Volumetrics Nexus Workgroup January 2016 1 Action Action 1202: Volumetrics - Xoserve to consider the peaks [within the DECC roll out curve] and demonstrate in real terms what this may look like across the month. Assess potential peak day meter reading volumes considering the available Smart Roll Out Figures In order to do so, need to define: Smart Roll Out – baseline figures Peak Volumes This will depend upon behaviours which have to be tested Smart Roll Out Figures Source: Steve Mulinganie Smart Roll Out – interpretation What this looks like for gas meters: Cumulative Gas Smart Roll Out 30,000,000 25,000,000 20,000,000 15,000,000 Cumulative 10,000,000 5,000,000 0 to June 2015 remainder of 2015 2016 2017 2018 2019 2020 2021 Assumptions The following assumptions were used to get to this position: Assumptions: Figures includes iGT Meter Points - estimated at iGT+DN is: 24,000,000 Profile doesn't describe actual to June 2015 - assumed 4M (G&E) Total described in roll out 4,000,000 48,500,000 52,500,000 TOTAL % of Roll Out assumed to be gas 46% Profile assumed in the following way: to June 2015 remainder of 2015 Profile: 4,000,000 1,000,000 3,750,000 8,500,000 14,000,000 13,000,000 8,250,000 0 52,500,000 Gas profile: 2,000,000 457,143 1,714,286 3,885,714 6,400,000 5,942,857 3,771,429 0 24,171,429 2016 2017 2018 2019 2020 2021 Note: actuals recorded at Sept 15 < stated for June 2015 Peak Reading Volumes against Smart Roll Out Key factors to consider: Product utilisation Profile of submission Process Specific Assumptions Class take-up To help in developing the requirement, and therefore the assumed Class takeup volumes, the overall meter point count was split into 3 groupings based on their AQ band: AQ Group 1: DM Mandatory AQ Group 2: Meter Points with an AQ greater than 732,000 kWh and less than 58,600,000 kWh AQ Group 3: Meter Points with an AQ less than 732,000 kWh Assumed that, with the exception of Class 1, Class utilisation profile will fluctuate and will not remain static For Go Live assumed that the majority (around 75%) of smart meter sites in AQ Group 3 will remain in Class 4 with a small take-up in Class 2 & 3 Take-up of Class 3 for AQ Group 3 meter points as smart meters are installed All dumb meter sites will remain in Class 4, quarterly read 15_07 Process Specific Assumptions Meter Read submissions Daily reads for Class 1 & 2 meter points For planning its been assumed that all Class 3 reads will be submitted on a monthly basis with 30 reads per batch Class 3 reads will be submitted over a 5 day period to allow for the batch of readings to be submitted within the defined timescales Class 4 reads from smart meters will be submitted monthly Provision made for the submission of a weekly read Class 4 reads from dumb meters will be submitted quarterly Class 4 reads will be submitted over a 20 day period, not smoothed across the whole month, allowing for a higher average daily volume 15_07 Process Specific Assumptions Meter Read submissions Daily reads for Class 1 & 2 meter points For planning its been assumed that all Class 3 reads will be submitted on a monthly basis with 30 reads per batch Class 3 reads will be submitted over a 5 day period to allow for the batch of readings to be submitted within the defined timescales Class 4 reads from smart meters will be submitted monthly Provision made for the submission of a weekly read Class 4 reads from dumb meters will be submitted quarterly Class 4 reads will be submitted over a 20 day period, not smoothed across the whole month, allowing for a higher average daily volume 15_07 Planned Approach Action 1202: Volumetrics – Xoserve to compare the baseline position and what timescales would be required to advance this. Planned Approach Propose to provide assumed volumetrics Maximum Design Volumes Assumed volumes against which UK Link has been designed Expected Usage Volumes Peak transaction rates for key input transactions 15_10 Why? Figures will provide: The above are necessary to ensure that Users of the system understand capacity Better sense of capacity ownership within User / Transporter community What Users can do to maximise existing volumes? Volumes are susceptible to fluctuation as a result of User decisions E.g. and particularly ‘Class’ products Ability to amend where the future is not perfect Smart Roll Out Others??? Assists in defining a process for one off breaches E.g. mass updates of specific flows 15_10 How do we keep ahead of the curve? Will require an industry process to assess this Envisaged in UK Link Manual Users will be required to provide forecast of usage of UK Link 12 month forecast required at 6 monthly intervals UK Link Committee – mandated responses from portfolio shippers greater than [100,000] meter points / assume roll forward? 15_10 14 Any Questions? Whilst the information and data ("the Information") in this document is provided to you in good faith, it includes third party provided data which has not been verified. No warranty or representation of accuracy, completeness or fitness for purpose is given by Xoserve in respect of the information and you are advised that any use of the information by you or your employees is entirely at your own risk.