The TB5000 Gas Turbine Uprate to 5200/5400 bhp For TB5000 Gas Turbines (and some later TB4000 models) Answers for Energy The TB type gas turbine, renowned for its ruggedness and reliability, numbering in excess of 840 units operating throughout the world, was originally brought into service in 1970. Throughout the production life of the TB turbine, the design and performance of the engine has been improved, whilst maintaining its philosophy of reliability and ease of maintenance on site. Since the first TB3000, rated at 3100 bhp*, the TB has undergone three power enhancement changes; 3990 bhp* - TB4000 4900 bhp* - TB5000 5200/5400 bhp* - TB5000 uprate For the latter increase of power 4900 bhp* to 5200/5400 bhp*, we can offer to uprate your TB5000 gas turbine. This uprate to 5200/5400 bhp* can also be offered for some later TB4000 models. The Uprate To increase the nominal ISO power output of a TB5000 from 4900 bhp to 5200/5400 bhp, the design maximum temperature was raised from 877°C to 900°C, giving an increased exhaust temperature of 495°C. To cater for this increase in temperature, various design changes were made to the turbine gas generator. The combustion system is modified using sealed chambers, the swirler tubes and their extensions having special mating features to improve temperature spread to the compressor turbine. (*Power output figures given based on ISO conditions.) www.siemens.com/energy Limitations Performance Health & Safety Obsolescence Cost Reduction Benefit by Mods & Ups Reliability Whilst the TB5000 can be uprated to provide up to 5400 bhp output, the following points should be noted: The increase in power attained by uprating from 4900 bhp is 5200 bhp for liquid fuel engines, and 5400 bhp for gas fuel engines, subject to gas fuel analysis. Limitations of the driven unit Dual fuel engines are rated respective to the fuel used. Limitations of the gearbox and coupling Performance Power Limit 50 6000 6000 Environment ISO Rating 5400 bhp (gas only) se 46 ng r pe m Te as 4000 0 50 °C 48 3000 32 2000 1000 0 0 40 380 360 340 320 300 280 10 20 30 40 50 °C Ambient Temperature Early TB5000 gas turbines were fitted with a dry solids compressor cleaning system. Due to the nature of the cooled blades required for the uprate, the cooling holes would become blocked with solids, defeating the cooling system. It is therefore essential that a fluid wash system is retrofitted. 1*013 bar 14*7 psia 15 C 59 F -10 0 0 34 30 0 Altitude sea level Ambient pressure 1.013 bar Gearbox loss is not included Inlet/exhaust ducting losses not included Power turbine speed 7950 rev/min 7*30 bar 105*8 psia 271 C 520 F 10 20 30 40 6*86 bar 99*5 psia 900 C 1625 F When requesting details or a quotation for a TB5000 uprate, please quote the turbine serial number to enable us to check the engine details. For a quotation of further details, please contact your local Siemens Industrial Turbomachinery Ltd representative. 2*43 psia 53*3 ata 663 C 2*43 bar 1225 F 53*3 psia 663 C 1225 F When requesting a quote for a TB5000 uprate, please advise if a fluid wash system is already fitted. Published by and copyright © 2013: Siemens AG Energy Sector Freyeslebenstrasse 1 91058 Erlangen, Germany Siemens Energy, Inc. 4400 Alafaya Trail Orlando, FL 32826-2399, USA For more information, please contact our Customer Support Center. Phone: +49 180 524 70 00 Fax: +49 180 524 24 71 (Charges depending on provider) E-mail:support.energy@siemens.com www.siemens.com/energy 50 °C 0 46 0 36 360 340 320 280 -10 ISO Rating 4900 bhp Ambient Temperature 0 w s Flo Mas δ 40 Ex Gas --20 0 44 38 lb/s st hau 5000 3000 re 0 52 u at 40 42 Zero Loss Power Output (bhp) tG 42 -20 Compressor Cleaning ati 300 The abradable seals of the second stage are fitted via a ‘T’ slot in the stator ring, hence the retrofit of a new stator ring will be required. 44 380 The cooling air for the first stage CT blades is routed through holes in the quadrants, hence the uprate requires the retrofit of new bladed quadrants. dr us ha Ex The Parts loa ISO Rating 5200 bhp 4000 48 Ba For retrofitting to a 4900 bhp rated TB5000, new swirler cones, flame tubes and extensions are required for the combustion system. ISO Power Output (bhp) 5000 ISO Rating 5200 bhp Energy Service Division LCN 2013 - F33.19 LN Printed on elementary chlorine-free bleached paper. All rights reserved. Trademarks mentioned in this document are the property of Siemens AG, its affiliates, or their respective owners. Subject to change without prior notice. The information in this document contains general descriptions of the technical options available, which may not apply in all cases. The required technical options should therefore be specified in the contract.