WORK IN PROGRESS TOWARDS EFFICIENT, SUSTAINABLE CITY DEVELOPMENT By the: Growth Management Branch, Spatial Planning and Urban Design Department Date: September 2007 Work undertaken thus far Planning for Future Cape Town & the identification of settlement growth options IDP - The spatial alignment of capital budgets Mapping of infrastructure capacities Our starting point We want to: Improve long-term and shortterm spatial growth management Goal: Shared Growth And Development ` Ensure that our plans are implemented 5 YEAR PLAN FOR T HE CIT Y Improve public investment decision making Provide the private sector with information that will inform their investment decisions Urban Efficiency •Sustainable Urban Infrastructure and Services •Public T ransport Systems •Integrated Human Settlements •Safety and Security •Shared Economic Growth and Development •Health, Social and Human Capital Development •Good Governance and Regulatory Reform Institutional Efficiency IDP Strategy 07/08 – 12/13 Where we are heading towards A Spatial Development Framework for Cape Town and 8 District Plans IDP Spatial Strategy Laying some of the foundations for a city development strategy Spatial Development Framework: Settlement Growth Options REGIONAL CONTEXT The city’s functional area • Recognise the functional linkages between the metropolitan region and the adjacent towns • Natural resource base biodiversity • Service infrastructure – water, energy, waste • Commuter belt – public transport • Social services – health, education etc • Tourism & recreation REGIONAL CONTEXT Regional economic infrastructure • Recognise the regional nature of the primary economic backbone • Ports – Cape Town & Saldanah • Airport – current and future location • National transport linkages – freight logistics & tourism KEY POINTS OF THE ARGUMENT Consolidate, protect and improve access to natural resources • Extend and consolidate Metropolitan Open Space System (C’MOSS): protect biodiversity areas, river corridors & agricultural land • Create a metropolitan system of green spaces; agricultural zones, Metropolitan Parks and high quality local open spaces 1 FIVE KEY POINTS OF THE ARGUMENT Establish an equitable pattern of access • Move away from historical focus of all transport routes and infrastructure on the Cape Town CBD • Establish an access pattern that serves all parts of the City equally well X 2 FIVE KEY POINTS OF THE ARGUMENT Sustainable & accessible economic opportunities • Develop a more accessible and opportunity rich “economic heart” for Cape Town • Focus public investment and incentives in this zone • Promote affordable housing in this zone • Establish a high quality, reliable and attractive public transport system in this zone 3 FIVE KEY POINTS OF THE ARGUMENT Integrated settlement development path • Ensure that new development is planned and aligned with infrastructure investment • Strategic settlement sites along development axes • Reinforce integration through mixed use mixed income development based on sound economic backbone • Reinforce metropolitan access system, especially public transport • Creating Sustainable neighborhoods 4 FIVE KEY POINTS OF THE ARGUMENT Create new special places • Clearly identify coastal development nodes and protect valuable natural areas • “Meet the coast” and optimise the social and economic potential of coastal areas at strategic points: • City-wide system of coastal development nodes & resorts • Create new nodes or resorts adjacent to inadequately served communities • Create new inland special cultural, sports and entertainment centres 5 Draft long-term spatial development strategy Concept Provisional Application of Concept Settlement growth options BUSINESS AS USUAL Accommodate existing development trends Densification 65 000 units/ 20 years (3 259 units/p.a.) Significant new infrastructure required DIRECTED GROWTH To shift growth away from the high potential agricultural land and where economic growth dynamic exists Densification 30 000 units/ 20 years (1 500 units/ p.a.) 77 000 units beyond edge Focused infrastructure development Settlement growth options CONTAINED CITY To contain development within the footprint of Cape Town Densification in existing areas -110 000 units/ 20 years (5 500 units/ p.a.) Development of vacant land within the City’s footprint Upgrading of infrastructure capacity in older areas NEW TOWN & REGIONAL GROWTH Develop a regional urbanization strategy Contain Cape Town’s growth through infill development & directed growth Direct 20% of the Cape Town’s growth (109,000 households) to a “New Town” within the region Founded on “economic drivers” / support strategic economic infrastructure IDP: The spatial alignment of “ideal” 5-year capital budgets Essential Capital Investment: Water Services Department • Bulk water supply Berg River related pipes, reservoirs and treatment works Blaauwberg, Plattekloof Welgemoed & Eerste River-Macasser new demand • Bulk Water Reticulation Reticulation upgrading and pressure management: Southern Suburbs, Bottelary, Fisantekraal, Mitchell’s Plain, Athlone, Du Noon & Atlantis Reticulation new demand: AECI & Stikland – Durbanville area and Blaauwberg East • Waste water treatment works (WWTW) Most of the WWTW need maintenance and upgrading. The Bellville and Kraaifontein WWTW are beyond capacity. Capacity for new demand is required at Potsdam &/or Melkbos, Wildevolevlei, Macasser, Atlantis and the proposed Fisantekraal WWTW • Waste water reticulation Economic backbone, Mitchell’s Plain, Bottelary & Durbanville area • Treated effluent reticulation Athlone, Scottsdene & Macasser WWTW Essential Capital Investment: Electricity Services Department ESKOM • Eskom major new capacity investments Acacia Park, Sarepta/ Belhar and Firgrove • Lourensford-Firgrove line and Gordons Bay supply are under pressure. Essential Capital Investment: Solid Waste Management Department • New bulk waste manage ment Atlantis/ Kabaskraal • New transfer stations Swartklip, Helderberg Region, Tygerberg Region, Oostenberg Region, Vissershok landfill • Materials recovery facility Athlone and Coastal Park landfill • Closure and rehabilitation of full/ disused land fills Vissershok (LFS & North LFS), Coastal Park, Bellville, Brackenfell, Faure, Swartklip, Helderberg & Table View. Capital Investment Related to Integrated Human Settlement Development • Social Development Creches, sport complexes, sports fields, swimming pools, public toilets, beach facilities, community centres and general allocation to housing projects • City Parks Metropolitan parks, district parks, recreational areas, river greening, cemeteries and general allocation to housing projects • Health Clinic buildings and fences, meat market stalls and air pollution control equipment • City Spatial Development Dignified Places and 2010 viewing sites Infrastructure Investment by Other Spheres of Government: Housing Subsidies Projects requiring substantial bulk infrastructure investment • Pelikan Park • Wingfield • ?Blaauwberg East • ?Darwin Road corridor • ?Sir Lowry’s Village Infrastructure Investment by Other Spheres of Government Upgrading of Cape Town Airport Upgrading of the following rail network: - Southern Suburbs - Cape Flats - Khayelitsha - Mitchell’s Plain - Cape Town – Monte Vista – Kraaifontein - Cape Town, Athlone, Heideveld and Langa station upgrades Realignme nt of the N2 Upgrading and extension of Cape Town Port Atlantis Gas Turbines Private Sector Capital Investment • • 76% residential investment ( 30% home improvements and 46% new flats and houses) 24% industrial and commercial development ( new and improvements) Draft 5-Year Spatial Development Strategy Limited expansion of city foot print Reinforcement of the economic backbone Alignment of the public transport and road network improvements with land use intensification and residential densification Mitchell’s Plain/ Khayelitsha Urban Renewal Programme Special urban places: Possibly Athlone Power Station, Kaptein’s Klip/ Mnandi Coastal Node 2010 facilities: Green Point Stadium,practice venues and viewing venues Mapping of infrastructure capacities WATER: BULK & RETICULATION CAP ACITY CONSRAINTS < 10 YRS & INVESTMENT AREAS IN THE NEXT 3 YEARS WASTE WATER: WWTW & RETICULATION CAPACITY CONSRAINTS < 10 YRS & INVESTMENT AREAS IN THE NEXT 3 YEARS ELECTRICITY CAPACITY CONSTRAINTS STORM WATER CAPACITY CONSTRANTS < 10 YRS – IF NO CAPITAL INV ESTMENT < 10 YRS IF NOT CAPITAL INV ESTMENT CURRENT ROAD NETWORK CAPACITY CONSTRAINTS ANTICIPATED INFRASTRUCTURE CAPACITY CONSTRAINTS IF THERE IS NO CAPITAL INVESTMENT IN THE NEXT 5 YEARS ANTICIPATED 5-YEAR INFRASTRUCTURE CAPACITY CONSTRAINTS NOT COV ERED BY THE 3-YEAR BUDGET ANTICIPATED 5-YEAR INFRASTRUCTURE CAPACITY CONSTRAINTS NOT COV ERED BY THE 3-YEAR BUDGET ANTICIPATED INFRASTRUCTURE CAPACITY CONSTRAINTS IF THERE IS NO CAPITAL INVESTMENT IN THE NEXT 5 - 10 YEARS DRAFT IDP SPATIAL DEV ELOPMENT STRATEGY IN THE NEXT 5 YEARS INFRASTRUCTURE CAPACITY CONSTRAINTS NEXT 5 YEARS NOT COV ERED BY THE 3-YEAR CAPITAL BUDGET Questions that need to answered What should our growth management strategy be? How should public investment be directed to support this strategy? Questions that need to answered How do we attract and try to spatially direct private sector investment? What mechanisms other than the urban edge and residential intensification can be used to manage city growth? Thank you Let us work together for a better city