Borras Construction Limited 1 Salar House Campfield Road St Albans Hertfordshire AL1 5HT Tel: 01727 850633 Fax: 01727 847306 Our ref: SQ1 24 March 2016 Dear Sir/Madam, To ensure we are in full compliance with the Construction (Design and Management) Regulations 2015 as well as our own ISO quality, environmental and safety management procedures we require that all our sub-contractors complete the attached SQ1 – Sub-Contractor Questionnaire. To enable the questionnaire to be approved please complete all sections to the best of your ability, providing as much detail as possible. This will enable the originator of the SQ1 to approve your company without delay. Questions relating to the completion of the form should be directed to the originator. If you need specific information on membership to receive safety/environmental competent advice or inspection services (Question 14) you can also contact The Building Safety Group (BSG). If you need company training (Question 15) you can also contact Bedfordshire and Hertfordshire Construction Training Limited (BHCTL). Both BSG and BHCTL are not for profit groups who work for the benefit of their members striving to improve our industry standards throughout the region. Their contact details are listed below. The Building Safety Group Limited http://www.bsgltd.co.uk/ Tel: 01454 414877 Fax: 01454 415388 Email: info@bsgltd.co.uk Bedfordshire & Hertfordshire Construction Training Limited http://www.bhctl.com/ Tel: 0845 603 5783 Fax: 0845 603 5783 Email: info@bhctl.com Yours Sincerely Kane Blatchford Health, Safety, Quality & Environmental Manager SQ1/4/Rev11 04/15 SUBCONTRACTOR QUESTIONNAIRE Please complete sections 1-20 and provide details where requested Originator: Date: Company Details Name & Address: 1. Tel: Fax: E-mail: 2. Nature of Business: 3. Managing Director: 4. Preferred geographical operating area: 5. Value of Contracts undertaken: 6. (Please complete the attached trade listings) Estimator: Previous years turnover: Min: £ Max: Last Year: £ 2 years ago: £ 3 years ago: £ £ If yes state group name: 7. Member of a group of companies? Yes/No Company Registration No: Received: VAT No: 8. UTR No: N.I. No (if not a Ltd company): If a partnership please provide names and UTR number of each partner BACS Payment Details Bank Account Name: Bank Name: Bank Branch: Account Number: 9. Sort Code: Insurance: Public Liability Employers Liability Professional Indemnity Insurer: Policy No: 9. Renewal Date: Limit & one occurrence Received: SQ1/4/Rev11 04/15 Do you have the following accreditations? Yes/No ISO 9001 Quality Standard 10. ISO 14001/BS 8555 Environmental Standard BS 18001 Health and Safety Standard BS 25999 Business Continuity Standard Please Provide: Received: Environmental Policy Statement Equal Opportunities Policy Statement 11. Details of any Environmental incidents/prosecutions Copies of Insurance Certificates, or Broker’s letter, showing renewal date/liability limit Note: If you have any relevant incidents or prosecutions you must notify us immediately Borras Construction Office Use Only: Approved By: HSQE Approval (refer to checklist on page 6) Name: Name: Signature: Signature: Date: Date: 12. Has your organisation been approved by SSIP Member organisation e.g. CHAS, Exor, Safe Contractor or equivalent? Yes/No If yes please provide a copy of your certificate or registration number and skip questions 13-17 Please provide a copy of your organisations Policy, Organisation, arrangements and procedures in relation to health & safety. 13. This should include details of arrangements and procedures for monitoring, audit and review of H&S performance, worker involvement and consultation, accident reporting, sub-contracting (including how you assess the competence of your sub-contractors), hazard identification, risk assessment and production of method statements, co-operation and co-ordination of works with other contractors and welfare. Note: if your organisation employs less than 5 employees you may not have a safety policy. If this is the case please provide a written statement, signed by the person responsible for H&S within your organisation that you will comply with the requirements of our documented health and safety policy as a minimum. Please provide details of who provides your organisation with competent health and safety advice including relevant records of training and experience. 14. 15. Name: E-mail: Address: Tel: Do your employees and subcontractors have the necessary training and qualifications for the work they are to undertake? Yes/No If yes please provide evidence of training that you have undertaken relevant to your works SQ1/4/Rev11 04/15 16. Please state the percentage of your workforce that has passed the CSCS touch screen test and/or provide us with a commitment to obtain a minimum of 90% CSCS carded workforce within 3 years: % Carded: We commit to 90% of our onsite operatives being CSCS carded by: Provide a summary of your health and safety record over the past three years, including details of any notifiable accidents, prosecutions or notices issued by the Health and Safety Executive that have occurred during this period as set out in the Reporting of Injuries, Disease and Dangerous Occurrences Regulations (RIDDOR). Where you have indicated a RIDDOR reportable incident or HSE notice/prosecution please provide details including actions taken to prevent further occurrences. Numbers should include staff, direct employees and sub-contractors. Statistics Last Year 2 Years ago 3 Years ago Comments Prohibition or Improvement Notices Prosecutions Fatalities 17. Specified Injuries Over 7 day injury Dangerous Occurrences Reportable Disease Accident incident rate (AIR) = average number of employees including subcontractors divided by number of reportable incidents multiplied by 100,000 Please provide details of relevant experience in the field of work for which you are applying and provide 2 references confirming that the work was carried out with due regard for health and safety 18. 19. Please select trade categories relevant to your business using the table below SQ1/4/Rev11 04/15 A10 A11 A12 A13 A14 A15 A20 A30 A40 A41 A45 A50 A70 A90 A94 A95 A96 A97 A98 C C10 C15 Preliminaries Scaffolding Scaffolding alarms Fall arrest/Eyebolts Air tight/Thermal testing Scaffolding roofs Acoustic/Sound testing Tower cranes Concrete pumps Hoisting/Cranes Abseiling/Difficult access Temporary fencing Temporary works engineers Site electrics Skip hire Drain cleaning Site cleaning Labour hire Site survey Security Guard Demolitions/Alterations Demolishing structures Soft strip F14 F20 G G05 G10 G20 G25 G31 G32 G35 G40 G50 G59 G61 G65 G68 G70 G75 H H10 H11 H13 H14 C20 C21 C35 C36 C37 C38 C39 C40 C42 C44 C51 C60 C65 C70 Shoring Demolition/Welding Clean stonework Clean concrete Anti graffiti Pest control Chemical DPC to existing Rep. to concrete/brickwork Sika approval Fosroc approved Wet/Dry rot Repairs to timber windows Repairs to steel windows Shot blasting H15 H20 H21 H22 H23 H24 H25 H26 H60 H62 H71 H72 H73 H75 C80 C81 C90 D D10 D11 D12 D20 D21 D30 D32 D40 D50 D75 D80 E E10 E15 E20 E30 Asbestos removal Asbestos testing Preservation Groundwork Ground investigation Soil stabilization Site dewatering Excavating and groundwork Bulk dig Piled foundations Steel sheet piling Diaphragm walling Underpinning Thrust boring Machine hire Concrete/Precast Concrete frames Industrial insitu concrete slab Formwork Steel fixing J J01 J02 J03 J04 J05 J06 J07 J08 J09 J20 J22 J31 J41 J42 J44 J45 J46 J47 J48 Wall tie repair Stone walling Structural steel/timber Onsite welding Structural steel Woodwork Specialist joinery Timber frames Timber frames fix only Timber roof trusses Metal balustrades Stainless steel Keeclamp PVC handrail Architectural metalwork On-site welding Metal stairs Mezzanine floors Cladding/Coverings Patent glazing/curtain wall Rainscreen cladding Structural glazing Concrete rooflight/pavement light Shop fronts Metal cladding Corus Euroclad Kingspan Rigidal Speedeck Wards Roof tiling Roof slating Lead sheet/flashings Alum strip/sheet/flashings Copper strip/sheet/flashings Stainless steel strip/sheet/flashings Waterproofing Ext insulation (Enclad) Ext insulation (Eglinton) Ext insulation (PCP) Ext insulation (MR) Ext ins. (Permarock) Ext insulation (EWIA) Ext insulation Alumasc EW1 Ext insulation (Sto) Ext ins Envirowall Asphalt Green roofing Liquid applied membrane Build up felt roof covering Sgle layer hi-perform roof Decra roofing system Callenders approved Andersons approved Erisco & Bauder approv. Esha (UK) roofs J56 J57 J58 J59 J60 J61 J62 J63 J64 K K10 K11 K15 K30 K31 K32 K33 K39 K40 K41 K50 L L05 Alumasc Icopol Trocal Alkor Draka Axter Protan Permaquick Ecofin Kemper Linings/Partitioning Drylining Hygienic wall/ceiling clad Acoustic floors/ceilings Demountable partitions Specialist fixed partitions Folding partitions Moveable partitions Clean/redec suspd ceilings Suspended ceilings Raised access floors Corner/Door protection Windows/Doors Aluminium windows L06 L07 L08 L09 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 Aluplus Comar Sapa Kawner Timber windows Steel windows Plastic windows Plus plan systems Rehau systems Schuco systems Profile 22 systems Veka systems Glostal Monarch Deceuninck systems L20 L22 L23 L24 L35 L37 L39 L40 L41 L42 L45 L56 L60 L70 L75 L80 L90 M M04 M05 LB Plastics Eurocell Spectus Duraflex Industrial doors Shutters & Grilles Secondary glazing General glazing Lead light glazing Glass blocks Applied films Glass renovation Metal louvers Rood lights Sunpipes Garage doors Automatic doors Surface Finishes Plastering/Screeding Screeds SQ1/4/Rev11 04/15 E50 E60 E95 F F09 F10 F11 M32 Precast concrete large units Precast/Concrete flooring Metal deck forming Masonry Repointing Brickwork Glass block walling Rigid insulation thermal J49 J50 J51 J52 J53 J54 J55 Q26 Sarnafil roofing Permafelt Derbigum Langley Ruberoid Tremco Marley Special surface/paving sports M06 M08 M12 M16 M21 M24 M28 Y M36 M40 M41 M42 M45 M50 M60 M61 M62 Rigid insulation fire protection Ceramic W/F tiling Terazzo Woodblock/Parquet flooring Sports flooring Carpet/Vinyl tiling Painting/Wallpaper Anti graffiti Intumescent painting Q30 Q31 Q40 Q41 Q50 Q90 Q91 R R10 Z10 Z20 Z30 Z31 Z32 M63 M64 M65 M66 M67 M68 M70 M72 M76 N N09 Resin finishes Artex TOR-Communal areas TOR-Balcony coatings TOR-Roof coatings Sprayed painting Window care French polishing Signwriting Furniture/Equipment General fixtures/Furnishings/Equipment Laboratory equipment Domestic kitchen fittings Catering equipment Sanitary ware Signs/Notices Medical equipment Sauna/Steam rooms WC cubical partitions Curtains and blinds Shop fitting Warehouse racking Clocks Entrance matting R21 R50 R60 R65 S S10 S11 S21 S34 S63 S64 Landscaping Arborlogist Fencing timber/chain link Security fencing Site/Street furniture/equip. Road markings Access control Disposal Systems UPVC Rainwater pipework/Gutters Sewage pumping Aluminium gutters/fascias CCTV drain inspections Drain lining Piped Systems Plumbing Plumbing –Social Housing Swimming pools Medical gases Sprinklers Fire protection installations Storage equipment Flagpoles Insulation/Ironmongery/ Sundries Sundry insulation/Fire stops Loft insulation Cavity insulation Mastic pointing Diamond drilling Paving/Planting/Fencing Tarmac paving Asphalt road Interlock brick/Block road/paving Slab/Brick/Sett/Cobble paving W30 W40 W41 N10 N11 N12 N13 N15 N20 N22 N41 N60 N70 N80 N90 N91 N92 N93 P P10 P13 P20 P22 P31 Q Q21 Q22 Q24 Q25 T T30 T40 U U41 V V10 V30 V40 V50 V60 V65 W Specialist floor coatings Granolithic Lightweight screeds Fibrous plaster Insulation with render Sprayed insulation therm Spray/d insul fire protect Mechanical & Electrical Services Various Solar control General builders Civil engineering Social Housing contractors Mechanical Services Mechanical services Heated screeds Air Conditioning Air Conditioning Electrical Installations Electrical services Fire alarm installations Sound insulation TV aerials Computer wiring Induction loops Communications/ Security TV installations Door entry systems Security systems W45 Window controls W52 Lightning protection X Lifts & Transport Systems X10 Lifts X15 Mobility lifts X20 Escalators Q90 Road markings Other (Please add in the space below your trade if not listed above) SQ1/4/Rev11 04/15 Declaration: I hereby confirm the information given in this questionnaire is true and correct Signed on behalf of the subcontractor Date: 20. Name: Position: SQ1/4/Rev11 04/15 Borras Assessors Checklist: Evidence required by assessor carrying out approval: Note where no evidence is provided the HSQE Manager is to be consulted prior to approval 1-11: Provided (Y/N) Details provided (registration to 9001, 14001, 18001/8555 or 25999 is desired but not mandatory) 12: EXOR, CHAS, Safe Contractor or Equivalent Registration Certificate or Number (registration is desired but not mandatory). If certificate provided then the contractor can skip questions 13-17 otherwise a full assessment is required. 13: Policy includes all listed items or statement is included verifying they will comply, as a minimum, with the requirements contained within our Health and Safety Policy and Procedures. Where there is doubt as to the adequacy of the H&S policy for the type of works the contractor is to undertake the HSQE Manager is to be consulted. 14: Should supply evidence of qualifications or experience to carry out this role and may include IOSH, NEBOSH, CITB, CSCS or other relevant qualifications (note that some companies may use external consultants, in-house operatives or directors to fulfil this role). Where industry experience is the only evidence HSQE should be consulted prior to approval. 15: Training records should include H&S records for Management/Supervisory Staff as well as applicable operative training e.g. asbestos awareness, plant operators, working at height etc and may include on the job, in-house or external training. The HSQE Manager is to be consulted where recent training, relevant to the works to be carried out cannot be provided. 16: The contractor has over 90% of their on site workforce qualified to CSCS or provided a commitment to do so within 3 years. Where accidents, dangerous occurrences, HSE prosecutions/prohibitions have been identified the contractor should identify actions taken including actions to prevent recurrence of a similar incident. 17: The HSQE manager is to be consulted where the contractor has had any Fatalities, Major Accidents, Dangerous Occurrences or Reportable Diseases or if the AIR is over 1000 prior to approval. 18: 2 satisfactory references have been provided; they are relevant to the type of work the contractor is approved to carry out 19: Trade categorisation identified 20: Questionnaire singed on behalf of contractor Assessor Comments: SQ1/4/Rev11 04/15