Full Name MOHAMMAD NAEEM KHAN

advertisement
MOHAMMAD NAEEM
Civil Engineer
Mob: +971 55 7280746
Email: naeemkhan18372@yahoo.com or
mohammadnaeemk@ymail.com
Professional Profile
Professionally qualified Civil Engineer with 16 year experience in Structures, Roads, Infrastructures, i-e
Gravity Sewer Networks, Gravity Drainage work, Irrigation networks, Telecom Networks, Construction of
Combined Ducts (LV, HV, Ducts, Irrigation, DM Spare Ducts, Street Lighting Ducts), Sewer connection
Mainline Ø600mm, Ø1000mm, Ø1200mm and Irrigation line Ø400mm, Supervision of NDM works, Over
pumping, Construction of Drainage and sewer pumping stations, Drainage Detention Pond, Manholes &
Chambers construction and House connection works.
WORK EXPERIENCE
1-AECOM Middle East Ltd.
Assistant Resident Engineer (June 2007 to Present)
July 1, 2011 to till date


Project: ADSSC Contract No. O-10841 - Construction of Sewerage connections and related
works to isolated properties in Abu Dhabi Island and Main Land Phase – VII
Project: ADSSC Contract No. O-10515 - Construction of Sewerage connections and related
works to isolated properties in Abu Dhabi Island and Main Land Phase – VI
Brief Description of work:
Both the above projects are of similar in nature having defined and undefined works as under:







Construction of Flow Diversion link between trunk sewers E and D lines of ADSSC.
Sewer Connection of Central Market Development to pumping station PS2. Abu Dhabi.
Construction of flow Diversion near Plot No.PA3 in sector S-23
Creation of New Sewerage Connection for Sector W-42 Adnoc Head Quarter Building Abu Dhabi.
Gravity sewer including related structures and associated works
Abandonment of existing sewerage and storm water lines with associated structures
Testing and Commissioning of all the works
February 2009 to July 2011

Project: ADSSC Contract No. O - 1191 - Construction of sewerage scheme for Al Shawamekh, Al
Shahama, Al Bahiya, Al Sader, and trunk sewer for Falah and Shamkha Abu Dhabi - Additional
work Orders Sewerage works at Sector MW-5 Musaffah and W-21 Abu Dhabi,
Description of work:




Construction of gravity sewer network of pipe lines ranging from 160mm diameter Upvc to
280mm diameter Upvc and 200mm diameter GRP to 400mm diameter GRP by open cut method
and NDM along with associated manholes and chambers.
Construction of 1000mm dia Trunk sewer main using NDM 2.3 km long with connection to
existing Trunk sewer.
Construction of 2 Nos. of sewerage pumping stations, demolishing of existing pumping station.
Construction of sewer pressure line 1000mm dia GRP from MPS 8 to Mafraq waste water
treatment plant, along with associated chambers community. The proposed pressure line had
conflict with many existing services, such as existing storm water and irrigation lines, Estisalat
chambers, and existing sewer pressure lines.
June 2007 to February 2009








Project : Contract DS-142 - Drainage & Sewerage Infrastructure works of Oud Al Muteena
(C265), Dubai:
The scope of work under this contract comprises of carrying out the infrastructure works at Oud
Al Muteena areas of Dubai Emirate, as detailed here in:
The construction of gravity sewerage networks of 74.6 km of different pipe materials and
diameters and associated manholes 860 nos. and
The Construction of sewerage house connection network of 160mm to 200 mm uPVC pipes,
arppox.11.6 km and associated house connection chambers more than 1000 nos.
The construction of gravity drainage network of more than 55 km of different pipe materials and
dia (from 250mm dia uPVC to 1300mm dia GRP) and associated manholes (560 nos. gullies.
Carrying out the sewerage wet connection for 560 no. villas and 80 no. labor accommodation
buildings at Sonapur area.
Execution of 17 no. of road crossings using NDM method and pipe jacking.
Construction of drainage detention pond and associated structures of Total area: 108, 702 m
2-Halcrow International Partnership
Civil Engineer (May 2005 to June 2007)
Contract: R-407 & R-517 - infrastructures, roads and parking, all underground utilities, drainage and
sewerage various colleges, schools and department building at Sharjah University
Contract: R478 - Sharjah Dhaid Road Improvement widening and beatification.
Montgomery Watson Harza International Consultants (MWH)
Civil Engineer (April 2003 - April 2005)
Projects: Contract R713/A - Trunk Sewerage for Baniyas East Extension Abu Dhabi, Includes:

Construction of sewerage pipe line 800mm dia GRP to 1800 mm dia GRP Pipe by open cut and
NDM method and open and associated manholes and chambers.


Construction of house connection network for sector 2 and sector 4
Construction of pumping station PS-16 at Baniyas East.
Projects: DS-115 Drainage and sewerage works for Mohaisna 3 & 4 Emirates of Dubai Includes:





The scope of work under this contract was comprised of Construction of complete sewerage and
drainage network of the community.
Construction of gravity sewerage network 120km long of different material (uPVC and GRP) and
diameters (200 to 1400mm) and associated manholes.
Construction of house connection network of gravity line of 160mm diameter total length of
pipe 65km and associated house connection chambers.
Making house connections (dry and wet connections) to 700 Nos. of existing villas and
demolishing of existing septic tanks.
Construction of drainage network for the same community.
Project: DS151-Al Warqa-1 Sewerage and Drainage works
Duties and Responsibilities Performed as ARE:















Assist the Resident Engineer in performing the contractual duties on site.
Provides supervision of field inspection and ensure that the project specification/requirement is
carried out to the client's satisfaction
Supervising the contractor to achieve construction in accordance with the contract documents,
budget and time frame.
Monitoring the progress of construction against the approved program and take the necessary
steps to achieve the progress as per approved program.
Review contractor's submissions (Project Quality Plan, Safety Plan, Method statement, shop
drawings, materials, and monthly payments).
Provide all necessary on-site direction and issue site instructions, NCR,s to ensure quality on site.
Supervise site inspection staff and advise them for inspection needs.
Ensure that all materials and equipment to be incorporated into permanent constructions are
incompliance with contract plans/specs with client approval.
Assists the Resident Engineer in reporting on progress, safety, and quality control and design
modifications.
Builds a trusted relationship with the management team and with the client's counterpart staff.
Places an emphasis on safe construction practices (Target Zero) and on maintaining a high
quality of construction. Leads by example in driving safe practices on site.
Ensures that the approved project quality control procedures are used for the supervision works
and monitors it for improvement.
Evaluates, selects, and adapts construction management and control techniques, procedures,
and criteria to suit job tasks, and devises and implements solutions to problems encountered.
Coordinate with client representatives and all services authorities.
Handing over inspection of the completed work to the client, preparation of documents for PAC
and/or PPAC.
3-Al Shaafar Transport and Contracting Company Dubai.
Roads & Infrastructure Engineer (Jan 2002 - April 2003)
Projects: Dubai Central Fruit and Vegetable Markets, Complete new development at Al Aweer area.
Worked as team leader to carry out the infrastructure work of the contract mostly the following
utilities:
 Construction of Sewerage network Including Pipe line with associated manholes and house
connection chambers.
 Construction of storm water drainage including pipeline and associate manholes and gullies.
 Water distribution network all associated chambers.
 Irrigation system including pipelines with associated chambers
 Street lighting.
 Public address system.
 Fire fighting system.
 Electrical cables.
 Etisalat Ducts.
 Landscaping
 Roads and Parking’s
4-Emirates Road Contracting Company Dubai & Ajman.
Project Engineer (utilities & services) (Jul 1998 - December 2001)
 Projects completed include:
 Improvement of Al tawar Road Dubai.
 Internal Road in Al-Jurf Ajman.
 Improvement of Hamidiya Junction Ajman.
5-Marwan General Contracting Company LLC, Sharjah
Site Engineer (Aug 1996 - June 1998)
Projects completed: R-321 -Improvement and Widening of Sheikh Zayed Road, Sharjah (15km).
 Removal of existing asphalt, Road base up to formation level.
 Lowering and relocating of existing services as per new design to the approved Corridor and
depths.
 Lying of road crossing ducts for all services as per authorities requirements.
 Re-construction formation, sub base, road base, Asphalt base course and wearing course.
Duties and Responsibilities



Overall supervision of construction activities
Technical Design review of highway and services i-e surveys, earth work, Wet mix, base course,
wearing course, storm water drainage, dewatering system street lighting, road signage as per
specification for the aforementioned projects
Coordination with consultants regarding quality, inspection, approval of works,




Coordination and progress review meeting with sub-contractors, consultants and clients
Coordination with local authorities i-e Ajman Municipality, FEWA, Etisalat, Ajman Police,
Regarding work permits, NOCs for relocation of existing services and traffic diversions
Handing over of all services to the respective authorities
Final handing over inspection with client representative
Academic Qualification
B.Sc. (Civil Engineering) in 1996 (with Honors)
University of Engineering and Technology Lahore, Pakistan
Professional Affiliations




Member of ICE U.K (Registration No.64529541)
Registered Member of Pakistan Engineering Council
Member of Society of Engineers, UAE
Member of American society of Civil Engineers (Registration No.491623)
Computer skills: MS Word, MS Excel, MS PowerPoint & Primavera Project Planning
Safety courses completed:
 Managing safety in construction approved and validated by IOSH in association with Safety
Solution UK LTD.
 Confined space entry training from Emirates Technical & Safety Development Center (ETSDC)
Abu Dhabi.
Approval from Various Clients



As Assistant resident Engineer from Dubai Municipality for contract DS-115, DS-142, DS-151.
As Project engineer from EMMAR for Arabian Ranches Infrastructure works.
As Assistant Resident Engineer from Abu Dhabi Sewerage Services Company (ADSSC) for
Contracts, O-1191, O-10841, O-10515.
Personal Information
Full Name
Date of Birth
Nationality
Religion
Marital Status
Visa Status
MOHAMMAD NAEEM KHAN
18th March 1972
Pakistani
Islam
Married
Employment (Transferrable)
Download