Interface with non-ISPS Compliant Vessel XYZ Port Facility Maritime Security Drill Briefing for Controllers date Interface with non-ISPS Compliant Vessel Interface with non-ISPS Compliant Vessel Drill D511 Interface with non-ISPS Compliant Vessel Scope • Date, time, location • Aim • Objectives • Desired outcomes • Controllers • Players • Materials • Scenario • Master Events List • Controller Tasks • Communications • Safety • Debrief Interface with non-ISPS Compliant Vessel Drill number: X/XX Date: Start Time: Location: Estimated End Time: Interface with non-ISPS Compliant Vessel Aim To allow security staff to be familiar with the entire process for the exchange of a DoS. Interface with non-ISPS Compliant Vessel Objectives • Obtain the necessary information required from the ship for DoS by using proper shoreto-ship communication. • Implement the security measures as specified in the DoS. Interface with non-ISPS Compliant Vessel Desired outcomes Players will be able to: • Negotiate the successful exchange of DoS. • Implement the measures to comply with the requirements of the DoS. Interface with non-ISPS Compliant Vessel Control Team • Chief Controller: Safety Manager, Mr. AAA • Ship’s agent to be informed • Controllers Ship Security Officer – Mr. XXX Interface with non-ISPS Compliant Vessel Players • PFSO • Security staff • Operations staff Interface with non-ISPS Compliant Vessel Scenario The agent for a ship scheduled to call upon the Port Facility informs the Port Facility that the ship is at a higher Security Level than the port facility and may need an exchange of DoS. Interface with non-ISPS Compliant Vessel Master Events List S/N Time Event 001 0900 All participants in position 002 0905 Drill commence 003 0945 Informs Port Facility that ship is at a higher Security Level and request for an exchanged of DoS Drill completed 004 1100 005 1130 Hot Wash From To Means of Delivery Chief Controller All Telephone Ship’s agent Chief Controller Chief Controller Expected Response None PFSO Telephone Obtain information from ship for DoS Telephone Dispersal of personnel/ equipment N/A All All Remarks “Drill Start” “Drill End” Consider delaying till ship in is harbor Interface with non-ISPS Compliant Vessel Controller Tasks • The Chief Controller will check that the ship is ready for the drill • The ship’s agent will inform the port facility that the ship is at a higher level of security than the port facility and will need an exchanged of DoS. Interface with non-ISPS Compliant Vessel Communications • Telephone • Sat Comms SSO – XXXX Port Facility – YYYY • Email SSO – XXXX Port Facility – YYYY Interface with non-ISPS Compliant Vessel Code words Drill Start The drill is to commence Drill Suspend The drill is temporarily suspended Drill Go The drill is to resume from where it was suspended Drill Stop The drill is to be terminated (prematurely) Drill End The drill is completed Drill, Drill, Drill The message or statement that follows this preamble relates to the drill only, and is not to be confused with real activity Interface with non-ISPS Compliant Vessel Debrief • Location: • Secretary: • Attendance Interface with non-ISPS Compliant Vessel Any questions ?