System From Silver in February 2012 to Gold in November 2012 Energy efficiency awards Eskom ETA Awards 2012 City of CT Energy Efficiency Forum Award 2012 ALL NEW DEVELOPMENTS IN THE PRECINCT WILL BE AT LEAST 4 STAR RATED New Allan Gray Head Office 6 Star As Design rating achieved in February 2013 WAY FORWARD 1. Complete current lighting project: • Potential 3GWh or 3 000 000kWh saving per year • R4,4 Million project 2. Continue with tenant education. 3. Update of tenant criteria document and implementation of Green Lease. 4. Improve on data analysis. 5. All future developments to be designed and built following Green Building guidelines. 6. Have just completed our Carbon Footprint audit.