Addendum No. 1 16-009 - UC 304 Remodel Date: Thursday, November 19, 2015 To: All Bidders From: University of Colorado at Colorado Springs Facilities Planning and Construction Clarifications: 1. Sheet CS: Schedule, Work Hours and Building Access: Hours of construction should be within schedule below unless otherwise arranged with Project Manager. Nov. 30-Dec 18 M-Th 7:00am – 10:30pm F-Sat 7:00am - 11:30pm Sun 12:00pm - 9:00pm Dec. 19 – Jan. 18 M-F 7:30am – 7:00pm Sat 8:00am - 6:00pm Sun closed 2. Ceiling tile to be used: Armstrong Fine Fissured; 2x2 or 2x4 Angled Tegular Facilities Services/Planning and Construction 1420 Austin Bluffs Pkwy • Colorado Springs, CO 80918 t 719-255-3505 • f 719-255-3222 3. Is a VAV required to control the air flow at each heat coil? System is a constant volume and a balancing damper will be required at each new take off and installed between take off and new RHC. 4. Please provide a model # for the heat coils. Carrier is listed but they are saying they cannot provide. Carrier provides the coils through a third party. A cutsheet of the coils selected during the design phase is attached. Carrier contact is Doug Amerine; Inside Equipment Sales Office: (719) 444-0505. 5. Are the T- stats local or connected to a building controlled system? I would suggest that the new coil control components (valves, actuators and balancing valves) and the room temperature sensor match the existing control components. UCCS Existing control system is Setpoint. Facilities Services/Planning and Construction 1420 Austin Bluffs Pkwy • Colorado Springs, CO 80918 t 719-255-3505 • f 719-255-3222