University Facilities Buying Services from Facilities with Departmental Funds Procedure University Facilities Policy 3.1 Effective date: June 12, 2002 Last Modified: July 15, 2009 Approved by: Steve Copeland Background The University budget allocates funds directly to University Facilities for routine maintenance and operation of University E&G facilities and grounds. This funding is intended to maintain University facilities in the condition in which the facilities were originally provided. Departments must fund discretionary work beyond routine or emergency maintenance with departmental funds. Work Requests Requesting services is described on the University Facilities web site: http://www.clemson.edu/facilities/service_requests/price_quotations.html. Customer service specialists are also available at 656-2186. Please have your departmental account number available for reimbursable work requests. If a department would like an estimate prior to the start of work, the department should submit a University Facilities CUBO 700 Form to University Facilities Minor Projects Section. A Minor Project is established and a unique work request number is assigned for tracking purposes. The work request number should be referred to in all future inquiries and correspondence. Minor Projects (Typically less than $100,000.00) For minor projects, the Construction Services Section within University Facilities prepares a preliminary cost estimate. Two types of project estimates are offered. Project Estimates The requesting department should identify on the CUBO 700 whether they desire a “lump sum estimate” or a “fixed cost estimate.” • “A lump sum estimate” will be provided at no cost and is derived from a brief review of work to be done compared with cost experience on work of a similar nature; a basic description, and if applicable, a concept drawing of the scope of the project may be provided. If the department wishes to proceed with the project, submit the digitally signed CUBO 700 with the account number to fmojobreq@clemson.edu. University Facilities will schedule project. • A “fixed cost estimate” includes a design with drawings and specifications, if required, and a detailed cost estimate for construction. Depending on the complexity of the project, the services of a professional consultant may be required. The development of a fixed cost estimate allows facilities to offer the project at a fixed cost subject to scope increases described later in this policy under Changing Scope or Cost. If a “fixed cost estimate” is desired, submit a digitally signed CUBO 700 along with an account number indicating a “fixed cost estimate” is desired. NOTE: The cost of developing a fixed cost estimate will be billed to the department account on the CUBO 700 regardless of whether the department proceeds with the project. Estimate Status Once a Project Manager has been assigned, an e-mail will be sent to the Requestor of work with the work request number and name of Project Manager completing their work. Requests for information concerning status of a “lump sum estimate” or “fixed cost estimate” should be directed to the Minor Projects Manager. Project Types Minor projects cost may be charged to customers at “actual cost” or at a “fixed cost”. If University Facilities can offer a “fixed cost” on a minor project, the CUBO 700 will be marked with the notation “offered at fixed cost.” Fixed cost work requires a “fixed cost estimate” in order to develop a detailed estimate (see definition of fixed cost estimate under Project Estimates). • Actual cost - The work performed will be billed at the actual cost. This total may be more or less than the estimated cost of the project. • Fixed cost - The work will be billed at the “fixed cost” regardless of the actual cost unless the scope is altered by the user. If user changes in the job scope are required, the fixed cost will be adjusted to reflect the changes. In order to minimize additional charges, the user should limit scope changes after work has commenced. The entire fixed cost amount will be billed to the requesting department during the month of project approval. Additional costs based on change orders will be billed in the month the change order is approved by the department head. After receiving either a lump sum or fixed cost estimate, if the department decides to proceed with the project, all costs incurred including project manager time as well as any outside consultants will be billed to the project. Changing Scope or Cost If a department has elected a “fixed cost” project and desires to make a change in scope, the customer must submit a University Facilities CUBO 701 form to the Minor Projects Section describing the changes. The Minor Projects Section will contact the customer regarding requested changes to their project. A change order signed by the department head must be received in order for work to proceed. The cost of the change order will be added to the project cost resulting in a revised “fixed cost”. Encumbrance Funding Documents submitted from a fixed cost estimate by the Minor Project Section will be for the amount of the fixed cost estimate including the cost of developing the fixed cost estimate. This amount will be encumbered (funds reserved) against the account indicated on the University Facilities CUBO 700 Form. Page 2 of 3 Turn Around Time for Estimates The average turn-around time for lump sum estimates is 30 days. Lump sum estimates take less time than a fixed cost estimate due to the effort involved in developing construction documents and the possible need for outside consultants. Keep in mind that estimated costs are only an estimate of the project cost and not guaranteed. The requesting department should be aware that old estimates may no longer reflect current construction costs. If the department has an old estimate, it is advisable to have the estimate validated prior to committing resources to a project. Reference: University Facilities CUBO 700 Form and CUBO 701 Form Page 3 of 3