FE presentation

advertisement
Electronics Week
Summary
M. Hansen, CERN
January 2012 Electronics week
Session Summary

https://indico.cern.ch/categoryDisplay.py?categId=153

Token Ring operation workshop
CMS common spares workshop
Radiation Effects workshop
DAQ and Online: VME maintenance and uTCA upgrades
uTCA low level software
Firmware Maintenance Review
uTCA Rack and cDCS Integration
B904 workshop (Electronics integration centre)







UPO 20120316
M. Hansen, CERN. magnus.hansen@cern.ch
Token Ring operation workshop

Reminder
 Pixels, Strips, ECAL, RPC slow control (FE
configuration)
 Redundant Ring architecture
 Pixels and ECAL highly vulnerable to TR hardware
failures


Strips (multiple independent layers) and RPC (accessible) less so
General Status
 Pixels, ECAL, and RPC have all rings operational


ECAL has a few dead nodes for which the bypass function is successfully
utilized
Strip tracker has one dead ring with B on and one dead
with B off (!!!)
UPO 20120316
M. Hansen, CERN. magnus.hansen@cern.ch
Token Ring operation workshop

Soft issues (or resettable)
 Pixels
 Strips


A few rings lost communication during operation on a few occasions but still
early days of investigation
ECAL

39 cases of communication loss leading to data taking interruption
 Mainly two different cases detected by DCC going to error

RPC


All OK (Operating with non-redundant configuration)
Significant effort in Strips and ECAL to keep up with soft
issues, software updates, etc.
UPO 20120316
M. Hansen, CERN. magnus.hansen@cern.ch
Token Ring operation workshop


Opportunity to standardize software
 Move to slc5 an opportunity but time too short
Agreements
 All systems will evaluate Tk fecsoftware
 Systems will attempt to align before end 2012
 Deployment of a common version beginning 2013
 Hypernews for communication

Hn-cms-TokenRing
UPO 20120316
M. Hansen, CERN. magnus.hansen@cern.ch
CMS common spares workshop

Goals
 Identify means for track-keeping


Identify candidate equipment


E.g. CAEN mainframes
Detect and mitigate “us and them” attitudes
within CMS

UPO 20120316
E.g. EMDB
Not that there seem to be any problem…
M. Hansen, CERN. magnus.hansen@cern.ch
CMS common spares workshop

Discussion
 The Functionality of and Interfaces to the
Equipment Management Database is almost
there
Spreadsheet import is laborious
 If the EMDB is used from the beginning of a construction project
there is no import step needed.
 The EMDB and its interface development team lacks resources to
react rapidly to requests


The EMDB content need consolidation

Lacks a naming convention, e.g mao, A3486 and CAEN AC/DC is
the same module type but the three names are different
 Suggested to allow for aliases to give a name to a type of equipment
UPO 20120316
M. Hansen, CERN. magnus.hansen@cern.ch
CMS Radiation Effects workshop

Agenda
 Overview of CMS environment and status of SEU
mitigation
 COTS in radiation environment


Mainly FPGA
Goals
 Share experience
 Review requirements
 Review available tools for mitigation of SEU in FPGAs in
CMS
 Review availability of radiation facilities and their usage
at CERN
UPO 20120316
M. Hansen, CERN. magnus.hansen@cern.ch
CMS Radiation Effects workshop

Discussion
Run down of current CMS issues related to Radiation and on-going work to
mitigate
 Run down of FPGAs in radiation from RPC, CSC, DT, HCAL

 Upgrade plans increasing exposure
 Increasing exposure due to increasing dose rates

Short summary of a PH/ESE seminar about SEE effects
 Concludes that tools are effective, radiation tolerant design validation is difficult but
crucial, SRAM based FPGAs (e.g. Xilinx) radiation hard but soft error rate is high, flash
based FPGAs (e.g. ACTEL ProASIC) have less upsets but total dose resistance is limited
and they are ??no longer developed??
Summary of tools available at CERN and elsewhere as well as some test results
 Introduction to CERN mixed field radiation facility, it’s future, and a summary of
experience by a CMS user

 Dt used the facility in 2011

N.b. FPGA in radiation is a hot subject: part of program @
e.g. TWEPP2012
UPO 20120316
M. Hansen, CERN. magnus.hansen@cern.ch
DAQ workshop
uTCA upgrades and VME maintenance

Status and plans for VME PC replacement
 Schedule: first three months of LS1
 Required: Subsystems should evaluate the
PCIexpress conet2 controller card before
summer
Two x4 cards installed in PCs in b904
 BRM will use such a card in CMS during 2012 and have ordered
two cards

UPO 20120316
M. Hansen, CERN. magnus.hansen@cern.ch
DAQ workshop
uTCA upgrades and VME maintenance



Current work in the cDAQ and plans was discussed
 Evaluation of technologies for cDAQ upgrade
 How to deal with legacy vs “new” cDAQ sources
Foreseen evolution of event size was reviewed
 Current investigations of event size dependency on
n.o. primary vertices
Discussion
 All upgrade projects have to produce a time line
showing how many FEDs need to be read out at any
given time up to LS2 and document where the FEDs are
going to be located

Information to the cDAQ group (Frans / Christoph)
UPO 20120316
M. Hansen, CERN. magnus.hansen@cern.ch
uTCA upgrades


Most upgrade systems target uTCA to replace
legacy VME
uTCA is defined as a shelf (crate) carrying AMCs
 Advanced Mezzanine Cards as defined in the
ATCA specification
 Double or Single Width (Slot height, that is)
 Full, mid, or compact height (Thickness, that
is...)
 Double width full size AMCs are square and
have enough space on top and bottom for
components and cooling
UPO 20120316
M. Hansen, CERN. magnus.hansen@cern.ch
uTCA upgrades
UPO 20120316
M. Hansen, CERN. magnus.hansen@cern.ch
uTCA upgrades
Example: Vadatech VT892
Power Module site #2
Twin bulk supply
AMC13 on MCH site #2
Vertical
Air flow!
12 slots
Double Width
Full Size
Power Module site #1
UPO 20120316
Commercial MCH on MCH site #1
M. Hansen, CERN. magnus.hansen@cern.ch
uTCA upgrades


The basic backplane, the MCH, and the power module are
specified in detail in the uTCA specification in order to
avoid interoperability issues. Nevertheless, in order to
make maintenance easier and cheaper:
CMS target
 Common Crates




Perhaps with variants of backplane
Common Bulk Power Supplies
Common Power Modules
Common CMS integration Module
A.k.a. AMC13
 Providing CMS wide common interface to TTC, TTS, DAQ

UPO 20120316
M. Hansen, CERN. magnus.hansen@cern.ch
uTCA Upgrades
Rack and cDCS Integration

Central DCS integration
 Has been useful to have a centralised archive of
temperatures, voltages, currents, etc. in central DCS
 Requires a software bridge from PVSS to IPMI and a list
of quantities to read and archive

LHCb has developed such a bridge that may be evaluated
The cDCS team believes the software development
effort to include uTCA systems is available
The discussion about module standardisation was deferred
 Shelf, backplane, power module, MCH
 Foresee discussion during the upgrade week at the
latest


UPO 20120316
M. Hansen, CERN. magnus.hansen@cern.ch
uTCA Upgrades
IP address assignment

IP address analogous with VME base address for
TCA systems
 Need to represent physical location of the
module, either by direct addressing or through
LUT (IT DNS preferred by sysadmin)
 D. Newbold (Bristol) will write a short note
about a proposed baseline IP assignment
procedure taking current requirements into
account
UPO 20120316
M. Hansen, CERN. magnus.hansen@cern.ch
uTCA Upgrades
Firmware Upload and Bootstrap features

Bootstrap
 Includes functionality of Module Management
Controller (MMC)

Common design preferred
 UW development, IC development, CERN/CPPM/DESY


Common command set agreed
Includes on-board firmware management

“golden build” with firmware upgrade features
 Non-upgradable
“production build” with required functionality
 “development build(s)” with upgraded or modified functionality

 Selectable by software

UPO 20120316
Greg Iles (IC) will write a short note about on-board firmware
management
M. Hansen, CERN. magnus.hansen@cern.ch
uTCA low level software
C. Schwick


Discussion about e.g. register access in uTCA
 Through ethernet: no defined way to access
registers in modules
Proposal
 Ipbus
Initially defined in Minnesota
 Refined and Currently maintained by a UK consortium
 Contain software libraries and firmware demonstrator


The proposal has been adopted as the baseline
for register access for XTCA in CMS
UPO 20120316
M. Hansen, CERN. magnus.hansen@cern.ch
Firmware Maintenance Review


Cyclic review
 Latest review in 2009
Reminder about use of back-up
 Suggest to use a e.g. SVN repository at CERN or
elsewhere for source code development
No seamless integration with development tools
 In particular useful when multiple developers


Recommend to store binary files on the CMS online
depository
As safe as other run conditions
 Intended to be used as communication channel between developer and
“upgrade manager”
 Some complaints to be worked on

 Limitations in version number format
 Cannot delete files (but this is the whole point...)
 Display option requests, e.g. Explode subdirectories
UPO 20120316
M. Hansen, CERN. magnus.hansen@cern.ch
B904
Electronics Integration lab workshop


cDAQ installation almost finished
 Private (.cms’) network ready
 NAS ready configured as in CMS
 Quattor templates debugged
 User head node in place
 5-6 client machine installed, more on request
 DAQ machines installation on-going
 Using the P5 “dropbox” for updating configs in
b904
Installation slowed down by the cooling works on
the building, star point power reliability, etc.
UPO 20120316
M. Hansen, CERN. magnus.hansen@cern.ch
B904
Electronics Integration lab workshop

cTTC
 One TTC Control PC installed (ttc-904)
 One global TTC crate


Clock and Orbit Generator + fanouts
Few TTCci:s
GCT, GT
 HCAL, ECAL, RPC (only soft)


cTTC Waiting for more users
UPO 20120316
M. Hansen, CERN. magnus.hansen@cern.ch
B904
Electronics Integration lab workshop

DSS




https://indico.cern.ch/getFile.py/access?contribId=4&resId=0&mat
erialId=slides&confId=164335
All racks cut on smoke
Dew point monitored, currently no action
Pressure + temp of cooling plant monitored
Select racks have actions based on cooling (see talk linked above)
 Please review and request modifications as appropriate


UPO 20120316
DSS back end installed and users enabled to
acknowledge Alarms and Actions
M. Hansen, CERN. magnus.hansen@cern.ch
Upcoming reviews




RE4 ESR last Wednesday
 Minutes available in agenda under electronics
 Report being edited
ME1/1 EDR follow-up on the 28th of March
HO PRR scheduled on the 18th of April
MB SC relocation ECR to be scheduled early May
UPO 20120316
M. Hansen, CERN. magnus.hansen@cern.ch
Thank you
Download