Bluffs Restoration Project Preliminary Technical Report UCCS Green Action Fund Grant: Spring, 2012 Prepared for: UCCS Green Action Fund, Facilities and Administration Prepared by: Andrea Hassler UCCS Restoration Club President 1|Page Table of Contents INTRODUCTION……………………………………………………………………………………………………………………………….. PAGE 4 PROJECT DESIGN……………………………………………………………………………………………………………………………… PAGE 5 MATERIALS AND EXPENSES……………………………………………………………………………………………………. PAGE 6 MONITORING DESIGN………………………………………………………………………………………………………………………. PAGE 7 PRELIMINARY ANALYSIS…………………………………………………………………………………………………………………….. PAGE 9 DISCUSSION……………………………………………………………………………………………………………………………………. PAGE 11 2|Page List of Figures FIGURE 1: MAP SHOWING RESTORATION WORK SITE IN RELATION TO THE UCCS CAMPUS………………………………………………..PAGE 5 FIGURE 2: SITE OF SOIL AMENDMENT, SEEDING AND EROSION CONTROL MATTING……………………………………………………………PAGE 6 FIGURE 3: PONDEROSA PINE TRANSPLANT WITH ROCK BERM AND PVC PIPE FOR WATERING………………………………………………….PAGE 6 FIGURE 4: INSTALLATION OF COMPOST EROSION CONTROL SOCKS………………………………………………………………………………….PAGE 6 TABLE 1: MATERIALS AND EXPENSES……………………………………………………………………………………………………………………….PAGE 7 FIGURE 5: MATERIALS USED FOR THE PROJECT. ……………………………………..…………………………………………………………………..PAGE 7 TABLE 2: VEGETATION MONITORING DESIGN……………………………………..……………………………………………………………………..PAGE 8 FIGURE 6: VEGETATION MONITORING PLOTS……………………………………..……………………………………………………………………..PAGE 8 TABLE 3: DAUBENMIRE COVER CLASSES FOR VEGETATION REGROWTH MONITORING…………………………………………………………..PAGE 8 FIGURE 7: SEEDLINGS EMERGING FROM EC MATTING…………………………………………………….………………………………………….PAGE 10 RD FIGURE 8: LARGE PONDEROSA TRANSPLANT AS OBSERVED ON JUNE 3 …………………………….……………………….…………..…..PAGE 10 TH FIGURE 9: LARGE PONDEROSA TRANSPLANT AS OBSERVED ON JUNE 20 ……………………………….…………………..………………….PAGE 10 RD FIGURE 10: COMPOST SOCK CHECK DAMS IN DRAINAGE ON JUNE 3 SHOWING DEPOSITION ……………………………………………..PAGE 11 TH FIGURE 11: COMPOST SOCK CHECK DAMS IN DRAINAGE ON JUNE 20 SHOWING DEPOSITION ………………………………………….PAGE 11 3|Page INTRODUCTION In the fall of 2011, David Havlick’s Conservation and Public Lands class completed a survey and report for Stanton Road. This road, originally developed in the early years of the University, has been left unmaintained in recent decades since it’s closure. The current state of the road is in severe disrepair, with numerous rills and large gullies continually forming along it’s half mile stretch up the northernmost portion of the bluffs formation behind the UCCS campus. The consensus of the student’s reports was a suggestion to restore the major gullies along the road and convert it to a hiking trail which connected to the adjacent open spaces. Since this report was completed, students and faculty have met with administration concerning the state of the road and its future as a trail. In the spring of 2011, students completed a bluffs trail rerouting project led by Kyle Rodman of the Restoration Club in completion of the UCCS Geography Honor’s Thesis. A report on the current state of gullies on the bluffs was completed by two Geography Honor’s students. In the 2012 SGA elections, a vote was placed on the ballot to increase student fees by $80 to go towards a rec center expansion. This expansion would include the funding for restoring the Stanton Road and a bluffs trail maintenance program to be housed in rec center programming. The restoration club met with Susan Szpyrka (Senior Associate Vice Chancellor for Administration) and Brian Burnett (Vice Chancellor for Administration) regarding the restoration of Stanton Road. The result of this meeting was a commitment by the Restoration Club to increase student involvement in bluffs’ restoration efforts in order to raise awareness and support for the future of the bluffs’ trail. The rec center expansion bill passed, and additional sustained funding will begin for the rec center in 2014. A bluffs restoration project was completed on April 29th in honor of Earth Month. This project was funded by a grant from the UCCS Green Action Fund. The goal of this project was to experiment with different treatments to see their effectiveness in stabilizing soil and reducing sediment transport. Three different techniques were implemented with the direction of the Restoration Club by UCCS student volunteers. A vegetation monitoring plot was set up to evaluate the effectiveness of restoring vegetation on a denuded space next to the rerouted trail as well as transplant survivability counts. Photo points were collected for continued monitoring and evaluation. The Bluffs Restoration Project was completed by the student and faculty volunteers on April 29 , 2012. All of the proposed treatments were implemented. This report provides information on the technical planning and project implementation, monitoring technique, and a brief summary of preliminary results. A final report will be completed and submitted to the Green Action Fund and persons in the UCCS facilities and administration in the fall of 2012. This report will include data from the vegetation monitoring plots, as well as observed changes through photo points. th 4|Page PROJECT DESIGN Due to the desire by the UCCS administration, faculty and student body to restore the bluffs to a stable state and maintain a sustainable trail system, the focus of this project was to experiment with different vegetation regrowth and soil stabilization treatments surrounding the existing trail. Previous research has found that an increase in vegetation will help to mitigate the impacts of raindrop splash and rilling. The treatments were implemented to the east of Main Hall and the Campus Services building at the beginning of the trail. The project sites were selected due to their current state of exposed, eroding soil as well as location to the bluffs trail and ease of access for project implementation and monitoring. The restoration project was designed to test the effectiveness of three different treatments in order to stabilize soils, increase vegetation, and mitigate soil sediment transport. FIGURE 1: MAP SHOWING RESTORATION WORK SITE IN RELATION TO THE UCCS CAMPUS WITH THE BLUFFS TRAIL (YELLOW); SOIL, SEED AND MATTING SITE (GREY BOX), TRANSPLANTS (GREEN DOTS) AND DRAINAGE (GREY LINE) WITH COMPOST SOCKS (BLACK LINES). 5|Page SOIL AMENDMENT, SEEDING AND EROSION CONTROL MATTING An area adjacent to the rerouted trail was chosen for revegetation where no existing ground cover occurred. Exposed clayey soil was decompacted by crews using hand tools. Top soil, compost and bio-waste fertilizer were added as amendments to the soil. Blue Gramma (bouteloua gracilis) and Buffalo Grass (Bouteloua dactyloides) seed was spread and then raked in. Finally, erosion control matting composed of shredded aspen tree was laid over top of the seeded and amended soil and tacked down with biodegradable stakes. After the matting was laid, branches and rocks were placed on top as well as buckets of water and additional fertilizer. FIGURE 2: SITE OF SOIL AMENDMENT, SEEDING AND EROSION CONTROL MATTING. ROCKS IN FOREGROUND DELINEATE THE TRAIL. TRANSPLANTS Five Ponderosa Pine (pinus ponderosa) trees were collected from densely vegetated areas around campus by Keith Woodring of Facilities Services. The trees varied in height from six inches to one foot tall. Holes three feet in diameter were dug for the transplants to be placed in. A pvc pipe was cut to the tree length and slots were sawed into the end. The pipe was buried in the soil with the tree, slot side to the roots. A berm was built around the downslope side of the tree to aide in water catchment. The trees were watered with two gallons upon transplanting, and subsequent watering occurred one month later. COMPOST EROSION CONTROL SOCKS FIGURE 3: PONDEROSA PINE TRANSPLANT WITH ROCK BERM AND PVC PIPE FOR WATERING. Filtexx compost socks filled with compost from A-1 Organics were obtained from Environmental Supply based in Platteville, Colorado. The socks were placed as check dams in an active drainage downslope from the bluffs trail. They were 10 feet long and 12 inches in diameter, placed 2-3 feet apart in the channel perpendicular to the anticipated flow. The ends of the socks were sloped uphill, and were staked in using eight inch long wooden stakes. Upstream from the sock, rocks were placed to help mitigate the potential water flow. FIGURE 4: INSTALLATION OF COMPOST EROSION CONTROL SOCKS 6|Page Bluffs Restoration Materials and Expenses List Item Cost Compost Socks Erosion Control Matting Greenstakes Seed Seed Fertilizer Topsoil compost soil $ 52.00 Delivery Plaque Quantity Total 3 $ 156.00 76.25 47.60 18.67 20.48 13.11 29.75 36.50 2 1 1 1 2 0.5 0.5 $ $ $ $ $ $ $ 152.50 47.60 18.67 20.48 26.22 14.88 18.25 $ 150.00 $ 35.00 1 1 $ $ 150.00 35.00 $ 639.60 $ $ $ $ $ $ $ Total Expenses: TABLE 1: MATERIALS AND EXPENSES FIGURE 5: MATERIALS USED FOR THE PROJECT. 7|Page Distributor Green Earth Environmental Description Environmental Supply Environmental Supply Agri-Feed Agri-Feed Agri-Feed CNC sand CNC sand Green Earth Environmental Facilities Services Aspen and Coconut Biodegradable (to tack ec mat) Blue Gramma (per pound) Buffalo Gramma (per pound) "Millorganite" Biosolids topsoil-cow manuer-compost mix "blue grow, biocompost1" 10' long X 12" diameter Delivered April 28th MONITORING DESIGN Photos were taken before, during and after project completion as baseline observations. The following measures will be taken to indicate trends in vegetation regrowth, transplant survivability and gully morphology. Precipitation and wind readings, amongst other meteorological metadata, will be collected from a local satellite maintained by UCCS facilities and monitored by the UCCS Office of Sustainability. This information will be correlated with the following measures to monitor vegetation regrowth and channel aggradation. As discussed previously, a positive trend of increased vegetation over time will indicate the potential for decreased erosion and sediment transport (CITE). SOIL AMENDMENT, SEEDING AND EROSION CONTROL MATTING A monitoring plot was developed to evaluate vegetation regrowth revegetation project. The plot was laid out as follows: Buffalo Grass, No Soil Amendment Blue Gramma Grass, No Soil Amendment Buffalo Grass, Top Soil Amendment Blue Gramma Grass, Top Soil Amendment Buffalo Grass, Compost Amendment Blue Gramma Grass, Compost Amendment TABLE 2: VEGETATION MONITORING DESIGN All plots were treated with a bio-solids fertilizer. The plots were on set up on a Southern aspect on a relatively flat, roughly a 0-3 degree, slope. Percent cover will be quantified using the Daubenmire method will be used to monitor percent coverage after summer the summer monsoon season. This method measures the percent cover as either grass, erosion control matting or bare soil. A transect will be run through the middle of the plot at the division between the different grass seeds. At every 20 cm, a 20 cm by 50 cm frame will be placed adjacent to the transect to assign cover classes for observed percent cover. FIGURE 6: VEGETATION MONITORING PLOTS Cover Class Percent Cover 1 0-5% 2 6-25% 3 26-50% 4 51-75% TABLE 3: DAUBENMIRE COVER CLASSES FOR VEGETATION REGROWTH MONITORING 8|Page 5 76-95% 6 95-100% TRANSPLANTS Transplants will be measured based on percent survivability (referring to persistence of green needles) for each of the five transplants. Monitoring will include information on transplant size, location, slope and aspect, as well as any observed drainage phenomenon that could be impacting the plant (i.e. ponding). COMPOST EROSION CONTROL SOCKS Observations will be made of geomorphic patterns in the area up and downstream from each sock. Any obvious ponding and deposition or rilling, headcutting or gullying will be observed. Photo points will be taken to compare channel morphology over time. 9|Page PRELIMINARY RESULTS The Bluffs Restoration Project has had one restoration work day on April 29th, 2012. There were 11 students from various departments and organizations(Geography and Environmental Studies, Nutrition, a Resident Hall, Students for Environmental Awareness and Sustainability (SEAS), Student Activities, Engineering and Alumni) as well as two faculty volunteers (Carole and Tom Huber). A total area of 50 square feet of soil was amended, seeded and covered in erosion control matting. Five Ponderosa Pines were transplanted on south facing slopes. Three Compost Erosion Control socks were installed in 15 feet of a 30 foot long drainage. Sodexo donated pizza, a cheese and fruit tray, as well as beverages to the working crews. The plots have been visited in the beginning and end of the month of July. Photos were taken and observations were made on grass seedling regrowth, transplant survivability and sediment transport. The following is preliminary results of these visits. The proposed monitoring will not take place until after the monsoonal season when the plants and bare soil have been exposed to high precipitation events. SOIL AMENDMENT, SEEDING AND EROSION CONTROL MATTING The first June visit found no grass seedlings emerging from the treated site. Upon revisiting at the end of June, over 20 grass seedlings were observed throughout the entire area. The erosion control matting had changed colors, and appeared to be breaking down however continuing to provide ground coverage. FIGURE 7: SEEDLINGS EMERGING FROM EC MATTING TRANSPLANT SURVIVABILITY To date, three of the five transplants have survived. One transplant had obvious ponding, and clay had been deposited in the time since planting. RD TH FIGURES 8 & 9: LARGE PONDEROSA TRANSPLANT AS OBSERVED ON JUNE 3 (LEFT) AND JUNE 20 (RIGHT). 10 | P a g e COMPOST SOCKS There appears to be obvious ponding behind the compost socks, with fine sediments filling in the channel upstream from each sock. There has been some rilling observed downstream from the socks. The photo on the left was taken in the beginning of June, and the photo on the right over two weeks later, exemplifying the amount of sediment that has moved through this channel and has been held back by the compost socks. RD TH FIGURES 10 & 11: COMPOST SOCK CHECK DAMS IN DRAINAGE SHOWING DEPOSITION ON JUNE 3 (LEFT) AND 20 (RIGHT). 11 | P a g e DISCUSSION The goal of the restoration project was to experiment with different techniques which would increase vegetation and soil stability in the bluffs formation behind the UCCS campus. The techniques used were all located near the bluffs trail, and included various soil amendments, grass seed, transplant locations and erosion control measures. Baseline observations were taken before and immediately after the treatments were completed. Two visits have been made in the time since project completion with photo and written observations. This preliminary analysis found no grass seedlings in the beginning of June, but many grass seedlings by the end of the month. Numerous grass seedlings have emerged from areas surrounding dead branches placed on top of the erosion control matting. This is most likely due to the microsite of shade provided by the branches, and potentially nutrients provided by the break down of the woody debris. There was no observed difference between the treatments, however precise monitoring has not yet taken place. Three of the five transplants were alive at the last June visit, whereas all were alive in the beginning of June. It appears as though the smaller transplants have been more successful than the larger ones. One of the transplants, which was one foot tall, on a south facing 10 degree slope next to the treated drainage, was observed as alive and healthy in the beginning of June but was dead by the end of the month. This is most likely due to high temperatures and low precipitation. The compost socks appear to be holding back sediment that is moving through the active drainage. Fine sediment has accumulated behind (upstream) from the socks, indicating the ability of the socks to slow the flow of water moving through the channel as well as ponding in some locations. There has been some observed rilling downstream from the socks. This is potentially due to an increase in speed of water moving through the channel as it drops over the socks as it moves downhill. Continued monitoring will take place to determine a percent cover on vegetation plots, transplant survivability and channel morphology after the monsoon rains. A final report will be completed by late September and presented to the Green Action Fund as well as Facility Services and UCCS Administration to be made available for future restoration and trail planning projects. 12 | P a g e