1 Invitation to Quote Price of Equipment of R-32 in the manufacture of air conditioner under HCFC Phase out Project Item 1 2 3 4 5 Description Charging equipment Transfer pump and piping Safety system Vacuum pumps Leakage detectors DOWNLOAD FILE ลงประกาศวันที่ 2 กุมภาพันธ์ 2559 Quantity 1 1 1 1 1 2 Invitation to Quote Price of Equipment of R-32 in the manufacture of air conditioner under HCFC Phase out Project Date … February 2,2016………………, P.P.J Engineering CO., LTD has received grant fund through the World Bank to implement HCFC Phase out Project. As part of the project, P.P.J Engineering CO., LTD would like to procure the following goods Item 1 2 3 4 5 Description Charging equipment Transfer pump and piping Safety system Vacuum pumps Leakage detectors Quantity 1 1 1 1 1 The supplier is obliged to read and understand the provisions regarding the World Bank’s Anti-Corruption Guidelines stipulated in the World Bank’s Procurement Guidelines for Goods, Works, and Non-Consulting Services version January 2011. The World Bank’s AntiCorruption Guidelines can be found from http://siteresources.worldbank.org/INTLAWJUSTICE/ Resources/AnticorruptionGuidelinesOct2006RevisedJan2011.pdf Supplier must delivery the above mention goods within … 120. .. days after contract signing to the following destination: P.P.J Engineering CO., LTD 52/50 Moo. 4 Sukhaprachasant Road, Bangpood, Pakkred, Nonthaburi, 11120 Thailand Pursuant to the above, P.P.J Engineering CO., LTD would like to invite you to submit quotation of the above mention goods in accordance with specification enclosed with this invitation letter. The quotation including specification of proposed goods must be submitted to us by hand / mail / e-mail not later than at 16.00 pm. of 20 March 2016. The quotation can be sent to the following contact address: 3 Name of Contact Person: Address: Mr.Sittadol Toauravong 52/50 Moo. 4 Sukhaprachasant Road, Bangpood,Pakkred,Nonthaburi, 11120 Telephone 02-9633970-5. Fax. 02-9630438 E-mail prasong@staraire.com Currency USD or EURO Payment term T/T 20% when order confirmation The balance 80% by L/C at sight 60% after completely machine installation & test run and approved by PPJ’s engineer 20% after 6 months of PPJ’s engineer approval date. Warrantee term Minimum 2 years after commissioning date Provide service maintenance at least 2 times per year under warrantee period Sincerely yours, [Mr.Sittadol Toauravong] [International Trade Manager] P.P.J./Engineering CO.,LTD 4 Specification 1. Charging equipment - Mass flow metering device - Charging speed up to 120-150 g/s. - Charging accuracy +/-0.5 %,> 100 to 250g - Accumulator 25 to 30L - Hose length 3.5m, with coupling ,3/8” - 1 Flex. Charging gun - Vacuum speed not less than 20m3/hr - Power supply 380-415V/3Ph/50Hz - Color touch screen controller 2. Transfer pump and piping - Flammable booster pump - Refrigerant flow rate 6-7 l/m or 100 g/s up - Max. Refrigerant outlet pressure 30-40 bar - Manual shut off incoming supply. - Supply line safety valve 35-45 bar - Power supply 220-240V/1Ph/50Hz 3. Safety system Controller system 4. - Up to 4 gas sensor connection - Up to 4 delta P connection - 2 local e-stop, 1 ext electric cut-out (pot free) - 2 level gas alarm 15%, 30 to 35% Vacuum pump - Pumping speed: ≥ 25 m3/h - 2 x 3m vacuum hose with Nitto type 3/8" - Exhaust filter - Digital vacuum gauge - Power supply 380V/3Ph/50Hz 5 5. Leakage detector - Detect R 32 leaks by sniffing method - Response time < 1s. - Min. detectable leak rate 0.5 g/y. - Starting warm up time 30 s. 6