PRELIMINARY IMPACT ASSESSMENT FOR THE KHAYELITSHA MITCHELLS PLAIN URBAN RENEWAL PROGRAMME Compiled by: MCA Africa Cape Town: 9 Rhodes Avenue, Mowbray Tel: +27 (0)21 685 1150 Fax: +27 (0)21 685 1210 December 2006 Jo'Burg: 137 Daisy Street, Sandown Tel: +27 (0)11 322 4818 Fax: +27 (0)11 322 4767 For Department of Provincial Government (DPLG) and Local i Disclaimer: Statistics on delivery of services as part of this report have been drawn from budget records from the City of Cape Town , URP reporting and sector information (where available). Due to the difficulty of obtaining consolidated information for the years 2001-2006, MCA can in no way accept responsibility for any inaccuracies related to reporting of statistical information in this regard. Preliminary Impact Assessment of the URP in KMP Report for dplg report: December 2006 i EXECUTIVE SUMMARY ............................................................................................................................................................................................... 1 1. INTRODUCTION ................................................................................................................................................................................................... 7 1.1 1.2 1.3 1.4 2. NODAL CONTEXT.............................................................................................................................................................................................. 11 2.1 2.2 2.3 2.4 3. BASIC SERVICES ........................................................................................................................................................................................... 20 HUMAN SETTLEMENT INFRASTRUCTURE ......................................................................................................................................................... 45 HUMAN AND SOCIAL CAPITAL FORMATION ...................................................................................................................................................... 63 PRELIMINARY GOVERNANCE AND INSTITUTIONAL SYSTEMS ASSESSMENT:...................................................................................... 77 4.1 4.2 4.3 5. LOCATION AND DEMOGRAPHIC SUMMARY....................................................................................................................................................... 11 BRIEF SUB-NODAL AREA DESCRIPTION .......................................................................................................................................................... 15 KEY ISSUES FACING KHAYELITSHA MITCHELLS PLAIN ..................................................................................................................................... 17 URP STRATEGY, OBJECTIVES AND OUTCOMES .............................................................................................................................................. 17 PRELIMINARY SERVICE DELIVERY IMPACT ASSESSMENT ....................................................................................................................... 20 3.1 3.2 3.3 4. BACKGROUND AND MOTIVATION ...................................................................................................................................................................... 7 APPROACH AND METHODOLOGY ...................................................................................................................................................................... 7 QUALIFICATIONS AND LIMITATIONS ................................................................................................................................................................... 8 GUIDE TO READING THE REPORT ..................................................................................................................................................................... 9 INSTITUTIONAL CAPACITY REMAINS AND ISSUE ................................................................................................................................................ 77 COORDINATION BETWEEN AND WITHIN SPHERES OF GOVERNMENT REMAINS AN ISSUE ...................................................................................... 78 LEVELS OF PARTNERSHIP WITH EXTERNAL STAKEHOLDERS HAVE BEEN ACHIEVED, BUT CHALLENGES REMAIN ..................................................... 79 CONSIDERATIONS EMERGING FROM THE ASSESSMENT ......................................................................................................................... 81 5.1 5.2 5.3 SERVICE DELIVERY: FOCUS AREAS ................................................................................................................................................................. 81 DEVELOPING EFFECTIVE SYSTEMS OF MONITORING AND EVALUATION ............................................................................................................... 82 STRENGTHENING INSTITUTIONAL CAPACITY AND COORDINATION ...................................................................................................................... 83 ii 6. CONCLUSION .................................................................................................................................................................................................... 85 REFERENCES............................................................................................................................................................................................................. 86 ANNEXURES............................................................................................................................................................................................................... 88 List of Figures Figure 1: Metropolitan Location - Khayelitsha Mitchells Plain Urban Renewal Node Figure 2: In Migration – Number of People moving to Khayelitsha from outside Western Cape Figure 3: Age distribution of Population in Khayelitsha Figure 4: In Migration – Number of People moving to Mitchells Plain from outside Western Cape Figure 5: Age distribution of population in Mitchells Plain Figure 6: Nodal area Figure 7: Access to Electricity in Khayelitsha by Enumerator Area (EA) Figure 8: Access to Electricity in Mitchells Plain by Enumerator Area (EA) Figure 9: Kuyasa – Solar energy retrofitting Figure 10: Access to Piped Water in Khayelitsha by Enumerator Area (EA) Figure 11: Access to Piped Water in Mitchells Plain by Enumerator Area (EA) Figure 12: Type of (Household) Access to Sanitation in Khayelitsha Figure 13: Type of (Household) Access to Sanitation in Mitchells Plain Figure 14: % Households with no access to flush/chemical toilets in Khayelitsha by EA Figure 15: % Households with no access to flush/chemical toilets in Khayelitsha by EA Figure 16: Type of refuse removal (% Households) in Khayelitsha Figure 17: Type of refuse removal (% Households) in Mitchells Plain Figure 18: Type of Dwelling (Khayelitsha) Figure 19: Type of Dwelling (Khayelitsha) Figure 20: Upgrading informal settlement in Freedom Park (Khayelitsha) Figure 21: Housing – Dwelling Unit Density and % Informal Dwellings Figure 22: Remodelling of Lentegeur Station Figure 23: Highest Level of Education for Adults Age 20+ (Khayelitsha) Figure 24: Highest Level of Education for Adults Age 20+ (Mitchells Plain) Figure 25: Project/programme process incorporating M&E iii List of Annexures Annexure 1: Water & sanitation projects & initiatives 2001-2006 in the urban renewal node Annexure 2: Key transport, roads and storm water projects & initiatives 2001-2006 in the urban renewal node Annexure 3: Key housing projects & initiatives 2001-2006 in the urban renewal node Annexure 4: Key sports/environment, parks projects & initiatives 2001-2006 in the urban renewal node Annexure 5: Crime statistics iv ACRONYMS CMIP Consolidated Municipal Infrastructure Programme CoCT City of Cape Town DLG&H Department of Local Government and Housing DPLG Department of Provincial and Local Government IDP Integrated Development Plan FBE Free basic electricity FET Further Education and Training IGR Inter-governmental Relations IGRFA Inter-governmental Relations Framework Act KBD Khayelitsha Business District KCT Khayelitsha Community Trust KDF Khayelitsha Development Forum MIG Municipal Infrastructure Grant MPDF Mitchells Plain Development Forum MPTC Mitchells Plain Town Centre MSF Multi-stakeholder Forum MTIEF Medium Term Income and Expenditure Framework NSC Nodal Steering Committee PG: WC Provincial Government Western Cape PTI Public Transport Interchange RMB Rand Merchant Bank SDF Spatial Development Framework UR Urban Renewal URBP Urban Renewal Business Plan URN Urban Renewal Node URP Urban Renewal Programme URSDF Urban Renewal Spatial Development Framework VPUU Violence Prevention through Urban Upgrading Preliminary Impact Assessment of the URP in KMP Report for dplg report: December 2006 v 2. Nodal Context EXECUTIVE SUMMARY 1. Introduction This report is one of several impact assessment reports occurring for URN and ISRDP nodes in the country. The key objectives are: • • To assess the impact that has been made through the implementation of government programmes in the Khayelitsha Mitchells Plain urban renewal node; and To highlight critical areas (policy and practice) that need further attention The approach adopted by this study involved four steps: (i) obtaining baseline information; (ii) reviewing service delivery progress; (iii) obtaining and understanding of beneficiary perceptions and (iv) developing a preliminary impact assessment. A focus was on the nature and extent of delivery 2001-2006 rather than purely on ‘URP projects.’ The assessment is preliminary in nature as it has been limited by a variety of factors such as unevenness in measurement of data, and the short time period assessed. Khayelitsha and Mitchells Plain are located in Cape Town, 2030km from the CBD in the ‘metro south east’ and have their history in apartheid era planning. The areas vary in comparison to each other. Khayelitsha is more populous than Mitchells Plain and is growing at a more rapid rate, expanding due to high levels of immigration. In general, Khayelitsha reflects higher levels of poverty and unemployment. Within the areas there is also significant variation, with a concentration of informal settlement in the northern and peripheral areas of Khayelitsha, where levels of poverty and access to basic services are most problematic. Certain areas of Mitchells Plain, although on a far less significant scale, reflect similar characteristics of informality, with socioeconomic indicators reflecting the most problematic condition in the south east of the area and pockets of informal settlement to the north. The priority issues facing Khayelitsha include crime, jobs and unemployment, housing and health and in Mitchells Plain, they include drugs, jobs and unemployment, crime and gangs1. 1 See City of Cape Town, 2006a. 1 In this context, and as part of efforts to give direction to the urban renewal programme (URP), several strategic initiatives have been conducted including the development of a business plan (in 2003) and a spatial development framework (2006). Furthermore, several anchor projects have been identified in relation to the programme, many of which were initiated well before the URP. 3. Most visible in Mitchells Plain, specifically in relation to access to water and sanitation services (where backlogs have virtually been eliminates3, • Steady in Khayelitsha, though a significant number of households remain under-serviced, particularly in terms of access to adequate sanitation services (where backlogs have been reduced from 30 000 in 2001 to 22 000 in 2005). Preliminary Service Delivery Impact Assessment The preliminary service delivery impact assessment focussed on three overarching areas: basic services, human settlement infrastructure and human social capital formation. It reflected on available quantitative (baseline and delivery related2) and qualitative information including beneficiary perceptions to identify levels of impact. (i) Basic Services Progress has been made in extending basic services within the URN. The scale of impact on backlogs has been: 2 • These measurements included the extent of allocated resources and impact indicators in relation to interventions where available. Consideration of the qualitative nature of impacts as well as levels of coordination reflects: • A degree of innovation in the type of delivery which has had positive impacts including the piloting of green energy initiatives as well as PPPs. • Continuing issues related to basic service provision in informal settlements. From a delivery perspective, there were high levels of concurrency in delivery between bulk servicing departments and housing / anchor projects. However, certain concerns exist around reporting and transparency, particularly in relation to electricity provision. 3 Although it needs to be recognised that this area started the measurement period (2001-2006) with far less significant backlogs than Khayelitsha. 2 Beneficiary perceptions regarding basic service provision in the URN reflect: • • Levels of dissatisfaction (least favourable in this cluster for sanitation services in Khayelitsha) which could be related to the real issue of lingering backlogs in delivery, particularly in informal settlement in Khayelitsha; • Generally most impact in addressing backlogs (specifically in the housing sector) in terms of the baseline situation in Mitchells Plain4. • Real issues in terms of coping with the backlogs in access to housing in Khayelitsha where current rates of delivery will take decades to address existing backlogs (assuming no further growth of informal settlement). High levels of satisfaction in areas that are better serviced. • Some downfall in the qualitative aspects of service delivery within certain functions (for instance with regard to the solid waste function – refuse removal receives high satisfaction, but there is a low satisfaction with area level cleanliness). Consideration of the qualitative nature of impacts as well as levels of coordination reflects: • In general, whist progress has been made in the roll out of basic services, pressing issues remain in informal settlements in Khayelitsha. These need to be addressed as part of a broader human settlement strategy in the area. (ii) Infrastructure lead projects (specifically a number of the anchor nodal development projects) that have, through integrated planning and delivery, managed to have significant impact on the upgrading of areas and improving access to social and economic opportunities. Impacts have been further maximised due to the location of these projects (high impact zones such as PTIs). • High degrees of concurrency in service delivery as well as phasing of investment in bulk services to enable human settlement development. • At times, a lack in focus on operational issues linked to Human Settlement Infrastructure Progress has been made in developing human settlement infrastructure within the URN. The scale of impact reflects: infrastructure development (e.g. maintenance of public spaces post development is an issue). 4 Again it should be noted that backlogs in aspects such as housing were of a far more limited nature than those in Khayelitsha. 3 • In limited cases, investment in major line oriented infrastructure which has seemingly had muted impact on issues (the development of the Swartklip sports complex for instance seems to have had limited impact on access to sports and recreation opportunities in Khayelitsha where backlogs are most serious). Beneficiary perceptions regarding the impact of human settlement infrastructure provision in the URN reflect: • • (iii) Human Social Capital Formation Progress has been made in impacting on levels of social capital (education, health, safety) in the URN. The scale of impact reflects: • Progress in the development of physical infrastructure to support social and economic development services (clinics, police stations, schools, market facilities). • Remaining infrastructure backlogs, most notable in terms Levels of dissatisfaction, particularly in Khayelitsha, of health facilities in Khayelitsha (although a new district hospital is planned). which in some cases is related to operational issues rather than infrastructure provision (e.g. the train service) • Some levels of dissatisfaction which are clearly related to the pace of delivery and expectations of residents (particularly the case in the housing sector). Impact on certain social indicators (such as levels of crime in Khayelitsha) although it is difficult to attribute this to any one intervention or programme. • Positive impacts on curbing the spread of HIV/AIDS In general, whist progress has been made in the roll out of human settlement infrastructure, pressing quantitative and qualitative issues remain specifically in the housing sector as well as in relation to levels of amenity and the quality of the environment (sports and recreation, parks public spaces). It is likely that expectations will need to be managed whilst scaling up appropriate human settlement infrastructure programmes. related to specific programmes such as ARV roll out and the Mothers to children HIV prevention programme in Khayelitsha. In relation to levels of service delivery, it should be noted that human resource/staffing capacity issues are negatively influencing the degree to which services can have an impact on arguably the most pressing challenges within the URN (crime, job creation, health). On the other hand, positive levels of institutional coordination have been experienced 4 been the case particularly with regard to the health sector in Khayelitsha. (particularly in the health as well as safety sectors) although it is difficult to attribute this to the URP. • Coordination between and within spheres of government: There have been clear achievements in relation to coordination at the project level, through structures such as the Multi-stakeholder forum (MSF) and through sound project management. However, challenges are still experienced around the lack of coordination between sector plans and a level of resulting ad-hoc, non-strategic investment. Urban renewal is not always a priority within sector planning initiatives. • Levels of partnership with external stakeholders: within the URP (2001-2006) successes have been achieved in partnering with the private sector5 as well as involving communities in projects to strengthen levels of impact. However, there have been challenges, in particular with regard to the problematic interfaces between certain community organisations and government. Beneficiary perceptions regarding human social capital related service delivery in the URN reflect high levels of dissatisfaction with regard to many of these services in Khayelitsha, although it should be remembered that socio-economic indicators reflected low developmental baselines. In general, whilst progress has been made in the provision of services in these arenas, pressing issues remain specifically in terms of improving levels of health in Khayelitsha, strengthening initiatives to reduce crime as well as improving the prospects for economic development. 4. Preliminary Governance and Institutional Systems Assessment As a result of the interviews and drawing on information from existing literature, a limited assessment of governance and institutional systems in relation to urban renewal was developed. The assessment pointed to several challenges and achievements in this regard: • Institutional capacity: service delivery is hampered by the shortage of human capacity in several sectors. This has 5 This has been the case in the Khayelitsha Business District where innovative partnership arrangements enabled the development of the retail centre. 5 5. Considerations Emerging from the Assessment the URN and temper unrealistic expectations amongst communities. The outcomes of the assessment point to certain areas that require further attention within the context of the URP: • Service delivery focus areas: There are hotspot issues that need to be dealt with particularly around access to basic services, however the fact that these issues are often multi-dimensional (e.g. health issues are related to environmental aspects and provision of dignified living environments as much as they are access to appropriate care) means that a similarly multi-dimensional approach is needed. • Developing effective systems of monitoring and evaluation6: There is a need to develop meaningful indicators across line departments and to coordinate, manage and make this information accessible for the purposes of evaluation. • Strengthening institutional capacity: there is a need to address capacity issues in key areas such as health and improve levels of coordination at the strategic level. • 6 Strengthening communication: Communication efforts need to clarify government’s programme of action within M&E is a major weak point in the URP and more broadly and is plagued by inconsistencies in reporting and data gathering 6 1. 1.1 INTRODUCTION Background and Motivation In February 2001, President Thabo Mbeki announced the Urban Renewal Programme (URP) aimed at addressing poverty and underdevelopment in eight (8) identified urban renewal nodes. The identified nodes represent the places where the largest concentrations of urban poor live. The overall objectives of the URP are the following: • To address poverty and underdevelopment • To achieve increased equity • To encourage socially cohesive communities • To ensure integration between spheres of government • To enhance municipal capacity to deliver The Department of Provincial and Local Government (DPLG) is the national coordinator and has overall responsibility for guiding the intergovernmental coordination, implementation, management, monitoring and evaluation of the URP. Acting in its role as national coordinator, the DPLG has embarked on a series of preliminary impact assessments for the urban renewal and integrated sustainable rural development programme (ISRDP) nodes. This report is the third to be commissioned for the urban renewal nodes. The study is motivated by the need to ensure that the impacts of government programmes are reflected on in a coherent manner and if necessary recommendations are made to enhance the impact of associated policies and actions. As such, the key objectives of this assignment are: • To assess the impact that has been made through the implementation of government programmes in the Khayelitsha Mitchells Plain urban renewal node; and • To highlight critical areas (policy and practice) that need further attention 1.2 Approach and Methodology The approach adopted included a service delivery impact assessment. In this regard, a number of steps were taken: STEP ONE: a baseline was established as some form of benchmark against which service delivery progress could be measured. This made use of census information and a number of secondary sources. 7 STEP TWO: a review of progress in terms of service delivery was made. The focus was on quantitative data and specifically the nature and extent of capital and operational investment in the nodal area. In the absence of an overall M&E system, a variety of documentary information was used in this regard. • The perception of impact in relation to how conditions have improved/deteriorated and to what extent interventions have addressed issues; • Comment on overall progress in service delivery taking into account the above. STEP THREE: An indication of beneficiary perceptions in relation to delivery around each specific sector provided additional qualitative information regarding the impact of investment. In terms of this process, existing data gathered as part of a sample of 1000 households in Khayelitsha Mitchells Plain in 2005 was used extensively. This survey provided a good degree of representivity across the node and was stratified according to the number of households of the two geographical areas and according to the number of formal and informal dwelling units in each area (Khayelitsha and Mitchells Plain). (City of Cape Town, 2006a). Note: The assessment was not meant to attribute all service delivery progress to the Urban Renewal programme, but to STEP FOUR: a preliminary assessment of the impact of sector investment was made. This reflects: • • The magnitude of impact in relation to backlogs (reflected by baseline data) and the degree to which they may be addressed by interventions. The type of impact (the nature of delivery and how it reflect on the nature and extent of delivery from 2001-2006. Furthermore, to add further depth to the impact assessment, a preliminary review of institutional capacity and governance issues was undertaken. A number of these issues emerged from specific engagements with regard to service delivery challenges, however some information was drawn from documentary sources. The aim was to identify a number of the broad reasons for service delivery success and underperformance. 1.3 Qualifications and Limitations It should be noted that this study represents and is to some extent limited by the fact that it is a preliminary impact assessment. The focus is on its preliminary status as: may have impacted in a qualitative sense on residents; 8 • A relatively short time period is being assessed (20012006), which means that impact may not be as visible as for an assessment over, for example a ten year period; • Availability of quantitative data is uneven (at sector department and municipal levels) • The nature of engagement with beneficiaries (or representatives) undertaken as part of this process was did not represent a sample of statistical significance and as such cannot be taken to reflect perceptions of the residents of the URN. Further to these qualifications, a number of limitations and issues are identified including: • captured (for instance investment to improve the housing conditions and infrastructure may have a major impact on resident’s health). • 1.4 Given Cape Town’s late start (2003) and long lead in times, the assessment conducted at this point in time may reflect more negatively than might be the case if concerted effort had been initiated in 2001. The UR initiative for Cape Town had no influence on 2001/02 and 2002/03 budgets and was to some extent too late to impact on 2003/04 budget. Guide to Reading the Report In general there is an inconsistent basis for quantitative and qualitative assessment as part of the URP. A significant re-working of systems of reporting and recording is required if the impact of the programme is to be consistently and rigorously assessed. Section 1: provides an introduction to the project, the • Data available made it difficult to disaggregate capital vs. operating budget provisions. • The information available generally reports on funding Section 2: contextualises the urban renewal node in terms of its location, demographics, issues facing its residents and the focus of urban renewal related strategic intervention. made available by the CoCT. Additional budget streams not generally included until 2006 and even then not consistently. • The sectoral assessment approach adopted is limited in that the impacts of cross sectoral actions are not always approach and methodology adopted as well as associated qualifications and limitations. Section 3: provides a preliminary service delivery impact assessment for the period 2001-2006. This focuses on delivery of basic services (such as water, sanitation and electricity), human settlement infrastructure (such as housing, 9 transport and public facilities) as well as progress in developing human capital (education, health and levels of crime prevention, justice and safety) Section 4: provides a preliminary impact assessment of the URP on institutional systems and levels of cooperative governance. Section 5: identifies a set of considerations that have emerged from the preliminary assessment. The focus is on areas where interventions may assist in improving levels of delivery and the impact of the urban renewal programme. Bearing in mind the scope of the assessment, the considerations are contained to areas where issues have been raised during the course of this process. Section 6: is a conclusion to the assessment, summing up key findings. 10 2. NODAL CONTEXT 2.1 Location and Demographic Summary is now has however expanded well beyond the 250 000 people it was originally planned for. Khayelitsha and Mitchells Plain are located in Cape Town in what is often referred to as the ‘metro south-east,’ approximately 20-30km away from the CBD. (see Figure 1). Mitchells Plain is located south east of the R300 and bounded by the Philippi horticultural area to its west. It is separated from Khayelitsha by the ‘Swartklip products’ or ‘Denel’ site and a waste site to the east. The southern extent of both areas is bound a green coastal belt separating them from the False Bay coastline. Khayelitsha is bounded by the N2 in the north and Baden Powell Drive and the Macassar Dunes to its east. The two areas were planned separately under the apartheid regime. Mitchells Plain, an area conceived of largely in the 1970s was planned as a ‘coloured’ group area accommodating many people forcibly removed from places such as District Six. Khayelitsha, meaning new home, is a more recent development established in 1983 as a township to accommodate, what the apartheid government recognised as a growing influx of ‘black’ persons into the metropolitan area. It Figure 1: Metropolitan Location - Khayelitsha Mitchells Plain Urban Renewal Node 11 2.1.1 Khayelitsha: Brief Demographic Profile Khayelitsha is a dynamic and expanding urban area. Its population in 2001 has been recorded as 329 002 people, living in 85 614 households, i.e. 3.84 people per household. (Statssa, 2001). This compares to the 1996 figure of 249 540 implying a growth rate of 5.3% per annum between 1996 and 2001. (City of Cape Town, 2005a). Table 1: Comparison of 1996 and 2001 Census Figures Khayelitsha No. people of 1996 Census 2001 Census Average growth 249 540 329 002 5.3 Figure 2: In Migration – Number of People moving to Khayelitsha from outside Western Cape City of Cape Town, 2005a Source: City of Cape Town, 2005a Migration trends reflect an increasing number of people moving to Khayelitsha from outside the Western Cape. (see Figure 2). Most in migrants (almost 90% in 2001) come from the Eastern Cape. These migrants are dominantly part of the ‘young stream’ of migrants (who generally come to Cape Town in search of employment. They are young, with dependants and at the start of their working lives. (KfW, 2002). Migrants in this stream suffer educational disadvantages compared to the urban black population, are unlikely to return home, their Figure 3: Age distribution of Population in Khayelitsha City of Cape Town, 2005a 12 children are likely to stay in the City. (Cross and Bekker, in KfW, 2002). This is significant in the context of this report as there is likely to be increasing pressure on service delivery. In terms of the breakdown of the population, census 2001 reflects that more than half of Khayelitsha residents are female (51,9%). Khayelitsha’s population is also young (see Figure 3) with 29.6% of people aged 14 years or younger. 75% of the population is younger than 35. (City of Cape Town, 2005a). 13 2.1.2 Mitchells Plain: Brief Demographic Profile The population of Mitchells Plain is recorded by the 2001 Census as 283 196 people living in 61 269 households i.e. 4.62 people per household. (Statssa, 2001). This compares to the 1996 figure of 257 578. (City of Cape Town, 2005a). Table 2: Comparison of 1996 and 2001 Census Figures – Mitchells Plain No. people of 1996 Census 2001 Census 257 578 283 196 Average growth Figure 4: In Migration – Number of People moving to Mitchells Plain from outside Western Cape Source: City of Cape Town, 2005a In migration to Mitchells Plain from outside the Western Cape is far less significant that in Khayelitsha. (Figure 4). In terms of the breakdown of the population, census 2001 reflects that more than half of Khayelitsha residents are female (51,7%). Mitchells Plain’s population is also young (Figure 5) with 30.2% of people aged 14 years or younger. 68.5% of the population was younger than 35. (City of Cape Town, 2005a). Figure 5: Age distribution of population in Mitchells Plain 14 2.2 Brief Sub-Nodal Area Description Whilst the two areas can be broadly differentiated from each other in a variety of ways, it is also critical to note that there are vast differences within the townships with regard to levels of development, socio-economic characteristics of the people and the nature of the built environment. As such and to the extent possible, baseline statistics as well as service delivery projects and programmes have been reflected on at a sub nodal level (see Figure 6). • Pockets of informal settlement in certain areas in the north and east (comprising 3.9% of the area’s households) • Associated pockets of more extreme poverty in the north (Kosovo) and extreme south east (parts of Tafelsig) • Poorer levels of education and higher levels unemployment amongst households in the east (e.g. Tafelsig and Eastridge) and extreme north of the area vs. better off western areas (e.g. Westridge). Characteristic variations within Khayelitsha include: • A mix of formal and informal settlement. Informal settlement, comprises 64% of households, (see Figure 6) and is concentrated in the northern areas better served by public transport and peripheral areas in the south and east (e.g. Monwabisi Park, Enkanini). • Higher levels of poverty and unemployment in Site B and C vs. comparatively better off central areas such as Elitha Park, Khaya and Eyethu. • Poorer levels of access to basic services in informal areas, along with poor environmental health conditions. Characteristic variations within Mitchells Plain include: 15 Figure 6: Nodal area 16 2.3 Key Issues Facing Khayelitsha Mitchells Plain A variety of analytical documents have reflected on the key challenges facing Khayelitsha and Mitchells Plain. Furthermore, the recent sample survey of residents conducted in 2006 asked respondents to rate their most pressing challenges. These corresponded with most work completed around analysing issues facing the area. In Khayelitsha, the most pressing challenges, in order of prioritisation, were identified as: 1. Crime 2. Jobs and unemployment 3. Housing 4. Health In Mitchells Plain the most pressing challenges were identified as: 1. Drugs 2. Jobs and unemployment 3. Crime 4. Gangs (City of Cape Town, 2006a) 2.4 URP Strategy, Objectives and Outcomes As part of the URP, several strategic initiatives have been conducted to give direction to the programme, furthermore several anchor projects have been identified to lead the URP in Khayelitsha and Mitchells Plain. 2.4.1 The Urban Renewal Business Plan The URP business plan for Khayelitsha Mitchells Plain, drawn up in late 2003, has set the identified the overall objective of the programme as: “Enabling a systematic and sustained intervention to alleviate poverty and significantly address underdevelopment in the Khayelitsha Mitchells Plain area”. (City of Cape Town, 2003). The URP business plan identifies seven outcomes for urban renewal in the area including: • Physical (infrastructural) development • Social development: capacitated communities • Safety and security: safe communities • Economic Development: a developing and sustainable community 17 • Effective governance • Environmental development • Effective service delivery 2.4.2 • 2.4.3 URP Anchor Projects The URP which was initiated, in earnest, in Cape Town in 20037, incorporates several anchor projects, most of which were initiated well before 2003 and driven by considerations not linked to the URP. These projects are dealt with in more detail in section 3 but include, in Khayelitsha: • Khayelitsha Rail extension • Khayelitsha CBD • HIV/Aids and other health related projects • Housing/Land Mitchells Plain CBD • Lentegeur and Mandalay Public Transport Upgrade • Mitchells Plain Housing • Tafelsig Youth and Family Development Centre and Public Space Upgrade • 7 Swartklip Regional Sports Facility Other Nodal Strategic Projects Since 2003, several other strategic projects have been conducted under the auspices of the URP. These include: • The Urban Renewal Spatial Development Framework for Khayelitsha Mitchells Plain, 2006 (URSDF), which focussed on providing a missing spatial component to urban renewal initiatives across the node. • The Environmental Management Framework (2005), which aimed to provide a framework for managing development in the context of a range of environmental issues and challenges. • The profiling of the urban renewal node aimed at forming a baseline set of information for planning and monitoring purposes of development initiatives in the two areas. In Mitchells Plain the anchor projects include: • Colorado Multi Purpose Centre • Urban Renewal Integrated Knowledge Management (IKM) which seeks to capture the best practices emerging from URP implementation. • An emerging Housing Development Strategy for Khayelitsha and Mitchell’s Plain which seeks to fast-track housing delivery in both Khayelitsha and Mitchell’s Plain See section 4.2.2 for detail. 18 through mobilising partners in the housing development process. Furthermore, a number of other initiatives are planned for the URN including: • Review of URP Business Plan; • Development of local area precinct plans to guide implementation, development and spending; • Development of clear actions plans from the Integrated Nodal Crime Prevention Strategy; • Development of Nodal Local Economic Development Strategy. (City of Cape Town, 2007) 19 In Mitchells Plain: 3. PRELIMINARY SERVICE IMPACT ASSESSMENT 3.1 3.1.1 (a) DELIVERY • The number of households with access to electricity for lighting is 60 471 (or 98% of the total number of households). • According to the 2001 census, 755 households do not have access to electricity for lighting in this area. Basic Services Electricity The following points are noted with regard to the geographic focus of the backlog in access to electricity services (see Figures 7 and 8): • The backlog is concentrated in Khayelitsha (over 96% of the backlog is in this area). • Particular ‘hot spots’ are the informal housing areas of Baseline status Khayelitsha, generally in the northern parts of the area, but increasingly in the peripheral settlements on its southern and eastern edges (see also Table 3). Access to electricity has been determined from 2001 census statistics. The following points are noted in this regard for Khayelitsha: • The number of households with access to electricity for lighting is 65 397 (or 76% of the total number of households in Khayelitsha). • In Mitchells Plain, the areas served worst in terms of access to electricity include Tafelsig and Weltevreden Valley both with backlogs of 212. • Whilst the backlog in terms of access to electricity has been reduced in percentage terms between 1996 and • Areas to the north of Mitchells Plain, including Browns 2001 (from 33% to 24%), according to the 2001 census, 20 619 households do not have access to electricity for lighting. (City of Cape Town, 2005a). Farm are in fact far worse off in this regard. Across the nodal area, the five census sub-place areas with the highest backlog (measured in terms of access to electricity for lighting) are identified in the table below. 20 It should be noted that since the 2001 census, the major new informal settlement of Enkanini in the extreme south east of Khayelitsha has developed. This area comprises several thousand households with no access to electricity. Monwabisi Park appears also to have grown significantly since the previous census. 5. Khayelitsha T2V2b (Monwabisi Park) 762 3.70 3.57 Source: extracted from Statssa, 2001 Table 3: Household Access to Electricity for Lighting (five least serviced areas) Rank Sub-place (and area name) 1. 2. 3. 4. H.H. not using electricity for lighting % of Khayelitsha or Mitchells Plain backlog % of nodal backlog Khayelitsha T1V4 (Victoria Mxenge) 6127 29.72 28.67 Khayelitsha T1V3 (Nonqubela) 4782 23.19 22.37 Khayelitsha (incl. Silvertown, Sibata Dalindyebo, Barney Molokwana Corner) 3645 17.68 17.05 1372 6.65 6.42 Khayelitsha Site C (incl. RR section, Mxolisi Phetani Taiwan, Bongweni Lansdowne Road Reserve) 21 Figure 7: Access to Electricity in Khayelitsha by Enumerator Area (EA) Source: City of Cape Town 2005a 22 Figure 8: Access to Electricity in Mitchells Plain by Enumerator Area (EA) Source: City of Cape Town 2005a 23 (b) Khayelitsha households (54 537) are in receipt of FBE (see Table 4). Progress in service delivery • In the period under review, both Eskom (Western Region) – through PN Energies - and the CoCT8 held responsibility for the provision of electricity reticulation services within Khayelitsha and Mitchell’s Plain respectively. Aside from the provision of an electricity service, a key focus has been the electrification of informal settlements. In terms of service delivery, without statistics emerging directly from service providers it has been difficult to gain an understanding of progress in addressing electricity backlogs (which are dominantly focussed in Khayelitsha). Available information regarding the service has, however indicated that: • The current extent of electrification of informal settlement (or any related service delivery information) in Khayelitsha has not been forthcoming from the service provider. The baseline statistic indicates that approximately 34 000 (+/-60%) informal households had access to electricity in 2001. In terms of these connections and current delivery, several issues exist: o Many of the installations have not been installed in compliance with SABS 0142 and o o There has been progress in electrifying formal housing development (existing and new). At present 100% of formal households in Khayelitsha and Mitchells Plain have access to electricity. (Lekotla 2005, 2007). • 8 Progress in the provision of free basic electricity (FBE) to households unable to afford it - in this regard, 63.4% of These Electricity Services have been undergoing a multi-phase transformation process, in part related to the consolidation of seven municipal administrations into one (2001 to 2004), but more particularly in response to National Government requirements for the restructuring of the Electricity Distribution Industry. o illegal connections are rife – a major risk in terms of electrocution; Sales points are not easily accessible; PN Energies have had a track record of poor service delivery (see KfW, 2002); Many informal dwellings still require electrification. Table 4: Provision of Free Basic Electricity in URN 2005 URN No. of households (hh) No. of hh. with FBE % of hh provided with FBE Khayelitsha 85 988 54 537 63.4% Mitchell’s Plain 95 605 37 006 38.7% Source: Imbizo 2005 24 In addition to electrification of informal settlements, funding of infrastructure in the URN has either been linked to the anchor projects, or to improving safety through lighting. Positive impacts relating to the qualitative aspects of service delivery with the context of the URP include: • Piloting of green energy initiatives at Kuyasa (retrofitting of 2300 units with solar panels to assist in heating and lighting (an initiative of the City of Cape Town and a not for profit organization). (c) No resident perceptions specifically relating to progress with improving access to electricity during the URP were captured. However, residents were asked, regarding the degree to which they felt that electricity was safely installed9. Of the sampled households in Khayelitsha: • 27.79% of respondents felt that their electricity was not safely installed and a further 13.53% were unsure about the safety of installation. • 7.5% of respondents had no access to electricity. In comparison, of the sampled households in Mitchells Plain: • Only 7.28% of respondents felt that their electricity was not safely installed and a further 6.4% were unsure about the safety of installation. • Figure 9: Kuyasa – Solar energy retrofitting • Beneficiary perceptions Most respondents had access to electricity (86.09%), whilst only 0.22% of respondents had no access in this regard. The apparent high level of concurrency in delivery of electrical reticulation services within anchor projects. 9 See City of Cape Town 2006a 25 (d) 1. Magnitude (quantitative) • • • 2. 3. a sense, electrification has, in certain instances, been leading development without responding to a broader development strategy. Assessment Type of impact (qualitative) Perceptions • • During the financial years for which data was available, the provision of electricity in the URN has been extended. FBE has been extended to poorer households in the area, in line with Council policy. Other quantitative outputs have not been measured on a comparative basis. Detailed information from PN Energies has not been forthcoming. Innovation has occurred in the piloting of ‘green technologies’ in Kuyasa and Renewable energy services on the Golf Range – both in Khayelitsha Perceptions of the lack of safety regarding electricity are a symptom of the issues with service delivery in the Khayelitsha area. Comment: Backlogs in access to electricity in Mitchells Plain are limited and have been addressed in areas such as Freedom Park. In Khayelitsha, it is problematic to identify impact of service delivery on backlogs due to issues with reporting and access to information. This is not the first time issues have been encountered with accessing information for the purposes of monitoring 10 delivery in the URN (see KfW 2002) . This issue needs to be addressed urgently through the appropriate channels. Clearly the provision of electricity services remains an area of major challenge in Khayelitsha. There appear to be certain issues with service delivery which apart from impacting on people’s access to electricity threaten safety. Furthermore, the lack of responsiveness, reporting, (and at worst transparency) in the provision of service delivery information (as part of this and other projects) is a cause for concern and may require separate investigation at the appropriate level of government. Beneficiary perceptions regarding lack of safety reinforce the urgency of the need for progress in this sector. On the positive side, it seems that the URP has been able to impact most significantly on the provision of electricity in relation to the anchor projects. Furthermore, certain innovative approaches have been piloted with regard to sustainable energy provision, although these have been limited (and driven by role players outside the sector) and a broader initiative is required in this arena. The functional separation of responsibility for electricity between Eskom (via PN Energies) and the CoCT is likely to impact on the extent to which the URP can influence service delivery. The formation of RED ONE is intended, in part, to overcome these deficiencies. However, although efficiencies within the service may be improved over time, it is likely to make coordinated service delivery more difficult. Anecdotal sources indicate that this lack of coordination has already had negative consequences. Certain informal areas have been electrified, adding a degree of permanence to settlement that, from the housing development side, may not be desirable. In 10 In this case, Eskom refused a request for information in terms of the distribution system. 26 In Mitchells Plain: 3.1.2 Water (a) Baseline status • The number of households with access to piped water within their dwelling is 54 143 (or 89% of the total number of households). • A further 4 377 households have access to piped water on site. Access to piped water has been determined from 2001 census statistics. In Khayelitsha, the following points are noted in this regard: • • The number of households with access to piped water within their dwellings is 17 287 (or 20% of the total number of households). A further 35 758 households have access to piped water on site. • The backlog in terms of households with access to piped water in their dwelling or on site has increased between 1996 and 2001, according to the 2001 census from 28.7% to 38.4% (most likely a reflection of the growth in informal settlement). • In 2001, 32 971 households did not have access to piped water either within their dwelling or on site. 13 582 (almost 16% of) households in Khayelitsha only have access to water through a communal tap more than 200m away. • According to the 2001 census, 2 706 households do not have access to piped water either within their dwelling or on site. • According to the census, 2.5% of households get access to water from a communal pipe more than 200m away. The following points are noted with regard to the geographic focus of the backlog in access to water services (see Figure 10 and 11): • The backlog is highest in Khayelitsha (over 92% of the nodal backlog is in this area) • It is concentrated in many of the informal housing areas of Khayelitsha (see also Table 5). • In Mitchells Plain, areas of Kosovo (close to the boundary of Weltevreden Valley) and Tafelsig are served worst in terms of access to piped water. • Again the areas to the north of Mitchells Plain in Philippi are highlighted in terms of poor access to water services. 27 Across the nodal area, the five census sub-place areas with the least access to water on site are indicated in the table below. Table 5: Household Access to Piped Water (five least serviced areas) Rank 1. Sub-place area name) (and H.H. with no piped water in % of Khayelitsha or Mitchells dwelling or on site Plain backlog % of nodal backlog Khayelitsha (incl. Silvertown, Sibata Dalindyebo, Barney Molokwana Corner) 9184 27.85 25.74 2. Khayelitsha T1V4 (Victoria Mxenge) 6119 18.56 17.15 3. Khayelitsha (Nonqubela) 4959 15.04 13.90 4. Khayelitsha Site C (incl. RR section, 4466 13.55 12.52 3874 11.75 10.86 T1V3 Mxolisi Phetani Taiwan, Bongweni Lansdowne Road Reserve) 5. Khayelitsha T2V2b (Monwabisi Park) Source: extracted from Statssa, 2001 28 Figure 10: Access to Piped Water in Khayelitsha by Enumerator Area (EA) Source: City of Cape Town 2005a 29 Figure 11: Access to Piped Water in Mitchells Plain by Enumerator Area (EA) Source: City of Cape Town 2005a 30 (b) Progress in service delivery The CoCT Water and Sanitation Department is responsible for the provision of water services in the URN. Aside from maintenance of infrastructure, the key focus in service delivery within this sector has been the delivery of basic services, particularly to the informal settlements and achieving national objectives in this regard. In terms of the impact of water service delivery over the past five years, progress reflects: • • The reduction of the backlog in Mitchells Plain (based on the RDP standard) from 1531 in 2001 (baseline) to approximately 5% of informal households (119 households) in 200511. (City of Cape Town, 2005c). Investment in water reticulation infrastructure occurred in new housing projects in Kuyasa. • Investment in water reticulation infrastructure in the informal settlements of Barney Molokwane and the Site C buffer zone. (both these areas are in the top 5 of least serviced areas see previous section). • Most investment in the water and sanitation services was focussed on the upgrade of the Zandvliet wastewater treatment works and the upgrading of the Monwabisi sewer pump station. In Mitchells Plain, patterns of investment reflect that: • Investment in water reticulation infrastructure as part of new housing projects • Upgrades to the Mitchells Plain wastewater treatment works A declining trend in burst water mains in Khayelitsha (30 recorded in 2003/2004, 20 in 2005/6) and Mitchells Plain. 11 • The reduction of the backlog in Khayelitsha (based on the RDP standard) from 13 582 in 2001 (baseline) to approximately 11 000 in 2005. (City of Cape Town, 2005c). • In terms of patterns of investment in water services infrastructure (see Annexure 1), sources available for the purpose of this study indicate that in Khayelitsha: In Mitchell’s Plain a project undertaken by The Executive Mayor in 2005 bought services to 95% of Mitchell’s Plain’s informal settlements by providing them with rudimentary services like water and sanitation. Challenges in the URN remain. A key focus is the need to address issues of access to water in a number of informal settlements (dominantly in Khayelitsha) including Enkanini and Monwabisi Park. In this regard, tenders were out during 2006 for the following improvements to water delivery infrastructure: 31 • • In Enkanini, (Khayelitsha) for the provision of 6000 households with water and sanitation. In Monwabisi Park (Khayelitsha) to provide 4000 households with water and sanitation. Dissatisfied 86 15.7 25 5.52 Highly dissatisfied 72 13.2 4 0.88 Total 547 100 453 100 Source: City of Cape Town 2006a Furthermore, interventions are planned in Khayelitsha for the installation of Storm water Ponds/Channels to reduce impact of grey/black hazardous water in informal settlements. (c) (d) 1. Assessment Magnitude (quantitative) Beneficiary perceptions • • Testing perceptions of levels of satisfaction with the water services indicates high levels of satisfaction in Mitchells Plain (over 90% of respondents were either satisfied or highly satisfied with the service – see Table 6). In Khayelitsha, most respondents (over 65%) were either satisfied or highly satisfied, although a significant proportion (almost 30%) was either dissatisfied or highly dissatisfied. Table 6: Level of satisfaction with water service Satisfaction with service Khayelitsha Mitchells Plain No. % No. % Highly satisfied 132 24.1 84 18.54 Satisfied 228 41.7 329 72.63 Uncertain 29 5.3 11 2.43 • • 2. Type of impact (qualitative) • 3. Perceptions • Reporting regarding annual delivery of water reticulation in relation to quantitative indicators has not been forthcoming to any significant extent. From the figures available it seems as if significant progress has been made in addressing backlogs in Mitchells Plain. An improvement in household access to water services has also occurred in Khayelitsha, however a significant backlog remains. It appears as if much of this backlog will be addressed if tenders out are awarded and funding made available. Much of the delivery in terms of access to water services in informal areas has been in the form of communal standpipes. It is not always safe to access these points (especially at night) and issues of wastage and standing water are prevalent. The indication of dissatisfaction with the service is likely to come from residents with limited access to water. Comment: Progress has been made in addressing existing backlogs in access to water services, although a significant backlog remains in Khayelitsha. It is likely that new investment in reticulation will be required as the process of upgrading informal settlements continues. 32 Beneficiary perceptions reflect the fact that there remain residents who are under serviced in relation to access to water. The on-going expansion of informal settlements in Khayelitsha has compounded the challenges related to attempts to expand basic services. Bearing in mind the City’s sometimes precarious water situation, careful demand management measures will need to be implemented as the service is extended and enhanced. 33 3.1.3 has increased between 1996 and 2001, according to the 2001 census from 29.8% to 34.9% of households. Sanitation • (a) Baseline status In 2001, 22 289 (or 26%) of Khayelitsha households did not have access to any sanitation. In Mitchells Plain: Access to sanitation has been determined from 2001 census statistics. In Khayelitsha, the following points are noted in this regard: • The number of households with access to flush or chemical toilet is 55 957 (or 65.1 % of the total number of households – see Figure 12). • A further 7 771 households have access to a pit latrine or bucket latrine. • The backlog in terms of households without access to either a flush or chemical toilet site Figure 12: Type of (Household) Access to Sanitation in Khayelitsha • The number of households with access to flush or chemical toilet is 59 670 (or 97% of the total number of households – see Figure 13). • A Pit latrine 0% None 2% Bucket latrine 0% relatively insignificant number (334) of households have access a pit latrine or bucket latrine. • According to the 2001 census, 1220 (2%) of Mitchells Plain households do not have access to sanitation. Flush/chemical toilet 98% Figure 13: Type of (Household) Access to Sanitation in Mitchells Plain Source: City of Cape Town 2005a Source: City of Cape Town 2005a 34 The following points are noted with regard to the geographic focus of the backlog in access to sanitation (see Figures 14 and 15): • • It is concentrated in many of the informal housing areas of Khayelitsha (see also Table 7). In Mitchells Plain, informal settlement such as Kosovo and areas of Tafelsig are served worst in terms of access to piped water. • Again the areas to the north of Mitchells Plain in Philippi are highlighted in terms of poor access to sanitation. (Victoria Mxenge) 3. Khayelitsha T1V3 (Nonqubela) 4440 19.92 18.89 4. Khayelitsha T2V2b (Monwabisi Park) 3820 17.14 16.25 5. Khayelitsha Site C (incl. RR section, Mxolisi Phetani Taiwan, Bongweni Lansdowne Road Reserve) 2127 9.54 9.05 Source: extracted from Statssa, 2001 Across the nodal area, the five census sub-place areas with the highest backlog are indicated in the table below. Table 7: Household Access to Sanitation (five least serviced areas) Rank Sub-place (and area name) 1. 2. H.H. with no sanitation % of Khayelitsha or Mitchells Plain backlog % of nodal backlog Khayelitsha (incl. Silvertown, Sibata Dalindyebo, Barney Molokwana Corner) 5624 25.23 23.92 Khayelitsha 4830 21.67 20.55 T1V4 35 Figure 14: % Households with no access to flush/chemical toilets in Khayelitsha by EA Source: City of Cape Town 2005a 36 Figure 15: % Households with no access to flush/chemical toilets in Khayelitsha by EA Source: City of Cape Town 2005a 37 (b) Progress in service delivery The CoCT Water and Sanitation Department is responsible for the provision of sanitation services in the URN. Aside from maintenance of infrastructure, the key focus in service delivery within this sector has been the delivery of basic services, particularly to the informal settlements and achieving national objectives in this regard. In terms of patterns of investment in sanitation services infrastructure (see Annexure 1), sources available for the purpose of this study indicate that in Khayelitsha: • Investment in sanitation infrastructure occurred in new housing projects in Kuyasa. • Investment in sanitation infrastructure in the informal settlements such as the C buffer zone. • In terms of the impact of sanitation service delivery over the past five years, progress reflects: • The reduction of the backlog in Khayelitsha (based on the RDP standard) from approximately 30 000 (baseline) to approximately 22 000 in 2005. (City of Cape Town, 2005c). • • The reduction of the backlog in Mitchells Plain (based on the RDP standard) from 1491 in 2001 (baseline) to approximately 5% of informal households (119 households) in 200512. (City of Cape Town, 2005c). A lower number of sewage blockages in 2005/06 than in the previous two years. 12 In Mitchell’s Plain a project undertaken by The Executive Mayor in 2005 bought services to 95% of Mitchell’s Plain’s informal settlements by providing them with rudimentary services like water and sanitation. Most investment in the water and sanitation services was focussed on the upgrade of the Zandvliet wastewater treatment works and the upgrading of the Monwabisi sewer pump station. In Mitchells Plain patterns of investment reflect that: • Investment in sanitation reticulation infrastructure as part of new housing projects • (c) Upgrades to the Mitchells Plain wastewater treatment works Beneficiary perceptions Testing perceptions of levels of satisfaction with the sanitation services indicates high levels of satisfaction in Mitchells Plain (over 87% of respondents were either satisfied or highly satisfied with the service). In Khayelitsha, levels of satisfaction varied. A high proportion of respondents (over 45%) were either dissatisfied or highly dissatisfied. (Table 8). 38 Table 8: Level of satisfaction with sanitation service Satisfaction with service Khayelitsha Mitchells Plain No. % No. % Highly satisfied 79 14.4 78 17.22 Satisfied 178 32.5 317 69.98 Uncertain 42 7.7 19 4.19 Dissatisfied 105 19.2 27 5.96 Highly dissatisfied 143 26.1 12 2.65 Total 547 100 453 100 3. Source: City of Cape Town 2006a (d) 1. Assessment Magnitude (quantitative) • • • • 2. Type of impact (qualitative) • Reporting regarding annual delivery of sanitation services in relation to quantitative indicators has not been forthcoming to any significant extent. From the figures available it seems as if significant progress has been made in addressing backlogs in Mitchells Plain. An improvement in household access to sanitation services has also occurred in Khayelitsha, however a significant backlog remains. It appears as if a significant impact on this backlog will be made if tenders out are awarded and funding made available, however, services remain poor in informal settlements in Site B and C, many of which do not seem to have been impacted on during the URP period. Issues of safety remain, with regard to the manner in which many people access sanitation services. In some areas, communal Perceptions • toilets are the only means of access to sanitation services. It is often a danger to personal safety to access these facilities as night. The indication of dissatisfaction with the service is likely to stem from residents with limited access to sanitation services. The high level of dissatisfaction reinforces the level of need in this area. Comment: A level of progress has been made in addressing existing backlogs, although a significant backlog remains in Khayelitsha, which is being addressed at a rate which will not eliminate backlogs within the next ten years if existing delivery is taken as an indication of future progress. It is likely that new investment in reticulation will be required as the process of upgrading informal settlements continues. Beneficiary perceptions reflect the fact that there remain many households in Khayelitsha who are under serviced in relation to access to appropriate levels of sanitation. The on-going expansion of informal settlements in Khayelitsha has compounded the challenges related to attempts to expand basic services. 39 settlements and 30000 in informal settlement; 3.1.4 Refuse Removal/Solid Waste (a) Baseline status • Street sweeping at various intervals. This system altered subsequently and was replaced by: • 240L containers provided to all service points in formal settlements; The following points are noted with regard to indicators reflected in the 2001 census: • Most refuse in both Khayelitsha and Mitchells Plain is removed by the local authority (see Figures 16 and 17). • Large communal containers, that are closed, strategically placed in informal; settlements supplemented with 220L swing bins; • Termination of street cleaning service from October 2002. In Khayelitsha, this represented a significant upward trend from 1996 figures. In 1996, 75.5% of households had their refuse removed by the local authority and in 2001, this figure rose to 95.1%. (City of Cape Town, 2005a) • In Mitchells Plain, this represented a decline from 98.4% to 94.8%. (City of Cape Town, 2005a). In Khayelitsha, the baseline status of refuse removal reflected in 2001 was: • Removal of standard domestic containers of 85L on a weekly basis; • 40 000 service points in the formal Figure 16: Type of refuse removal (% Households) in Khayelitsha 40 In 2002, illegal dumping was identified as an issue in Khayelitsha. Furthermore, the lack of refuse bins in public places and bins being too small were identified as issues contributing to litter. (KfW, 2002). Figure 17: Type of refuse removal (% Households) in Mitchells Plain Source: City of Cape Town 2005a 41 (b) Progress in service delivery Responsibility for refuse removal in the URN lies ultimately with the Refuse and Removal service of the CoCT. However, since 1997, Khayelitsha has been on a tri-partite service delivery contract aimed at local entrepreneurial development. As part of a city-wide initiative within the service, containerisation also commenced in Khayelitsha in November 2005 and tenders were invited to service the informal areas. Tedcor now provides 50% of the service in this area, the remainder being provided by the CoCT. In Mitchell’s Plain, the CoCT provides the service on the basis of kerbside collection once a week as per the schedule of collection on an area basis. Table 9: Measurement of Key Performance Indicators: Refuse Removal / Solid Waste Service – Khayelitsha 2001/02 % direct hh refuse removal % communal illustrated in the tables below, which most notably reflect: • An increase in the number of informal households with door to door refuse removal in Khayelitsha • An increase in the number of househlds benefiting from the refuse removal service in Mitchells Plain. 2003/04 95.1% 2004/05 2005/06 95% hh 2% 2% 1% 1% 0.5% 2.1% 2% 1% 1% 0.6% 0.8% 0 0 0 0 weekly weekly weekly weekly 100% 100% 100% 100% 56 000 (100%) 70% 70% 70% 70% 30% 30% 20% 5% refuse dump % hh own refuse dump % hh with no rubbish disposal Cycle of 1.9% removal domestic containers of <weekly 93.2% weekly # formal hh with door to door refuse removal (%) # Refuse removal coverage and progress in service delivery is 2002/03 informal hh with door to door refuse removal (%) % informal hh with open skip 126 686 (87.3%) 12.7% Source: 2001 census; Lekotla 2005; 2007; CoCT Refuse & Solid Waste 42 Table 10: Measurement of Key Performance Indicators: Refuse Removal/Solid Waste Service - Mitchell’s Plain 2001/02 % hh refuse removal by local 2002/03 94.8% 2003/04 2004/05 2005/06 97% authority % hh communal refuse dump % hh own refuse dump % hh with no rubbish disposal (c) Beneficiary perceptions emerging from the 2006 survey (see Tables 11 and 12) reflect: • The majority of respondents in Khayelitsha (over 73%) and Mitchells Plain (over 85%) were either satisfied or highly satisfied with the refuse removal service. • On 1.6% 4.3% of 0.3% < removal domestic containers of weekly 88.7% weekly formal hh with door to door refuse removal (%) weekly 100% % informal hh with door to door refuse removal % informal hh with open skip Source: 2001 census; Lekotla 2005; 2007 98% 10% (?) the other hand, the majority of Khayelitsha respondents (over 63%) and a smaller though significant proportion of respondents from Mitchells Plain (over 36%) were either dissatisfied or highly dissatisfied with the cleanliness of the area. 5.1% Cycle Beneficiary perceptions Table 11: Level of satisfaction with refuse removal Satisfaction with service Khayelitsha Mitchells Plain No. % No. Highly satisfied 169 30.9 83 18.32 Satisfied 235 42.96 304 67.11 Uncertain 21 3.84 11 2.43 Dissatisfied 54 9.87 42 9.27 Highly dissatisfied 68 12.43 13 2.87 Total 547 100 453 100 % Source: City of Cape Town 2006a 43 Table 12: Level of satisfaction with cleanliness of area perceptions of the cleanliness of local areas (particularly in Khayelitsha) is a concern in relation to this service. Satisfaction with service Khayelitsha Mitchells Plain No. % No. % Highly satisfied 37 6.8 43 9.49 Satisfied 141 25.8 224 49.45 Uncertain 21 3.8 21 4.64 Dissatisfied 148 27.1 117 25.83 Highly dissatisfied 200 36.6 48 10.6 Total 547 100 453 100 Source: City of Cape Town 2006a (d) 1. Assessment Magnitude (quantitative) • • 2. Type of impact (qualitative) • 3. Perceptions • The measurement of progress by and of this sector has been limited and/or inconsistent. However, on the basis of information that is available, the trend appears to be towards improved service delivery. During the five financial years for which (some) data was available, the overall refuse removal service delivery has improved, particularly in Mitchell’s Plain. In Khayelitsha, the focus has been on improving baseline service delivery to ensure more households have access to at least an acceptable level of service. Door to door service in the informal settlements has improved from 70% to 87.3% in this URN. Innovation has occurred in the public-private partnership established for Khayelitsha to enhance service delivery and promote local entrepreneurial development. It is clear that removal of refuse is generally viewed in a positive light, however negative Comment: The improvement in service delivery in respect of this sector has largely been driven from within the sector itself. A citywide programme for containerisation coincided with broader political imperatives to equalise service delivery standards across the City and it is this programme, rather than the URP, that has been responsible for improvements in refuse collection. Privatising the collection of waste was an initiative already in operation prior to the inception of the URP. Nevertheless, the refuse removal service seems to have made progress, particularly in terms of reducing backlogs. Beneficiary perceptions, however, point to an issue around the general cleanliness of local areas. Despite the improvement in household service delivery, it seems areas (particularly in Khayelitsha) are not being adequately maintained in terms of their cleanliness. This could relate to issues pointed to as part of the baseline state including the lack of refuse bins in public places, illegal dumping as well as suspension of the street sweeping service. The lack in cleanliness of public places is a concern as it impacts negatively on the public environment (which is of paramount importance in dense environments). It may also hamper perceptions of areas at a time in which private investment in these areas is sought to promote local economic development. 44 (ii) 3.2 3.2.1 Movement Modes Human Settlement Infrastructure Transport systems (a) Baseline status (i) Infrastructure At the starting point of the evaluation period, road infrastructure was generally good throughout Khayelitsha and Mitchells Plain, with by far the majority of road surfaces being tar. However, road maintenance was an issue along certain stretches of the road system. (KfW, 2002). Peripheral informal areas, however, generally do not have tarred roads. In terms of public transport infrastructure, the nodal area is penetrated by the Khayelitsha line. This line splits with one branch linking through central spines within both Khayelitsha and Mitchells Plain. Khayelitsha is service by three rail stations with the line terminating at the Khayelitsha rail station. Mitchells Plain is served by four rail stations with the line terminating at Kapteinsklip near the coast. The following statistics from the 2001 census reflect on movement modes in the area. In Khayelitsha, of those travelling to school or work: • About 46% do so by foot; • Only 7% did so as a driver or passenger; • 46% make use of public transport. Of the employed population in Khayelitsha, of those who travel to work: • Most (80%) make use of trains (45.8%); • Only 12% do so by car as driver or passenger. In Mitchells Plain, of those travelling to school or work: • About 36% do so by foot; • 22.5 did so as a driver or passenger; • 39.7% make use of public transport. Of the employed population in Mitchells Plain, of those who travel to work: • Most (58.3%) make use of public transport; • 33.6% did so by car as driver or passenger 45 (b) Progress in service delivery Delivery of transport infrastructure has been undertaken by the CoCT as well as the PG:WC in the urban renewal node. Funding has largely come through infrastructure grants (CMiP and now MIG), the Cape Metropolitan Transport Fund and loan funding. In terms of delivery of transport and roads infrastructure (see Annexure 2), sources available for the purpose of this study indicate that in Khayelitsha: • Spending on road infrastructure (R18 386 977) outweighed spending on public transport infrastructure (R5 171 360). • Road infrastructure spend was dominated by investment to support new housing projects such as in Kuyasa. • Public transport infrastructure spend was focussed on the design and construction of infrastructure at the CBD as well as planning and design work linked to the rail extension (although most of the funds required for this project have not yet been spent). • Public transport infrastructure delivery focussed on Mitchells Plain public transport upgrade (including bus terminus, taxi facility, public space improvements) and Lentegeur and Mandalay public transport upgrades; • Road infrastructure focussed on servicing new housing developments as well as a multitude of smaller investments on traffic calming. During the urban renewal time period, significant improvements are reflected at the public transport interchanges (PTIs), mainly in Mitchells Plain. Funding for public transport infrastructure has also had an impact (beyond the transport sector) on the quality of spaces, levels of safety at interchanges and opportunities for business activity. ANCHOR PROJECT: KHAYELITSHA RAIL EXTENSION Planning for this project (with a budget estimated at R430m, was initiated in 1994 and it was subsequently labelled an anchor project. It is driven by the South African Rail Commuter Corporation. It involves: • Extension of the rail line by 4.2km, In Mitchells Plain: • Spending on public transport (R48 402 535) by far outweighed spending on road infrastructure (R5 900 338). • Two new rail stations, four pedestrian bridges and two road over rail bridges. When it occurs, it will have a dramatic impact on improving residents’ access to public transport. In particular, the development of the two new stations will mean that thousands of residents would 46 be within easy walking distance of access to metropolitan-wide public transport systems. (c) Beneficiary perceptions Uncertain 17 4 28 6 18 3 16 6 7 2 9 2 Dissatisfied 80 18 27 6 56 11 23 9 15 4 29 8 Highly dissatisfied 67 15 31 6 28 5 19 7 5 1 9 2 Total 451 100 490 100 521 100 269 100 364 100 385 100 Source: City of Cape Town 2006a Testing perceptions of awareness of the Khayelitsha Rail extension project (an anchor project) and its perceived impact on households’ quality of life indicated that: • Approximately 82% of Khayelitsha respondents were aware of the project. • 91.4% of respondents rated the project as improving their quality of life. Furthermore, 69% of respondents in Khayelitsha and 80% in Mitchells Plain indicated that urban renewal projects in the last three years had a positive impact on access to public transport. (see Table 13). Table 14: Level of satisfaction with roads and streets Satisfaction with service Khayelitsha No. % No. % Highly satisfied 77 14.1 61 13.57 Satisfied 205 37.5 256 56.51 Uncertain 18 3.3 10 2.21 Dissatisfied 112 20.5 92 20.31 Highly dissatisfied 135 24.7 34 7.51 Total 547 100 453 100 Source: City of Cape Town 2006a (d) Table 13: Level of satisfaction public transport services Satisfaction Khayelitsha with Train Bus service N % N % Mitchells Plain Taxi Train Bus N % N % N % N % Highly satisfied 135 30 197 40 212 41 44 16 82 23 74 19 Satisfied 152 34 207 42 207 40 167 62 255 70 264 69 Taxi Mitchells Plain Assessment 1. Magnitude (quantitative) • • No robust quantitative indicators have been used to monitor the impact of transport interventions in the node. As such, certain assumptions have been made using available data. Access to public transport: it is not clear from the data available whether access to public transport has actually improved as no operational data was collected. It is likely though that, linked to the construction of new interchange infrastructure, that 47 • 2. Type of impact (qualitative) • • • • 3. Perceptions • • access has been more convenient those areas. Road infrastructure: investment in new roads has served more than 6000 new residential units. Investment in public transport infrastructure (mainly in Mitchells Plain) has impacted on a significant number of resident’s lives considering the proportion of people using public transport and the number of people using the interchanges on a daily basis (e.g. 74 131 daily boarding and alighting at Mitchells Plain PTI). At these interchanges, the type of impact has gone beyond improving access to transport, but has improved the quality of environments and provided improved preconditions for economic activity. Investment in transport infrastructure in Khayelitsha is likely to have had less impact as it has been localised and biased toward road infrastructure. Investment in public transport and pedestrian infrastructure in the CBD has however improved the quality of the local environment and access to particularly road based public transport. Levels of dissatisfaction with public transport services are limited though a relatively significant negative rating is achieved for train services in Khayelitsha. Levels of satisfaction with roads and streets are relatively high, although approximately 20% of respondents are dissatisfied with the service. Judging from beneficiary perceptions, it seems that access to public transport is good within the urban renewal node. It is likely, though, that levels of dissatisfaction relate less to the development of public transport infrastructure and rather to operational issues. Issues with the rail service in particular appear to be a cause for concern including: • Safety (trains are often overcrowded at peak times and security is poor on the trains and at stations) • Service consistency (breakdowns in service occur periodically often due to vandalism of cables). Levels of dissatisfaction with roads and streets are likely to stem from safety concerns. Many roads in the node are extremely dangerous for pedestrians due to their high mobility focus. The high number of traffic calming projects is an indication of this issue (particularly in Mitchells Plain) as well as the systems of ward allocations focussed on addressing local ward concerns. Levels of access to public transport are likely to be impacted on positively by the extension of the rail line in Khayelitsha. This area of Khayelitsha has also grown significantly since 2001. Delivery in terms of this key anchor project is thus likely to impact positively on levels of access to public transport. Comment: The focus of expenditure and delivery with regard to transport during the measurement period (2001-2006) has been focussed on public transport infrastructure. Associated with these interventions, have been efforts to improve the quality of urban environments to support nodal development. This nodal focussed has had positive spin offs for local areas, particularly in Mitchells Plain. It appears too that investment in road infrastructure has been aligned to housing projects and a high degree of concurrency in delivery has been achieved. It has however been noted that the investment in upgrading and maintaining the area’s relatively good road infrastructure may be a concern. 48 3.2.2 Housing (a) Baseline status The following points are noted with regard to the geographic focus of informal housing (see Figure 21): • The types of dwellings in which residents stay has been determined from 2001 census statistics (see Figures 18 and 19). In Khayelitsha, the following points are noted in this regard: • The majority of households (55 300 or 64.3%) lived in shacks (64.3%). • Of this 6 250 or 7.3% of households lived in informal Concentration in the northern areas of Khayelitsha both within existing formal settlement (including invaded open space) and in the peripheral areas of the Figure 18: Type of Dwelling (Khayelitsha) Source: City of Cape Town (2005a) housing – backyard shacks. • township such Monwabisi Park. also Table 5). 30% lived in houses on a separate stand. In Mitchells Plain: • as (see The majority of households lived in houses on a separate stand. • Almost 22% of households lived in a town house, cluster house or block of flats. • In terms of census data for Mitchells Plain, there are 2377 households in informal settlement (3.9% of the total number of households). • In Mitchells Plain, concentration of informal housing mainly in Kosovo and Samora Machel, (Weltevreden Valley area) and Lost City and Freedom Park (Tafelsig). Figure 19: Type of Dwelling (Khayelitsha) Source: City of Cape Town, 2005a 49 Table 15: Informal Housing Concentration (5 areas with highest number of informal settlement) Rank Sub-place (and area name) Informal households % of Khayelitsha or Mitchells Plain total (informal) % of nodal total (informal) 1. Khayelitsha Site C 2. Khayelitsha (incl. Silvertown, Sibata Dalindyebo, Barney Molokwana Corner) 9224 16.68% 16% 8821 15.96% 15.29% T1V4 (Victoria Mxenge) 8412 15.21% 14.58% 4. Khayelitsha T1V3 (Nonqubela) 6704 12.12% 11.62% 5. Khayelitsha Site C (incl. RR section, Mxolisi Phetani Taiwan, Bongweni Lansdowne Road Reserve) 4775 8.63% 8.28% 3. Figure 20: Upgrading informal settlement in Freedom Park (Khayelitsha) Across the nodal area, the five census sub-place areas with the highest backlog are indicated in the table below. Khayelitsha Source: extracted from Statssa, 2001 50 Figure 21: Housing – Dwelling Unit Density and % Informal Dwellings Source: City of Cape Town, 2006b 51 (b) Progress in service delivery Housing delivery in the urban renewal node has largely been funded through subsidies allocated via the PG:WC. In terms of delivery of housing, sources available for the purpose of this study (see Annexure 3) indicate that: • 6103 new housing subsidy units have been developed in the nodal area (2002/3-2005/6). • Delivery in the node has been relatively evenly split between Khayelitsha (2066 units) and Mitchells Plain (2037 units) • • In Khayelitsha, the geographical focus of delivery has been in Kuyasa (greenfield site in the south of the area) and to a lesser extent in Silvertown and Green Point on the eastern edge of the area and the buffer area between Site C and the N2. In Mitchells Plain, the geographical focus of delivery has been in Westridge (Westgate Mall Housing) and to a lesser extent several infill projects in Tafelsig. ANCHOR PROJECT: KHAYELITSHA - HOUSING/LAND This project is focussed on providing and upgrading existing informal settlements in Khayelitsha. It has involved interventions in a range of areas (see also Annexure 3) including Kuyasa phase 2, upgrading of informal settlement in Silvertown, resolution of ownership rights in Site C and housing development in Greenpoint. Despite this anchor project, the impact on backlogs in Khayelitsha remains relatively limited and significant informal settlements remain, many of which have with poor access to basic services. ANCHOR PROJECT: MITCHELLS PLAIN HOUSING The project is to provide a mix of housing opportunities in Mitchells Plain. The focus has been on the Tafelsig Housing project, and delivery through the Cape Town Community Housing Company in Westridge. In terms of its impact, the project has resulted in a relatively significant amount of new housing units in the area when measured against the existing housing backlog. (c) Beneficiary perceptions In Khayelitsha, housing is one of the most pressing issues (whilst it does not feature as a major issue in Mitchells Plain)13. In this regard, research has indicated several important indicators of the seriousness of the issue to residents: • Respondents rated the lack and low quality of housing as the third most pressing challenge in the area following crime and jobs/unemployment. 13 The issue was not raised by respondents in the Mitchells Plain survey (see City of Cape Town 2006a). 52 • The second most important need expressed was for projects focussing on housing. Testing perceptions of awareness of the housing programmes in Khayelitsha and Mitchells Plain (both anchor projects) indicated that: • Approximately 60% of households were aware of the Khayelitsha housing programme. • Approximately 38% of households in Mitchells Plain were aware of the project in this area. Testing of perceptions on the project’s impact on quality of life and experience over the past three year over which the project has run reflects that: • Highly dissatisfied 264 48.26 23 5.08 Total 547 100 453 100 Source: City of Cape Town 2006a (d) Assessment 1. Magnitude (quantitative) • 2. Type of impact (qualitative) • • 43% of Khayelitsha households experienced worsened • housing conditions. • • 17% of Mitchells Plain households worsened housing conditions. experienced • 3. • Perceptions Table 16: Level of satisfaction with housing • Satisfaction Khayelitsha Mitchells Plain with service No. % No. % Highly satisfied 36 6.58 53 11.7 Satisfied 99 18.1 300 66.23 Uncertain 34 6.22 36 7.95 Dissatisfied 114 20.84 41 9.05 During the three financial years for which data was available, approximately 4% of the 2001 housing backlog in Khayelitsha was addressed14. Approximately 85% of the backlog in Mitchells Plain was impacted on by the delivery of housing15. Generally housing interventions in the node have reflected a relatively high degree of concurrency with engineering services (bulk services, roads, etc). The form of housing has generally conformed to the standard ‘RDP model’ with limited variation, despite the heightened focus of interventions as part of anchor projects. Innovation has occurred in the piloting of ‘green technologies’ in Kuyasa. Many of the new housing environments do however retain an element of sterility characteristic of many areas in the node. A positive perception of housing programmes in the Mitchells Plain area. A high proportion of respondents are highly dissatisfied with housing delivery in Khayelitsha. Comment: The housing issue is clearly most serious in Khayelitsha. Housing delivery in 14 This assumes zero population growth and a stable backlog. The figures are thus in reality likely to be slightly lower. 15 Ibid 53 Mitchells Plain has, however, had the most impact on this area’s backlog, whilst the level of delivery in Khayelitsha has been less dramatic in terms of its impact on backlogs. Apart from limited resources, it is likely that other factors have impeded more rapid delivery in this area including the greater degree of complexity in dealing with the issue (well located vacant land is scarce and upgrading informal settlement is a complex, time consuming process) as well as fact that housing is a highly politicised and contested issue in Khayelitsha. Beneficiaries’ perception of progress with service delivery, which reflects most dissatisfaction with levels of delivery in Khayelitsha, is likely to be a function of the enormous scale of the issue in this area. Public funding processes and capacity do not seem sufficient to deal with delivery of the scale necessary (within the current approach to housing delivery). The urban renewal status of the node has impacted on the delivery of housing in a relatively limited manner, despite housing being an anchor project. Recently, however, additional strategic focus has been placed on the housing issue with: • The compilation of a vacant land audit in Khayelitsha ( a tool to assist in identifying possibilities for future use of land) • A housing summit which was held to establish housing opportunities in the nodes and how integration can be effected. • Proposal for a housing development strategy aimed at soliciting the involvement of private sector and other social partners in housing development at the nodes. • Planned public private partnerships aimed at the gap housing market. • Recent policy energy around the provincial sustainable human settlement strategy and its identification of informal settlement upgrade in Site C as a pilot. 54 3.2.4 Parks/Sports Facilities, Environmental Development (a) Public Spaces is often not realised and negatively impacted by human processes. In addition, many of the areas not developed due to natural constraints have now become dangerous (including dune areas in Mitchells Plain). and Baseline status (b) A comprehensive ‘baselining’ of all aspects of these services is not possible within the context of this report. The following points are noted in relation to available sports facilities (2001): • There were 3 district sports complexes in Khayelitsha and 5 district sports complexes in Mitchells Plain • Significant shortfalls in access to sport and recreation facilities exist in Khayelitsha (see City of Cape Town 2006b). Furthermore, in relation to public spaces and the environment, quantitative indicators are not well developed however a number of issues are noted including: • Progress in service delivery Responsibility for service delivery in respect of public facilities lies primarily with a number of Departments within the City of Cape Town, including City Parks (sports and recreation), Civic Amenities (facilities), Planning & Urban Design (Public Places) and Environmental Management (environment). However, Province (Department of Environment & Development Planning in particular) and DPLG fund some infrastructure on a project basis. Inconsistent project progress measurement and independent project management within the various Departments however creates difficulties in presenting a unified overall review of progress. Prevalence of poor quality public spaces including significant vacant/underutilised Mitchells Plain. land particularly in • These areas were and are identified as high risk in terms of violent crime • A variety of environmentally sensitive areas occur in the URN including the coastal strip. The value of these areas In terms of delivery in these sectors effort has focussed on (see Annexure 4 for detail project breakdown): • Development of mostly higher order (and high cost) sports facilities including: o A major new regional sports facility (Swartklip) on the Khayelitsha side of Mitchells Plain. 55 o o New cricket oval and swimming pool in the Khayelitsha CBD Development of Mandela Park Tartan track • A number of smaller sports field have been upgraded (mostly in Mitchells Plain). • A variety of environmental/parks/ programmes including: o o o Bush clearing Community and food gardens (also run by Economic Development) Greening and landscaping ANCHOR CENTRE PROJECT: COLORADO MULTI PURPOSE This project is focussed on development of required community facilities including a multi-purpose hall (budget R8.1m), multipurpose hard courts, basketball courts and landscaping. A clinic and library are planned to further develop the Colorado node. In terms of impact, the project has created 248 jobs (temporary construction) and is likely to have an impact on the local area in terms of improving access to facilities ANCHOR PROJECT: SWARTKLIP REGIONAL SPORTS FACILITY TAFELSIG YOUTH AND FAMILY DEVELOPMENT CENTRE AND PUBLIC SPACE UPGRADE This project is focussed on the development of a regional sports facility to serve residents of Mitchells Plain and Khayelitsha. Phase 1 and 2 (budget of R24m) including sports fields as well as phase 3 (multi-purpose indoor facility and conference and boardroom facility – budget of R33m) are complete. This anchor project has managed to combine infrastructural investment and soft initiatives to strengthen its impact. It is focussed on the construction of a youth and family development centre, public space upgrade, improved public transport facilities and opportunities for informal trade. The total estimated budget for the project is R12m. (City of Cape Town, 2007). In terms of impact, the project has created 35 permanent jobs, and is likely to provide access to senior club level sports teams and other uses. (City of Cape Town, 2007). It does not seem to have had major impact amongst the broader population or catalysed further development and investment. In addition it appears as if there remains a challenge in ensuring Khayelitsha residents are aware of and benefit from the facility. In terms of impact the project has combined infrastructure development with a focus on social well-being as well as issues of safety. Apart from providing facilities for young people in an area where levels of gangsterism are high, it forms part of a broader initiative to prevent crime. Infrastructure development has focussed on securing public spaces. Whilst the impact will be felt mainly at the local area level, this anchor project and its specific targeting in an 56 area where social issues are a concern with a multi-facetted approach combining infrastructure and social programmes is likely to have a strong role in improving quality of life for residents. The involvement of local communities in decision making is also likely to strengthen the impact of the project. The project reflects strong evidence of being able to mobilise a range of sectors in different spheres of government, sources of funding and community stakeholders to achieve the benefits of synergies in resources within a specific locale. (c) • Approximately 30% of Mitchells Plain (and 5% of Khayelitsha) respondents were aware of the Swartklip regional sports facility anchor project. • Approximately 18% of Mitchells Plain respondents were aware of the Tafelsig public space upgrade. Testing of respondents (who were aware of the projects) perceptions on their impact on quality of life indicated that: • 73.08% of Mitchells Plain (and 34.69% of Khayelitsha) respondents indicated that the Swartklip regional sports facility had a positive impact on quality of life. • 70.89% of Mitchells Plain respondents indicated that the Beneficiary perceptions Tafelsig public space upgrade had a positive impact on quality of life. Respondents were tested regarding access to specific facilities in their communities. The following findings are noteworthy in the context of this service: • In Khayelitsha, recreation and sport facilities rated as two of the three least accessible facilities by 72% and 63% of respondents respectively. • Recreation facilities also received the highest level of dissatisfaction rating from Khayelitsha respondents at 62%. (d) Assessment 1. Magnitude (quantitative) • • • In terms of resident perceptions of anchor projects, testing perceptions of awareness of the Swartklip regional sports facility and Tafelsig youth and family development centre and public space upgrade (all anchor projects) indicated that: 2. Type of impact (qualitative) • No measurement of key performance indicators is apparent in relation to these line functions. During the financial years for which data was available, there has been significant investment in infrastructure in this sector. Much of this investment was dedicated to district/regional sports facilities. The type of impact of projects identified in this sector varies significantly depending on the scale and nature of intervention. Certain anchor projects are likely to have improved environmental quality, access to facilities and levels of safety due to their multi-dimensional approach (however the Swartklip sports facility has 57 3. Perceptions • • adopted a more ‘traditional line-oriented’ approach). It is clear that, despite the progress in terms of delivery of sports and recreational facilities, lack of access to these facilities remains a major issue. Furthermore, the anchor projects in this sector seem to have had a generated a localised awareness (though not insignificant impact) on residents. Comment: Whilst the focus has, to some extent, been on construction of higher order sports facilities, it is seems that impacts on levels of access to these facilities have been limited in Khayelitsha. It should be noted, however, that base levels of facility provision in this area were extremely low. Beneficiary perceptions seem to reinforce the fact that interventions in the sport and recreation sector have not had a major impact on access to these facilities specifically in Khayelitsha. It is also likely that due to the focus on higher order facilities, the lack in local facilities has not been adequately addressed. Operational issues also hamper resident access to major sports facilities, which could be another reason for negative perceptions. Anchor projects referred to have generally required intra- and intergovernmental co-operation and funding. On a project basis, it would appear that the URP has improved intra- and inter-governmental co-operation. However, it is evident that improved coordination delivery in respect of specific anchor projects has predominantly been in respect of the planning and construction phases where several line departments have been involved. It is critical though that these efforts are sustained during the operational phases. Other projects in the URN within this sector, whilst not unimportant appear to have been determined either on an ad hoc basis, or on the basis on the imperatives established within the individual service departments. 58 ANCHOR PROJECT: KHAYELITSHA BUSINESS DISTRICT 3.2.5 Nodal Development: Economic Activity Centres (a) Baseline status No specific baseline information has been identified for the status and level at which nodal areas were developed in 2001. However, the description of progress in service delivery provides and indication of what has occurred during the URP. (b) Progress in service delivery A strong focus of the URP has been related to the development of nodal areas. There has been a strong focus on new infrastructure often with a specific focus on improving public transport facilities, but generally inclusive of a basket of interventions. Many of these interventions were initiated or planned prior to the initiation of the URP. The following anchor projects have been identified in relation to the development of economic activity centres as, particularly in the case of the CBDs, a key focus is enabling economic development. In the late 1990s, the KBD was a 73ha vacant expanse of land on the western side of Khayelitsha Station. The project was initiated before 2001, but became the main anchor project for Khayelitsha and aims to establish a vibrant and viable CBD in the area. To this end, public development has included a swimming pool and cricket oval, magistrate offices, social welfare and home affairs offices with a multi-purpose centre underway. Imminent development includes a new district hospital and SAPS (detectives’ branch) as well as public squares and landscaping. The private sector has also invested in the area in the form of a 17 500m2 retail centre. Planned development occurring through private funding includes new residential development of between 1200 and 2500 units aimed at the ‘gap’ housing market (R180 000 – R250 000), a service station and municipal offices which is likely to receive R25m in funding from Rand Merchant Bank (RMB). (City of Cape Town, 2006c). ANCHOR PROJECT: MITCHELLS PLAIN CBD This project aims to regenerate and reinforce the development of the Mitchells Plain CBD. The aim is to leverage additional private sector investment through public investment. A range of private sector investments have occurred during the course of the project including the R400m Promenade Retail centre. Public investment has included: 59 • A range of public transport infrastructure associated with the Mitchells Plain PTI including bus and taxi termini, new roads infrastructure • Landscaping • Administrative buildings • Informal trading market • Pedestrian bridge In terms of its impact, the project has created a significant number of jobs. Indications are that 2400 informal traders will have access to markets through the newly developed infrastructure and 1800 new jobs associated with the taxi industry are also ascribed to the project. (City of Cape Town, 2007). Due to its strategic and accessible location it is likely that outcomes will impact on the thousands of people using this area. The project is likely to impact on a number of facets of life of residents in Mitchells Plain including: • Improving access to public transport; • Improving levels of safety in the key commercial node in the area; • Improving opportunities for job creation accommodation of trading facilities and spaces; through the • Improving access to public and private facilities ANCHOR PROJECT: LENTEGEUR PUBLIC TRANSPORT UPGRADE AND MANADALY This project focuses on the upgrading and remodelling of the station forecourts at these stations and improving levels of accessibility, including ensuring that the Lenteguer station caters for special needs of patients. This is linked to accessing the nearby Lentegeur Hospital, which has been upgraded and will draw patients from the wider area. Key public investment has included the upgrading of physical infrastructure around the stations including pedestrian spaces and access routes, pavement widening and dropping of kerbs and installation of CCTV cameras. (See Figure 22). Key public investment occurring in relation to the western Forecourt of Lentegeur Station includes construction of a bus and taxi terminal and a market for informal traders. Figure 22: Remodelling of Lentegeur Station In terms of impact, the project is strategically located and will impact on a significant number of people (users of the two stations). The project is likely to improve the transport experience (particularly for special needs passengers) through improved infrastructure, as well as through the focus on improving operational aspects of public transport (through the bus/taxi service linking the stations to the hospital). In addition, linked interventions such as informal trade infrastructure are likely to improve the conditions for economic development. 60 (c) Beneficiary perceptions Testing perceptions of awareness of the Khayelitsha CBD, Mitchells Plain CBD and Mandalay and Lentegeur PTI upgrades (all anchor projects) indicated that: • • Assessment 1. Magnitude (quantitative) Approximately 62% of Mitchells Plain respondents were 2. Type of impact (qualitative) Approximately 88% of Mitchells Plain respondents were not aware of the Mandalay and Lentegeur PTI upgrades • • • • Testing of respondents (who were aware of the projects) perceptions on their impact on quality of life indicated that: • • • Approximately 89% of Khayelitsha respondents were aware of the Khayelitsha Business District anchor project not aware of the Mitchells Plain CBD anchor project. • (d) 87.79% of Khayelitsha respondents believed the CBD • development had a positive impact on quality of life. • 63.53% of Mitchells Plain respondents believed the CBD development in this area had a positive impact on their households’ quality of life. • 61.4% of Mitchells Plain respondents believed the Lentegeur and Mandalay PTI upgrades had a positive impact on quality of life. 3. Perceptions • • The upgrades and linked developments at these strategic nodal areas are likely to be felt by a significant number of people due to the station areas being the centres of gravity in the area. No further quantitative measures have been developed with regard to development at these CBDs, in relation to baseline information (beyond a reflection of jobs created). Impacts vary between projects. The development of the KBD is likely to provide an opportunity to access a range of higher order social facilities in a highly accessible area in Khayelitsha. Furthermore, the development brings convenience in terms of a significant retail outlet. The Mitchells Plain CBD upgrades add vitality to the area and improve access to and convenience of public transport. In all cases, it appears as if levels of public safety will be impacted at these important nodes, however, much will rely on levels of policing and operational issues. In terms of economic development impact, the station areas have become a focus for development of infrastructure to support informal trade. Furthermore, through commitment of public investment, it has been possible to provide the preconditions for the private sector commitment to the business district. It is clear that the Khayelitsha CBD has created the highest level of awareness amongst respondents, with a high number believing that development will improve quality of life. Interventions in Mitchells Plain have perhaps been less evident although for respondents that were aware of the projects, the majority felt that they would improve quality of life. Comment: Significant resources have been allocated across spheres of government to 61 the development of these nodal areas, particularly the Khayelitsha Business District and have mainly taken the form of physical infrastructure such as roads, public transport facilities, new social facilities and bulk services (with impacts on job creation mostly in the form of temporary construction phase jobs). In cases such as the KBD and MPTC it is likely that these interventions have at least contributed to leveraging private investment in the form of retail centres, though the economic development/job creation benefits of these investments are often questionable. Generally impacts of public (and private) investments are likely to be felt by significant numbers of people due to the strategic location of the projects. The nature of the impact in relation to these nodal development generally relates to improving of access to certain social and economic opportunities, which in many (health, access to grants) cases is critical as well as the citywide public transport system (although operational issues should be noted – see section 3.2.1). The level at which investments in these nodes further catalyses major new private investment is questionable though (when considered within the 16 context of the City). Private lead development is often focussed elsewhere . Nevertheless, the creation of small scale economic opportunities (such as for informal trade) does have the potential to enable further local economic development. Beneficiary perceptions reflect that the KBD in particular has generated high levels of awareness and perceptions that it will improve quality of life for most respondents. To ensure that the impacts of nodal development are realised, there is a parallel need to ensure that soft programmes as well as operational budgets compliment these high impact development areas. Ensuring vibrancy and vitality of these nodal areas require not only infrastructure but good services (cleansing, policing) to avoid decline. At this point it is not clear whether additional operational resources have been allocated in this regard, however issues have been experienced with the management of newly developed public spaces. 16 See City of Cape Town, 2002 62 3.3 Human and Social Capital Formation 3.3.1 Education and skills development (a) Baseline status (i) Levels of Education Levels of education have been determined from 2001 census statistics. In Khayelitsha, the following points are noted in this regard: • Levels of education are relatively low in Khayelitsha; • 75.7% of adults’ highest level of education is less than a Source: City of Cape Town 2005a matric certificate; • Only 4.3% of adults have any form of post-matric qualification. In Mitchells Plain: • Education levels are relatively low; • Almost 75% of adults do not hold a matric qualification; • Only 3.9% of adults hold a post matric qualification. Figure 24: Highest Level of Education for Adults Age 20+ (Mitchells Plain) Source: City of Cape Town 2005b) 63 (ii) Physical Infrastructure In terms of physical infrastructure there are 37 primary, 15 secondary, 2 high schools and 1 tertiary college in Khayelitsha. In Mitchells Plain, there are 46 primary schools and 17 secondary schools. (City of Cape Town, 2006b). Khayelitsha is a specific problem area in terms of infrastructure provision with its growing population and preexisting backlog in school provision. Partly due to the infrastructure backlog, overcrowding remains a huge challenge in some schools in Khayelitsha in 2006. (Dugmore, 2006). Furthermore, it seems that the slow increase in enrolments within the Further Education and Training (FET) sector is at least in part due to an under-provision in the number FET facilities as well as staff shortages, both linked to budget constraints in this regard. (b) Progress in service delivery The Provincial Department of Education is responsible for the development of schools in the URN, as well as running certain training programmes, often indirectly, through partners such as the Good Hope College. However, other actors within government also perform a training role including the Department of Labour as well as programmes sponsored by the Department of Economic Development. In terms of physical infrastructure development in Khayelitsha (2001-2006) the following projects have been completed by the Department of Education: • 2 secondary schools (both in 2002) • 3 Primary schools (two in 2003 and one in 2004) • Upgrading of one FET facility Furthermore, the construction is underway of: • 3 new primary schools • 3 new secondary schools One new primary school and a new secondary school were developed in Mitchells Plain. (Pers comm. I Jakoet, 2006). In addition, a (FET) college is being designed at present. The department of education has also been responsible for the Khanya programme related to the roll out of computer facilities to all schools in order to promote learning and maximise educator capacity by integrating the use of appropriate, available and affordable technology (mainly computer technology) into the curriculum delivery process (www.capegateway.gov.za). 64 (c) Beneficiary perceptions Beneficiary perceptions of policing services were gauged during the 2006 survey. Results are reflected in Table 17. • Facility/staff shortages are likely to impact negatively on the quality of education in the node. No clear indication of the extent of this issue is available. • In general, most respondents to the survey were satisfied with the level of education services, although one in five respondents from Khayelitsha was either dissatisfied or highly dissatisfied in this regard. This seems to reinforce the indication provided by the quantitative data that service delivery backlogs and related issues are more severe in Khayelitsha. 2. Type of impact (qualitative) 3. Perceptions Table 17: Level of satisfaction with education services Satisfaction with service Khayelitsha Mitchells Plain No. % No. % Highly satisfied 117 21.39 67 14.79 Satisfied 254 46.44 306 67.55 Uncertain 70 12.8 25 5.52 Dissatisfied 62 11.33 44 9.71 Highly dissatisfied 44 8.04 11 2.43 Total 547 100 453 100 • Source: City of Cape Town 2006a (d) Assessment 1. Magnitude (quantitative) • • • Comment: • • • • It is clear that backlogs in Khayelitsha in terms of access to education facilities persist. Overcrowding is a major issue at a number of schools, although the scale of the issue is not clear from existing information. In terms of delivery, infrastructure development to date has been focussed on Khayelitsha, though potentially at a scale which has not made significant enough impacts on backlogs. It is likely that staff capacity shortages reinforce apparent under provision in terms of infrastructure as the general shortage of teaching staff is an issue in the Province. In terms of infrastructure development there has been a recent acceleration in budget allocation for schools in the Khayelitsha area, which seems to be required bearing in mind the overcrowding issue. Infrastructure development including the development of schools and installation of technology are critical aspects of improving the impact of delivery and are likely to have a positive impact in improving convenient access to schooling as well as enabling improved levels of computer literacy respectively. However there is a concern around the level to which human resource capacity in the form of quality teachers can be raised. This needs to occur to improve the quality of education as well as further contributing to reducing overcrowding. Furthermore, whilst there are opportunities to develop on training beyond basic schooling, it appears as if interventions have been limited in relation to addressing the low levels of post matric qualification in the node. Accelerating the provision of training and skills development beyond schooling is essential to address high levels of unemployment. 65 3.3.2 Justice, Crime Prevention and Safety (a) Baseline status Baseline information in terms of crime statistics for the URN is available as Annexure 5. In terms of physical infrastructure to support safety and crime prevention, information indicates a significant shortfall in the number of police stations in terms of the population of the two areas. (see City of Cape Town, 2006b). (b) Progress in service delivery With crime a significant issue in both URN, considerable attention has been focussed in this sector, particularly in Khayelitsha. Clearly a multi-dimensional problem, the provision of programmes and services in this regard is multisectoral. Principal responsibility for crime prevention in the URN lies with the Department of Community Safety (DOCS) and South African Police Services (SAPS). However, the Metro Police and the URP have also made a strategic contribution to this work. The Department of Justice is also a significant service provider, as is the Department of Correctional Services. The Department of Education is also committed to a crime prevention programme at schools in Khayelitsha and Mitchell’s Plain. In 2004/05 approximately R1 000 000 and R600 000 were committed in these areas respectively to the following programmes: • Substance abuse • Disaster Management • Safety awareness • Gang violence interventions • Sports against Crime • Safety Clusters • Youth development programmes Key initiatives within the URP include: • The Peace and Development Project (PDP) is a jointly funded DOCS and URP project which trains unemployed youth as peace and development workers on a voluntary basis. 110 youths have been trained in Khayelitsha. It is anticipated the project will extend to Mitchell’s Plain in 2007. • Violence Prevention through Urban Upgrading (VPUU) is a crime prevention programme in Khayelitsha initiated by the CoCT in partnership with KfW (German organisation). Although still in its start-up phase, it is anticipated that 66 considerable programme. • funding will be contributed to the A Diversion programme between the CoCT and Correctional Services to allow B-Offenders to do community service at public facilities in Mitchell’s Plain (c) Beneficiary perceptions Beneficiary perceptions of policing services were gauged during the 2006 survey. Results are reflected in Table 19. Table 19: Level of satisfaction with policing In relation to infrastructure development and staff capacity, progress is reflected in Tables 18. Satisfaction with service Khayelitsha No. % No. % Highly satisfied 78 14.26 40 8.83 Satisfied 153 29.97 256 56.51 Uncertain 46 8.41 29 6.4 2005/06 Dissatisfied 117 21.39 83 18.32 K Highly dissatisfied 153 27.97 45 9.93 Total 547 100 453 100 Table 18: New (n) & upgraded (u) police and justice facilities & personnel in the URN Police station 2003/04 2004/05 K K MP 2 (n) 1 (u) MP 90 SAPS staff Source: City of Cape Town 2006a 1 (n) Juvenile Courts 1 Community Court (d) 1 (u) Magistrates Court 2 Magistrates Community Peace workers MP Mitchells Plain 55 Source: Lekotla 2007; Imbizo 2005; Lekotla 2005 55 Assessment 1. Magnitude (quantitative) • • During the four financial years for which crime related data was available, there has been a significant reduction in crime in Khayelitsha in almost all categories. It is likely that the additional police stations and levels of policing have impacted positively on the area. However, during the same period, crime statistics in Mitchell’s Plain are not as positive. Whilst there has been a reduction in serious crimes such as murder, attempted murder and rape, there are increases in crimes that reflect poor socioeconomic conditions. These include assault, 67 • • • • 2. Type of impact (qualitative) 3. Perceptions • • indecent assault, neglect and ill-treatment of children, and drug-related crime. Car robbery, cash in transit robbery and theft of vehicles are also more prevalent. The URN has benefited from investment in infrastructure in both the justice and crime prevention sectors. Khayelitsha will see a significantly larger injection of capital and focus through the PDP and VPUU projects. The focus on projects designed to address issues of crime has improved over the three years of the URP's operation. Of all the CoCT projects in the URN in 2003/04, only one in Mitchell's Plain (or 3% of the total number of CoCT urban renewal projects focused on Mitchell's Plain) related directly to safety and security. In the same year, no projects identified with this issue were initiated in Khayelitsha, despite crime being identified as one of the key issues to address. By 2005/06 a number of projects, in both urban renewal areas, were identified and significant funding input anticipated. Innovative approaches to tackling the issue of crime have been identified through the VPUU pilot and the PDP project. Within this sector, the URP does appear to have improved intergovernmental co-operation and service delivery. Whilst generally not the core business of local authorities, the City has begun to identify areas in which it can become involved in this sector – directly through the metro police, but more indirectly through support for initiatives such as the PDP and VPUU. Whilst initiation of these projects may not have emerged directly through the URP, the designation of the URN appears to have drawn the focus of such initiatives to the node. However, the levels of crime in Cape Town have drawn national (political) attention in recent years. Khayelitsha, in particular, had already been identified as an area in critical need of attention, with exceptional levels of crime, and it is unclear whether this imperative may not have brought focus and funding to the area in any event. The construction of new and upgraded police stations and the construction of justice facilities generally have long lead in times and may have been identified prior to initiation of the URP. High levels of dissatisfaction (almost 50% of respondents) have been recorded in relation to policing services in Khayelitsha. A higher satisfaction rating was displayed by respondents from Mitchells Plain. Comment: Safety and security, and addressing the high levels of crime in the URN have, since the project’s inception, been seen as a key strategic thrust. However, as a multi-dimensional problem, it is difficult to clearly identify specific and direct impacts of the URP on levels of crime. The extent of the problem in these areas demands, and is now receiving, high levels of attention from all sectors within government, from education, to health and obviously justice and crime prevention. However, the identification of these areas as an urban renewal node no doubt reinforces this focus. 68 3.3.3 Health In Khayelitsha, in particular, these facilities have proved to be hopelessly inadequate with regard to levels of need. Staffing and available equipment has also been a significant concern. (a) Baseline status (b) (i) Health Indicators The functional responsibility for the health services in the URN lies both with the Provincial Department of Health and the CoCT’s City Health. Baseline indicators (2001) have not been forthcoming beyond those reflected in the tables as part of section (b). Nevertheless, an impression is generated using these indicators of issues in the URN related to high levels of HIV/AIDS (ii) Progress has been made in the development or upgrading of service infrastructure (clinics) during the period 2001-2006, including: • Provision of a new one-stop TB/HIV Centre at Site B; • The provision of new or upgraded facilities, including a 24 hour Rape & Survivor centre at Site B (upgrade of Mathew Goniwe Clinic); and Kuyasa Clinic and Youth Facility Site C; 6 clinics in Khayelitsha (managed by the City of Cape • Specialist rehabilitation facilities at Lentegeur Hospital Town), one 24-hour hospital (Nolungile CHC) as well as two day hospitals (Site B and Michael Maponwane) all managed by the Provincial Government. Apart from these facilities, health related expenditure in Khayelitsha has focussed on: Physical Infrastructure Baseline physical infrastructure for the provision of health services included: • • Progress in service delivery 8 clinics in Mitchells Plain. In Mitchells Plain non-spending has focussed on: 69 ANCHOR PROJECT: HIV/AIDS AND OTHER HEALTH RELATED PROJECTS (KHAYELITSHA) One of the URP Anchor projects is the CoCT’s City Health programme in Khayelitsha, focussing on HIV/Aids and other health related issues. The programme is a multi-stakeholder, intra-governmental partnership and includes: • Infrastructural improvements and new developments in Khayelitsha (as outlined) • HIV/Aids programmes including Mother to child • Chronic Diseases • Health promoting in schools • Internal Human Capital The Department’s of Health, both at Provincial and Local level do establish key performance indicators and regularly monitor their programmes. In this regard, several performance measurements are reflected in the tables below in relation to trends in service provision and related indicators: transmission programme ; • TB programmes; • Management of childhood illnesses pilot roll-out; Table 20: Measurement of Key Performance Indicators: Health Service - Khayelitsha Community based sanitation, hygiene and de-worming intervention. Within the City’s programme, the total project requirement Output 2003/04 to 2006/07 is approximately R41 127 000 immunised • 2001/02 2002/03 2003/04 Increase # children 1 yr or < who are fully Infant mortality 42 2004/05 2005/06 101% 92% 36 (deaths/ 1000 live births) Within the PG:WC, the URP has been linked to the Social Capital Formation Strategy, introduced as one of the lead strategies of the Provincial Government’s Ikapa Elihlumayo. Thus, the Department of Health’s metropole Social Capital project is based in Khayelitsha and Mitchell’s Plain. The key focus areas are: • Child Health through IMCI programme, focussing on Diahorrea and Immunization HIV infection rate in pregnant women 24.9% 33% Availability ARV sites of 3 5 # patients ARV on 2979 2500 Mother to child HIV transmission 30% 5.6% 70 rates Increase coverage VCT to 7.8% those 15 years or older TB increase new smear positive cure rate 64% 74% Increase VCT coverage to those 15 years or older 7.8% TB increase new smear positive cure rate 70% Increase # women (30 – 59 yrs) Increase # women (30 – 59 6.5% yrs) screened for cervical cancer 74% 6.5% screened for cervical cancer Source: Provincial Department of Health; Lekotla Reports 2004, 2005, 2007; Imbizo Report 2005; Source: Provincial Department of Health; Lekotla Reports 2004, 2005, 2007; Imbizo Report 2005. Table 21: Measurement of Key Performance Indicators: Health Service – Mitchells Plain 2001/02 Output 2002/03 2003/04 Increase # children 1 yr or < who are immunised 2004/05 2005/06 93% 92% fully Infant mortality (deaths/ 1000 live births) HIV infection rate in pregnant 16 4% 20 (c) In Khayelitsha, health is one of the more pressing issues (whilst it does feature in Mitchells Plain but to a far lesser extent)17. In this regard, research has indicated several important indicators of the seriousness of the issue to residents: • Respondents rated the health as the fifth most pressing challenge in the Khayelitsha. • The sixth most important need expressed was for 12.9% women Availability of ARV 0 projects focussing Khayelitsha. 1 sites # patients on ARV Mother to child HIV transmission rates Beneficiary perceptions on Aids by respondents from 671 30% 7% 17 see City of Cape Town 2006a. 71 • The seventh most important need expressed was for health projects in Mitchells Plain. (d) Assessment 1. Magnitude (quantitative) Table 22: Level of satisfaction with health services • • • Satisfaction with service Khayelitsha Mitchells Plain No. % No. % Highly satisfied 94 17.18 51 11.26 Satisfied 154 28.15 275 60.71 Uncertain 33 6.03 23 5.08 Dissatisfied 118 21.57 69 15.23 Highly dissatisfied 148 27.06 35 7.73 Total 547 100 453 100 • 2. Type of impact (qualitative) • 3. Perceptions • Source: City of Cape Town 2006a Testing perceptions of awareness of the HIV/Aids and health programme in Khayelitsha (an anchor project) and its impact on quality of life indicated that: • Approximately 55% of households were aware of the Khayelitsha HIV/Aids programme. • 68% of Khayelitsha respondents believed it had a positive impact on quality of life. Service delivery in the URN has seen certain improvements over the past five years. Achievements have been made in respect of provision of ARVs and beginning to address the significant backlogs in health facilities, particularly in Khayelitsha. Whilst it is difficult to identify progress with regard to the specific indicators, the clearest area where progress is evident is in the prevention of mother to child HIV infection and this programme appears to have been a major success. Furthermore the roll out of ARV seems to have increased (although this programme was initiated by Doctors Without Borders and the Treatment Action Campaign, during 2001 in collaboration with the PG:WC, rather than as a UR initiative) The sector has established innovative approaches to its service delivery responsibilities. Which is likely to have a positive impact on the quality of service delivery This includes the formation of Multi Sectoral Action Teams (MSATS), comprising NGOs, CBOs, faith based organisations, businesses and local officials. The MSATS develop and drive a local response to HIV, Aids and TB. A clear divergence in perceptions regarding health services is apparent. In Khayelitsha, a high proportion of respondents (more than 48%) reflect dissatisfaction in this regard, whilst in Mitchells Plain perceptions reflect levels of satisfaction. Comment: Progress has been made both in terms of the development of physical (supporting) infrastructure and the roll out of health related programmes. Programmes have specifically focussed on HIV/AIDS interventions in Khayelitsha. Significant progress has been made, during the measurement period, with regard to the prevention of mother to child HIV infections and well as rolling out ARVs. Despite progress, beneficiary perceptions indicate high levels of 72 dissatisfaction with the health service. This is likely to be due to the low levels of service in relation to population numbers and in particular the lack of hospital facilities, staff (doctors) and equipment which is likely to be a persisting problem (see KfW, 2002). As with many of the issues in the URN, the underlying problem of poverty, lack of employment, poor nutrition and overall poor living conditions mean that health interventions impact on only some dimensions of the problem, and such interventions have to be multi-dimensional in themselves. Levels of environmental health in informal settlements in particular are poor and contribute to the spread of communicable diseases. In terms of the impact of urban renewal on health service provision a number of points are noted: • Whilst HIV/AIDS prevalence in Cape Town is well below the national figure, its prevalence in Khayelitsha (and Nyanga) in 2004 was as high as, or higher than the national prevalence. The imperative to focus interventions in this area therefore were already in place before the selection of the URN. The key focus within this sector has been on Khayelitsha, and interventions in Mitchell’s Plain do not appear to bear a direct relationship to its status as an URN. • It is speculated that where inter-departmental co-operation is already effective, the URP has been able to effectively support initiatives by drawing more funding than might otherwise have been the case. But it appears unable to significantly influence departmental co-operation independently. • The on-going drive at provincial and local level to ensure equitable service delivery in all sectors, including health, appears to be a significant factor influencing the extent to which the service has focussed on the areas of Mitchell’s Plain and Khayelitsha. Other provincial programmes, such as the Provincial 2010 Health Care Plan and the Social Capital Formation Strategy, introduced as one of the lead strategies of the Provincial Government’s Ikapa Elihlumayo have also had a significant influence in directing service delivery. It is difficult therefore to clearly ascribe improvements (or otherwise) in service delivery to designation as URN. • Co-operation between the Provincial and City Health Departments appears to be very effective, although this is likely to relate more to relationships developed in years prior to the inception of the URP. There are also national discussions regarding the integration of the primary health care services at metro level, indicating broader imperatives to integrated and co-operative service delivery. In summary, despite progress, it seems there remains much to be done to address poor levels of health, particularly in Khayelitsha. Some of this intervention will come from the health sector including: • New district hospitals which are to be developed in the Khayelitsha CBD and at the Lentegeur Hospital in Mitchells Plain. • Continued roll out of a variety of health programmes (HIV/AIDS, TB, Maternal and child health, community based de-worming etc) A concern remains in terms of the human capacity to address the high levels of need and resources need to be forthcoming to support new infrastructure as long queues, waiting times at clinics remain a major challenge. Furthermore, physical interventions to improve the quality of the environment and improved job creation efforts at the broader level are critical in relation to improving community health. 73 (b) 3.3.4 (a) Baseline status Key baseline indicators in relation to levels of economic development of the population of the urban renewal node reflect that in Khayelitsha • In terms of the official definition of unemployment 50.8% of the population was unemployed at the time of the 2001 census and increase from the previous census. • The majority of households (72%) have a household income less than R1600 per month (i.e. below household subsistence level). In Mitchells Plain: • In terms of the official definition of unemployment 29.7% of the population was unemployed at the time of the 2001 census, an increase from the previous census. • Progress in service delivery Economic Development Support 35.3% of households have a household income less than R1600 per month (i.e. below household subsistence level). Responsibility for Economic Development initiatives is held both by Province and the CoCT, although not exclusively within the Economic Development Departments. Focus in terms of providing economic development has included: • The provision of training, skills development and business support. In this regard a number of programmes have been initiated in the URN by both the Province and City including: o The Red Door initiative (PG: WC driven), which provides assistance particularly to emerging entrepreneurs. Red Door centres have been developed in both Khayelitsha and Mitchells Plain o Business support vouchers o Entrepreneurship matchmaking partnerships o A range of direct training initiatives (e.g. leather and candle project, mattress making, compute illiteracy training, construction sector skills 74 training, skills training in film sector and youth entrepreneur training)18. • The provision of physical infrastructure such as: o The development of market stalls o The development of the Lookout Hill tourism facility in Khayelitsha Robust and consistent indicators measuring the impact that these initiatives have had during the URP have not been determined and measured by the line departments, although some measurement has occurred including the following: • The issuing of business support vouchers in Khayelitsha (336) and Mitchells Plain (736) in (2005/06). • Entrepreneur matchmaking BEE partnerships Khayelitsha (17) and Mitchells Plain (9) in (2005/06). • (c) Beneficiary perceptions During the survey conducted, respondents in both Khayelitsha and Mitchells Plain rated jobs and unemployment as the second most pressing challenge facing the areas. Respondents were also asked to rate the impact of URP projects on household quality of life during the past 3 years. In this regard, Table 23 reflects outcomes. in Red door assistance to 7831 entrepreneurs in Mitchells Plain (2005/06) although not measured in Khayelitsha. In terms of patterns of investment, funding for capacity building and training in the node has increased from 2003/04 to 2005/06. In terms of physical infrastructure to support economic development, most investment was made in 2003/04 when the Lookout Hill tourism facility was developed. 18 Spending on infrastructure (such as the development of informal markets) tends to be initiated and driven by departments outside of the economic development sector. Much of the funding for skills training has also been provided by the Table 23: Impact of URP projects: job opportunities on household quality of life Project Impact of URP Projects Yes Some None Worse Total N % N % N % N % N % Job opportunities: Khayelitsha 4 0.7 50 9.1 73 13.4 420 76.8 547 100 Job opportunities: Mitchells Plain 4 0.9 60 13.3 125 27.6 264 58.3 453 100 Source: City of Cape Town 2006a Provincial Department of Social Development and the Department of Labour 75 (d) Assessment 1. Magnitude (quantitative) • • • 2. Type of impact (qualitative) • • 3. Perceptions • • During the three financial years for which data was available, funding for both LED projects and economic infrastructure in the URN has increased. Considering the low baseline status in terms of economic indicators (as well as skills levels) the ‘softer’ programmes run are likely to have limited (though not entirely insignificant) impact on significantly improving economic livelihoods. Other quantitative outputs have not been measured on a comparative basis and it is difficult to make assumptions in this regard. The projects and programmes run are have impacted mainly on facilities available to informal business (infrastructure) and on the ‘softer’ side on skills levels through the roll out of training programmes. Information regarding the degree to which these training programmes have been successful in producing individuals with appropriate and marketable skills has not been identified through the course of this study. Perceptions of the impact of projects and programmes on job creation are generally negative, with more than three quarters of respondents indicating that the situation has worsened. This is likely to reflect the rather limited impact that local projects and programmes are likely to have on levels of job creation and economic development. Selected interviews have highlighted certain issues which have impacted on service delivery in this sector. They include: • Coordination is an issue - there is limited guidance from an overall URP perspective individual and services are expected to make some (unspecified and within their own pre-existing budget allocations) provision for projects in the urban renewal areas, to determine the nature of and drive such projects, and report progress to the interdepartmental URP meetings. • With project programmes being drawn up, funded and managed individually within line departments, and URP-led inter-departmental meetings principally directed to progress reporting, post-project management is frequently poor as operational services are unable to provide the funding or staff to maintain the project or facility. It is clear that Khayelitsha and Mitchells Plain are unlikely to ever be major hubs of economic activity. Potential for an increase in economic activity exists, but generally at rather local and low levels. An emphasis on ‘softer’ skills and training programmes from within and beyond this sector is thus likely to be key to improving the economic prospects of the local community. Beneficiary perceptions of levels of job creation will only alter once residents have the skills necessary to participate in the broader economy. Public works programmes cannot be relied on to absorb those in need of jobs. Typically the nature of these jobs is temporary and thus unsustainable. Comment: Progress has been reflected in the development of economic infrastructure and skills programmes. In relation to the former, however, issues have been experienced in terms of the impact that major initiatives such as the Lookout Hill tourism facility are having on the economic prospects of local communities, often due to operational issues. 76 4. PRELIMINARY GOVERNANCE AND INSTITUTIONAL SYSTEMS ASSESSMENT: The lack of human capacity and specialist equipment is reflected by the example below, which reinforces this issue: “A severely traumatised young man with 40% burns on his body spent 24 agonising hours at Khayelitsha Day Hospital before being transferred to GF Jooste Hospital in Cape Town. He then lay in a general ward for over a week, his chances of survival rapidly diminishing, because Tygerberg’s specialised burns unit said it had no room for him”. (Cullinan K, 2006) This section does not and cannot undertake a comprehensive review of institutional systems in relation to the performance of all sectors in the context of the urban renewal programme. Neither can it undertake a comprehensive review of levels of cooperative governance within government and between government and external role players. It does, however, highlight several areas of concern and progress in relation to the above, using examples in support of statements where available. 4.1 Institutional capacity remains and issue Issues with regard to human capacity shortages have been recognised by the PG:WC as reflected in the recent Medium Term Budget Policy Statement (2007-2010) which determines a course of action in this regard including inter alia: • It is clear that. to some extent at least, service delivery is hampered by the shortage of human capacity within line departments. The URP seems to have had a limited impact on altering this situation. In particular, it seems health services are impacted negatively in this regard. Studies have identified a lack of doctors as being an issue as nurses are often required to perform functions outside their scope of responsibility. (KfW, 2002). Hiring of additional health care professionals to lessen staff shortages; • 24% of additional funds available through the equitable share targeted for increased remuneration in health and education. Clearly there are resource constraints in terms of a range of services and functions (beyond the health and education sector) and it will be necessary to understand these needs and 77 act to improve human resource levels to accelerate and improve the quality of service delivery in the URN. • A relatively high degree of concurrency in the implementation of infrastructure as part of significant UR projects (such as housing initiatives and a number of the anchor projects, particularly nodal projects – see section 3). • Establishment of the urban renewal unit within the City of 4.2 Coordination between and within spheres of government remains an issue Cape Town which is tasked with fostering greater harmonisation and alignment around the URP. It is clear that the multi-dimensional nature of the issues facing the residents of Khayelitsha and Mitchells Plain necessitates action across a range of service delivery departments. To a significant extent, the extent to which various responsible agencies are able to coordinate their actions and spending determines the effectiveness in the level of impact that these interventions are likely to have. In this regard, URP has had a number of positive impacts on processes of coordination within government, whilst it is acknowledged that challenges remain. 4.2.1 Achievements • 4.2.2 The drafting of a multi-sectoral business plan to guide intervention in the node. Challenges Despite progress experienced during the first five years of urban renewal, the impact that the programme could make on altering the institutional relations to achieve greater service delivery impact was hampered by: During the 2001-2006 period, the URP has impacted positively on institutional arrangements to foster greater alignment in a number of respects including: • • The slow take up of urban renewal as a focus in the City of Cape Town (it was only initiated within the local government in the City in late 2003) which stalled dialogue between spheres of government around the programme. • In this regard, it has been noted that before 2003, The formation and operation of intergovernmental structures focussed on promoting the coordination of planning, budgeting and implementation. The Multistakeholder Forum (MSF) fulfils this role for the URN (although representation is wider than government). planning officials within the City of Cape Town, responsible for Khayelitsha and Mitchells Plain as well as 78 the then director of Planning had attempted to drive the cause of the programme. At that time, however, there were no formal institutional structures or personnel tasked with responsibility for the programme. It proved extremely difficult to gain commitment from key role players in the City (including senior politicians) with regard to the URP. Essentially projects underway within the two nodes in 2001 and 2002 became part of urban renewal, rather than the programme influencing the selection and prioritisation of projects. (Graham, pers comm, 2006). • Line departments tending to be influenced more strongly by sector imperatives than ‘multi-sectoral’ planning initiatives (despite the existence of the URP business plan). • A level of ad-hoc project identification. • Lack of prioritisation of urban renewal by line functions. • The URP unit, tasked with coordination activities, which appears to be under-resourced. 4.3 Levels of partnership with external stakeholders have been achieved, but challenges remain One of the preconditions for effective project implementation and maximisation of impact of service delivery is the degree to which effective partnerships have been formed between government and external stakeholders. In this regard, it seems that the URP has, at minimum, provided some momentum to efforts to forge partnerships with external role-players, despite significant challenges. 4.3.1 Achievements Key achievements in this regard include: • Pioneering partnerships with the private sector. A specific example of such a partnership is that between the City, and a local community organisation and private sector in the form of Futuregrowth and RMB which enabled development of the retail centre in the KBD. (It is, however, difficult to determine what impact the URP had on the formation of this partnership). • Strong levels of community involvement in the URP, specifically in Khayelitsha where the Khayelitsha Development Forum (KDF) has been active. At the 79 project level urban renewal efforts have had a strongly positive impact where community engagement been strong. As a means of example, strong community involvement in a safety audit in Tafelsig lead to the identification of key design solutions (and a-spatial program interventions) to improve levels of safety and access to facilities19. 4.3.2 • At the project level, in some cases a lack of communication between implementers and communities. Challenges To some extent, the lack of formation of strong partnerships has been a significant downfall and at times a hindrance to effective service delivery in the node. In this regard, several challenges are noted: • The nature of involvement of the MPDF (now defunct) in the URP, which at times acted as a ‘gatekeeper’ and was, to some extent, driven by individual agendas. (see also City of Cape Town, 2006c). • Sometimes problematic (power) relations between community forums and existing structures (such as ward committees). (City of Cape Town, 2006c). 19 As part of the Taflesig Youth and Family Centre and public space upgrade. 80 5. CONSIDERATIONS EMERGING FROM THE ASSESSMENT The assessment focuses dominantly on: • Levels of impact of service delivery (2001-2006) across a range of sectors • The extent to which the URP has impacted on service delivery and related institutional arrangements (as well as pointing to particular challenges) enabling effective service delivery The outcomes of the assessment as well as specific inputs during the engagement process point to several areas which require further attention. 5.1 Service delivery: focus areas The sectoral review of line function delivery may lead to the conclusion that sectors where backlogs are high require sector intervention. Interventions should, however, not be purely reactive to existing challenges if maximum developmental impact is sought. There are clearly ‘hot-spot’ issues that need to be dealt with relating in particularly to basic service provision as government is obligated to provide in terms of constitutional requirements. However, the assessment highlights the interlinked and multi-dimensional nature of the challenges facing the urban renewal node. It also highlights that, from an impact perspective, projects that have taken on a multi-dimensional approach have been most successful. As a means of example, it has been highlighted that addressing issues related to crime and health are linked clearly to the need for additional resources for ‘softer’ programmes to improve levels of policing and health care as well as infrastructure and equipment necessary to perform these functions. These types of interventions in many cases, however, only address some of the symptoms rather than the root cause of the issues. Coordinated efforts need to be made in other spheres, which are likely to, in many cases, have more significant long term impacts on these issues in the area. Using this approach as a starting point, priority issues (including health, crime and economic development) need to be taken into account by a far wider number of sector departments than is currently the case. For example, infrastructure lead projects need to ensure that development outcomes support a-spatial concerns such as creating safer, environments (with less dangerous undeveloped spaces) and environments that support opportunities for economic activity. 81 Through a number of the anchor projects (e.g. interventions linked to the Tafelsig public space upgrade), these approaches have been initiated. If and when new anchor projects are identified for the node it is critical, if they are to maximise impact on residents’ quality of life that they incorporate these considerations. Figure 25: Project/programme process incorporating M&E 5.2 Developing effective systems of monitoring and evaluation Effective reporting, monitoring and evaluation on the projects and programmes of government, in this case within the URN, is essential if strategy is to be reflected upon and adjusted if desirable outcomes are not being achieved (Figure 25). In the context of this study, certain aspects relating to M&E have impacted on the level to which the impacts of government intervention can be assessed in the node. In particular, efforts have been hampered by: • The general lack of monitoring over time by line • The lack in consistency of measurement of progress in delivery (both in terms of actual measurement as well as the indicators used) • The lack of an overall rigorous M&E framework for the URN, which potentially relates to city-wide issues. It is clear that intervention is needed to strengthen M&E systems including: • Development of meaningful indicators (beyond purely budget spend) within line departments to measure the impact of projects and programmes. • The management of information around measured indicators to ensure that for evaluation and assessment purposes information is easily accessible. • Strong channels of communication between the URP unit departments of the implementation of projects and programmes. • The lack of development of quantitative and/or qualitative indicators or informative and useful measures of impact by line departments which is responsible for monitoring this programme and 82 line departments (implementers) to enable effective reporting and coordination of information requirements. 5.3 Strengthening institutional capacity and coordination The impact assessment identifies the lack of capacity in certain key sectors as hampering the impact of service delivery. This is especially evident within the health sector, but is likely to extend to other functional areas. At present, it is not clear whether the institutional capacity constraints and ‘on the ground issues’ are always clearly understood or form a basis for reallocation or strengthening of human resource capacity20. It should be noted that blockages in service delivery cannot always be attributed to local government. In certain cases, it is often due to problematic patterns of resource allocation or policy (the responsibility for which often rests within other spheres of government). It is thus critical that the URP provides a mechanism for joint prioritisation of issues and commitments in terms of levels of resources which will be made available in this regard. 20 Although in the health sector it seems that the PG:WC is intervening in this regard The assessment, however, indicates that, apart from at the level of certain projects21, which by their nature require input from a number of departments, a ‘higher’, strategic level of coordination of effort (flowing from a clear framework) is not a reality for the urban renewal node. Sector plans generally have far more influence on the allocation of resources and the type of investments in the node than any multi-departmental planning exercise. This institutional challenge has clearly diminished the impact that initiatives could have had in the urban renewal node. 5.4 Strengthening communication Beneficiary perceptions of urban renewal and related projects as emerging from the sample survey reflect (although a minority) a significant number of participants are aware of the programme. Variable results were recorded for each of the projects. Communication, however, goes beyond increasing levels of awareness. 21 Coordination of and information sessions related to projects are generally the focus of MSF meetings. 83 One of the key issues facing government is communicating the direction and focus of interventions and what can realistically be expected to occur within certain time frames. Levels of dissatisfaction (expressed by residents) in relation to certain aspects of delivery seem to suggest that there is a need to manage expectations. Often this form of communication is not politically popular, however, there is a need to ensure that they expectations and perceptions in relation to delivery are informed by a realistic basis for what can be (and has been) accomplished. In particular, areas of service delivery with significant backlogs and major resources required to address them are problematic in this regard. Unless mechanisms can be found to rapidly increase the speed of delivery, roll out of these services are only likely to have significant impact on backlogs over the longer term. Linked to this issue is the need for clear statements and engagement regarding which areas will be prioritised for development and resources and during which time frames. 84 6. CONCLUSION The preliminary impact assessment is limited by the level at which data is collected in relation to service delivery and its impact on people residing in the URN. Many of the conclusions reached are based on This in itself points to the need to evaluation systems both within line how they are able to feed into and initiatives such as URP and the IDP. incomplete information. improve monitoring and departments as well as inform shifts in broader Nevertheless, the assessment pointed to the fact that during the URP period, significant progress has been made in terms of service delivery. Basic services have been rolled out, particularly in relation to new housing developments in both Khayelitsha and Mitchells Plain and in certain informal settlements. However, significant backlogs remain in Khayelitsha, particularly in terms of access to sanitation services. Human settlement infrastructure has been delivered, focusing on public transport infrastructure (mainly in the form of PTIs) and housing development in both areas. However, backlogs in relation to housing in Khayelitsha will require some decades to address at the current rate of delivery. Strategic initiatives at nodal points (e.g. Khayelitsha CBD) are likely to have had the most wide ranging impact, and are likely to be particularly successful when combining softer interventions with hard infrastructure projects. Delivery has occurred which has had a positive impact on levels of human social capital formation both in the form of infrastructure to support delivery (police stations, clinics, schools) and ‘soft’ programmes, however an issue seems to be the lack of human capacity and resources on operations budgets. Issues of institutional capacity, the depth of coordination within and between spheres of government and levels of partnership with external stakeholders do present a constant challenge. In this context, the assessment points to several areas where attention is required within the context of the URP in Khayelitsha Mitchells Plain. These include the need for multisectoral interventions to address key issues within the node, the need to develop effective M&E systems, the need to strengthen institutional capacity in certain key areas and an improved level of communication between government and stakeholders in relation to the programme of action and what can be expected from the URP. 85 City of Cape Town, (2005b): A Population Profile of Mitchells Plain, compiled by Information and Knowledge Management Department, October 2005. REFERENCES Dugmore (2006): BuaNews online, 18 January 2006 (www.buanews.gov.za). City of Cape Town (2007): Presidential Renewal Programme Cabinet Lekgotla Report, Renewal Project, Draft January 2007 Urban Urban City of Cape Town (2005c): Urban Renewal Programme Lekgotla Report, Urban Renewal Project, November 2005 City of Cape Town (2005): Presidential Imbizo Report, Draft 2005/06 City of Cape Town (2006a): Socio-economic Profiling of Urban Renewal Nodes – Khayelitsha and Mitchells Plain, Information and Knowledge Management Department, July 2006. City of Cape Town (2004): Presidential Urban Renewal Programme Progress Report - Khayelitsha & Mitchell's Plain, Urban Renewal Project, November 2004 City City of Cape Town (2004): Urban Renewal Node Progress Report - Khayelitsha & Mitchell's Plain (Lekgotla 2004), Urban Renewal Project, January 2004 of Cape Town (2006b): Urban Renewal Spatial Development Framework for Khayelitsha and Mitchells Plain, Final Draft for Comment, January 2006. City of Cape Town (2006c): Shared Learning from the City of Cape Town’s Urban Renewal Programme. City of Cape Town (2005a): A Population Profile of Khayelitsha, compiled by Information Management Department, April 2005. and Knowledge City of Cape Town (2003): Presidential Urban Renewal Programme Business Plan, Together, building a stronger nation. City of Cape Town (2002): MSDF Review / New SDF: Phase 1 – Spatial Analysis, Trends and Implications www.health-e.org.za/news Cullinan, K (2006): Hospitals in Crisis - Special Investigation 86 Dr. Bitalo, Personal communication, Department of Health, November 2006 Graham, A, pers comm. (2006): conducted on 19 December, 2006. Provincial Telephonic interview KfW (2002): Untitled report Mgquba, B, Personal communication, Removal, City of Cape Town, November 2006 Tisiker, H, Personal communication, Economic Development and Tourism, City of Cape Town, November 2006 Western Cape Provincial Commissioner crime statistics, www.saps.gov.za of Police: www.capegateway.gov.za Refuse and Pers Comm, I Jakoet, telephonic interview, 13 December 2006. PG:WC (2006): Medium Term Budget Policy Statement (20072010), and Adjusted Estimates, Speech delivered by Minister of Finance and Tourism, L Brown. PG:WC (2006b): SIP – Chapter 4, Education Sector. Statistics South Africa (Statssa) (2001): Population Census, 2001. 87 ANNEXURES Annexure 1: WATER & SANITATION PROJECTS & INITIATIVES 2001-2006 IN THE URBAN RENEWAL NODE 1. Water and Sanitation Service Delivery: Quantitative Indicators – Mitchells Plain (2001-2006) • • Total households with access to water Total households with access to adequate sanitation Mitchells Plain: Capital investment Project Location Type intervention of Output Capital spend (R) Indication of community spin-offs (job creation / skills development) 2001/2002 2002/2003 2003/2004 Mitchells Wastewater Plain Mitchells Plain Installation of Infrastructure New Mitchells Plain 698 993 New infrastructure 590 086 CTCHC Phase 3 New water and sanitation reticulation 523 616 CTCHC Urban Renewal: Mitchells Plain Sewer Sanitation reticulation 192 040 Morgenster CTCHC Water reticulation 265 010 Elimination of septic tanks Elimination of septic tanks 655 901 Mitchells Wastewater 1 Plain 243 88 2004/2005 Wastewater Works Treatment treatment upgrade Mitchells Wastewater Works Plain Treatment Wastewater treatment upgrade works 186.77 1 000 000 works 2005/2006 2. • • Water and Sanitation Service Delivery: Quantitative Indicators – Khayelitsha (2001-2006) Total households with access to water Total households with access to adequate sanitation Khayelitsha: Capital investment Project Location Type intervention of Output Capital spend (R) Indication of community spin-offs (job creation / skills development) 2001/2002 2002/2003 Zandvliet Treatment Wastewater Water/sanitation zone - Phase 2 2003/2004 -buffer Wastewater treatment upgrade 2 447 249 works Site C buffer zone Water/sanitation reticulation Kuyasa Phase 2: Water Kuyasa Water reticulation New water reticulation 1 840 219 Barney Informal Water Barney Molokwane Water reticulation New water reticulation 657 679.85 Molokwane Settlement - 824 500 89 Upgrade station sewer Sand and Facility Rag pump Khayelitsha Trap Upgrading of Monwabisi Sewer Pump station Monwabisi/Khayelitsha Zandvliet Wastewater Treatment Works upgrade 2004/2005 Sanitation upgrading station Sand and Facility Rag Trap 1 683 112.11 Sanitation 58 953.82 Sanitation 2 068 302.30 Sanitation – upgrade waste water treatment works 799 076.03 Zandvliet Wastewater Treatment Works upgrade Upgrading of Monwabisi Sewer Pump station – pump 3 949 073 Monwabisi/Khayelitsha Sanitation 46 800 Sanitation 14 763 2005/2006 90 Annexure 2: KEY TRANSPORT, ROADS AND STORM WATER PROJECTS & INITIATIVES 2001-2006 IN THE URBAN RENEWAL NODE 1. • • • • TRS Service Delivery: Quantitative Indicators – Mitchells Plain (2001-2006) New Roads: km (2001-2006) Upgraded Roads: km New public transport infrastructure (e.g. new rail station) Upgraded public transport infrastructure (e.g. upgraded interchange facility) Mitchells Plain: Capital investment Project Location Type of intervention Output Capital spend (R)* Bulk Storm water New bulk storm water linked to housing project 2 005 789 Variety of road improvements: Round about, median island, Speed humps, street lighting, footways Road improvements, footways and related infrastructure. 360 632 Road infrastructure New road infrastructure 2 142 456 Indication of community spin-offs (job creation / skills development) 2001/2002 2002/2003 Storm water CT Community Housing Bulk Storm water Roads Variety of road improvement/pedestrian infrastructure/street lighting projects CT Community Housing Roads Mitchells Plain 91 linked to housing project Victoria Drive Slip lane Road construction New road infrastructure 337 625 Public transport Mitchells Plain Station transport interchange 2003/2004 Mitchells Plain town centre 7 027 142 Storm water Infilling of wet detention ponds Infilling detention pond of 295 037 Variety of road improvements: Traffic calming, street lighting. Traffic calming, street lighting, 228 916 CTCHC Phase 3 Roads Road infrastructure Road infrastructure 1 146 745 CTCHC Phase 3 Street lighting Street lighting Street lighting 96 154 Street lighting General Street lighting Roads Variety of road improvement/pedestrian infrastructure projects Mitchells Plain 875 944 Public transport Lentegeur & Mandalay Station PTIs: Conceptual Design Lentegeur / Mandalay Conceptual Design of PTIs Conceptual design of PTIs 5 006 192 Lentegeur & Mandalay Station PTIs: construction of transport interchange Lentegeur / Mandalay Construction of public transport interchange infrastructure Transport interchange infrastructure 3 325 000 92 Mitchells Plain Station Transport Interchange (east) 2004/2005 Mitchells Plain town centre Construction of public transport interchange Public transport interchange infrastructure 1 189 690 Mitchells Plain Traffic calming, street lights, footways. Traffic calming, street lighting. 428 966 Street lighting Street lighting 105 507 Street lighting Street lighting 177 393 Design/construction of public transport interchange Public transport interchange infrastructure 1 783 328 Design/construction of public transport interchange Public transport interchange infrastructure 30 071 183 Roads Variety of road improvements, street lighting, pedestrian infrastructure Mitchells Plain CTCHC street lighting Westridge street lighting heights Westridge Public transport Detailed design construction interchanges (Lentegeur Mandalay) and of and Design and construction of transport interchange – Mitchells Plain Station 2005/2006 Mitchells Plain town centre Storm water Roads 93 Public transport *Note certain funding sources/items have been consolidated 2. • • • • TRS Service Delivery: Quantitative Indicators – Khayelitsha (2001-2006) New Roads: km (2001-2006) Upgraded Roads: km New public transport infrastructure (e.g. new rail station) Upgraded public transport infrastructure (e.g. upgraded interchange facility) Khayelitsha: Capital investment Project Location Type of intervention Output Capital spend (R)* Walter Sisulu/Steve Biko road improvements Road upgrading Road upgrading 806 586 New local distributor route New road infrastructure New road infrastructure 1 720 900 Indication of community spin-offs (job creation / skills development) 2001/2002 2002/2003 Storm water Roads 94 Griffiths Mxenge Phase 1 Variety of street lighting projects 1 409 754 Khayelitsha (incl Graceland & Silvertown) High mast street lighting. lighting, Rail Khayelitsha Design/planning Street Khayelitsha New street lighting Griffiths Mxenge Minor road upgrading High mast/street lighting 349 021 Public transport Khayelitsha extension 2003/2004 400 000 Storm water Roads Bonga lighting Road Upgrade minor roads Upgrade minor roads Upgrading 4.5km of minor roads and installation of associated storm water system New lighting Street 498 182 1 275 245 Upgraded road and storm water system 2 210 549 New lighting street 486 513 New street lighting Pama road New street lighting Bus routes, Green point, Village 2b New street lighting on major bus and taxi routes New lighting street 1 023 798 Kuyasa bulk roads and storm water Kuyasa New roads and bulk storm water New roads and bulk storm water 4 965 847 95 Public transport Detailed design construction of PTIs and Khayelitsha CBD PTI 2004/2005 Khayelitsha Design and planning related to Khayelitsha rail extension Khayelitsha CBD Design and construction Planning and design of interchanges 2 843 954 486 814 Storm water Roads Khayelitsha Rail extension: construction of two road over rail bridges and two transport interchanges and access roads Khayelitsha 1 051 838 Khayelitsha pedestrian and bicycle path construction Khayelitsha Kuyasa Phase 1 Street lighting Kuyasa Installation lights of street Street lighting 619 499 Kuyasa Phase 2 Street lighting Kuyasa Installation lighting of street Street lighting 313 277 Construction of bulk roads and storm water facilities Khayelitsha Construction of bulk roads and storm water facilities New roads and storm water facilities 477 276 Minor road improvements and high mast lighting Tembokwezi and Minor road upgrade and high mast light Upgraded and high 181 767 Pedestrian bicycle path and road mast 996 935 96 Thembani light Public transport Design and construction of PTI Khayelitsha CBD Khayelitsha CBD Design and construction Planning design interchange and of 1 927 406 2005/2006 *Note certain funding sources/items have been consolidated 3. • Key Strategic Planning Projects for URN (operational expenditure) Mitchells Plain Transport Management Plan (2004) 97 Annexure 3: KEY HOUSING PROJECTS & INITIATIVES 2001-2006 IN THE URBAN RENEWAL NODE 1. • • Housing Service Delivery: Quantitative Indicators – Mitchells Plain (2001-2006) Total houses delivered Total number of serviced sites (note: not including above figure - as part of informal settlement upgrading) Mitchells Plain: Capital investment Project Location 2002/2003 Tafelsig Area L: Silvercity Housing Tafelsig 2003/2004 Tafelsig Area L: Silvercity Housing Tafelsig Type of housing / Output intervention Capital spend (R) Indication of community spin-offs (job creation / skills development) 2001/2002 Mitchells Plain Housing Phase 1 2004/2005 Westgate Morgen Village 21 891 100 units Infill housing: 4705 1 757 504 Westgate 92 units 98 2005/2006 Westgate Morgen Village Mitchells housing housing: Plain infill 1845 units (of 2600) Tafelsig: cnr Kilimanjaro and AZ Berman Drive Tafelsig: cnr Spine Swartklip Roads and Tafelsig: Freedom Park Taflesig: Cnr Swartklip and Tafelberg Road Hyde Park Stabilisation 2. • • Housing Service Delivery: Quantitative Indicators – Khayelitsha (2001-2006) Total houses delivered Total number of serviced sites (note: not including above figure - as part of informal settlement upgrading) Khayelitsha: Capital investment Project Location Type of housing / Output intervention Capital spend (R) Indication of community spin-offs (job creation / skills development) 2001/2002 2002/2003 Kuyasa T3V1 Structures Top Upgrade of Silvertown Green Point (Phase 2) Kuyasa 265 476 Silvertown 2 458 619 99 Housing Project 2003/2004 Eco Village project Kuyasa Kuyasa T3V1: Phase 2 Kuyasa Upgrade of Silvertown Silvertown Kuyasa T3V1: Structures 2004/2005 Top 6 824 975 Platform construction Raised Platform Kuyasa Silvertown: Upgrade 2000 structures Silvertown 354 386 Site C Consolidations Site C Site C Buffer Site C Subsidy housing top structures Green Point (Phase 2) Housing Green Point Platform construction Green Point (Phase 2) Housing Project Green Point Development of 520 subsidy linked houses Khayelitsha : Kuyasa, Town 3, Village 1, Phase 2 Housing Project Kuyasa 92 units (of 2399) (including 03/04) 8 318 741 Nonquabela MLS Phase 2 Housing Project Nonquabela (? of f 600 Units?) 0 Site C Buffer Site C Subsidy housing top structures 75 units (of 165) 520 units Remaining 90 units (of 165) 3 482 396 103 temporary jobs created, 10 people trained including two CLOs 70 temporary jobs created (during construction), 12 persons completed 6 100 week training course Green Point Phase Housing Project 2005/2006 2 Silvertown Silvertown Khayelitsha Housing Project Silvertown 0 units (of 2000) Khayelitsha : Kuyasa, Town 3, Village 1, Phase 2 Housing Project Kuyasa 780 units (of 2399) Site C Buffer Site C 2 Silvertown Khayelitsha Housing Project • • 76 units (of 509) Silvertown, Khayelitsha Housing Project Green Point Phase Housing Project 3. Green Point Green Point Platform construction Subsidy housing top structures 253 312 429 877 Remaining 433 units 365 041 See 2004/2005 Silvertown Key Strategic Projects for URN (operational expenditure) 2005: Khayelitsha Vacant Land Study – database of all non residential land as a database for potential housing opportunities with development options 2006 Housing Summit: to establish how housing opportunities in the nodes and how integration can be affected 101 Annexure 4: KEY SPORTS/ENVIRONMENT, PARKS PROJECTS & INITIATIVES 2001-2006 IN THE URBAN RENEWAL NODE Project 2003/04 Khayelitsha Indigenous nursery M. Plain Khayelitsha 2005/06 M. Plain R250 000 (CoCT) Multi-purpose hall R2 000 000 (CoCT) Dune vehicle M. Plain R45 000 (CoCT) Open Space development R200 000( CoCT) Design Kuyasa Civic node R100 000 (CoCT) Victoria Mxenge Phase 2 R700 000 (CoCT) Upgrade halls R400 000 (CoCT) Monwabisi resort upgrade R650 000 (CoCT) Mandela Park tartan track R6 200 000 (Private/PGWC/CoCT) Planning design purpose hall R410 000 (CoCT) multi- 240 000 450 000 Wolfgat Ecotourism centre R300 000 (CoCT) Bush clearing R500 000 (CoCT) Area cleanup R500 000 (CoCT) Westridge Dune project R300 000 (CoCT) Beacon Valley netball court 78 000 (CoCT) Food gardens upgrade 450 000 (CoCT) & dune School sports field upgrades Environ. Mgmt Fmwk 123 291 200 000 200 000 (CoCT) 200 000 CoCT/PDEAT/UCT 200 000 CoCT/PDEAT/UCT Beautification 200 000 200 000 Bush clearing 197 000 250 000 Strandfontein upgrade Khayelitsha R300 000 (PGWC/CoCT) Sportsfield upgrades Macassar access 2004/05 Pavilion Sports sector summit 200 000 600 000 250 000 75 000 38 044 102 Mandalay upgrade sportfield Project 50 000 2003/04 Khayelitsha 2004/05 M. Plain Khayelitsha 2005/06 M. Plain Harare sports facility Khayelitsha M. Plain 230 000 Eco-schools 120 000 Construct parks: League & Heinz The 22 480 Beach upgrading 500 000 Westridge Community Gardens upgrade 350 000 Fencing Eastridge informal sportsfield 200 000 Fencing Rocklands Lookout Hill 350 000 Upgrade Portlands, Woodlands 400 000 sportsfields Rocklands, Upgrading Colorado Multipurpose Centre 300 000 Heinz Play Park equipment 100 000 Urban farm fencing 100 000 Beach cleaning 200 000 Greening Mandalay Landscaping 250 000 roadway 700 000 EPWP TOTAL R11 255 000 R2 328 000 R837 000 R1 025 000 R1 400 000 R4 033 815 103 Annexure 5: CRIME STATISTICS 104