[SRM752 Advanced Project Management] Individual assignment 1 Critical analysis essay; strategic, tactical and operational challenges on complex projects in AEC industry 40 Marks PURPOSE OF ASSIGNMENT The purpose of this assignment is to: ● ● Enable you application of your critical analysis attributes and demonstrate your understanding o f strategic, tactical and operational challenges facing modern project management (PM) profession within the Architecture, Engineering and Construction (AEC) industry Provide evidence of your ability to review and evaluate various organisational structures forming project environment of a complex (international) construction project ASSUMPTION: Assume that you were appointed the Construction Manager to assist Project Management Team in managing construction of the “BCA Class-6 Drive-through restaurant” (SRM752-T3 2014) project. The project scope relates ONLY to the construction phase. Necessary design and project management information is provided in CloudDeakin (“2014 case PROJECT” folder). ASSIGNMENT TASK Based on the above assumption your tasks are as follow: Introduce (very briefly) the “BCA Class-6 Drive-through restaurant” (SRM752-T3 2014) project (scope of work, project procurement, stakeholders, etc) Detail scope (deliverables) of the “BCA Class-6 Drive-through restaurant” (SRM752-T3 2014) project Define your role as the Construction Manager on this project Identify strategic, tactical and operational challenges currently facing PM discipline Identify strategic, tactical and operational challenges currently facing AEC industry Identify strategic, tactical and operational challenges that the “BCA Class-6 Drive-through restaurant” (SRM752-T3 2014) project is likely to face at its construction phase Identify and briefly define a number of feasible organizational structures for managing medium-scale, local-projects (including but not limited to traditional organizations, pure product, projected organizations, matrix organizations, and relationship - based organizational structures such as IPD, Partnering, PPP) Recommend p r o j e c t organization most appropriate for the construction phase of the “BCA Class-6 Drive-through restaurant” (SRM752-T3 2014) project. Your recommendation to the project stakeholders should provide detailed description and justification for the proposed structure Benchmark/evaluate your recommendation against other feasible organisational structures that could be employed on the “BCA Class-6 Drive-through restaurant” (SRM752-T3 2014) project Identify possible implications of your proposed organisational structure in relation to strategic, tactical and operational challenges likely to face the project © Deakin University Trimester 3, 2014 [SRM752 Advanced Project Management] ASSESSMENT CRITERIA You will be provided with an assessment rubric two (2) weeks prior to the submission date of this assignment (24/11/2014) _________________________________________________________________________________ FORMAT OF ASSIGNMENT Preferred submission format of the assignment is an essay; however, a technical report submission is also acceptable (pdf). Suggested word count 1,500 per student ASSESSMENT SUBMISSION Submission is in Week 5: by 5.00pm on 09 December 2014, via dropbox in CloudDeakin. _________________________________________________________________________________ ADDITIONAL INFORMATION - Feedback Feedback on this assignment will be provided by 5.00m on 19 December 2014 via BlackboardCollaborate © Deakin University Trimester 3, 2014 [SRM752 Advanced Project Management] SRM752 Advanced Project Management School of Architecture and Built Environment Trimester 3 - 2014 Unit Chair: Adam Krezel Teaching Staff: TBA ASSIGNMENTS - GENERAL INSTRUCTIONS 1. This document is to be read in conjunction with the Unit Guide for this unit. The Unit Guide provides detailed procedures and requirements for issues such as late submission and special consideration for assessment. 2. It is the responsibility of each student to confirm submission requirements including dates, time, format and procedures. 3. This unit has two assignments. individually. You should accomplish Assignment 1 and Assignment 2 4. According to the Faculty’s regulations, late submission of an assignment will incur a ten per cent (10%) reduction of the available mark for each day, up to three days, after the due date. Assignments submitted after three days will not be marked. 5. Extension or special consideration may be considered for late submission. relevant university regulations for detailed procedure. Please refer to 6. All assignments must be submitted electronically through CloudDeakin. Assignments submitted in any other way will not be marked. 7. You may refer to publications, but you must write in your own “language” and cite the references using the Author-Date (Harvard) system. It is essential for you to fully understand what you write and to be able to provide further explanations if you are requested to do so later on. The library provides workshops and advice on citations and referencing. 8. The front page of all assignments submitted through CloudDeakin must only include: ● Title ● Author name(s) and affiliation ● Date 9. If you are not clear about the requirements of the assignments, please seek your lecturer/tutor’s help as soon as possible. 10. The University regards plagiarism as an extremely serious academic offence. 11. Before starting your assignment, please read the University document, Study Skills at http://www.deakin.edu.au/current-students/study-support/study-skills/ © Deakin University Trimester 3, 2014 [SRM752 Advanced Project Management] © Deakin University [SRM752 Advanced Project Management] ASSESSMENT RUBRIC © Deakin University